CN115187200A - Assembly type machine room construction management system based on BIM digital-analog separation - Google Patents
Assembly type machine room construction management system based on BIM digital-analog separation Download PDFInfo
- Publication number
- CN115187200A CN115187200A CN202210810609.XA CN202210810609A CN115187200A CN 115187200 A CN115187200 A CN 115187200A CN 202210810609 A CN202210810609 A CN 202210810609A CN 115187200 A CN115187200 A CN 115187200A
- Authority
- CN
- China
- Prior art keywords
- construction
- management
- model
- bim
- machine room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000926 separation method Methods 0.000 title claims abstract description 22
- 238000009430 construction management Methods 0.000 title claims abstract description 17
- 238000010276 construction Methods 0.000 claims abstract description 93
- 238000007726 management method Methods 0.000 claims abstract description 87
- 238000000034 method Methods 0.000 claims abstract description 22
- 238000010586 diagram Methods 0.000 claims abstract description 17
- 239000004576 sand Substances 0.000 claims abstract description 15
- 230000000007 visual effect Effects 0.000 claims abstract description 5
- 238000013523 data management Methods 0.000 claims description 13
- 238000009434 installation Methods 0.000 claims description 8
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 230000008520 organization Effects 0.000 claims description 5
- 239000003086 colorant Substances 0.000 claims description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 2
- 238000004891 communication Methods 0.000 claims 1
- 238000013461 design Methods 0.000 abstract description 16
- 238000005516 engineering process Methods 0.000 abstract description 9
- 238000009417 prefabrication Methods 0.000 abstract description 5
- 238000013468 resource allocation Methods 0.000 abstract description 2
- 238000012384 transportation and delivery Methods 0.000 abstract description 2
- 238000012545 processing Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000013016 damping Methods 0.000 description 3
- 238000005457 optimization Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Tourism & Hospitality (AREA)
- Finance (AREA)
- Architecture (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Software Systems (AREA)
- Geometry (AREA)
- Computer Graphics (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Technology Law (AREA)
- Primary Health Care (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an assembly machine room construction management system based on BIM (building information modeling) separation, which comprises an assembly machine room construction cooperative platform based on a construction process, wherein the assembly machine room construction cooperative platform comprises a large-screen display end, a Web application end and an APP application end, the large-screen display end is used for displaying a total progress crosswalk diagram, construction states of each work area, image progress and completion conditions, the Web application end is used for separating digital and analog by adopting a BIM model lightweight technology according to the construction process so as to build a visual electronic sand table, fine management in the construction process is realized, and the APP application end is used for checking on-site construction information and reporting feedback in time. The invention digitally manages the project under the advantages of shortened construction period and complete assembly type construction technology, provides effective data connection among a plurality of procedures such as prefabrication factories, construction sites, transportation and the like in the processes of design, construction and completion delivery, and provides effective scheduling basis for resource allocation.
Description
Technical Field
The invention belongs to the field of BIM technology and assembly technology, and particularly relates to an assembly machine room construction management system based on BIM digital-analog separation.
Background
Along with the green construction and the intelligent construction of engineering projects are vigorously carried out in China, the construction of the modular assembly type machine room is rapidly developed, fine factory prefabrication and the height of the BIM digital platform are matched, the prefabrication rate of pipelines of the machine room is greatly improved, the construction speed of the machine room is increased, and the traditional construction site installation is gradually replaced. The civil engineering and installation major can be constructed simultaneously, and the total construction period of the machine room is greatly shortened.
In order to realize the management of the assembly type construction, the invention forms a set of assembly type-based management method, and a digital management mode and a system are formed by data obtained after the digital-analog separation of the BIM model.
Disclosure of Invention
The invention aims to provide an assembly type machine room construction management system based on BIM digital-analog separation, which aims to solve the problems.
In order to achieve the above object, an embodiment of the present invention provides the following technical solutions:
the utility model provides an assembled computer lab construction management system based on BIM digifax separation, includes the platform is joined in marriage in assembly computer lab construction based on construction flow, the platform is joined in marriage in assembly computer lab construction includes big screen show end, web application and APP application, big screen show end is used for showing general progress crosswalk picture, each work area construction state and image progress and the condition of accomplishing, the Web application carries out the digifax separation through adopting BIM model lightweight technology according to construction flow, and then builds visual electronic sand table, realizes the fine-grained management in the work progress, the APP application is used for looking over the site operation information to in time report the feedback.
And further, the construction states of each work area comprise three states of non-construction, construction and construction in the future, the image progress and completion condition comprises three states of advance, normal and delay, and the overall progress crosswalk diagram, the construction states of each work area and the image progress and completion condition are displayed at the large-screen display end by adopting different colors.
Further, the Web application end comprises system management, project management, model management, assembly management, an electronic sand table, field labor management and material management, wherein the project management is used for managing project information.
Further, the system management comprises organization management, authority management, user management and process management, wherein the authority management comprises role management and authority management.
Further, the model management comprises model professional maintenance, model structure maintenance and model file management, wherein the model file management comprises model uploading, model previewing, model version control, model transcoding and model state.
Further, assembly member management includes component type, component mark, component two-dimensional code and component code, the APP end can acquire component information through scanning the component two-dimensional code, the information of installation position, the elevation of assembly module is included to the component two-dimensional code.
Furthermore, the electronic sand table is used for automatically analyzing codes in the BIM, the codes are used as a data main chain to form an effective database and a resource library, and the electronic sand table is used for compiling progress plans of assembly type construction, managing construction production and tracking data of field assembly, so that fine management in the construction process is realized.
Further, the on-site labor management comprises labor member management, labor cost payment and gate management, and the labor members comprise labor teams, labor teams and labor personnel.
Further, the data management comprises construction data management and custom data management, and the construction data content comprises work sections, progress and assembly parts.
Furthermore, the APP application end has the functions of project rotation, proxy, BIM model, quality safety, progress filling, project bar watching, project data and scanning.
Compared with the prior art, the invention has the following advantages:
the invention digitally manages the project under the advantages of shortened construction period and complete assembly type construction technology, provides effective data connection among a plurality of procedures such as prefabrication factories, construction sites, transportation and the like in the processes of design, construction and completion delivery, and provides effective scheduling basis for resource allocation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments described in the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a system diagram of a construction collaboration platform of an assembly machine room according to an embodiment of the present invention;
FIG. 2 is a diagram of a Web application end system in accordance with an embodiment of the present invention;
FIG. 3 is a system management system diagram according to an embodiment of the present invention;
FIG. 4 is a diagram of a model management system in accordance with an embodiment of the present invention;
FIG. 5 is a diagram of an assembly management system according to an embodiment of the present invention;
FIG. 6 is a diagram of a schedule management system in accordance with an embodiment of the present invention;
FIG. 7 is a diagram of a quality safety system in accordance with one embodiment of the present invention;
FIG. 8 is a diagram of an electronic sand table system in accordance with an embodiment of the present invention;
FIG. 9 is a diagram of an on-site labor management system in accordance with an embodiment of the present invention;
FIG. 10 is a diagram of a net work system according to an embodiment of the present invention;
FIG. 11 is a diagram of a data management system according to an embodiment of the present invention;
FIG. 12 is a diagram of an APP application end system in accordance with an embodiment of the present invention;
FIG. 13 is an overall construction drawing in accordance with an embodiment of the present invention.
Detailed Description
The present invention will be described in detail below with reference to embodiments shown in the drawings. The embodiments are not intended to limit the present invention, and structural, methodological or functional changes made by those skilled in the art according to the embodiments are included in the scope of the present invention.
The invention discloses a BIM digital-analog separation-based assembly type machine room construction management system, which is shown in a reference figure 1-12 and comprises an assembly type machine room construction cooperation platform based on a construction process, wherein the assembly type machine room construction cooperation platform comprises a large-screen display end, a Web application end and an APP application end.
The construction process mainly comprises a design stage, a deepening design stage, a factory assembly module processing stage and a field assembly and installation stage.
In addition, the design stage and the deepening design stage mainly comprise equipment model selection and equipment data collection, equipment arrangement, module design, profile steel model selection, damping design, basic design, drainage ditch optimization, pipe group splitting and combination and support hanger arrangement deepening drawing.
Referring to fig. 1 to 12, the large screen display end includes a projector and a display screen, and the display screen is used for displaying the overall progress crosswalk diagram, the construction state of each work area, the image progress and the completion condition.
The construction state of each work area comprises three states of non-construction, construction and future construction.
In addition, the image progress and the completion condition, namely the construction progress of the model of a single specialty, display the mutual relation between the actual progress and the planned progress of the single component and comprise three states of advance, normal and delay.
Specifically, the overall progress crosswalk diagram, the construction states of each work area, the image progress and the completion condition are displayed on the display screen by adopting different colors.
Preferably, the overall progress crossroad map is displayed in a first level, namely grey, the construction state of each work area is displayed in a foundation mode, and the image progress and the completion condition are displayed in a second level.
Referring to fig. 2-12, according to the construction process, the Web application performs digital-analog separation by using a BIM model lightweight technology, so as to construct a visual electronic sand table, thereby implementing fine management in the construction process, and the APP application is used for checking the site construction information and reporting feedback in time.
The Web application end comprises system management, project management, model management, assembly management, an electronic sand table, field labor management and data management, and the project management is used for managing project information.
In addition, the system management comprises organization management, authority management, user management and process management, and the authority management comprises role management and authority management.
Specifically, model management comprises model professional maintenance, model structure maintenance and model file management, wherein the model file management comprises model uploading, model previewing, model version control, model transcoding and model state.
Preferably, the model states include historical states and reuse states.
In addition, the assembly management comprises component types, component labels, two-dimensional codes and component codes, and the APP end can acquire component information by scanning the two-dimensional codes.
Preferably, the two-dimensional code of the component comprises information such as an installation position and an elevation of the assembly module, the model takes the code as a data main chain to form an effective database and a resource library, and the effective database and the resource library are used for compiling a progress plan of the assembly type construction, managing construction production and tracking data of field assembly, so that refined organization management in the construction process is realized.
Referring to fig. 1 to 12, the electronic sand table integrates data and graphic elements such as equipment data, equipment arrangement, module design, section steel selection, damping design, foundation design, drainage ditch optimization, pipe set splitting and combining, support hanger arrangement and the like, is used for automatically analyzing codes in a BIM model, takes the codes as a data main chain, forms an effective database and a resource library, is used for compiling progress plans of fabricated construction, managing construction production and tracking data of field assembly, and realizes fine management in a construction process.
The field labor management comprises labor teams, labor teams and groups, labor personnel, labor admission, labor attendance checking, labor return, labor cost payment conditions and gate management.
In addition, the data management comprises construction data management and custom data management, and the construction data content comprises work sections, progress, assembly parts and other data.
Referring to fig. 1-12, the Web application further includes progress management, quality safety, and engineering net volume.
The content of the progress management comprises progress planning and progress execution.
In addition, quality security includes quality control points and problem rectification orders.
When the problem rectification list is created, a rectification flow needs to be defined, and the problem rectification list also has the functions of adding, processing and inquiring.
Specifically, the engineering net volume includes engineering code maintenance and net volume statistics.
Referring to fig. 1-12, the APP has the functions of project rotation, agent, BIM model, quality security, progress filling, project bar-watching, project data and scanning.
The APP application end is also provided with a home page, an address list, a message and a layout.
When the pipeline assembly and transportation system is used specifically, referring to fig. 13, a factory processing mode is adopted in the early stage of project construction, module manufacturing and large-diameter pipeline section cutting and pipe row assembly are completed, factory large-scale hoisting and transportation machinery is fully utilized, module assembly and hoisting operation are efficiently completed, when civil engineering meets the implementation conditions of installation engineering, pipeline processing machines are combined into modules to be transported to the site, and a mobile pipeline processing station is assembled, so that the transportation cost of secondary transportation of pipelines is greatly reduced, the pipeline assembly and welding efficiency is improved to the maximum extent, the labor cost is greatly reduced, the welding pollution of a construction site is reduced, and the pipeline assembly rate is improved;
according to the construction process, an assembly machine room construction cooperative platform is established, the assembly machine room construction cooperative platform connects links of design, module prefabrication, construction and the like in series, digital-analog separation is carried out by adopting a BIM model lightweight technology, a visual electronic sand table is realized by combining a WebGL technology, the electronic sand table integrates data and graphic elements such as equipment information, equipment arrangement, module design, profile steel selection, damping design, basic design, drainage ditch optimization, pipe group splitting and combination, support hanger arrangement and the like, codes in the BIM model can be automatically analyzed, the codes are used as a data main chain to form an effective database and a resource library, and the electronic sand table is used for compiling progress plan of assembly construction, managing construction production and tracking data of field assembly, and realizing refined organization management in the construction process;
in addition, the assembly type machine room construction cooperation platform not only realizes the conventional factors such as data management, safety management, quality management, technical management, progress management and personnel management, but also provides a plurality of personalized functions, namely, the two-dimensional codes are pasted at the doorways of all functional rooms, the composing drawings and the methods of the wall tops and the ground of the rooms and the corresponding three-dimensional effects are included, and the back check function of the model and the assembly module is further realized; after the assembly module arrives at the site, the APP application end scans information such as two-dimensional codes on the component to obtain information such as the installation position and elevation of the assembly module, so that the assembly module is convenient to check; the safety and quality problems can be found, reported, rectified, examined and rectified on the whole site to the whole closed-loop working flow meeting the requirements on the mobile terminal;
in addition, the site progress plate and the Gantt chart project a large site screen, the overall three-dimensional model state (grey display) is displayed at the first stage, the construction state (non-construction, construction and future construction) of each construction area of the site is displayed at the foundation, the construction progress of the model of a single specialty is displayed at the second stage, the mutual relation (advance, delay and the like) between the actual progress and the planned progress of an individual component is displayed, and the individual component is distinguished by different colors, so that the observation is convenient.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (10)
1. The utility model provides an assembled computer lab construction management system based on BIM digifax separation, a serial communication port, include the platform is joined in marriage in cooperation in the assembled computer lab construction based on construction flow, the platform is joined in marriage in cooperation in the assembled computer lab construction includes big screen show end, web application and APP application, big screen show end is used for showing general progress crosswalk picture, each work area construction state and image progress and the condition of accomplishing, the Web application carries out the digifax separation through adopting BIM model lightweight technique according to the construction flow, and then builds visual electronic sand table, realizes the detailed management among the work progress, the APP application is used for looking over the site operation information to in time report the feedback.
2. The BIM digital-analog separation-based assembly machine room construction management system as claimed in claim 1, wherein the construction states of each work area comprise three states of non-construction, construction and future construction, the image progress and completion conditions comprise three states of advance, normal and delay, and the overall progress crosswalk diagram, the construction states of each work area and the image progress and completion conditions are displayed on the large screen display end by adopting different colors.
3. The BIM separation-based assembly machine room construction management system according to claim 1, wherein the Web application comprises system management, project management, model management, assembly management, electronic sand table, on-site labor management and data management, wherein the project management is used for managing project information.
4. The BIM digital-analog separation-based construction management system for the assembly machine room as claimed in claim 3, wherein the system management comprises organization management, authority management, user management and process management, and the authority management comprises role management and authority management.
5. The BIM digital-analog separation-based assembly type machine room construction management system of claim 3, wherein the model management comprises model professional maintenance, model structure maintenance and model file management, and the model file management comprises model uploading, model previewing, model version control, model transcoding and model state.
6. The BIM digital-analog separation-based assembly machine room construction management system according to claim 3, wherein assembly management comprises component types, component labels, component two-dimensional codes and component codes, the APP end can obtain component information by scanning the component two-dimensional codes, and the component two-dimensional codes comprise information of installation positions and elevations of assembly modules.
7. The BIM digital-analog separation-based assembly type machine room construction management system of claim 3, wherein the electronic sand table is used for automatically analyzing codes in a BIM model, the codes are used as a data main chain to form an effective database and a resource library, and the effective database and the effective resource library are used for compiling a progress plan of assembly type construction, managing construction production and tracking data of field assembly, so that fine management in a construction process is realized.
8. The BIM separation-based assembly machine room construction management system according to claim 3, wherein the on-site labor management comprises labor member management, labor cost payment and gate management, and the labor members comprise labor teams, labor teams and labor personnel.
9. The BIM separation-based assembly machine room construction management system according to claim 3, wherein the data management comprises construction data management and custom data management, and the construction data content comprises work sections, progress and assembly parts.
10. The BIM digital-analog separation-based assembly type machine room construction management system of claim 3, wherein the APP application terminal has functions of project rotation, agent, BIM model, quality safety, progress filling, project bar watching, project data and scanning.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210810609.XA CN115187200B (en) | 2022-07-11 | 2022-07-11 | Assembled computer lab construction management system based on BIM digital-analog separation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210810609.XA CN115187200B (en) | 2022-07-11 | 2022-07-11 | Assembled computer lab construction management system based on BIM digital-analog separation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115187200A true CN115187200A (en) | 2022-10-14 |
CN115187200B CN115187200B (en) | 2023-05-16 |
Family
ID=83517002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210810609.XA Active CN115187200B (en) | 2022-07-11 | 2022-07-11 | Assembled computer lab construction management system based on BIM digital-analog separation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115187200B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116109281A (en) * | 2023-04-10 | 2023-05-12 | 中建安装集团有限公司 | Machine room equipment self-adaptive management system and method based on cloud computing |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110276886A1 (en) * | 2010-05-05 | 2011-11-10 | Eric Hall | System and method for managing facility content and equipment information |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN109087048A (en) * | 2018-08-17 | 2018-12-25 | 青岛理工大学 | Two-dimensional code-based assembled building component tracking method |
CN109215470A (en) * | 2018-10-31 | 2019-01-15 | 广西路桥工程集团有限公司 | A kind of goods electronic sand map system and its construction method based on BIM+GIS |
CN109544051A (en) * | 2019-01-25 | 2019-03-29 | 中铁三局集团广东建设工程有限公司 | A kind of construction management application platform based on BIM technology application |
CN112001680A (en) * | 2020-08-27 | 2020-11-27 | 四川公路桥梁建设集团有限公司 | BIM-based highway engineering management system |
CN113177768A (en) * | 2020-11-10 | 2021-07-27 | 国网青海省电力公司 | Intelligent engineering platform based on comprehensive digital management of capital construction whole process |
CN113361975A (en) * | 2021-07-16 | 2021-09-07 | 安徽富煌钢构股份有限公司 | BIM + wisdom building site management platform system |
CN114399265A (en) * | 2021-12-08 | 2022-04-26 | 国网上海市电力公司 | Electric power engineering construction project overall process management and control system |
JP2022067634A (en) * | 2020-10-20 | 2022-05-06 | ウソン ユニバーシティ コーオペレーション オブ インダストリアル エデュケーショナル プログラム | Bim railroad infrastructure-enterprise information management system and method therefor |
-
2022
- 2022-07-11 CN CN202210810609.XA patent/CN115187200B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110276886A1 (en) * | 2010-05-05 | 2011-11-10 | Eric Hall | System and method for managing facility content and equipment information |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN109087048A (en) * | 2018-08-17 | 2018-12-25 | 青岛理工大学 | Two-dimensional code-based assembled building component tracking method |
CN109215470A (en) * | 2018-10-31 | 2019-01-15 | 广西路桥工程集团有限公司 | A kind of goods electronic sand map system and its construction method based on BIM+GIS |
CN109544051A (en) * | 2019-01-25 | 2019-03-29 | 中铁三局集团广东建设工程有限公司 | A kind of construction management application platform based on BIM technology application |
CN112001680A (en) * | 2020-08-27 | 2020-11-27 | 四川公路桥梁建设集团有限公司 | BIM-based highway engineering management system |
JP2022067634A (en) * | 2020-10-20 | 2022-05-06 | ウソン ユニバーシティ コーオペレーション オブ インダストリアル エデュケーショナル プログラム | Bim railroad infrastructure-enterprise information management system and method therefor |
CN113177768A (en) * | 2020-11-10 | 2021-07-27 | 国网青海省电力公司 | Intelligent engineering platform based on comprehensive digital management of capital construction whole process |
CN113361975A (en) * | 2021-07-16 | 2021-09-07 | 安徽富煌钢构股份有限公司 | BIM + wisdom building site management platform system |
CN114399265A (en) * | 2021-12-08 | 2022-04-26 | 国网上海市电力公司 | Electric power engineering construction project overall process management and control system |
Non-Patent Citations (1)
Title |
---|
鲁剑蓉: "BIM+智慧工地平台项目应用" * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116109281A (en) * | 2023-04-10 | 2023-05-12 | 中建安装集团有限公司 | Machine room equipment self-adaptive management system and method based on cloud computing |
Also Published As
Publication number | Publication date |
---|---|
CN115187200B (en) | 2023-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110909972B (en) | BIM-based steel structure full life cycle management system and method | |
CN111210199B (en) | Bridge prefab BIM information management system | |
CN110008648B (en) | Intelligent building site integration implementation method based on BIM model | |
CN106845919A (en) | Construction information collection processing method | |
CN107622355A (en) | Project cluster work progress digital management system and method | |
Yu et al. | RIOMS: An intelligent system for operation and maintenance of urban roads using spatio-temporal data in smart cities | |
CN109544051A (en) | A kind of construction management application platform based on BIM technology application | |
CN111223178B (en) | Three-dimensional model application method and system for nuclear power engineering modularization construction | |
CN107862153A (en) | A kind of transformer station digitizes managing and control system | |
CN110147417A (en) | Expressway works construction supervision unified platform | |
CN103440600A (en) | BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model | |
CN107993000A (en) | Construction general plane dynamic coordination management method based on BIM | |
CN114003998A (en) | Steel structure digital factory cooperation system and method based on digital twin technology | |
CN112465390A (en) | BIM-based subway station construction progress management method | |
CN110750827A (en) | Progress management method based on BIM | |
CN109886838A (en) | Smart city operation management platform based on CIM | |
CN115187200A (en) | Assembly type machine room construction management system based on BIM digital-analog separation | |
Laurini et al. | Technology 4.0 for buildings management: from building site to the interactive building book | |
CN210072621U (en) | BIM management-based deepened transformation system for vehicle section with ultra-large cover body | |
CN116187923A (en) | Port digital system | |
CN116561871A (en) | Deep construction method for mounting embedded part of bridge bearing platform | |
CN114662189A (en) | Construction method of steel-concrete structure foundation pit trestle based on BIM | |
Yang | Application of BIM during lean construction of high-rise buildings | |
CN113449374B (en) | Equipment self-organization strategy optimization method and system adaptive to steel structure construction characteristics | |
Mancuso et al. | Industry 4.0 for AEC Sector: Impacts on Productivity and Sustainability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |