CN109544051A - A kind of construction management application platform based on BIM technology application - Google Patents

A kind of construction management application platform based on BIM technology application Download PDF

Info

Publication number
CN109544051A
CN109544051A CN201910075499.5A CN201910075499A CN109544051A CN 109544051 A CN109544051 A CN 109544051A CN 201910075499 A CN201910075499 A CN 201910075499A CN 109544051 A CN109544051 A CN 109544051A
Authority
CN
China
Prior art keywords
construction
model
management
information
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910075499.5A
Other languages
Chinese (zh)
Inventor
耿少鹏
连双伟
王振华
郭振方
李俊杰
李子华
田勇欣
张天
兰平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Guangdong Construction Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201910075499.5A priority Critical patent/CN109544051A/en
Publication of CN109544051A publication Critical patent/CN109544051A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of construction management systems, espespecially a kind of construction management application platform based on BIM technology application, specifically include that work station, server are connect with construction equipment by wireless router to form wireless communication transmission control, construction equipment mainly includes mobile terminal device, suspension and support, folding ladder, detachable protective fence, transtainer, striping machine, plumbing installation and positioning member;Wherein positioning member is the steel bar framework component of quantity Matching architecture information;Suspension and support is fixedly mounted between two wall bodies of adjacent spaces;Folding ladder and detachable protective fence are arranged in architecture information outer periphery;At the movable passageway that the architecture information being spaced apart from each other is set of transtainer, striping machine, plumbing installation;The present invention is by management system and modeling software, is that the critical process such as progress control, on-site coordination in work progress provide the guidance such as accurate component geometric position, project amount in time, side item controlled cost promotes quality in conjunction with construction equipment.

