CN106997511A - Railway beam yard management system and railway beam yard management method based on BIM technology - Google Patents

Railway beam yard management system and railway beam yard management method based on BIM technology Download PDF

Info

Publication number
CN106997511A
CN106997511A CN201710218010.6A CN201710218010A CN106997511A CN 106997511 A CN106997511 A CN 106997511A CN 201710218010 A CN201710218010 A CN 201710218010A CN 106997511 A CN106997511 A CN 106997511A
Authority
CN
China
Prior art keywords
model
information
threedimensional model
railway beam
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710218010.6A
Other languages
Chinese (zh)
Inventor
胡伟
杨铭
肖丽娜
沈翔
李强
李福健
王步云
楚跃峰
吴艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201710218010.6A priority Critical patent/CN106997511A/en
Publication of CN106997511A publication Critical patent/CN106997511A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Geometry (AREA)
  • General Business, Economics & Management (AREA)
  • Computer Hardware Design (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Health & Medical Sciences (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application discloses a railway beam yard management system and a railway beam yard management method based on a BIM technology, wherein the railway beam yard management system establishes a three-dimensional model through a model establishment module, the three-dimensional model is updated in real time according to real-time information transmitted by a data communication module, and the data communication module can display the three-dimensional model in a mode of sending a request instruction to the model establishment module, so that the information transmission speed of the whole railway beam yard management system is greatly increased; in addition, the real-time information sent by the data communication module of the three-dimensional model of the railway beam yard management system can be directly transmitted to the model establishing module, so that transmission errors possibly caused by excessive transmission links of the real-time information are avoided, and the robustness of the railway beam yard management system is enhanced.

