[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN110210771A - A kind of construction information management system and technique based on Building Information Model - Google Patents

A kind of construction information management system and technique based on Building Information Model Download PDF

Info

Publication number
CN110210771A
CN110210771A CN201910492415.8A CN201910492415A CN110210771A CN 110210771 A CN110210771 A CN 110210771A CN 201910492415 A CN201910492415 A CN 201910492415A CN 110210771 A CN110210771 A CN 110210771A
Authority
CN
China
Prior art keywords
information
construction
building
progress msg
floor tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910492415.8A
Other languages
Chinese (zh)
Other versions
CN110210771B (en
Inventor
张鸿鹄
郭长春
周雪梅
孟露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Original Assignee
CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd filed Critical CHONGQING CONSTRUCTION NINTH ENGINEERING Co Ltd
Priority to CN201910492415.8A priority Critical patent/CN110210771B/en
Publication of CN110210771A publication Critical patent/CN110210771A/en
Application granted granted Critical
Publication of CN110210771B publication Critical patent/CN110210771B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01KMEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
    • G01K13/00Thermometers specially adapted for specific purposes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/38Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
    • G01S19/39Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/42Determining position
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Radar, Positioning & Navigation (AREA)
  • General Business, Economics & Management (AREA)
  • Remote Sensing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to construction engineering technical fields, are related to a kind of construction information management system and technique based on Building Information Model.Construction information management system includes data collection module, message processing module and information display module.The data collection module for acquiring construction information includes construction speed information acquisition unit, technical information acquisition unit, quality management information acquisition unit, safety management information acquisition unit and Building Information Model acquisition unit.The construction speed information acquisition unit includes ground tile paving progress msg acquisition device, the ground tile paving progress msg acquisition device includes alternating temperature portion and test section, according to ground tile paving progress temperature change occurs for the alternating temperature portion, and the test section is for detecting alternating temperature portion temperature change signal and sending ground tile paving progress msg to message processing module.The system can acquire construction speed information in time, thus the management of more scientific realization construction information.

Description

A kind of construction information management system and technique based on Building Information Model
Technical field
The invention belongs to construction engineering technical fields, are related to construction information management system and technique, and in particular to Yi Zhongji In the construction information management system and technique of Building Information Model.
Background technique
In engineering construction, the management of engineering data is most important and most basic one of link.In engineering construction, Unit in charge of construction is specially equipped with full-time reference librarians and is responsible for collecting, arranges, summarize the technological document data formed in work progress, but Be still will appear in practical operation data collection not in time, data be filled in manually easily there is mistake, can not system and intuitively The problems such as showing construction information, it would be highly desirable to which developing may be implemented collects construction information and the intuitive construction for showing construction information in time Data supervision system.Building Information Model (Building Information Modeling) passes through digital information analogue simulation Real information possessed by building can help to realize the integrated of architecture information.Building Information Model is applied to above-mentioned apply , it can be achieved that conveniently management to construction information in work data supervision system.
Chinese patent CN104881751A (a kind of construction information management system and method based on Building Information Model), skill All kinds of construction informations are carried out classified storage and related to Building Information Model component by construction information management system in art scheme The relationship between Building Information Model component and construction information is presented with more intuitive mode in connection, and data management personnel can be with All kinds of construction informations are extracted and checked from Building Information Model component, and construction information is managed.But in above-mentioned construction In data supervision system, concrete scheme is not suggested that solve the problems, such as the practical operation in acquisition construction information.With Requirement of the people to inhabitation, life, amusement and working environment it is higher and higher, be laid with floor tile due to have improve building class, The effects of increasing user's level of comfort, has become an essential link in building construction process.In ground tile paving In the acquisition of construction speed data, there are data collections not in time, data is filled in manually easily there is the problems such as mistake, results in and applies The problem of work data management system data errors, data are not complete or data update not in time.
Summary of the invention
The construction information management system based on Building Information Model that the purpose of the present invention is to provide a kind of, which can The construction speed information of acquisition ground tile paving in time, thus the management of more scientific realization construction information.
In order to solve the above technical problems, technical solution of the present invention is as follows:
A kind of construction information management system based on Building Information Model, including data collection module, message processing module With information display module;
The data collection module is for acquiring and transmitting construction information, the data collection module to message processing module Including construction speed information acquisition unit;
The construction speed information acquisition unit includes ground tile paving progress msg acquisition device and reports floor tile, describedly Brick is laid with progress msg acquisition device and is used to acquire the progress msg for striking practical operation work carried out to report floor tile, the report floor tile For last block floor tile to be laid of ground tile paving engineering.
By adopting the above technical scheme, technical principle are as follows: construction information, construction speed information are acquired by data collection module Acquisition unit is for acquiring construction speed information.When to construction speed information collection, particular for ground tile paving progress msg Acquisition use ground tile paving progress msg acquisition device.In the construction process, worker is using tools such as rubber hammers to including All floor tiles to be laid including report floor tile carry out striking practical operation work, and ground tile paving progress msg acquisition device acquires worker and carries out The progress msg of positive activity is struck to report floor tile.This programme be specifically designed report floor tile be ground tile paving engineering it is to be laid most Latter piece of floor tile, ground tile paving progress msg acquisition device collect worker have been carried out report floor tile strike positive activity, just anticipate Taste the ground tile paving Practical Completion.Ground tile paving progress msg acquisition device just acquires the progress msg, and (ground tile paving is complete Work), and the information of " ground tile paving Practical Completion " is sent to message processing module, to realize timely, automatic construction The acquisition of progress msg.Strike practical operation work progress msg refer to worker whether carried out floor tile strike practical operation work, have yes/no Two dimensions.In the present solution, having carried out striking practical operation work to report floor tile, expression ground tile paving engineering is near completion, Ke Yixiang Message processing module transmits progress of the information to record ground tile paving engineering.Whether the progress msg for striking practical operation work refer to Carried out floor tile strikes practical operation work.
The utility model has the advantages that
In the prior art, the form that construction unit or archives receive construction information is commonly papery version data, papery version Material takes up space very much, and the process that relevant information is extracted from papery plate material takes time and effort very much.By the data input of extraction The process of message processing module is related to for unstructured data being transformed into structural data, and process is complicated, is easy to appear data Situations such as typing mistake.And data collection mode in the prior art will lead to the lag of information, because data collect number Pilot process according to deposit message processing module is more.It is the to be laid of ground tile paving engineering that this programme, which is specifically designed report floor tile, Last block floor tile, ground tile paving progress msg acquisition device collect worker have been carried out report floor tile strike positive activity, Mean that the ground tile paving engineering approaches completion.Ground tile paving progress msg acquisition device in the technical program can automate Acquisition, and collected information timely can be passed into message processing module, realize timely acquisition, the transmission of data And processing.
The process of deployment of floor tile includes preparing cement mortar, and cement mortar is shakeout on the ground, then puts down floor tile It is laid in the cement mortar shakeout, finally uses the uniform tapping tile surface of rubber hammer repeatedly.Rubber hammer strikes repeatedly The operation for hitting floor tile, floor tile is beaten it is solid so that combining closely between floor tile and cement mortar, so that floor tile and cement mortar There is no gap or cavity, and the floor tile (being generally benchmark brick) that the floor tile being laid with can also be made to complete with other flushes, Keep the aesthetic measure and construction quality of ground tile paving.Therefore, tapping floor tile operation (as striking practical operation work) is ground tile paving mistake Essential and more important sport technique segment in journey.In the present invention, the definition for striking practical operation work is following procedure: being laid with ground During brick, tap tile surface repeatedly, floor tile is beaten it is solid so that combine closely between floor tile and cement mortar, and So that floor tile is flushed with other floor tiles (being generally benchmark brick).Select the information collection for striking practical operation work as ground tile paving progress Point, has the following advantages: (1) strike practical operation and make be ground tile paving necessary step, do not need worker and use its in addition to necessary step He operates to report ground tile paving progress msg;(2) to report floor tile strike practical operation already belong to ground tile paving in the process compared with Link rearward, compared with, as information gathering point, this programme more can accurately reflect and actually accomplish floor tile using more forward link The time of laying can more accurately react ground tile paving progress.
Further, the ground tile paving progress msg acquisition device is fixed on the upper surface of the report floor tile;Describedly It includes alternating temperature portion and test section that brick, which is laid with progress msg acquisition device,;The ground tile paving progress msg acquisition device is struck It hits, temperature change occurs for triggering alternating temperature portion, and the test section is for detecting alternating temperature portion temperature change signal and to information processing mould Block sends ground tile paving progress msg.
By adopting the above technical scheme, worker makes when being laid with last block floor tile of ground tile paving engineering in a certain stage It is laid with the floor tile (report floor tile) for being fixed with ground tile paving progress msg acquisition device.It include striking in ground tile paving step Practical operation is made, and is uniformly tapped using upper surface of the rubber hammer class tool to floor tile, in order to guarantee ground tile paving quality, strikes practical operation Need to cover the entire upper surface of floor tile.Since ground tile paving progress msg acquisition device is fixed on the upper surface of report floor tile, It needs by tapping ground tile paving progress msg acquisition device top, to realize to the floor tile upper surface part covered by above-mentioned apparatus The percussion divided.It can specify that worker carries out striking practical operation when making, it is necessary to strike to ground tile paving progress msg acquisition device top It hits, temperature change occurs to ensure to trigger alternating temperature portion.Due to secure the acquisition device floor tile upper surface portion in appearance Upper variant with the floor tile others upper surface portion, so above-mentioned acquisition device also has mark action, worker is easy to know The not acquisition device, and take advantage of a situation in striking practical operation work and strike the acquisition device, it has both realized triggering alternating temperature portion and temperature change occurs Effect also achieve additionally by the transmitting of power and strike real effect to floor tile.The laying of last block floor tile represents the rank The tile work construction of section is over, and construction worker only needs to carry out just using the floor tile with ground tile paving progress msg acquisition device Often construction (is laid with floor tile), does not need to carry out the operation that subsequent data is filled in and reported.
Wherein, the upper surface of floor tile refers to the one side towards user after ground tile paving.
Further, the test section includes temperature sensor, STC chip and gsm module;The temperature sensor is used for The temperature change signal in the alternating temperature portion is detected, the STC chip is used to receive the voltage signal of temperature sensor and controls GSM Module sends ground tile paving progress msg to message processing module.
By adopting the above technical scheme, after temperature sensor detects the temperature change in alternating temperature portion, electric signal is passed into STC Chip.After STC chip receives the voltage signal of temperature sensor, resolved to obtain temperature value by voltage value.When temperature value is higher than When certain threshold value, STC chip controls GSM sending module to distance host send " completion of ground tile paving staged construction " construction into Spend information.Using above-mentioned apparatus, the automatic collection and transmission of alternating temperature portion signal may be implemented.
Further, the test section further includes GPS module, and the GPS module is for obtaining the ground tile paving progress letter It ceases the location information of acquisition device and the location information is sent to the STC chip.
By adopting the above technical scheme, GPS module is used to obtain the location information of ground tile paving progress msg acquisition device, keeps away Exempt from alternating temperature portion and warming phenomenon (such as existing warming phenomenon is accidentally knocked out in alternating temperature portion) occurs in non-job location, it will so as to avoid system It does not represent the heating signal that construction is completed and is mistaken for construction completion signal.
Further, alternating temperature portion includes mutually isolated aqueous cavity and cavity containing quick lime;The alternating temperature portion further includes wearing Structure is pierced, the puncturing structure is connected to aqueous cavity and cavity containing quick lime when being tapped.
By adopting the above technical scheme, be laid with report floor tile carry out striking practical operation make when, the ground tile paving progress msg is adopted Acquisition means top is tapped, and aqueous cavity is connected to by puncturing structure with cavity containing quick lime, and quick lime and water contact generate greatly Calorimetric amount, heat transfer pass to data processing module to temperature sensor, to start test section and signal is completed in construction, when Between construction speed data collection.
Further, solid by the inharmonious adhesive tape of heat between the ground tile paving progress msg acquisition device and the report floor tile It is scheduled on the upper surface of last block floor tile.
By adopting the above technical scheme, the inharmonious adhesive tape of heat refers to that the adhesive surface of the adhesive tape at room temperature can normal paste Body, the adhesive force of adhesive surface weakens or disappears after heating, can easily remove adhesive tape from the object being stuck.? Foaming agent, heating rear foaming agent foaming are added in the adhesive of the adhesive surface of adhesive tape, adhesive surface loses viscous type, this is the prior art In routine operation means.
Further, the data collection module further includes technical information acquisition unit, quality management information acquisition unit, peace Full management information acquisition unit and Building Information Model acquisition unit.
By adopting the above technical scheme, technical information acquisition unit is used to acquire the technical information including construction drawing, Quality management information acquisition unit is for acquiring the quality managements information such as construction quality, and safety management information acquisition unit is for adopting Collect the safety management information including production safety information, Building Information Model acquisition unit is for acquiring architecture information mould Type.The technical program realizes the comprehensive acquisition of construction relevant information and material, helps to improve this construction information management system System.
Further, the message processing module is for the acquisition module construction information collected that receives and store data;Institute Stating construction information includes construction speed information, technical information, quality management information, safety management information and Building Information Model; Construction speed information, technical information, quality management information and safety management information are associated with Building Information Model respectively, described Building Information Model is distributed on a timeline.
By adopting the above technical scheme, construction speed information, technical information, quality management information and safety management information difference It is associated with Building Information Model, it can be convenient all moneys that user is checked based on Building Information Model in work progress Material and information.And Building Information Model is distributed on a timeline, can be checked convenient for users to time for carrying out according to engineering Buildings model data reaches model bandwagon effect synchronous with construction speed.
Further, the information display module for visualizing construction information according to user instructions.
By adopting the above technical scheme, information display module can be by the information stored in message processing module with visual Form shows user, and user is allowed intuitively to know that engineering carries out the skill that situation and each step are related to The information of art, management etc..
Further, a kind of construction information management technique based on Building Information Model, which is characterized in that including following step It is rapid:
S1: acquisition construction speed information, technical information, quality management information, safety management information and architecture information mould Type;, the construction speed information includes ground tile paving progress msg.
S2: by construction speed information, technical information, quality management information and safety management information respectively with architecture information mould Type is associated;
S2: Building Information Model is classified according to time shaft.
By adopting the above technical scheme, to construction speed information, technical information, quality management information, safety management information and Building Information Model is associated, and classifies in chronological order, can present in a more intuitive way Building Information Model with Relationship between other construction informations.
Detailed description of the invention
Fig. 1 is a kind of logic diagram of the construction information management system based on Building Information Model of the present invention;
Fig. 2 is the main view that brick of the present invention is laid with progress msg acquisition device;
Fig. 3 is the A-A sectional view of Fig. 2 of the present invention.
Specific embodiment
It is further described below by specific embodiment, in which:
Alternating temperature portion 1, test section 2, stomata 3, the inharmonious adhesive tape 4 of heat report floor tile 5, aqueous cavity 6, chamber 7 of ventilating, containing life Lime cavity 8, shell 9, subassembly wrapper 10, the first diaphragm 11, the second diaphragm 12, temperature sensor 13, cable 14, sealed membrane 15, Puncturing structure 16.
Embodiment 1:
The present embodiment is substantially as shown in Fig. 1, and a kind of construction information management system based on Building Information Model includes money Expect acquisition module, message processing module and information display module.
For data collection module for acquiring construction information, data collection module includes construction speed information acquisition unit, skill Art information acquisition unit, quality management information acquisition unit, safety management information acquisition unit and Building Information Model acquisition are single Member.Construction speed information acquisition unit, technical information acquisition unit, quality management information acquisition unit, safety management information are adopted Collection unit and Building Information Model acquisition unit are respectively used to acquisition construction speed information, technical information, quality management information, peace Full management information and Building Information Model.Technical information acquisition unit, quality management information acquisition unit and safety management information Acquisition unit includes scanner, for acquisition technique information material, the image of collection quality control data and safety management data; Building Information Model acquisition unit includes computer, BIM software is equipped on computer, for drawing Building Information Model.
Message processing module believes construction speed for the acquisition module construction information collected that receives and store data Breath, technical information, quality management information and safety management information are associated with Building Information Model respectively, Building Information Model point On a timeline, message processing module includes processor to cloth.Information display module for visually showing according to user instructions Construction information, including display.
As shown in Fig. 2, construction speed information acquisition unit includes ground tile paving progress msg acquisition device, ground tile paving into Spending information collecting device includes alternating temperature portion 1 and test section 2.As shown in figure 3, alternating temperature portion 1 is rectangular column shape and hollow, in this implementation In example, alternating temperature portion 1 is surrounded by 4 sidewall panelings, 1 top plate and 1 bottom plate.4 sidewall panelings, 1 top plate and 1 bottom plate are all made of Heat Conduction Material, Heat Conduction Material is metallic aluminium in the present embodiment.
Ground tile paving progress msg acquisition device is fixed on the upper surface of report floor tile 5, floor tile paving by the inharmonious adhesive tape 4 of heat If the upper surface of the bottom plate of progress msg acquisition device and report floor tile 5 is affixed, ground tile paving progress after the completion of ground tile paving The top plate of information collecting device is towards user.In the present embodiment, inharmonious 4 a part of adhesive tape of heat is pasted onto the side in alternating temperature portion 1 In the one side of the outside towards alternating temperature portion 1 of siding, another part is pasted onto the upper surface of report floor tile 5, to realize ground Brick is laid with progress msg acquisition device and reports the fixation of floor tile 5.It shares the inharmonious adhesive tape 4 of 4 heat and is attached to the 4 of alternating temperature portion 1 respectively On a sidewall paneling.The inharmonious adhesive tape 4 of heat refer to the adhesive surface of the adhesive tape at room temperature can normal substrates, glue after heating The adhesive force of veneer weakens or disappears, and can easily remove adhesive tape from the object being stuck.In the adhesive surface of adhesive tape Foaming agent, heating rear foaming agent foaming are added in adhesive, adhesive surface loses viscosity, this is routine operation hand in the prior art Section.
There are three chambers in alternating temperature portion 1, are followed successively by aqueous cavity 6 from top to bottom, ventilate chamber 7 and cavity containing quick lime 8. Separated between aqueous cavity 6 and ventilation chamber 7 by one first diaphragm 11, ventilates and pass through between chamber 7 and cavity containing quick lime 8 The partition of one second diaphragm 12.Aqueous cavity 6 is the closed containing cavity surrounded by the first diaphragm 11,4 sidewall panelings and top plates, aqueous Cavity 6 is loaded with water.Cavity containing quick lime 8 is the closed containing cavity surrounded by the second diaphragm 12,4 sidewall panelings and bottom plates, is being contained Quick lime, i.e. lime powder are contained in quick lime cavity 8.Chamber 7 ventilate by the first diaphragm 11, the second diaphragm 12 and 4 Sidewall paneling surrounds.Each sidewall paneling is divided by first diaphragm 11 and the second diaphragm 12 for 3 parts, in Fig. 3, from top to bottom It is successively the sidewall sections of aqueous cavity 6, the ventilate sidewall sections of chamber 7 and the sidewall sections of cavity containing quick lime 8.It is wherein every Through-hole, i.e. stomata 3 are offered on the sidewall sections of the ventilation chamber 7 of a sidewall paneling, for excluding gas and the solid after expansion, Since quick lime and water reaction can generate amount of heat, so that 8 internal gas of cavity containing quick lime expands, and quick lime meets water Volume itself can also expand afterwards.The material of first diaphragm 11 and the second diaphragm 12 is PVC film, all has water-proof function.
Hole is offered on the top plate in alternating temperature portion 1, hole is sealed by sealed membrane 15.Through-hole, above-mentioned through-hole are provided on sealed membrane 15 Pass through for puncturing structure 16.The lower part of puncturing structure 16 is rodlike, and length is greater than the depth of aqueous cavity 6 and ventilation chamber 7 The sum of, the top of puncturing structure 16 is discoid, and the lower part of puncturing structure 16 and the top of puncturing structure 16 are integrally formed.? When not needing to carry out ground tile paving progress report, the lower part of puncturing structure 16 is fixed on the through-hole on sealed membrane 15 by viscose glue Place, and viscose glue, by the gap sealing between puncturing structure 16 and sealed membrane 15, which is waterproof adhesive.In above-mentioned state (not needing to carry out ground tile paving progress report), the depth that aqueous cavity 6 is inserted into the lower part of puncturing structure 16 is less than aqueous cavity 6 Depth.When carrying out the laying of report floor tile 5, worker uniformly taps report 5 upper surface of floor tile, in the process, punctures knot The top of structure 16 also will receive percussion, and under the influence of the impact force, sealed membrane 15 ruptures, the lower part of puncturing structure 16 by first every Film 11 and the second diaphragm 12 pierce through, so that the quick lime of the water in aqueous cavity 6 and cavity containing quick lime 8 mixes, in addition, may be used also To use the lower part of puncturing structure 16 to stir quick lime and water, reach well-mixed purpose.The material of sealed membrane 15 is PVC Film has water-proof function.The disk diameter on the top of puncturing structure 16 is greater than the Kong Zhi in the hole opened up on the top plate in alternating temperature portion 1 Diameter prevents puncturing structure 16 to be difficult to take out completely into the inside in alternating temperature portion 1, also increases percussion target, be convenient for standard Really impact.