Description

A kind of construction management application platform based on BIM technology application
Technical field
The present invention relates to a kind of construction management system, espespecially a kind of construction management application platform based on BIM technology application.
Background technique
With industrial scale and specialization, it is seen that scientific and technical development level is continuously jumped In property progress, and now construction-engineering project in, the management of the progress of architectural engineering, quality, safety, environment etc. is just from right The management of original personnel is gradually transformed into the management to guiding building;When in super large lid rolling stock section environment, the environment Belong to Large Infrastructure Projects, there are the civil engineering scale of construction is big in construction management, electromechanical installation is complicated, multi-process, intersect, the duration Nervous feature, there are many urgent problems to be solved, such as environmental protection, quality, safety, cost, the controls of progress etc.;But mesh Technical staff is generally young in preceding project, and construction experience is insufficient, causes site operation field management level lower, and no forensic science closes Allotment talent's machine resource of reason;Measure common at present is to be participated in using BIM technology into construction, and BIM technology can be in certain journey It makes up the shortcoming of experience on degree, and Optimizing Construction Scheme can be shifted to an earlier date using BIM technology, by construction simulation optimized construction procedure, Construction speed is presented in real time with three-dimensional visualization;But specific in super large lid rolling stock section, it is reasonable to be still short of a system Management operation.
In super large lid rolling stock section environment, do mechanization operation is gradually realized, but do mechanization operation can not avoid completely Unpredictalbe safety accident occurs, cause the accident it is mostly be since operator inadvertently operates against regulations, accident occurs When, not only delay construction quality and progress, but also cause construction personnel's injury, the even more serious life for influencing whether construction personnel Life safety or the huge property loss for causing engineering, and causing the main reason for operating against regulations is since operator is to building machine The safety operation of tool does not have effective monitoring means or Supervision Measures, and without multifarious ancillary equipment.By BIM technology When being applied in engineering construction, due in the construction system of super large lid rolling stock section, being run at present in conjunction with BIM technology Transformation does not have the reasonable operating method of system, therefore in future construction, needs to rationalize the two, efficient fusion It for a work system, avoids difficulty of construction but increasingly difficult with technology development, leads to the quality of architectural engineering, architectural engineering Construction speed, the construction safety of architectural engineering, architectural engineering control of investment can not monitor it is perfect.
Summary of the invention
To solve the above problems, the present invention is directed to disclose a kind of construction management system, it is espespecially a kind of to be based on BIM technology application Construction management application platform.
To achieve the above object, the technical solution adopted by the present invention is that: it is a kind of based on BIM technology application construction management answer With platform, it is applied to construct in super large lid rolling stock section, main includes the work station that control room is arranged in, server, management system System, wireless router and setting construction equipment on construction ground, it is characterised in that: the work station, server pass through nothing Line router is connect to form wireless communication transmission control with construction equipment, and the management system is flat for WEB terminal BIM coordinated management Platform is mounted in work station, provides data transport service by server;
The construction equipment mainly includes mobile terminal device, suspension and support, folding ladder, detachable protective fence, transtainer, mark Line machine, plumbing installation and positioning member;Wherein mobile terminal device is set as carrying out data transmission exchanging with management system The application terminal hand-held mobile APP equipment;Positioning member is the steel bar framework component of quantity Matching architecture information, and fixed-point type is perpendicular Architecture information is marked with positioning in straight installation on construction ground;Suspension and support is fixedly mounted between two wall bodies of adjacent spaces, and It penetrates through from construction site bottom to top;Folding ladder and detachable protective fence are arranged in architecture information outer periphery;Transtainer, mark At the movable passageway that the architecture information being spaced apart from each other is set of line machine, plumbing installation.
Preferably, the main operational module of the management system includes the database of logic operation, model AM access module, mould It is quasi- build module, module is corrected in collision and module is instructed in construction.
Preferably, the work station is provided with starting management system and reads the large screen work station of LAN computer, Network associate is carried out to read the instant messages of mobile terminal device upload by server with mobile terminal device.
Preferably, the suspension and support of the construction equipment mainly includes a cube frame, lifting motion device and boom hoisting, cube Frame is vertically fixed between two wall bodies, and highly to extend to top from construction site bottom, a cube frame inner wall is provided with vertical rail Road, lifting motion device are movably arranged on vertical rail to go up and down activity along the longitudinal direction, and boom hoisting includes chain and circle Ring metal hanging ring is connected to below lifting motion device to convey lifting object by lifting motion device;Construction equipment it is removable Unloading protective fence is rod member structure that can be laterally folded, and rod member bottom is provided with Universal pulley, passes through moveable roller tune Save the folding or tensile elongation of hinge bar;Transtainer, striping machine, the plumbing installation of construction equipment are movable part, wherein Transtainer is run along the track that striping machine is arranged, and plumbing installation may be provided on transtainer and move to work Position.
A kind of management method of the construction management application platform based on BIM technology application, which is characterized in that the management Method mainly comprises the steps that
S1, modeling: by Revit civil engineering, MagiCAD is electromechanical, Tekla steel structure software is to the tectonic information of super large lid rolling stock section Carry out three-dimensional modeling;
S2, it imports model: importing the modeler model of super large lid rolling stock section in WEB terminal BIM cooperating management platform, calculated by BIM Measure the modeling information of modeling tool docking super large lid rolling stock section;
S3, record modeling data: read super large lid rolling stock section modeling information, to the geometric position of model, modeling accuracy and Depth, element attribute are recorded, and a database is formed;