Description

Railway beam course management system and railway beam a management method based on BIM technology
Technical field
The application is related to beam administrative skill field, is managed more specifically to a kind of railway beam based on BIM technology Reason system and railway beam management method.
Background technology
Precast beam, is to use prefabrication, then is transported to the beam that job site by design requirement position install fixation, is Staple product during bridge construction.
Liang Chang is as the Workplace of precast beam, and the supervision and oversight of its production process is the weight of precast beam quality and duration Ensure.The management for Liang Chang is also limited to the stage of " people's pipe people ", the transmission assigned with information of order in the prior art By being carried out taking human as the management system of " node ", assigning for order is slower with the transmission speed of information;And entirely management is The robustness of system is poor, it is easy to cause the biography of order or information due to the transmission mistake of some " node " in transmittance process Mistake is passed, causes the information of whole management system inconsistent, quality and the duration of precast beam is influenceed.
Therefore, information transmission speed, and the more preferable management system of robustness can be lifted by needing one kind badly.
The content of the invention
In order to solve the above technical problems, the invention provides a kind of railway beam course management system and iron based on BIM technology Road beam management method, provides that a kind of information transmission speed is very fast and the preferable railway beam course management system of robustness to realize Purpose.
To realize above-mentioned technical purpose, the embodiments of the invention provide following technical scheme:
A kind of railway beam course management system based on BIM technology, including:Model building module and data communication module, its In,
The model building module, for setting up threedimensional model according to arrangement of girder field information, and updates according to real time information The threedimensional model, and for sending the threedimensional model to the data communication module after request instruction is received;
The data communication module, for sending the real time information to the model building module, and for described Model building module sends request instruction, and receives the threedimensional model and shown.
Optionally, in addition to:
Database sharing module, for setting up standard element storehouse and technique according to beam component information and technique engineering method information Engineering method storehouse, is called for the model building module;
The model building module is additionally operable to set up construction speed model simultaneously according to construction information and the technique engineering method storehouse Shown in the threedimensional model, and Liang Chang is generated for recording beam field device use information, and according to the standard element storehouse Device using information.
Optionally, the standard element storehouse includes product library and mechanical frock storehouse.
Optionally, the product library is used to store product model.
Optionally, the mechanical frock storehouse is used to store mechanical frock model.
Optionally, the model building module is additionally operable to analyze actual progress according to the threedimensional model, and judges described Whether actual progress is consistent with target advance, if it is not, then judging process occur delayed, sends delayed warning information.
Optionally, the model building module analyzes actual progress according to the threedimensional model, and judges described actually to enter Whether degree consistent with target advance, if it is not, then process occur delayed for judgement, send delayed warning information specifically for, according to The threedimensional model analyzes actual progress, and judges whether the actual progress is consistent with program of standards development progress, if it is not, then sentencing Make existing process delayed, send delayed warning information, and it is delayed according to the actual progress and the target advance analysis procedure Reason.
A kind of railway beam management method, based on the railway beam course management system described in any of the above-described, the railway beam Field management method includes:
Threedimensional model is set up using the railway beam course management system;
Progress control is carried out based on the three-dimension modeling construction plan, and based on the threedimensional model;
Work progress quality management is carried out based on the threedimensional model;
Quality control on construction management is carried out based on the threedimensional model.
It can be seen from the above technical proposal that the embodiments of the invention provide a kind of railway beam based on BIM technology pipe Reason system and railway beam management method, wherein, the railway beam course management system sets up three by the model building module Dimension module, the real time information real-time update that the threedimensional model is transmitted according to the data communication module, and the data are led to Letter module can show the threedimensional model by way of sending request instruction to the model building module, considerably increase The information transmission speed of whole railway beam course management system;In addition, the data of the threedimensional model of the railway beam course management system The real time information that communication module is sent can be transferred directly to the model building module, it is to avoid the excessive transmission of real time information Link and the transmission mistake being likely to result in, enhance the robustness of the railway beam course management system.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
A kind of structural representation for railway beam course management system that Fig. 1 provides for one embodiment of the application;
A kind of schematic flow sheet for railway beam management method that Fig. 2 provides for one embodiment of the application.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
The embodiment of the present application provides a kind of railway beam course management system, as shown in figure 1, including:Model building module 200 With data communication module 100, wherein,
The model building module 200, for setting up threedimensional model according to arrangement of girder field information, and according to real time information more The new threedimensional model, and for sending the threedimensional model to the data communication module 100 after request instruction is received;
The data communication module 100, for sending the real time information to the model building module 200 and request refers to Make, and receive the threedimensional model and shown.
It should be noted that BIM (Building Information Modeling, BIM) technology or Architecture information management (Building Information Management, BIM) technology is every phase with construction-engineering project Based on the information data of pass, it is established that the technology of three-dimensional building model, had by digital information analogue simulation building Real information.It has information completeness, information relevance, consistency on messaging, visualization, harmony, simulation, optimization property With can go out the big feature of figure eight.
In this application, it can be set up by the model building module 200 according to arrangement of girder field information based on BIM technology Threedimensional model, can be shown Liang Chang every terms of information based on the threedimensional model, the phase that for example precast beam construction is produced Model data, qualitative data and work progress data etc. are closed, are easy to the unified management of box girder construction, promote the standard of box girder construction Change and standardize, improve work progress management and quality management level.
