DE102010016585A1 - Drill pipe handling device, method of operating the device and use of means for moving such device - Google Patents
Drill pipe handling device, method of operating the device and use of means for moving such device Download PDFInfo
- Publication number
- DE102010016585A1 DE102010016585A1 DE201010016585 DE102010016585A DE102010016585A1 DE 102010016585 A1 DE102010016585 A1 DE 102010016585A1 DE 201010016585 DE201010016585 DE 201010016585 DE 102010016585 A DE102010016585 A DE 102010016585A DE 102010016585 A1 DE102010016585 A1 DE 102010016585A1
- Authority
- DE
- Germany
- Prior art keywords
- magazine
- path
- handling device
- linkage
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 238000005553 drilling Methods 0.000 claims description 85
- 238000012546 transfer Methods 0.000 claims description 42
- 238000006073 displacement reaction Methods 0.000 claims description 9
- 230000008859 change Effects 0.000 claims description 4
- 230000001419 dependent effect Effects 0.000 claims description 4
- 230000008569 process Effects 0.000 description 11
- 230000008878 coupling Effects 0.000 description 9
- 238000010168 coupling process Methods 0.000 description 9
- 238000005859 coupling reaction Methods 0.000 description 9
- 230000008901 benefit Effects 0.000 description 6
- 238000003860 storage Methods 0.000 description 5
- 241000283984 Rodentia Species 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 239000004215 Carbon black (E152) Substances 0.000 description 2
- 238000000151 deposition Methods 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 229930195733 hydrocarbon Natural products 0.000 description 2
- 150000002430 hydrocarbons Chemical class 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000008021 deposition Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003209 petroleum derivative Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/15—Racking of rods in horizontal position; Handling between horizontal and vertical position
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Es werden zwei Varianten einer Vorrichtung zur Handhabung von Bohrgestänge (16, 18) angegeben, die jeweils zumindest ein entlang eines Gestängemagazinwegs (24) verschiebbar oder auf sonst geeignete Weise bewegliches Gestängemagazin (20, 22) – also ein verschiebbares/bewegliches Gestängelager – umfassen. Sodann werden ein Verfahren zum Betrieb der jeweiligen Vorrichtung und eine Verwendung von Mitteln zum Verschieben/Bewegen des Gestängelagers angegeben.Two variants of a device for handling drill rods (16, 18) are specified, each of which comprises at least one rod magazine (20, 22) that can be displaced along a rod magazine path (24) or is movable in some other suitable manner, i.e. a displaceable / movable rod bearing. A method for operating the respective device and a use of means for displacing / moving the rod bearing are then specified.
Description
Die vorliegende Erfindung betrifft eine Vorrichtung und ein Verfahren zur Handhabung von Bohrgestänge, also Rohre, Stangen und Gestängezüge für Bohrgeräte und Bohranlagen, insbesondere zum Abteufen von Bohrungen auf Kohlenwasserstoff-Lagerstätten oder für Geothermie.The present invention relates to a device and a method for handling drill pipes, ie pipes, rods and linkage trains for drilling rigs and drilling rigs, in particular for sinking boreholes on hydrocarbon deposits or for geothermal energy.
Bohrungen auf Kohlenwasserstoff-Lagerstätten, also z. B Erdöl oder Ergas, werden in der Regel diskontinuierlich abgeteuft, da nach dem Bohren einer Gestängelänge der Bohrvorgang unterbrochen werden muss, um mit dem Bohrstrang ein weiteres Gestängeelement zu kombinieren, mit dem anschließend der Bohrvorgang fortgeführt wird. Diskontinuierlich ist auch der Ausbau des Bohrgestänges oder der Einbau und Ausbau von Verrohrungen des Bohrloches (Casings), da jedes Mal der Vorgang unterbrochen werden muss, um die entsprechenden Rohre oder Bohrstangen mit dem Bohrstrang oder dem Casing-Strang zu verbinden bzw. zu lösen. Übliche Bohrstangen erreichen ungefähr eine Länge von neun Metern, ein doppelter oder dreifacher Gestängezug (Double-Stand bzw. Triple Stand) entsprechend in etwa achtzehn bzw. siebenundzwanzig Meter.Drilling on hydrocarbon deposits, ie z. B petroleum or natural gas, are usually sunk discontinuously, since after drilling a boom length of drilling must be interrupted to combine with the drill string another linkage, with which the drilling process is then continued. Discontinuing is also the removal of the drill pipe or the installation and removal of casing casings, as each time the process must be interrupted in order to connect or disconnect the corresponding pipes or drill rods with the drill string or the casing string. Usual boring bars reach approximately nine meters in length, a double or triple boom train, respectively, about eighteen and twenty-seven meters respectively.
Aufgrund steigenden Kostendrucks ergibt sich für Betreiber von Bohranlagen das Bedürfnis, den diskontinuierlichen Vorgang des Abteufens von Bohrungen bzw. Ziehens von Bohrgestänge und Verrohrungen durch einen quasi kontinuierlichen Ablauf zu ersetzen.Due to increasing cost pressure, operators of drilling rigs are faced with the need to replace the discontinuous process of drilling bores or pulling drill pipes and piping by a quasi-continuous process.
Eine Aufgabe der Erfindung besteht entsprechend darin, eine Vorrichtung zur Handhabung von Bohrgestänge für eine Bohranlage und ein Verfahren zum Betrieb einer solchen Vorrichtung anzugeben, mit der bzw. mit dem die Zuführung von Bohrgestänge zur Bohranlage erleichtert wird.Accordingly, it is an object of the invention to provide an apparatus for handling drill pipe for a drilling rig and a method of operating such a device with which the supply of drill pipe to the drilling rig is facilitated.
Diese Aufgabe wird erfindungsgemäß in einer ersten Variante durch eine Vorrichtung mit den Merkmalen des Anspruchs 1 und in einer alternativen Variante durch eine Vorrichtung mit den Merkmalen des Anspruchs 6 gelöst. Gemäß der ersten Variante ist vorgesehen, dass bei einer Vorrichtung zur Handhabung von Bohrgestänge für eine Bohranlage mindestens ein Gestängemagazin (Gestängelagervorrichtung) eines Gestängemagazinwegs verschiebbar beweglich ist und dass als Gestängemagazinweg eine so genannte Skiddingbahn fungiert, insbesondere eine Skiddingbahn mit zwei parallel verlaufenden Strängen mehrerer aneinandergereihter Skiddingmatten.This object is achieved in a first variant by a device having the features of claim 1 and in an alternative variant by a device having the features of claim 6. According to the first variant it is provided that in a device for handling drill pipe for a drilling rig at least one boom magazine (rod storage device) a Gestängemagazinwegs is slidably movable and that acts as Gestängemagazinweg a so-called Skiddingbahn, in particular a Skiddingbahn with two parallel strands of several juxtaposed Skiddingmatten ,
Die Verwendung einer Skiddingbahn zum Verlagern einer Bohranlage und der Aufbau einer Skiddingbahn aus anreihbaren Skiddingmatten sind an sich bekannt. Bei den einzelnen Skiddingmatten handelt es sich um längliche, plattenförmige Metallkonstruktionen, die eine entsprechende Last, nämlich z. B. die Bohranlage, aufnehmen können, aber auch zur Aufnahme von Zugbelastungen, wie sie sich beim Verschieben oder Verlagern der Bohranlage ergeben, geeignet sind. Die Skiddingbahn fungiert mit ihren zwei parallel laufenden Strängen im Wesentlichen wie ein Schienenzug, auf dem die Bohranlage beweglich ist. Die Bohranlage ruht mit Gleitern auf den beiden Strängen der Skiddingbahn, und mit der Skiddingbahn einerseits und einem unten liegenden Basisabschnitt der Bohranlage andererseits sind Hydraulikelemente verbindbar, die bei Betätigung, ein Ziehen oder Schieben der Bohranlage auf der Skiddingbahn entlang deren Längserstreckung bewirken.The use of a skidding track for relocating a drilling rig and the construction of a skidding track of attachable skidding mats are known per se. The individual Skiddingmatten are elongated, plate-shaped metal structures, which have a corresponding load, namely z. As the drilling rig, can record, but also to absorb tensile loads, as they arise when moving or moving the rig, are suitable. The skidding track with its two parallel strands acts essentially like a rail train on which the rig is movable. The drilling rig rests with sliders on the two strands of Skiddingbahn, and with the Skiddingbahn on the one hand and a lower base portion of the drilling rig on the other hand hydraulic elements are connected, which cause on actuation, pulling or pushing the rig on the Skiddingbahn along the longitudinal extent.
