[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP3268811B2 - Mounting process management system - Google Patents

Mounting process management system

Info

Publication number
JP3268811B2
JP3268811B2 JP8396292A JP8396292A JP3268811B2 JP 3268811 B2 JP3268811 B2 JP 3268811B2 JP 8396292 A JP8396292 A JP 8396292A JP 8396292 A JP8396292 A JP 8396292A JP 3268811 B2 JP3268811 B2 JP 3268811B2
Authority
JP
Japan
Prior art keywords
mounting
line
data
management computer
computer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8396292A
Other languages
Japanese (ja)
Other versions
JPH05285753A (en
Inventor
英樹 中島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP8396292A priority Critical patent/JP3268811B2/en
Publication of JPH05285753A publication Critical patent/JPH05285753A/en
Application granted granted Critical
Publication of JP3268811B2 publication Critical patent/JP3268811B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Automatic Assembly (AREA)
  • General Factory Administration (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、部品の実装ラインを何
列も並べて作業を行う場合の工程管理システムに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a process management system for performing a work by arranging a number of component mounting lines.

【0002】[0002]

【従来の技術】部品実装機及びその周辺機器を組み合わ
せて構成した実装ラインをコンピュ−タで制御するもの
の例を、特開平2−12505号公報に見ることができ
る。
2. Description of the Related Art An example in which a computer controls a mounting line constituted by combining a component mounter and its peripheral devices can be seen in Japanese Patent Application Laid-Open No. 2-1505.

【0003】[0003]

【発明が解決しようとする課題】複数の実装ラインが存
在する場合、実装ライン群全体を活用して効率よく作業
をこなすためには、各ラインを構成する実装機の負荷が
均等化するよう、基板1枚当りのNCデ−タを適宜分割
し、実装機に割り付ける必要がある。このような割付け
作業は、これまでのところ作業者がパ−ソナルコンピュ
−タを使って手入力で行い、パ−ソナルコンピュ−タか
ら個々の実装機に送り込んでいた。従って、実装ライン
を構成する機器が変われば、それに合わせて作業者が分
割様式を変える必要があり、熟練者でなければNCデ−
タを作成できないという問題があった。また、基板によ
っては数千ステップもの座標入力作業を行わねばなら
ず、作業者の負担が膨大であった。しかも、せっかく作
成した実装デ−タも、実装機毎にフロッピ−ディスクに
保存しているため、実装デ−タの一元管理を行うことが
できなかった。本発明はこれらの課題を解決しようとす
るものである。
When there are a plurality of mounting lines, in order to carry out work efficiently by utilizing the entire mounting line group, it is necessary to equalize the load on the mounting machines constituting each line. It is necessary to appropriately divide the NC data per board and allocate it to the mounting machine. Until now, such an allocation operation has been manually performed by a worker using a personal computer, and the work has been sent from the personal computer to each mounting machine. Therefore, if the equipment composing the mounting line changes, it is necessary for the operator to change the division mode accordingly.
There was a problem that data could not be created. Further, depending on the substrate, it is necessary to perform a coordinate input operation of thousands of steps, and the burden on the operator is enormous. In addition, since the mounting data created with great care is also stored on a floppy disk for each mounting machine, the integrated data cannot be managed centrally. The present invention seeks to solve these problems.

【0004】[0004]

【課題を解決するための手段】このため本発明は、部品
実装機及びその周辺機器を組合わせて構成した実装ライ
ンを管理するライン管理コンピュータ複数台分を、1台
の集中管理コンピュータで統括するものとする。集中管
理コンピュータにはライン構成ファイルを設けてここに
は各実装ラインを構成する個々の機器の固有データを
納し、遂行すべき実装作業を、その作業内容とライン構
成ファイルを参照しつつ集中管理コンピュータが分析
し、ライン構成ファイルから実装データ中の全種類の部
品を装着できる部品実装機及びその周辺機器を備えた実
装ラインを検索し、検索により抽出された複数個の実装
ラインから生産計画に余裕がある実装ラインを選択し、
選択された実装ラインの実装機毎に実装作業のNCデー
タを分割して割り付け、分割したNCデータをライン管
理コンピュータに転送すると共に、ライン管理コンピュ
ータにて新規作成され、あるいは修正された実装データ
は集中管理コンピュータに送信され、集中管理コンピュ
ータはこれに基づきデータを更新する。更に、、集中管
理コンピュータは実装作業のNCデータを作成する際、
パーツライブラリから部品の寸法形状を抽出し、映像化
して実装パターン通り集中管理コンピュータのディスプ
レイ画面上に表示する。また、ディスプレイ画面上には
部品の装着軌跡を示す。また、パーツライブラリに登録
されたデータに基づき部品同士の間隔を計算して、部品
同士衝突する場合にはその旨を表示する。
According to the present invention, a single centralized management computer manages a plurality of line management computers for managing a mounting line configured by combining a component mounting machine and its peripheral devices. Shall be. Case specific data for individual devices here are centralized computer provided line configuration file constituting each mounting line
The implementation work to be delivered and performed
Central management computer analyzes while referring to the file
And all types of parts in the mounting data from the line configuration file
A component mounter that can mount components and an actual
Multiple implementations extracted by searching
From the line, select a mounting line that can afford the production plan,
NC data of mounting work for each mounting machine of the selected mounting line
Data is divided and assigned, and the divided NC data is
Transfer to the
The newly created or modified mounting data is transmitted to the central management computer, and the central management computer updates the data based on the data. Furthermore, the centralized pipe
When the computer creates the NC data of the mounting work,
The dimensions and shapes of the parts are extracted from the parts library, visualized, and displayed on the display screen of the central control computer according to the mounting pattern. Also, the mounting locus of the component is shown on the display screen. Further, the interval between the components is calculated based on the data registered in the parts library, and when the components collide, the fact is displayed.

【0005】[0005]

【作用】遂行すべき実装作業を、その作業内容とライン
構成ファイルを参照しつつ集中管理コンピュータが分析
し、ライン構成ファイルから実装データ中の全種類の部
品を装着できる部品実装機を備えた実装ラインを検索
し、検索により抽出された複数個の実装ラインから生産
計画に余裕がある実装ラインを選択し、選択された実装
ラインの実装機毎に実装作業のNCデータを分割して割
り付け、分割したNCデータをライン管理コンピュータ
に転送する。これに基づき、ライン管理コンピュータは
ライン中の実装機を稼動させる。
The centralized management computer analyzes the mounting work to be performed with reference to the work contents and the line configuration file, and analyzes all types of parts in the mounting data from the line configuration file.
Search for mounting lines with component mounters that can mount components
Production from multiple mounting lines extracted by search
Select an implementation line that has room for planning, and select the implementation
NC data for mounting work is divided and divided for each mounting machine in the line.
A line management computer that attaches and divides the NC data
Transfer to Based on this, the line management computer operates the mounting machine in the line.

【0006】ライン管理コンピュータにて新規作成さ
れ、あるいは修正された実装データは集中管理コンピュ
ータに送信され、集中管理コンピュータはこれに基づき
データを更新する。
[0006] The newly created by the line management computer, or a modified mounting data is sent to the centralized management computer, centralized management computer updates the data on this basis.

【0007】NCデ−タを作成するときには、部品の寸
法形状がディスプレイ上に現れるので、CAD設計のミ
スを容易にチェックできる。
When creating NC data, the dimensions and shapes of the parts appear on the display, so that CAD design errors can be easily checked.

【0008】[0008]

【実施例】図に基づき一実施例を説明する。第1図にお
いて、1はLAN(ロ−カルエリアネットワ−ク)、
2、3、4はLAN1に接続された実装ラインである。
実装ライン2、3、4は電子回路基板に電子部品を装着
するためのものであって、各々、複数個の機械(実装機
及び周辺機器)5と、これらを管理するライン管理コン
ピュ−タ6からなる。7、8は同じくLAN1に接続さ
れたCAD(コンピュ−タエイデッドデザイン)システ
ムと集中管理コンピュ−タである。集中管理コンピュ−
タ8はライン構成ファイル9、生産計画ファイル10、
実装デ−タファイル11、パ−ツライブラリ12を付属
させている。ライン構成ファイル9には、実装ラインを
構成する機械5の種類、機能等の固有デ−タを格納す
る。生産計画ファイル10には、実装ライン毎の生産計
画を格納する。実装デ−タファイル11には、CADシ
ステム7で作成した部品装着パタ−ン関係のデ−タを格
納する。パ−ツライブラリ12には、部品についての固
有デ−タ、すなわち種類、寸法、形状等のデ−タを格納
する。
An embodiment will be described with reference to the drawings. In FIG. 1, 1 is a LAN (local area network),
2, 3, and 4 are mounting lines connected to the LAN 1.
The mounting lines 2, 3, and 4 are for mounting electronic components on an electronic circuit board, and each includes a plurality of machines (mounting machines and peripheral devices) 5 and a line management computer 6 for managing these. Consists of Reference numerals 7 and 8 denote a CAD (Computer Aided Design) system and a centralized management computer which are also connected to the LAN 1. Centralized management computer
8 is a line configuration file 9, a production plan file 10,
A mounting data file 11 and a part library 12 are attached. The line configuration file 9 stores specific data such as the type and function of the machine 5 that forms the mounting line. The production plan file 10 stores a production plan for each mounting line. The mounting data file 11 stores data relating to the component mounting pattern created by the CAD system 7. The part library 12 stores data unique to the component, that is, data such as types, dimensions, and shapes.

【0009】本システムは次のように機能する。最初
に、作業者は集中管理コンピュ−タ8で1日の生産計画
を立てる。その際に作業者は、基板の投入時間、生産枚
数、実装デ−タファイル名等を入力する。すると集中管
理コンピュ−タ8は、その実装デ−タ中の全種類の部品
を装着できる機械を備えた実装ラインを、ライン構成フ
ァイル9から検索する。検索により複数個の実装ライン
が抽出されたならば、生産計画ファイル10を調べ、余
裕のあるラインに今回の生産計画を追加する。
The system functions as follows. First, the operator makes a daily production plan on the central control computer 8. At this time, the operator inputs the board loading time, the number of boards to be produced, the mounting data file name, and the like. Then, the central management computer 8 searches the line configuration file 9 for a mounting line provided with a machine capable of mounting all kinds of components in the mounting data. If a plurality of mounting lines are extracted by the search, the production plan file 10 is checked, and the current production plan is added to a line having a margin.

【0010】次に、集中管理コンピュ−タ8の生産計画
処理プログラムにより遂行すべきものとして登録された
実装デ−タを、CADシステム7よりオンラインで集中
管理コンピュ−タ8に転送する。転送されたデ−タは実
装デ−タファイル11に格納される。
Next, the mounting data registered as what is to be executed by the production plan processing program of the central control computer 8 is transferred from the CAD system 7 to the central control computer 8 online. The transferred data is stored in the mounting data file 11.

【0011】次に、集中管理コンピュ−タ8上で、各実
装機の作業時間が均等になるよう実装デ−タを分割する
作業が、プログラムに基づき自動的に実行される。これ
は、ライン構成ファイル9を参照しながら行われる。こ
れにより、各実装機毎のNCデ−タが作成され、割り付
けられる。
Next, on the centralized management computer 8, the work of dividing the mounting data so that the working time of each mounting machine becomes equal is automatically executed based on the program. This is performed with reference to the line configuration file 9. Thus, NC data for each mounting machine is created and allocated.

【0012】上記NCデ−タ作成作業の際、集中管理コ
ンピュ−タ8のモニタ−ディスプレイ上には、図2のよ
うな映像が現れる。これは、所定の装着パタ−ンに従っ
て部品形状を表示し、また、装着軌跡を線で示したもの
である。部品の映像化は、パ−ツライブラリ12に登録
されたデ−タに基づき行われる。従って部品像は、実際
の寸法に比例する寸法関係で、形状を正確に表したもの
であり、間違った部品をCAD入力していてもチェック
可能である。また、部品同士の間隔も自動計算できるか
ら、部品同士衝突するような場合には部品の色を変えて
表示する。これにより作業者は、CAD設計のミスを発
見できる。ミスを発見した場合、作業者は集中管理コン
ピュ−タ8のキ−ボ−ドを使って実装デ−タを修正す
る。小さな部品が密集している個所をチェックする場合
は、図2の左上の画像の中の一部分(例えばAの個所)
を、右下の画像のように拡大表示できる。
At the time of the NC data creation operation, an image as shown in FIG. 2 appears on the monitor-display of the central control computer 8. In this example, the component shape is displayed according to a predetermined mounting pattern, and the mounting locus is indicated by a line. The imaging of the parts is performed based on the data registered in the parts library 12. Therefore, the component image accurately represents the shape in a dimensional relationship proportional to the actual size, and can be checked even if the wrong component is CAD-input. In addition, since the interval between the components can be automatically calculated, the component is displayed in a different color when the components collide. This allows the operator to find a CAD design error. If a mistake is found, the operator uses the keyboard of the central control computer 8 to correct the implementation data. When checking a place where small parts are concentrated, a part in the upper left image in FIG.
Can be enlarged and displayed as in the lower right image.

【0013】次に、今回の生産計画に組み込まれた実装
ラインのライン管理コンピュ−タ6は、分割されたNC
デ−タを集中管理コンピュ−タ8から受信し、その実装
ラインの各実装機に転送する。
Next, the line management computer 6 of the mounting line incorporated in the current production plan is
The data is received from the central management computer 8 and transferred to each mounting machine on the mounting line.

【0014】上記実装機群はNCデ−タに基づき基板の
生産を開始し、生産過程で得られた実績デ−タを、一定
時間毎にライン管理コンピュ−タ6に送信する。ライン
管理コンピュ−タ6は、実装ライン全体の実績デ−タを
集中管理コンピュ−タ8に送信する。実生産で基板設計
に不具合が見つかれば、実装機側でも実装データを修正
できる。
The above-mentioned mounting machine group starts the production of the board based on the NC data, and transmits the result data obtained in the production process to the line management computer 6 at regular intervals. The line management computer 6 transmits the result data of the entire mounting line to the centralized management computer 8. If a defect is found in the board design during actual production, the mounting machine can correct the mounting data.

【0015】基板生産終了後、ライン管理コンピュ−タ
6は各実装機から最終生産実績デ−タを収集し、集中管
理コンピュ−タ8に送信する。
After the production of the board is completed, the line management computer 6 collects the final production result data from each mounting machine and sends it to the centralized management computer 8.

【0016】集中管理コンピュ−タ8においては、ライ
ン管理コンピュ−タ6から送られてきた実績デ−タをリ
アルタイムに表示することができる。受け取ったデ−タ
は保存する。
The central management computer 8 can display the result data transmitted from the line management computer 6 in real time. The received data is stored.

【0017】本システムでは、実装機側で実装デ−タを
修正した時、実装機側のNCデ−タと集中管理コンピュ
−タ8側のNCデ−タとが食い違うことを防ぐため、生
産終了後、ライン管理コンピュ−タ6は実装機からNC
デ−タを収集し、集中管理コンピュ−タ8に送信する。
集中管理コンピュ−タ8は、受け取ったデ−タに基づき
実装デ−タファイル11の更新を行う。
In this system, when the mounting data is modified on the mounting machine side, the NC data on the mounting machine side and the NC data on the centralized control computer 8 are prevented from being discrepant with each other. After the completion, the line management computer 6 sends the NC from the mounting machine.
The data is collected and transmitted to the central management computer 8.
The centralized management computer 8 updates the mounting data file 11 based on the received data.

【0018】このように、実装デ−タと実装後の実績デ
−タを集中管理コンピュ−タ8で一元管理することによ
り、デ−タの保守・点検が容易になる。
As described above, the centralized management computer 8 centrally manages the mounting data and the actual data after mounting, thereby facilitating the maintenance and inspection of the data.

【0019】[0019]

【発明の効果】以上のように、本発明によれば、ライン
の負荷を考慮しながら実装機毎のNCデータが自動作成
されるので、熟練者でなくても最良のNCデータを作成
でき、また、集中管理コンピュータが自己のライン構成
ファイルを参照して複数の実装ラインのうち最適なライ
ンを選択してそのライン管理コンピュータにNCデータ
を転送できるので実装部門全体の作業効率を向上でき
る。また、実装機側で実装データを修正すれば、その効
果は集中管理コンピュータにも及び、双方でデータが食
い違うことによるトラブルを防止できる。また、集中管
理コンピュータのディスプレイ上で部品チェックを行
い、実際に試し打ちすることなしに部品装着経路の確
認、種類確認や衝突チェックが可能である。
As described above, according to the present invention, the NC data for each mounting machine is automatically created in consideration of the line load, so that the best NC data can be created even by a non-expert. In addition, since the centralized management computer can refer to its own line configuration file and select an optimum line from among a plurality of mounting lines and transfer the NC data to the line management computer, the work efficiency of the entire mounting section can be improved. In addition, if the mounting data is corrected on the mounting machine side, the effect is extended to the centralized management computer, and a trouble caused by a difference in data between the two can be prevented. In addition, a component check can be performed on a display of a centralized management computer, and a component mounting path can be checked, a type can be checked, and a collision can be checked without actually performing a test hit.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明実装工程管理システムの概念図である。FIG. 1 is a conceptual diagram of a mounting process management system of the present invention.

【図2】集中管理コンピュ−タのディスプレイ画面を示
す図である。
FIG. 2 is a diagram showing a display screen of a central management computer.

【符号の説明】[Explanation of symbols]

2 実装ライン 3 実装ライン 4 実装ライン 6 ライン管理コンピュ−タ 8 集中管理コンピュ−タ 9 ライン構成ファイル 7 CADシステム 12 パ−ツライブラリ 2 mounting line 3 mounting line 4 mounting line 6 line management computer 8 centralized management computer 9 line configuration file 7 CAD system 12 part library

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B23P 21/00 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int. Cl. 7 , DB name) B23P 21/00

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 部品実装機及びその周辺機器を組み合わ
せて構成した複数の実装ラインと、この実装ラインを管
理するライン管理コンピュータと、複数個のライン管理
コンピュータを統括する集中管理コンピュータとを含
み、集中管理コンピュータにはライン構成ファイルを設
けてここには各実装ラインを構成する個々の機械の固有
データを格納し、遂行すべき実装作業を、その作業内容
とライン構成ファイルを参照しつつ集中管理コンピュー
タが分析し、ライン構成ファイルから実装データ中の全
種類の部品を装着できる部品実装機及びその周辺機器を
備えた実装ラインを検索し、検索により抽出された複数
個の実装ラインから生産計画に余裕がある実装ラインを
選択し、選択された実装ラインの実装機毎に実装作業の
NCデータを分割して割り付け、分割したNCデータを
ライン管理コンピュータに転送すると共に、ライン管理
コンピュータは新規作成され、あるいは修正された実装
データを集中管理コンピュータに送信し、集中管理コン
ピュータはこれに基づきデータを更新することを特徴と
する実装工程管理システム。
1. A system comprising: a plurality of mounting lines configured by combining a component mounter and its peripheral devices; a line management computer that manages the mounting lines; and a central management computer that controls the plurality of line management computers. The centralized management computer has a line configuration file that stores the unique data of each machine that composes each mounting line, and centrally manages the mounting work to be performed while referring to the work contents and the line configuration file. The computer analyzes and reads all of the implementation data from the line configuration file.
A component mounter that can mount various types of components and its peripheral devices
A search is made for mounting lines that have
From a single mounting line to a mounting line
Select and perform mounting work for each mounting machine on the selected mounting line.
NC data is divided and allocated, and the divided NC data is transferred to a line management computer, and the line management is performed.
Computer newly created or mounting process control system modified to implement data transmitted to the centralized management computer, the central management computer and updates the data based on this.
【請求項2】 部品実装機及びその周辺機器を組み合わ
せて構成した複数の実装ラインと、この実装ラインを管
理するライン管理コンピュータと、複数個のライン管理
コンピュータを統括する集中管理コンピュータとを含
み、集中管理コンピュータにはライン構成ファイルを設
けてここには各実装ラインを構成する個々の機械の固有
データを格納し、遂行すべき実装作業を、その作業内容
とライン構成ファイルを参照しつつ集中管理コンピュー
タが分析し、ライン構成ファイルから実装データ中の全
種類の部品を装着できる部品実装機及びその周辺機器を
備えた実装ラインを検索し、検索により抽出された複数
個の実装ラインから生産計画に余裕がある実装ラインを
選択し、選択された実装ラインの実装機毎に実装作業の
NCデータを分割して割り付け、分割したNCデータを
ライン管理コンピュータに転送すると共に、集中管理コ
ンピュータは実装作業のNCデータを作成する際、パー
ツライブラリから部品の寸法形状を抽出し、映像化して
実装パターン通り集中管理コンピュータのディスプレイ
画面上に表示することを特徴とする実装工程管理システ
ム。
2. A system comprising: a plurality of mounting lines configured by combining a component mounter and its peripheral devices; a line management computer managing the mounting lines; and a central management computer managing the plurality of line management computers. The centralized management computer has a line configuration file that stores the unique data of each machine that composes each mounting line, and centrally manages the mounting work to be performed while referring to the work contents and the line configuration file. The computer analyzes and reads all of the implementation data from the line configuration file.
A component mounter that can mount various types of components and its peripheral devices
A search is made for mounting lines that have
From a single mounting line to a mounting line
Select and perform mounting work for each mounting machine on the selected mounting line.
The NC data is divided and assigned, and the divided NC data is transferred to the line management computer and the centralized management
A mounting process management system, wherein a computer extracts the dimensional shape of a part from a parts library when creating NC data of a mounting operation, converts the extracted shape into an image, and displays the image on a display screen of a centralized management computer according to the mounting pattern.
【請求項3】 前記ディスプレイ画面上には部品の装着
軌跡を示すことを特徴とする請求項2に記載の実装工程
管理システム。
3. The mounting process management system according to claim 2, wherein a mounting locus of a component is shown on the display screen.
【請求項4】 パーツライブラリに登録されたデータに
基づき部品同士の間隔を計算して、部品同士衝突する場
合にはその旨を表示することを特徴とする請求項2また
は3に記載の実装工程管理システム。
4. The mounting process according to claim 2, wherein an interval between the components is calculated based on the data registered in the parts library, and when the components collide, the fact is displayed. Management system.
JP8396292A 1992-04-06 1992-04-06 Mounting process management system Expired - Lifetime JP3268811B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8396292A JP3268811B2 (en) 1992-04-06 1992-04-06 Mounting process management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8396292A JP3268811B2 (en) 1992-04-06 1992-04-06 Mounting process management system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP12044399A Division JP3332888B2 (en) 1999-04-27 1999-04-27 Mounting process management system

Publications (2)

Publication Number Publication Date
JPH05285753A JPH05285753A (en) 1993-11-02
JP3268811B2 true JP3268811B2 (en) 2002-03-25

Family

ID=13817189

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8396292A Expired - Lifetime JP3268811B2 (en) 1992-04-06 1992-04-06 Mounting process management system

Country Status (1)

Country Link
JP (1) JP3268811B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3171238B1 (en) 2012-09-03 2020-03-18 FUJI Corporation Production line management method and production line management system
JP5909650B2 (en) 2012-10-23 2016-04-27 パナソニックIpマネジメント株式会社 Electronic component mounting system

Also Published As

Publication number Publication date
JPH05285753A (en) 1993-11-02

Similar Documents

Publication Publication Date Title
US5579231A (en) Management system for manufacture
US7321803B2 (en) System and processes for performing quick changeovers on assembly lines
JP4545115B2 (en) Production condition determination method, production condition determination apparatus, component mounter, and program
US4796194A (en) Real world modeling and control process
EP1785797A2 (en) System and method for production planning by visualizing products and resources in a manufacturing process
CN109429515B (en) Line configuration changing system and line configuration changing method
JPH07251356A (en) Actual operation result display analyzing system
JPH056212A (en) Data preparing method for equipment loading machine
JP3332888B2 (en) Mounting process management system
JP3268811B2 (en) Mounting process management system
JP3537267B2 (en) Equipment operation method
JP7405679B2 (en) Line configuration planning device
JP3611374B2 (en) Component mounting method
JPH04362783A (en) Cad system having simultaneous concurrent processing function at plural terminals
JPH09260231A (en) Production control system and its equipment
JP3229101B2 (en) Printed circuit board manufacturing apparatus and method
JP3003869B2 (en) Electronic package manufacturing equipment
KR19980056338A (en) Automated path creation device with history of design change management and its history management method
JP7550312B2 (en) Data acquisition device
JP3236312B2 (en) Component supply management method and component supply management device
JPH05290053A (en) Providing method for flowing information in production management system of small scale many kinds
JPH04205606A (en) Mounting process control system
JP3326643B2 (en) Component setup support method and board production method
JP3365155B2 (en) Multi power supply design equipment
JPH09160947A (en) Device for displaying selection condition of electronic component to be loaded on printed wiring board

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090118

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100118

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110118

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110118

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120118

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120118

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130118

Year of fee payment: 11

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130118

Year of fee payment: 11