S4, setting attribute: to the generic term for a building, e. g. Apartment, store, a movie theater, etc. of model, floor number, flowing water section, each element type on WEB terminal BIM cooperating management platform Information setting static attribute, it is dynamic to reserved Construction Arrangement, construction equipment operation, the information setting of construction technology and construction speed State attribute, while the attribute of each component is associated with construction speed attribute, to obtain actual progress information;
S5, initialization: successively working according to floor number sequence, to selection civil construction or electromechanical installation after selection floor Or construction is made in steel building, then carries out simulated crash test, is exported wrong structure and is carried out correction guidance;Calculate temporary engineering Amount, for face set cost control, subpackage clearing reference frame is provided;
S6, progress chasing: recording live progress in real time by mobile terminal device and be uploaded in management system in real time, and with The model of management system is associated;
S7, arrangement suspension and support: according to the site planning in construction site, suspension and support load-bearing checking computations, planning suspension and support installation are calculated Space and the generation bill of materials, and export arrangement report;
S8, planning safe trajectory: safe construction region delimited according to original modeling information, then at the construction field (site) using striping machine Trajectory planning is carried out, can be moved along track with subsequent;
S9, construction plan: construction site and management system, the installation site of planning position component, according to construction are being combined first Scene is installed by the positioning member of back work as desired;Then automatic row's brick planning is carried out to positioning member present position;Most Auxiliary type folding ladder, detachable protective fence can be installed in outer periphery after heel row brick;
S10, flowing water segment management: by model partition being the working face that can be managed in such a way that flowing water section divides, and will be into The information such as degree plan, project amount, resource carry out tissue and management according to working face, so that operation needed for construction equipment be set Standby arrangement in due course participates in construction, and completes specific constructing operation by planning.
Further, the BIM calculation amount modeling tool includes figure calculation amount tool, reinforcing bar calculation amount tool and installation calculation amount Tool.
Further, the step S3 further includes specific steps:
1) model integration and data exchange determine and software unprocessed form model, the requirement of BIM link model, browsing model are submitted to want It asks, BIM model export data standard specification;
2) unified Modeling public information mainly includes unified model origin, uniform units, measurement system, unified model coordinate system, system One floor absolute altitude;
3) model file is named, model according to designing system disassembly principle, by model file be divided into working model and Integrated Models two major classes, working model refer to that model file of designer's input comprising building content, Integrated Models refer to according to one Working model is integrated the model as building system by fixed rule;
4) model component color is provided, with sieving element type.
Further, when the construction speed information of each component of the step S4 mainly includes planned time, actually accomplishes Between, construction daily sheet and live photographs of progress information.
The beneficial effects of the present invention are embodied in: the present invention docking by management system and modeling software, and combine construction Field condition and construction equipment, the three-dimensional modeling data Interface integration civil engineering of management system, steel structure, electromechanics, curtain wall etc. is multiple Professional Model, and using BIM integrated model as carrier, by the progress in work progress, contract, cost, technique, quality, safety, figure The information integrations such as paper, material, labour are to identical platform, while site administrator cooperates the monitoring work of control room simultaneously, The equipment of observation site is run and construction speed, immediately uploads in system field condition record, utilizes the image of BIM model Intuitively, the characteristic of computable analysis is progress control, on-site coordination, contract cost management, store keeping etc. in work progress Critical process provides accurate component geometric position, project amount, stock number, planned time etc. in time, and administrative staff is helped to carry out Effective decision-making and precision management reduce construction change, shorten project duration, item controlled cost, promote quality.
The present invention carries out construction simulation first, is redefined to construction simulation, project manager can be allowed to exist The construction site arrangement of each key node, big machinery and measure arrangement side in look-ahead project building course before construction Case can also predict every month, the fund of each Zhou Suoxu, material, labour's situation, find the problem and optimize in advance; Secondly the present invention is provided with progress and cost supervision, one side progress monitoring: the progress pipe of the virtual construction technology based on BIM The problem of reason passes through construction simulation analysis repeatedly, and the construction stage is allowed to be likely to occur occurs in advance in the environment of simulation, one by one Modification, and counter-measure is formulated in advance, keep schedule and arrangement and method for construction optimal, then be used to instruct actual project construction, from And guarantee smoothly completing for project construction;Another aspect cost control: goods and materials are counted by dimensions such as floor, progress, specifications and models Amount, guidance establishment material supply and procurement plan;The industry data of many years accumulates, and project amount is more acurrate;Demander can adjust at any time Data realize the multidisciplinary shared of the data such as project amount out;Project management department member accesses section chief at any time and counts dosage, makes auditing flow It is effectively reliable, it is truly realized limit neck material;It is easy to implement the real-time three ways of calculating comparison of Project Process management.
There are also full Professional Models to integrate by the present invention: the models such as integrated morphology, electromechanics, steel structure, curtain wall realize full Professional Model Browsing, convenient for communication, guiding construction;Seamless interfacing extensively joins up to each professional calculation amount software, supports world IFC standard, imports The models such as Revit, MagiCAD, Tekla avoid repeating to model, reduce cost;The key messages such as integrated progress, budget simultaneously, It is checked by vivid progress, adjusts fund and resource planning, reached fund and resource and use balance.
Animation mechanism is provided during operation of the present invention, realizes the mould of interspersed big operating condition, complex node construction, technical solution Quasi-, Optimizing Construction Scheme instructs site operation;Using mobile terminal device, i.e. mobile phone terminal APP application: make an inspection tour at the construction field (site) The photo information of the progress of middle acquisition, quality, safety etc. can be handled with timely sharing and analysis;And in management system WEB terminal BIM cooperating management platform can be conducive to company management level leader can long-range strange land, easily and intuitively check project at any time Latest tendency, comprising: project process, cost, quality, safety etc. relevant information.
Detailed description of the invention
Fig. 1 is system logic connection figure of the invention.
Fig. 2 is the plan structure schematic diagram of construction equipment mounting arrangement of the invention.
Attached drawing mark explanation: 1- architecture information, 2- suspension and support, 3- folding ladder, the detachable protective fence of 4-, 5- transtainer, 6- striping machine, 7- plumbing installation, 8- positioning member, the construction site 9-.
Specific embodiment
The embodiment of the invention will now be described in detail with reference to the accompanying drawings:
A kind of construction management application platform based on BIM technology application is applied to construct in super large lid rolling stock section, mainly includes Work station, server, management system, the construction equipment of wireless router and setting on construction ground of control room, institute are set Work station, the server stated are connect with construction equipment by wireless router to form wireless communication transmission control, the management System is WEB terminal BIM cooperating management platform, is mounted in work station, provides data transport service by server;It is wherein described The main operational module of management system includes the database of logic operation, model AM access module, module is built in simulation, collision is corrected Module is instructed in module and construction;Database is used to store the modeling information of super large lid rolling stock section, mobile terminal device uploads The recall info that information is read in construction site, operational management process occurs;Model AM access module is used to cooperate with from WEB terminal BIM and manage The modeling information that end docking imports is patted, and format is converted into platform end and requires format, is counted by calculation amount modeling tool Attribute is modeled, and passes through the property content of database storage access;Simulation builds module for simulating on the basis of modeling information Operation equipment and operating procedure needed for building construction;Collision corrects module for detecting the operation equipment built, it is determined whether There is information collision problem and reminded, then sets correction approach;Construction instructs module to be used on the basis of colliding correction, Carry out correct guidance and planning again;The work station is provided with starting management system and reads the big of LAN computer Screen work station carries out network associate by server with mobile terminal device to read the instant letter of mobile terminal device upload Breath;
The construction equipment mainly includes mobile terminal device, suspension and support, folding ladder, detachable protective fence, transtainer, mark Line machine, plumbing installation and positioning member;Wherein mobile terminal device is set as carrying out data transmission exchanging with management system The application terminal hand-held mobile APP equipment;Positioning member is the steel bar framework component of quantity Matching architecture information, and fixed-point type is perpendicular Architecture information is marked with positioning in straight installation on construction ground;Suspension and support is fixedly mounted between two wall bodies of adjacent spaces, and It penetrates through from construction site bottom to top;Folding ladder and detachable protective fence are arranged in architecture information outer periphery;Transtainer, mark At the movable passageway that the architecture information being spaced apart from each other is set of line machine, plumbing installation;The wherein branch of the construction equipment Hanger mainly includes a cube frame, lifting motion device and boom hoisting, and a cube frame is vertically fixed between two wall bodies, highly for from Construction site bottom extends to top, and a cube frame inner wall is provided with vertical rail, and lifting motion device is movably arranged on vertical rail To go up and down activity along the longitudinal direction on road, boom hoisting includes chain and annulus metal hanging ring, is connected under lifting motion device Side is to convey lifting object by lifting motion device;The detachable protective fence of construction equipment is rod member knot that can be laterally folded Structure, rod member bottom are provided with Universal pulley, and the folding or tensile elongation of hinge bar are adjusted by moveable roller;Construction equipment Transtainer, striping machine, plumbing installation be movable part, wherein transtainer along the track that striping machine be arranged run, manage Road mounting device may be provided on transtainer and move to operating position;Plumbing installation is by pipeline and its erector Tool composition.
A kind of management method of the construction management application platform based on BIM technology application, the management method are mainly wrapped Include following steps:
S1, modeling: by Revit civil engineering, MagiCAD is electromechanical, Tekla steel structure software is to the tectonic information of super large lid rolling stock section Carry out three-dimensional modeling;
S2, it imports model: importing the modeler model of super large lid rolling stock section in WEB terminal BIM cooperating management platform, calculated by BIM Measure the modeling information of modeling tool docking super large lid rolling stock section;The BIM calculation amount modeling tool include figure calculation amount tool, Reinforcing bar calculation amount tool and installation calculation amount tool;Management system is uploaded based on the engineering data in cloud simultaneously, engineering data and model Association, the Classification Management of engineering data and shared, realize classification, the orientation management of engineering data;
S3, record modeling data: read super large lid rolling stock section modeling information, to the geometric position of model, modeling accuracy and Depth, element attribute are recorded, and a database is formed;
The step S3 further includes specific steps:
1) model integration and data exchange determine and software unprocessed form model, the requirement of BIM link model, browsing model are submitted to want It asks, BIM model export data standard specification;
2) unified Modeling public information mainly includes unified model origin, uniform units, measurement system, unified model coordinate system, system One floor absolute altitude;
3) model file is named, model according to designing system disassembly principle, by model file be divided into working model and Integrated Models two major classes, working model refer to that model file of designer's input comprising building content, Integrated Models refer to according to one Working model is integrated the model (achievement model format or browsing model format) as building system by fixed rule;
4) model component color is provided, with sieving element type
S4, setting attribute: to the generic term for a building, e. g. Apartment, store, a movie theater, etc. of model, floor number, flowing water section, each element type on WEB terminal BIM cooperating management platform Information setting static attribute, it is dynamic to reserved Construction Arrangement, construction equipment operation, the information setting of construction technology and construction speed State attribute, while the attribute of each component is associated with construction speed attribute, to obtain actual progress information;The construction of each component Progress msg mainly includes planned time, actual finish time, construction daily sheet and live photographs of progress information;
S5, initialization: successively working according to floor number sequence, to selection civil construction or electromechanical installation after selection floor Or construction is made in steel building, then carries out simulated crash test, is exported wrong structure and is carried out correction guidance;Automatic calculate of intelligence is faced Build project amount, for face set cost control, subpackage clearing reference frame is provided;In conjunction with management system, look-ahead project was built Construction site arrangement, big machinery and the measure arrangement of each key node, can also predict every month, Mei Yizhou in journey Required fund, material, labour's situation, find the problem in advance and optimize;
S6, progress chasing: recording live progress in real time by mobile terminal device and be uploaded in management system in real time, and with The model of management system is associated;At the scene make an inspection tour in, engineer in field pass through mobile terminal device (such as mobile phone) to progress, The problem of quality, safety etc., is taken pictures, is recorded and writing record, and correlation model;Management system be based on server in Eastern automatic realization mobile terminal device is synchronous with station data, is showed in a model in the form of document drawing pin, assists production Progress, quality, security problems are managed with supervisory engineering staff;
S7, arrangement suspension and support: according to the site planning in construction site, suspension and support load-bearing checking computations, planning suspension and support installation are calculated Space and the generation bill of materials, and export arrangement report;Using the quick key arrangement of MagiCAD software realization suspension and support, arrangement Consider suspension and support installation space in advance before, and avoids the collision with other pipelines;Management system supports suspension and support load-bearing checking computations, And special calculated description is automatically generated, allow the design and installation of suspension and support more to have safety guarantee;Suspension and support can Mass production material it is clear Single, detail drawing of installation and automatic numbering, convenient for the unified purchase of suspension and support material, the prefabricated and accurate installation positioning of batch machining;
S8, planning safe trajectory: safe construction region delimited according to original modeling information, then at the construction field (site) using striping machine Trajectory planning is carried out, can be moved along track with subsequent;
S9, construction plan: construction site and management system, the installation site of planning position component, according to construction are being combined first Scene is installed by the positioning member of back work as desired;Then automatic row's brick planning is carried out to positioning member present position;Most Auxiliary type folding ladder, detachable protective fence can be installed in outer periphery after heel row brick;Row brick arrangement require and step include masonry brick, The size and material of stuff up a crack brick are arranged;Lead wall height, thickness of mortarat bed joint, the setting of vertical mortar joint thickness;Constructional column and circle, lintel Arrangement;Hole, tube seat arrangement;Automatic row's brick, export row's brick figure;Maximum loss calculates;Internal component representated by positioning member Including more than the 100 kinds of construction site components such as road, board house, processing space, stock ground, fence;Applied to the project entire construction phase, very Positive accomplishes that guiding construction early period, the construction of process control, result check construction, realizes the fine-grained management of project;
S10, flowing water segment management: by model partition being the working face that can be managed in such a way that flowing water section divides, and will be into The information such as degree plan, project amount, resource carry out tissue and management according to working face, so that operation needed for construction equipment be set Standby arrangement in due course participates in construction, and completes specific constructing operation by planning;Flowing water segment management process can clearly be seen To the progression time of each flowing water section, project amount, drawing, inventory, required goods and materials amount etc.;Production management personnel are helped rationally to pacify The problems such as arranging production plan, evading working face conflict and resource distribution in advance;The setting of comprehensive statistics period, the duration generates according to plan Scheduled completion amount generates practical completion amount, the practical completion amount of preference pattern primitive generating by the actual construction time.
The present invention carries out construction simulation first, is redefined to construction simulation, project manager can be allowed to exist The construction site arrangement of each key node, big machinery and measure arrangement side in look-ahead project building course before construction Case can also predict every month, the fund of each Zhou Suoxu, material, labour's situation, find the problem and optimize in advance; Secondly the present invention is provided with progress and cost supervision, one side progress monitoring: the progress pipe of the virtual construction technology based on BIM The problem of reason passes through construction simulation analysis repeatedly, and the construction stage is allowed to be likely to occur occurs in advance in the environment of simulation, one by one Modification, and counter-measure is formulated in advance, keep schedule and arrangement and method for construction optimal, then be used to instruct actual project construction, from And guarantee smoothly completing for project construction;Another aspect cost control: goods and materials are counted by dimensions such as floor, progress, specifications and models Amount, guidance establishment material supply and procurement plan;The industry data of many years accumulates, and project amount is more acurrate;Demander can adjust at any time Data realize the multidisciplinary shared of the data such as project amount out;Project management department member accesses section chief at any time and counts dosage, makes auditing flow It is effectively reliable, it is truly realized limit neck material;It is easy to implement the real-time three ways of calculating comparison of Project Process management.The invention enables entire works Journey system can remotely concerned item purpose latest tendency, comprising: project process, cost, quality, the related letter of safety etc. Breath obtains quality, Security Problem Analysis, progress follow-up analysis, model and attribute information browsing, cost analysis by management system Etc. information;System of the invention is that have uniqueness using two dimensional code as tie, reduces the switch in raw material transportational process, loses Leakage, misloading etc., the integrated system which is made of BIM model, background server and mobile terminal;Field Force passes through shifting Dynamic terminal device scans two dimensional code, is uploaded to server for information automatically, then extract, count from server according to demand, Analysis and management related information take data band to carry out convenience for project;Scene has been uploaded to the information of cloud platform, has permission Administrative staff etc. can synchronize the dynamic change situation for seeing project field data, have simultaneity.
The above is only presently preferred embodiments of the present invention, is not intended to limit the scope of the present invention, current row The technical staff of industry can make some deformations and modification, all technologies according to the present invention under the inspiration of the technical program Essence still falls within the range of technical solution of the present invention to any modification, equivalent variations and modification made by above embodiment It is interior.

