[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN102830255A - Smart electricity meter with function of monitoring and protecting power failure - Google Patents

Smart electricity meter with function of monitoring and protecting power failure Download PDF

Info

Publication number
CN102830255A
CN102830255A CN2012103017363A CN201210301736A CN102830255A CN 102830255 A CN102830255 A CN 102830255A CN 2012103017363 A CN2012103017363 A CN 2012103017363A CN 201210301736 A CN201210301736 A CN 201210301736A CN 102830255 A CN102830255 A CN 102830255A
Authority
CN
China
Prior art keywords
electric energy
energy meter
voltage
current
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103017363A
Other languages
Chinese (zh)
Other versions
CN102830255B (en
Inventor
王金泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210301736.3A priority Critical patent/CN102830255B/en
Publication of CN102830255A publication Critical patent/CN102830255A/en
Application granted granted Critical
Publication of CN102830255B publication Critical patent/CN102830255B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

A smart electricity meter with a function of monitoring and protecting power failure comprises a metering chip, a leakage current sampling circuit, a phase current sampling circuit, a phase voltage sampling circuit, a CPU (central processing unit), a power module and a low voltage breaker. The leakage current sampling circuit is electrically connected with the metering chip which is mutually electrically connected with the CPU. The CPU is electrically connected with the low voltage breaker through a trip output port. The low voltage breaker is electrically connected with the CPU through a status acquisition interface. The invention further provides a power failure monitoring and controlling method of the smart electricity meter. The smart electricity meter has the advantages that the reliable power module for power failure protection and control is provided, various types of power failure warning and protection are provided, failure warning and failure protection for voltage, current, power and the like are achieved for power users, failure spots are prevented and isolated, economic loss and personal safety accidents due to failure of electric circuit equipment of the users are prevented and reduced, and reliability of low voltage grids is effectively improved.

Description

A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function
Technical field
The present invention relates to low voltage electric network power measurement protection apparatus field, relate in particular to a kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function.
Background technology
According to the definition of State Grid Corporation of China's intelligence table, intelligent electric energy meter is made up of measuring unit, data processing unit, communication unit etc., has the electric energy meter of functions such as electrical energy metering, information stores and processing, monitoring in real time, control automatically, information interaction.Therefore, existing intelligent electric energy meter does not possess electricity consumption malfunction monitoring and defencive function.
Intelligent low-pressure device for switching art equipment had been obtained very much progress in recent years; Occurred like intelligent switch electrical equipment such as intelligent low-pressure comprehensive protection device, intelligent electricity leakage protector, intelligent breakers; Its major function is low-voltage circuit control and protection; The protection type that relates generally to has overvoltage, under-voltage, decompression, overcurrent, short circuit, electric leakage (residual current) etc., and some intelligent switch electrical equipment also have communication function, can realize the remote monitoring of device for switching ruuning situation.But these intelligent switch electrical equipment also exist some shortcomings, as: be difficult to realize realize interactive with higher level's electrical network smart machine and system; Need to set up independently communication and supervisory system, build the maintenance cost height.Therefore, in power consumer, also there is big difficulty by large scale application intelligent switch electrical equipment.
In addition, the raising that requires along with power supply reliability owing to power autonomously in recent years constantly increase with the dual power supply user, causes sending electric incident to be on the increase from user side to low voltage electric network is counter, and low voltage electric network maintenance personal's personal safety in serious threat.According to the data of retrieval, at present domestic also do not have can be to preventing specially at low voltage electric network from the anti-protectiveness intelligent switch equipment that send electricity of user side.
State Grid Corporation of China proposes during " 12 ", to accelerate to build strong intelligent grid, and the main characteristic of strong intelligent grid is " informationization, robotization, interactive ".The gordian technique that need relate at low-voltage distribution, with electrical domain mainly contains intelligent power two-way interaction technology, Self-Service technology by all kinds of means, client's intelligent fault administrative skill, safety on line multiplexe electric technology etc.
Low voltage electric network is the weakest link of technology and equipment that intelligent grid is built, and the technology and equipment in existing low voltage electric network field all is difficult to satisfy the demand of intelligent grid at present.Be embodied in; Intelligent electric energy meter still is confined to electric energy metrical, charging and relevant information interaction function; The intelligent low-pressure device for switching still is confined to electric monitoring and electric protection aspect function, does not also have a kind of intelligent terminal that has intelligent electric energy meter and intelligent switch electrical equipment two aspect functions simultaneously.
Intelligent electric energy meter is mounted in a kind of intelligent terminal between low voltage electric network and the power consumer line facility property right circle point, is " nerve ending " of " intelligent grid " mesolow electrical network part.With the intelligent electric energy meter is carrier, expands intelligent electric energy meter in the function aspect electrical measurement, protection control, malfunction monitoring analysis, power information interaction, and power supply enterprise and power consumer are all had very strong practical value.Therefore; Invent a kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function; As the intelligent terminal equipment that integrates functions such as metering and billing, switch, measurement, protection control, on-line monitoring, communication, electricity consumption interaction, with greatly promoting the intelligent grid construction in the development aspect low-voltage distribution, the electricity consumption.
Summary of the invention
The technical matters that the present invention will solve is: the deficiency that overcomes prior art; A kind of intelligent electric energy meter with electricity consumption malfunction monitoring and defencive function is provided; Include functions such as electricity consumption working condition measuring, fault analysis, fault isolation protection, fault remote monitoring, power information interaction in the intelligent electric energy meter envelop of function; Make intelligent electric energy meter have protection of electricity consumption malfunction monitoring and warning function; Can analyze the isolated fault point as required automatically; With a shared cover network channel and an equipment of power information acquisition system, compatible power information acquisition system communication protocol, power information acquisition system main website can realize the long-range electricity consumption failure monitoring management to power consumer for the terminal management carrier with the intelligent electric energy meter.Through improving, can also improve the anti-stealing electricity function and the generation that prevents the dangerous electricity consumption behavior of part of intelligent electric energy meter.
The monitoring of intelligent electric energy meter according to the invention and protection to as if the electric wiring and the equipment of electric energy meter downside, monitoring and protection type comprise: overvoltage, under-voltage, decompression, overcurrent, short circuit, electric leakage (residual current), the anti-type emergency protection such as electricity of sending.
The technical scheme that the present invention adopted is: a kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function; Comprise computation chip, leakage current sample circuit, phase current sampling circuit, phase voltage sample circuit, central processor CPU; Low-voltage circuit breaker, said leakage current sample circuit electrically connects said computation chip, and said computation chip and central processor CPU electrically connect each other; Said central processor CPU electrically connects said low-voltage circuit breaker through a tripping operation output interface; Said low-voltage circuit breaker electrically connects said central processor CPU through a state acquisition interface, it is characterized in that, also comprises power module.Power module comprises circuit components such as voltage stabilizing, rectification, charging and battery.
Preferably, said power module comprises rechargeable battery.
Preferably, also comprise communication interface, communication module, long-range main website, said communication interface is electrically connected with said central processor CPU, communication module respectively each other, adopts data communication protocol to carry out communication each other between said long-range main website and the communication module.
Preferably; Also comprise communication interface, communication module, concentrator, long-range main website; Said communication interface is electrically connected with said central processor CPU, communication module respectively each other, adopts data communication protocol to carry out communication each other between said long-range main website and concentrator, said concentrator and the communication module respectively.
Preferably, said low-voltage circuit breaker comprises shunt release and auxiliary contact, and said tripping operation output interface electrically connects shunt release, and said auxiliary contact electrically connects the state acquisition interface.
Preferably, also comprise protection control switch and tripping relay, said protection control switch and tripping relay are serially connected on the control output loop of output interface.
Further, also comprise keyboard, display screen, audible-visual annunciator, said keyboard electrically connects described central processor CPU, and said central processor CPU electrically connects said display screen, audible-visual annunciator respectively.
Further, said display screen is used to show electric weight, the electricity charge, power, table meter fault and overcurrent, short circuit, overvoltage, under-voltage, decompression, electric leakage, the counter protection dependent event information of sending electric fault
Further, said audible-visual annunciator is used to point out electric energy meter operating condition, communications status, electric energy meter ERST, relevant emergency protection information.
Further, said data communication protocol carries out function and expands on the communication protocol of " power consumer power information acquisition system " and technical manual, and the agreement after the expansion realizes backward compatible acquisition system and equipment, common user communication passage.
Further, said intelligent electric energy meter and long-range main station system or remote administration terminal are carried out two-way communication through data communication protocol, and accept the management of long-range main station system or remote administration terminal.
Further, said central processor CPU electrically connects with a clock module respectively each other, electrically connects each other with a data-carrier store.
A kind of electricity consumption malfunction monitoring and control method with intelligent electric energy meter of electricity consumption malfunction monitoring defencive function also is provided, may further comprise the steps,
Step 1: one or more composite signals in the leakage current signal that the ac current signal that the said phase current sampling circuit in the intelligent electric energy meter is gathered, the ac voltage signal that said phase voltage sample circuit is gathered and said leakage current sample circuit are gathered convert digital signal into; Import said computation chip into and carry out data processing, and deposit in the working storage;
Step 2: store various protection setting valves or warning setting valve in the said data-carrier store in advance by long-range main website or the input of intelligent electric energy meter button; Said central processor CPU constantly reads or receives the data from computation chip; And compare with corresponding protection setting valve or warning setting valve, judge that intelligent electric energy meter connects the residing duty of user load lateral circuit;
Step 3: in the data value that reads or receive is in the setting valve scope of normal operating conditions; Then do not start corresponding failure protection and warning subroutine; Said central processor CPU carries out analytic statistics with data, forms statisticss such as interior mean value of unit interval, maximal value, minimum value, and on display screen; And regularly related data is uploaded, is forwarded to long-range main website through concentrator; Or directly uploading to long-range main website, step 2 is returned in data storage and analysis so that long-range main website leaks electricity again; When exceeding or be lower than the setting valve scope, then start corresponding failure protection and warning subroutine, carry out further fault judgement; According to comprehensive judged result, central processor CPU sends the protection trip command and gives said low-voltage circuit breaker, the shunt release action open-circuit line in the said low-voltage circuit breaker, or send alarm command and give audible-visual annunciator, report to the police;
Step 4: by said central processor CPU will report to the police, the implementation status of emergency protection trip event and emergency protection or warning forms the event of failure message that has timestamp; Write entry data memory; And show that on display said intelligent electric energy meter is uploaded dependent failure event message and data in real time, be forwarded to long-range main website through concentrator; Or directly uploading to long-range main website, long-range main website carries out data storage and analysis.
Preferably; Said central processor CPU compares the overvoltage that prestores in current ac voltage signal data of being gathered and the said data-carrier store, under-voltage, decompression setting valve; When phase voltage value>during the overvoltage setting valve, then satisfy overvoltage fault verification entry condition; When phase voltage value <under-voltage setting valve and current magnitude of voltage>decompression setting valve, then satisfy under-voltage fault verification entry condition; When phase voltage value < during the decompression setting valve, then satisfies no-voltage fault and judges entry condition; When magnitude of voltage numerical value meets above-mentioned scope; Protection of intelligent electric energy meter trigger voltage class and warning subroutine; Carry out further fault judgement, comprehensively judge according to data such as voltage swing, fluctuation situation, out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss.
Preferably, said central processor CPU compares the overcurrent, the short circuit setting valve that prestore in current ac current signal data of being gathered and the said data-carrier store, when phase current values>during the over-current adjusting value, then satisfy over current fault and judge entry condition; When phase current values>during the short circuit setting valve, then satisfy short trouble and judge entry condition; When current value numerical value meets above-mentioned scope; Intelligent electric energy meter starting current class protection subroutine and warning subroutine; Carry out further fault judgement, comprehensively judge according to data such as phase current size, fluctuation situation, out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss.
Preferably; Said central processor CPU compares the current active power that has a direction symbol of being gathered or current data and null value, the anti-electric protection power setting valve that send; When meritorious performance number < 0 and active power absolute value>is anti-when sending electric protection power setting valve; Or when phase current values < 0 and phase current absolute value>is anti-when sending the electric protection current setting; Intelligent electric energy meter starts anti-electricity type emergency protection and the warning subroutine sent, and carries out further fault judgement, comprehensively judges according to data such as reverse active power or size of current, fluctuation situation, reverse out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss.
Compared with prior art; The invention has the beneficial effects as follows: 1, power module is provided; For low-voltage circuit breaker provides reliable and stable protection action control power supply, improve the reliable rate and protection action accuracy of whole device, and reduce the failure rate of low-voltage circuit breaker trip operation mechanism; For the intelligent electric energy meter nucleus module provides the operation back-up source, operational modes such as the standby of support intelligent electric energy meter nucleus module, dormancy provide condition for resuming operation fast after the intelligent electric energy meter power down, have improved the practicality of failure protection function; 2, polytype electricity consumption fault alarm and protection are provided; Electricity consumption emergency protection type comprises overvoltage, under-voltage, decompression, overcurrent, short circuit, electric leakage (residual current), instead send type protection such as electricity; Electricity consumption fault alarm and defencive function through intelligent electric energy meter; Can realize fault alarm and emergency protection to types such as power consumer voltage, electric current, power; Prevention is monitored the electric leakage situation of electric wiring and equipment in real time with electric fault and automatic isolated fault point, reduces the electric energy loss and the economic loss that cause because of electric leakage; Prevent and reduce the economic loss that causes because of the electric wiring equipment failure and the generation of personal safety accident, and effectively improve the reliability of low voltage electric network; 3, polytype electricity consumption failure message prompting is provided; Intelligent electric energy meter can show relevant failure message and electricity consumption information on its display screen; Maintain easily personnel and user and understand reason intuitively, accurately and timely fix a breakdown and hidden danger, and can accurately distinguish the power failure failure cause and cause still to be to cause by power supply enterprise by power consumer with electric fault; For power supply enterprise and electric power electricity consumption fault analysis provide foundation, improve power supply reliability and breakdown repair efficient.The back-up source that intelligent electric energy meter is built-in with power module and is supplied power by rechargeable battery; Can in a period of time of intelligent electric energy meter outage back, continue failure condition is pointed out, can manual work when intelligent electric energy meter changes standby mode over to wake up and carry out data query; 4, the electricity consumption fault management can be included telemanagement in, especially can insert power consumer power information acquisition system and manage.Power supply enterprise includes the electricity consumption fault management in range of management; Can analyze low voltage electric network and user power utilization fault pests occurrence rule; Early warning in time with take measures to investigate fault and hidden danger, improve the intelligent level of low voltage electric network and electricity consumption, effectively instruct power consumer science, safety, efficiently electricity consumption; 5, compatible existing power consumer power information acquisition system and equipment.The present invention carries out function and expands on the communication protocol of " power consumer power information acquisition system " and technical manual, but its great advantage is exactly can backward compatible acquisition system and equipment common user communication passage; 6, has the current acquisition element of gathering neutral line current or gathering phase line, neutral line current simultaneously through having increased; Can more effectively monitor the electricity filching behavior that adopts current return shunting or short circuit method; Improve the function of opposing electricity-stealing of intelligent electric energy meter; And prevent the generation of dangerous electricity consumption behavior, reduce power supply enterprise because of measuring economic loss unusual and that stealing causes.
Description of drawings
Fig. 1 is the circuit structure block diagram of the present invention according to the mode one of the object division of nucleus module exchanges data;
Fig. 2 is the circuit structure block diagram of the present invention according to the mode two of the object division of nucleus module exchanges data;
Fig. 3 is an electricity consumption emergency protection primary control program synoptic diagram;
Fig. 4 is the circuit structure diagram of the present invention according to the mode one of alternating-current electric signals collecting sensor element type division;
Fig. 5 is the circuit structure diagram of the present invention according to the mode two of alternating-current electric signals collecting sensor element type division;
Fig. 6 is the circuit structure diagram of the present invention according to the mode three of alternating-current electric signals collecting sensor element type division;
Fig. 7 is the built-in synoptic diagram of low-voltage circuit breaker of the present invention;
Fig. 8 is a low-voltage circuit breaker external synoptic diagram of the present invention;
Description of reference numerals: 1, computation chip; 2, leakage current sample circuit; 3, phase current sampling circuit; 4, phase voltage sample circuit; 5, tripping operation output interface; 6, state acquisition interface; 7, low-voltage circuit breaker; 8, communication interface; 9, communication module; 10, data-carrier store; 11, clock module; 12, central processor CPU; 13, audible-visual annunciator; 14, display screen; 15, keyboard; 16, long-range main website; 17, concentrator; 18, power module.
Embodiment
Do further detailed explanation below in conjunction with the accompanying drawing specific embodiments of the invention.
Like Fig. 1, shown in Figure 2; A kind of intelligent electric energy meter with electricity consumption malfunction monitoring and defencive function; Comprise computation chip 1, phase current sampling circuit 3, phase voltage sample circuit 4, central processor CPU 12, leakage current sample circuit 2, low-voltage circuit breaker 7 and power module 18.Said leakage current sample circuit 2 electrically connects said computation chip 1; Said computation chip 1 electrically connects with central processor CPU 12 each other; Said central processor CPU 12 electrically connects said low-voltage circuit breaker 7 through a tripping operation output interface 5, and said low-voltage circuit breaker 7 electrically connects said central processor CPU 12 through a state acquisition interface 6.Said leakage current sample circuit 2 comprises the leakage current pick-up transducers.
Also comprise communication interface 8, communication module 9, keyboard 15, display screen 14, audible-visual annunciator 13; Said communication interface 8 is electrically connected with said central processor CPU 12, communication module 9 respectively each other; Said keyboard 15 inserts described central processor CPU 12, and said central processor CPU 12 electrically connects said display screen 14, audible-visual annunciator 13 respectively.A said central processor CPU 12 and a clock module 11 electrically connect each other.A said central processor CPU 12 and a data-carrier store 10 electrically connect each other.
It is digital signal that the leakage current sample circuit is responsible for the low pressure leakage current is exchanged analog signal conversion, and imports the leakage current digital signal into computation chip and carry out data processing.Most important element is the leakage current pick-up transducers in the leakage current sample circuit; The leakage current pick-up transducers is the interchange analog signal conversion element of leakage current; The line electrical leakage current signal concerned to convert into by a certain percentage be suitable for the AC signal that the leakage current sample circuit is handled; The leakage current sample circuit will leak electricity again, and to exchange analog signal conversion be to output to computation chip after the digital signal, carries out the leakage current digital signal processing by computation chip.The leakage current pick-up transducers can adopt leakage current signals such as current transformer or shunt resistance to gather sensing element.Phase current sampling circuit, phase voltage sample circuit exchange the digital signal that simulating signal converts suitable computation chip collection respectively into phase current, the phase voltage of three-phase or single-phase low-voltage circuit; And import voltage, current digital signal into computation chip and carry out data processing, form measurement data such as electric current, voltage, electric power, electric weight.Voltage, current sampling circuit comprise sensor element, are generally voltage, current transformer or dividing potential drop, shunt resistance element.Computation chip is a kind of digital signal processing (Digital Singnal Processing that electric signals such as electric energy metrical and voltage, electric current are handled that is specifically designed to; Be called for short DSP) chip; Among the present invention; Computation chip not only is responsible for converting phase current, phase voltage digital signal into power and electric weight through calculation process, also is responsible for converting phase voltage, phase current, leakage current digital signal into effective value through calculation process, and related data is stored in the working storage of computation chip.CPU is the core parts of intelligent electric energy meter; The general embedded microprocessor that adopts; Be that intelligent electric energy meter is realized protection parameter tuning, protection judgement and sent the protection Intelligent treatment core parts of instruction, and tasks such as responsible data parameters storage administration, peripheral hardware control and Control on Communication.Data-carrier store also is used for stored electricity data (phase voltage, phase current, leakage current etc.), parameter and event information except that being used for data such as storage of electrical energy metering, charging and table meter incident.The tripping operation output interface is used for to low-voltage circuit breaker output tripping operation control wave or level signal, realizes the tripping operation control to low-voltage circuit breaker.The tripping operation output interface comprises a tripping relay, is used to control the output of trip signal.The tripping operation output interface also comprises protection control switch, and on the control output loop of protection control switch serial connection tripping operation output interface, whether the emergency protection trip avoidance function that is used to set intelligent electric energy meter comes into operation.The state acquisition interface is responsible for gathering the divide-shut brake location status amount of low-voltage circuit breaker.Communication interface and communication module are responsible for communicating by letter of intelligent electric energy meter and intelligent terminals such as concentrator, long-range main website, on-the-spot portable data acquisition PDA.Clock is a timing device, and from charged pool, is used for the independent timing of intelligent electric energy meter, and guarantees intelligent electric energy meter still accurately timing when outage, to guarantee the accuracy of failure message time of origin record.Keyboard button, display, acousto-optic are designated as the input-output apparatus of the man-machine interaction of intelligent electric energy meter, are responsible for defencive function debugging of electricity consumption malfunction monitoring and fault alarm, failure message demonstration.Power module is the circuit module that has voltage stabilizing, rectification and charge function, and the normal operation that is responsible for intelligent electric energy meter itself provides stable power, and can be the low-voltage control power supply that low-voltage circuit breaker is controlled provides safe and reliable.Power module comprises one group of rechargeable battery power supply in support, can support intelligent electric energy meter to keep operation a period of time later in dead electricity, carries out data processing, data storage, data communication, display message and sends operation such as alerting signal; And consume situation according to battery power, change standby, dormant state automatically over to, so that resume operation fast during the intelligent electric energy meter telegram in reply.Low-voltage circuit breaker is a kind of low-voltage circuit breaker that has shunt release and auxiliary contact.The effect of shunt release is a kind of contents of realizing low-voltage circuit breaker is carried out sub-switching operation as intelligent electric energy meter, when intelligent electric energy meter tripping operation control interface output sub-gate signal, just connects the shunt opening trip coil power supply, handles the low-voltage circuit breaker separating brake.Auxiliary contact is a kind of contents that low-voltage circuit breaker is used for auxiliary judgment divide-shut brake position, and the divide-shut brake position state signal to intelligent electric energy meter feedback low-voltage circuit breaker is responsible in the moving contact interlock of it and low-voltage circuit breaker.Low-voltage circuit breaker is the electrical control equipment that is used to cut off and recover user load, and the shunt opening trip coil of low-voltage circuit breaker, auxiliary contact are connected with tripping operation output interface, the state acquisition interface of intelligent electric energy meter respectively.Among the present invention, low-voltage circuit breaker is responsible for when breaking down open failure point or fault power consumer as required, and can break off low-voltage circuit breaker or prevent that according to the parameter that long-range main website issues low-voltage circuit breaker from being closed a floodgate by illegal according to the instruction of long-range main website.Can select the low-voltage circuit breaker that has electric switch-on operating mechanism external accessory for use; And increase the combined floodgate output interface in the intelligent electric energy meter core; Expand through function; Can realize the function of intelligent electric energy meter, and realize that long-range main website is to low-voltage circuit breaker remote control closing function under the intelligent electric energy meter the low-voltage circuit breaker automatic reclosing.Concentrator is meant the data of collecting each acquisition terminal or electric energy meter; And handle storage; Ability and power information collection main website or handheld device are carried out the equipment of exchanges data simultaneously; Among the present invention, concentrator also is responsible for the storage and the forwarding of intelligent electric energy meter failure protection function related data, parameter, incident.Long-range main website refers to power information acquisition system main website, is responsible for intelligent electric energy meter is carried out data acquisition and management, and telemanagement is carried out in service data, controlled variable and the protection control also be responsible for intelligent electric energy meter.
The present invention also provides a kind of electricity consumption malfunction monitoring and control method with intelligent electric energy meter of electricity consumption malfunction monitoring defencive function, may further comprise the steps,
(1) one or more composite signals in the leakage current signal gathered of the ac current signal gathered of the said phase current sampling circuit in the intelligent electric energy meter, ac voltage signal that said phase voltage sample circuit is gathered and said leakage current sample circuit convert digital signal into; Import said computation chip into and carry out data processing, and deposit in the working storage;
(2) store various protection setting valves or the warning setting valve of importing by long-range main website or intelligent electric energy meter button in the said data-carrier store in advance; Said central processor CPU constantly reads or receives the data from computation chip; And compare with corresponding protection setting valve or warning setting valve, judge that intelligent electric energy meter connects the residing duty of user load lateral circuit;
(3) in the data value that reads or receive is in the setting valve scope of normal operating conditions; Then do not start corresponding failure protection and warning subroutine; Said central processor CPU carries out analytic statistics with data, forms statisticss such as interior mean value of unit interval, maximal value, minimum value, and on display screen; And regularly related data is uploaded, is forwarded to long-range main website through concentrator; Or directly uploading to long-range main website, step (2) is returned in data storage and analysis so that long-range main website leaks electricity again; When exceeding or be lower than the setting valve scope, then start corresponding failure protection and warning subroutine, carry out further fault judgement; According to comprehensive judged result, central processor CPU sends the protection trip command and gives said low-voltage circuit breaker, the shunt release action open-circuit line in the said low-voltage circuit breaker, or send alarm command and give audible-visual annunciator, report to the police;
(4) by said central processor CPU will report to the police, the implementation status of emergency protection trip event and emergency protection or warning forms the event of failure message that has timestamp; Write entry data memory; And show that on display said intelligent electric energy meter is uploaded dependent failure event message and data in real time, be forwarded to long-range main website through concentrator; Or directly uploading to long-range main website, long-range main website carries out data storage and analysis.
Its emergency protection principle of work and process are following:
The monitoring of intelligent electric energy meter and protection to as if the electric wiring and the equipment of electric energy meter downside, monitoring and protection content comprise: overvoltage, under-voltage, decompression, overcurrent, short circuit, electric leakage (residual current), the anti-type emergency protection such as electricity of sending.
For realizing all kinds of electricity consumption emergency protections, in the embedded type CPU core working procedure of intelligent electric energy meter, each emergency protection and warning subroutine are all benefited from the control of electric fault protection primary control program.For guaranteeing the real-time of malfunction monitoring protection, embedded type CPU and operating system thereof should be selected the operating system of supporting real-time multi-task for use.
Electricity consumption emergency protection primary control program is as shown in Figure 3, after intelligent electric energy meter powers up startup, loads electricity consumption emergency protection primary control program immediately and carries out electricity consumption failure monitoring and protection.Electricity consumption emergency protection primary control program reads from one group of current phase voltage of computation chip, phase current, leakage current numerical value, and phase voltage, phase current, leakage current numerical value are compared with corresponding setting valve respectively.If phase voltage, phase current, leakage current numerical value are out-of-limit; Perhaps there is the anti-electrical anomaly signal that send, checks then whether corresponding protection subroutine process is in operation, if corresponding protection subroutine is moved; Then directly turn back to the next item down data decision node; If corresponding protection subroutine off-duty then starts corresponding protection subroutine process and further judges, and turns back to the next item down data decision node.After each data item had all relatively been accomplished with setting valve, flow process turned back to and reads one group of new current phase voltage, phase current, leakage current numerical value node, and carries out cycle criterion by above-mentioned flow process.Because intelligent electric energy meter adopts real-time multi-task operating system; Therefore intelligent electric energy meter is supported multinomial fault type parallel detection simultaneously protection; Operating system is created the corresponding failure process according to different fault-signal types temporarily; Start corresponding protection subroutine, after accomplishing emergency protection action back or fault-signal disappearance, operating system stops automatically and discharges this process.
Intelligent electric energy meter adopt to support the advantage of the operating system of real-time multi-task to be: just can realize that by a cpu chip voltage, electric current, electric leakage, the anti-a plurality of electric faults such as electricity of sending protect types to move simultaneously; Can guarantee that emergency protection is judged and protection action real-time, and can realize the united and coordinating scheduling of dissimilar protection subprogram activations.
Existing is its emergency protection principle of work and process of example explanation with earth leakage protection:
Touch when intelligent electric energy meter connects the user load lateral circuit, when leaking electricity; The inner zero sequence current mutual inductor of intelligent electric energy meter just generates leakage current; The secondary circuit of zero sequence current mutual inductor is input to A/D converter after treatment with leakage current signal and carries out the collection of leakage current analog signal digital; With the leakage current analog signal conversion is digital signal, and incites somebody to action and import the leakage current digital signal into computation chip and carry out data processing.The leakage current data that computation chip transmits the leakage current sample circuit are handled the back through mathematical operation and are formed data such as leakage current effective value, average data, and with data storage in the working storage of computation chip.CPU constantly reads or receives the leakage current data from computation chip; And real-time leakage current data and earth leakage protection setting valve or warning setting valve compared; If leakage current value is greater than earth leakage protection setting valve or warning setting valve; Then start earth leakage protection and warning subroutine, when satisfying earth leakage protection tripping operation trigger condition, CPU exports tripping operation control wave or level signal through the tripping operation output interface to low-voltage circuit breaker; Connect the shunt opening trip coil power supply of low-voltage circuit breaker, realize the earth leakage protection tripping operation; When satisfying the leakage-current alarm trigger condition, CPU connects sound and light alarm equipment and carries out leakage-current alarm to sound and light alarm equipment output control signal.Described earth leakage protection setting valve or warning setting valve are earth leakage protection and the alarm parameters by long-range main website or the input of intelligent electric energy meter button; Parameter type comprises parameters such as earth leakage protection setting valve, leakage-current alarm setting valve, earth leakage protection tripping operation delay time, earth leakage protection tripping operation allow/forbid, leakage-current alarm allows/forbids, correlation parameter all is stored in the data-carrier store of intelligent electric energy meter.
Earth leakage protection and warning subroutine are one section computer program codes that intelligent electric energy meter leaks electricity and judges and send protection tripping operation/alarm command; Its principle is that various factors such as the size, fluctuation situation, duration according to leakage current carries out from motion tracking and intelligent decision, whether sends earth leakage protection tripping operation or leakage-current alarm instruction according to judged result and predetermined strategy decision.
Leakage-current alarm, earth leakage protection trip event that the power consumer that intelligent electric energy meter is monitored takes place because of electric leakage; And the implementation status condition of earth leakage protection or leakage-current alarm; Form the event message that has timestamp by CPU; Event message is write entry data memory, and dependent event information is shown on LCD.After leakage-current alarm, earth leakage protection trip event took place, intelligent electric energy meter was also uploaded dependent event message and data in real time, be forwarded to long-range main website through concentrator, or directly uploads to long-range main website.
If intelligent electric energy meter connects the load-side leakage current value in normal range; The CPU of intelligent electric energy meter also constantly reads current leakage current value from data-carrier store and carries out analytic statistics; Form statisticss such as interior leakage current mean value of unit interval, maximal value, minimum value; And on LCDs, show related data as required; And regularly related data is uploaded, is forwarded to long-range main website through concentrator, or directly upload to long-range main website, data storage and analysis so that long-range main website leaks electricity.
The overvoltage of intelligent electric energy meter, under-voltage, decompression, overcurrent, short circuit, counter other type protection principle of work such as electricity of sending are consistent with earth leakage protective principle process with process; Its difference is service data, controlled variable, event information type difference, and is different with the warning subroutine with performed correspondence protection.
Overvoltage, under-voltage, no-voltage fault protection principle of work and process are following:
The voltage signal that intelligent electric energy meter is gathered through the phase voltage sample circuit, the voltage data after the computation chip computing is not only as the data source of electric weight, power calculation, also as voltage class malfunction monitoring and protection judgment basis such as overvoltage, under-voltage, decompressions.Similar with the earth leakage protection principle; The CPU of intelligent electric energy meter with the current voltage data of being gathered be stored in overvoltage in the data-carrier store in advance, under-voltage, decompression setting valve compares; When current magnitude of voltage>during the overvoltage setting valve, then satisfy overvoltage fault verification entry condition; When current phase voltage value <under-voltage setting valve and current magnitude of voltage>decompression setting valve, then satisfy under-voltage fault verification entry condition; When current phase voltage value < during the decompression setting valve, then satisfies no-voltage fault and judges entry condition.If current magnitude of voltage numerical value meets above-mentioned scope; Then show and to have voltage class fault; Intelligent electric energy meter trigger voltage protection subroutine is carried out further fault judgement; Comprehensively judge according to data such as voltage swing, fluctuation situation, out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss, when meeting the fault alarm condition, output alarm information then; When meeting the emergency protection operation condition, then export trip command to the tripping operation control interface, control low-voltage circuit breaker disconnect user circuit.Voltage class failure message also shows on the display at intelligent electric energy meter after judging, and real-time report is to long-range main website.
Overcurrent, short trouble protection principle of work and process are following:
The current data that intelligent electric energy meter is gathered through the phase current sampling circuit, the current data after the computation chip computing is not only as the data source of electric weight, power calculation, also as current capacity malfunction monitoring and protection judgment basis such as overcurrent, short circuits.Similar with the earth leakage protection principle; The CPU of intelligent electric energy meter compares the current current data of being gathered and the overcurrent, the short circuit setting valve that are stored in the data-carrier store in advance; When current phase current values>during the over-current adjusting value, then satisfy over current fault and judge entry condition; When current phase current values>during the short circuit setting valve, then satisfy short trouble and judge entry condition.If current current value numerical value meets above-mentioned scope; Then show and to have the current capacity fault; Intelligent electric energy meter starting current protection subroutine is carried out further fault judgement; Comprehensively judge according to data such as phase current size, fluctuation situation, out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss, when meeting the fault alarm condition, output alarm information then; When meeting the emergency protection operation condition, then export trip command to the tripping operation control interface, control low-voltage circuit breaker disconnect user circuit.The current capacity failure message also shows on the display at intelligent electric energy meter after judging, and real-time report is to long-range main website.
Anti-electric fault protection principle of work and the process sent is following:
Instead send electricity to refer to power supply oppositely to send the phenomenon of electricity through improper approach, in low voltage electric network, counter to send the principal mode of electricity be that the low-voltage power user side is provided generating power supply or double-cricuit supply oppositely send phenomenon from electricity to low voltage electric network for oneself.Its harm is when the low-voltage distribution network interruption maintenance, and the anti-sending electrode of electric power electricity consumption is prone to cause the line facility maintainer to suffer electric shock to cause human casualty accident.
The anti-electric fault protection philosophy that send of intelligent electric energy meter according to the invention is: when intelligent electric energy meter detects phase line active power or the current reversal of the intelligent electric energy meter of flowing through; Break off low-voltage circuit breaker immediately, break off electric power and connect with the electric of low voltage electric network with electric line or equipment.According to the electric energy four-quadrant diagram, when applied power dropped on I or IV quadrant, the power delivery direction was for to be supplied power to power consumer by low voltage electric network, and its active power and direction of current are forward, belonged to normally sending electricity condition; When applied power dropped on II or III quadrant, the power delivery direction was that its active power and direction of current are oppositely, belong to the anti-electricity condition that send by the power supply of power consumer side direction low voltage electric network side.
The anti-electric fault protection course of work and other emergency protection process sent is similar; The CPU of intelligent electric energy meter compares the current active power that has a direction symbol of being gathered or current data and null value; When current active power value < 0 and current active power absolute value>is anti-when sending electric protection power setting valve; Perhaps when current phase current values < 0 and current phase current absolute value>is anti-when sending the electric protection current setting; Then possibly have the anti-electric situation of sending, intelligent electric energy meter starts the anti-electric fault protection subroutine of sending and carries out further fault judgement, comprehensively judges according to data such as reverse active power or size of current, fluctuation situation, reverse out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss; When meeting the fault alarm condition, output alarm information then; When meeting the emergency protection operation condition, then export trip command to the tripping operation control interface, control low-voltage circuit breaker disconnect user circuit.The anti-electric fault information of sending also shows on the display of intelligent electric energy meter, and real-time report is to long-range main website.
The present invention is according to the electric data of intelligent electric energy meter computation chip collection and the processing of related data; Can also expand the failure protection function that other type, as: go out phase sequence emergency protection (preventing the reversing of power consumer three phase electric machine) according to three-phase voltage phasing degree order is extendible; Go out the out-of-limit emergency protection of power (preventing power consumer electricity consumption overload) according to the multiplying of voltage and electric current is extendible.
Intelligent electric energy meter of the present invention; Keeping on original power information remote data transfer function basis; Through data communication protocol and related software are carried out the expansion improvement of malfunction monitoring protection correlation function; Need not to increase private communication, main website hardware device, adopt shared communication medium, communication facilities and main website mode, just can realize the remote monitoring and the adjustment of user power utilization emergency protection ruuning situation.
Intelligent electric energy meter electricity consumption malfunction monitoring protection correlation function data communication protocol expands, and refers at intelligent electric energy meter and concentrator, concentrator and power information and gathers the data communication protocol expansion between the main website.Wherein, Communication protocol between intelligent electric energy meter and the concentrator is that the basis is expanded with DL/T645-2007 " multifunctional electric energy meter communication protocol ", and communication protocol is that the basis is expanded with Q/GDW 376.1-2009 " power consumer power information acquisition system communication protocol: main website and acquisition terminal communication protocol " between concentrator and the power information acquisition system main website.
Following with electric fault Remote monitoring and control method:
Telecommunication protocol to intelligent electric energy meter expands.With the leak current fault protection is example, increases data item such as real-time leakage current, leakage current freezing data, leakage current curve data; Increase zero sequence current mutual inductor multiplying power (as measurement point basic parameter item); Leakage current thresholding (as earth leakage protection tripping operation action current setting valve); The leakage current upper limit (as leakage current off-limit alarm current setting); Leakage current is got over the thresholding duration (earth leakage protection tripping operation delay time); Leakage current is got over the upper limit duration (leakage-current alarm delay time); Leakage current is got over the thresholding coefficient of restitution; Leakage current is got over measurement point limit value parameters and protection parameter such as upper limit coefficient of restitution; Increase earth leakage protection controlled variable such as the earth leakage protection tripping operation allows/forbids, leakage-current alarm allows/forbids; Increase incident projects such as earth leakage protection trip event, electric leakage off-limit alarm incident.Voltage class emergency protection and current capacity emergency protections such as overcurrent, short circuit such as overvoltage, under-voltage, decompression, and instead send the electric fault protection, the extending method of its communication protocol is similar with the earth leakage protection type, no longer carefully states one by one.For realizing the compatibility of main website and intelligent electric energy meter function, the concentrator that is connected with intelligent electric energy meter, the communication protocol of main website also communicate agreement as stated above and expand.
The adjustment of malfunction monitoring protection correlation parameter issues.Through the electric leakage of main website, overvoltage, under-voltage, decompression, overcurrent, short circuit, the anti-parameter management software functions such as electricity of sending are improved.With earth leakage protection is example, increases zero sequence current mutual inductor multiplying power, leakage current thresholding, the leakage current upper limit, leakage current thresholding duration, leakage current upper limit duration, leakage current thresholding coefficient of restitution, leakage current correlation parameter management functions of leaking electricity such as upper limit coefficient of restitution, earth leakage protection tripping operation allow/forbid more, the off-limit alarm of leak electricity allows/forbids more more more.Accomplish the setting of correlation parameter in main website after; Correlation parameter is formed message under concentrator is transmitted, pass to intelligent electric energy meter in batches or one by one; Intelligent electric energy meter is verified, is resolved the parameter message that receives, and the parameter that main website is issued is stored in the data-carrier store.Voltage class emergency protections such as overvoltage, under-voltage, decompression, current capacity emergency protections such as overcurrent, short circuit, and counter to send electric fault to protect isoparametric adjustment to issue also similar with the Parameters of Earth-Leakage Protection delivery method, no longer carefully states one by one.
The remote monitoring of intelligent electric energy meter ruuning situation and emergency protection.The intelligent electric energy meter timing automatic uploads to main website with the data message mode through concentrator with real time data, freezing data, the curve data of types such as the leakage current that collects, phase voltage, phase current; Main website verifies the data message that receives, resolve; And data are write database, carry out data exhibiting and demonstration by main website.Intelligent electric energy meter detects with after automatic corresponding protection of startup and warning subroutine are handled behind the electric fault; And formation emergency protection trip event or electric protection numerical value off-limit alarm event message; Relevant event information is uploaded to main website through concentrator automatically with the event message mode, further handle by main website.Main station monitoring personnel inquire about the current of intelligent electric energy meter or historical failure monitoring and protecting relevant information if desired; Can send failure message from main website and call the survey order together; Intelligent electric energy meter passes to main website with relevant information with message after receiving and calling the survey order together immediately automatically in form.
Electricity consumption situation and error information displaying method are following:
Under normal electricity consumption situation, the display screen of intelligent electric energy meter can turn over the data such as information that screen shows that current voltage, electric current, leakage current, power, electric weight, the electricity charge, time, main website issue automatically; When taking place to use electric fault, the display screen of intelligent electric energy meter can show information such as electricity consumption fault type, failure cause, fault-time; When the generation electric network fault causes the intelligent electric energy meter dead electricity; Rely on the support of built-in back-up source; The display screen of intelligent electric energy meter still can provide the power information of a period of time to show; For repairing personnel and user provide the coherent reference information of power-off event, the failure judgement type and the source of failure exactly.When back-up source be depleted to a certain degree or the certain hour that cuts off the power supply after, intelligent electric energy meter changes the low power consumpting state of standby automatically over to, closes all peripheral hardwares and peripheral circuit power supply, only gives the internal memory power supply of intelligent electric energy meter core.When under power down mode, needing the inquiry intelligent electric energy meter for information about, can wake intelligent electric energy meter up by the manually-operated keyboard button and carry out information inquiry.Behind intelligent electric energy meter telegram in reply, can experience operating system and guide start-up course again, can return to normal operating condition rapidly, guarantee the accuracy of measuring, guarantee that each item failure protection function in time puts into operation.
The present invention presses the difference of the connected mode of intelligent electric energy meter nucleus module exchanges data, and two kinds of embodiments are arranged:
Mode one: as shown in Figure 1, the communication interface 8 of nucleus module is electrically connected with central processor CPU 12, communication module 9 respectively each other, adopts data communication protocol to carry out communication each other between long-range main website 16 and the communication module 9.
Mode two: as shown in Figure 2, also comprise concentrator 17, adopt data communication protocol to carry out communication each other between the communication module 9 of long-range main website 16 and concentrator 17, concentrator 17 and nucleus module respectively.Concentrator 17 is collected the data of each acquisition terminal or electric energy meter, and stores, and can realize the exchanges data that electric energy meter and power information are gathered main website or hand-held intelligent terminal equipment simultaneously.
It is different with the type of combination that the present invention presses the element selection of alternating-current electric signals collecting sensor in leakage current sample circuit, phase current sampling circuit, the phase voltage sample circuit, and three kinds of embodiments are arranged:
Mode one: as shown in Figure 4, adopt mutual inductor type acquisition elements, zero sequence current mutual inductor L1 gathers leakage current, and current transformer L2 gathers the phase line current, and voltage transformer (VT) L3 gathers phase voltage.
Mode two: as shown in Figure 5, adopt mutual inductor type acquisition elements, current transformer L1 gathers the phase line current, and current transformer L2 gathers neutral line current, and voltage transformer (VT) L3 gathers phase voltage.Leakage current obtains the instantaneous numerical value of leakage current by the instantaneous value of phase line current, neutral line current through computation chip mathematical operation stack.For improving the acquisition precision of leakage current, current transformer L1, L2 should adopt the electrical specification current transformer consistent with parameter.
Mode three: as shown in Figure 6, adopt dividing potential drop, shunt resistance type acquisition elements.Resistance R 1, R2 constitute the shunt resistance circuit jointly, and wherein, the R1 resistance value is less; The R2 resistance value is bigger; The ratio 1:N of R1 and R2 resistance value, wherein N is an integer, resistance R 1 is connected on the phase line; Resistance R 2 outputs to phase line current acquisition terminal with the partial current signal on divided circuit, the current signal that computation chip collected is 1/ (N+1) phase line current doubly.Resistance R 3, R4 constitute the shunt resistance circuit jointly and are used to gather neutral line current, and acquisition method is identical with the phase line acquisition method.Resistance R 5, R6 series connection constitute the divider resistance circuit and are used to gather phase voltage between phase line, zero line; Wherein, the R5 resistance value is bigger, and the R6 resistance value is less; R5 is M:1 with the ratio of R6; Wherein M is an integer, and the voltage signal at R6 two ends outputs to phase voltage and gathers terminal, and the voltage signal that computation chip collected is 1/ (M+1) phase line voltage doubly.Identical with mode two; Leakage current obtains numerical value by the instantaneous value of phase line current, neutral line current through computation chip mathematical operation stack; For improving the acquisition precision of leakage current; Resistance R 1, R3 should adopt the electrical specification resistance consistent with parameter, and resistance R 2, R4 also should adopt the electrical specification resistance consistent with parameter.The mode three described resistance of respectively gathering should adopt precision resistance to be used as exchanging acquisition elements.
What above-mentioned three kinds of modes were given an example is the interchange pick-up transducers element mode of connection under the single-phase situation, and for three-phase four-line system, its mode of connection principle is same as described above, and difference only is to have increased respectively two current acquisition elements and two voltage acquisition elements.
The present invention has two kinds of assembly models by the installation site of topworks's (being low-voltage circuit breaker) of emergency protection action:
Mode one: low-voltage circuit breaker is built-in.As shown in Figure 7, install the low-voltage circuit breaker that has electrical apparatus release and auxiliary contact additional in intelligent electric energy meter inside.The quantity of state acquisition interface input terminal of the auxiliary contact access intelligent electric energy meter nucleus module of isolating switch is used for deciliter position of monitoring breaker, and the shunt opening trip coil of isolating switch inserts the tripping operation output interface terminal of intelligent electric energy meter nucleus module and realizes emergency protection tripping operation control.Whether the tripping operation output interface also comprises protection control switch and tripping relay, and protection control switch and tripping relay serial connection trips on the control output loop of output interface, come into operation at the emergency protection trip avoidance function that is used to set intelligent electric energy meter.
Mode two: low-voltage circuit breaker external.As shown in Figure 8, the low-voltage circuit breaker installation site is moved on to the intelligent electric energy meter outside, intelligent electric energy meter is identical with mode of connection and Fig. 7 between the low-voltage circuit breaker, with electric major loop, control signal loop, state detection signal return wire one by one correspondence be connected.
What mode one, mode two were given an example is the mode of connection of function according to the invention in the different installation sites of protection topworks of single-phase intelligent electric energy meter; For the three-phase intelligent electric energy meter; Its connection principle is constant, but needs to select the three-phase low-voltage circuit breaker as emergency protection topworks.Be conserve space and cost, can select only to cut-off the low-voltage circuit breaker of phase line type, also have identical effect, but under the situation of electric energy meter zero line and phase line wiring error, just do not have earth leakage protective effect.The tripping operation output interface of such scheme all comprises a tripping relay, is used to be switched on or switched off the control power supply of isolating switch shunt opening trip coil, plays the effect of control breaker open operation.The shunt opening trip coil control power supply of isolating switch; Can adopt type control power supplys such as alternating current 220V, direct current 24V; Interchange or the DC power supply that also can after the voltage stabilizing rectification, export through the power module of intelligent electric energy meter both can have been adopted by the direct mode of power supply of electric major loop (being phase line).It is simple in structure that employing directly provides the advantage of control power supply power supply mode by electric major loop; Production results is low; But the control power quality is relatively poor; Emergency protection action accuracy can reduce, and for improving protection action accuracy, the shunt release of wide operating voltage range can be considered to adopt in the type selecting aspect of isolating switch shunt release annex; Employing is that fault protection action accuracy is high by the advantage of the mode of the power module power supply of intelligent electric energy meter, and can reduce the failure rate of isolating switch shunt release annex, improves the reliability of electricity protection.
The advantage of mode one is to install simply; If intelligent electric energy meter and higher level's communication mode are the power carrier modes; Its method and common electric energy meter that inserts electrical network is in full accord, and only need phase line, zero line that low-voltage circuit is passed in and out line inserts respective terminal respectively and can realize said fault remote monitoring defencive function.Its shortcoming is that the low-voltage circuit breaker repair and replacement are inconvenient.The advantage of mode two is that the low-voltage circuit breaker repair and replacement are more convenient.Shortcoming is to install with wiring to show complicated slightly, and control signal wire, state detection signal line all need to receive the low-voltage circuit breaker respective terminal from the intelligent electric energy meter terminal, need to consider to prevent the ruined problem of connecting line.
Although specifically show and introduced the present invention in conjunction with preferred embodiment; But the those skilled in the art should be understood that; In the spirit and scope of the present invention that do not break away from appended claims and limited; In form with on the details the present invention is made various variations, be protection scope of the present invention.

Claims (10)

1. intelligent electric energy meter with electricity consumption malfunction monitoring defencive function; Comprise computation chip, leakage current sample circuit, phase current sampling circuit, phase voltage sample circuit, central processor CPU; Low-voltage circuit breaker, said leakage current sample circuit electrically connects said computation chip, and said computation chip and central processor CPU electrically connect each other; Said central processor CPU electrically connects said low-voltage circuit breaker through a tripping operation output interface; Said low-voltage circuit breaker electrically connects said central processor CPU through a state acquisition interface, it is characterized in that, also comprises power module.
2. a kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function according to claim 1 is characterized in that said power module comprises rechargeable battery.
3. a kind of intelligent electric energy meter according to claim 1 with electricity consumption malfunction monitoring defencive function; It is characterized in that; Said low-voltage circuit breaker comprises shunt release and auxiliary contact, and said tripping operation output interface electrically connects shunt release, and said auxiliary contact electrically connects the state acquisition interface; Also comprise protection control switch and tripping relay, said protection control switch and tripping relay are serially connected on the control output loop of output interface.
4. a kind of intelligent electric energy meter according to claim 1 with electricity consumption malfunction monitoring defencive function; It is characterized in that; Also comprise keyboard, display screen, audible-visual annunciator; Said keyboard electrically connects described central processor CPU, and said central processor CPU electrically connects said display screen, audible-visual annunciator respectively; Said display screen is used to show electric weight, the electricity charge, power, table meter fault and overcurrent, short circuit, overvoltage, under-voltage, decompression, electric leakage, the counter protection dependent event information of sending electric fault; Said audible-visual annunciator is used to point out electric energy meter operating condition, communications status, electric energy meter ERST, relevant emergency protection information; Said central processor CPU electrically connects with a clock module respectively each other, electrically connects each other with a data-carrier store.
5. a kind of intelligent electric energy meter according to claim 1 with electricity consumption malfunction monitoring defencive function; It is characterized in that; Said data communication protocol carries out function and expands on the communication protocol of " power consumer power information acquisition system " and technical manual, the agreement after the expansion realizes backward compatible acquisition system and equipment, common user communication passage.
6. a kind of intelligent electric energy meter according to claim 1 with electricity consumption malfunction monitoring defencive function; It is characterized in that; Said intelligent electric energy meter and long-range main station system or remote administration terminal are carried out two-way communication through data communication protocol, and accept the management of long-range main station system or remote administration terminal.
7. an electricity consumption malfunction monitoring and control method with intelligent electric energy meter of electricity consumption malfunction monitoring defencive function is characterized in that: adopt each described intelligent electric energy meter of claim 1-6, may further comprise the steps with electricity consumption malfunction monitoring defencive function,
Step 1: one or more composite signals in the leakage current signal that the ac current signal that the said phase current sampling circuit in the intelligent electric energy meter is gathered, the ac voltage signal that said phase voltage sample circuit is gathered and said leakage current sample circuit are gathered convert digital signal into; Import said computation chip into and carry out data processing, and deposit in the working storage; Step 2: store various protection setting valves or warning setting valve in the said data-carrier store in advance by long-range main website or the input of intelligent electric energy meter button; Said central processor CPU constantly reads or receives the data from computation chip; And compare with corresponding protection setting valve or warning setting valve, judge that intelligent electric energy meter connects the residing duty of user load lateral circuit;
Step 3: in the data value that reads or receive is in the setting valve scope of normal operating conditions; Then do not start corresponding failure protection and warning subroutine; Said central processor CPU carries out analytic statistics with data, forms statisticss such as interior mean value of unit interval, maximal value, minimum value, and on display screen; And regularly related data is uploaded, is forwarded to long-range main website through concentrator; Or directly uploading to long-range main website, step 2 is returned in data storage and analysis so that long-range main website leaks electricity again; When exceeding or be lower than the setting valve scope, then start corresponding failure protection and warning subroutine, carry out further fault judgement; According to comprehensive judged result, central processor CPU sends the protection trip command and gives said low-voltage circuit breaker, the shunt release action open-circuit line in the said low-voltage circuit breaker, or send alarm command and give audible-visual annunciator, report to the police;
Step 4: by said central processor CPU will report to the police, the implementation status of emergency protection trip event and emergency protection or warning forms the event of failure message that has timestamp; Write entry data memory; And show that on display said intelligent electric energy meter is uploaded dependent failure event message and data in real time, be forwarded to long-range main website through concentrator; Or directly uploading to long-range main website, long-range main website carries out data storage and analysis.
8. a kind of electricity consumption malfunction monitoring and control method according to claim 7 with intelligent electric energy meter of electricity consumption malfunction monitoring defencive function; It is characterized in that; Said central processor CPU compares the overvoltage that prestores in current ac voltage signal data of being gathered and the said data-carrier store, under-voltage, decompression setting valve; When phase voltage value>during the overvoltage setting valve, then satisfy overvoltage fault verification entry condition; When phase voltage value <under-voltage setting valve and current magnitude of voltage>decompression setting valve, then satisfy under-voltage fault verification entry condition; When phase voltage value < during the decompression setting valve, then satisfies no-voltage fault and judges entry condition; When magnitude of voltage numerical value meets above-mentioned scope; Protection of intelligent electric energy meter trigger voltage class and warning subroutine; Carry out further fault judgement, comprehensively judge according to data such as voltage swing, fluctuation situation, out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss.
9. a kind of electricity consumption malfunction monitoring and control method according to claim 7 with intelligent electric energy meter of electricity consumption malfunction monitoring defencive function; It is characterized in that; Said central processor CPU compares the overcurrent, the short circuit setting valve that prestore in current ac current signal data of being gathered and the said data-carrier store; When phase current values>during the over-current adjusting value, then satisfy over current fault and judge entry condition; When phase current values>during the short circuit setting valve, then satisfy short trouble and judge entry condition; When current value numerical value meets above-mentioned scope; Intelligent electric energy meter starting current class protection subroutine and warning subroutine; Carry out further fault judgement, comprehensively judge according to data such as phase current size, fluctuation situation, out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss.
10. a kind of electricity consumption malfunction monitoring and control method according to claim 7 with intelligent electric energy meter of electricity consumption malfunction monitoring defencive function; It is characterized in that; Said central processor CPU compares the current active power that has a direction symbol of being gathered or current data and null value, the anti-electric protection power setting valve that send; When meritorious performance number < 0 and active power absolute value>is anti-when sending electric protection power setting valve; Or when phase current values < 0 and phase current absolute value>is anti-when sending the electric protection current setting; Intelligent electric energy meter starts anti-electricity type emergency protection and the warning subroutine sent, and carries out further fault judgement, comprehensively judges according to data such as reverse active power or size of current, fluctuation situation, reverse out-of-limit duration, low-voltage circuit breaker divide-shut brake location statuss.
CN201210301736.3A 2012-08-23 2012-08-23 A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function Expired - Fee Related CN102830255B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210301736.3A CN102830255B (en) 2012-08-23 2012-08-23 A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210301736.3A CN102830255B (en) 2012-08-23 2012-08-23 A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function

Publications (2)

Publication Number Publication Date
CN102830255A true CN102830255A (en) 2012-12-19
CN102830255B CN102830255B (en) 2016-03-16

Family

ID=47333460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210301736.3A Expired - Fee Related CN102830255B (en) 2012-08-23 2012-08-23 A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function

Country Status (1)

Country Link
CN (1) CN102830255B (en)

Cited By (89)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103267893A (en) * 2013-06-04 2013-08-28 长沙高升电子电器科技有限公司 Intelligent electric meter with balanced power distribution
CN103954814A (en) * 2014-01-09 2014-07-30 何亚雄 Guiderail-type intelligent electric energy meter with protection function to electric appliances
CN104113138A (en) * 2014-07-03 2014-10-22 青岛鼎信通讯股份有限公司 Power-event collection system based on low-voltage power-line carrier communication
CN104361730A (en) * 2014-10-29 2015-02-18 梁永富 Data transferring system and data transferring method of intelligent metering device
CN104614619A (en) * 2015-02-11 2015-05-13 成都祥和云端节能设备集团有限公司 Remote power data collection system and method based on wireless network
CN104635194A (en) * 2013-11-08 2015-05-20 中国石油天然气股份有限公司 Three-phase metering loop online fault monitoring timing device
CN104730410A (en) * 2015-03-16 2015-06-24 王金泽 Distribution line breakage monitoring method and device based on voltage and current vectors
CN104810805A (en) * 2015-03-26 2015-07-29 广东电网有限责任公司江门供电局 Integrated protection and control method of single-phase load
CN105071361A (en) * 2015-08-18 2015-11-18 国网山东桓台县供电公司 Device for intelligently preventing disordered reverse power transmission for power system
CN105119372A (en) * 2015-08-28 2015-12-02 国家电网公司 Station area wire outlet leakage current protection breaker remote closing system and remote closing method
CN105162248A (en) * 2015-08-18 2015-12-16 国网山东桓台县供电公司 Intelligent disordered reverse feeding prevention method for power system
CN105449866A (en) * 2015-12-24 2016-03-30 安徽中电兴发与鑫龙科技股份有限公司 Automatic microcomputer comprehensive protection measurement and control device of transformer substation
CN105548627A (en) * 2016-01-12 2016-05-04 浙江共同电子科技有限公司 Electric energy data concentrator
CN105548685A (en) * 2015-12-15 2016-05-04 彭江莲 Electronic intelligent electric energy meter
CN105572525A (en) * 2014-11-04 2016-05-11 吴志兵 Single-phase electric leakage monitoring apparatus
WO2016070676A1 (en) * 2014-11-05 2016-05-12 江苏省电力公司常州供电公司 Smart electric meter capable of measuring residual current
CN105699791A (en) * 2014-11-24 2016-06-22 国网河南省电力公司平顶山供电公司 DSP-based electric energy quality online monitor
CN105699931A (en) * 2016-01-19 2016-06-22 国网河北省电力公司电力科学研究院 Method for determining communication faults of intelligent electric energy meter
CN106199176A (en) * 2016-06-30 2016-12-07 芯海科技(深圳)股份有限公司 A kind of multifunctional electric energy metering circuit saving system resource
CN106291022A (en) * 2015-05-27 2017-01-04 安徽圣享智能科技有限公司 A kind of multifunctional electric energy meter batch meter
CN106329466A (en) * 2016-11-14 2017-01-11 国网浙江慈溪市供电公司 Low-voltage switch control device
CN106526426A (en) * 2016-11-24 2017-03-22 云南电网有限责任公司电力科学研究院 Power distribution network fault analyzing system and method
CN106771574A (en) * 2016-12-29 2017-05-31 上海国缆智能电气有限公司 A kind of single-phase intelligent ammeter and its implementation
CN106781429A (en) * 2016-12-28 2017-05-31 重庆世纪之光科技实业有限公司 Intelligent electric meter, concentrator and meter register method
CN106771440A (en) * 2017-01-03 2017-05-31 张涉应 A kind of single-phase liquid crystal ammeter and its control method for preventing power stealing
CN106846786A (en) * 2016-12-28 2017-06-13 重庆世纪之光科技实业有限公司 Unidirectional loop is checked meter the Quick Acquisition of ammeter data in network
CN106961156A (en) * 2017-04-19 2017-07-18 南京控驰科技有限公司 A kind of low-voltage circuit breaker
CN107093916A (en) * 2017-05-23 2017-08-25 广西康体佳智能科技有限公司 A kind of charging pile system being integrated on street lamp
CN107302243A (en) * 2017-05-23 2017-10-27 广西康体佳智能科技有限公司 A kind of charging pile based on power carrier communication
CN107422159A (en) * 2017-09-13 2017-12-01 国网河南省电力公司汝阳县供电公司 Ammeter box and control circuit available for remote control
CN107493669A (en) * 2017-09-22 2017-12-19 周华 A kind of 1P guide rail double-gate intelligent breakers identified with electric energy metrical and electrical equipment
CN107526008A (en) * 2017-09-12 2017-12-29 益和电气集团股份有限公司 Business electrical monitoring device and failure analysis methods
CN107621563A (en) * 2016-07-13 2018-01-23 国网上海市电力公司 A kind of Multifunctional electric meter case of integrated multiple faults monitoring
CN107707623A (en) * 2017-08-31 2018-02-16 深圳市盛路物联通讯技术有限公司 Equipment operation control method and relevant device
CN108072858A (en) * 2017-12-25 2018-05-25 深圳市航天泰瑞捷电子有限公司 Electric energy meter method for quality control, system and terminal device
CN108120951A (en) * 2018-02-01 2018-06-05 国网江西省电力有限公司电力科学研究院 A kind of achievable built-in switch fault detect takes control intelligent electric energy meter
CN108169526A (en) * 2018-02-05 2018-06-15 国网江苏省电力有限公司苏州供电分公司 With the intelligent electric meter for being spaced apart moving control function
CN108181536A (en) * 2018-01-24 2018-06-19 宁波大家小家网络科技有限公司 A kind of intelligent monitor system for single-phase residential electricity consumption
CN108418177A (en) * 2018-06-15 2018-08-17 北京乐鸟科技有限公司 A kind of arc extinguishing type protective device
CN108445286A (en) * 2018-03-08 2018-08-24 广西网冠电气有限公司 A kind of three-phase four-wire system electrical energy meter fault simulator
CN108444660A (en) * 2018-06-22 2018-08-24 国家电网公司 Helium leak method for diagnosing faults, apparatus and system
CN108572270A (en) * 2018-05-08 2018-09-25 西南大学 Rural power grids stealing detecting system and its control method
CN108594012A (en) * 2018-07-05 2018-09-28 滁州安瑞电力自动化有限公司 A kind of motor protection measure and control device having electric energy acquisition function
CN108919714A (en) * 2018-07-16 2018-11-30 华立科技股份有限公司 A kind of control method and system of the external on-load switch of electric energy meter
CN108963985A (en) * 2018-07-23 2018-12-07 深圳友讯达科技股份有限公司 Power distribution protective device, system and method
CN109061262A (en) * 2018-08-27 2018-12-21 广东电网有限责任公司 Stealing monitoring method and device
CN109217468A (en) * 2018-08-30 2019-01-15 武汉精伦电气有限公司 A kind of intelligent terminal box and electricity consumption observing and controlling and auditing system
CN109342809A (en) * 2018-09-18 2019-02-15 珠海优特物联科技有限公司 Control method and device, the intelligent electric meter of air switch
CN109358307A (en) * 2018-11-21 2019-02-19 深圳深宝电器仪表有限公司 A kind of intelligent electric energy meter safety detection circuit and intelligent electric energy meter
CN109470902A (en) * 2018-09-18 2019-03-15 珠海优特物联科技有限公司 Intelligent electric meter
CN109525043A (en) * 2019-01-16 2019-03-26 杭州吉租科技有限公司 A kind of intelligent electric power management integrated apparatus and its method
CN109842087A (en) * 2019-02-18 2019-06-04 苏州阿德文斯电子科技有限公司 A kind of intelligent power protector
CN109980570A (en) * 2019-03-27 2019-07-05 江苏伊顿电气科技有限公司 A kind of intelligent power distribution cabinet system
CN110021999A (en) * 2019-05-07 2019-07-16 天津市百利电气有限公司 Electric current and voltage detecting can be achieved and handle the breaker module of monitoring line fault
CN110061471A (en) * 2019-04-17 2019-07-26 南宁学院 A kind of method for detecting short circuit of long range electric current
CN110108915A (en) * 2019-06-21 2019-08-09 广东电网有限责任公司 A kind of intelligent electric meter based on audio alert
CN110120708A (en) * 2019-05-18 2019-08-13 南京觅丹电子信息有限公司 Ensure that more people remotely operate the intelligent breaker of safety
CN110311350A (en) * 2019-07-04 2019-10-08 天津市中力神盾电子科技有限公司 Power distribution loop protection method and system
CN110363922A (en) * 2019-08-12 2019-10-22 国网冀北电力有限公司承德供电公司 A kind of charging trip system and method
CN110412930A (en) * 2019-08-29 2019-11-05 江苏高博锐电气有限公司 A kind of things internet switch with function of measuring
CN110412346A (en) * 2019-07-01 2019-11-05 许昌许继低压电器有限公司 A kind of metering type intelligent breaker based on Internet of Things
CN110474424A (en) * 2019-08-06 2019-11-19 广东电网有限责任公司 A kind of intelligent monitoring system used in distributing substation
CN110556919A (en) * 2019-08-12 2019-12-10 浙江恒业电子有限公司 NB-IoT-based network distribution system with residual current detection function and terminal
CN110690710A (en) * 2019-08-13 2020-01-14 杭州海兴电力科技股份有限公司 Low-frequency low-voltage load shedding protection system in micro-grid environment
CN110726872A (en) * 2019-09-30 2020-01-24 巴祎 Intelligent tapping line terminal row
CN110855013A (en) * 2019-12-30 2020-02-28 桂林海威科技股份有限公司 Intelligent constant display power monitoring device and control method thereof
CN111091699A (en) * 2019-12-30 2020-05-01 安徽波瑞电气有限公司 Street lamp circuit breaker based on ad hoc network module and with metering operation and method
CN111190094A (en) * 2020-01-13 2020-05-22 山东商务职业学院 Control system based on circuit physical parameter detection
CN111431274A (en) * 2020-03-19 2020-07-17 有新智能科技(广州)有限公司 Intelligent Internet of things three-phase four-wire multifunctional power monitoring terminal and method
CN111650413A (en) * 2020-04-14 2020-09-11 江苏三口井信息科技有限公司 Metering and protecting system and method of intelligent miniature circuit breaker
CN111722041A (en) * 2020-06-24 2020-09-29 无锡中科电气设备有限公司 Intelligent detection method and system for low-voltage distribution board
CN111830297A (en) * 2020-06-05 2020-10-27 宁波三星医疗电气股份有限公司 Anti-interference method for electric energy meter under 0.5mT power frequency magnetic field
CN111965584A (en) * 2020-08-11 2020-11-20 云南电网有限责任公司电力科学研究院 Electric energy meter abnormity analysis method and device
CN111986469A (en) * 2020-08-25 2020-11-24 广东电网有限责任公司广州供电局 Intelligent diagnosis method for field terminal fault
CN112198379A (en) * 2020-09-14 2021-01-08 江阴长仪集团有限公司 Low-voltage electric equipment fault positioning system based on electric energy metering technology
CN112710896A (en) * 2020-12-24 2021-04-27 国网黑龙江省电力有限公司供电服务中心 Multicore module smart metering ammeter
WO2021098326A1 (en) * 2019-11-18 2021-05-27 国网浙江省电力有限公司舟山供电公司 Intelligent terminal power distribution system
CN113097993A (en) * 2021-03-15 2021-07-09 机械工业第九设计研究院有限公司 Intelligent power supply jack box of high-power dynamometer and balanced power supply method
CN113162057A (en) * 2021-03-30 2021-07-23 国网河北省电力有限公司雄安新区供电公司 Intelligent ammeter box and control method thereof
CN113625029A (en) * 2021-06-22 2021-11-09 广西电网有限责任公司南宁供电局 Electric energy metering control method with positioning time service and protection functions
CN113655433A (en) * 2021-09-09 2021-11-16 深圳市道通合创新能源有限公司 Three-phase electric energy meter calibration equipment and system, calibration method and storage medium
CN113923126A (en) * 2021-09-13 2022-01-11 国网浙江省电力有限公司湖州供电公司 Four-way distribution network quality monitoring device and method thereof
CN114024290A (en) * 2021-06-25 2022-02-08 重庆康佳光电技术研究院有限公司 Display panel power supply system and overcurrent protection method
CN114089010A (en) * 2021-11-19 2022-02-25 国网四川省电力公司达州供电公司 High-stability electric meter capable of testing leakage current and testing system thereof
CN114113721A (en) * 2021-12-03 2022-03-01 康熹智能科技(东莞)有限公司 Smart electric meter with electric leakage prompt function
CN114184877A (en) * 2020-09-14 2022-03-15 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Electric energy meter and full voltage loss detection method thereof
CN114301894A (en) * 2020-09-20 2022-04-08 高山 Method for monitoring and managing entity power grid node device by virtual power grid
CN112965022B (en) * 2019-12-12 2023-07-28 北京京人电器有限公司 Electric energy meter box
CN117856445A (en) * 2023-12-28 2024-04-09 茂硕电源科技股份有限公司 Intelligent power supply control circuit, control method and power supply control device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI822552B (en) * 2023-01-10 2023-11-11 尚偉機電有限公司 Power consumption detection and distribution system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4843306A (en) * 1987-09-21 1989-06-27 Landis & Gyr Metering, Inc. Replaceable resistors for calibrating a watthour meter
CN201781262U (en) * 2009-12-31 2011-03-30 嘉兴市永信电子有限公司 Intelligent electronic electric leakage protector
CN102510128A (en) * 2011-10-27 2012-06-20 王成楷 Intelligent electric leakage remote monitoring protector of low-voltage power grid
CN202948040U (en) * 2012-08-23 2013-05-22 王金泽 Intelligent electric energy meter having power failure monitoring and protection functions

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4843306A (en) * 1987-09-21 1989-06-27 Landis & Gyr Metering, Inc. Replaceable resistors for calibrating a watthour meter
CN201781262U (en) * 2009-12-31 2011-03-30 嘉兴市永信电子有限公司 Intelligent electronic electric leakage protector
CN102510128A (en) * 2011-10-27 2012-06-20 王成楷 Intelligent electric leakage remote monitoring protector of low-voltage power grid
CN202948040U (en) * 2012-08-23 2013-05-22 王金泽 Intelligent electric energy meter having power failure monitoring and protection functions

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
赵莉等: "智能电表的基本功能与技术特点研究", 《科技信息》 *
都洪基等: "PLC智能化电力设备故障诊断系统", 《电力自动化设备》 *

Cited By (117)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103267893B (en) * 2013-06-04 2015-10-28 长沙高升电子电器科技有限公司 Balanced distribution intelligent electric meter
CN103267893A (en) * 2013-06-04 2013-08-28 长沙高升电子电器科技有限公司 Intelligent electric meter with balanced power distribution
CN104635194B (en) * 2013-11-08 2017-12-05 中国石油天然气股份有限公司 Three-phase metering loop online fault monitoring timing device
CN104635194A (en) * 2013-11-08 2015-05-20 中国石油天然气股份有限公司 Three-phase metering loop online fault monitoring timing device
CN103954814A (en) * 2014-01-09 2014-07-30 何亚雄 Guiderail-type intelligent electric energy meter with protection function to electric appliances
CN104113138A (en) * 2014-07-03 2014-10-22 青岛鼎信通讯股份有限公司 Power-event collection system based on low-voltage power-line carrier communication
CN104361730A (en) * 2014-10-29 2015-02-18 梁永富 Data transferring system and data transferring method of intelligent metering device
CN105572525A (en) * 2014-11-04 2016-05-11 吴志兵 Single-phase electric leakage monitoring apparatus
WO2016070676A1 (en) * 2014-11-05 2016-05-12 江苏省电力公司常州供电公司 Smart electric meter capable of measuring residual current
CN105699791A (en) * 2014-11-24 2016-06-22 国网河南省电力公司平顶山供电公司 DSP-based electric energy quality online monitor
CN104614619A (en) * 2015-02-11 2015-05-13 成都祥和云端节能设备集团有限公司 Remote power data collection system and method based on wireless network
CN104730410A (en) * 2015-03-16 2015-06-24 王金泽 Distribution line breakage monitoring method and device based on voltage and current vectors
CN104730410B (en) * 2015-03-16 2017-11-21 王金泽 A kind of distribution line disconnection monitoring method and device based on voltage x current vector
CN104810805B (en) * 2015-03-26 2018-05-08 广东电网有限责任公司江门供电局 A kind of single-phase load integration protection control method
CN104810805A (en) * 2015-03-26 2015-07-29 广东电网有限责任公司江门供电局 Integrated protection and control method of single-phase load
CN106291022A (en) * 2015-05-27 2017-01-04 安徽圣享智能科技有限公司 A kind of multifunctional electric energy meter batch meter
CN105162248A (en) * 2015-08-18 2015-12-16 国网山东桓台县供电公司 Intelligent disordered reverse feeding prevention method for power system
CN105162248B (en) * 2015-08-18 2019-01-18 国网山东桓台县供电公司 Power System Intelligent prevents unordered anti-power transmission method
CN105071361A (en) * 2015-08-18 2015-11-18 国网山东桓台县供电公司 Device for intelligently preventing disordered reverse power transmission for power system
CN105119372A (en) * 2015-08-28 2015-12-02 国家电网公司 Station area wire outlet leakage current protection breaker remote closing system and remote closing method
CN105548685A (en) * 2015-12-15 2016-05-04 彭江莲 Electronic intelligent electric energy meter
CN105449866A (en) * 2015-12-24 2016-03-30 安徽中电兴发与鑫龙科技股份有限公司 Automatic microcomputer comprehensive protection measurement and control device of transformer substation
CN105548627A (en) * 2016-01-12 2016-05-04 浙江共同电子科技有限公司 Electric energy data concentrator
CN105699931A (en) * 2016-01-19 2016-06-22 国网河北省电力公司电力科学研究院 Method for determining communication faults of intelligent electric energy meter
CN106199176A (en) * 2016-06-30 2016-12-07 芯海科技(深圳)股份有限公司 A kind of multifunctional electric energy metering circuit saving system resource
CN107621563A (en) * 2016-07-13 2018-01-23 国网上海市电力公司 A kind of Multifunctional electric meter case of integrated multiple faults monitoring
CN106329466A (en) * 2016-11-14 2017-01-11 国网浙江慈溪市供电公司 Low-voltage switch control device
CN106526426A (en) * 2016-11-24 2017-03-22 云南电网有限责任公司电力科学研究院 Power distribution network fault analyzing system and method
CN106846786A (en) * 2016-12-28 2017-06-13 重庆世纪之光科技实业有限公司 Unidirectional loop is checked meter the Quick Acquisition of ammeter data in network
CN106781429A (en) * 2016-12-28 2017-05-31 重庆世纪之光科技实业有限公司 Intelligent electric meter, concentrator and meter register method
CN106771574A (en) * 2016-12-29 2017-05-31 上海国缆智能电气有限公司 A kind of single-phase intelligent ammeter and its implementation
CN106771440A (en) * 2017-01-03 2017-05-31 张涉应 A kind of single-phase liquid crystal ammeter and its control method for preventing power stealing
CN106771440B (en) * 2017-01-03 2019-08-13 宁夏隆基宁光仪表股份有限公司 Control method of single-phase liquid crystal electricity meter for avoiding electricity stealing
CN106961156A (en) * 2017-04-19 2017-07-18 南京控驰科技有限公司 A kind of low-voltage circuit breaker
CN107302243A (en) * 2017-05-23 2017-10-27 广西康体佳智能科技有限公司 A kind of charging pile based on power carrier communication
CN107093916A (en) * 2017-05-23 2017-08-25 广西康体佳智能科技有限公司 A kind of charging pile system being integrated on street lamp
CN107707623B (en) * 2017-08-31 2021-04-30 深圳市盛路物联通讯技术有限公司 Equipment work control method and related equipment
CN107707623A (en) * 2017-08-31 2018-02-16 深圳市盛路物联通讯技术有限公司 Equipment operation control method and relevant device
CN107526008A (en) * 2017-09-12 2017-12-29 益和电气集团股份有限公司 Business electrical monitoring device and failure analysis methods
CN107422159A (en) * 2017-09-13 2017-12-01 国网河南省电力公司汝阳县供电公司 Ammeter box and control circuit available for remote control
CN107493669A (en) * 2017-09-22 2017-12-19 周华 A kind of 1P guide rail double-gate intelligent breakers identified with electric energy metrical and electrical equipment
CN108072858A (en) * 2017-12-25 2018-05-25 深圳市航天泰瑞捷电子有限公司 Electric energy meter method for quality control, system and terminal device
CN108072858B (en) * 2017-12-25 2019-12-24 深圳市航天泰瑞捷电子有限公司 Electric energy meter quality management method and system and terminal equipment
CN108181536A (en) * 2018-01-24 2018-06-19 宁波大家小家网络科技有限公司 A kind of intelligent monitor system for single-phase residential electricity consumption
CN108120951B (en) * 2018-02-01 2024-04-02 国网江西省电力有限公司电力科学研究院 Cost control intelligent electric energy meter capable of realizing built-in switch fault detection
CN108120951A (en) * 2018-02-01 2018-06-05 国网江西省电力有限公司电力科学研究院 A kind of achievable built-in switch fault detect takes control intelligent electric energy meter
CN108169526A (en) * 2018-02-05 2018-06-15 国网江苏省电力有限公司苏州供电分公司 With the intelligent electric meter for being spaced apart moving control function
CN108445286A (en) * 2018-03-08 2018-08-24 广西网冠电气有限公司 A kind of three-phase four-wire system electrical energy meter fault simulator
CN108572270B (en) * 2018-05-08 2020-04-28 西南大学 Rural power grid electricity stealing detection system and control method thereof
CN108572270A (en) * 2018-05-08 2018-09-25 西南大学 Rural power grids stealing detecting system and its control method
CN108418177B (en) * 2018-06-15 2024-02-06 北京乐鸟科技有限公司 Arc extinguishing type protection device
CN108418177A (en) * 2018-06-15 2018-08-17 北京乐鸟科技有限公司 A kind of arc extinguishing type protective device
CN108444660B (en) * 2018-06-22 2020-01-07 国家电网公司 Nitrogen leakage fault diagnosis method, device and system
CN108444660A (en) * 2018-06-22 2018-08-24 国家电网公司 Helium leak method for diagnosing faults, apparatus and system
CN108594012A (en) * 2018-07-05 2018-09-28 滁州安瑞电力自动化有限公司 A kind of motor protection measure and control device having electric energy acquisition function
CN108919714A (en) * 2018-07-16 2018-11-30 华立科技股份有限公司 A kind of control method and system of the external on-load switch of electric energy meter
CN108963985A (en) * 2018-07-23 2018-12-07 深圳友讯达科技股份有限公司 Power distribution protective device, system and method
CN109061262A (en) * 2018-08-27 2018-12-21 广东电网有限责任公司 Stealing monitoring method and device
CN109217468A (en) * 2018-08-30 2019-01-15 武汉精伦电气有限公司 A kind of intelligent terminal box and electricity consumption observing and controlling and auditing system
CN109470902A (en) * 2018-09-18 2019-03-15 珠海优特物联科技有限公司 Intelligent electric meter
CN109342809A (en) * 2018-09-18 2019-02-15 珠海优特物联科技有限公司 Control method and device, the intelligent electric meter of air switch
CN109470902B (en) * 2018-09-18 2021-03-02 珠海优特物联科技有限公司 Intelligent electric meter
CN109342809B (en) * 2018-09-18 2021-03-02 珠海优特物联科技有限公司 Method and device for controlling air switch and intelligent electric meter
CN109358307A (en) * 2018-11-21 2019-02-19 深圳深宝电器仪表有限公司 A kind of intelligent electric energy meter safety detection circuit and intelligent electric energy meter
CN109525043A (en) * 2019-01-16 2019-03-26 杭州吉租科技有限公司 A kind of intelligent electric power management integrated apparatus and its method
CN109842087A (en) * 2019-02-18 2019-06-04 苏州阿德文斯电子科技有限公司 A kind of intelligent power protector
CN109980570A (en) * 2019-03-27 2019-07-05 江苏伊顿电气科技有限公司 A kind of intelligent power distribution cabinet system
CN110061471A (en) * 2019-04-17 2019-07-26 南宁学院 A kind of method for detecting short circuit of long range electric current
CN110021999A (en) * 2019-05-07 2019-07-16 天津市百利电气有限公司 Electric current and voltage detecting can be achieved and handle the breaker module of monitoring line fault
CN110120708B (en) * 2019-05-18 2024-04-05 南京觅丹电子信息有限公司 Intelligent breaker for guaranteeing safety of remote operation of multiple persons
CN110120708A (en) * 2019-05-18 2019-08-13 南京觅丹电子信息有限公司 Ensure that more people remotely operate the intelligent breaker of safety
CN110108915A (en) * 2019-06-21 2019-08-09 广东电网有限责任公司 A kind of intelligent electric meter based on audio alert
CN110412346A (en) * 2019-07-01 2019-11-05 许昌许继低压电器有限公司 A kind of metering type intelligent breaker based on Internet of Things
CN110311350A (en) * 2019-07-04 2019-10-08 天津市中力神盾电子科技有限公司 Power distribution loop protection method and system
CN110474424A (en) * 2019-08-06 2019-11-19 广东电网有限责任公司 A kind of intelligent monitoring system used in distributing substation
CN110556919A (en) * 2019-08-12 2019-12-10 浙江恒业电子有限公司 NB-IoT-based network distribution system with residual current detection function and terminal
CN110363922A (en) * 2019-08-12 2019-10-22 国网冀北电力有限公司承德供电公司 A kind of charging trip system and method
CN110690710A (en) * 2019-08-13 2020-01-14 杭州海兴电力科技股份有限公司 Low-frequency low-voltage load shedding protection system in micro-grid environment
CN110690710B (en) * 2019-08-13 2021-05-07 杭州海兴电力科技股份有限公司 Low-frequency low-voltage load shedding protection system in micro-grid environment
CN110412930A (en) * 2019-08-29 2019-11-05 江苏高博锐电气有限公司 A kind of things internet switch with function of measuring
CN110726872A (en) * 2019-09-30 2020-01-24 巴祎 Intelligent tapping line terminal row
WO2021098326A1 (en) * 2019-11-18 2021-05-27 国网浙江省电力有限公司舟山供电公司 Intelligent terminal power distribution system
CN112965022B (en) * 2019-12-12 2023-07-28 北京京人电器有限公司 Electric energy meter box
CN110855013A (en) * 2019-12-30 2020-02-28 桂林海威科技股份有限公司 Intelligent constant display power monitoring device and control method thereof
CN111091699B (en) * 2019-12-30 2021-10-29 黄山特拉斯智能科技有限公司 Street lamp circuit breaker based on ad hoc network module and with metering operation and method
CN111091699A (en) * 2019-12-30 2020-05-01 安徽波瑞电气有限公司 Street lamp circuit breaker based on ad hoc network module and with metering operation and method
CN111190094A (en) * 2020-01-13 2020-05-22 山东商务职业学院 Control system based on circuit physical parameter detection
CN111431274A (en) * 2020-03-19 2020-07-17 有新智能科技(广州)有限公司 Intelligent Internet of things three-phase four-wire multifunctional power monitoring terminal and method
CN111650413A (en) * 2020-04-14 2020-09-11 江苏三口井信息科技有限公司 Metering and protecting system and method of intelligent miniature circuit breaker
CN111830297A (en) * 2020-06-05 2020-10-27 宁波三星医疗电气股份有限公司 Anti-interference method for electric energy meter under 0.5mT power frequency magnetic field
CN111830297B (en) * 2020-06-05 2023-05-23 宁波三星医疗电气股份有限公司 Anti-interference method of electric energy meter under 0.5mT power frequency magnetic field
CN111722041A (en) * 2020-06-24 2020-09-29 无锡中科电气设备有限公司 Intelligent detection method and system for low-voltage distribution board
CN111965584A (en) * 2020-08-11 2020-11-20 云南电网有限责任公司电力科学研究院 Electric energy meter abnormity analysis method and device
CN111986469A (en) * 2020-08-25 2020-11-24 广东电网有限责任公司广州供电局 Intelligent diagnosis method for field terminal fault
CN112198379B (en) * 2020-09-14 2022-11-01 江阴长仪集团有限公司 Low-voltage electric equipment fault positioning system based on electric energy metering technology
CN114184877A (en) * 2020-09-14 2022-03-15 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Electric energy meter and full voltage loss detection method thereof
CN114184877B (en) * 2020-09-14 2024-03-19 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Electric energy meter and full-voltage-loss detection method thereof
CN112198379A (en) * 2020-09-14 2021-01-08 江阴长仪集团有限公司 Low-voltage electric equipment fault positioning system based on electric energy metering technology
CN114301894A (en) * 2020-09-20 2022-04-08 高山 Method for monitoring and managing entity power grid node device by virtual power grid
CN114301894B (en) * 2020-09-20 2024-02-13 高山 Method for monitoring and managing entity power grid node device by virtual power grid
CN112710896A (en) * 2020-12-24 2021-04-27 国网黑龙江省电力有限公司供电服务中心 Multicore module smart metering ammeter
CN113097993B (en) * 2021-03-15 2022-10-11 机械工业第九设计研究院股份有限公司 Intelligent power supply jack box of high-power dynamometer and balanced power supply method
CN113097993A (en) * 2021-03-15 2021-07-09 机械工业第九设计研究院有限公司 Intelligent power supply jack box of high-power dynamometer and balanced power supply method
CN113162057A (en) * 2021-03-30 2021-07-23 国网河北省电力有限公司雄安新区供电公司 Intelligent ammeter box and control method thereof
CN113625029B (en) * 2021-06-22 2024-01-12 广西电网有限责任公司南宁供电局 Electric energy metering control method with positioning time service and protection functions
CN113625029A (en) * 2021-06-22 2021-11-09 广西电网有限责任公司南宁供电局 Electric energy metering control method with positioning time service and protection functions
CN114024290A (en) * 2021-06-25 2022-02-08 重庆康佳光电技术研究院有限公司 Display panel power supply system and overcurrent protection method
CN114024290B (en) * 2021-06-25 2023-06-16 重庆康佳光电技术研究院有限公司 Display panel power supply system and overcurrent protection method
CN113655433A (en) * 2021-09-09 2021-11-16 深圳市道通合创新能源有限公司 Three-phase electric energy meter calibration equipment and system, calibration method and storage medium
CN113655433B (en) * 2021-09-09 2024-04-26 深圳市道通合创数字能源有限公司 Three-phase electric energy meter calibration equipment and system, calibration method and storage medium
CN113923126B (en) * 2021-09-13 2024-01-02 国网浙江省电力有限公司湖州供电公司 Four-way distribution network quality monitoring device and method
CN113923126A (en) * 2021-09-13 2022-01-11 国网浙江省电力有限公司湖州供电公司 Four-way distribution network quality monitoring device and method thereof
CN114089010A (en) * 2021-11-19 2022-02-25 国网四川省电力公司达州供电公司 High-stability electric meter capable of testing leakage current and testing system thereof
CN114113721B (en) * 2021-12-03 2024-03-19 江阴众和电力仪表有限公司 Smart electric meter with electric leakage prompt facility
CN114113721A (en) * 2021-12-03 2022-03-01 康熹智能科技(东莞)有限公司 Smart electric meter with electric leakage prompt function
CN117856445A (en) * 2023-12-28 2024-04-09 茂硕电源科技股份有限公司 Intelligent power supply control circuit, control method and power supply control device
CN117856445B (en) * 2023-12-28 2024-06-18 茂硕电源科技股份有限公司 Intelligent power supply control circuit, control method and power supply control device

Also Published As

Publication number Publication date
CN102830255B (en) 2016-03-16

Similar Documents

Publication Publication Date Title
CN202948040U (en) Intelligent electric energy meter having power failure monitoring and protection functions
CN102830255B (en) A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function
CN202886463U (en) Intelligent electric energy meter with functions of electric leakage remote monitoring and protection
CN103760454B (en) MOV lightning arrester leakance detection device, long distance control system and method
CN101777785B (en) Uninterrupted power supply (UPS) electricity separating system and electricity separating method based on dynamic environment monitoring
CN105207237A (en) Distribution network three-phase load unbalance adjusting control system
US20100141050A1 (en) Switching control system of circuit breaker
CN105071536A (en) Intelligent distribution transformer area system
CN101499650A (en) Small current earthing wire selection protection apparatus and protection method based on GPRS
CN110086252B (en) Polymorphic feeder automation field test device
CN104283319A (en) Intelligent distribution transformer terminal
CN103066621A (en) Static switch and control method applied to connection of microgrid and public supply network
CN101873010A (en) Intelligent monitoring terminal of electric distribution system
CN204835714U (en) Intelligent power distribution platform flora all
CN104242338A (en) Micro grid system for transformer substation with distributed power supplies and control method
CN109842087A (en) A kind of intelligent power protector
CN201893567U (en) Electric energy supply system for electric automobile
CN104283307A (en) Intelligent operation and power distribution integrated high-voltage switch
CN201345506Y (en) Intellectualized power distribution cabinet
KR101223670B1 (en) Switchgear installed power control unit with commercial-emergency power supply control function and method for operating thereof
CN102624090B (en) Based on the intelligent high-pressure panel switches of electronic mutual inductor
CN202260626U (en) Intelligent power distribution system
KR100722517B1 (en) Digital Intelligent Home Electric Management System and Method
CN202535162U (en) Electronic mutual inductor-based intelligent high-voltage power distribution switch
CN208723530U (en) Intelligent microcomputer protecting controller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160316

Termination date: 20210823

CF01 Termination of patent right due to non-payment of annual fee