The railway beam course management system sets up threedimensional model, the threedimensional model by the model building module 200 The real time information real-time update transmitted according to the data communication module 100, and the data communication module 100 can pass through The mode for sending request instruction to the model building module 200 shows the threedimensional model, considerably increases whole railway beam The information transmission speed of course management system;In addition, the data communication module 100 of the threedimensional model of the railway beam course management system The real time information of transmission can be transferred directly to the model building module 200, it is to avoid the excessive transmission link of real time information And the transmission mistake being likely to result in, enhance the robustness of the railway beam course management system.
It should also be noted that, in general the data communication module 100 includes multiple mobile communication equipments, the shifting Dynamic communication equipment includes but is not limited to mobile phone, tablet personal computer and intelligent watch.Species of the application to the mobile communication equipment Do not limit, specifically depending on actual conditions.
On the basis of above-described embodiment, in another embodiment of the application, the railway beam course management system is also Including:
Database sharing module, for setting up standard element storehouse and technique according to beam component information and technique engineering method information Engineering method storehouse, is called for the model building module 200;
The model building module 200 is additionally operable to set up construction speed model according to construction information and the technique engineering method storehouse And shown in the threedimensional model, and generate beam for recording beam field device use information, and according to the standard element storehouse Field device use information.
Specifically, the standard element storehouse includes product library and mechanical frock storehouse.
The product library is used to store product model.
The mechanical frock storehouse is used to store mechanical frock model.
The foundation of the product model needs to carry out in strict accordance with design drawing, commonly use property parameters include name of product, Type, weight, volume, area and length etc.;Mechanical frock mode shape size is set up according to design drawing, and interior details are not made Depth Study, thin portion modeling is carried out only for conventional consumable accessory, is managed in order to the updating maintenance of later stage plant equipment, is commonly used category Property parameter include device name, type, power and numbering etc..
On the basis of above-described embodiment, in another embodiment of the application, the model building module 200 is also used In analyzing actual progress according to the threedimensional model, and judge whether the actual progress is consistent with target advance, if it is not, then It is delayed that process occurs in judgement, sends delayed warning information.
Specifically, in the preferred embodiment of the application, the model building module 200 is according to the threedimensional model Actual progress is analyzed, and judges whether the actual progress is consistent with target advance, if it is not, then process occur delayed for judgement, Send delayed warning information specifically for,
Actual progress is analyzed according to the threedimensional model, and judges whether the actual progress is consistent with target advance, such as It is really no, then judge process occur delayed, send delayed warning information, and analyze according to the actual progress and the target advance Process hysteresis reason.
It should be noted that in this application, realize that threedimensional model is practical, technological guidance based on the threedimensional model Visualization, process management procedure and quality management are information-based, are specifically described below:
Threedimensional model is practical:
A. construction calculation volume
Construction calculation volume is as one of most basic application of BIM technology, while technical staff's workload is greatly reduced, Improve the accuracy and efficiency of data statistics.For example in box beam concrete side's amount of this project is calculated, model export engineering Amount differs only by 0.2% with layout design amount.
B. race storehouse is standardized
The related plant equipment storehouse of beam, frock storehouse, product library are established, with the constantly improve that race storehouse is built, by pole The earth facilitates the BIM technology application of subsequent project.
C. field construction meter and place roaming
On the basis of standardization race storehouse, with reference to the ginseng such as beam task processed, duration arrangement, topography and geomorphology, Ground arrangement form Number, quickly generates field and builds three-dimensional visualization model, and problem present in Ground arrangement is found in advance, reaches that reduction is done over again, saved The purpose of cost.By the three-dimensional display interface of system, we can be with roaming on the spot in person, it is seen that Liang Chang really produces feelings Condition, additionally it is possible to view personnel, the accurate physical location of machinery and relevant information.The model in interface is clicked on, can call and be Data in system, view the real time information such as construction speed situation, engineering quantity.
D. resource management
In resources of production management aspect, the research that wireless location technology and BIM technology are combined, the personnel of realizing examine Diligent, the programming count and record of machine operation;By the mounting of the production schedule and resource consumption, the automatic of handling of goods and materials is realized Reduce and early warning, facilitate tissue and the allotment of produced on-site resource.
Technological guidance visualizes, and specifically includes:
A. collision detection
Collision detection is carried out using the threedimensional model, the component interference problem faced and built in work progress is accurately found that, By local directed complete set, Deepen Design, can preferably guiding construction, the cost payout caused by doing over again is reduced to greatest extent.
B. job instruction
The 3D job instructions that BIM technology makes are used based on the threedimensional model, can freely be broadcast on an electronic device Put, and can be fine displaying per pass technological process, because 3-D view image is understandable, greatly reduces the difficulty of receiving, carry The high efficiency of training.
Process management procedure, is specifically included:
A. progress is pushed
In progress control, mobile phone mobile terminal of this Project-developing with system support realizes field data data Push and receive in time, facilitate the upload of task to assign, improve process circulation efficiency.
B. schedule
In process of production, the overall manufacturing plan of year, season, the moon can be generated, monolithic can also be shown according to process The schedule of beam, simultaneity factor can generate the planning of monolithic beam, actual contrast difference's figure, image and it is directly perceived.
C. progress analysis
When occur process it is delayed when, being capable of remarks the reason for go out delayed in system.By to a collection of beam plan and reality Comparative analysis, system can also provide influence box beam manufacturing schedule master operation and influence the process progress main original Cause, foundation is provided to improve organization of production.
D. progress display
Field Force scans Quick Response Code or manual import information by mobile terminal, remotely sends and instructs to system, realizes work The quick transmission of sequence information, greatlys save process conversion time.
For example when a shifting beam process starts, beam information can be moved with remote visiting system by cell-phone customer terminal and box beam rises, eventually Dot position information is to system, after system refreshes automatically, you can the virtual condition and position letter of box beam are seen in displaying interface Breath, realizes and is virtually interconnected with real.
Quality management is information-based, specifically includes:
A. process management
The quality management of traditional construction mostly rely on paper document data, on the one hand, it cannot be guaranteed that the accuracy of data and Promptness, on the other hand can not realize and share between system.In the present system, the tracking mode of BIM technology Life cycle is utilized Management mode, from marching into the arena to inspection for former material, then to the links such as production whole process record, mounts with correlation model, realizes from source Head arrives the whole process control of terminal.And the component relevant with the material, quality guarantee data can visual queries.Have simultaneously to part There is the work equipment of access times and cycle on probation limitation, carry out shifting to an earlier date automatic early-warning, it is convenient to remind related personnel to wake up with a start operation, with Traditional account mode compares, and production delay of being constructed caused by artificial information updating not in time greatly reduces.
B. data interaction
In order to timely and accurately reach data sharing, for the situation of not intercommunication between multiple systems, the system is preliminary Realize and load automatically with beam body automatic Tensioning system, mixing station information system, static test in railway work management platform and be System, the real-time, interactive of laboratory's information system, can capture the box beam that data assign reference numeral, click model can be direct Check related data information, it is ensured that qualitative data it is authentic and valid.
C. synergetic office work
Traditional completion information is all to print storage by substantial amounts of document form, it has not been convenient to management and access, is This, the system has also done the trial of BIM completion models, the quality guarantee data of original papery version is imparted into threedimensional model, and transfer to System is managed as a whole.
By the three-dimensional display interface of system, we can be with roaming on the spot in person, it is seen that the real conditions of production of Liang Chang, Personnel, the accurate physical location of machinery and relevant information can also be viewed.The model in interface is clicked on, can be with calling system Data, view the real time information such as construction speed situation, engineering quantity.
In summary, the embodiment of the present application provides a kind of railway beam course management system, the railway beam course management system Threedimensional model is set up by the model building module 200, the threedimensional model is transmitted according to the data communication module 100 Real time information real-time update, and the data communication module 100 can be by sending request to the model building module 200 The mode of instruction shows the threedimensional model, considerably increases the information transmission speed of whole railway beam course management system;In addition, The real time information that the data communication module 100 of the threedimensional model of the railway beam course management system is sent can be transferred directly to institute State model building module 200, it is to avoid the excessive transmission link of real time information and the transmission mistake that is likely to result in, enhance described The robustness of railway beam course management system.
Accordingly, the embodiment of the present application additionally provides a kind of railway beam management method, as shown in Fig. 2 based on above-mentioned Railway beam course management system described in one embodiment, the railway beam management method includes:
S101:Threedimensional model is set up using the railway beam course management system;
S102:Progress control is carried out based on the three-dimension modeling construction plan, and based on the threedimensional model;
Specifically, it is described to be based on the three-dimension modeling construction plan, and progress pipe is carried out based on the threedimensional model Reason includes:According to construction characteristic and construction technology, the critical process to construction carries out detailed Task-decomposing and defined to construction In progress template, by precast beam feature (title, figure number, model, curve element, sound barrier, secondary dead load, track plates type, Earthquake motion peak value, classification) with the intelligent Matching of the aspect of model, realize that the online layout of construction plan, resource distribution and task are assigned; By the pre- granting of construction plan in systems, the interaction collaboration work(between each operation, work post in construction plan formulation process is realized Energy;Cooperateed with by the online updating of construction speed, warning function realization management with produced on-site, progress data direct drive three Tie up the dynamic change of virtual scene, it is ensured that the promptness and validity of progress control, visual virtual scene displaying is significantly The efficiency and quality linked up are improved, information is delivered important technology and production status is managed and feeds back to pipes at different levels in time Reason department, and being adjusted to construction stage, task, time, resource etc., improve the accuracy of construction plan, operability and Completion rate.All construction speed technology establishments and real-time statistics and early warning analysis, are grasped on threedimensional model Make, it is ensured that the uniqueness and accuracy of data.
S103:Work progress quality management is carried out based on the threedimensional model;
Specifically, it is described to be included based on threedimensional model progress work progress quality management:Constructed with reference to precast beam Critical process and task, the test data in each stage, inspection data, critical process data and task are associated, and defines Key deliverable, determines the completion condition of task.The typing of qualitative data is completed by the multiple means such as mobile terminal and PC ends, and The related quality document of automatic output, realizes the Classification Managements such as threedimensional model, test data, survey report;Implementation model, document Online browse function;Threedimensional model, the quick-searching function of document are provided;Realize each operation threedimensional model, test data, inspection Test reviewing for the qualitative datas such as data, critical process data;Associate the management of electronics builder's diary.
S104:Quality control on construction management is carried out based on the threedimensional model.
Specifically, it is described to be included based on threedimensional model progress quality control on construction management:For current railway engineering In carry out extensively prestressing force intelligent tensioning system, Intelligent mud jacking system, Liang Chang is from dynamic and static load tests system and mixing plant, experiment Room information system, by the exploitation and the docking of exchange data of interface, realizes that the automatic data collection of data and quality are automatic Evaluate, and incidence relation is set up with corresponding model.
On the basis of above-described embodiment, in another embodiment of the application, the railway beam management method is also Including:
Management platform and construction management control centre are set up, the communication exchange channel of administrative staff and operation team is set up, Job instruction (including 3D job instruction) of the technical study achievements conversion for ease of operation, preferably guiding construction is given birth to Production, and in implementation process checking, it is perfect.
In summary, the embodiment of the present application provides a kind of railway beam course management system and railway beam based on BIM technology Field management method, wherein, the railway beam course management system sets up threedimensional model, the three-dimensional by the model building module The real time information real-time update that model is transmitted according to the data communication module, and the data communication module can by The mode that the model building module sends request instruction shows the threedimensional model, considerably increases whole railway beam management The information transmission speed of system;In addition, the reality that the data communication module of the threedimensional model of the railway beam course management system is sent When information can be transferred directly to the model building module, it is to avoid the excessive transmission link of real time information and be likely to result in Mistake is transmitted, the robustness of the railway beam course management system is enhanced.
The embodiment of each in this specification is described by the way of progressive, and what each embodiment was stressed is and other Between the difference of embodiment, each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (8)

1. a kind of railway beam course management system based on BIM technology, it is characterised in that including:Model building module and data are logical Believe module, wherein,
The model building module, for setting up threedimensional model according to arrangement of girder field information, and according to updating real time information Threedimensional model, and for sending the threedimensional model to the data communication module after request instruction is received;
The data communication module, for sending the real time information to the model building module, and for the model Set up module and send request instruction, and receive the threedimensional model and shown.
2. system according to claim 1, it is characterised in that also include:
Database sharing module, for setting up standard element storehouse and technique engineering method according to beam component information and technique engineering method information Storehouse, is called for the model building module;
The model building module is additionally operable to set up construction speed model and in institute according to construction information and the technique engineering method storehouse State in threedimensional model and show, and beam field device is generated for recording beam field device use information, and according to the standard element storehouse Use information.
3. system according to claim 2, it is characterised in that the standard element storehouse includes product library and mechanical frock Storehouse.
4. system according to claim 3, it is characterised in that the product library is used to store product model.
5. system according to claim 3, it is characterised in that the mechanical frock storehouse is used to store mechanical frock model.
6. system according to claim 1, it is characterised in that the model building module is additionally operable to according to the three-dimensional mould Type analysis actual progress, and judge whether the actual progress is consistent with target advance, if it is not, then judging process occur stagnant Afterwards, delayed warning information is sent.
7. system according to claim 6, it is characterised in that the model building module is analyzed according to the threedimensional model Actual progress, and judge whether the actual progress is consistent with target advance, if it is not, then judging process occur delayed, sends Delayed warning information according to the threedimensional model specifically for analyzing actual progress, and judge the actual progress and standard meter Whether the progress of drawing is consistent, if it is not, then judging process occur delayed, sends delayed warning information, and according to the actual progress With the target advance analysis procedure hysteresis reason.
8. a kind of railway beam management method, it is characterised in that based on the railway beam management described in claim any one of 1-7 System, the railway beam management method includes:
Threedimensional model is set up using the railway beam course management system;
Progress control is carried out based on the three-dimension modeling construction plan, and based on the threedimensional model;
Work progress quality management is carried out based on the threedimensional model;
Quality control on construction management is carried out based on the threedimensional model.
CN201710218010.6A 2017-04-05 2017-04-05 Railway beam yard management system and railway beam yard management method based on BIM technology Pending CN106997511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710218010.6A CN106997511A (en) 2017-04-05 2017-04-05 Railway beam yard management system and railway beam yard management method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710218010.6A CN106997511A (en) 2017-04-05 2017-04-05 Railway beam yard management system and railway beam yard management method based on BIM technology

Publications (1)

Publication Number Publication Date
CN106997511A true CN106997511A (en) 2017-08-01

Family

ID=59434776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710218010.6A Pending CN106997511A (en) 2017-04-05 2017-04-05 Railway beam yard management system and railway beam yard management method based on BIM technology

Country Status (1)

Country Link
CN (1) CN106997511A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107506907A (en) * 2017-08-02 2017-12-22 中国十七冶集团有限公司 Application of the mobile terminal based on BIM cloud platforms in construction quality inspection
CN108898660A (en) * 2018-05-31 2018-11-27 四川隧唐科技股份有限公司 monitoring method and device
CN109523182A (en) * 2018-11-27 2019-03-26 华规软件(上海)有限公司 A kind of beam field production management method, platform, computer equipment and storage medium
CN109784693A (en) * 2018-12-29 2019-05-21 陕西铁路工程职业技术学院 A kind of Three-Dimensional Dynamic production management system for prefabricated components field
CN110106800A (en) * 2019-05-16 2019-08-09 北京鼎兴达信息科技股份有限公司 High speed railway sound barrier health indicator administrative evaluation system and monitoring device
CN110188997A (en) * 2019-05-13 2019-08-30 赣州和永软件开发有限责任公司 A kind of construction quality cruising resource content evaluation method and its system
CN110197007A (en) * 2019-05-09 2019-09-03 北新集团建材股份有限公司 A method of automatically generating light steel keel gypsum board Wall model
CN110363852A (en) * 2019-07-15 2019-10-22 中铁四局集团有限公司 Three-dimensional digital beam field, construction method, computer equipment and storage medium
CN110414922A (en) * 2019-06-28 2019-11-05 万翼科技有限公司 A kind of construction data management method and device based on Building Information Model
CN110443480A (en) * 2019-07-26 2019-11-12 中铁四局集团第一工程有限公司 Construction progress monitoring and early warning method and system
CN110658790A (en) * 2019-09-17 2020-01-07 广州市微柏软件股份有限公司 Precast beam production management system based on three-dimensional visual process management
CN111210199A (en) * 2020-01-03 2020-05-29 广西路桥工程集团有限公司 Bridge prefab BIM information management system
CN117371907A (en) * 2023-09-26 2024-01-09 杭州市交通工程集团有限公司 Precast beam field material supervision method and system based on Internet of things

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104567985A (en) * 2015-01-28 2015-04-29 桥软科技(北京)有限公司 Bridge information processing method and device
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN105652830A (en) * 2015-12-25 2016-06-08 中国铁道科学研究院铁道建筑研究所 Bridge monitoring system based on BIM
CN106339490A (en) * 2016-08-31 2017-01-18 铁道第三勘察设计院集团有限公司 System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN104567985A (en) * 2015-01-28 2015-04-29 桥软科技(北京)有限公司 Bridge information processing method and device
CN105652830A (en) * 2015-12-25 2016-06-08 中国铁道科学研究院铁道建筑研究所 Bridge monitoring system based on BIM
CN106339490A (en) * 2016-08-31 2017-01-18 铁道第三勘察设计院集团有限公司 System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107506907A (en) * 2017-08-02 2017-12-22 中国十七冶集团有限公司 Application of the mobile terminal based on BIM cloud platforms in construction quality inspection
CN108898660A (en) * 2018-05-31 2018-11-27 四川隧唐科技股份有限公司 monitoring method and device
CN109523182A (en) * 2018-11-27 2019-03-26 华规软件(上海)有限公司 A kind of beam field production management method, platform, computer equipment and storage medium
CN109784693B (en) * 2018-12-29 2023-09-19 陕西铁路工程职业技术学院 Three-dimensional dynamic production management system for prefabricated part field
CN109784693A (en) * 2018-12-29 2019-05-21 陕西铁路工程职业技术学院 A kind of Three-Dimensional Dynamic production management system for prefabricated components field
CN110197007A (en) * 2019-05-09 2019-09-03 北新集团建材股份有限公司 A method of automatically generating light steel keel gypsum board Wall model
CN110188997A (en) * 2019-05-13 2019-08-30 赣州和永软件开发有限责任公司 A kind of construction quality cruising resource content evaluation method and its system
CN110106800A (en) * 2019-05-16 2019-08-09 北京鼎兴达信息科技股份有限公司 High speed railway sound barrier health indicator administrative evaluation system and monitoring device
CN110106800B (en) * 2019-05-16 2023-09-19 北京鼎兴达信息科技股份有限公司 High-speed railway sound barrier health index management evaluation system and monitoring device
CN110414922A (en) * 2019-06-28 2019-11-05 万翼科技有限公司 A kind of construction data management method and device based on Building Information Model
CN110363852B (en) * 2019-07-15 2023-08-29 中铁四局集团有限公司 Three-dimensional digital beam field, construction method, computer equipment and storage medium
CN110363852A (en) * 2019-07-15 2019-10-22 中铁四局集团有限公司 Three-dimensional digital beam field, construction method, computer equipment and storage medium
CN110443480A (en) * 2019-07-26 2019-11-12 中铁四局集团第一工程有限公司 Construction progress monitoring and early warning method and system
CN110443480B (en) * 2019-07-26 2023-10-27 中铁四局集团第一工程有限公司 Construction progress monitoring and early warning method and system
CN110658790A (en) * 2019-09-17 2020-01-07 广州市微柏软件股份有限公司 Precast beam production management system based on three-dimensional visual process management
CN111210199A (en) * 2020-01-03 2020-05-29 广西路桥工程集团有限公司 Bridge prefab BIM information management system
CN117371907A (en) * 2023-09-26 2024-01-09 杭州市交通工程集团有限公司 Precast beam field material supervision method and system based on Internet of things
CN117371907B (en) * 2023-09-26 2024-06-11 杭州市交通工程集团有限公司 Precast beam field material supervision method and system based on Internet of things

Similar Documents

Publication Publication Date Title
CN106997511A (en) Railway beam yard management system and railway beam yard management method based on BIM technology
CN106988221B (en) Unit construction bridge beam construction method based on BIM
CN111369158A (en) BIM-based informatization quality management method and system
CN109165394B (en) Standardized BIM model lightweight realization method
CN111143915A (en) Steel structure modular installation method based on Tekla software platform
CN107958101A (en) A kind of assembled architecture Information Management System and method based on BIM
CN104866952B (en) Three-dimensional digital management implementation method for hydropower station engineering project
CN105825335A (en) BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN109801038A (en) A kind of versatility engineering construction method based on BIM technology application
CN107622355A (en) Project cluster work progress digital management system and method
CN105549557A (en) Real-time dynamic 3D water balance monitoring system of power plant and working method of system
Xu et al. Integration of BIM and energy consumption modelling for manufacturing prefabricated components: a case study in China
CN107038259A (en) A kind of operational method and its system for constructing traffic network data
CN109558412A (en) The data growing method and device of assembled architecture construct platform
Wen Research on the intelligent construction of prefabricated building and personnel training based on BIM5D
CN110263451A (en) Arch rib processing construction method based on BIM
Barbosa et al. Implementing lean construction effectively in a year in a construction project
CN109191577A (en) A kind of distribution BIM collaborative platform
Bonenberg et al. BIM in prefabrication and modular building
CN118071059A (en) Intelligent beam field management platform based on BIM and GIS
CN107368972A (en) It is a kind of that work platform and its application method are sent based on BIM technology
Cao et al. A digital twin (DT) framework at design and construction phases
CN116561871A (en) Deep construction method for mounting embedded part of bridge bearing platform
Barbosa et al. Heijunka system to level telescopic forklift activities using tablets in construction site
CN112396296A (en) Resource scheduling system based on BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170801

RJ01 Rejection of invention patent application after publication