Test section 2 includes temperature sensor 13, and in the present embodiment, temperature sensor 13 (PT100) is attached to alternating temperature portion 1 In the one side of the outside towards alternating temperature portion 1 of sidewall paneling, and the height of temperature sensor 13 is lower than the height of the second diaphragm 12.Temperature Degree sensor 13 is covered with shell 9, and shell 9 is fixed on the sidewall paneling in alternating temperature portion 1 by viscose glue.Shell 9 is far from alternating temperature portion 1 Side is fixed with subassembly wrapper 10 by viscose glue, be equipped in subassembly wrapper 10 battery (ER14505, HPST), GPS module (NEO-6M), Gsm module (M590E) and STC chip (STC15F2K60S2-28I-PDIP40).Temperature sensor 13 passes through cable 14 for data The electric elements (STC chip) being transmitted in subassembly wrapper 10.
In the present embodiment, the inharmonious temperature (90 DEG C or more) of heat of the inharmonious adhesive tape 4 (QD97-UV-017, Gan Dingli) of heat is The heat aluminium that the slaking reaction (calcium oxide and water reaction) of quick lime generates, (1mol is raw for the temperature that can be easily reached Lime complete exothermic heat of reaction about 60j can make 1g aluminium heat up 120 DEG C or more).In the present embodiment, in cavity containing quick lime 8 The molar ratio of quick lime and the water in aqueous cavity 6 is 1:1 to guarantee efficient heat production.And reporting the main material of floor tile 5 is Clay, heat resistance and it is corrosion-resistant preferably, the heat that the slaking reaction of quick lime is discharged can be born.Even if quick lime is ripe Change calcium hydroxide caused by reacting to be moved on report floor tile 5 by stomata 3, because calcium hydroxide is alkalescent, and report The corrosion resistance and good of floor tile 5 is accused, report floor tile 5 will not be damaged.The upper surface of report floor tile 5 refers to report floor tile The one side towards user after 5 layings.
When the construction information management system of specifically used the technical program, operate as follows:
Data collection module acquires construction information, and construction information includes construction speed information, technical information, quality management letter Breath, safety management information and Building Information Model, respectively by construction speed information acquisition unit, technical information acquisition unit, Quality management information acquisition unit, safety management information acquisition unit and Building Information Model acquisition unit realize above-mentioned data Acquisition.The construction information of acquisition is transferred to message processing module by data collection module, and message processing module is receiving construction money After material, construction information is stored, and classification processing is carried out to construction information.Data collection module is by Building Information Model according to the time Axis classification, then by construction speed information, technical information, quality management information and safety management information same Building Information Model respectively It is associated.User can obtain the construction information in message processing module by information display module, and construction information is according to user's Command visible is shown.
When obtaining the ground tile paving progress msg in construction speed information, construction worker is in the floor tile for being laid with a certain stage When last block floor tile (as report floor tile 5) of laying project, using being fixed with ground tile paving progress msg acquisition device Report floor tile 5 is laid with.When carrying out the laying of report floor tile 5, worker uniformly taps report 5 upper surface of floor tile, herein mistake Cheng Zhong, the top of puncturing structure 16 also will receive percussion, and under the influence of the impact force, sealed membrane 15 ruptures, puncturing structure 16 The first diaphragm 11 and the second diaphragm 12 are pierced through in lower part, so that the quick lime of the water in aqueous cavity 6 and cavity containing quick lime 8 is mixed It closes, to reach more preferable effect, stirs quick lime and water using the lower part of puncturing structure 16, reach well-mixed purpose.Raw stone Exothermic reaction occurs for ash and water mixing, and heat is transmitted to the temperature sensor being fitted on sidewall paneling by the sidewall paneling in alternating temperature portion 1 13, after temperature sensor 13 detects temperature rising, electric signal is transmitted to STC chip by cable 14.STC chip receives temperature After spending the voltage signal of sensor 13, resolved to obtain temperature value by voltage value.When temperature value is higher than 50 DEG C, STC chip controls GSM sending module sends the construction speed information and GPS position information of " completion of ground tile paving staged construction " to distance host.Far Journey host receives information by GSM receiving module, then gives message processing module, above- mentioned information are associated with by message processing module Onto Building Information Model, and store into database.In addition, when ground tile paving progress msg acquisition device location information and When construction site location information is unmatched, message processing module will not be carried out in information association to Building Information Model Operation.
Since ground tile paving progress msg acquisition device is fixed on report floor tile 5 by the inharmonious adhesive tape 4 of heat, quick lime It is mixed with water and exothermic reaction generation amount of heat occurs, heat is transmitted to by the sidewall paneling in alternating temperature portion 1 and is fitted on sidewall paneling On the inharmonious adhesive tape 4 of heat, the viscosity of the inharmonious adhesive tape 4 of heat is reduced, and worker can be easily by the inharmonious adhesive tape 4 of heat from ground tile paving progress msg It is removed on acquisition device, to be recycled the device to reduce use cost.
Embodiment 2:
Substantially with embodiment 1, difference is the present embodiment: the gsm module in subassembly wrapper 10 is changed to LoRa module (ATK-LORA-01), LoRa module can not be by public wireless network base station, and Lai Shixian construction speed information is from job location To the transmitting of message processing module.In addition, the molar ratio of the quick lime in cavity containing quick lime 8 and the water in aqueous cavity 6 is The amount of 1:1.5, water are slightly excessive, to guarantee rapid reaction.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these also should be considered as protection scope of the present invention, these all will not influence what the present invention was implemented Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as specific embodiment can be used for explaining the content of claim.

Claims (10)

1. a kind of construction information management system based on Building Information Model, including data collection module, message processing module and Information display module, which is characterized in that
For acquiring and transmitting construction information to message processing module, the data collection module includes the data collection module Construction speed information acquisition unit;
The construction speed information acquisition unit includes ground tile paving progress msg acquisition device and report floor tile, the floor tile paving If progress msg acquisition device is used to acquire the progress msg for striking practical operation work carried out to report floor tile, the report floor tile is ground Last block floor tile to be laid of brick laying project.
2. the construction information management system according to claim 1 based on Building Information Model, which is characterized in that the floor tile paving If progress msg acquisition device is fixed on the upper surface of the report floor tile;The ground tile paving progress msg acquisition device includes Alternating temperature portion and test section;The ground tile paving progress msg acquisition device is tapped, and temperature change, institute occur for triggering alternating temperature portion Test section is stated for detecting alternating temperature portion temperature change signal and sending ground tile paving progress msg to message processing module.
3. the construction information management system according to claim 2 based on Building Information Model, which is characterized in that the test section Including temperature sensor, STC chip and gsm module;The temperature sensor is used to detect the temperature change letter in the alternating temperature portion Number, the STC chip, which is used to receive the voltage signal of temperature sensor and controls gsm module, sends floor tile to message processing module It is laid with progress msg.
4. the construction information management system according to claim 3 based on Building Information Model, which is characterized in that the test section It further include GPS module, the GPS module is used to obtain the location information of the ground tile paving progress msg acquisition device and by institute It states location information and is sent to the STC chip.
5. the construction information management system according to claim 4 based on Building Information Model, which is characterized in that alternating temperature portion includes Mutually isolated aqueous cavity and cavity containing quick lime;The alternating temperature portion further includes puncturing structure, and the puncturing structure is struck Aqueous cavity and cavity containing quick lime are connected to when hitting.
6. the construction information management system according to claim 5 based on Building Information Model, which is characterized in that the floor tile paving If being fixed between progress msg acquisition device and the report floor tile by the inharmonious adhesive tape of heat.
7. the construction information management system described in any one of -6 claims based on Building Information Model according to claim 1 System, which is characterized in that the data collection module further includes technical information acquisition unit, quality management information acquisition unit, peace Full management information acquisition unit and Building Information Model acquisition unit.
8. the construction information management system according to claim 7 based on Building Information Model, which is characterized in that the letter Breath processing module is for the acquisition module construction information collected that receives and store data;The construction information includes construction speed Information, technical information, quality management information, safety management information and Building Information Model;Construction speed information, technical information, Quality management information and safety management information are associated with Building Information Model respectively, and the Building Information Model is distributed in the time On axis.
9. the construction information management system according to claim 8 based on Building Information Model, which is characterized in that the letter Breath display module for visualizing construction information according to user instructions.
10. the construction information management technique based on Building Information Model of management system according to claim 9, feature It is, comprising the following steps:
S1: acquisition construction speed information, technical information, quality management information, safety management information and Building Information Model, it is described Construction speed information includes ground tile paving progress msg.
S2: by construction speed information, technical information, quality management information and safety management information respectively with Building Information Model phase Association;
S2: Building Information Model is classified according to time shaft.
CN201910492415.8A 2019-06-06 2019-06-06 Construction data management system and method based on building information model Active CN110210771B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910492415.8A CN110210771B (en) 2019-06-06 2019-06-06 Construction data management system and method based on building information model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910492415.8A CN110210771B (en) 2019-06-06 2019-06-06 Construction data management system and method based on building information model

Publications (2)

Publication Number Publication Date
CN110210771A true CN110210771A (en) 2019-09-06
CN110210771B CN110210771B (en) 2023-02-03

Family

ID=67791450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910492415.8A Active CN110210771B (en) 2019-06-06 2019-06-06 Construction data management system and method based on building information model

Country Status (1)

Country Link
CN (1) CN110210771B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112307543A (en) * 2020-10-30 2021-02-02 湖南宝家云建筑工程管理有限公司 Visual model construction method for guiding house construction and house construction system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105976089A (en) * 2016-04-27 2016-09-28 中交第二航务工程局有限公司 Construction data classification system based on building information model and method thereof
CN106803155A (en) * 2017-01-25 2017-06-06 深圳市万科房地产有限公司 Construction quality management-control method and system
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application
CN109801301A (en) * 2018-12-15 2019-05-24 华南理工大学 A kind of automatic collection method of tile work progress msg based on BIM and computer vision
CN109829693A (en) * 2019-01-21 2019-05-31 浙江浙东建设有限公司 One kind being used for Construction Schedule management system and management method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105976089A (en) * 2016-04-27 2016-09-28 中交第二航务工程局有限公司 Construction data classification system based on building information model and method thereof
CN106803155A (en) * 2017-01-25 2017-06-06 深圳市万科房地产有限公司 Construction quality management-control method and system
CN109801301A (en) * 2018-12-15 2019-05-24 华南理工大学 A kind of automatic collection method of tile work progress msg based on BIM and computer vision
CN109829693A (en) * 2019-01-21 2019-05-31 浙江浙东建设有限公司 One kind being used for Construction Schedule management system and management method
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王屿川等: "BIM技术在中国人寿数据中心装饰工程中的应用", 《建筑技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112307543A (en) * 2020-10-30 2021-02-02 湖南宝家云建筑工程管理有限公司 Visual model construction method for guiding house construction and house construction system

Also Published As

Publication number Publication date
CN110210771B (en) 2023-02-03

Similar Documents

Publication Publication Date Title
CN1311319C (en) Textual and graphical demarcation of location, and interpretation of measurements
CN110210771A (en) A kind of construction information management system and technique based on Building Information Model
CN103148824A (en) Intelligent detection method for vibration effective depth
CN110042823A (en) A kind of multifunction dynamic feeler inspection automatic production record and test method based on Internet of Things
CN109914376B (en) Automatic recording method for standard penetration test
CN212317973U (en) Intelligent drilling data measuring system for percussion drilling
CN103942936A (en) Remote vibration measurement collector and blasting signal collection method
CN115826033A (en) Karst geology detection method and system based on elastic wave imaging
JPH11294080A (en) Tunnel boring system
JP6804739B2 (en) Estimating method of strength characteristics of soil cement, estimation device, quality control method of rooted part during pile construction, quality control device
CN204940891U (en) A kind of cleaver
CN104460473B (en) Concrete vibrating effective time monitoring method
JP2007018164A (en) Self-propelled measurement device, diagnosis device, and automatic diagnosis system
EP3994328A1 (en) Method and system for estimating wear of a drill bit
JP5848056B2 (en) Filler with inorganic adhesive to anchor hole
CN116952080A (en) Three-dimensional trajectory test method for deep penetration test
JP6352684B2 (en) Drilling navigation device
CN115655032A (en) Tunnel large-section blasting construction method and system
CN216477296U (en) Long auger drilling machine based on terminal equipment remote control
CN101040180A (en) Monitoring system for concrete pilings and method of installation
CN101339102A (en) Merchantable coal train mobile sampling system and method
Woods Density management diagrams tools and uses
CN210341863U (en) Automatic counting structure for standard penetration test
CN105464392A (en) Trowel
CN209854690U (en) Data box

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant