FR3036123A1 - PREFABRICATED SLAB - Google Patents
PREFABRICATED SLAB Download PDFInfo
- Publication number
- FR3036123A1 FR3036123A1 FR1554206A FR1554206A FR3036123A1 FR 3036123 A1 FR3036123 A1 FR 3036123A1 FR 1554206 A FR1554206 A FR 1554206A FR 1554206 A FR1554206 A FR 1554206A FR 3036123 A1 FR3036123 A1 FR 3036123A1
- Authority
- FR
- France
- Prior art keywords
- hand
- cavity
- plate
- slab
- sole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 claims abstract description 46
- 239000011230 binding agent Substances 0.000 claims abstract description 30
- 239000002023 wood Substances 0.000 claims abstract description 25
- 238000004519 manufacturing process Methods 0.000 claims abstract description 18
- 230000002787 reinforcement Effects 0.000 claims description 20
- 238000009415 formwork Methods 0.000 claims description 11
- 239000004568 cement Substances 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 7
- 239000011324 bead Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 8
- 239000002184 metal Substances 0.000 description 3
- 238000001035 drying Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000002513 implantation Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
- E04B5/26—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with filling members between the beams
- E04B5/261—Monolithic filling members
- E04B5/263—Monolithic filling members with a flat lower surface
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
- E04B5/26—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with filling members between the beams
- E04B5/266—Filling members covering the undersurface of the beams
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
L'invention concerne une dalle préfabriquée (1) pour la réalisation d'un plancher ou d'un plafond d'une construction. Cette dalle (1) comporte : - une plaque (2), d'une part, réalisée en un matériau contenant au moins du bois et un liant et, d'autre part, comportant au moins une cavité (3) ; - au moins une armature (4), une telle armature (4) s'étendant au moins en partie à l'intérieur de la cavité (3) ou au moins en partie à l'intérieur de l'une des cavités (3) de la plaque (2); - au moins une semelle (5), une telle semelle (5), d'une part, s'étendant au moins à l'intérieur de la cavité (3) ou au moins à l'intérieur de l'une des cavités (3) de la plaque (2) et, d'autre part, recevant intérieurement au moins une partie de l'armature (4) ou au moins une partie de l'une des armatures (4). L'invention concerne, également, un procédé de fabrication d'une telle dalle préfabriquée (1).The invention relates to a prefabricated slab (1) for producing a floor or a ceiling of a building. This slab (1) comprises: - a plate (2), on the one hand, made of a material containing at least wood and a binder and, on the other hand, having at least one cavity (3); at least one armature (4), such armature (4) extending at least partly inside the cavity (3) or at least partly inside one of the cavities (3) the plate (2); at least one sole (5), such sole (5), on the one hand, extending at least inside the cavity (3) or at least inside one of the cavities ( 3) of the plate (2) and, on the other hand, receiving internally at least a portion of the armature (4) or at least a portion of one of the armatures (4). The invention also relates to a method of manufacturing such a prefabricated slab (1).
Description
1 La présente invention concerne une dalle préfabriquée pour la réalisation d'un plancher ou d'un plafond d'une construction. Cette invention a, également, trait à un procédé de fabrication d'une telle dalle préfabriquée.The present invention relates to a prefabricated slab for producing a floor or a ceiling of a building. This invention also relates to a method of manufacturing such a prefabricated slab.
L'invention concerne le domaine du bâtiment et, plus particulièrement, celui de la fabrication en usine d'éléments de construction destinés à être utilisés pour la réalisation d'une construction, notamment d'un immeuble en particulier d'habitation. L'invention trouvera, alors, plus particulièrement une application dans le cadre d'un élément de construction constitué par une dalle employée pour la réalisation d'un plancher ou d'un plafond d'une telle construction. L'on connait, d'ores et déjà, de telles dalles préfabriquées qui comportent, usuellement, une plaque réalisée en béton ainsi que des armatures métalliques comportant, d'une part, une partie interne noyée à l'intérieur du béton de cette plaque et, d'autre part, une partie externe s'étendant à l'extérieur de cette plaque. Etant donné qu'une telle plaque est réalisée en béton, la fabrication d'une telle dalle consiste à couler dans un moule le béton destiné à constituer ladite plaque et à maintenir ce béton dans ce moule dans l'attente du séchage à coeur de ce béton, ceci pour pouvoir manipuler la dalle en vue de son stockage sans lui occasionner de dégradations. Pendant que le béton de la plaque sèche dans son moule, il n'est pas possible d'utiliser ce moule pour la fabrication d'une nouvelle dalle ce qui nuit à la productivité. Pour accélérer le séchage, il a été imaginé une solution consistant à chauffer le moule ce qui présente, alors, l'inconvénient d'une consommation d'énergie importante.The invention relates to the field of the building and, more particularly, that of the manufacture in the factory of building elements intended to be used for the realization of a construction, in particular of a particular residential building. The invention will find, more particularly, an application in the context of a building element consisting of a slab used for the realization of a floor or a ceiling of such a construction. Already known, such prefabricated slabs that usually comprise a plate made of concrete and metal reinforcements having, on the one hand, an inner portion embedded in the concrete of this plate and, on the other hand, an outer portion extending outside of this plate. Since such a plate is made of concrete, the manufacture of such a slab is to pour into a mold the concrete intended to form said plate and maintain the concrete in the mold while waiting for the drying heart of this concrete, this to be able to manipulate the slab for storage without causing damage. While the concrete of the plate dries in its mold, it is not possible to use this mold for the manufacture of a new slab which affects productivity. To accelerate the drying, it has been imagined a solution consisting of heating the mold, which then has the disadvantage of a significant energy consumption.
