[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP2005307522A - Swivel type construction machinery - Google Patents

Swivel type construction machinery Download PDF

Info

Publication number
JP2005307522A
JP2005307522A JP2004124587A JP2004124587A JP2005307522A JP 2005307522 A JP2005307522 A JP 2005307522A JP 2004124587 A JP2004124587 A JP 2004124587A JP 2004124587 A JP2004124587 A JP 2004124587A JP 2005307522 A JP2005307522 A JP 2005307522A
Authority
JP
Japan
Prior art keywords
pipe
swing
piping
swing post
additional hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004124587A
Other languages
Japanese (ja)
Inventor
Takeshi Hibiya
武 日比谷
Kenichiro Nakatani
賢一郎 中谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2004124587A priority Critical patent/JP2005307522A/en
Publication of JP2005307522A publication Critical patent/JP2005307522A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Shovels (AREA)
  • Component Parts Of Construction Machinery (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide swivel type construction machinery capable of raising built-up workability and maintenance property or the like by providing additional hydraulic piping with a simple work. <P>SOLUTION: In the case additional hydraulic piping 30 is provided to a front device 4 side, fixed piping 31 of the additional hydraulic piping 30 is mounted to the front device 4 side to connect to a breaker 36, and flexible piping 32 is connected to a piping connection port 28A of reserve hydraulic piping 28 provided to the front side of an upper turning body 3 through a right side of a right side plate 6B forming a swing post 6. Accordingly, the additional hydraulic piping 30 can be simply added to mount without passing through an inside of the like of the swing post 6 like the conventional technique. Since the flexible piping 32 avoids hydraulic piping 24 for the front on the left side of the swing post 6 and is placed to the right side of the right side disc 6B of the swing post 6, it can be prevented to interfere with the hydraulic piping 24 for the front even if the swing post 6 is oscillated. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、例えばフロント装置が左,右方向に揺動可能に設けられた油圧ショベル等の旋回式建設機械に関する。   The present invention relates to a swivel construction machine such as a hydraulic excavator in which a front device is provided so as to be swingable leftward and rightward.

一般に、旋回式建設機械としては、例えば油圧ショベル等が知られており、この油圧ショベルは、自走可能な下部走行体と、該下部走行体上に旋回可能に搭載された上部旋回体と、該上部旋回体の前側に俯仰動可能に設けられたフロント装置とによって大略構成されている。また、フロント装置は、ブーム、アーム、バケットおよびこれらを駆動するブームシリンダ、アームシリンダ、バケットシリンダ等によって構成されている。また。バケットは、作業内容に応じてブレーカ、グラップル等のフロントアタッチメントに交換することができる。   Generally, as a swing type construction machine, for example, a hydraulic excavator or the like is known, and this hydraulic excavator includes a self-propelled lower traveling body, an upper revolving body that is rotatably mounted on the lower traveling body, The front apparatus is generally constituted by a front device provided on the front side of the upper swing body so as to be able to move up and down. The front device includes a boom, an arm, a bucket, and a boom cylinder, an arm cylinder, a bucket cylinder, and the like that drive these. Also. The bucket can be replaced with a front attachment such as a breaker or grapple according to the work content.

ここで、油圧ショベルには、例えば側溝の掘削作業等を行なうことができるようにフロント装置が左,右方向に揺動可能となったスイング式の油圧ショベルがある。このスイング式油圧ショベルの上部旋回体は、フロント装置を左,右方向に揺動可能に支持するスイングポストが設けられた旋回フレームと、該旋回フレームに搭載された制御弁とを備え、該制御弁とフロント装置に設けられた各シリンダとは複数本の油圧配管によって接続している。また、各油圧配管は、上部旋回体とフロント装置との間、フロント装置の可動部分が可撓性を有する可撓配管となっている。   Here, as the hydraulic excavator, for example, there is a swing type hydraulic excavator in which the front device can swing leftward and rightward so that excavation work of a side groove can be performed. The upper swing body of the swing type hydraulic excavator includes a swing frame provided with a swing post that supports the front device so as to be swingable leftward and rightward, and a control valve mounted on the swing frame. The valve and each cylinder provided in the front device are connected by a plurality of hydraulic pipes. In addition, each hydraulic pipe is a flexible pipe between the upper swing body and the front device, and a movable part of the front device is flexible.

そして、上部旋回体とフロント装置との間の可撓配管は、作業時に邪魔にならないようにスイングポストの内部を通している。また、可撓配管は、スイングポストの揺動動作とフロント装置のブームの俯仰動動作を許容するために、スイングポスト内の空間でほぼS字状に屈曲させている(例えば、特許文献1参照)。   The flexible piping between the upper swing body and the front device passes through the inside of the swing post so as not to get in the way during work. Further, the flexible pipe is bent in a substantially S-shape in the space in the swing post in order to allow the swinging movement of the swing post and the lifting / lowering movement of the boom of the front device (see, for example, Patent Document 1). ).

一方、油圧ショベルは、例えば解体作業等を行なう場合には、バケットに代えてアームの先端にブレーカ、グラップル等を取付ける場合がある。このブレーカ等は、タガネを振動させる破砕用のシリンダを備えているため、フロント装置の各シリンダに圧油を給排する油圧配管とは別にブレーカ用の油圧配管を追加する必要がある。   On the other hand, when excavating, for example, a hydraulic excavator, a breaker, a grapple or the like may be attached to the tip of an arm instead of a bucket. Since this breaker or the like has a crushing cylinder that vibrates the chisel, it is necessary to add a breaker hydraulic pipe separately from the hydraulic pipe that supplies and discharges the pressure oil to and from each cylinder of the front device.

このように、フロント装置にブレーカ等を取付けた場合に取付ける追加油圧配管は、一般的にフロント用の油圧配管に沿わせるように、スイングポストの内部を通してブレーカの破砕用シリンダに接続する構成としている。   As described above, the additional hydraulic piping to be attached when the breaker or the like is attached to the front device is generally configured to be connected to the breaker crushing cylinder through the inside of the swing post so as to be along the front hydraulic piping. .

特開2001−214467号公報JP 2001-214467 A

ところで、上述した従来技術による油圧ショベルでは、フロント装置に取付けられたブレーカの破砕用シリンダに圧油を給排する追加油圧配管は、フロント用の油圧配管に沿わせてスイングポストの内部を通している。このため、フロント装置用の油圧配管に加えてブレーカ用の追加油圧配管も狭いスイングポスト内を通ることになるから、組立作業性やメンテナンス作業性が悪くなってしまう。   By the way, in the hydraulic excavator according to the related art described above, the additional hydraulic piping for supplying and discharging the pressure oil to the breaker crushing cylinder attached to the front device passes through the inside of the swing post along the front hydraulic piping. For this reason, since the additional hydraulic piping for the breaker passes through the narrow swing post in addition to the hydraulic piping for the front device, the assembling workability and the maintenance workability are deteriorated.

しかも、組立てられた油圧ショベルに後から追加油圧配管を取付ける場合には、耐圧仕様の油圧配管を曲げて僅かな隙間に通さなくてはならず、多大な労力や時間が必要になるという問題がある。   Moreover, when installing additional hydraulic piping to the assembled hydraulic excavator later, it is necessary to bend the pressure-resistant hydraulic piping and pass it through a slight gap, which requires a lot of labor and time. is there.

本発明は上述した従来技術の問題に鑑みなされたもので、本発明の目的は、追加油圧配管を簡単な作業で設けることができ、組立作業性、メンテナンス性等を向上できるようにした旋回式建設機械を提供することにある。   The present invention has been made in view of the above-described problems of the prior art, and an object of the present invention is to provide an additional hydraulic piping by a simple operation, and to make it possible to improve assembly workability, maintainability, and the like. To provide construction machinery.

請求項1の発明による建設機械は、自走可能な下部走行体と、該下部走行体上に旋回可能に搭載された上部旋回体と、該上部旋回体の前側にスイングポストを用いて左,右方向に揺動可能に支持されたフロント装置と、該フロント装置に選択的に取付けられるフロントアタッチメントとを備えている。   A construction machine according to the invention of claim 1 is a self-propelled lower traveling body, an upper revolving body that is turnably mounted on the lower traveling body, and a swing post on the front side of the upper revolving body. A front device supported to swing rightward and a front attachment selectively attached to the front device.

そして、上述した課題を解決するために、請求項1の発明が採用する構成の特徴は、前記上部旋回体の前側には前記スイングポストの近傍に位置して前記フロントアタッチメントに圧油を給排するための配管接続口を設け、前記フロント装置側には前記フロント装置に沿って延びた先端側が前記フロントアタッチメントと接続される追加油圧配管を設け、該追加油圧配管の基端側は前記スイングポストの側方を経由して前記配管接続口と接続する構成としたことにある。   In order to solve the above-mentioned problem, the feature of the configuration adopted by the invention of claim 1 is that the front swiveling body is positioned in the vicinity of the swing post, and pressure oil is supplied to and discharged from the front attachment. A pipe connection port is provided, and an additional hydraulic pipe connected to the front attachment is provided at a front end side extending along the front apparatus on the front device side, and a base end side of the additional hydraulic pipe is the swing post. It is that it was set as the structure connected with the said piping connection port via the side of this.

請求項2の発明によると、前記追加油圧配管は、前記フロント装置に沿って配置された固定配管と、該固定配管と前記配管接続口との間に設けられる可撓配管とにより構成したことにある。   According to the invention of claim 2, the additional hydraulic pipe is constituted by a fixed pipe disposed along the front device and a flexible pipe provided between the fixed pipe and the pipe connection port. is there.

請求項3の発明によると、前記配管接続口は上部旋回体の前側に露出した位置に上側に立ち上げて設け、前記追加油圧配管の基端側は該配管接続口に上側から接続する構成としたことにある。   According to a third aspect of the present invention, the pipe connection port is provided to rise upward at a position exposed on the front side of the upper swing body, and the base end side of the additional hydraulic pipe is connected to the pipe connection port from above. It is to have done.

請求項4の発明によると、前記スイングポストには前記追加油圧配管をガイドするガイド部材を設ける構成としたことにある。   According to the invention of claim 4, the swing post is provided with a guide member for guiding the additional hydraulic pipe.

請求項1の発明によれば、フロントアタッチメントに接続する追加油圧配管を設ける場合には、追加油圧配管をフロント装置に沿わせ、その先端側をフロントアタッチメントに接続する。また、追加油圧配管の基端側は、スイングポストの側方を経由して上部旋回体の前側に設けた配管接続口に接続する。これにより、追加油圧配管は、例えば狭いスイングポストの内部を通すことなく、スイングポストの側方に簡単に配置することができる。   According to the first aspect of the present invention, when the additional hydraulic piping connected to the front attachment is provided, the additional hydraulic piping is provided along the front device, and the tip side thereof is connected to the front attachment. Further, the proximal end side of the additional hydraulic piping is connected to a piping connection port provided on the front side of the upper swing body via the side of the swing post. Thereby, the additional hydraulic piping can be easily arranged on the side of the swing post without passing through the inside of the narrow swing post, for example.

この結果、旋回式建設機械を組立てるとき、また組立てた後からでも、選択されたフロントアタッチメントに応じて追加油圧配管を簡単な作業で設けることができ、組立作業性やメンテナンス作業性を向上することができる。   As a result, additional hydraulic piping can be installed in a simple operation according to the selected front attachment when assembling or after assembling the swivel construction machine, improving assembly workability and maintenance workability. Can do.

請求項2の発明によれば、固定配管をフロント装置に沿って配置し、可撓配管を固定配管と上部旋回体側の配管接続口とに接続することにより、追加油圧配管を容易に設けることができる。また、可撓配管は、撓むことによりスイングポストによる揺動動作とフロント装置の俯仰動作とを許容することができる。   According to the invention of claim 2, the additional hydraulic pipe can be easily provided by arranging the fixed pipe along the front device and connecting the flexible pipe to the fixed pipe and the pipe connection port on the upper swing body. it can. Further, the flexible pipe can be allowed to swing by the swing post and to raise and lower the front device by bending.

請求項3の発明によれば、追加油圧配管の基端側は、上部旋回体の前側に露出した位置で立ち上がった配管接続口に上側から接続するだけであるから、該配管接続口に容易に接続することができ、組立作業、メンテナンス作業等を容易に行なうことができる。   According to the invention of claim 3, since the proximal end side of the additional hydraulic piping is only connected from above to the piping connection port that rises at the position exposed to the front side of the upper swing body, it can be easily connected to the piping connection port. They can be connected, and assembly work and maintenance work can be easily performed.

請求項4の発明によれば、スイングポストを揺動動作させた場合でも、スイングポストの側方を経由する追加油圧配管を、スイングポストを揺動動作させたときに、追加油圧配管が大きく振れたり、倒れたりして周囲の部材に干渉するのを防止でき、耐久性、信頼性を向上することができる。   According to the invention of claim 4, even when the swing post is swung, the additional hydraulic pipe passing through the side of the swing post is greatly swung when the swing post is swung. Or can be prevented from interfering with surrounding members due to falling, and durability and reliability can be improved.

以下、本発明の実施の形態に係る旋回式建設機械として小型の油圧ショベルを例に挙げ、図1ないし図5に従って詳細に説明する。   Hereinafter, a small hydraulic excavator will be described as an example of a swivel construction machine according to an embodiment of the present invention, and will be described in detail with reference to FIGS.

図1において、1は旋回式建設機械としてのキャノピ仕様の油圧ショベルで、該油圧ショベル1は、自走可能なクローラ式の下部走行体2と、該下部走行体2上に旋回可能に搭載された上部旋回体3と、該上部旋回体3の前側に揺動および俯仰動可能に設けられたフロント装置4とにより大略構成されている。   In FIG. 1, reference numeral 1 denotes a canopy-type hydraulic excavator as a swing construction machine. The hydraulic excavator 1 is mounted on a self-propelled crawler type lower traveling body 2 and on the lower traveling body 2 so as to be able to swivel. The upper revolving body 3 and a front device 4 provided on the front side of the upper revolving body 3 so as to be swingable and foldable are generally constituted.

ここで、フロント装置4は、後述のスイングポスト6に俯仰動可能に取付けられたブーム4Aと、該ブーム4Aの先端部に俯仰動可能に取付けられたアーム4Bと、該アーム4Bの先端部に回動可能に取付けられたバケット4Cと、スイングポスト6とブーム4Aとの間に設けられたブームシリンダ4Dと、ブーム4Aとアーム4Bとの間に設けられたアームシリンダ4Eと、アーム4Bとバケット4Cとの間に設けられたバケットシリンダ4Fとにより大略構成されている。また、フロント装置4には、例えば解体作業等を行なう場合、バケット4Cに代えて後述のブレーカ36を取付けることができる。   Here, the front device 4 includes a boom 4A attached to a swing post 6 described later so as to be able to move up and down, an arm 4B attached to the tip of the boom 4A so as to be able to move up and down, and a tip of the arm 4B. A bucket 4C rotatably attached, a boom cylinder 4D provided between the swing post 6 and the boom 4A, an arm cylinder 4E provided between the boom 4A and the arm 4B, an arm 4B and the bucket It is roughly constituted by a bucket cylinder 4F provided between 4C. For example, when performing a dismantling operation or the like, a breaker 36 described later can be attached to the front device 4 instead of the bucket 4C.

一方、フロント装置4には、ブームシリンダ4D、アームシリンダ4E、バケットシリンダ4Fに圧油を供給するための後述のフロント用油圧配管24がブーム4A、アーム4Bに沿って取付けられている。また、フロント装置4のアーム4B先端にバケット4Cに代えてブレーカ36を取付けた場合には、ブレーカ36に設けられた破砕用シリンダ36Bを駆動するための追加油圧配管30が取付けられる。   On the other hand, a front hydraulic pipe 24 to be described later for supplying pressure oil to the boom cylinder 4D, the arm cylinder 4E, and the bucket cylinder 4F is attached to the front device 4 along the boom 4A and the arm 4B. When the breaker 36 is attached to the tip of the arm 4B of the front device 4 instead of the bucket 4C, an additional hydraulic pipe 30 for driving the crushing cylinder 36B provided in the breaker 36 is attached.

また、上部旋回体3は、下部走行体2の車幅内でほぼ旋回できるように、上方からみて略円形状に形成されている(図3参照)。そして、上部旋回体3は、後述の旋回フレーム5、スイングポスト6、エンジン7、運転席17、床板19等を含んで構成されている。   Further, the upper turning body 3 is formed in a substantially circular shape when viewed from above so that it can turn substantially within the vehicle width of the lower traveling body 2 (see FIG. 3). The upper swing body 3 includes a swing frame 5, a swing post 6, an engine 7, a driver's seat 17, a floor plate 19 and the like which will be described later.

5は上部旋回体3の支持構造体を構成する旋回フレームで、該旋回フレーム5は、図3に示す如く、左,右方向の中間部を前,後方向に延びた平板状の底板5Aと、該底板5Aの上面側に左,右に離間して立設された一対の縦板5B,5Bと、該各縦板5Bの先端部に設けられた円筒状の支持ブラケット5Cと、該支持ブラケット5Cよりも後側に設けられ、前記各縦板5Bにほぼ直交するように左,右方向に延びた前梁5Dと、前記各縦板5Bの後部位置で左,右方向に延びた中梁5Eと、前記前梁5Dと中梁5Eとの間を覆うように前記底板5Aの左側に敷設されたアンダカバー5Fとにより大略構成されている。ここで、旋回フレーム5には、例えば前梁5D等に配管通し穴(図示せず)が設けられ、この配管通し穴には後述のフロント用油圧配管24が挿通される。   Reference numeral 5 denotes a revolving frame that constitutes a support structure for the upper revolving structure 3. The revolving frame 5 includes a flat bottom plate 5A that extends in the front and rear directions in the middle in the left and right directions, as shown in FIG. A pair of vertical plates 5B and 5B provided on the upper surface side of the bottom plate 5A so as to be separated from each other on the left and right sides, a cylindrical support bracket 5C provided at the tip of each vertical plate 5B, and the support A front beam 5D provided on the rear side of the bracket 5C and extending in the left and right directions so as to be substantially orthogonal to the respective vertical plates 5B, and a center extending in the left and right directions at the rear portion of each vertical plate 5B. A beam 5E and an under cover 5F laid on the left side of the bottom plate 5A so as to cover the space between the front beam 5D and the middle beam 5E are roughly configured. Here, the revolving frame 5 is provided with, for example, a through-hole (not shown) in the front beam 5D and the like, and a later-described front hydraulic pipe 24 is inserted into the through-hole.

6は旋回フレーム5の支持ブラケット5Cに取付けられたスイングポストで、該スイングポスト6は、前記支持ブラケット5Cに連結ピン(図示せず)を介して連結され、この連結ピンを中心にして左,右方向に揺動可能となっている。そして、スイングポスト6は、フロント装置4のブーム4Aを俯仰動可能に支持するものである。   6 is a swing post attached to the support bracket 5C of the revolving frame 5. The swing post 6 is connected to the support bracket 5C via a connecting pin (not shown). It can swing rightward. The swing post 6 supports the boom 4A of the front device 4 so as to be able to move up and down.

ここで、スイングポスト6は、図4、図5に示すように、左側面板6Aと、右側面板6Bと、該各側面板6A,6B間に位置して後向きに開口するコ字形状に形成された後面板6Cとによって形成され、該後面板6Cで旋回フレーム5の支持ブラケット5Cを上,下方向から挟むように取付けられている。また、左側面板6Aには、後述のフロント用油圧配管24を挿通するための配管挿通穴(図示せず)が設けられている。一方、右側面板6Bにはシリンダブラケット6Dが設けられ、該シリンダブラケット6Dには、当該スイングポスト6を左,右方向に揺動(スイング)させる後述のスイングシリンダ16が取付けられている。さらに、左側面板6Aと右側面板6Bの上部には、フロント装置4のブーム4Aが俯仰動可能に取付けられ、前部にはブームシリンダ4Dが取付けられている。   Here, as shown in FIGS. 4 and 5, the swing post 6 is formed in a U-shape that is located between the left side plate 6A, the right side plate 6B, and the side plates 6A and 6B and opens rearward. The rear plate 6C is attached so that the support bracket 5C of the revolving frame 5 is sandwiched from above and below by the rear plate 6C. Further, the left side plate 6A is provided with a pipe insertion hole (not shown) for inserting a later-described front hydraulic pipe 24. On the other hand, a cylinder bracket 6D is provided on the right side plate 6B, and a swing cylinder 16 (described later) that swings (swings) the swing post 6 in the left and right directions is attached to the cylinder bracket 6D. Further, a boom 4A of the front device 4 is attached to the upper portions of the left side plate 6A and the right side plate 6B so as to be able to move up and down, and a boom cylinder 4D is attached to the front portion.

7は旋回フレーム5の後側に搭載されたエンジンで、該エンジン7は、左,右方向に延在する横置き状態に配置されている。また、エンジン7の左側には、該エンジン7によって駆動される油圧ポンプ8が設けられ、エンジン7の右側にはラジエータ9、オイルクーラ10が重ねて配設されている。   Reference numeral 7 denotes an engine mounted on the rear side of the revolving frame 5, and the engine 7 is arranged in a horizontally placed state extending in the left and right directions. A hydraulic pump 8 driven by the engine 7 is provided on the left side of the engine 7, and a radiator 9 and an oil cooler 10 are disposed on the right side of the engine 7.

さらに、11はラジエータ9等の前側に位置して旋回フレーム5の右側に設けられた作動油タンク、12は該作動油タンク11の前側に設けられた燃料タンクを示している。また、13は旋回フレーム5の後側に設けられた支持部材で、該支持部材13は、後述するキャノピ34等の後側部分を支持するものである。   Further, 11 is a hydraulic oil tank located on the front side of the radiator 9 and provided on the right side of the revolving frame 5, and 12 is a fuel tank provided on the front side of the hydraulic oil tank 11. Reference numeral 13 denotes a support member provided on the rear side of the revolving frame 5, and the support member 13 supports a rear side portion such as a canopy 34 described later.

14は上部旋回体3の旋回中心に位置して旋回フレーム5の底板5Aに設けられたセンタジョイントで、該センタジョイント14は、上部旋回体3の旋回動作を許容しつつ下部走行体2側に圧油を供給するものである。また、15はセンタジョイント14の周囲に位置して旋回フレーム5の底板5Aに設けられた旋回モータで、該旋回モータ15は、下部走行体2上で上部旋回体3を旋回動作するための駆動源を構成している。   Reference numeral 14 denotes a center joint provided on the bottom plate 5A of the swing frame 5 and positioned at the center of rotation of the upper swing body 3. The center joint 14 moves toward the lower traveling body 2 while allowing the upper swing body 3 to rotate. Pressure oil is supplied. A swing motor 15 is provided around the center joint 14 and provided on the bottom plate 5A of the swing frame 5. The swing motor 15 is a drive for swinging the upper swing body 3 on the lower traveling body 2. Constitutes the source.