Die Erfindung zielt mit ihrem im ersten unabhängigen Vorrichtungsanspruch angegebenen Aspekt auf die Verwendung von zum Bewegen der Bohranlage bereits bekannten Mitteln, nämlich der Skiddingbahn, ebenfalls zur Verwendung beim Bewegen eines oder mehrerer Gestängemagazine. Dadurch, dass ein oder mehrere Gestängemagazin(e) beweglich ist bzw. sind, lässt sich jeweils bedarfsabhängig ein Gestängemagazin in eine Übergabe- oder Übernahmeposition bewegen, in welcher Bohrgestänge an die Bohranlage übergeben oder von dieser übernommen werden kann. Dadurch, dass ein komplettes Gestängemagazin in diese Übernahmeposition beweglich ist, entfällt das bisher erforderliche einzelne Übergeben oder Übernehmen von Bohrgestänge oder ein Anliefern oder Abnehmen von Bohrgestänge zwar in größeren Mengen, jedoch nicht in den Mengen, wie sie in den entsprechend dem erfindungsgemäßen Ansatz beweglichen Gestängemagazinen vorgehalten werden können.The invention, with its aspect stated in the first independent device claim, aims at the use of means already known for moving the drilling rig, namely the skidding track, also for use in moving one or more boom magazines. By virtue of the fact that one or more boom magazine (s) is / are movable, a boom magazine can be moved to a transfer or transfer position, as required, in which drill pipe can be transferred to or taken over by the drilling rig. The fact that a complete rod magazine is movable in this transfer position, eliminating the previously required individual handover or takeover of drill pipe or a supply or removal of drill pipe in larger quantities, but not in the amounts as they move in accordance with the inventive approach rod magazines can be kept.
Als Gestängemagazin kommt insbesondere eine Kombination zweier mit Abstand nebeneinander angeordneter und zueinander fixierter Bühnenelemente in Betracht. Der Abstand zwischen diesen Bühnenelementen ist dabei so gewählt, dass ein Beladen und Entladen des Gestängemagazins mit einem Handhabungsgerät nach Art eines Gabelstaplers oder dergleichen möglich ist.As a linkage magazine in particular a combination of two spaced juxtaposed and mutually fixed stage elements comes into consideration. The distance between these stage elements is chosen so that a loading and unloading of the boom magazine with a handling device like a forklift or the like is possible.
Die oben genannte Aufgabe wird ebenfalls gelöst mit den Merkmalen des zweiten unabhängigen Vorrichtungsanspruchs. Danach ist bei einer Vorrichtung zur Handhabung von Bohrgestänge für eine Bohranlage vorgesehen, dass mindestens ein Gestängemagazin, insbesondere ein Gestängemagazin der oben genannten Art, entlang eines Gestängemagazinwegs verschiebbar beweglich ist, dass quer zum Gestängemagazinweg eine Gestängehandhabungseinrichtung entlang eines Handhabungseinrichtungswegs verfahrbar ist und dass der Handhabungseinrichtungsweg zumindest abschnittsweise zusammen mit dem Gestängemagazin beweglich ist.The above object is also achieved with the features of the second independent device claim. Thereafter, in a device for handling drill pipe for a drilling rig, it is provided that at least one boom magazine, in particular a boom magazine of the above type, is displaceably movable along a boom magazine path, that a boom handling device can be moved transversely to the boom magazine travel along a handling device path and that the handling device travel is at least sections movable together with the rod magazine.
Bei dieser Ausführungsform kommt ebenfalls der Vorteil zum Tragen, dass ein komplettes Gestängemagazin in eine Übergabe- oder Übernahmeposition beweglich ist. Zur Übergabe oder Übernahme ist dabei eine Gestängehandhabungseinrichtung, z. B. ein Portalkran oder dergleichen, vorgesehen, wobei sich für diese Einrichtung die Besonderheit ergibt, dass ein als Verfahrweg vorgesehener Handhabungseinrichtungsweg zumindest abschnittsweise mit dem Gestängemagazin beweglich ist. Es ergibt sich also eine fixe Position von zumindest dem Abschnitt des Handhabungseinrichtungswegs zu dem jeweiligen Gestängemagazin. Eine auf dem Handhabungseinrichtungsweg verfahrbare Gestängehandhabungseinrichtung kann ohne zusätzliche Justierung oder dergleichen das Gestängemagazin im Sinne eines Entnehmens oder Ablegens von Bohrgestänge bedienen. In this embodiment, the advantage also comes into play that a complete rod magazine is movable in a transfer or transfer position. To transfer or takeover is a linkage handling device, z. As a gantry crane or the like, is provided, with the result for this device, the peculiarity that a provided as a travel handling device path is at least partially movable with the rod magazine. This results in a fixed position of at least the portion of the handling device path to the respective boom magazine. A movable on the handling equipment rod handling device can operate without additional adjustment or the like the rod magazine in the sense of removing or dropping drill pipe.
Die abhängigen Ansprüche sind auf bevorzugte Ausführungsformen der vorliegenden Erfindung gerichtet. Die mit der Anmeldung eingereichten Patentansprüche sind Formulierungsvorschläge ohne Präjudiz für die Erzielung weitergehenden Patentschutzes. Die Anmelderin behält sich vor, noch weitere, bisher nur in der Beschreibung und/oder Zeichnungen offenbarte Merkmalskombinationen zu beanspruchen. In Unteransprüchen verwendete Rückbeziehungen weisen auf die weitere Ausbildung des Gegenstandes des in Bezug genommenen unabhängigen Anspruches durch die Merkmale des jeweiligen Unteranspruches hin; sie können auch selbständige Erfindungen enthalten, die eine von den Gegenständen der vorhergehenden Ansprüche unabhängige Gestaltung aufweisen und sind nicht als ein Verzicht auf die Erzielung eines selbständigen, gegenständlichen Schutzes für deren Merkmale oder die Merkmalskombinationen der rückbezogenen Unteransprüche zu verstehen. Des Weiteren ist im Hinblick auf eine Auslegung der Ansprüche bei einer näheren Konkretisierung eines Merkmals in einem nachgeordneten Anspruch davon auszugehen, dass eine derartige Beschränkung in den jeweils vorangehenden Ansprüchen nicht vorhanden ist.The dependent claims are directed to preferred embodiments of the present invention. The claims filed with the application are formulation proposals without prejudice to the achievement of further patent protection. The Applicant reserves the right to claim further feature combinations previously disclosed only in the description and / or drawings. Relationships used in subclaims indicate the further development of the subject matter of the independent claim referred to by the features of the respective subclaim; they may also contain independent inventions having a design independent of the objects of the preceding claims and are not to be understood as a waiver of the provision of independent, objective protection for their features or the feature combinations of the dependent claims. Furthermore, with a view to an interpretation of the claims in a closer specification of a feature in a subordinate claim, it is to be assumed that such a restriction does not exist in the respective preceding claims.
Wenn die hier und nachfolgend beschriebene Vorrichtung zur Handhabung von Bohrgestänge für eine Bohranlage zusammen mit der jeweiligen Bohranlage verschieb- oder verlagerbar ist, ergibt sich eine günstige Situation hinsichtlich des zusammen mit der Bohranlage mitwandernden Lagerorts des Bohrgestänges oder eines Teils des Bohrgestänges, nämlich in den zur Vorrichtung gehörigen Gestängemagazinen. Wenn das Verlagern der Vorrichtung zusammen mit der Bohranlage im Sinne einer Gleichzeitigkeit erfolgt, steht das Bohrgestänge am Ende des Bewegungsvorgangs unmittelbar zur Fortsetzung des Bohrvorgangs an der neuen Position zur Verfügung. Die Bewegung der Vorrichtung zur Handhabung von Bohrgestänge und die parallele Bewegung der Bohranlage können sogar synchronisiert sein, so dass während des Bewegungsvorgangs ein Übergeben von Bohrgestänge an die Bohranlage oder ein Übernehmen von Bohrgestänge von der Bohranlage möglich bleibt.If the here and described below described apparatus for handling drill pipe for a drilling rig together with the respective drilling rig or displaced, there is a favorable situation with respect to the mitwandernden along with the drill storage location of the drill string or a portion of the drill string, namely in the Device belonging linkage magazines. If the displacement of the device with the drilling rig takes place in the sense of a simultaneity, the drill pipe is at the end of the movement process immediately available for the continuation of the drilling operation at the new position. The movement of the drill pipe handling device and the parallel movement of the drilling rig may even be synchronized so as to permit transfer of drill pipe to the drilling rig or transfer of drill pipe from the drilling rig during the movement process.
Wenn bei einer Vorrichtung zur Handhabung von Bohrgestänge ohne eine eigene Gestängehandhabungseinrichtung für das Gestängemagazin eine Neigung entlang einer längs zum Gestängemagazinweg verlaufenden Achse veränderbar ist, lässt sich mit einer solchen Neigungsveränderung das im Gestängemagazin befindliche Bohrgestänge zu einer Seite des Gestängemagazins bewegen, indem das Bohrgestänge entsprechend der Neigung in diese Richtung rollt. Die damit bewirkte Positionierung des Bohrgestänges innerhalb des Gestängemagazins erlaubt dessen Übergabe an die Bohranlage und bei einer entgegengesetzten Neigung eine Übernahme von der Bohranlage, so dass entsprechend der Neigung das übernommene Bohrgestänge von der Übernahmeposition weg rollt und diese damit wieder frei wird.If in a device for handling of drill pipe without a separate rod handling device for the boom magazine a slope along an axis extending to Gestängemagazinweg axis is changeable, can be located with such a change in inclination in the boom magazine drill pipe to one side of the rod magazine by the drill pipe according to Tilt rolls in this direction. The thus effected positioning of the drill pipe within the boom magazine allows its transfer to the drilling rig and at an opposite inclination takeover of the drilling rig, so that according to the inclination, the assumed drill pipe rolls away from the transfer position and this is thus free again.
Vorteilhaft ist mit einer Neigungsveränderung des Gestängemagazins darin befindliches Bohrgestänge zu einer tiefer liegenden Seite des Gestängemagazins beförderbar und in dieser Position von einem Vertikalaufzug aufnehmbar. Der Vertikalaufzug gehört bereits zur Bohranlage, nämlich zu einer als Arbeitsbühne fungierenden Basis der Bohranlage. Der Vertikalaufzug greift z. B. mit Klinken oder dergleichen seitlich in das Gestängemagazin und kann auf diesem Wege Bohrgestänge aufnehmen.It is advantageous with a change in inclination of the rod magazine located therein drill string conveyed to a deeper side of the boom magazine and can be received in this position by a vertical elevator. The vertical elevator already belongs to the drilling rig, namely to a base of the drilling rig acting as a working platform. The vertical elevator uses z. B. with pawls or the like laterally in the rod magazine and can record in this way drill pipe.
Wenn der Gestängemagazinweg mit einem Fahrweg überbrückt wird oder überbrückbar ist, der ein Überfahren des Gestängemagazinwegs mit einem Handhabungsgerät, z. B. einem Gabelstapler oder dergleichen, erlaubt, lässt sich ein Gestängemagazin auch auf dem Gestängemagazinweg mit Bohrgestänge bestücken oder derartiges Bohrgestänge ist mit einem solchen Handhabungsgerät entnehmbar.If the boom magazine path is bridged or bridged with a guideway, which is a driving over the Gestängemagazinwegs with a handling device, for. As a forklift or the like, allows a rod magazine can also be equipped on the rod magazine path with drill pipe or such drill string is removable with such a handling device.
Wenn zumindest zwei oder sämtliche auf dem Gestängemagazinweg anordenbare Gestängemagazine gekoppelt sind, so dass eine Bewegung oder Verlagerung eines Gestängemagazins alle gekoppelten Gestängemagazine betrifft und zwischen je zwei gekoppelten Gestängemagazinen ein mit den Gestängemagazinen bewegliches Handhabungseinrichtungswegelement als Abschnitt oder zumindest als möglicher Abschnitt des Handhabungseinrichtungswegs angeordnet ist, oder sich zwischen je zwei gekoppelten Gestängemagazinen und jeweils an den Außenseiten eines ersten und eines letzten gekoppelten Gestängemagazins ein mit diesen bewegliches Handhabungseinrichtungswegelement angeordnet ist, ist ein Abschnitt des Handhabungseinrichtungswegs zusammen mit den gekoppelten Gestängemagazinen beweglich. Je nach dem, welches der gekoppelten Gestängemagazine in eine Übergabeposition bewegt wird, erfolgt mit der Bewegung dieses Magazins in die Übergabeposition unmittelbar auch eine Bewegung zumindest eines Handhabungseinrichtungswegelements zu dieser Übergabeposition, also zu einer Position oder zu Positionen seitlich von der Übergabeposition. Mit dem oder jedem Handhabungseinrichtungswegelement an der Übergabeposition kann die Handhabungseinrichtung an der Übergabeposition über dem in Übergabeposition befindlichen Gestängemagazin verfahren werden, so dass eine Entnahme oder ein Ablegen von Bohrgestänge möglich ist.When at least two or all of the linkage magazines that can be arranged on the linkage magazine path are coupled, such that a movement or displacement of a linkage magazine concerns all coupled linkage magazines and between each two coupled linkage magazines a handling device travel element movable with the linkage magazines is arranged as a section or at least as a possible section of the handling device path, or is disposed between each two coupled linkage magazines and each on the outer sides of a first and a last coupled linkage magazine with a movable handling device Wegelementes this is a section of Handling device along with the coupled rod magazines mobile. Depending on which of the coupled linkage magazines is moved into a transfer position, with the movement of this magazine into the transfer position, movement of at least one handling device path element to this transfer position, ie to a position or to positions laterally from the transfer position, takes place directly. With the or each handling device path element at the transfer position, the handling device can be moved at the transfer position above the transfer magazine located in the transfer rack, so that a removal or removal of drill pipe is possible.
Wenn der Handhabungseinrichtungsweg in Form zumindest eines Handhabungseinrichtungswegelements oder eines Paars von Handhabungseinrichtungswegelementen zumindest im Bereich der Übergabeposition seitlich über den Gestängemagazinweg hinausreicht und dort eine Handhabungseinrichtungswarteposition bildet, kann die Handhabungseinrichtung in diese Position verfahren werden, wenn ein Gestängemagazin oder gekoppelte Gestängemagazine auf den Gestängemagazinweg bewegt werden. Die Handhabungseinrichtung bleibt dann während der kompletten Bewegungsphase des oder jedes Gestängemagazins ortsfest. Des Weiteren verbleibt die Handhabungseinrichtung unabhängig von der Bewegung des oder jedes Gestängemagazins im Bereich der Übergabeposition, so dass einerseits die Handhabungseinrichtung beim Bewegen des oder jedes Gestängemagazins nicht ebenfalls transportiert werden muss und andererseits die Verfügbarkeit der Handhabungseinrichtung im Bereich der Übergabeposition erhalten bleibt.When the handling path in the form of at least one handling device path member or a pair of handling path members at least in the region of the transfer position extends laterally beyond the boom magazine path and forms a handling device waiting position, the handling device can be moved to this position when a rack magazine or coupled rack magazines are moved onto the boom magazine path. The handling device then remains stationary during the complete movement phase of the or each rod magazine. Furthermore, the handling device remains independent of the movement of the or each rod magazine in the transfer position, so that on the one hand the handling device when moving the or each rod magazine does not have to be transported and on the other hand, the availability of the handling device is maintained in the transfer position.
Wenn das oder jedes Handhabungseinrichtungswegelement im Bereich der Handhabungseinrichtungswarteposition beim Betrieb der hier und nachfolgend beschriebenen Vorrichtung ortsfest ist und beim Verschieben des oder jedes Gestängemagazins, insbesondere am Ende des Verschiebeprozesses, das oder jedes mitbewegte Handhabungseinrichtungswegelement fluchtend zu dem oder jedem Handhabungseinrichtungswegelement der Handhabungseinrichtungswarteposition positionierbar ist, ergibt sich mit der fluchtenden Anordnung am Ende des Bewegungsprozesses ein als Verfahrweg für die Handhabungseinrichtung nutzbarer Übergang zwischen den ortsfesten und den mitbewegten Handhabungseinrichtungswegelementen, so dass die Handhabungseinrichtung aus der Handhabungseinrichtungswarteposition heraus und wieder über das sich jetzt in der Übergabeposition befindende Gestängemagazin verfahrbar ist.When the or each walker path member is stationary in the region of the handling device waiting position in operation of the apparatus described hereinbelow and when displacing the or each boom magazine, particularly at the end of the shifting process, the or each traveling handler path member is positionally aligned with the or each handler path member of the handler waiting position itself with the aligned arrangement at the end of the movement process as a travel path for the handling device usable transition between the stationary and the co-moving Handlingseinrichtungswegelementen so that the handling device from the handling equipment waiting position out and again on the now in the transfer position located rod magazine is movable.
Als Gestängemagazinweg kommt eine Skiddingbahn in Betracht, insbesondere eine Skiddingbahn mit zwei parallel verlaufenden Strängen mehrfach aneinander angereihter Skiddingmatten. Die Verwendung einer Skiddingbahn als Gestängemagazinweg hat den Vorteil, dass gleiche Komponenten für die Bewegung der hier und im Weiteren beschriebenen Vorrichtung zur Handhabung von Bohrgestänge wie auch für die Verlagerung der gesamten Bohranlage durch „Skidden” verwendbar sind. Dies verringert durch die verwendbaren Gleichteile Entwicklungs-, Produktions- und Wartungskosten. Als Gestängemagazin kommt die Verwendung von zwei mit Abstand nebeneinander angeordneten und zueinander fixierten Bühnenelementen in Betracht. Zwei Bühnenelemente eignen sich besonders für die Lagerung von Bohrgestänge, bei denen zwei Einzelelemente bereits durch übliches Verschrauben kombiniert sind (ein so genanntes „Double”/„Double-Stand”), wobei jedes Bühnenelement im Wesentlichen einen Abschnitt des doppelten Gestängeelements aufnimmt. Zudem ist die Verwendung zweier nebeneinander fixierter Bühnenelemente vorteilhaft, weil dadurch zwischen diesen ausreichend Raum verbleibt, so dass ein Zugang mit einem Handhabungsgerät nach Art eines Gabelstaplers möglich bleibt und entsprechend das Gestängemagazin mit diesem be- oder entladen werden kann.As Gestängemagazinweg is a Skiddingbahn into consideration, in particular a Skiddingbahn with two parallel strands of several lined Skiddingmatten. The use of a skidding track as a linkage magazine path has the advantage that identical components can be used for the movement of the device described here and hereinafter for handling drill pipes as well as for the displacement of the entire drilling rig by "skidden". This reduces development, production and maintenance costs through the use of the same common parts. As a rod magazine, the use of two spaced apart side by side and fixed to each other stage elements comes into consideration. Two stage elements are particularly suitable for the storage of drill pipes, in which two individual elements are already combined by conventional screwing (a so-called "double" / "double-stand"), wherein each stage element substantially receives a portion of the double linkage element. In addition, the use of two juxtaposed fixed stage elements is advantageous because thereby sufficient space remains between them, so that access with a handling device in the manner of a forklift remains possible and accordingly the rod magazine can be loaded or unloaded with this.
Als Gestängehandhabungseinrichtung kommt ein Portalkran oder jede Art von Kran, die zum Heben und zum zumindest seitlichen Verfahren von Bohrgestänge geeignet ist, in Betracht. Die Verwendung eines Portalkrans hat den Vorteil, dass dieser wegen seiner im Wesentlichen senkrecht belasteten Stützen und bei entsprechender Auslegung der Kranbrücke einerseits hohe Lasten tragen kann und andererseits konstruktiv vergleichsweise unaufwendig ist. Zudem kann bei Verwendung eines Portalkrans das Bohrgestänge entlang sämtlicher kartesischer Koordinatenachsen bewegt werden: die vertikale Beweglichkeit erlaubt das Aufnehmen und Ablegen des Bohrgestänges im Gestängemagazin oder beim Vertikalaufzug. Eine horizontale Bewegungsrichtung ermöglicht das Verfahren in oder aus der Handhabungseinrichtungswarteposition, über dem Gestängemagazin und vom oder zum Vertikalaufzug. Eine zu dieser letzten Bewegungsrichtung senkrechte, optionale horizontale Bewegungsmöglichkeit erlaubt das genaue Justieren von Paketen von Bohrgestänge im Gestängemagazin. Bei entsprechender Ausführung eines Portalkrans als Gestängehandhabungseinrichtung, also bei einer entsprechenden Höhe eines solchen Portalkrans, kann in Einzelfällen der Portalkran die Funktion des ansonsten separat erforderlichen Vertikalaufzugs mit übernehmen, also z. B. Bohrgestänge im Bereich des Bodenniveaus aus einem Gestängemagazin entnehmen und auf dem Niveau der als Arbeitsbühne fungierenden Basis der Bohranlage, dem so