On observera, également, qu'une telle dalle, outre les armatures métalliques mentionnées ci-dessus, comporte encore un ferraillage s'étendant à l'intérieur de la plaque en béton et destiné à garantir l'intégrité de cette dalle. Ceci étant, cette dalle présente un poids conséquent qui nécessite de faire appel à un outillage particulier pour manutentionner une telle dalle aussi bien en usine lors de sa fabrication et de son stockage, 3036123 2 que lors de son chargement sur un véhicule, ou encore lors de son déchargement à partir d'un tel véhicule sur un chantier, mais également lors sa mise en place sur un chantier. La présente invention se veut de remédier aux inconvénients 5 des dalles préfabriquées de l'état de la technique ainsi que de leur procédé de fabrication. A cet effet, l'invention concerne une dalle préfabriquée pour la réalisation d'un plancher ou d'un plafond d'une construction. Une telle dalle comporte : 10 - une plaque, d'une part, réalisée en un matériau contenant au moins du bois et un liant et, d'autre part, comportant au moins une cavité ; - au moins une armature, une telle armature s'étendant au moins en partie à l'intérieur de la cavité ou au moins en partie 15 à l'intérieur de l'une des cavités de la plaque ; - au moins une semelle, une telle semelle, d'une part, s'étendant au moins à l'intérieur de la cavité ou au moins à l'intérieur de l'une des cavités de la plaque et, d'autre part, recevant intérieurement au moins une partie de l'armature ou au 20 moins une partie de l'une des armatures. Une autre caractéristique consiste en ce que le bois est sous forme de copeaux de bois et/ou que le liant est constitué par du ciment. En fait, la ou les cavités adoptent la forme d'une rainure 25 s'étendant selon une direction perpendiculaire ou au moins parallèle à une direction principale dans laquelle s'étend la plaque ou la dalle. En ce qui concerne la ou les semelles, celles-ci s'étendent également à l'intérieur d'une partie du corps de la plaque.It will also be observed that such a slab, in addition to the metal reinforcements mentioned above, further comprises a reinforcement extending inside the concrete slab and intended to guarantee the integrity of this slab. This being the case, this slab has a considerable weight which requires the use of special tools to handle such a slab both in the factory during its manufacture and storage, 3036123 2 that when loaded on a vehicle, or when unloading from such a vehicle on a construction site, but also when it is set up on a construction site. The present invention aims to overcome the disadvantages of prefabricated slabs of the state of the art and their manufacturing process. To this end, the invention relates to a prefabricated slab for producing a floor or a ceiling of a building. Such a slab comprises: a plate, on the one hand, made of a material containing at least wood and a binder and, on the other hand, having at least one cavity; at least one armature, such armature extending at least partly inside the cavity or at least partly inside one of the cavities of the plate; at least one sole, such a soleplate, on the one hand, extending at least inside the cavity or at least inside one of the cavities of the plate and, on the other hand, receiving internally at least a portion of the frame or at least a portion of one of the frames. Another characteristic is that the wood is in the form of wood chips and / or that the binder is made of cement. In fact, the cavity or cavities take the form of a groove 25 extending in a direction perpendicular or at least parallel to a main direction in which the plate or the slab extends. With regard to the sole or soles, these also extend inside a part of the body of the plate.
30 Une autre caractéristique consiste en que la ou les semelles sont réalisées (notamment intégralement) en un matériau contenant un liant, notamment en un matériau constitué par du béton contenant un tel liant sous forme de ciment. Une caractéristique additionnelle consiste en ce que la 35 dalle comporte au moins un ensemble, d'une part, constitué par un talon en béton et par une armature dont une partie est noyée 3036123 3 dans le béton du talon et, d'autre part, localisé à l'intérieur de la cavité ou d'au moins une des cavités de la plaque. Dans cette dalle, d'une part, la ou les armatures de la dalle sont constituées par l'armature d'au moins un tel ensemble et, 5 d'autre part, la ou les semelles de la dalle sont constituées en partie par le talon d'au moins un tel ensemble ainsi qu'en partie par un matériau contenant un liant. L'invention concerne, également, un procédé de fabrication d'une telle dalle préfabriquée. Ce procédé consiste en ce que : 10 - dans un coffrage comportant au moins une protubérance, on dispose un matériau contenant au moins du bois et un liant, ceci pour réaliser une plaque comportant au moins une cavité ; - on décoffre la plaque ; - à l'intérieur de la cavité ou d'au moins une des cavités 15 de la plaque, d'une part, on positionne au moins une armature, d'autre part, on réalise une semelle à l'intérieur de laquelle est noyée une partie d'une telle armature. Ainsi, la dalle préfabriquée conforme à l'invention comporte une plaque réalisée en un matériau contenant du bois 20 sous forme de copeaux de bois ce qui permet, avantageusement, de diminuer le poids de la plaque d'une telle dalle et ainsi de la dalle elle-même, ceci par rapport à une dalle de l'état de la technique présentant une même surface. Une telle diminution du poids permet de faciliter la 25 manutention d'une telle dalle aussi bien en usine que sur un chantier. Ceci permet, également, d'envisager une augmentation de la taille (surface) d'une telle dalle ce qui, pour une même surface à couvrir, permet de réduire le nombre de dalles et, donc, le nombre d'opérations de manutention 30 L'utilisation d'un tel matériau contenant du bois permet, également, d'améliorer les qualités acoustiques par rapport aux dalles de l'état de la technique et, de ce fait, permet d'envisager l'utilisation d'une dalle conforme à l'invention pour la protection phonique d'une construction.Another characteristic consists in that the sole or soles are made (in particular integrally) of a material containing a binder, in particular of a material consisting of concrete containing such a binder in the form of cement. An additional feature is that the slab comprises at least one set, on the one hand, consisting of a concrete bead and a reinforcement one part of which is embedded in the concrete of the bead and, on the other hand, located inside the cavity or at least one of the cavities of the plate. In this slab, on the one hand, the reinforcement or reinforcements of the slab are constituted by the reinforcement of at least one such assembly and, on the other hand, the slab soles or soles are constituted in part by the heel of at least one such assembly as well as in part by a material containing a binder. The invention also relates to a method of manufacturing such a prefabricated slab. This method consists in that: in a formwork comprising at least one protuberance, a material containing at least wood and a binder is provided, this to produce a plate comprising at least one cavity; - we sell the plate; inside the cavity or at least one of the cavities of the plate, on the one hand, at least one armature is positioned, on the other hand, a sole is formed inside which is embedded. a part of such a frame. Thus, the prefabricated slab according to the invention comprises a plate made of a material containing wood in the form of wood chips, which advantageously makes it possible to reduce the weight of the slab of such a slab and thus of the slab. itself, this compared to a slab of the state of the art having the same surface. Such a reduction in weight makes it easier to handle such a slab both in the factory and on a construction site. This also makes it possible to envisage an increase in the size (area) of such a slab which, for the same surface to be covered, makes it possible to reduce the number of slabs and therefore the number of handling operations. The use of such a material containing wood also makes it possible to improve the acoustic qualities compared to slabs of the state of the art and, therefore, makes it possible to envisage the use of a compliant slab. to the invention for the sound protection of a construction.
35 Finalement, l'utilisation d'un tel matériau contenant du bois permet de conférer à la dalle conforme à l'invention des 3036123 4 caractéristiques mécaniques autorisant son implantation en zone sismique. On observera que le matériau de la plaque d'une telle dalle contient un liant sous forme de ciment. En particulier, le 5 matériau de cette plaque peut contenir du béton contenant un tel liant ce qui permet, avantageusement, de conférer à une telle dalle un comportement par rapport au feu qui autorise le classement de cette dalle dans la catégorie des produits incombustibles correspondant à la classe MO de réaction au feu.Finally, the use of such a wood-containing material makes it possible to provide the slab according to the invention with mechanical characteristics enabling its implantation in a seismic zone. It will be observed that the material of the plate of such a slab contains a binder in the form of cement. In particular, the material of this plate may contain concrete containing such a binder which advantageously makes it possible to confer on such a slab a behavior with respect to the fire which authorizes the classification of this slab in the category of incombustible products corresponding to the MO class of reaction to fire.
10 La dalle conforme à l'invention comporte, également, au moins une armature ainsi qu'au moins une semelle qui permettent de rendre cette dalle autoportante. D'autres buts et avantages de la présente invention apparaîtront au cours de la description qui va suivre se 15 rapportant à des modes de réalisation qui ne sont donnés qu'à titre d'exemples indicatifs et non limitatifs. La compréhension de cette description sera facilitée en se référant aux dessins joints en annexe et dans lesquels : - la figure 1 est une vue schématisée et en perspective 20 d'une dalle conforme à l'invention ; - la figure 2 est une vue schématisée et de côté de la dalle illustré figure 1 ; - la figure 3 est une vue schématisée et correspondant à un détail de la dalle illustrée figure 2.The slab according to the invention also comprises at least one reinforcement and at least one soleplate which makes this slab self-supporting. Other objects and advantages of the present invention will become apparent from the following description relating to embodiments which are given by way of indicative and non-limiting examples. The understanding of this description will be facilitated with reference to the accompanying drawings in which: FIG. 1 is a schematic and perspective view of a slab according to the invention; - Figure 2 is a schematic side view of the slab illustrated in Figure 1; - Figure 3 is a schematic view and corresponding to a detail of the slab illustrated in Figure 2.
25 La présente invention concerne le domaine du bâtiment et, plus particulièrement, celui de la fabrication en usine d'éléments de construction destinés à être utilisés pour la réalisation d'une construction, notamment d'un immeuble en particulier d'habitation.The present invention relates to the field of the building and, more particularly, that of the manufacture in the factory of building elements intended to be used for the realization of a construction, in particular of a particular residential building.
30 L'invention concerne, alors, plus particulièrement, un élément de construction constitué par une dalle préfabriquée 1 employée pour la réalisation d'un plancher ou d'un plafond d'une telle construction. Une telle dalle préfabriquée 1 comporte une plaque 2 35 réalisée en un matériau contenant au moins du bois et un liant.The invention then relates more particularly to a building element consisting of a prefabricated slab 1 used for the production of a floor or a ceiling of such a construction. Such a prefabricated slab 1 comprises a plate 2 35 made of a material containing at least wood and a binder.
3036123 5 A ce propos, on observera que ce bois est sous forme de copeaux de bois. De tels copeaux de bois peuvent être constitués par des déchets d'usinage de bois, par exemple issus d'une scierie.In this regard, it will be observed that this wood is in the form of wood chips. Such wood chips may consist of woodworking waste, for example from a sawmill.
5 En ce qui concerne le liant, celui-ci peut être constitué par une résine ou, et de préférence, par du ciment. Aussi et selon un mode de réalisation préféré de l'invention, le matériau contenant au moins du bois et un liant est constitué par un matériau contenant au moins du bois et du 10 béton qui lui-même contient le liant constitué par du ciment. Ce béton peut, également, contenir de l'eau, voire encore du sable et/ou des adjuvants. Selon une autre caractéristique, la plaque 2, que comporte la dalle préfabriquée 1, comporte, également, au moins une 15 cavité 3. Selon un premier mode de réalisation non représenté, une telle cavité 3 peut adopter la forme d'un trou borgne. Cependant et selon un mode de réalisation préféré illustré figures 1 à 3, cette ou ces cavités 3 adoptent la forme d'une 20 rainure s'étendant selon une direction perpendiculaire ou (et de préférence) au moins parallèle à une direction principale dans laquelle s'étend la plaque 2 ou la dalle 1. Une autre caractéristique consiste en ce qu'une telle cavité 3 comporte un fond 30 ainsi qu'au moins une paroi 31 25 s'étendant à partir de ce fond 30 en divergeant. Tel que visible sur les figures en annexe, ladite plaque 2 présente deux grands côtés (20 ; 20'). Ceci étant, la ou les cavités 3 débouchent à la surface de l'un 20 de ces deux grands côtés (20 ; 20').As regards the binder, this may be a resin or, preferably, cement. Also and according to a preferred embodiment of the invention, the material containing at least wood and a binder is constituted by a material containing at least wood and concrete which itself contains the binder consisting of cement. This concrete may also contain water, or even sand and / or admixtures. According to another characteristic, the plate 2, which comprises the prefabricated slab 1, also comprises at least one cavity 3. According to a first embodiment not shown, such a cavity 3 may take the form of a blind hole. However, and according to a preferred embodiment illustrated in FIGS. 1 to 3, this or these cavities 3 adopt the shape of a groove extending in a perpendicular direction or (and preferably) at least parallel to a main direction in which s Another feature is that such a cavity 3 has a bottom 30 and at least one wall 31 extending from the bottom 30 diverging. As can be seen in the appended figures, said plate 2 has two long sides (20; 20 '). This being the case, the cavities 3 open on the surface of one of these two long sides (20; 20 ').
30 Une autre caractéristique consiste en ce que la dalle préfabriquée 1 comporte au moins une armature 4. En fait, une telle armature 4 s'étend au moins en partie à l'intérieur de la cavité 3 de la plaque 2 ou au moins en partie à l'intérieur de l'une des cavités 3 de la plaque 2.Another characteristic is that the prefabricated slab 1 comprises at least one armature 4. In fact, such a frame 4 extends at least partly inside the cavity 3 of the plate 2 or at least partly inside one of the cavities 3 of the plate 2.
35 Un mode particulier de réalisation consiste en ce qu'une telle armature 4 s'étend, d'une part, en partie à l'intérieur 3036123 6 d'une telle cavité 3 et, d'autre part, en partie à l'extérieur d'une telle cavité 3, ceci en saillie par rapport à la surface de l'un 20 des deux grands côtés (20 ; 20'). Cependant et selon un mode préféré de réalisation illustré 5 figures 1 à 3, une telle armature 4 s'étend intégralement à l'intérieur d'une telle cavité 3. Selon un premier mode de réalisation, la ou les armatures 4 peuvent adopter la forme d'une corbeille résultant de l'assemblage de barres, notamment métalliques, plus 10 particulièrement agencées de manière parallèle et, selon le cas, en carré ou en rectangle. Cependant et selon un mode de réalisation préféré de l'invention illustré figures 1 à 3, la ou les armatures 4 adoptent la forme d'une poutrelle comportant au moins deux 15 barres parallèles ainsi qu'au moins un moyen de raccordement de ces barres parallèles entre elles. En fait, la ou les armatures 4 adoptent, de préférence, la forme d'une poutrelle comportant, d'une part, trois barres parallèles et agencées en triangle et, d'autre part, des moyens 20 de raccordement de l'une de ces barres aux deux autres barres. En particulier, ces moyens de raccordement comportent, d'une part, un moyen de raccordement pour raccorder une des barres définissant la base du triangle à une des barres définissant le sommet de ce triangle et, d'autre part, un autre 25 moyen de raccordement pour raccorder l'autre barre définissant la base du triangle à la barre définissant le sommet de ce triangle. Une autre caractéristique consiste en ce que la dalle préfabriquée 1 comporte au moins une semelle 5.A particular embodiment is that such a frame 4 extends, on the one hand, partly inside 3036123 6 of such a cavity 3 and, on the other hand, partly to the outside of such a cavity 3, this protruding from the surface of one of the two long sides (20; 20 '). However, and according to a preferred embodiment illustrated in FIGS. 1 to 3, such a reinforcement 4 extends integrally inside such a cavity 3. According to a first embodiment, the reinforcement (s) 4 can adopt the shape a basket resulting from the assembly of bars, in particular metal, more particularly arranged in parallel and, as the case may be, in square or rectangle. However, and according to a preferred embodiment of the invention illustrated in FIGS. 1 to 3, the reinforcement (s) 4 take the form of a beam comprising at least two parallel bars and at least one connecting means for these parallel bars. between them. In fact, the reinforcement or frames 4 preferably adopt the shape of a beam comprising, on the one hand, three parallel bars and arranged in a triangle and, on the other hand, means 20 for connecting one of the these bars to the other two bars. In particular, these connecting means comprise, on the one hand, connection means for connecting one of the bars defining the base of the triangle to one of the bars defining the vertex of this triangle and, on the other hand, another means of connection to connect the other bar defining the base of the triangle to the bar defining the top of this triangle. Another characteristic is that the prefabricated slab 1 comprises at least one sole 5.
30 Une telle semelle 5 s'étend au moins à l'intérieur de la cavité 3 de la plaque 2 ou au moins à l'intérieur de l'une des cavités 3 de la plaque 2. En fait, une telle semelle 5 est immobilisée à l'intérieur d'une telle cavité 3 (et, donc, par rapport à la plaque 2) et 35 s'étend, plus particulièrement, au moins dans le fond d'une telle cavité 3.Such a sole 5 extends at least inside the cavity 3 of the plate 2 or at least inside one of the cavities 3 of the plate 2. In fact, such a sole 5 is immobilized. within such a cavity 3 (and, therefore, with respect to the plate 2) and 35 extends, more particularly, at least in the bottom of such a cavity 3.
3036123 7 Selon un mode de réalisation préféré, la ou les semelles 5 s'étendent également à l'intérieur d'une partie du corps de la plaque 2, plus particulièrement à l'intérieur d'une partie du corps de la plaque 2 bordant ou délimitant une cavité 3 de cette 5 plaque 2. Ceci permet, avantageusement, d'immobiliser une telle semelle 5 à l'intérieur d'une rapport à la plaque 2. A ce propos, on observera telle cavité 3 et, donc, par que le matériau de la plaque 2 (plus particulièrement les copeaux de bois) définit des creux à 10 l'intérieur desquels pénètre le matériau d'une telle semelle 5 et qui constituent des moyens d'accrochage du matériau d'une telle semelle 5. Une autre caractéristique consiste en ce qu'une telle semelle 5 reçoit intérieurement au moins une partie de 15 l'armature 4 de la dalle 1 ou au moins une partie de l'une des armatures 4 de cette dalle 1. A ce propos, on observera qu'une telle partie d'armature 4 est, alors, noyée à l'intérieur d'une telle semelle 5. Une telle armature 4 peut, alors également, comporter une 20 autre partie d'armature 4, s'étendant en dehors d'une telle semelle 5, et permettant la coopération avec un engin de manutention de la dalle 1, plus particulièrement permettant l'accrochage d'un crochet d'accrochage équipant une élingue que comporte un tel engin de manutention.According to a preferred embodiment, the sole or soles 5 also extend inside a part of the body of the plate 2, more particularly inside a part of the body of the plate 2 bordering or delimiting a cavity 3 of this plate 2. This advantageously makes it possible to immobilize such a sole 5 within a ratio to the plate 2. In this respect, one will observe such cavity 3 and, therefore, by the material of the plate 2 (more particularly the wood chips) defines cavities within which the material of such a sole 5 penetrates and which constitute means for fastening the material of such a sole 5. Another feature is that such a sole 5 internally receives at least a portion of the frame 4 of the slab 1 or at least a portion of one of the frames 4 of the slab 1. In this regard, observe that such a part of frame 4 is, then, embedded inside 5. Such a frame 4 may then also comprise another reinforcing part 4, extending outside such a sole 5, and allowing the cooperation with a handling device of the slab. 1, more particularly allowing the hooking of a hook hook fitted to a sling that includes such a handling device.
25 Une autre caractéristique consiste en ce que la ou les semelles 5 sont réalisées en un matériau contenant un liant. Selon un mode préféré de réalisation, un tel matériau est constitué par du béton (plus particulièrement un béton de type C25/30 au minimum) contenant un tel liant sous forme de ciment.Another feature is that the sole (s) 5 are made of a material containing a binder. According to a preferred embodiment, such a material is made of concrete (more particularly a C25 / 30 type concrete at least) containing such a binder in the form of cement.
30 Selon un premier mode de réalisation, une telle semelle 5 peut être constituée par un bloc (notamment de type monobloc) réalisé en un tel matériau, plus particulièrement réalisé dans son intégralité à partir d'un tel matériau coulé à l'intérieur d'une des cavités 3 de la plaque 2.According to a first embodiment, such a sole 5 may be constituted by a block (in particular of monobloc type) made of such a material, more particularly made in its entirety from such a material cast inside one of the cavities 3 of the plate 2.
35 Selon un deuxième mode de réalisation, la dalle 1 comporte au moins un ensemble 6 constitué par un talon 60 en béton et par 3036123 8 une armature 61 (notamment adoptant la forme d'une poutrelle telle que décrite ci-dessus) dont, d'une part, une partie est noyée dans le béton du talon 60 et, d'une part, une autre partie s'étend en dehors de ce talon 60. Un tel ensemble 6 est 5 usuellement connu sous la dénomination de poutrelle treillis. Un tel ensemble 6 est, alors, localisé à l'intérieur de la cavité 3 de la plaque 2 ou à l'intérieur d'au moins une des cavités 3 de la plaque 2. Dans un pareil cas, la ou les armatures 4 susmentionnées de 10 la dalle 1 sont, alors, constituées par l'armature 61 d'au moins un tel ensemble 6 tandis que la ou les semelles 5 susmentionnées de la dalle 1 sont constituées en partie par le talon 60 d'au moins un tel ensemble 6. De manière complémentaire, une telle semelle 5 peut, encore, être en partie constituée par un 15 matériau (tel que susmentionné, notamment constitué par du béton, plus particulièrement un béton de type C25/30 au minimum) contenant un liant, que contient la cavité 3 ou l'une des cavités 3 de la plaque 2, qui vient compléter le talon 60 d'au moins un tel ensemble 6, et qui assure l'immobilisation d'un tel 20 ensemble 6 à l'intérieur d'une telle cavité 3. Une caractéristique additionnelle consiste en ce que la dalle 1 comporte une pluralité de cavités 3, une pluralité d'armatures 4 et une pluralité de semelles 5. Dans ce cas, une partie au moins de ces cavités 3 reçoit, d'une part, au moins 25 une telle semelle 5 qui s'étend alors à l'intérieur d'une telle cavité 3 et, d'autre part, au moins une telle armature 4 qui s'étend au moins en partie à l'intérieur d'une telle cavité 3 ainsi qu'en partie à l'intérieur d'une telle semelle 5. Cependant et selon un mode de réalisation préféré de 30 l'invention illustré figures 1 à 3, chaque cavité 3 reçoit, d'une part, au moins une telle semelle 5 qui s'étend alors à l'intérieur d'une telle cavité 3 et, d'autre part, au moins une telle armature 4 qui s'étend au moins en partie à l'intérieur d'une telle cavité 3 ainsi qu'en partie à l'intérieur d'une 35 telle semelle 5.According to a second embodiment, the slab 1 comprises at least one assembly 6 constituted by a concrete heel 60 and by an armature 61 (in particular in the form of a beam as described above), of which, on the one hand, a part is embedded in the concrete of the heel 60 and, on the other hand, another part extends outside this heel 60. Such a set 6 is usually known under the name of lattice truss. Such an assembly 6 is then located inside the cavity 3 of the plate 2 or inside at least one of the cavities 3 of the plate 2. In such a case, the above-mentioned reinforcement (s) 4 the slab 1 are then constituted by the reinforcement 61 of at least one such assembly 6 while the abovementioned soles 5 of the slab 1 are formed in part by the heel 60 of at least one such assembly 6. In a complementary manner, such a sole 5 may, again, be partly constituted by a material (as mentioned above, in particular consisting of concrete, more particularly a C25 / 30 type concrete at least) containing a binder, that contains the cavity 3 or one of the cavities 3 of the plate 2, which completes the heel 60 of at least one such assembly 6, and which ensures the immobilization of such an assembly 6 inside of such an additional cavity 3. An additional feature is that the slab 1 comprises a plurality of cavities 3, a plurality of reinforcements 4 and a plurality of soles 5. In this case, at least part of these cavities 3 receives, on the one hand, at least 25 such a sole 5 which then extends to the inside of such a cavity 3 and, on the other hand, at least one such armature 4 which extends at least partly inside such a cavity 3 as well as partly inside a However, and according to a preferred embodiment of the invention illustrated in FIGS. 1 to 3, each cavity 3 receives, on the one hand, at least one such sole 5 which then extends inside such a cavity 3 and, on the other hand, at least one such armature 4 which extends at least partly inside such a cavity 3 as well as partly inside such a sole 5.
3036123 9 L'invention concerne, également, un procédé de fabrication d'une dalle préfabriquée 1 présentant les caractéristiques décrites ci-dessus. Ce procédé de fabrication consiste en ce que : 5 - dans un coffrage comportant au moins une protubérance, on dispose un matériau contenant au moins du bois et un liant, ceci pour réaliser une plaque 2 comportant au moins une cavité 3 ; - on décoffre la plaque 2 ; - à l'intérieur de la cavité 3 ou d'au moins une des 10 cavités 3 de la plaque 2, d'une part, on positionne au moins une armature 4, d'autre part, on réalise une semelle 5 à l'intérieur de laquelle est noyée une partie d'une telle armature 4. Ainsi, une première étape de ce procédé consiste à réaliser une plaque 2 comportant au moins une cavité 3, ceci en ayant 15 recours à un coffrage comportant au moins une protubérance qui adopte, de préférence, la forme d'une nervure. Selon un premier mode de réalisation de cette première étape de ce procédé, on dispose le matériau contenant au moins le bois et le liant à l'intérieur d'un coffrage comportant un 20 fond pourvu de la protubérance ou des protubérances et, après durcissement du matériau, on retourne et on décoffre la plaque 2. A ce propos, on observera qu'au cours de cette première étape, on peut tout d'abord décoffrer la plaque 2 et, ensuite 25 seulement, retourner cette plaque 2. Cependant et selon un mode de réalisation préféré, on retourne simultanément la plaque 2 ainsi que le coffrage et, ensuite seulement, on décoffre cette plaque 2. Un deuxième mode de réalisation de cette première étape de 30 procédé consiste en ce qu'on dispose le matériau contenant au moins le bois et le liant dans un moule que comporte le coffrage. Ensuite et par-dessus le matériau, on positionne un couvercle que comporte ce coffrage et qui est pourvu de la protubérance ou des protubérances. Par la suite, on compacte le 35 matériau avec la ou les protubérances du couvercle, ceci pour la réalisation de la cavité 3 ou des cavités 3.The invention also relates to a method of manufacturing a prefabricated slab 1 having the characteristics described above. This manufacturing method consists in that: in a formwork comprising at least one protuberance, a material containing at least wood and a binder is provided, this for producing a plate 2 comprising at least one cavity 3; - the plate 2 is soldered; inside the cavity 3 or at least one of the cavities 3 of the plate 2, on the one hand, at least one armature 4 is positioned, on the other hand, a sole 5 is made to which is embedded in a part of such a frame 4. Thus, a first step of this method is to make a plate 2 having at least one cavity 3, this using a formwork comprising at least one protrusion which adopts preferably, the shape of a rib. According to a first embodiment of this first step of this process, the material containing at least the wood and the binder is placed inside a formwork having a bottom provided with the protuberance or protuberances and, after hardening of the In this respect, it will be observed that during this first step, the plate 2 can be first discarded and then this plate 2 can be turned over. However, and according to In a preferred embodiment, the plate 2 and the formwork are simultaneously turned over and then only this plate 2 is opened. A second embodiment of this first process step consists of disposing the material containing the less wood and binder in a mold that includes the formwork. Then and over the material, there is positioned a cover that includes this formwork and which is provided with the protuberance or protuberances. Subsequently, the material is compacted with the protrusion or bumps of the lid, this for the realization of the cavity 3 or cavities 3.
3036123 10 En fait, on compacte ce matériau en exerçant une pression sur le couvercle et/ou en rapprochant le couvercle et le fond. Une autre caractéristique de ce deuxième mode de réalisation de cette première étape de procédé consiste en ce 5 qu'on procède au décoffrage de la plaque 2 immédiatement après avoir assuré le compactage du matériau. Tel que mentionné ci-dessus, ce procédé consiste en ce qu'à l'intérieur de la cavité 3 ou d'au moins une des cavités 3 de la plaque 2, d'une part, on positionne au moins une armature 4, 10 d'autre part, on réalise une semelle 5 à l'intérieur de laquelle est noyée une partie d'une telle armature 4. A ce propos, on observera que, selon un premier mode de réalisation, à l'intérieur de la cavité 3 ou d'au moins une cavité 3 de la plaque 2, d'une part, on positionne au moins une 15 telle armature 4 (notamment adoptant la forme d'une poutrelle telle que décrite ci-dessus), d'autre part, on coule un matériau (tel que susmentionné, notamment au moins en partie constitué par du béton, plus particulièrement un béton de type C25/30 au minimum) contenant un liant ceci pour la réalisation d'une 20 semelle 5 et, d'autre part encore, on noie une partie d'une telle armature 4 à l'intérieur du matériau d'une telle semelle 5. Dans un pareil cas, ladite semelle 5 est intégralement réalisée en coulant le matériau d'une telle semelle 5 à 25 l'intérieur d'une telle cavité 3. Selon un deuxième mode de réalisation, à l'intérieur de la cavité 3 ou d'au moins une cavité 3 de la plaque 2, on dispose au moins un ensemble 6 (présentant les caractéristiques décrites ci-dessus), d'une part, usuellement connu sous la dénomination 30 de poutrelle treillis et, d'autre part, comportant un talon 60 en béton ainsi qu'une armature 61 (notamment adoptant la forme d'une poutrelle telle que décrite ci-dessus) dont une partie est noyée dans le béton du talon 60. Selon ce deuxième mode de réalisation, à l'intérieur d'une 35 telle cavité 3, on coule un matériau (tel que décrit ci-dessus, notamment constitué par du béton, plus particulièrement un béton 3036123 11 de type C25/30 au minimum) contenant un liant qui, avec le béton du talon 60 du ou des ensembles 6, constitue une semelle 5 recevant intérieurement une partie de l'armature 61 de cet ensemble 6 ou de ces ensembles 6, une telle armature 61 5 constituant l'armature 4 de la dalle 1. La présence de ce matériau permet, après durcissement, d'assurer l'immobilisation d'un tel ensemble 6 (et ainsi d'une telle armature 4) à l'intérieur d'une telle cavité 3. 10In fact, this material is compacted by exerting a pressure on the lid and / or by bringing the lid and the bottom together. Another feature of this second embodiment of this first process step is that the form is stripped of the plate 2 immediately after compaction of the material. As mentioned above, this process consists in that inside the cavity 3 or at least one of the cavities 3 of the plate 2, on the one hand, at least one armature 4, 10 is positioned. on the other hand, a sole 5 is made inside which part of such a reinforcement 4 is embedded. In this respect, it will be observed that, according to a first embodiment, inside the cavity 3 or at least one cavity 3 of the plate 2, on the one hand, at least one such armature 4 is positioned (in particular in the form of a beam as described above), on the other hand, sinks a material (as mentioned above, in particular at least partly constituted by concrete, more particularly a C25 / 30 type concrete at least) containing a binder, this for producing a sole 5 and, secondly, a portion of such a frame 4 is embedded within the material of such a sole 5. In such a case, said sole 5 is integral. made by casting the material of such a sole 5 inside such a cavity 3. According to a second embodiment, inside the cavity 3 or at least one cavity 3 of the plate 2, there is at least one assembly 6 (having the characteristics described above), on the one hand, usually known as lattice girder and, on the other hand, having a concrete heel 60 and a reinforcement 61 (in particular adopting the form of a beam as described above), part of which is embedded in the concrete of the heel 60. According to this second embodiment, within such a cavity 3, sinks a material (as described above, in particular constituted by concrete, more particularly a C25 / 30 type concrete at least) containing a binder which, together with the concrete of the heel 60 of the assembly (s) 6, constitutes a sole 5 receiving internally part of the armature 61 of this assembly 6 or 6 of these sets, such a frame 61 5 constituting the frame 4 of the slab 1. The presence of this material allows, after hardening, to ensure the immobilization of such a set 6 (and so such an armature 4) inside such a cavity 3. 10
Claims (14)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1554206A FR3036123B1 (en) | 2015-05-12 | 2015-05-12 | PREFABRICATED SLAB |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1554206 | 2015-05-12 | ||
FR1554206A FR3036123B1 (en) | 2015-05-12 | 2015-05-12 | PREFABRICATED SLAB |
Publications (2)
Publication Number | Publication Date |
---|---|
FR3036123A1 true FR3036123A1 (en) | 2016-11-18 |
FR3036123B1 FR3036123B1 (en) | 2018-10-12 |
Family
ID=53496842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1554206A Active FR3036123B1 (en) | 2015-05-12 | 2015-05-12 | PREFABRICATED SLAB |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR3036123B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020016531A1 (en) | 2018-07-17 | 2020-01-23 | Constructions Composites Bois | Plate and slab intended for creating a floor or a wall and methods for producing a plate and a slab of this kind |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE894753C (en) * | 1951-11-14 | 1953-10-26 | Carl Dr-Ing Seelbach | Reinforced concrete beam ceiling to be produced without formwork with prestressed ceiling beams and floating floor slab made of reinforced concrete |
GB983794A (en) * | 1962-11-02 | 1965-02-17 | Rapid Floor Company Ltd | Improvements in reinforced concrete floors or roofs |
GB1540575A (en) * | 1976-06-25 | 1979-02-14 | Hereford Woodwool Ltd | Structural element |
WO1995009953A1 (en) * | 1993-10-05 | 1995-04-13 | N.T.C. S.R.L. | A prefabricated element for floor construction |
FR2798685A1 (en) * | 1999-09-17 | 2001-03-23 | Promo Brevet Borg Sarl | Prefabricated fibrous slabs for making floors comprise two distinct elements : lower plane horizontal plate connected to two uprights, and upper plane horizontal plate with two vertical supports |
EP2146017A1 (en) * | 2008-07-18 | 2010-01-20 | Beletto AG | Component for floor or roof slabs and method for manufacturing a component |
-
2015
- 2015-05-12 FR FR1554206A patent/FR3036123B1/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE894753C (en) * | 1951-11-14 | 1953-10-26 | Carl Dr-Ing Seelbach | Reinforced concrete beam ceiling to be produced without formwork with prestressed ceiling beams and floating floor slab made of reinforced concrete |
GB983794A (en) * | 1962-11-02 | 1965-02-17 | Rapid Floor Company Ltd | Improvements in reinforced concrete floors or roofs |
GB1540575A (en) * | 1976-06-25 | 1979-02-14 | Hereford Woodwool Ltd | Structural element |
WO1995009953A1 (en) * | 1993-10-05 | 1995-04-13 | N.T.C. S.R.L. | A prefabricated element for floor construction |
FR2798685A1 (en) * | 1999-09-17 | 2001-03-23 | Promo Brevet Borg Sarl | Prefabricated fibrous slabs for making floors comprise two distinct elements : lower plane horizontal plate connected to two uprights, and upper plane horizontal plate with two vertical supports |
EP2146017A1 (en) * | 2008-07-18 | 2010-01-20 | Beletto AG | Component for floor or roof slabs and method for manufacturing a component |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020016531A1 (en) | 2018-07-17 | 2020-01-23 | Constructions Composites Bois | Plate and slab intended for creating a floor or a wall and methods for producing a plate and a slab of this kind |
EP3824151A1 (en) * | 2018-07-17 | 2021-05-26 | Constructions Composites Bois | Plate and slab intended for creating a floor or a wall and methods for producing a plate and a slab of this kind |
US11434637B2 (en) | 2018-07-17 | 2022-09-06 | Carbon Capture Buildings Greentech | Panel and slab designed for forming a floor or a wall and methods for manufacturing such panels and slabs |
Also Published As
Publication number | Publication date |
---|---|
FR3036123B1 (en) | 2018-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1690993A2 (en) | Wall with integrated formwork | |
FR2962143A1 (en) | PREFABRICATED STAIRCASE IN CONCRETE WITH MODULAR RACK | |
FR3036123A1 (en) | PREFABRICATED SLAB | |
EP3170947A1 (en) | Pre-wall for building construction and method for manufacturing the pre-wall | |
FR2608496A1 (en) | Method for building a wall or portion of a wall out of exposed stones or similar materials, and wall thus built | |
EP3070221B1 (en) | Method for treating thermal bridges, associated heat-insulating element and structural connection element, and pre-slab provided with such elements | |
FR2540540A1 (en) | Elements for building insulating floors, and method for the manufacture of these elements | |
FR2958574A1 (en) | METHOD FOR PRODUCING PREFABRICATED WOOD-CONCRETE COLLABORATION CONSTRUCTION PANELS AND PANELS OBTAINED THEREBY | |
CA3106583A1 (en) | Plate and slab intended for creating a floor or a wall and methods for producing a plate and a slab of this kind | |
EP3061881A1 (en) | Prefabricated balcony with ribs | |
EP3061880B1 (en) | Prefabricated balcony with ribs | |
FR2918089A1 (en) | Facing element obtaining method for e.g. bricked masonry surface, in construction field, involves immobilizing masonry elements by using maintenance agent, and removing model and guiding unit to obtain facing element with masonry elements | |
FR2770239A1 (en) | Prefabricated reinforced concrete floor slab | |
FR2993290A1 (en) | Method for construction of housing element in building site, has wall, floor and pre-wall, and floor slab that is positioned horizontally such that slab rests on emerging part of wedge, where slab comprises part of floor | |
FR2912440A1 (en) | Prefabricated panel for forming e.g. pavement, of building, has wall with counterdraft cavities containing hardenable bonding agent in which reinforcing bars are partially drowned, where cavities consist of profiled grooves | |
EP2633131B1 (en) | Construction element made of adobe | |
FR3099194A1 (en) | Method, device and installation for manufacturing a facing element and facing element thus obtained | |
FR3016908A1 (en) | INSULATING CONSTRUCTION ELEMENT AND METHOD FOR MANUFACTURING THE SAME | |
FR2960251A1 (en) | Water basin construction method for e.g. semi-inground swimming pool, involves fixing shuttering panels with concrete flagstone, and filling, with insulating material, empty spaces partially separating walls of shuttering panels | |
BE1021545B1 (en) | SWIMMING POOL COMPRISING AN STAIRCASE. | |
JPH08323716A (en) | Manufacture of surface decorative concrete product and surface decorative concrete product | |
BE395195A (en) | ||
EP4392386A1 (en) | Wall panel and method for manufacturing such a wall panel | |
FR2856092A1 (en) | Concrete floor or concrete slab thinning unit for construction e.g. house, has air evacuation unit to prevent entry of concrete into cavity, and to permit outlet of air from cavity in case of high pressure in cavity, during fire | |
FR2752257A1 (en) | Concrete floor insulating system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 2 |
|
PLSC | Publication of the preliminary search report |
Effective date: 20161118 |
|
PLFP | Fee payment |
Year of fee payment: 3 |
|
PLFP | Fee payment |
Year of fee payment: 4 |
|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 6 |
|
PLFP | Fee payment |
Year of fee payment: 7 |
|
PLFP | Fee payment |
Year of fee payment: 8 |
|
PLFP | Fee payment |
Year of fee payment: 9 |
|
PLFP | Fee payment |
Year of fee payment: 10 |