Claims (8)

1. a kind of construction management application platform based on BIM technology application is applied to construct in super large lid rolling stock section, main to wrap The work station that control room is set, server, management system, the construction equipment of wireless router and setting on construction ground are included, It is characterized by:
The work station, server are connect with construction equipment by wireless router to form wireless communication transmission control, institute Stating management system is WEB terminal BIM cooperating management platform, is mounted in work station, provides data transport service by server;
The construction equipment mainly includes mobile terminal device, suspension and support, folding ladder, detachable protective fence, transtainer, mark Line machine, plumbing installation and positioning member;Wherein mobile terminal device is set as carrying out data transmission exchanging with management system The application terminal hand-held mobile APP equipment;Positioning member is the steel bar framework component of quantity Matching architecture information, and fixed-point type is perpendicular Architecture information is marked with positioning in straight installation on construction ground;Suspension and support is fixedly mounted between two wall bodies of adjacent spaces, and It penetrates through from construction site bottom to top;Folding ladder and detachable protective fence are arranged in architecture information outer periphery;Transtainer, mark At the movable passageway that the architecture information being spaced apart from each other is set of line machine, plumbing installation.
2. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute The main operational module of management system is stated to include the database of logic operation, model AM access module, simulate and build module, collide and entangle Module is instructed in positive module and construction.
3. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute It states work station to be provided with starting management system and read the large screen work station of LAN computer, pass through with mobile terminal device Server carries out network associate to read the instant messages of mobile terminal device upload.
4. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute The suspension and support for stating construction equipment mainly includes a cube frame, lifting motion device and boom hoisting, and a cube frame is vertically fixed in two walls Between body, highly to extend to top from construction site bottom, a cube frame inner wall is provided with vertical rail, and lifting motion device is living Dynamic to be mounted on vertical rail to go up and down activity along the longitudinal direction, boom hoisting includes chain and annulus metal hanging ring, is connected to To convey lifting object by lifting motion device below lifting motion device;The detachable protective fence of construction equipment is laterally to roll over Folded rod member structure, rod member bottom are provided with Universal pulley, and the folding or drawing of hinge bar are adjusted by moveable roller Elongation;Transtainer, striping machine, the plumbing installation of construction equipment are movable part, and wherein transtainer is set along striping machine The track operation set, plumbing installation may be provided on transtainer and move to operating position.
5. a kind of management method of the construction management application platform based on BIM technology application, which is characterized in that the manager Method mainly comprises the steps that
S1, modeling: by Revit civil engineering, MagiCAD is electromechanical, Tekla steel structure software is to the tectonic information of super large lid rolling stock section Carry out three-dimensional modeling;
S2, it imports model: importing the modeler model of super large lid rolling stock section in WEB terminal BIM cooperating management platform, calculated by BIM Measure the modeling information of modeling tool docking super large lid rolling stock section;
S3, record modeling data: read super large lid rolling stock section modeling information, to the geometric position of model, modeling accuracy and Depth, element attribute are recorded, and a database is formed;
S4, setting attribute: to the generic term for a building, e. g. Apartment, store, a movie theater, etc. of model, floor number, flowing water section, each element type on WEB terminal BIM cooperating management platform Information setting static attribute, it is dynamic to reserved Construction Arrangement, construction equipment operation, the information setting of construction technology and construction speed State attribute, while the attribute of each component is associated with construction speed attribute, to obtain actual progress information;
S5, initialization: successively working according to floor number sequence, to selection civil construction or electromechanical installation after selection floor Or construction is made in steel building, then carries out simulated crash test, is exported wrong structure and is carried out correction guidance;Calculate temporary engineering Amount, for face set cost control, subpackage clearing reference frame is provided;
S6, progress chasing: recording live progress in real time by mobile terminal device and be uploaded in management system in real time, and with The model of management system is associated;
S7, arrangement suspension and support: according to the site planning in construction site, suspension and support load-bearing checking computations, planning suspension and support installation are calculated Space and the generation bill of materials, and export arrangement report;
S8, planning safe trajectory: safe construction region delimited according to original modeling information, then at the construction field (site) using striping machine Trajectory planning is carried out, can be moved along track with subsequent;
S9, construction plan: construction site and management system, the installation site of planning position component, according to construction are being combined first Scene is installed by the positioning member of back work as desired;Then automatic row's brick planning is carried out to positioning member present position;Most Auxiliary type folding ladder, detachable protective fence can be installed in outer periphery after heel row brick;
S10, flowing water segment management: by model partition being the working face that can be managed in such a way that flowing water section divides, and will be into The information such as degree plan, project amount, resource carry out tissue and management according to working face, so that operation needed for construction equipment be set Standby arrangement in due course participates in construction, and completes specific constructing operation by planning.
6. a kind of management method of construction management application platform based on BIM technology application according to claim 5, special Sign is that the BIM calculation amount modeling tool includes figure calculation amount tool, reinforcing bar calculation amount tool and installation calculation amount tool.
7. a kind of management method of construction management application platform based on BIM technology application according to claim 5, special Sign is that the step S3 further includes specific steps:
1) model integration and data exchange determine and software unprocessed form model, the requirement of BIM link model, browsing model are submitted to want It asks, BIM model export data standard specification;
2) unified Modeling public information mainly includes unified model origin, uniform units, measurement system, unified model coordinate system, system One floor absolute altitude;
3) model file is named, model according to designing system disassembly principle, by model file be divided into working model and Integrated Models two major classes, working model refer to that model file of designer's input comprising building content, Integrated Models refer to according to one Working model is integrated the model as building system by fixed rule;
4) model component color is provided, with sieving element type.
8. a kind of management method of construction management application platform based on BIM technology application according to claim 5, special Sign is that the construction speed information of each component of the step S4 mainly includes planned time, actual finish time, construction daily paper Table and live photographs of progress information.
CN201910075499.5A 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application Pending CN109544051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910075499.5A CN109544051A (en) 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910075499.5A CN109544051A (en) 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application

Publications (1)

Publication Number Publication Date
CN109544051A true CN109544051A (en) 2019-03-29

Family

ID=65838359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910075499.5A Pending CN109544051A (en) 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application

Country Status (1)

Country Link
CN (1) CN109544051A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110096828A (en) * 2019-05-09 2019-08-06 南昌航空大学 The modeling and construction method of the elongated muscle in floor Vierendeel girder top or bearing rod based on BIM technology
CN110119565A (en) * 2019-05-08 2019-08-13 中铁八局集团建筑工程有限公司 A method of quick association and displaying based on BIM model and project programme
CN110210771A (en) * 2019-06-06 2019-09-06 重庆建工第九建设有限公司 A kind of construction information management system and technique based on Building Information Model
CN110518497A (en) * 2019-09-30 2019-11-29 哈尔滨工程大学 A kind of cable automatic laying optimization method for ship
CN110782219A (en) * 2019-09-03 2020-02-11 广州轨道交通建设监理有限公司 Rail transit operation information processing method, system, device and storage medium
CN112381522A (en) * 2020-11-24 2021-02-19 正太集团有限公司 BIM-based site layout dynamic management and control method and system
JP2021089498A (en) * 2019-12-03 2021-06-10 株式会社トプコン Data management system, management method and management program
JP2021099673A (en) * 2019-12-23 2021-07-01 株式会社トプコン Data management system, management method, and management program
CN113436320A (en) * 2021-07-01 2021-09-24 山西省交通规划勘察设计院有限公司 3D model generation system and method based on IFC model file
CN113515834A (en) * 2020-04-10 2021-10-19 任逸切科技(上海)有限公司 Steel bar structure manufacturing system and method
CN115187200A (en) * 2022-07-11 2022-10-14 山西省安装集团股份有限公司 Assembly type machine room construction management system based on BIM digital-analog separation
CN115310798A (en) * 2022-07-30 2022-11-08 中铁济南工程建设监理有限公司 Safety supervision early warning method and monitoring system for rail transit electromechanical installation project
CN116187950A (en) * 2023-03-02 2023-05-30 北京城建集团有限责任公司 Airport full-specialized collaborative design system based on BIM
CN116934262A (en) * 2023-07-26 2023-10-24 江苏晓宇水利建设有限公司 Construction safety supervision system and method based on artificial intelligence
CN118246888A (en) * 2024-05-28 2024-06-25 四川路桥盛通建筑工程有限公司 Construction management method and system based on prefabricated part

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103123016A (en) * 2013-02-28 2013-05-29 浙江国联设备工程有限公司 Construction method for laying gas pipelines along bridge
CN104808610A (en) * 2015-02-13 2015-07-29 上海同筑信息科技有限公司 Machinery control system and machinery control method based on a BIM (building information model)
CN205003839U (en) * 2015-10-15 2016-01-27 武汉大学 Project offshore management system based on BIM
CN106228208A (en) * 2016-07-21 2016-12-14 重庆工程职业技术学院 Control system based on BIM and method
CN106447116A (en) * 2016-10-10 2017-02-22 陕西铁路工程职业技术学院 Application of BIM technology in metro track laying construction
CN107818198A (en) * 2017-09-27 2018-03-20 中建三局基础设施工程有限公司 A kind of science of bridge building management platform based on BIM technology
CN108090610A (en) * 2017-12-14 2018-05-29 四川建筑职业技术学院 Orbit construction system based on BIM technology
CN108932383A (en) * 2018-07-04 2018-12-04 成都希盟科技有限公司 The comprehensive aid decision-making method of engineering construction organization scheme based on BIM technology
CN109190252A (en) * 2018-09-05 2019-01-11 北京比目鱼信息科技有限责任公司 A kind of construction method based on R-N5DL-BIM technology
CN209486723U (en) * 2019-01-25 2019-10-11 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103123016A (en) * 2013-02-28 2013-05-29 浙江国联设备工程有限公司 Construction method for laying gas pipelines along bridge
CN104808610A (en) * 2015-02-13 2015-07-29 上海同筑信息科技有限公司 Machinery control system and machinery control method based on a BIM (building information model)
CN205003839U (en) * 2015-10-15 2016-01-27 武汉大学 Project offshore management system based on BIM
CN106228208A (en) * 2016-07-21 2016-12-14 重庆工程职业技术学院 Control system based on BIM and method
CN106447116A (en) * 2016-10-10 2017-02-22 陕西铁路工程职业技术学院 Application of BIM technology in metro track laying construction
CN107818198A (en) * 2017-09-27 2018-03-20 中建三局基础设施工程有限公司 A kind of science of bridge building management platform based on BIM technology
CN108090610A (en) * 2017-12-14 2018-05-29 四川建筑职业技术学院 Orbit construction system based on BIM technology
CN108932383A (en) * 2018-07-04 2018-12-04 成都希盟科技有限公司 The comprehensive aid decision-making method of engineering construction organization scheme based on BIM technology
CN109190252A (en) * 2018-09-05 2019-01-11 北京比目鱼信息科技有限责任公司 A kind of construction method based on R-N5DL-BIM technology
CN209486723U (en) * 2019-01-25 2019-10-11 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
丁传奇: ""基于BIM5D 技术施工阶段成本控制的研究"", 《中国优秀硕士学位论文全文数据库 工程科技II辑》, no. 06, pages 038 - 37 *
吴凯;拜正芳;花锋;吴利平;石登锋;金康熙;: "BIM技术在大树智能科技中心项目中的应用研究", 土木建筑工程信息技术, no. 05, pages 93 - 101 *
赵治超;谢一玲;: "基于BIM技术施工进度计划管理应用研究", 广西水利水电, no. 03, pages 71 - 74 *
鞠竹;丁益民;李松伟;刘子贤;贺斌山;: "国家核与辐射安全监管技术研发基地建设项目BIM技术应用", 土木建筑工程信息技术, no. 03, pages 73 - 77 *
马远航;: "基于BIM云数据的施工造价应用体系", 建筑经济, no. 08, pages 69 - 72 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110119565A (en) * 2019-05-08 2019-08-13 中铁八局集团建筑工程有限公司 A method of quick association and displaying based on BIM model and project programme
CN110096828A (en) * 2019-05-09 2019-08-06 南昌航空大学 The modeling and construction method of the elongated muscle in floor Vierendeel girder top or bearing rod based on BIM technology
CN110096828B (en) * 2019-05-09 2022-04-01 南昌航空大学 Building information modeling and construction method of upper through long rib or erection rib of floor frame beam based on BIM technology
CN110210771B (en) * 2019-06-06 2023-02-03 重庆建工第九建设有限公司 Construction data management system and method based on building information model
CN110210771A (en) * 2019-06-06 2019-09-06 重庆建工第九建设有限公司 A kind of construction information management system and technique based on Building Information Model
CN110782219A (en) * 2019-09-03 2020-02-11 广州轨道交通建设监理有限公司 Rail transit operation information processing method, system, device and storage medium
CN110518497A (en) * 2019-09-30 2019-11-29 哈尔滨工程大学 A kind of cable automatic laying optimization method for ship
JP2021089498A (en) * 2019-12-03 2021-06-10 株式会社トプコン Data management system, management method and management program
JP7408363B2 (en) 2019-12-03 2024-01-05 株式会社トプコン Data management system, management method, management program
JP2021099673A (en) * 2019-12-23 2021-07-01 株式会社トプコン Data management system, management method, and management program
JP7385461B2 (en) 2019-12-23 2023-11-22 株式会社トプコン Data management system, management method, management program
CN113515834A (en) * 2020-04-10 2021-10-19 任逸切科技(上海)有限公司 Steel bar structure manufacturing system and method
CN112381522A (en) * 2020-11-24 2021-02-19 正太集团有限公司 BIM-based site layout dynamic management and control method and system
CN113436320A (en) * 2021-07-01 2021-09-24 山西省交通规划勘察设计院有限公司 3D model generation system and method based on IFC model file
CN113436320B (en) * 2021-07-01 2024-05-17 山西省交通规划勘察设计院有限公司 3D model generation system and method based on IFC model file
CN115187200B (en) * 2022-07-11 2023-05-16 山西省安装集团股份有限公司 Assembled computer lab construction management system based on BIM digital-analog separation
CN115187200A (en) * 2022-07-11 2022-10-14 山西省安装集团股份有限公司 Assembly type machine room construction management system based on BIM digital-analog separation
CN115310798A (en) * 2022-07-30 2022-11-08 中铁济南工程建设监理有限公司 Safety supervision early warning method and monitoring system for rail transit electromechanical installation project
CN116187950A (en) * 2023-03-02 2023-05-30 北京城建集团有限责任公司 Airport full-specialized collaborative design system based on BIM
CN116934262A (en) * 2023-07-26 2023-10-24 江苏晓宇水利建设有限公司 Construction safety supervision system and method based on artificial intelligence
CN116934262B (en) * 2023-07-26 2024-02-02 江苏晓宇水利建设有限公司 Construction safety supervision system and method based on artificial intelligence
CN118246888A (en) * 2024-05-28 2024-06-25 四川路桥盛通建筑工程有限公司 Construction management method and system based on prefabricated part
CN118246888B (en) * 2024-05-28 2024-08-06 四川路桥盛通建筑工程有限公司 Construction management method and system based on prefabricated part

Similar Documents

Publication Publication Date Title
CN109544051A (en) A kind of construction management application platform based on BIM technology application
CN109801038A (en) A kind of versatility engineering construction method based on BIM technology application
CN107958101A (en) A kind of assembled architecture Information Management System and method based on BIM
WO2021128675A1 (en) Bim technology-based method for constructing underground continuous wall
CN209486723U (en) A kind of construction management application platform based on BIM technology application
CN106202723A (en) A kind of BIM subway work method
CN109583149A (en) Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management
CN111210199A (en) Bridge prefab BIM information management system
CN106997511A (en) Railway beam yard management system and railway beam yard management method based on BIM technology
KR20130016620A (en) 3d process management method for bim(building information modeling)
CN112884290A (en) BIM-based field construction management method
CN111666619A (en) BIM technology-based substation engineering implementation field digital management system
CN116561871A (en) Deep construction method for mounting embedded part of bridge bearing platform
CN112464494A (en) Construction system is built to wisdom
CN115329416A (en) Building construction method based on BIM
CN118071059A (en) Intelligent beam field management platform based on BIM and GIS
CN210072621U (en) BIM management-based deepened transformation system for vehicle section with ultra-large cover body
Yamazaki et al. 3D/BIM applications to large-scale complex building projects in Japan
CN100570757C (en) The modular construction method that is used for nuclear island of nuclear power station
CN101752017B (en) Modularization construction method for nuclear power station nuclear island
CN115187200B (en) Assembled computer lab construction management system based on BIM digital-analog separation
CN107832951A (en) Application processes and system of the BIM in precast concrete supply chain
CN109558606A (en) BIM Tender System
CN101748915B (en) Modularization construction method for nuclear power station nuclear island
Mancuso et al. Industry 4.0 for AEC Sector: Impacts on Productivity and Sustainability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination