JP6236587B2 - デマンドレスポンス及び分散エネルギーリソースを最適化及び管理するシステム及び方法 - Google Patents
デマンドレスポンス及び分散エネルギーリソースを最適化及び管理するシステム及び方法 Download PDFInfo
- Publication number
- JP6236587B2 JP6236587B2 JP2014530653A JP2014530653A JP6236587B2 JP 6236587 B2 JP6236587 B2 JP 6236587B2 JP 2014530653 A JP2014530653 A JP 2014530653A JP 2014530653 A JP2014530653 A JP 2014530653A JP 6236587 B2 JP6236587 B2 JP 6236587B2
- Authority
- JP
- Japan
- Prior art keywords
- demand response
- load
- engine
- customer
- resources
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000004044 response Effects 0.000 title claims description 185
- 238000000034 method Methods 0.000 title claims description 47
- 238000005457 optimization Methods 0.000 claims description 36
- 238000012545 processing Methods 0.000 claims description 23
- 238000009826 distribution Methods 0.000 claims description 21
- 230000005540 biological transmission Effects 0.000 claims description 17
- 230000006870 function Effects 0.000 claims description 17
- 230000009467 reduction Effects 0.000 claims description 14
- 238000010801 machine learning Methods 0.000 claims description 9
- 238000013439 planning Methods 0.000 claims description 7
- 238000007726 management method Methods 0.000 description 14
- 230000005611 electricity Effects 0.000 description 8
- 230000009897 systematic effect Effects 0.000 description 7
- 230000000694 effects Effects 0.000 description 6
- 230000008901 benefit Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000010354 integration Effects 0.000 description 4
- 238000010248 power generation Methods 0.000 description 4
- 230000002776 aggregation Effects 0.000 description 3
- 238000004220 aggregation Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000011664 signaling Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- MOYKHGMNXAOIAT-JGWLITMVSA-N isosorbide dinitrate Chemical compound [O-][N+](=O)O[C@H]1CO[C@@H]2[C@H](O[N+](=O)[O-])CO[C@@H]21 MOYKHGMNXAOIAT-JGWLITMVSA-N 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 230000008685 targeting Effects 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/14—Session management
- H04L67/141—Setup of application sessions
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Power Engineering (AREA)
- Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
本出願は、2011年9月16日に出願の「Software-as-a-Service (SaaS) for Optimization and Management of Demand Response and Distributed Energy Resources」と題する米国仮特許出願第61/535,369号に対する優先権の恩典を主張し、2011年9月16日に出願の「Multi-Channel Communication of Demand Response Information between Server and Client」と題する米国仮特許出願第61/535,371号に対する優先権の恩典を主張し、2011年9月16日に出願の「System and Method for Optimization of Demand Response and Distributed Energy Resources and Management Thereof」と題する米国仮特許出願第61/535,365号に対する優先権の恩典を主張し、それぞれの内容はその全体を引用することにより本明細書の一部をなすものとする。
[項目1]
耐負荷リソースに対してリアルタイムに電力潮流を制御するようにデマンドレスポンスを最適化及び管理するシステムであって、
デマンドレスポンスイベントに応答して需要削減を検出する能力を提供するベースラインエンジンと、
公益事業者のバックエンドデータ及び顧客エンドポイントデータを上記システムに与える手段と、
公益事業者のバックエンドデータ及び顧客エンドポイントデータに通信可能に結合される、上記耐負荷リソースのリソースモデラーと、
上記リソースモデラーに通信可能に結合され、上記システムに接続される負荷ごとに個々の負荷及び利用可能な負荷制限を予測し、総負荷/負荷制限情報を与える第1のエンジンと、
上記リソースモデラー及び上記第1のエンジンに通信可能に結合され、デマンドレスポンスイベントに応答して負荷削減を検出する第2のエンジンと、
上記第1のエンジン及び上記第2のエンジンに通信可能に結合され、所与のコスト関数のもとでデマンドレスポンスの最適な発信を計算する第3のエンジンと、
上記第3のエンジンに通信可能に結合され、デマンドレスポンスの上記最適な発信を決定するオプティマイザーと、
上記オプティマイザーに通信可能に結合され、顧客のポートフォリオにわたってデマンドレスポンス信号を発送する発信エンジンと、
を備える、システム。
[項目2]
上記システムはソフトウェアアズアサービス分散モデルとして提供される、項目1に記載のシステム。
[項目3]
上記リソースモデラーは、上記耐負荷リソースのタイプ、場所、特性、応答時間、ランプ時間及び利用可能性の情報を追跡する、項目1に記載のシステム。
[項目4]
上記第1のエンジンは機械学習アルゴリズムを利用して、負荷及び負荷制限を予測する、項目1に記載のシステム。
[項目5]
上記最適化エンジンによって考慮される上記コスト関数は、コスト、信頼性、負荷優先順位、GHG又はこれらの加重和を含む、項目1に記載のシステム。
[項目6]
公益事業者メーター管理システムによって、上記公益事業者のバックエンドデータが与えられる、項目1に記載のシステム。
[項目7]
リアルタイムに電力潮流を制御するようにデマンドレスポンスを最適化及び管理する、コンピューターによって実施される方法であって、
利用可能なデマンドレスポンスリソースに関する情報を収集するとともに、デマンドレスポンスイベントに参加するのに望ましい上記デマンドレスポンスリソースを決定することと、
個々の顧客ごとに総負荷及び利用可能な負荷制限の短期予測を実行することと、
所与のコスト関数のもとでデマンドレスポンスの最適な発信を決定することと、
公益事業者のバックエンドデータ及び顧客エンドデータを統合し、フィードバックを生成し、デマンドレスポンスを識別することと、
を含む方法。
[項目8]
上記実施はウェブ利用であり、ソフトウェアアズアサービス分散モデルのもとで提供される、項目7に記載の方法。
[項目9]
利用可能なデマンドレスポンスに関する上記情報は、対応するデマンドレスポンスイベントに対するリソースのタイプ、場所、関連する特性、応答時間、ランプ時間及び利用可能性を含む、項目7に記載の方法。
[項目10]
上記最適化エンジンによって考慮される上記コスト関数は、コスト、信頼性、負荷優先順位、GHG又はこれらの加重和を含む、項目7に記載の方法。
[項目11]
デマンドレスポンスの上記最適な発信は、最適なデマンドレスポンス入札、デマンドレスポンスイベントの最適な発信、及び顧客に対する価格信号の形で計算される、項目7に記載の方法。
[項目12]
耐負荷リソースの電力潮流をリアルタイムに制御するデマンドレスポンスシステムであって、
(a)デマンドレスポンスシステムに公益事業運用者及び顧客エンドポイントからデータを与える手段と、
(b)公益事業運用者及び顧客エンドポイントに通信可能に結合され、上記耐負荷リソースの利用可能性に関する情報と、応答時間及びランプ時間を含む関連する特性とを抽出するリソースモデラーと、
(c)上記リソースモデラーに通信可能に結合され、利用可能なリソースのリストをフェッチし、総負荷及び利用可能な負荷制限に対する短期予測を実行する予測エンジンと、
(d)デマンドレスポンスの最適な発信を決定するオプティマイザーであって、上記予測エンジンから予測を受信するオプティマイザーと、
(e)上記予測エンジン及び上記オプティマイザーに通信可能に結合され、所与のコスト関数のもとで顧客のポートフォリオにわたってデマンドレスポンスの上記最適な発信を計算する発信エンジンと、
(f)デマンドレスポンス価格通知に応答して需要削減を観察するベースラインエンジンであって、スパース信号処理アルゴリズムを展開するベースラインエンジンと、
(g)上記予測エンジン及び上記オプティマイザーを較正する手段であって公益事業者データフィードからデマンドレスポンスイベントを実行する手段と、
(h)上記デマンドレスポンスシステムと、上記公益事業運用者と、上記顧客エンドポイントとの間の接続性を与えるインターフェースと、
を備え、
上記デマンドレスポンスシステムはクラウドネットワーク内にホスティングされ、インターネットを通してアクセス可能である、デマンドレスポンスシステム。
[項目13]
上記システムは、ユーザーをサーバー上のデマンドレスポンスポートフォリオに接続するためにクラウドネットワークを使用する、項目12に記載のデマンドレスポンスシステム。
[項目14]
上記リソースモデラーは、デマンドレスポンスイベントに参加するリソースの負荷順序と、クライアントの契約期間及び状態とを監視する、項目12または13に記載のデマンドレスポンスシステム。
[項目15]
上記予測エンジンは、先行するデータフィードに基づいて結果を予測するインテリジェントシステムを構築する、項目12から14の何れか1項に記載のデマンドレスポンスシステム。
[項目16]
オプティマイザー及び上記発信エンジンは組み合わせされて最適化エンジンを形成し、上記最適化エンジンは、所与の計画対象期間にわたるコスト、信頼性、負荷優先順位、GHG又はこれらの加重和のうちの1つ又は複数を含むコスト関数を計算する、項目12から15の何れか1項に記載のデマンドレスポンスシステム。
[項目17]
上記システムは上記インターフェースによって、一方において公益事業者のバックエンドデータシステムに結合され、他方において顧客エンドポイントに結合される、項目12から16の何れか1項に記載のデマンドレスポンスシステム。
[項目18]
デマンドレスポンスシステムにおいてリアルタイムの電力潮流のためにデマンドレスポンスを通信及び制御する方法であって、
(a)公益事業者メーターによって利用可能なデマンドレスポンスリソースに関する情報を収集するとともに、デマンドレスポンスイベントに参加するのに望ましい上記デマンドレスポンスリソースを決定することと、
(b)個々の顧客ごとに総負荷及び利用可能な負荷制限の短期予測を実行することと、
(c)所与のコスト関数のもとでデマンドレスポンスの最適な発信を決定することと、
(d)公益事業者のバックエンドデータ及び顧客エンドデータを統合することであって、それによりフィードバックを生成し、デマンドレスポンスを識別することと、
を含む、デマンドレスポンスを通信及び制御する方法。
[項目19]
上記デマンドレスポンスシステムはクラウドネットワークを通してホスティングされる、項目18に記載の方法。
[項目20]
上記利用可能なデマンドレスポンス情報は、顧客のポートフォリオにわたって、対応するデマンドレスポンスイベントに対するリソースのタイプ、場所、関連する特徴、応答時間、ランプ時間、利用可能性を含む、項目18または19に記載の方法。
[項目21]
最適化エンジンによって計算される個別の上記コスト関数は、所与の計画対象期間にわたるコスト、信頼性、負荷優先順位、GHG又はこれらの加重和を含む、項目18から20の何れか1項に記載の方法。
[項目22]
顧客のポートフォリオにわたって、最適なデマンドレスポンス入札、デマンドレスポンスイベントの最適な発信、及び顧客に対する価格信号が計算される、項目7から10の何れか1項に記載の方法。
Claims (12)
- 耐負荷リソースの電力潮流をリアルタイムに制御するデマンドレスポンスシステムであって、コンピュータを備え、
前記コンピュータは、
(a)デマンドレスポンスシステムに公益事業者及び顧客エンドポイントからデータを与える手段と、
(b)前記公益事業者及び前記顧客エンドポイントに通信可能に結合され、前記顧客エンドポイントからのデータに対しリソース利用可能性と関連する特性とを追跡/監視して、前記耐負荷リソースの利用可能性に関する情報を抽出するリソースモデラーと、
(c)前記リソースモデラーに通信可能に結合され、前記リソースモデラーから、個々の顧客ごとの前記リソース利用可能性のリストをフェッチし、前記リソース利用可能性の前記リストに基づいて、前記個々の顧客ごとに総負荷及び利用可能な負荷制限に対する短期予測を機械学習(ML)技法を利用して実行する予測エンジンと、
(d)前記リソースモデラーから前記利用可能なリソースと、制約とを受け取り、かつ、前記予測エンジンから前記個々の顧客に対する前記総負荷及び前記利用可能な負荷制限の前記短期予測及び誤差分布を受け取ることによって、所与のコスト関数のもとでデマンドレスポンス信号の最適な発信を決定するオプティマイザーと、
(e)前記予測エンジン及び前記オプティマイザーに通信可能に結合され、利用可能なデマンドレスポンスリソース特有の複数の確率論的モデルを用いて、顧客のグループごとに最適な前記デマンドレスポンス信号を発信する発信エンジンと、
(f)一組の顧客が負荷制限に関する契約上の義務を果たしているか否かを検証するベースラインエンジンであって、スパース信号処理アルゴリズムを展開して、ベースライン電力消費量と、モデル及び予測誤差との背景の中のデマンドレスポンス関連の電力削減を検出するベースラインエンジンと、
(g)前記予測エンジン及び前記オプティマイザーを較正する手段であって前記公益事業者のバックエンドデータシステムからのデータフィードからデマンドレスポンスイベントを実行する手段と、
(h)前記デマンドレスポンスシステムと、前記公益事業者と、前記顧客エンドポイントとの間の接続性を与えるインターフェースと、
を有し、
前記デマンドレスポンスシステムの前記コンピュータはクラウドネットワーク内にホスティングされ、インターネットを通してアクセス可能である、デマンドレスポンスシステム。 - 前記システムは、ユーザーをサーバー上のデマンドレスポンスポートフォリオに接続するためにクラウドネットワークを使用する、請求項1に記載のデマンドレスポンスシステム。
- 前記リソースモデラーは、デマンドレスポンスイベントに参加するリソースの負荷順序と、クライアントの契約期間及び状態とを監視する、請求項1または2に記載のデマンドレスポンスシステム。
- 前記予測エンジンは、先行するデータフィードに基づいて結果を予測するインテリジェントシステムを構築する、請求項1から3の何れか1項に記載のデマンドレスポンスシステム。
- オプティマイザー及び前記発信エンジンは組み合わせされて最適化エンジンを形成し、前記最適化エンジンは、所与の計画対象期間にわたるコスト、信頼性、負荷優先順位、GHG又はこれらの加重和のうちの1つ又は複数を含むコスト関数を計算する、請求項1から4の何れか1項に記載のデマンドレスポンスシステム。
- 前記システムは前記インターフェースによって、一方において前記公益事業者のバックエンドデータシステムに結合され、他方において前記顧客エンドポイントに結合される、請求項1から5の何れか1項に記載のデマンドレスポンスシステム。
- デマンドレスポンスシステムにおいてリアルタイムの電力潮流のためにデマンドレスポンスを通信及び制御する方法であって、
(a)コンピュータが、公益事業者メーターによって利用可能なデマンドレスポンスリソースに関する情報を収集し、負荷優先順位の情報に基づいてデマンドレスポンスイベントに参加するのに望ましい前記デマンドレスポンスリソースを決定する手順と、
(b)前記コンピュータが、前記決定する手順により決定された利用可能なリソースのリストに基づいて、個々の顧客ごとに総負荷及び利用可能な負荷制限の短期予測を機械学習(ML)技法を利用して実行する手順と、
(c)前記コンピュータが、前記利用可能なリソースと、前記予測により与えられた前記総負荷及び前記負荷制限の前記短期予測及び誤差分布を入力とした所与のコスト関数のもとで複数の顧客をグループ化して最適化問題を解き、利用可能なリソース特有の確率論的モデルを用いて、グループ化した前記複数の顧客にわたってデマンドレスポンス信号の最適な発信を前記コンピュータが決定する手順と、
(d)前記コンピュータが、公益事業者のバックエンドデータ及び顧客エンドデータを統合することであって、それによりデマンドレスポンスに対する前記複数の顧客の決定履歴に関するフィードバックを生成し、ベースライン電力消費量と、モデル及び予測誤差との背景の中のデマンドレスポンス関連の電力削減を識別する手順と、
を含む、デマンドレスポンスを通信及び制御する方法。 - 前記デマンドレスポンスシステムはクラウドネットワークを通してホスティングされる、請求項7に記載の方法。
- 前記利用可能なデマンドレスポンス情報は、グループ化した前記複数の顧客にわたって、対応するデマンドレスポンスイベントに対するリソースのタイプ、場所、関連する特徴、応答時間、ランプ時間、利用可能性を含む、請求項7または8に記載の方法。
- 最適化エンジンによって計算される個別の前記コスト関数は、所与の計画対象期間にわたるコスト、信頼性、負荷優先順位、GHG又はこれらの加重和を含む、請求項7から9の何れか1項に記載の方法。
- グループ化した前記複数の顧客にわたって、最適なデマンドレスポンス入札、デマンドレスポンスイベントの最適な発信、及び前記複数の顧客に対する価格信号が計算される、請求項7から10の何れか1項に記載の方法。
- 請求項7から11のいずれか一項に記載の方法における複数の手順を前記コンピュータに実行させるためのプログラム。
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201161535369P | 2011-09-16 | 2011-09-16 | |
US201161535365P | 2011-09-16 | 2011-09-16 | |
US201161535371P | 2011-09-16 | 2011-09-16 | |
US61/535,365 | 2011-09-16 | ||
US61/535,369 | 2011-09-16 | ||
US61/535,371 | 2011-09-16 | ||
PCT/US2012/000399 WO2013039554A1 (en) | 2011-09-16 | 2012-09-14 | A system and a method for optimization and management of demand response and distribute energy resources |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2014527247A JP2014527247A (ja) | 2014-10-09 |
JP2014527247A5 JP2014527247A5 (ja) | 2017-04-27 |
JP6236587B2 true JP6236587B2 (ja) | 2017-11-29 |
Family
ID=47178273
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014530653A Active JP6236587B2 (ja) | 2011-09-16 | 2012-09-14 | デマンドレスポンス及び分散エネルギーリソースを最適化及び管理するシステム及び方法 |
JP2014530654A Active JP6277129B2 (ja) | 2011-09-16 | 2012-09-14 | デマンドレスポンスイベントの最適化および管理の促進を実現するシステム |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014530654A Active JP6277129B2 (ja) | 2011-09-16 | 2012-09-14 | デマンドレスポンスイベントの最適化および管理の促進を実現するシステム |
Country Status (4)
Country | Link |
---|---|
US (2) | US20140343983A1 (ja) |
EP (2) | EP2756468A1 (ja) |
JP (2) | JP6236587B2 (ja) |
WO (2) | WO2013039554A1 (ja) |
Families Citing this family (65)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9818073B2 (en) | 2009-07-17 | 2017-11-14 | Honeywell International Inc. | Demand response management system |
US10162374B2 (en) | 2011-09-17 | 2018-12-25 | AutoGrid Systems Inc. | Determining load reductions in demand response systems |
US9817376B1 (en) | 2012-05-19 | 2017-11-14 | Growing Energy Labs, Inc. | Adaptive energy storage operating system for multiple economic services |
US20190317463A1 (en) | 2012-05-19 | 2019-10-17 | Growing Energy Labs, Inc. | Adaptive energy storage operating system for multiple economic services |
US20140081704A1 (en) | 2012-09-15 | 2014-03-20 | Honeywell International Inc. | Decision support system based on energy markets |
EP2920747A4 (en) | 2012-11-14 | 2016-04-20 | Autogrid Inc | IDENTIFICATION OF AN OPPORTUNITY FAILURE IN DR ASSETS |
US9389850B2 (en) | 2012-11-29 | 2016-07-12 | Honeywell International Inc. | System and approach to manage versioning of field devices in a multi-site enterprise |
CN104283225A (zh) * | 2013-07-08 | 2015-01-14 | 株式会社日立制作所 | 风电场运行控制装置及方法 |
US9989937B2 (en) | 2013-07-11 | 2018-06-05 | Honeywell International Inc. | Predicting responses of resources to demand response signals and having comfortable demand responses |
US10346931B2 (en) | 2013-07-11 | 2019-07-09 | Honeywell International Inc. | Arrangement for communicating demand response resource incentives |
US20150019037A1 (en) * | 2013-07-11 | 2015-01-15 | Honeywell International Inc. | System having customer defined demand response signals |
US9691076B2 (en) | 2013-07-11 | 2017-06-27 | Honeywell International Inc. | Demand response system having a participation predictor |
US9372679B2 (en) | 2013-08-02 | 2016-06-21 | Sap Se | Method and system for software delivery service |
US10432753B2 (en) * | 2013-08-16 | 2019-10-01 | Fujitsu Limited | Demand response event dissemination system and method |
JP6302197B2 (ja) * | 2013-09-20 | 2018-03-28 | 株式会社東芝 | 電力需給制御装置及び電力需給制御方法 |
US9471080B2 (en) * | 2013-10-21 | 2016-10-18 | Restore Nv | Portfolio managed, demand-side response system |
US10026106B2 (en) * | 2013-11-13 | 2018-07-17 | Intel Corporation | Synthetic pricing for devices in an energy management system |
JP6429061B2 (ja) * | 2013-11-19 | 2018-11-28 | 東芝ライテック株式会社 | 通信装置 |
US10152683B2 (en) | 2014-01-22 | 2018-12-11 | Fujistu Limited | Demand response event assessment |
US20150213466A1 (en) * | 2014-01-24 | 2015-07-30 | Fujitsu Limited | Demand response aggregation optimization |
US10037014B2 (en) * | 2014-02-07 | 2018-07-31 | Opower, Inc. | Behavioral demand response dispatch |
US9665078B2 (en) | 2014-03-25 | 2017-05-30 | Honeywell International Inc. | System for propagating messages for purposes of demand response |
US10361924B2 (en) | 2014-04-04 | 2019-07-23 | International Business Machines Corporation | Forecasting computer resources demand |
US10043194B2 (en) | 2014-04-04 | 2018-08-07 | International Business Machines Corporation | Network demand forecasting |
US9385934B2 (en) | 2014-04-08 | 2016-07-05 | International Business Machines Corporation | Dynamic network monitoring |
US10439891B2 (en) | 2014-04-08 | 2019-10-08 | International Business Machines Corporation | Hyperparameter and network topology selection in network demand forecasting |
US10713574B2 (en) | 2014-04-10 | 2020-07-14 | International Business Machines Corporation | Cognitive distributed network |
US10115120B2 (en) | 2014-05-12 | 2018-10-30 | Fujitsu Limited | Dynamic demand response event assessment |
CN104102952B (zh) * | 2014-06-17 | 2017-06-06 | 国家电网公司 | 一种基于电网运行效率的负荷优化配置方法 |
EP3175401A1 (en) * | 2014-07-31 | 2017-06-07 | Growing Energy Labs Inc. | Predicting and optimizing energy storage lifetime performance with adaptive automation control software |
CN104200286B (zh) * | 2014-09-10 | 2017-06-06 | 东南大学 | 一种城市轨道交通时刻表优化技术应用框架 |
US10305736B2 (en) * | 2014-12-18 | 2019-05-28 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods, network nodes, and computer program products for price signal feedback for network optimization |
WO2016104402A1 (ja) * | 2014-12-25 | 2016-06-30 | 京セラ株式会社 | サーバ、ユーザ端末、及びプログラム |
US20160225006A1 (en) * | 2015-01-30 | 2016-08-04 | Fujitsu Limited | Utilization of coupons in residential demand response |
JP2016171710A (ja) * | 2015-03-13 | 2016-09-23 | 株式会社東芝 | 電力制御装置、電力制御方法、及び、電力制御プログラム |
KR101645689B1 (ko) * | 2015-06-26 | 2016-08-05 | (주)네모파트너즈엔이씨 | 스마트 전력수요자원 네모모델링데이터 시뮬레이션 모듈을 통한 전력수요관리사업 프로젝트 경제성 분석장치 및 방법 |
US20180212462A1 (en) * | 2015-07-29 | 2018-07-26 | Kyocera Corporation | Management server and management method |
US10567490B2 (en) * | 2015-09-11 | 2020-02-18 | Samsung Electronics Co., Ltd. | Dynamically reallocating resources for optimized job performance in distributed heterogeneous computer system |
US10615596B2 (en) | 2015-09-30 | 2020-04-07 | Siemens Aktiengesellschaft | Systems, methods and apparatus for an improved aggregation engine for a demand response management system |
US10168682B1 (en) | 2015-11-20 | 2019-01-01 | Wellhead Power Solutions, Llc | System and method for managing load-modifying demand response of energy consumption |
US10148092B2 (en) | 2016-01-27 | 2018-12-04 | Alliance For Sustainable Energy, Llc | Real time voltage regulation through gather and broadcast techniques |
KR101739271B1 (ko) * | 2016-03-30 | 2017-05-24 | 재단법인차세대융합기술연구원 | 수요반응자원 최적 구성용 스마트 포트폴리오 최적화모델링형성장치 및 방법 |
KR101818846B1 (ko) * | 2016-03-31 | 2018-02-28 | 전자부품연구원 | 수요관리사업자의 경제성 dr 입찰을 위한 최적 분산자원 선택 및 구성 방법 |
US10404067B2 (en) | 2016-05-09 | 2019-09-03 | Utopus Insights, Inc. | Congestion control in electric power system under load and uncertainty |
US10423185B2 (en) | 2016-05-09 | 2019-09-24 | General Electric Company | Systems and methods for regulating a microgrid |
PT3469680T (pt) * | 2016-07-18 | 2023-06-29 | Siemens Ag | Processo, produto de programa de computador, dispositivo e sistema de serviço cluster de energia para gerir objetivos de regulação, particularmente a compensação de cargas, no controlo do fornecimento, da conversão, do armazenamento, da alimentação, da distribuição e/ou do consumo de energia numa rede de energia |
US10516269B2 (en) | 2016-11-16 | 2019-12-24 | Alliance For Sustainable Energy, Llc | Real time feedback-based optimization of distributed energy resources |
US10715354B2 (en) | 2017-02-20 | 2020-07-14 | Lutron Technology Company Llc | Integrating and controlling multiple load control systems |
US10495333B2 (en) | 2017-02-24 | 2019-12-03 | Honeywell International Inc. | Providing demand response |
US10541556B2 (en) * | 2017-04-27 | 2020-01-21 | Honeywell International Inc. | System and approach to integrate and manage diverse demand response specifications for multi-site enterprises |
US11303124B2 (en) * | 2017-12-18 | 2022-04-12 | Nec Corporation | Method and system for demand-response signal assignment in power distribution systems |
CN109889500A (zh) * | 2019-01-18 | 2019-06-14 | 广州信安数据有限公司 | 电网数据开放运营平台 |
WO2020158592A1 (ja) * | 2019-01-30 | 2020-08-06 | 京セラ株式会社 | 電力供給方法及び電力管理装置 |
CN110210659B (zh) * | 2019-05-24 | 2021-04-02 | 清华大学 | 一种考虑可靠性约束的配电网规划方法 |
JP7303707B2 (ja) * | 2019-09-04 | 2023-07-05 | 積水化学工業株式会社 | 代替ベースライン計算装置、学習済みモデル、機械学習装置、代替ベースライン計算方法およびプログラム |
GB2588459B (en) * | 2019-10-25 | 2021-10-27 | Centrica Business Solutions Belgium N V | System for configuring demand response for energy grid assets |
CN112036616A (zh) * | 2020-08-17 | 2020-12-04 | 国网江苏省电力有限公司营销服务中心 | 一种基于动态过程优化的综合能源系统需求响应方法 |
EP3975369A1 (en) | 2020-09-23 | 2022-03-30 | Ampere Power Energy SL | Prosumers multiservice operation management system, for distributed storage networks |
CN112734277B (zh) * | 2021-01-20 | 2024-02-02 | 深圳华工能源技术有限公司 | 信息物理融合的需求侧响应资源多层级建模方法 |
US11968263B2 (en) | 2021-03-24 | 2024-04-23 | The Board Of Trustees Of The Leland Stanford Junior University | Behind-the-meter resource management system |
CN113705989B (zh) * | 2021-08-17 | 2023-12-08 | 上海交通大学 | 基于数据驱动和偏差判据的虚拟电厂用户响应检测方法 |
US20240266830A1 (en) * | 2023-02-03 | 2024-08-08 | Itron, Inc. | Load shedding in advanced metering infrastructure |
CN116565882B (zh) * | 2023-06-29 | 2023-09-19 | 北京大学 | 分布式需求响应方法、装置、系统及介质 |
CN117477578A (zh) * | 2023-09-01 | 2024-01-30 | 国网江苏省电力有限公司南京供电分公司 | 一种配电网的调度方法 |
CN117436672B (zh) * | 2023-12-20 | 2024-03-12 | 国网湖北省电力有限公司经济技术研究院 | 考虑等效循环寿命和温控负荷的综合能源运行方法及系统 |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6519509B1 (en) * | 2000-06-22 | 2003-02-11 | Stonewater Software, Inc. | System and method for monitoring and controlling energy distribution |
CA2480551A1 (en) * | 2002-03-28 | 2003-10-09 | Robertshaw Controls Company | Energy management system and method |
US8788310B2 (en) * | 2003-11-20 | 2014-07-22 | International Business Machines Corporation | Methods and apparatus for managing computing resources based on yield management framework |
US20060117317A1 (en) * | 2004-11-12 | 2006-06-01 | International Business Machines Corporation | On-demand utility services utilizing yield management |
EP2011030A2 (en) * | 2006-03-24 | 2009-01-07 | Rtp Controls | Method and apparatus for controlling power consumption |
WO2009020158A1 (ja) * | 2007-08-06 | 2009-02-12 | Panasonic Electric Works Co., Ltd. | 機器管理システム |
US7715951B2 (en) * | 2007-08-28 | 2010-05-11 | Consert, Inc. | System and method for managing consumption of power supplied by an electric utility |
US20090088907A1 (en) * | 2007-10-01 | 2009-04-02 | Gridpoint, Inc. | Modular electrical grid interface device |
WO2009055368A2 (en) * | 2007-10-21 | 2009-04-30 | Citrix Systems, Inc. | Systems and methods to adaptively load balance user sessions to reduce energy consumption |
CA2728091A1 (en) * | 2008-06-25 | 2010-01-21 | Versify Solutions, Inc. | Aggregator, monitor, and manager of distributed demand response |
US8041467B2 (en) * | 2008-10-31 | 2011-10-18 | General Electric Company | Optimal dispatch of demand side electricity resources |
WO2010083334A1 (en) * | 2009-01-14 | 2010-07-22 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
US20100218108A1 (en) * | 2009-02-26 | 2010-08-26 | Jason Crabtree | System and method for trading complex energy securities |
US20100306027A1 (en) * | 2009-06-02 | 2010-12-02 | International Business Machines Corporation | Net-Metering In A Power Distribution System |
CN102483732A (zh) * | 2009-07-07 | 2012-05-30 | 普利治能源集团股份有限公司 | 用于开发和管理应用的企业智能电网、需求管理平台及方法 |
US8744638B2 (en) * | 2009-09-11 | 2014-06-03 | General Electric Company | Method and system for demand response in a distribution network |
US8359124B2 (en) * | 2009-11-05 | 2013-01-22 | General Electric Company | Energy optimization system |
US9412082B2 (en) * | 2009-12-23 | 2016-08-09 | General Electric Company | Method and system for demand response management in a network |
US9847644B2 (en) * | 2010-02-09 | 2017-12-19 | Open Access Technology International, Inc. | Systems and methods for demand response and distributed energy resource management |
US8918842B2 (en) * | 2010-02-19 | 2014-12-23 | Accenture Global Services Limited | Utility grid command filter system |
-
2012
- 2012-09-14 JP JP2014530653A patent/JP6236587B2/ja active Active
- 2012-09-14 WO PCT/US2012/000399 patent/WO2013039554A1/en active Application Filing
- 2012-09-14 US US14/345,248 patent/US20140343983A1/en not_active Abandoned
- 2012-09-14 EP EP12787929.4A patent/EP2756468A1/en not_active Ceased
- 2012-09-14 EP EP12784763.0A patent/EP2756467A1/en not_active Withdrawn
- 2012-09-14 WO PCT/US2012/000400 patent/WO2013039555A1/en active Application Filing
- 2012-09-14 US US14/345,255 patent/US20150134280A1/en not_active Abandoned
- 2012-09-14 JP JP2014530654A patent/JP6277129B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP6277129B2 (ja) | 2018-02-07 |
WO2013039554A1 (en) | 2013-03-21 |
WO2013039555A1 (en) | 2013-03-21 |
JP2014531658A (ja) | 2014-11-27 |
US20150134280A1 (en) | 2015-05-14 |
JP2014527247A (ja) | 2014-10-09 |
US20140343983A1 (en) | 2014-11-20 |
EP2756468A1 (en) | 2014-07-23 |
EP2756467A1 (en) | 2014-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6236587B2 (ja) | デマンドレスポンス及び分散エネルギーリソースを最適化及び管理するシステム及び方法 | |
JP2014527247A5 (ja) | ||
Ouyang et al. | Time-dependent resilience assessment and improvement of urban infrastructure systems | |
JP6236585B2 (ja) | 個々の顧客からシステムレベルへの負荷予測 | |
US10734816B2 (en) | Identifying operability failure in demand response (DR) assets | |
CA2755831C (en) | Network status detection | |
JP6236586B2 (ja) | デマンドレスポンスシステムにおいて負荷削減を判断すること | |
US20130307702A1 (en) | Method and system for effective management of energy consumption by household appliances | |
US20200272187A1 (en) | Open automated demand response (openadr) server | |
US10348086B2 (en) | Construct to mitigate power system operational impacts of emerging “disruptive technologies” | |
KR102081727B1 (ko) | 서비스 최적화 운영관리 및 의사결정 지원을 위한 서비스 제공 시스템 및 방법 | |
CN109657998A (zh) | 一种资源分配方法、装置、设备及存储介质 | |
Efkarpidis et al. | Smart Metering Applications | |
JP6635895B2 (ja) | 電力需要制御システム、電力需要制御方法、アグリゲータシステム、需要家電力管理システム、及びプログラム | |
Kazman et al. | Architecture evaluation without an architecture: Experience with the smart grid | |
Aksanli et al. | Renewable energy prediction for improved utilization and efficiency in datacenters and backbone networks | |
Pau | Discovering the dynamics of smart business networks | |
Mikkola et al. | Near real time energy monitoring for end users: Requirements and sample applications | |
CN117640386A (zh) | 网络切片资源自适应调整方法、装置、存储介质及电子设备 | |
Simões et al. | Advances in information technology for Smart Grids | |
KR102693832B1 (ko) | 다중 수용가 게이트웨이 통합 운영 시스템 및 그 방법 | |
Aksanli et al. | A comprehensive approach to reduce the energy cost of network of datacenters | |
Khorasani et al. | Implementation and evaluation of OpenADR standard with AMI support in cloud computing | |
Radonjic et al. | MODELING QUALITY OF BUSINESS IN NEXT GENERATION TELECOM ENTERPRISES | |
Wang et al. | Demand Response in the Smart Grid: A Distributed Computing Perspective |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140428 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20150910 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20160826 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160920 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20161219 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20170217 |
|
A524 | Written submission of copy of amendment under article 19 pct |
Free format text: JAPANESE INTERMEDIATE CODE: A524 Effective date: 20170321 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170404 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20170502 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20170524 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170602 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6236587 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |