[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO2013168415A1 - 管理装置および管理システム - Google Patents

管理装置および管理システム Download PDF

Info

Publication number
WO2013168415A1
WO2013168415A1 PCT/JP2013/002951 JP2013002951W WO2013168415A1 WO 2013168415 A1 WO2013168415 A1 WO 2013168415A1 JP 2013002951 W JP2013002951 W JP 2013002951W WO 2013168415 A1 WO2013168415 A1 WO 2013168415A1
Authority
WO
WIPO (PCT)
Prior art keywords
value
unit
measurement
correction
meter
Prior art date
Application number
PCT/JP2013/002951
Other languages
English (en)
French (fr)
Inventor
鈴木 淳一
隆之 新居
秀樹 武長
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Publication of WO2013168415A1 publication Critical patent/WO2013168415A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D4/00Tariff metering apparatus
    • G01D4/002Remote reading of utility meters
    • G01D4/004Remote reading of utility meters to a fixed location
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading

Definitions

  • the present invention relates to a management device that manages use of a medium supplied from a supply company by a consumer, and a management system using the management device.
  • Patent Document 1 a system for measuring the amount of electric power used by a consumer is known (see, for example, Japanese Patent Publication No. 2009-130983 (hereinafter referred to as “Patent Document 1”)).
  • the system described in Patent Document 1 measures the main power amount supplied via the main breaker and the branch electric power amount supplied via each branch breaker as the amount of power used by the consumer. Each power amount as a measurement result is displayed on the display device.
  • a power meter that measures the amount of power used by the consumer is installed in order for the power company to collect a power charge from the consumer.
  • the measured values of the power usage may not match between the system and the power meter. That is, since the measurement accuracy differs between the conventional system and the power meter, even if the system and the power meter measure the same power consumption, there is a deviation in the measured value between the system and the power meter. Arise. For this reason, when the conventional system described in Patent Document 1 displays the measured value of the own system and the measured value of the power meter on the display device, there is a problem that the user who sees the display content is confused. .
  • the present invention has been made in view of the above points, and an object of the present invention is to provide a management device capable of reducing user confusion and a management system using the management device.
  • the management device of the present invention measures a total usage amount of a medium supplied from a supplier company at a consumer and transmits the total usage amount to a host device, and measures the total usage amount from the meter on the load side
  • a management device for managing use of the medium by the consumer an acquisition unit for acquiring a measurement value of the measurement unit from the measurement unit, and the meter in communication with the meter
  • a communication unit that receives the measurement value of the meter from the first value, a first value that uses the measurement value acquired by the acquisition unit as an initial value, and a second value that uses the measurement value received by the communication unit as an initial value;
  • a correction unit that corrects at least one of the first value and the second value so as to match, and an output unit that outputs the first value after correction by the correction unit It is characterized by.
  • the correction unit matches the first value with the second value by replacing the first value with an initial value of the second value.
  • the acquisition unit is configured to measure, for each branch circuit branched by the distribution board of the customer, a second measurement unit that measures a usage amount by a load connected to the branch circuit.
  • the measurement value of the measurement unit is acquired, and the correction unit acquires the correction value according to the correction value related to the first value and the second value for the total usage amount for each branch circuit.
  • the third value having the measurement value of the second measurement unit as an initial value is corrected, and the output unit outputs the third value after correction by the correction unit for each branch circuit. It is preferable to do.
  • a ratio of the initial value of the second value to the initial value of the first value is set as the correction amount, and the correction unit sets the third value for each branch circuit, It is preferable to correct to the product of the initial value of the third value and the correction amount.
  • the output unit displays a value after being corrected by the correction unit on a display device.
  • an abnormality determination unit that determines an abnormality when an absolute value of a difference between the measurement value acquired by the acquisition unit and the measurement value received by the communication unit is larger than a predetermined threshold value It is preferable to provide.
  • the medium is preferably electric power.
  • the management system of the present invention includes the management device and a display device that displays a value after being corrected by the correction unit.
  • the management apparatus and management system of the present invention it is possible to reduce user confusion due to the presence of different values for the usage amount at the consumer.
  • a management device 1 that manages the use of power at a customer 7 is used together with a power meter 2 and a measurement device 3.
  • Electric power is a medium or resource supplied from a supply company.
  • the power meter 2 corresponds to a meter that measures the total usage amount of a medium supplied from a supply company at a consumer and transmits the total usage amount to a host device.
  • a display device 4 is connected to the management device 1.
  • a distribution board 5 is installed in the consumer 7, and a plurality of load devices 6 are connected to the distribution board 5.
  • the management device 1, the power meter 2, the measurement device 3, the display device 4, and the distribution board 5 constitute a management system.
  • the management device 1 and the plurality of load devices 6 constitute a HEMS (Home Energy Management System) network 91 (see FIG. 2) as a network on the customer 7 side.
  • HEMS Home Energy Management System
  • this embodiment demonstrates the case where the consumer 7 is a detached house, even if the consumer 7 is not only a detached house, for example, each dwelling unit of a housing complex, an office, a factory, etc. Good.
  • the load device 6 is an electrical device that operates by consuming electric power.
  • Examples of the load device 6 include equipment such as an air conditioner, a lighting device, and a housing information panel, and home appliances such as a television and a refrigerator.
  • the load device 6 corresponds to a load connected to the branch circuit.
  • the management device 1 receives a measurement value of the power meter 2 from the power meter 2 by communication, acquires a measurement value of a first measurement unit 31 described later from the measurement device 3, and stores the measurement value of the first measurement unit 31.
  • the measurement value and the measurement value of the power meter 2 are corrected so as to coincide with each other, and the corrected value is output.
  • details of the management device 1, the power meter 2, the measurement device 3, the display device 4, and the distribution board 5 will be described.
  • the power meter 2 is an electronic power meter so-called smart meter having a communication function.
  • This electric power meter 2 is installed in the consumer 7 so that the electric power company 8 collects the electric charge, and the total electric power consumption of the electric power supplied from the electric power company 8 (see FIG. 2) in the consumer 7 is calculated. Measure and transmit the meter reading information including the total power consumption to the host device 81 (see FIG. 2).
  • the electric power company 8 corresponds to a resource supplier, that is, a supply company.
  • the power meter 2 includes a communication unit 21 having a communication function for communicating with other devices, and a measurement unit 22 having a measurement function for measuring power usage.
  • the communication unit 21 and the host device 81 of the power company 8 construct a communication network 92 for performing remote meter reading on the power usage acquired by the communication unit 21.
  • a plurality of communication units 21 and a host device 81 are connected to a multi-unit that enables communication with a parent device (not shown) by using the other communication unit 21 for relaying communication. Radio signals are transmitted and received by hop communication. That is, in the communication network 92, communication is performed directly or indirectly between each communication unit 21 and the parent device. A communication unit 21 that cannot directly communicate with the parent device is connected to another communication unit 21 within a communicable distance. Communication is performed with the parent device by sequentially relaying communication packets. In the case of the communication unit 21 that cannot communicate directly with the parent device, the communication route between the communication unit 21 and the parent device is determined in consideration of the communication quality between the communication units 21 that perform direct communication among a plurality of candidates. It is determined.
  • the host device 81 is, for example, a management server operated by the electric power company 8 or a service provider entrusted by the electric power company 8.
  • the host device 81 collects meter reading information of each customer 7.
  • the host device 81 can acquire not only meter reading information but also information other than meter reading information from each communication unit 21.
  • the measurement unit 22 shown in FIG. 1 includes an electric energy measuring unit 23 that measures the total electric power consumption at the consumer 7 and an open / close inserted into the distribution line 93 from the electric power company 8 (see FIG. 2) to the consumer 7. And a relay 24 as a device.
  • the power amount measuring unit 23 is inserted into the distribution line 93 from the power company 8 to the customer 7, and the amount of power supplied from the power company 8 to the customer 7 side, that is, the total power usage at the customer 7 is calculated. The instantaneous value of voltage and current is calculated.
  • the electric energy measuring unit 23 obtains the electric power used by integrating the instantaneous value of the voltage and the instantaneous value of the current, and the electric power consumption for every predetermined time (for example, 30 minutes) is obtained by integrating the obtained electric power used.
  • the obtained power consumption is output to the control unit 26 of the communication unit 21 as a meter reading result.
  • the distribution line 93 in the measurement unit 22 is connected to a pole transformer (not shown) on the supply side, and connected to the distribution board 5 on the demand side.
  • the relay 24 opens and closes the distribution line 93 from the power company 8 to the customer 7 side, for example, in accordance with an instruction from the host device 81 of the power company 8.
  • the communication unit 21 includes a communication unit 25 that communicates with the management device 1 and a control unit 26 that controls each unit of the power meter 2.
  • the communication unit 21 includes a second communication unit that performs wireless communication with the other communication unit 21, and a third communication unit that performs wireless communication with a maintenance terminal for road meter reading (not illustrated). It has.
  • the communication unit 25 transmits various types of information including meter reading information to the management device 1 and receives information held by the management device 1 from the management device 1.
  • the second communication unit transmits meter reading information to another communication unit 21 or relays meter reading information from another communication unit 21.
  • the third communication unit transmits meter reading information to the maintenance terminal at the time of road meter reading.
  • the communication unit 21 acquires the meter reading result of the measurement unit 22 every predetermined time (for example, 30 minutes).
  • the communication unit 21 transmits the meter reading result acquired from the measuring unit 22, that is, the power usage amount at the customer 7, to the host device 81 of the power company 8 as meter reading information.
  • the meter reading information is transmitted to the host device 81 by multi-hop communication directly or via the communication unit 21 on the host side.
  • the management apparatus 1 and the communication unit 21 communicate with each other using a communication path 94 that does not belong to either the HEMS network 91 (see FIG. 2) or the communication network 92 (see FIG. 2). Between the management device 1 and the communication unit 21, the power usage acquired by the communication unit 21, the reduction target of the power usage notified from the higher-level device 81 to the communication unit 21, and the management device 1 and the communication unit 21 are shared. Communicate information that should be used.
  • the communication path 94 may be either a wireless communication path or a wired communication path. When a wired communication path is adopted as the communication path 94, it is preferable to perform power line communication (PLC) that uses the distribution line 93 that feeds the customer 7 as the communication path 94.
  • PLC power line communication
  • a plurality of wireless channels used for wireless communication are set in a predetermined range of frequency bands, and the communication unit 21 performs wireless communication using at least one of the wireless channels.
  • a wireless channel used for wireless communication between the management device 1 and the communication unit 21 is used in the wireless channel used in the HEMS network 91 or the communication network 92. It may be the same as one of the radio channels or may be different from both.
  • the distribution board 5 distributes AC power to the load device 6 of the consumer 7.
  • the distribution board 5 includes a main breaker 51 and a plurality of branch breakers 52.
  • the main breaker 51 is inserted in the main circuit for outputting AC power from the power company 8 (see FIG. 2) to each branch breaker 52.
  • the branch breaker 52 is inserted in a branch circuit for supplying power from the main breaker 51 to the load device 6.
  • the measurement device 3 includes a first measurement unit (measurement unit) 31 that measures the total power consumption at the customer 7, and a control unit 33 that controls the entire measurement device 3, separately from the power meter 2. .
  • the first measurement unit 31 measures the total power consumption at the customer 7 using a current transformer that detects a current flowing in the main circuit on the input side of the main circuit breaker 51. That is, the first measuring unit 31 measures the total power usage amount in the distribution line 93 drawn from the power meter 2 to the load device 6 side.
  • the control unit 33 outputs the measurement value of the first measurement unit 31 to the management device 1.
  • the measurement device 3 is provided separately from the distribution board 5, but the measurement device 3 may be provided integrally with the distribution board 5.
  • the measuring device 3 may be provided integrally with the management device 1 or may be provided separately.
  • the management device 1 manages the power usage of the load device 6.
  • the management device 1 includes, for example, a computer (including a microcomputer) on which a CPU (Central Processing Unit) and a memory are mounted as main components, and includes an acquisition unit 11, a communication unit 12, a correction unit 13, and the like. And an output unit 14.
  • a computer including a microcomputer
  • CPU Central Processing Unit
  • the management device 1 includes, for example, a computer (including a microcomputer) on which a CPU (Central Processing Unit) and a memory are mounted as main components, and includes an acquisition unit 11, a communication unit 12, a correction unit 13, and the like. And an output unit 14.
  • CPU Central Processing Unit
  • the acquisition unit 11 has an interface unit for receiving information from the measurement device 3, and acquires the measurement value of the first measurement unit 31 (total power usage at the customer 7) from the measurement device 3. And the acquisition part 11 writes the measured value of the 1st measurement part 31 in the memory
  • the communication unit 12 includes an interface unit that communicates with the power meter 2 and receives meter reading information from the power meter 2 through communication. That is, the communication unit 12 receives the measurement value of the power meter 2 from the power meter 2. And the communication part 12 writes the measured value received from the electric power meter 2 in the memory
  • the correction unit 13 corrects the measurement value acquired by the acquisition unit 11 and the measurement value received by the communication unit 12 to coincide with each other. In other words, the correction unit 13 corrects at least one of the first value and the second value so that the first value matches the second value.
  • the first value is a value for the total power consumption
  • the measurement value of the first measurement unit 31 is set as the initial value.
  • the second value is a value for the total power consumption
  • the measured value of the power meter 2 is the initial value. That is, the correction unit 13 performs correction so that the difference between the measurement value of the first measurement unit 31 and the measurement value of the power meter 2 is eliminated with respect to the total power consumption at the customer 7.
  • the correction unit 13 sets the first value for the total power usage to the initial value of the second value (power meter 2).
  • the management device 1 can match the value corrected by the correction unit 13 with the value displayed on the power meter 2. it can.
  • the output unit 14 outputs usage information including the total power usage amount to the display device 4 in order to cause the display device 4 to display the total power usage amount corrected by the correction unit 13. That is, the output unit 14 outputs the usage information including the first value corrected by the correction unit 13 to the display device 4 and causes the display device 4 to display the usage information.
  • the display device 4 is, for example, a control viewer, acquires usage information from the output unit 14 of the management device 1, and displays the total power usage (first value) included in the usage information. That is, the display device 4 displays the total power consumption after being corrected by the correction unit 13.
  • the control viewer is installed in the consumer 7 and is a device that displays the state of the load device 6 of the consumer 7 and the like.
  • the measuring device 3 includes a second measuring unit 32 that measures the amount of power used by the load device 6 connected to the branch circuit for each branch circuit branched by the distribution board 5.
  • the plurality of second measuring units 32 are provided in one-to-one correspondence with the plurality of branch breakers 52.
  • Each second measuring unit 32 measures the amount of power used by the load device 6 connected to the branch circuit, using a current transformer that detects a current flowing in the branch circuit on the output side of the corresponding branch breaker 52. .
  • the control unit 33 outputs the measurement value of each second measurement unit 32 to the management device 1.
  • the acquisition unit 11 acquires the measurement values (the power usage amount of each branch circuit) of the plurality of second measurement units 32 from the measurement device 3. And the acquisition part 11 is a memory
  • the correction unit 13 corrects the power usage amount of each branch circuit acquired by the acquisition unit 11 in accordance with the correction amount with respect to the total power usage amount at the customer 7. That is, for each branch circuit, the correction unit 13 adjusts the third power consumption amount of the branch circuit in accordance with the correction amount related to the first value and the second value for the total power usage amount at the customer 7. Correct the value.
  • the correcting unit 13 In addition, the third value is corrected to the product of the initial value of the third value and the correction amount.
  • the correcting unit 13 Increase the power consumption of the branch circuit by A%. That is, the correction unit 13 increases the third value by A% from the initial value for each branch circuit.
  • the correction unit 13 increase the power consumption of the branch circuit by 4%. That is, the correction unit 13 increases the third value by 4% from the initial value for each branch circuit.
  • the output unit 14 outputs usage information including the power usage amount of each branch circuit to the display device 4 so that the power usage amount of each branch circuit after being corrected by the correction unit 13 is displayed on the display device 4. That is, the output unit 14 outputs the usage information including the third value after correction by the correction unit 13 to the display device 4 for each branch circuit and causes the display device 4 to display the usage information.
  • the management device 1 determines an abnormality when the absolute value of the difference between the measurement value acquired by the acquisition unit 11 and the measurement value received by the communication unit 12 with respect to the total power usage is greater than the threshold value.
  • a part 15 is further provided. That is, when the absolute value of the difference between the measurement value of the first measurement unit 31 and the measurement value of the power meter 2 is greater than the threshold value with respect to the total power usage, the abnormality determination unit 15 has an abnormality.
  • the threshold value is determined in advance to a value larger than the measurement variation between the power meter 2 and the measuring device 3. Examples of the abnormality determined by the abnormality determination unit 15 include an abnormality of the measuring device 3, an abnormality of the power meter 2, and an abnormality of the management device 1.
  • the output unit 14 outputs the determination result of the abnormality determination unit 15 to the display device 4 and causes the display device 4 to display the determination result.
  • the power meter 2 measures the total power usage at the customer 7, and the management device 1 receives the measured value (total power usage) of the power meter 2 by communication.
  • the management device 1 uses the measurement value of the first measurement unit 31 (total power consumption) and the measurement value of the plurality of second measurement units 32 (power consumption of each branch circuit) as the measurement device 3. Get from. Thereafter, the management device 1 corrects the total power consumption so that the measurement value of the first measurement unit 31 matches the measurement value of the power meter 2.
  • the management apparatus 1 correct
  • the display device 4 acquires usage information from the management device 1 and displays the power usage amount included in the usage information.
  • the management device 1 corrects the total power usage measured by the first measurement unit 31 and the total power usage measured by the power meter 2 so as to match, Output the total power consumption after correction. That is, the management device 1 corrects at least one of the first value and the second value so that the first value and the second value are matched with each other with respect to the total power usage amount at the customer 7. Then, the management apparatus 1 outputs the corrected first value. Thereby, the management apparatus 1 of this embodiment can reduce a user's confusion compared with the case where a different value exists about the total electric power consumption in the consumer 7. FIG.
  • the measurement value of the first measurement unit 31 (initial value of the first value) and the measurement value of the power meter 2 (initial value of the second value) are different.
  • the confusion of the user can be reduced as compared with the case where both measurement values are output as they are.
  • the management device 1 corrects the power usage amount of each branch circuit in the correction unit 13 in accordance with the correction amount with respect to the total power usage amount. That is, the management device 1 according to the present embodiment sets, for each branch circuit, the measurement value of the second measurement unit 32 as the initial value of the third value for the power usage amount of the branch circuit, and the total power usage amount. The third value is corrected in accordance with the correction amount related to the first value and the second value.
  • the management device 1 causes the display device 4 to display values (total power usage, power usage of each branch circuit) after correction by the correction unit 13.
  • the management apparatus 1 of this embodiment can reduce the confusion of the user who looked at the display content compared with the case where the display apparatus 4 displays an uncorrected value.
  • the abnormality determination unit 15 includes the measurement value (initial value of the first value) of the first measurement unit 31 and the measurement value (initial value of the second value) of the power meter 2. If the absolute value of the difference from () is larger than the threshold value, it is determined as abnormal. Thereby, the management apparatus 1 of this embodiment sets two threshold values which should be originally the same value by presetting a threshold value to a value equal to or greater than the variation in measurement accuracy of the power meter 2 and the first measurement unit 31. When the value (total power consumption) differs by more than the above variation, it can be easily and early detected that the power meter 2 or the first measurement unit 31 (measurement device 3) is abnormal, for example.
  • the correction unit 13 may be replaced with the measurement value of the first measurement unit 31. That is, the correction unit 13 may match the first value with the second value by replacing the second value with the first value. In other words, the correction unit 13 changes the second value stored in the storage unit (not shown) of the management device 1 to the initial value of the first value stored in the storage unit. Good. As another example of the correction, the correction unit 13 may use an average value of the measurement value of the first measurement unit 31 and the measurement value of the power meter 2 as a new total power usage amount.
  • the correction unit 13 replaces the first value and the second value with the average value of the initial value of the first value and the initial value of the second value, and thereby the first value and the second value.
  • the value may be matched.
  • the correction unit 13 may change the first value and the second value stored in the storage unit (not shown) of the management device 1 to the average value.
  • the display device 4 is not limited to the control viewer, and may be a portable information terminal or a television that can communicate with the management device 1.
  • the management device 1 may transmit usage information including the corrected power usage amount to the portable information terminal via the network.
  • the supply company is the power company 8 and the medium supplied from the supply company is electric power has been described.
  • the medium is used as the medium.
  • a technique similar to that of the embodiment can be applied.
  • a consumer 7 to which a medium is supplied from a supplier company is provided with a meter as a measuring device that measures the amount of medium used.
  • the measurement device 3 may include the first measurement unit 31 and the plurality of second measurement units 32 integrally, or may include the first measurement unit 31 and the plurality of second measurement units 32. It may be provided separately. That is, the measuring device 3 may include the first measuring unit 31 and the plurality of second measuring units 32 housed in one housing, or the first measuring unit 31 and the plurality of second measuring units. The unit 32 may be housed in a different housing.

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 管理装置は、メータおよび計測部とともに用いられる。メータは、需要家での媒体の総使用量を計測し、上記総使用量を上位装置に送信する。計測部は、メータから負荷側でメータとは別に総使用量を計測する。管理装置は、取得部と、通信部と、補正部と、出力部とを備える。取得部は、計測部の計測値を取得する。通信部は、メータと通信し、メータの計測値を受け取る。補正部は、第1の値と第2の値とを一致させるように当該第1の値および当該第2の値の少なくともいずれかを補正する。第1の値は、取得部が取得した計測値を初期値とする。第2の値は、通信部が受け取った計測値を初期値とする。出力部は、補正部が補正した後の第1の値を出力する。

Description

管理装置および管理システム
 本発明は、供給会社から供給される媒体の需要家での使用を管理する管理装置、およびこの管理装置を用いた管理システムに関する。
 従来から、需要家での電力使用量を計測するシステムが知られている(例えば日本国公開特許第2009-130983号公報(以下「特許文献1」という)参照)。特許文献1に記載されたシステムは、需要家での電力使用量として、主幹ブレーカを介して供給されている主幹電力量と、各分岐ブレーカを介して供給されている分岐電力量とを計測し、計測結果としての各電力量を表示装置に表示させている。
 一方、需要家には、上記のようなシステムとは別に、電力会社が需要家から電力料金を徴集するために、需要家での電力使用量を計測する電力メータが設置されている。
 ところで、近年、特許文献1に記載されたシステムと電力メータとの間を通信可能にする技術が開発されている。これにより、上記システムが電力メータの計測値を取得することが可能になる。
 しかしながら、特許文献1に記載された従来のシステムおよび電力メータの各々の計測精度などにより、上記システムと電力メータとの間で電力使用量の計測値が一致しないことがあった。すなわち、上記従来のシステムと電力メータとの間で計測精度が異なるため、上記システムと電力メータとが同じ電力使用量を計測しても、上記システムと電力メータとの間で計測値にずれが生じる。このため、特許文献1に記載された従来のシステムが自システムの計測値と電力メータの計測値とを表示装置に表示させた際に、表示内容を見たユーザが混乱するという問題があった。
 本発明は上記の点に鑑みて為された発明であり、本発明の目的は、ユーザの混乱を低減させることができる管理装置、およびこの管理装置を用いた管理システムを提供することにある。
 本発明の管理装置は、供給会社から供給される媒体の需要家での総使用量を計測し当該総使用量を上位装置に送信するメータ、および前記メータから負荷側で前記総使用量を計測する計測部とともに用いられ、前記需要家での前記媒体の使用を管理する管理装置であって、前記計測部から当該計測部の計測値を取得する取得部と、前記メータと通信して当該メータから当該メータの計測値を受け取る通信部と、前記取得部が取得した前記計測値を初期値とする第1の値と前記通信部が受け取った前記計測値を初期値とする第2の値とを一致させるように当該第1の値および当該第2の値の少なくともいずれかを補正する補正部と、前記補正部で補正された後の前記第1の値を出力する出力部とを備えることを特徴とする。
 この管理装置において、前記補正部は、前記第1の値を前記第2の値の初期値に置き換えることによって、前記第1の値と前記第2の値とを一致させることが好ましい。
 この管理装置において、前記取得部は、前記需要家の分電盤で分岐された分岐回路ごとに、当該分岐回路に接続された負荷による使用量を計測する第2の計測部から当該第2の計測部の計測値を取得し、前記補正部は、前記分岐回路ごとに、前記総使用量についての前記第1の値および前記第2の値に関する補正量に合わせて、前記取得部が取得した前記第2の計測部の前記計測値を初期値とする第3の値を補正し、前記出力部は、前記分岐回路ごとに、前記補正部で補正された後の前記第3の値を出力することが好ましい。
 この管理装置において、前記第1の値の前記初期値に対する前記第2の値の前記初期値の割合を前記補正量とし、前記補正部は、前記分岐回路ごとに、前記第3の値を、当該第3の値の前記初期値と前記補正量との積に補正することが好ましい。
 この管理装置において、前記出力部は、前記補正部で補正された後の値を表示装置に表示させることが好ましい。
 この管理装置において、前記取得部が取得した前記計測値と前記通信部が受け取った前記計測値との差の絶対値が予め決められたしきい値よりも大きい場合に異常と判断する異常判断部を備えることが好ましい。
 この管理装置において、前記媒体は、電力であることが好ましい。
 本発明の管理システムは、前記管理装置と、前記補正部で補正された後の値を表示する表示装置とを備えることを特徴とする。
 本発明の管理装置および管理システムによれば、需要家での使用量について異なる値が存在することによるユーザの混乱を低減させることができる。
 本発明の好ましい実施形態をより詳細に記載する。本発明の他の特徴および利点は、以下の詳細な記載および添付図面に関連して一層よく理解される。
実施形態に係る管理システムの構成を示すブロック図である。 実施形態の全体を示す概略図である。
 本実施形態は、図1に示すように、需要家7での電力の使用を管理する管理装置1が電力メータ2および計測装置3とともに用いられている形態である。電力は、供給会社から供給される媒体すなわち資源である。電力メータ2は、供給会社から供給される媒体の需要家での総使用量を計測し当該総使用量を上位装置に送信するメータに相当する。管理装置1には、表示装置4が接続されている。また、需要家7には分電盤5が設置されており、この分電盤5には複数の負荷機器6が接続されている。本実施形態では、管理装置1と電力メータ2と計測装置3と表示装置4と分電盤5とで管理システムを構成する。また、管理装置1と複数の負荷機器6とで、需要家7側のネットワークとしてのHEMS(Home Energy Management System)ネットワーク91(図2参照)を構築している。なお、本実施形態では、需要家7が戸建住宅である場合について説明するが、需要家7は、戸建住宅に限らず、例えば集合住宅の各住戸や事務所、工場などであってもよい。
 負荷機器6は、電力を消費して動作する電気機器である。負荷機器6としては、例えば、空調装置や照明装置や住宅情報盤等の設備機器、テレビや冷蔵庫等の家電機器がある。負荷機器6は、分岐回路に接続された負荷に相当する。
 本実施形態の管理装置1は、電力メータ2の計測値を通信によって電力メータ2から受け取り、後述の第1の計測部31の計測値を計測装置3から取得し、第1の計測部31の計測値と電力メータ2の計測値とを一致させるように補正し、補正後の値を出力する。以下、管理装置1、電力メータ2、計測装置3、表示装置4および分電盤5の詳細について説明する。
 まず、電力メータ2について説明する。電力メータ2は、通信機能を有する電子式電力メータいわゆるスマートメータである。この電力メータ2は、電力会社8が電力料金を徴集するために需要家7に設置されており、電力会社8(図2参照)から供給される電力の需要家7での総電力使用量を計測し、上記総電力使用量を含む検針情報を上位装置81(図2参照)に送信する。電力会社8は、資源供給事業者つまり供給会社に相当する。電力メータ2は、他の機器と通信する通信機能を有する通信ユニット21と、電力使用量を計測する計測機能を有する計測ユニット22とを備えている。通信ユニット21および電力会社8の上位装置81は、通信ユニット21で取得された電力使用量に対して遠隔検針を行うための通信ネットワーク92を構築している。
 図2に示す通信ネットワーク92では、複数の通信ユニット21および上位装置81は、通信ユニット21が他の通信ユニット21を通信の中継に用いることによって、図示しない親機との通信を可能にするマルチホップ通信により無線信号を送受している。すなわち、通信ネットワーク92では、各通信ユニット21と親機との間で直接または間接に通信が行われ、親機と直接通信できない通信ユニット21は、通信可能な距離にある他の通信ユニット21が通信パケットを順次中継することで、親機との間で通信を行っている。親機と直接通信できない通信ユニット21の場合、通信ユニット21と親機との間の通信ルートは、複数の候補の中から、直接通信を行う通信ユニット21間での通信品質などを考慮して決定される。
 上位装置81は、例えば、電力会社8、または電力会社8から委託されたサービス提供会社が運営する管理サーバである。上位装置81は、各需要家7の検針情報を集約する。なお、上位装置81は、検針情報だけではなく、検針情報以外の情報も各通信ユニット21から取得することができる。
 図1に示す計測ユニット22は、需要家7での総電力使用量を計測する電力量計測部23と、電力会社8(図2参照)から需要家7への配電線93に挿入された開閉器としてのリレー24とを備えている。電力量計測部23は、電力会社8から需要家7への配電線93に挿入されており、電力会社8から需要家7側に供給される電力量すなわち需要家7での総電力使用量を、電圧と電流との瞬時値を演算して求めている。すなわち、電力量計測部23は、電圧の瞬時値と電流の瞬時値とを積算して使用電力を求め、求めた使用電力を積算することによって所定時間(例えば30分)ごとの電力使用量を求め、求めた電力使用量を検針結果として通信ユニット21の制御部26に出力する。なお、計測ユニット22内の配電線93は、供給側においては柱上トランス(図示せず)に接続され、需要側においては分電盤5に接続されている。リレー24は、例えば電力会社8の上位装置81の指示に従って、電力会社8から需要家7側への配電線93を開閉する。
 通信ユニット21は、管理装置1と通信を行う通信部25と、電力メータ2の各部を制御する制御部26とを備えている。また、図示しないが、通信ユニット21は、他の通信ユニット21と無線通信を行う第2の通信部と、路上検針用の保守端末(図示せず)と無線通信を行う第3の通信部とを備えている。通信部25は、検針情報を含む種々の情報を管理装置1に送信したり、管理装置1が所持している情報を管理装置1から受信したりする。第2の通信部は、検針情報を他の通信ユニット21に送信したり、他の通信ユニット21からの検針情報を中継したりする。第3の通信部は、路上検針の際に、検針情報を保守端末に送信する。
 通信ユニット21は、所定時間(例えば30分)おきに計測ユニット22の検針結果を取得する。この通信ユニット21は、計測ユニット22から取得した検針結果すなわち需要家7での電力使用量を検針情報として電力会社8の上位装置81へ送信する。検針情報は、直接または上位側の通信ユニット21を経由してマルチホップ通信により、上位装置81へ送信される。
 管理装置1と通信ユニット21とは、HEMSネットワーク91(図2参照)と通信ネットワーク92(図2参照)とのいずれにも属さない通信路94を用いて通信を行う。管理装置1と通信ユニット21との間では、通信ユニット21が取得した電力使用量、上位装置81から通信ユニット21に通知された電力使用量の削減目標、管理装置1と通信ユニット21とが共有すべき情報などの通信を行う。なお、通信路94は、無線通信路と有線通信路とのどちらでもよい。有線通信路を通信路94に採用する場合は、需要家7に給電する配電線93を通信路94に兼用する電力線搬送通信(PLC:Power Line Communications)を行うことが好ましい。
 無線通信に用いられる無線チャネルは、予め決められた範囲の周波数帯に複数個設定されており、通信ユニット21は、少なくともいずれかの無線チャネルを用いて無線通信を行う。管理装置1と通信ユニット21とが無線通信を行う場合、管理装置1と通信ユニット21との間の無線通信で用いられる無線チャネルは、HEMSネットワーク91で用いられる無線チャネルまたは通信ネットワーク92で用いられる無線チャネルのいずれかと同一であってもよいし、両方と異なっていてもよい。
 続いて、分電盤5について説明する。分電盤5は、需要家7の負荷機器6に交流電力を分配する。この分電盤5は、主幹ブレーカ51と、複数の分岐ブレーカ52とを備えている。主幹ブレーカ51は、電力会社8(図2参照)からの交流電力を各分岐ブレーカ52に出力するための主幹回路に挿入されている。分岐ブレーカ52は、主幹ブレーカ51からの電力を負荷機器6へ供給するための分岐回路に挿入されている。
 続いて、計測装置3について説明する。計測装置3は、電力メータ2とは別に需要家7での総電力使用量を計測する第1の計測部(計測部)31と、計測装置3全体を制御する制御部33とを備えている。第1の計測部31は、主幹ブレーカ51の入力側の主幹回路に流れる電流を検出する電流トランスを用いて、需要家7での総電力使用量を計測する。すなわち、第1の計測部31は、電力メータ2から負荷機器6側に引き込まれた配電線93において総電力使用量を計測する。制御部33は、第1の計測部31の計測値を管理装置1に出力する。なお、図1の例では、計測装置3は分電盤5と別体に設けられているが、計測装置3は、分電盤5と一体に設けられていてもよい。また、計測装置3は、管理装置1と一体に設けられていてもよいし、別体に設けられていてもよい。
 続いて、管理装置1について説明する。管理装置1は、負荷機器6の電力使用量を管理する。この管理装置1は、例えばCPU(Central Processing Unit:中央処理装置)およびメモリが搭載されたコンピュータ(マイクロコンピュータを含む)を主構成要素とし、取得部11と、通信部12と、補正部13と、出力部14とを備えている。
 取得部11は、計測装置3から情報を受け取るためのインタフェース部を有しており、第1の計測部31の計測値(需要家7での総電力使用量)を計測装置3から取得する。そして、取得部11は、第1の計測部31の計測値を、総電力使用量についての第1の値の初期値として、管理装置1の記憶部(図示せず)に書き込む。
 通信部12は、電力メータ2と通信するインタフェース部を有しており、通信によって電力メータ2から検針情報を受信する。すなわち、通信部12は、電力メータ2の計測値を電力メータ2から受け取る。そして、通信部12は、電力メータ2から受け取った計測値を、総電力使用量についての第2の値の初期値として、管理装置1の記憶部(図示せず)に書き込む。
 補正部13は、取得部11が取得した計測値と通信部12が受け取った計測値とを一致させるように補正する。言い換えると、補正部13は、第1の値と第2の値とを一致させるように、第1の値および第2の値の少なくともいずれかを補正する。上述したように、第1の値は、総電力使用量についての値であり、第1の計測部31の計測値を初期値とする。第2の値は、総電力使用量についての値であり、電力メータ2の計測値を初期値とする。すなわち、補正部13は、需要家7での総電力使用量について第1の計測部31の計測値と電力メータ2の計測値との差分がなくなるような補正を行う。例えば、第1の計測部31の計測値と電力メータ2の計測値とが一致しない場合、補正部13は、総電力使用量についての第1の値を第2の値の初期値(電力メータ2の計測値)に置き換える。これにより、電力メータ2が自己の計測値をそのまま表示する機能を有する場合に、管理装置1は、補正部13で補正された値と、電力メータ2に表示される値とを一致させることができる。
 出力部14は、補正部13で補正された後の総電力使用量を表示装置4に表示させるために、上記総電力使用量を含む使用情報を表示装置4に出力する。すなわち、出力部14は、補正部13が補正した後の第1の値を含む使用情報を表示装置4に出力して表示装置4に表示させる。
 表示装置4は、例えばコントロールビューワであり、管理装置1の出力部14から使用情報を取得し、この使用情報に含まれている総電力使用量(第1の値)を表示する。すなわち、表示装置4は、補正部13で補正された後の総電力使用量を表示する。第1の計測部31の計測値が電力メータ2の計測値に置き換えられた場合、表示装置4が表示する総電力使用量を、電力メータ2が表示する総電力使用量と一致させることができる。コントロールビューワは、需要家7に設置されており、需要家7の負荷機器6の状態などを表示する機器である。
 ところで、計測装置3は、分電盤5で分岐された分岐回路ごとに、上記分岐回路に接続された負荷機器6による電力使用量を計測する第2の計測部32を備えている。複数の第2の計測部32は、複数の分岐ブレーカ52に一対一で対応付けられて設けられている。各第2の計測部32は、対応する分岐ブレーカ52の出力側の分岐回路に流れる電流を検出する電流トランスを用いて、上記分岐回路に接続されている負荷機器6による電力使用量を計測する。制御部33は、各第2の計測部32の計測値を管理装置1に出力する。
 管理装置1において、取得部11は、複数の第2の計測部32の計測値(各分岐回路の電力使用量)を計測装置3から取得する。そして、取得部11は、分岐回路ごとに、第2の計測部32の計測値を、分岐回路の電力使用量についての第3の値の初期値として管理装置1の記憶部(図示せず)に書き込む。
 補正部13は、需要家7での総電力使用量に対する補正量に合わせて、取得部11が取得した各分岐回路の電力使用量を補正する。すなわち、補正部13は、分岐回路ごとに、需要家7での総電力使用量についての第1の値および第2の値に関する補正量に合わせて、分岐回路の電力使用量についての第3の値を補正する。第1の値の初期値(第1の計測部31の計測値)に対する第2の値の初期値(電力メータ2の計測値)の割合を補正量とすると、補正部13は、分岐回路ごとに、第3の値を、当該第3の値の初期値と当該補正量との積に補正する。総電力使用量について電力メータ2の計測値P2が第1の計測部31の計測値P1に対してA%大きい場合(P2=P1×(100+A)/100の場合)、補正部13は、各分岐回路の電力使用量をA%だけ大きくする。すなわち、補正部13は、分岐回路ごとに、第3の値を初期値からA%だけ大きくする。例えば、総電力使用量について電力メータ2の計測値P2が第1の計測部31の計測値P1に対して4%大きい場合(P1=P2×1.04の場合)、補正部13は、各分岐回路の電力使用量を4%だけ大きくする。すなわち、補正部13は、分岐回路ごとに、第3の値を初期値から4%だけ大きくする。
 出力部14は、補正部13で補正された後の各分岐回路の電力使用量を表示装置4に表示させるように、各分岐回路の電力使用量を含む使用情報を表示装置4に出力する。すなわち、出力部14は、分岐回路ごとに、補正部13が補正した後の第3の値を含む使用情報を表示装置4に出力して表示装置4に表示させる。
 また、管理装置1は、総電力使用量について取得部11が取得した計測値と通信部12が受け取った計測値との差の絶対値がしきい値よりも大きい場合に異常と判断する異常判断部15をさらに備えている。すなわち、総電力使用量について第1の計測部31の計測値と電力メータ2の計測値との差の絶対値がしきい値よりも大きい場合、異常判断部15は、異常が発生していると判断する。しきい値は、電力メータ2と計測装置3との計測ばらつきよりも大きな値に予め決められている。異常判断部15が判断する異常としては、計測装置3の異常、電力メータ2の異常、管理装置1の異常などがある。出力部14は、異常判断部15の判断結果を表示装置4に出力して表示装置4に表示させる。
 次に、本実施形態に係る管理システムの動作について説明する。まず、電力メータ2が需要家7での総電力使用量を計測し、管理装置1が電力メータ2の計測値(総電力使用量)を通信によって受け取る。上記とは別に、管理装置1は第1の計測部31の計測値(総電力使用量)と複数の第2の計測部32の計測値(各分岐回路の使用電力量)とを計測装置3から取得する。その後、管理装置1は、総電力使用量について第1の計測部31の計測値と電力メータ2の計測値とを一致させるように補正する。また、管理装置1は、総電力使用量の補正量に合わせて、各分岐回路の電力使用量についての計測値を補正する。その後、管理装置1は、補正後の電力使用量(総電力使用量、各分岐回路の電力使用量)を含む使用情報を表示装置4に出力する。表示装置4は、管理装置1から使用情報を取得し、この使用情報に含まれている電力使用量を表示する。
 以上説明した本実施形態によれば、管理装置1は、第1の計測部31で計測された総電力使用量と電力メータ2で計測された総電力使用量とを一致させるように補正し、補正後の総電力使用量を出力する。すなわち、管理装置1は、需要家7での総電力使用量について、第1の値と第2の値とを一致させるように第1の値および第2の値の少なくともいずれかを補正する。そして、管理装置1は、補正した後の第1の値を出力する。これにより、本実施形態の管理装置1は、需要家7での総電力使用量について異なる値が存在する場合に比べて、ユーザの混乱を低減させることができる。すなわち、本実施形態の管理装置1は、第1の計測部31の計測値(第1の値の初期値)と電力メータ2の計測値(第2の値の初期値)とが異なっていても、両方の計測値をそのまま出力する場合に比べて、ユーザの混乱を低減させることができる。
 また、本実施形態によれば、管理装置1は、補正部13において、総電力使用量に対する補正量に合わせて、各分岐回路の電力使用量を補正する。すなわち、本実施形態の管理装置1は、分岐回路ごとに、第2の計測部32の計測値を、分岐回路の電力使用量についての第3の値の初期値とし、総電力使用量についての第1の値および第2の値に関する補正量に合わせて、第3の値を補正する。これにより、本実施形態の管理装置1は、各分岐回路の電力使用量を総電力使用量に整合させることができるので、総電力使用量と各分岐回路の電力使用量との間で矛盾が生じない。
 さらに、本実施形態によれば、管理装置1は、補正部13で補正された後の値(総電力使用量、各分岐回路の電力使用量)を表示装置4に表示させる。これにより、本実施形態の管理装置1は、未補正の値を表示装置4に表示させる場合に比べて、表示内容を見たユーザの混乱を低減させることができる。
 また、本実施形態の管理装置1において、異常判断部15は、第1の計測部31の計測値(第1の値の初期値)と電力メータ2の計測値(第2の値の初期値)との差の絶対値がしきい値よりも大きい場合に異常と判断する。これにより、本実施形態の管理装置1は、電力メータ2および第1の計測部31の計測精度のばらつき以上の値にしきい値を予め設定することによって、本来同じ値でなければならない2つの計測値(総電力使用量)が上記ばらつき以上に異なる場合、例えば電力メータ2や第1の計測部31(計測装置3)などが異常であることを簡単かつ早期に検出することができる。
 なお、電力メータ2の計測値を変更することが許容されるならば、第1の計測部31の計測値と電力メータ2の計測値とを一致させる補正の一例として、補正部13は、電力メータ2の計測値を第1の計測部31の計測値に置き換えてもよい。すなわち、補正部13は、第2の値を第1の値に置き換えることによって、第1の値と第2の値とを一致させてもよい。言い換えると、補正部13は、管理装置1の記憶部(図示せず)に記憶されている第2の値を、当該記憶部に記憶されている第1の値の初期値に変更してもよい。また、上記補正の他の例として、補正部13は、第1の計測部31の計測値と電力メータ2の計測値との平均値を新たな総電力使用量としてもよい。すなわち、補正部13は、第1の値および第2の値を、第1の値の初期値と第2の値の初期値との平均値に置き換えることによって、第1の値と第2の値とを一致させてもよい。言い換えると、補正部13は、管理装置1の記憶部(図示せず)に記憶されている第1の値および第2の値を当該平均値に変更してもよい。
 表示装置4は、コントロールビューワに限らず、携帯情報端末であってもよいし、管理装置1と通信可能なテレビであってもよい。表示装置4が携帯情報端末である場合、管理装置1は、補正後の電力使用量を含む使用情報を、ネットワークを介して携帯情報端末に送信すればよい。
 また、本実施形態では、供給会社が電力会社8であって、供給会社から供給される媒体が電力である場合について説明したが、電力以外にガスや水、熱などを媒体とする場合でも本実施形態と同様の技術を適用可能である。供給会社から媒体が供給される需要家7には、媒体の使用量を計測する計測装置としてのメータが設置される。
 なお、計測装置3は、第1の計測部31と複数の第2の計測部32とを一体に備えていてもよいし、第1の計測部31と複数の第2の計測部32とを別体に備えていてもよい。すなわち、計測装置3は、第1の計測部31および複数の第2の計測部32を1つの筐体に収納して備えてもよいし、第1の計測部31と複数の第2の計測部32とを異なる筐体に収納して備えてもよい。
 本発明を好ましい実施形態によって記載したが、本発明の本来の精神および範囲、すなわち請求の範囲を逸脱することなく、当業者によってさまざまな修正および変形が可能である。

Claims (8)

  1.  供給会社から供給される媒体の需要家での総使用量を計測し当該総使用量を上位装置に送信するメータ、および前記メータから負荷側で前記総使用量を計測する計測部とともに用いられ、前記需要家での前記媒体の使用を管理する管理装置であって、
     前記計測部から当該計測部の計測値を取得する取得部と、
     前記メータと通信して当該メータから当該メータの計測値を受け取る通信部と、
     前記取得部が取得した前記計測値を初期値とする第1の値と前記通信部が受け取った前記計測値を初期値とする第2の値とを一致させるように当該第1の値および当該第2の値の少なくともいずれかを補正する補正部と、
     前記補正部で補正された後の前記第1の値を出力する出力部と
     を備えることを特徴とする管理装置。
  2.  前記補正部は、前記第1の値を前記第2の値の初期値に置き換えることによって、前記第1の値と前記第2の値とを一致させることを特徴とする請求項1記載の管理装置。
  3.  前記取得部は、前記需要家の分電盤で分岐された分岐回路ごとに、当該分岐回路に接続された負荷による使用量を計測する第2の計測部から当該第2の計測部の計測値を取得し、
     前記補正部は、前記分岐回路ごとに、前記総使用量についての前記第1の値および前記第2の値に関する補正量に合わせて、前記取得部が取得した前記第2の計測部の前記計測値を初期値とする第3の値を補正し、
     前記出力部は、前記分岐回路ごとに、前記補正部で補正された後の前記第3の値を出力する
     ことを特徴とする請求項1または2記載の管理装置。
  4.  前記第1の値の前記初期値に対する前記第2の値の前記初期値の割合を前記補正量とし、
     前記補正部は、前記分岐回路ごとに、前記第3の値を、当該第3の値の前記初期値と前記補正量との積に補正する
     ことを特徴とする請求項3記載の管理装置。
  5.  前記出力部は、前記補正部で補正された後の値を表示装置に表示させることを特徴とする請求項1~4のいずれか1項に記載の管理装置。
  6.  前記取得部が取得した前記計測値と前記通信部が受け取った前記計測値との差の絶対値が予め決められたしきい値よりも大きい場合に異常と判断する異常判断部を備えることを特徴とする請求項1~5のいずれか1項に記載の管理装置。
  7.  前記媒体は、電力であることを特徴とする請求項1~6のいずれか1項に記載の管理装置。
  8.  請求項5記載の管理装置と、
     前記補正部で補正された後の値を表示する表示装置と
     を備えることを特徴とする管理システム。
PCT/JP2013/002951 2012-05-11 2013-05-08 管理装置および管理システム WO2013168415A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012109470A JP5914854B2 (ja) 2012-05-11 2012-05-11 管理装置および管理システム
JP2012-109470 2012-05-11

Publications (1)

Publication Number Publication Date
WO2013168415A1 true WO2013168415A1 (ja) 2013-11-14

Family

ID=49550478

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/002951 WO2013168415A1 (ja) 2012-05-11 2013-05-08 管理装置および管理システム

Country Status (3)

Country Link
JP (1) JP5914854B2 (ja)
TW (1) TWI514303B (ja)
WO (1) WO2013168415A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017017794A (ja) * 2015-06-29 2017-01-19 日東工業株式会社 配電線異常監視システム
JPWO2021241442A1 (ja) * 2020-05-27 2021-12-02

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06231132A (ja) * 1993-02-01 1994-08-19 Hitachi Building Syst Eng & Service Co Ltd 建造物内居住者の共有料金負担配分装置
JP2004259291A (ja) * 2004-04-02 2004-09-16 Mitsubishi Estate Co Ltd エネルギー管理装置
JP2009130983A (ja) * 2007-11-20 2009-06-11 Panasonic Electric Works Co Ltd エネルギーマネジメントシステム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5963457A (en) * 1994-03-18 1999-10-05 Hitachi, Ltd. Electrical power distribution monitoring system and method
TW200521658A (en) * 2003-12-18 2005-07-01 Mitac Int Corp Power consumption monitoring system
US7693670B2 (en) * 2007-08-14 2010-04-06 General Electric Company Cognitive electric power meter
US8190925B2 (en) * 2008-10-02 2012-05-29 International Business Machines Corporation Single shared power domain dynamic load based power loss detection and notification

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06231132A (ja) * 1993-02-01 1994-08-19 Hitachi Building Syst Eng & Service Co Ltd 建造物内居住者の共有料金負担配分装置
JP2004259291A (ja) * 2004-04-02 2004-09-16 Mitsubishi Estate Co Ltd エネルギー管理装置
JP2009130983A (ja) * 2007-11-20 2009-06-11 Panasonic Electric Works Co Ltd エネルギーマネジメントシステム

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017017794A (ja) * 2015-06-29 2017-01-19 日東工業株式会社 配電線異常監視システム
JPWO2021241442A1 (ja) * 2020-05-27 2021-12-02
WO2021241442A1 (ja) * 2020-05-27 2021-12-02 京セラ株式会社 電力管理システム、電力変換装置及び電力管理方法
JP7414988B2 (ja) 2020-05-27 2024-01-16 京セラ株式会社 電力管理システム、電力変換装置及び電力管理方法

Also Published As

Publication number Publication date
JP5914854B2 (ja) 2016-05-11
TW201403527A (zh) 2014-01-16
TWI514303B (zh) 2015-12-21
JP2013240131A (ja) 2013-11-28

Similar Documents

Publication Publication Date Title
US8307229B2 (en) Method of measuring power consumption of electric appliance
US9685822B2 (en) Management apparatus and management method for electrical appliances
US9518838B2 (en) Slave suitable for energy management systems and energy management system
JP5769927B2 (ja) 電力モニターシステム
US20120191263A1 (en) Electric power management system
US20160111920A1 (en) Energy management device and its associated method
KR20140092401A (ko) 무선 통신 장치, 이를 구비한 무선 통신 시스템, 및 소비 전력 관리 장치
WO2016104501A1 (ja) 電力管理システム、中継装置及び電力管理方法
US20120197563A1 (en) Electric power meter
JP2014202542A (ja) 計測装置
US20170307665A1 (en) Power management apparatus, power management method, and power management system
WO2013168415A1 (ja) 管理装置および管理システム
KR101645647B1 (ko) 실시간 다중통신용 스마트 분전반 제어기
TWI523364B (zh) 合作轉接器、配電盤、配電盤系統
TWI521817B (zh) 配電盤、配電盤系統、獨立配電盤
JP2005312112A (ja) 電力線搬送制御システム
KR101319449B1 (ko) 무선 라우팅 역할을 수행하는 무정전 전력 측정장치
KR101708762B1 (ko) 파워 모니터링 시스템 및 장치
US9146604B2 (en) Power control apparatus and power control method
KR101120953B1 (ko) 자동 아이디 설정기능이 구비된 분기 전력관리시스템
KR101645648B1 (ko) 통신 및 분기 확장이 용이한 통합 스마트 분전반 제어기
JP2013187848A (ja) 通信システムおよび通信装置
JP2017107384A (ja) メーターシステム及び検針システム
KR101520760B1 (ko) 수요전력관리를 위한 다선로 계측시스템
JP6238120B2 (ja) 分電盤及び通信システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13788152

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13788152

Country of ref document: EP

Kind code of ref document: A1