CN106436739A - 通信塔埋地式预制基础及其安装方法 - Google Patents
通信塔埋地式预制基础及其安装方法 Download PDFInfo
- Publication number
- CN106436739A CN106436739A CN201610730950.9A CN201610730950A CN106436739A CN 106436739 A CN106436739 A CN 106436739A CN 201610730950 A CN201610730950 A CN 201610730950A CN 106436739 A CN106436739 A CN 106436739A
- Authority
- CN
- China
- Prior art keywords
- foundation
- vertical pin
- basic blocks
- pin
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
本发明提供了一种通信塔埋地式预制基础及其安装方法,通信塔埋地式预制基础包括钢筋混凝土制成的第一基础块、第二基础块和第三基础块,所述的第一基础块包括底板和固定在底板上的若干垂直销柱,每根销柱上均开有水平销孔;所述的第二基础块包括连接板以及固定在连接板中央的支撑柱,所述的连接板上开有与第一基础块垂直销柱数量和位置完全对应的垂直销孔,当连接板和底部贴合时,垂直销柱穿过与其对应的垂直销孔;所述的第三基础块数量与第一基础块垂直销柱上的水平销孔数量相同,每个水平销孔中插入有一块第三基础块。本发明解决原有钢筋混凝土现场浇灌的周期长的问题,并且大大缩短了周期,同时也节省了运输工作量,节约了人工和成本。
Description
技术领域
本发明涉及通信设备领域,具体是一种通信塔埋地式预制基础及其安装方法。
背景技术
现有通信塔制造技术中,普遍采用现浇钢筋混凝土基础。该基础施工方法施工周期长,现场排放泥浆、污水,破坏绿化和损坏道路。
传统方法基础施工需要开挖、浇灌、自然养护20-28天等,且钢筋混凝土基础易产生建筑垃圾,对施工现场环境影响较大。
发明内容
本发明为了解决现有技术的问题,提供了一种通信塔埋地式预制基础,解决原有钢筋混凝土现场浇灌的周期长的问题,并且大大缩短了周期,同时也节省了运输工作量,节约了人工和成本。
本发明提供了一种通信塔埋地式预制基础,包括钢筋混凝土制成的第一基础块、第二基础块和第三基础块,所述的第一基础块包括底板和固定在底板上的若干垂直销柱,每根销柱上均开有水平销孔;所述的第二基础块包括连接板以及固定在连接板中央的支撑柱,所述的连接板上开有与第一基础块垂直销柱数量和位置完全对应的垂直销孔,当连接板和底部贴合时,垂直销柱穿过与其对应的垂直销孔;所述的第三基础块数量与第一基础块垂直销柱上的水平销孔数量相同,每个水平销孔中插入有一块第三基础块。
所述的第一基础块中的底板有两块基础板拼接而成。
所述的第一基础块、第二基础块和第三基础块之间连接处的缝隙均楔入有热浸镀锌楔块和微膨胀细石砼,使三个基础块形成一个整体共同抵抗外倾覆力矩。
本发明还提供了一种通信塔埋地式预制基础的安装方法,包括以下步骤:
1)开挖基坑,基坑挖好利用石子将基坑底部夯实平整;
2)将两个基础板通过吊机并排放置基坑底部,组成第一基础块的底板,在底板上固定垂直销柱,并调节底部的水平度;
3)将第二基础块的连接板上的垂直销孔对应垂直销柱插入,使连接板与底部贴合,垂直销柱伸出垂直销孔;
4)将第三基础块插入垂直销柱上的水平销孔中;
5)在第一基础块、第二基础块和第三基础块之间连接处的缝隙中,先楔入热浸镀锌楔块,再利用微膨胀细石砼灌缝;
6)回填基坑并夯实基坑。
本发明有益效果在于:
1、缩短了工程施工的周期,保证工程如期完成,以达到基站快速建设的要求。同时可以解决预制基础重复再利用的问题,采用预制基础的制作安装方式更加的节能环保,在经济发达地区和生态保护较好的地区,使用范围更广。
2、减少了基础建设给周围环境带来的破坏,对生态影响最低,使用轻型节能材料工厂集约化生产制作,减少现场施工受阴雨天气影响和淤泥、污水排放,节约能源,节约材料和运输工作量30-50%,可以多次重复利用,大大提高了基础建设的成功率;工厂化生产,标准化设计,现场快速装配更高效、环保、节能。
附图说明
图1为通信塔埋地式预制基础拆分示意图。
图2为通信塔埋地式预制基础固定后结构示意图。
具体实施方式
本发明提供了一种通信塔埋地式预制基础,包括钢筋混凝土制成的第一基础块1、第二基础块2和第三基础块3,三个基础块拆分后如图1所示,固定连接后如图2所示。所述的第一基础块1包括底板和固定在底板上的若干垂直销柱,每根销柱上均开有水平销孔;所述的第二基础块2包括连接板以及固定在连接板中央的支撑柱,所述的连接板上开有与第一基础块1垂直销柱数量和位置完全对应的垂直销孔,当连接板和底部贴合时,垂直销柱穿过与其对应的垂直销孔;所述的第三基础块3数量与第一基础块1垂直销柱上的水平销孔数量相同,每个水平销孔中插入有一块第三基础块。
所述的第一基础块1中的底板有两块基础板拼接而成。
所述的第一基础块1、第二基础块2和第三基础块3之间连接处的缝隙均楔入有热浸镀锌楔块和微膨胀细石砼,使三个基础块形成一个整体共同抵抗外倾覆力矩。
本发明还提供了一种通信塔埋地式预制基础的安装方法,包括以下步骤:
1)开挖基坑,基坑挖好利用石子将基坑底部夯实平整;
2)将两个基础板通过吊机并排放置基坑底部,组成第一基础块的底板,在底板上固定垂直销柱,并调节底部的水平度;
3)将第二基础块的连接板上的垂直销孔对应垂直销柱插入,使连接板与底部贴合,垂直销柱伸出垂直销孔;
4)将第三基础块插入垂直销柱上的水平销孔中;
5)在第一基础块、第二基础块和第三基础块之间连接处的缝隙中,先楔入热浸镀锌楔块,再利用微膨胀细石砼灌缝;
6)回填基坑并夯实基坑。
本发明具体应用途径很多,以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以作出若干改进,这些改进也应视为本发明的保护范围。
Claims (4)
1.一种通信塔埋地式预制基础,其特征在于:包括钢筋混凝土制成的第一基础块(1)、第二基础块(2)和第三基础块(3),所述的第一基础块(1)包括底板和固定在底板上的若干垂直销柱,每根销柱上均开有水平销孔;所述的第二基础块(2)包括连接板以及固定在连接板中央的支撑柱,所述的连接板上开有与第一基础块(1)垂直销柱数量和位置完全对应的垂直销孔,当连接板和底部贴合时,垂直销柱穿过与其对应的垂直销孔;所述的第三基础块(3)数量与第一基础块(1)垂直销柱上的水平销孔数量相同,每个水平销孔中插入有一块第三基础块。
2.根据权利要求1所述的通信塔埋地式预制基础,其特征在于:所述的第一基础块(1)中的底板有两块基础板拼接而成。
3.根据权利要求1或2所述的通信塔埋地式预制基础,其特征在于:所述的第一基础块(1)、第二基础块(2)和第三基础块(3)之间连接处的缝隙均楔入有热浸镀锌楔块和微膨胀细石砼。
4.一种通信塔埋地式预制基础的安装方法,其特征在于包括以下步骤:
1)开挖基坑,基坑挖好利用石子将基坑底部夯实平整;
2)将两个基础板通过吊机并排放置基坑底部,组成第一基础块的底板,在底板上固定垂直销柱,并调节底部的水平度;
3)将第二基础块的连接板上的垂直销孔对应垂直销柱插入,使连接板与底部贴合,垂直销柱伸出垂直销孔;
4)将第三基础块插入垂直销柱上的水平销孔中;
5)在第一基础块、第二基础块和第三基础块之间连接处的缝隙中,先楔入热浸镀锌楔块,再利用微膨胀细石砼灌缝;
6)回填基坑并夯实基坑。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730950.9A CN106436739A (zh) | 2016-08-26 | 2016-08-26 | 通信塔埋地式预制基础及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730950.9A CN106436739A (zh) | 2016-08-26 | 2016-08-26 | 通信塔埋地式预制基础及其安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106436739A true CN106436739A (zh) | 2017-02-22 |
Family
ID=58182225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610730950.9A Pending CN106436739A (zh) | 2016-08-26 | 2016-08-26 | 通信塔埋地式预制基础及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106436739A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724419A (zh) * | 2017-11-30 | 2018-02-23 | 国网湖北省电力公司咸宁供电公司 | 一种设备预制基础定位器及其使用方法 |
CN107916675A (zh) * | 2017-11-30 | 2018-04-17 | 国网湖北省电力公司咸宁供电公司 | 一种设备预制基础定位装置及其使用方法 |
CN111485573A (zh) * | 2020-03-19 | 2020-08-04 | 衡水衡源电力建设有限责任公司 | 一种输电工程预制基础安装、铁塔组立连贯施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110058359A (ko) * | 2009-11-26 | 2011-06-01 | 이창남 | 매입형 베이스 플레이트와 철골기둥의 이음 방법 |
CN202401469U (zh) * | 2012-01-07 | 2012-08-29 | 河北奥塔机械设备有限公司 | 连接式预制通信塔基础 |
CN202969410U (zh) * | 2012-12-28 | 2013-06-05 | 陈允锐 | 一种世构式管塔基础 |
CN103981886A (zh) * | 2014-04-10 | 2014-08-13 | 浙江和勤通信工程有限公司 | 可拆卸自稳式榫扣基础 |
CN206034475U (zh) * | 2016-08-26 | 2017-03-22 | 江苏铭远杆塔有限公司 | 通信塔埋地式预制基础 |
-
2016
- 2016-08-26 CN CN201610730950.9A patent/CN106436739A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110058359A (ko) * | 2009-11-26 | 2011-06-01 | 이창남 | 매입형 베이스 플레이트와 철골기둥의 이음 방법 |
CN202401469U (zh) * | 2012-01-07 | 2012-08-29 | 河北奥塔机械设备有限公司 | 连接式预制通信塔基础 |
CN202969410U (zh) * | 2012-12-28 | 2013-06-05 | 陈允锐 | 一种世构式管塔基础 |
CN103981886A (zh) * | 2014-04-10 | 2014-08-13 | 浙江和勤通信工程有限公司 | 可拆卸自稳式榫扣基础 |
CN206034475U (zh) * | 2016-08-26 | 2017-03-22 | 江苏铭远杆塔有限公司 | 通信塔埋地式预制基础 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724419A (zh) * | 2017-11-30 | 2018-02-23 | 国网湖北省电力公司咸宁供电公司 | 一种设备预制基础定位器及其使用方法 |
CN107916675A (zh) * | 2017-11-30 | 2018-04-17 | 国网湖北省电力公司咸宁供电公司 | 一种设备预制基础定位装置及其使用方法 |
CN107916675B (zh) * | 2017-11-30 | 2023-05-02 | 国网湖北省电力公司咸宁供电公司 | 一种设备预制基础定位装置及其使用方法 |
CN111485573A (zh) * | 2020-03-19 | 2020-08-04 | 衡水衡源电力建设有限责任公司 | 一种输电工程预制基础安装、铁塔组立连贯施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103912000B (zh) | 可重复使用的复合材料土钉墙支护面板的施工方法 | |
CN106759420B (zh) | 一种预制装配式变电站基础结构 | |
CN111188355B (zh) | 超大重力式锚碇浅埋基础及施工方法 | |
CN103225422A (zh) | 采用轻钢结构直接加层技术的既有砌体结构及其施工方法 | |
CN106436739A (zh) | 通信塔埋地式预制基础及其安装方法 | |
CN103334359A (zh) | 装配式预制钢筋混凝土路面板及路面施工方法 | |
CN106436738A (zh) | 通信塔地面式预制基础及其安装方法 | |
CN110424455A (zh) | 地下有限空间无肥槽结构侧墙大钢模板体系及施工方法 | |
CN110158656A (zh) | 一种一体化模板管廊及其建造方法 | |
CN211571770U (zh) | 一种新型通信塔预制装配基础 | |
CN103334361A (zh) | 装配式预制空心钢筋混凝土耐磨路面板及路面施工方法 | |
CN103343503B (zh) | 桥式预制钢筋混凝土槽形板耐磨路面结构体系及施工方法 | |
CN206034475U (zh) | 通信塔埋地式预制基础 | |
CN203782513U (zh) | 一种装配式道路构件 | |
CN102116036B (zh) | 联合逆作法和跳仓法技术对道路地下大型建筑物进行施工的方法 | |
CN106400838B (zh) | 一种预制装配式混凝土城市综合管廊结构及施工方法 | |
CN206308707U (zh) | 一种预制装配式混凝土城市综合管廊结构 | |
CN205116220U (zh) | L型混凝土预制件装配后浇筑电缆沟 | |
CN209854577U (zh) | 一种装配式薄壁箱型通道 | |
CN203284814U (zh) | 一种变电站预制混凝土散水 | |
CN112431289A (zh) | 一种市政污水井井壁预制拼装工艺及混凝土井壁构件 | |
CN201883422U (zh) | 用于地下连续墙的装配式钢导墙 | |
CN201381518Y (zh) | 准一体式室外设备井 | |
CN203768754U (zh) | 一种双层叠合式路面 | |
CN114319410A (zh) | 一种风力发电并网电力设备装配式基础结构和安装施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170222 |
|
WD01 | Invention patent application deemed withdrawn after publication |