16は旋回フレーム5とスイングポスト6との間に設けられたスイングシリンダ(図1、図4中に図示)で、該スイングシリンダ16は、スイングポスト6を左,右方向に揺動するものである。   Reference numeral 16 denotes a swing cylinder (shown in FIGS. 1 and 4) provided between the swing frame 5 and the swing post 6, and the swing cylinder 16 swings the swing post 6 leftward and rightward. is there.

17は旋回フレーム5の上側に設けられた運転席(図1、図2中に図示)で、該運転席17は、油圧ショベル1を操縦するオペレータが着座するものである。また、運転席17の左,右両側には、フロント装置4等を操作する作業レバー18,18が配設されている。   Reference numeral 17 denotes a driver's seat (shown in FIGS. 1 and 2) provided on the upper side of the turning frame 5. The driver's seat 17 is seated by an operator who operates the excavator 1. Further, work levers 18 and 18 for operating the front device 4 and the like are disposed on both the left and right sides of the driver's seat 17.

また、19は運転席17の前側部分に設けられた床板で、該床板19は、旋回フレーム5の上側を覆うように設けられている。また、床板19の前側位置には、下部走行体2を走行させる走行レバー・ペダル20等が配設されている。   Reference numeral 19 denotes a floor board provided in the front portion of the driver's seat 17, and the floor board 19 is provided so as to cover the upper side of the revolving frame 5. Further, a traveling lever / pedal 20 or the like for traveling the lower traveling body 2 is disposed at the front side position of the floor plate 19.

ここで、床板19は、旋回フレーム5の上側に間隔をもって配設され、これにより、旋回フレーム5と床板19との間には、センタジョイント14、旋回モータ15、後述の制御弁23等を収容する空間が形成されている。また、旋回フレーム5と床板19との間の空間は、後述のスカートカバー21によって周囲が覆われている。   Here, the floor plate 19 is disposed on the upper side of the swivel frame 5 with a space therebetween, so that a center joint 14, a swivel motor 15, a control valve 23 to be described later, and the like are accommodated between the swivel frame 5 and the floor plate 19. A space is formed. The space between the revolving frame 5 and the floor board 19 is covered with a skirt cover 21 described later.

21は旋回フレーム5の外周側に設けられたスカートカバーで、該スカートカバー21は、旋回フレーム5、制御弁23、後述の各油圧配管24,25,26,27等を覆い隠すものである。そして、スカートカバー21は、図2、図3に示すように、例えば旋回フレーム5の左側を覆う円弧状の左カバー21Aと、右側を覆う円弧状の右カバー21Bと、左前側を覆う左前カバー21Cと、右前側を覆う右前カバー21Dとにより大略構成されている。また、スカートカバー21のうち、左カバー21A、右カバー21Bの前側部分と左前カバー21Cと右前カバー21Dとは、旋回フレーム5の縦板5B、前梁5D等とほぼ同じ高さ寸法をもって形成されている。   Reference numeral 21 denotes a skirt cover provided on the outer peripheral side of the swivel frame 5. The skirt cover 21 covers the swivel frame 5, the control valve 23, and hydraulic pipes 24, 25, 26, 27 described later. 2 and 3, the skirt cover 21 includes, for example, an arcuate left cover 21A covering the left side of the revolving frame 5, an arcuate right cover 21B covering the right side, and a left front cover covering the left front side. 21C and a right front cover 21D that covers the right front side are roughly configured. Further, in the skirt cover 21, the front side portions of the left cover 21A and the right cover 21B, the left front cover 21C, and the right front cover 21D are formed with substantially the same height as the vertical plate 5B, the front beam 5D, and the like of the revolving frame 5. ing.

22はスカートカバー21の上側に設けられた外装カバーで、該外装カバー22は、運転席17の後側に位置してエンジン7を覆うエンジンカバー22Aと、運転席17の右側に位置して作動油タンク11、燃料タンク12等を覆うタンクカバー22Bとによって大略構成されている。   An exterior cover 22 is provided on the upper side of the skirt cover 21, and the exterior cover 22 is located on the rear side of the driver seat 17 and covers the engine 7, and is located on the right side of the driver seat 17. A tank cover 22B that covers the oil tank 11, the fuel tank 12, and the like is roughly configured.

23は旋回フレーム5の左前側に位置してアンダカバー5F上に配設された制御弁(図3参照)で、該制御弁23は、複数個の油圧パイロット式スプール弁を連結することにより形成されている。即ち、制御弁23は、フロント装置4のブームシリンダ4Dを制御するブーム制御弁と、アームシリンダ4Eを制御するアーム制御弁と、バケットシリンダ4Fを制御するバケット制御弁と、スイングシリンダ16を制御するスイング制御弁と、旋回モータ15を制御する旋回制御弁と、下部走行体2の走行を制御する左走行制御弁、右走行制御弁と、後述する排土板35のシリンダを制御する排土板制御弁と、予備制御弁とによって大略構成されている。   Reference numeral 23 denotes a control valve (see FIG. 3) located on the left front side of the revolving frame 5 and disposed on the under cover 5F. The control valve 23 is formed by connecting a plurality of hydraulic pilot type spool valves. Has been. That is, the control valve 23 controls the boom control valve that controls the boom cylinder 4D of the front device 4, the arm control valve that controls the arm cylinder 4E, the bucket control valve that controls the bucket cylinder 4F, and the swing cylinder 16. A swing control valve, a swing control valve that controls the swing motor 15, a left travel control valve that controls the travel of the lower traveling body 2, a right travel control valve, and a discharge plate that controls a cylinder of a discharge plate 35 to be described later The control valve and the preliminary control valve are generally configured.

また、制御弁23を構成する予備制御弁は、フロント装置4にブレーカ36を取付けたときに、このブレーカ36に内蔵された破砕用シリンダ36Bを制御するものである。そして、それぞれの制御弁23の油圧パイロット部は、作業レバー18、走行レバー・ペダル20、予備ペダル、スイッチ等(いずれも図示せず)に接続されている。   The preliminary control valve constituting the control valve 23 controls the crushing cylinder 36 </ b> B built in the breaker 36 when the breaker 36 is attached to the front device 4. And the hydraulic pilot part of each control valve 23 is connected to the working lever 18, the traveling lever / pedal 20, the spare pedal, the switch, etc. (all not shown).

24は制御弁23とフロント装置4との間に設けられた複数本のフロント用油圧配管を示している。これらの油圧配管24は、図1、図3に示すように、制御弁23のブーム制御弁、アーム制御弁、バケット制御弁とフロント装置4のブームシリンダ4D、アームシリンダ4E、バケットシリンダ4Fとを接続している。そして、各フロント用油圧配管24は、制御弁23から旋回フレーム5の左縦板5Bに沿って前側に延び、前梁5Dに設けられた配管通し穴からスイングポスト6を形成する左側面板6Aの左側方に突出している。また、上部旋回体2から突出した各油圧配管24は、スイングポスト6の左側面板6Aに設けられた配管挿通穴から該スイングポスト6内に侵入し、図1、図4に示すように、左側面板6Aと右側面板6Bとの間でほぼS字状に屈曲してフロント装置4のブーム4A上面側に延び、ブームシリンダ4D、アームシリンダ4E、バケットシリンダ4Fと接続されている。   Reference numeral 24 denotes a plurality of front hydraulic pipes provided between the control valve 23 and the front device 4. As shown in FIGS. 1 and 3, these hydraulic pipes 24 include a boom control valve, an arm control valve, and a bucket control valve of the control valve 23, and a boom cylinder 4 </ b> D, an arm cylinder 4 </ b> E, and a bucket cylinder 4 </ b> F of the front device 4. Connected. Each front hydraulic pipe 24 extends from the control valve 23 to the front side along the left vertical plate 5B of the swing frame 5, and is formed on the left side plate 6A that forms the swing post 6 from a pipe through hole provided in the front beam 5D. It protrudes to the left. Further, each hydraulic pipe 24 protruding from the upper swing body 2 enters the swing post 6 from a pipe insertion hole provided in the left side plate 6A of the swing post 6, and as shown in FIGS. Between the face plate 6A and the right side plate 6B, it is bent in an approximately S shape and extends to the upper surface side of the boom 4A of the front device 4, and is connected to the boom cylinder 4D, the arm cylinder 4E, and the bucket cylinder 4F.

25は制御弁23の左走行制御弁、右走行制御弁、排土板制御弁とセンタジョイント14とを接続して設けられた走行用および排土板35用の複数本の油圧配管を示している。また、26は制御弁23の旋回制御弁と旋回モータ15とを接続して設けられた旋回用の複数本の油圧配管を示している。さらに、27は制御弁23のスイング制御弁とスイングシリンダ16とを接続して設けられたスイング用の複数本の油圧配管を示している。   Reference numeral 25 denotes a plurality of hydraulic pipes for the traveling and earthing plates 35 provided by connecting the left traveling control valve, the right traveling control valve, the earthing plate control valve and the center joint 14 of the control valve 23. Yes. Reference numeral 26 denotes a plurality of hydraulic pipes for turning provided by connecting the turning control valve of the control valve 23 and the turning motor 15. Further, reference numeral 27 denotes a plurality of swing hydraulic pipes provided by connecting the swing control valve of the control valve 23 and the swing cylinder 16.

28は上部旋回体3に設けられた2本の予備油圧配管で、該各予備油圧配管28のうち、一方の配管28は、図3に示すように、制御弁23の予備制御弁からフロント用油圧配管24、旋回フレーム5の左縦板5Bを超えて右側に延び、右縦板5Bの近傍で前側に屈曲して延びている。また、他方の配管28は、制御弁23の予備制御弁から後側に延びた後、左縦板5B、旋回モータ15を超えて右側に延び、右縦板5Bの近傍で一方の配管28に沿って前側に延びている。そして、2本の予備油圧配管28の前側部分は、それぞれ配管接続口28Aとなり、固定部材29によって旋回フレーム5の前梁5D上に固定されている。   Reference numeral 28 denotes two auxiliary hydraulic pipes provided on the upper swing body 3, and one of the auxiliary hydraulic pipes 28 is connected to the front control valve of the control valve 23 as shown in FIG. The hydraulic pipe 24 extends to the right side beyond the left vertical plate 5B of the swivel frame 5, and bends and extends to the front side in the vicinity of the right vertical plate 5B. The other pipe 28 extends rearward from the preliminary control valve of the control valve 23, then extends to the right side beyond the left vertical plate 5B and the turning motor 15, and is connected to one pipe 28 in the vicinity of the right vertical plate 5B. Along the front. The front portions of the two auxiliary hydraulic pipes 28 are respectively pipe connection ports 28 </ b> A and are fixed on the front beam 5 </ b> D of the revolving frame 5 by a fixing member 29.

ここで、各予備油圧配管28の配管接続口28Aは、図4に示す如く、スイングポスト6の後側近傍に位置して先端部を上側に立ち上げた状態で設けられている。また、配管接続口28Aは、床板19と外装カバー22のタンクカバー22Bとの間に位置し、上部旋回体3の外部に露出した状態で設けられている。これにより、配管接続口28Aには、後述の可撓配管32を上側から螺着するだけで簡単に接続することができる。なお、予備油圧配管28は、フロント装置4にブレーカ36を取付けるときに、追加油圧配管30と一緒に取付けられる場合と、油圧ショベル1を組立てるときに予め取付けられる場合とがあり、顧客の使用形態に応じて自由に選択することができるものである。   Here, as shown in FIG. 4, the pipe connection port 28 </ b> A of each auxiliary hydraulic pipe 28 is provided near the rear side of the swing post 6, with the tip portion raised upward. The pipe connection port 28 </ b> A is located between the floor plate 19 and the tank cover 22 </ b> B of the exterior cover 22 and is provided in a state exposed to the outside of the upper swing body 3. Thereby, it is possible to easily connect to the pipe connection port 28 </ b> A simply by screwing a flexible pipe 32 described later from above. The spare hydraulic pipe 28 may be attached together with the additional hydraulic pipe 30 when the breaker 36 is attached to the front device 4 or may be attached in advance when the hydraulic excavator 1 is assembled. Can be freely selected according to the situation.

次に、30はフロント装置4側に設けられた2本の追加油圧配管で、該各追加油圧配管30は、バケット4Cに代えてフロント装置4のアーム4B先端に後述のブレーカ36を取付けるときに設けられるものである。そして、追加油圧配管30は、予備油圧配管28の配管接続口28Aとブレーカ36の破砕用シリンダ36Bとを接続する後述の固定配管31と可撓配管32とにより大略構成されている。   Next, reference numeral 30 denotes two additional hydraulic pipes provided on the front device 4 side. Each of the additional hydraulic pipes 30 is used when a breaker 36 described later is attached to the front end of the arm 4B of the front device 4 instead of the bucket 4C. It is provided. The additional hydraulic pipe 30 is generally constituted by a fixed pipe 31 and a flexible pipe 32 (described later) that connect the pipe connection port 28A of the auxiliary hydraulic pipe 28 and the crushing cylinder 36B of the breaker 36.

31はフロント装置4に固定して設けられたパイプ材等からなる2本の固定配管(図1、図4参照)で、該各固定配管31は、ブーム4A、アーム4Bに沿って延びている。また、各固定配管31は、一端がブーム4Aの基端側に位置する右側面で後述の可撓配管32を接続するための接続端部31Aとなり、他端がアーム4Bの先端側に位置する左,右の側面でブレーカ36の油圧配管36Cに接続される接続端部31B(右側のみ図示)となっている。また、固定配管31は、ブーム4Aとアーム4Bとの間の可動部分に対応するブーム4Aの先端部から接続端部31Bまでが可撓配管31Cとなっている。   Reference numeral 31 denotes two fixed pipes (see FIGS. 1 and 4) made of a pipe material fixed to the front device 4, and each fixed pipe 31 extends along the boom 4A and the arm 4B. . Each fixed pipe 31 has a connection end portion 31A for connecting a flexible pipe 32 (described later) on the right side surface of which one end is positioned on the base end side of the boom 4A, and the other end is positioned on the front end side of the arm 4B. The left and right side surfaces are connection end portions 31B (only the right side is shown) connected to the hydraulic piping 36C of the breaker 36. The fixed pipe 31 is a flexible pipe 31C from the tip end of the boom 4A corresponding to the movable part between the boom 4A and the arm 4B to the connection end 31B.

32は固定配管31と共に追加油圧配管30を構成するホース等からなる2本の可撓配管で、該可撓配管32は、固定配管31を予備油圧配管28に接続するもので、フロント装置4の俯仰動とスイングポスト6の揺動とを許すように可撓性を有している。また、可撓配管32は、一方の接続端部32Aが予備油圧配管28の配管接続口28Aに上側から接続され、他方の接続端部32Bが固定配管31の接続端部31Aに接続されている。   Reference numeral 32 denotes two flexible pipes composed of hoses or the like constituting the additional hydraulic pipe 30 together with the fixed pipe 31. The flexible pipe 32 connects the fixed pipe 31 to the auxiliary hydraulic pipe 28. It has flexibility so as to allow the heel up and down and the swing of the swing post 6. The flexible pipe 32 has one connection end 32A connected to the pipe connection port 28A of the auxiliary hydraulic pipe 28 from the upper side, and the other connection end 32B connected to the connection end 31A of the fixed pipe 31. .

また、各可撓配管32は、前述したスイングポスト6内を通るフロント用油圧配管24とは異なり、外部に露出した状態でスイングポスト6の右側面板6Bの外側位置を通る(経由する)ように配置されている。詳しくは、各可撓配管32は、各固定配管31の接続端部31Aから後側に延び、スイングポスト6の右側面板6Bの近傍位置で上側に湾曲し、予備油圧配管28の配管接続口28Aに上側から接続している。ここで、可撓配管32は、床板19よりも上側に湾曲しており、これにより、遊びを持たせてフロント装置4の俯仰動とスイングポスト6の揺動とを許容することができ、また、接続作業、交換等のメンテナンス作業、目視による確認作業等を容易に行なうことができる。   Each flexible pipe 32 is different from the front hydraulic pipe 24 passing through the swing post 6 described above, and passes through (passes through) the outer side position of the right side plate 6B of the swing post 6 while being exposed to the outside. Has been placed. Specifically, each flexible pipe 32 extends rearward from the connection end 31 </ b> A of each fixed pipe 31, curves upward at a position near the right side plate 6 </ b> B of the swing post 6, and is connected to a pipe connection port 28 </ b> A of the auxiliary hydraulic pipe 28. Connected from above. Here, the flexible pipe 32 is curved to the upper side of the floor plate 19, thereby allowing play and allowing the front device 4 to move up and down and the swing post 6 to swing. It is possible to easily perform maintenance work such as connection work and replacement, visual confirmation work, and the like.

しかも、各可撓配管32は、スイングポスト6の内部等を通るフロント用油圧配管24とは異なる経路、即ち、狭い場所への無理な差込み、曲げ等を行なうことなく、スイングポスト6の側方に無理のない状態で設けることができる。また、外部に露出した各可撓配管32は、作業時に手が届き易く、接続場所も目視し易いから、油圧ショベル1を組立てるとき、また組立てた後からでも、接続作業等を簡単に行なうことができる。   In addition, each flexible pipe 32 has a different path from the front hydraulic pipe 24 passing through the inside of the swing post 6, that is, the side of the swing post 6 without being forcedly inserted into a narrow place, bent, or the like. It can be provided in an unreasonable state. Further, each flexible pipe 32 exposed to the outside is easy to reach at the time of work, and the connection place is easy to visually check. Therefore, when the hydraulic excavator 1 is assembled or after it is assembled, the connection work can be easily performed. Can do.

33はスイングポスト6の右側面板6Bに取付けられたガイド部材で、該ガイド部材33は、追加油圧配管30の各可撓配管32を倒れないように保持(ガイド)するものである。また、ガイド部材33は、図5に示す如く、長辺部の一方が互いに固着された縦長な環状のガイドリング33A,33Aと、該各ガイドリング33Aの他方の長辺部に固着された取付部材33Bとにより大略構成されている。   Reference numeral 33 denotes a guide member attached to the right side plate 6B of the swing post 6, and the guide member 33 holds (guides) each flexible pipe 32 of the additional hydraulic pipe 30 so as not to fall down. Further, as shown in FIG. 5, the guide member 33 is a vertically long annular guide ring 33A, 33A in which one of the long side portions is fixed to each other, and an attachment fixed to the other long side portion of each guide ring 33A. This is roughly constituted by the member 33B.

そして、ガイド部材33は、その取付部材33Bをスイングポスト6の右側面板6Bにねじ止めしている。これにより、ガイド部材33は、各ガイドリング33A内に可撓配管32を挿通させることにより、該可撓配管32の上,下方向への撓みの変化を許容しつつ、可撓配管32の揺れや倒れを抑えることができ、周囲の部材に干渉するのを防止することができる。   The guide member 33 is screwed to the right side plate 6B of the swing post 6 with the mounting member 33B. Thereby, the guide member 33 allows the flexible pipe 32 to be inserted into each guide ring 33 </ b> A, thereby allowing the flexible pipe 32 to change in the upward and downward directions while allowing the flexible pipe 32 to swing. In addition, it is possible to suppress collapse and prevent interference with surrounding members.

34は運転席17の上側を覆うように設けられたキャノピ、35は下部走行体2の前側に設けられた排土板をそれぞれ示し、該排土板35はシリンダ(図示せず)により上,下方向に高さ位置を変位させることができる。   Reference numeral 34 denotes a canopy provided so as to cover the upper side of the driver's seat 17, and 35 denotes a discharge plate provided on the front side of the lower traveling body 2, and the discharge plate 35 is raised by a cylinder (not shown). The height position can be displaced downward.

一方、36はフロント装置4に選択的に取付けられるフロントアタッチメントとしてのブレーカ(図1中に図示)で、該ブレーカ36は、解体作業時にコンクリート等を破砕するものである。また、ブレーカ36は、タガネ36Aを振動させるシリンダ36Bを内蔵している。そして、ブレーカ36を使用するときには、バケット4Cに代えてアーム4B先端に取付け、シリンダ36Bに繋がる油圧配管36Cを追加油圧配管30の固定配管31先端に接続する。   On the other hand, 36 is a breaker (illustrated in FIG. 1) as a front attachment that is selectively attached to the front device 4, and the breaker 36 crushes concrete or the like during dismantling work. The breaker 36 has a built-in cylinder 36B that vibrates the chisel 36A. And when using the breaker 36, it attaches to the front-end | tip of the arm 4B instead of the bucket 4C, and connects the hydraulic piping 36C connected to the cylinder 36B to the front-end | tip of the fixed piping 31 of the additional hydraulic piping 30.

本実施の形態による油圧ショベル1は上述の如き構成を有するもので、次に、フロント装置4を用いて作業を行なう場合の動作について説明する。   The hydraulic excavator 1 according to the present embodiment has the above-described configuration. Next, an operation when the front apparatus 4 is used for work will be described.

まず、オペレータは、運転席17に着座して走行レバー・ペダル20を操作することにより、下部走行体2を走行させることができる。また、フロント装置4を下部走行体2の例えば左側に移動させて側溝掘り作業を行なうときには、スイングシリンダ16によってスイングポスト6を右側に揺動させると共に、上部旋回体3をフロント装置4の揺動方向とは反対側となる左側に旋回させることにより、フロント装置4を左側に平行移動させ、該フロント装置4を用いて左側の側溝掘り作業を行なう。さらに、逆方向の操作を行うことにより、右側の側溝掘り作業を行なうこともできる。   First, the operator can drive the lower traveling body 2 by sitting on the driver's seat 17 and operating the traveling lever / pedal 20. Further, when the front device 4 is moved to, for example, the left side of the lower traveling body 2 to perform the side groove digging operation, the swing post 6 is swung to the right by the swing cylinder 16 and the upper revolving body 3 is swung by the front device 4. By turning to the left side opposite to the direction, the front device 4 is translated to the left side, and the left side gutter work is performed using the front device 4. Further, the right side ditching operation can be performed by performing the operation in the reverse direction.

次に、油圧ショベル1を用いて解体作業等を行なう場合について説明する。この解体作業では、例えばバケット4Cに代えてブレーカ36をアーム4Bの先端に取付ける。また、ブレーカ36を取付けたときには、該ブレーカ36に設けられた破砕用シリンダ36Bに圧油を供給する必要がある。そこで、上部旋回体3側の予備油圧配管28とブレーカ36の油圧配管36Cとを接続する追加油圧配管30を取付ける。   Next, a case where a dismantling operation or the like is performed using the hydraulic excavator 1 will be described. In this dismantling work, for example, the breaker 36 is attached to the tip of the arm 4B instead of the bucket 4C. Further, when the breaker 36 is attached, it is necessary to supply pressure oil to the crushing cylinder 36 </ b> B provided in the breaker 36. Therefore, an additional hydraulic pipe 30 for connecting the auxiliary hydraulic pipe 28 on the upper swing body 3 side and the hydraulic pipe 36C of the breaker 36 is attached.

この場合、追加油圧配管30は、その固定配管31をブーム4A、アーム4Bに沿って簡単に取付けることができる。しかも、可撓配管32は、スイングポスト6の側方を通して上部旋回体3の前側に露出した予備油圧配管28の配管接続口28Aに上側から簡単な作業で接続することができる。   In this case, the additional hydraulic piping 30 can easily attach the fixed piping 31 along the boom 4A and the arm 4B. Moreover, the flexible pipe 32 can be connected to the pipe connection port 28 </ b> A of the auxiliary hydraulic pipe 28 exposed to the front side of the upper swing body 3 through the side of the swing post 6 from above by a simple operation.

そして、追加油圧配管30等によって制御弁23の予備制御弁とブレーカ36の破砕用シリンダ36Bとを接続したら、例えば予備ペダル(図示せず)を足踏み操作することにより、ブレーカ36の破砕用シリンダ36Bを駆動してタガネ36Aにより解体作業を行なうことができる。   Then, when the preliminary control valve of the control valve 23 and the crushing cylinder 36B of the breaker 36 are connected by the additional hydraulic pipe 30 or the like, for example, a crushing cylinder 36B of the breaker 36 is operated by stepping on a spare pedal (not shown). Can be dismantled by the chisel 36A.

かくして、本実施の形態によれば、フロント装置4側に追加油圧配管30を設ける場合には、フロント装置4側に追加油圧配管30の固定配管31を取付けてブレーカ36に接続し、可撓配管32をスイングポスト6を形成する右側面板6Bの右側方を経由して上部旋回体3の前側に設けられた予備油圧配管28の配管接続口28Aに接続すればよい。   Thus, according to the present embodiment, when the additional hydraulic piping 30 is provided on the front device 4 side, the fixed piping 31 of the additional hydraulic piping 30 is attached to the front device 4 side and connected to the breaker 36, and the flexible piping is provided. What is necessary is just to connect 32 to the piping connection port 28A of the auxiliary | assistant hydraulic piping 28 provided in the front side of the upper turning body 3 via the right side of the right side surface board 6B which forms the swing post 6. FIG.

このため、本実施の形態では、従来技術のようにスイングポスト6の内部等を通すことなく、追加油圧配管30を簡単に追加して取付けることができる。この結果、油圧ショベル1を組立てるとき、また油圧ショベル1を組立てた後からでも、追加油圧配管30を簡単な作業で設けることができ、組立作業性やメンテナンス作業性を向上することができる。   For this reason, in this embodiment, the additional hydraulic piping 30 can be easily added and attached without passing through the inside of the swing post 6 or the like as in the prior art. As a result, when the hydraulic excavator 1 is assembled, and even after the hydraulic excavator 1 is assembled, the additional hydraulic piping 30 can be provided by a simple operation, and the assembly workability and maintenance workability can be improved.

しかも、追加油圧配管30の可撓配管32は、スイングポスト6の左側に位置するフロント用油圧配管24を避け、該スイングポスト6の右側面板6Bの右側方を経由して設けているから、スイングポスト6を揺動させたり、フロント装置4を俯仰動させた場合でも、可撓配管32がフロント用油圧配管24に干渉するのを防止でき、配管24,32等の損傷を防止することができる。また、オペレータの前方視界から可撓配管32を外すことができ、作業性を高めることができる。   In addition, the flexible piping 32 of the additional hydraulic piping 30 is provided via the right side of the right side plate 6B of the swing post 6 while avoiding the front hydraulic piping 24 located on the left side of the swing post 6. Even when the post 6 is swung or the front device 4 is moved up and down, the flexible pipe 32 can be prevented from interfering with the front hydraulic pipe 24, and damage to the pipes 24, 32, etc. can be prevented. . Moreover, the flexible piping 32 can be removed from the operator's front view, and workability can be improved.

また、可撓配管32は、床板19よりも上側に立上るように湾曲させて設けているから、これによっても可撓配管32が、フロント用油圧配管24、スイングポスト6、スイングシリンダ16等と干渉するのを防止できる。また、作業時には可撓配管32を目視によって容易に確認できるから、周囲の障害物との干渉を未然に防ぐことができ、安全性、信頼性を向上することができる。さらに、可撓配管32は、外部から容易に点検することができるから、油漏れ、損傷等を早期のうちに発見し、補修することができる。   Further, since the flexible piping 32 is curved and provided so as to rise above the floor plate 19, the flexible piping 32 is also connected to the front hydraulic piping 24, the swing post 6, the swing cylinder 16, and the like. Interference can be prevented. In addition, since the flexible pipe 32 can be easily visually confirmed at the time of work, interference with surrounding obstacles can be prevented in advance, and safety and reliability can be improved. Further, since the flexible pipe 32 can be easily inspected from the outside, oil leakage, damage, etc. can be found and repaired at an early stage.

また、追加油圧配管30は、フロント装置4に取付ける固定配管31と、該固定配管31と予備油圧配管28とを繋ぐ可撓配管32とにより構成しているから、可撓配管32によってスイングポスト6による揺動動作、フロント装置4の俯仰動作を許容することができる。   Further, since the additional hydraulic pipe 30 is constituted by a fixed pipe 31 attached to the front device 4 and a flexible pipe 32 connecting the fixed pipe 31 and the auxiliary hydraulic pipe 28, the swing post 6 is formed by the flexible pipe 32. Can be allowed to swing and to move the front device 4 up and down.

一方、上部旋回体3側に設けた予備油圧配管28は、その配管接続口28Aをスイングポスト6の後側近傍で外部に露出した位置に上側に立ち上げて設けているから、可撓配管32は配管接続口28Aに上側から螺着するだけで簡単に接続することができる。   On the other hand, the auxiliary hydraulic pipe 28 provided on the upper swing body 3 side is provided with its pipe connection port 28A raised upward at a position exposed to the outside in the vicinity of the rear side of the swing post 6. Can be easily connected to the pipe connection port 28A simply by screwing from above.

さらに、スイングポスト6には、可撓配管32をスイングポスト6の右側方に上側に弧を描いた状態で保持するガイド部材33を設けているから、スイングポスト6を揺動動作させたときに、可撓配管32が大きく振れたり、倒れたりして周囲の部材に干渉するのを防止でき、耐久性、信頼性を向上することができる。   Further, the swing post 6 is provided with a guide member 33 that holds the flexible pipe 32 in an arcuate state on the right side of the swing post 6 so that the swing post 6 is swung. Further, it is possible to prevent the flexible pipe 32 from shaking greatly or falling down and interfering with surrounding members, and durability and reliability can be improved.

なお、実施の形態では、バケット4Cに代えてフロント装置4のアーム4B先端にブレーカ36を取付けた場合を例に挙げて説明した。しかし、本発明はこれに限らず、例えばグラップル等の他のフロントアタッチメントをアーム4Bの先端に取付ける構成としてもよい。   In the embodiment, the case where the breaker 36 is attached to the tip of the arm 4B of the front device 4 instead of the bucket 4C has been described as an example. However, the present invention is not limited to this, and another front attachment such as a grapple may be attached to the tip of the arm 4B.

また、実施の形態では、運転席17の上側を覆うキャノピ34を備えたキャノピ仕様の油圧ショベル1を例に挙げて説明した。しかし、本発明はこれに限るものではなく、例えば運転席の周囲と上側を覆うキャブを備えたキャブ仕様の油圧ショベルに適用してもよい。   Further, in the embodiment, the description has been given by taking the canopy-spec hydraulic excavator 1 including the canopy 34 that covers the upper side of the driver's seat 17 as an example. However, the present invention is not limited to this, and may be applied to, for example, a cab specification hydraulic excavator provided with a cab that covers the periphery and upper side of the driver's seat.

さらに、実施の形態では、旋回式建設機械としてクローラ式の油圧ショベル1を例示した。しかし、本発明はこれに限るものではなく、例えばホイール式油圧ショベル等に適用してもよい。   Furthermore, in the embodiment, the crawler hydraulic excavator 1 is exemplified as the swing construction machine. However, the present invention is not limited to this, and may be applied to, for example, a wheeled hydraulic excavator.

本発明の実施の形態に適用される油圧ショベルを示す正面図である。It is a front view which shows the hydraulic excavator applied to embodiment of this invention. 油圧ショベルをフロント装置、スイングポストを省略した状態で右側から拡大して示す右側面図である。It is a right view which expands and shows a hydraulic excavator from the right side in the state which abbreviate | omitted the front apparatus and the swing post. 運転席、床板、外装カバー等を省略した状態の上部旋回体を示す平面図である。It is a top view which shows the upper turning body in the state where a driver's seat, a floor board, an exterior cover, etc. were omitted. 追加油圧配管の可撓配管等の取付状態を示す要部拡大の斜視図である。It is a perspective view of the principal part expansion which shows the attachment state of flexible piping etc. of additional hydraulic piping. スイングポストとガイド部材を拡大して示す拡大斜視図である。It is an expansion perspective view which expands and shows a swing post and a guide member.

符号の説明Explanation of symbols

1 油圧ショベル(旋回式建設機械)
2 下部走行体
3 上部旋回体
4 フロント装置
4A ブーム
4B アーム
4C バケット
5 旋回フレーム
6 スイングポスト
23 制御弁
24 フロント用油圧配管
28 予備油圧配管
28A 配管接続口
30 追加油圧配管
31 固定配管
32 可撓配管
33 ガイド部材
36 ブレーカ(フロントアタッチメント)
1 Hydraulic excavator (swivel construction machine)
2 Lower traveling body 3 Upper revolving body 4 Front device 4A Boom 4B Arm 4C Bucket 5 Swing frame 6 Swing post 23 Control valve 24 Front hydraulic piping 28 Preliminary hydraulic piping 28A Piping connection port 30 Additional hydraulic piping 31 Fixed piping 32 Flexible piping 33 Guide member 36 Breaker (front attachment)

Claims (4)

自走可能な下部走行体と、該下部走行体上に旋回可能に搭載された上部旋回体と、該上部旋回体の前側にスイングポストを用いて左,右方向に揺動可能に支持されたフロント装置と、該フロント装置に選択的に取付けられるフロントアタッチメントとを備えてなる旋回式建設機械において、
前記上部旋回体の前側には前記スイングポストの近傍に位置して前記フロントアタッチメントに圧油を給排するための配管接続口を設け、
前記フロント装置側には前記フロント装置に沿って延びた先端側が前記フロントアタッチメントと接続される追加油圧配管を設け、
該追加油圧配管の基端側は前記スイングポストの側方を経由して前記配管接続口と接続する構成としたことを特徴とする旋回式建設機械。
A self-propelled lower traveling body, an upper revolving body mounted on the lower traveling body so as to be able to swivel, and a swing post supported on the front side of the upper revolving body so as to be swingable left and right. In a swivel construction machine comprising a front device and a front attachment selectively attached to the front device,
Provided on the front side of the upper swing body is a pipe connection port for supplying and discharging pressure oil to and from the front attachment in the vicinity of the swing post,
The front device side is provided with an additional hydraulic pipe connected to the front attachment at the tip side extending along the front device,
A swivel construction machine characterized in that a base end side of the additional hydraulic pipe is connected to the pipe connection port via a side of the swing post.
前記追加油圧配管は、前記フロント装置に沿って配置された固定配管と、該固定配管と前記配管接続口との間に設けられる可撓配管とにより構成してなる請求項1に記載の旋回式建設機械。   The swivel type according to claim 1, wherein the additional hydraulic pipe is constituted by a fixed pipe disposed along the front device and a flexible pipe provided between the fixed pipe and the pipe connection port. Construction machinery. 前記配管接続口は上部旋回体の前側に露出した位置に上側に立ち上げて設け、前記追加油圧配管の基端側は該配管接続口に上側から接続する構成としてなる請求項1または2に記載の旋回式建設機械。   3. The pipe connection port is configured to rise upward at a position exposed to the front side of the upper swing body, and the base end side of the additional hydraulic pipe is connected to the pipe connection port from above. Swivel construction machine. 前記スイングポストには前記追加油圧配管をガイドするガイド部材を設ける構成としてなる請求項1,2または3に記載の旋回式建設機械。   The swing construction machine according to claim 1, 2 or 3, wherein the swing post is provided with a guide member for guiding the additional hydraulic pipe.
JP2004124587A 2004-04-20 2004-04-20 Swivel type construction machinery Pending JP2005307522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004124587A JP2005307522A (en) 2004-04-20 2004-04-20 Swivel type construction machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004124587A JP2005307522A (en) 2004-04-20 2004-04-20 Swivel type construction machinery

Publications (1)

Publication Number Publication Date
JP2005307522A true JP2005307522A (en) 2005-11-04

Family

ID=35436602

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004124587A Pending JP2005307522A (en) 2004-04-20 2004-04-20 Swivel type construction machinery

Country Status (1)

Country Link
JP (1) JP2005307522A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014029099A (en) * 2012-07-04 2014-02-13 Kubota Corp Loader work machine
JP2014190153A (en) * 2013-03-28 2014-10-06 Hitachi Constr Mach Co Ltd Hydraulic excavator
JP2022029020A (en) * 2020-08-04 2022-02-17 大成建設株式会社 Breaker mounting jig

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014029099A (en) * 2012-07-04 2014-02-13 Kubota Corp Loader work machine
JP2014190153A (en) * 2013-03-28 2014-10-06 Hitachi Constr Mach Co Ltd Hydraulic excavator
JP2022029020A (en) * 2020-08-04 2022-02-17 大成建設株式会社 Breaker mounting jig
JP7308798B2 (en) 2020-08-04 2023-07-14 大成建設株式会社 Breaker mounting jig

Similar Documents

Publication Publication Date Title
JP4695017B2 (en) Construction machinery
JP4988661B2 (en) Construction machinery
JP4057542B2 (en) Construction machinery
JP2007205100A (en) Body frame of construction machinery and the construction machinery
JP4550623B2 (en) Construction machinery
JP4516009B2 (en) Construction machinery
JP5625013B2 (en) Construction machinery
JP3967501B2 (en) Swivel construction machine
JP2005307522A (en) Swivel type construction machinery
JP4256219B2 (en) Construction machinery
JP3949858B2 (en) Swivel construction machine
JP4199173B2 (en) Swivel construction machine
JP4625430B2 (en) Construction machinery
JP4468872B2 (en) Construction machinery
JP6706213B2 (en) Hydraulic excavator
JP2011106222A (en) Construction machine
JP2001115488A (en) Swivel type construction machine
JP2007092278A (en) Upper structure of backhoe
JP6618436B2 (en) Small excavator
JP4291219B2 (en) Construction machinery
JP3412577B2 (en) Hydraulic excavator
JP4510146B2 (en) Construction machine manufacturing method
JP2006063686A (en) Hydraulic excavator
JP2005061061A (en) Construction machine
JP2005336828A (en) Revolving construction machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20060512

Free format text: JAPANESE INTERMEDIATE CODE: A621

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080415

A131 Notification of reasons for refusal

Effective date: 20080819

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090106