genannten Drillfloor, ablegen oder dort an eine ggf. ausfahrbare oder sonst zur Bildung einer Übernahmeposition geeignete Übernahmeeinrichtung übergeben.As a boom handling device, a gantry crane or any type of crane suitable for lifting and for at least lateral movement of drill pipe is considered. The use of a gantry crane has the advantage that it can carry high loads on the one hand because of its substantially vertically loaded columns and with appropriate design of the crane bridge and on the other hand structurally relatively inexpensive. In addition, when using a gantry crane, the drill pipe can be moved along all Cartesian coordinate axes: the vertical mobility allows the drill pipe to be picked up and removed in the boom magazine or vertical lift. A horizontal direction of motion allows the process to be in or out of the hauler wait position, above the boom magazine, and from or to the vertical elevator. An optional horizontal movement option, perpendicular to this last direction of motion, allows accurate adjustment of drill string packages in the boom magazine. With appropriate execution of a gantry crane as a rod handling device, ie at a corresponding height of such a gantry crane, in individual cases, the gantry crane can take over the function of the otherwise separately required vertical elevator with, so z. B. drill pipe in the field of soil level from a rod magazine and at the level of functioning as a working platform base of the drilling rig, the so-called Drillfloor, drop or there to a possibly extendable or otherwise to Formation of a takeover position Passed suitable transfer facility.
Als Handhabungseinrichtungswegelement kommt eine Schiene oder ein nach Art einer Schiene für Verfahrbewegungen kontaktierbares Profilelement, z. B. ein T-Träger, ein Doppel-T-Träger, eine U-Schiene oder dergleichen, in Betracht.As a handling device path element is a rail or a contactable in the manner of a rail for traversing profile element, z. As a T-beam, a double-T-beam, a U-rail or the like, into consideration.
Wenn das Gestängemagazin mit Haltestangen, so genannten Rungen, in separate Abschnitte unterteilt ist und Bohrgestänge aus diesen oder in diese durch die Gestängehandhabungseinrichtung nach einer vorgegebenen oder vorgebbaren Sortierreihenfolge entnehmbar bzw. ablegbar ist, lässt sich der Automatisierungsgrad beim Zuführen und Abnehmen von Bohrgestänge zur bzw. von der Bohranlage automatisieren. Zudem kann bei einer manuellen Bedienung der Gestängehandhabungseinrichtung schadhaftes Bohrgestänge oder Bohrgestänge, das z. B. hinsichtlich seiner Benutzungsdauer vorgegebene Toleranzwerte erreicht hat, so gelagert werden, dass einerseits eine Wartung und Instandsetzung oder eine Entnahme für eine derartige Wartung und Instandsetzung ermöglicht und andererseits ein unbeabsichtigtes erneutes Verwenden des so separierten Bohrgestänges vermieden wird.If the boom magazine with holding bars, so-called stanchions, is divided into separate sections and drill pipe from these or in this by the linkage handling device according to a predetermined or predetermined sort order can be removed or stored, the degree of automation in feeding and removing drill pipe or from the drilling rig. In addition, in a manual operation of the boom handling device defective drill pipe or drill pipe, the z. B. has reached predetermined tolerance values with respect to its duration of use, are stored so that on the one hand a maintenance and repair or removal for such maintenance and repair allows and on the other hand unintentional reuse of the thus separated drill pipe is avoided.
Der Vorteil der alternativen Ausführungsform der Vorrichtung zur Handhabung von Bohrgestänge, also der Vorrichtung mit Gestängehandhabungseinrichtung, besteht vor allem darin, dass mit der Gestängehandhabungseinrichtung durch Verfahren quer zum Gestängemagazinweg Bohrgestänge selektiv aus einem jeweiligen Gestängemagazin zu einem Vertikalaufzug und umgekehrt transportierbar ist. Der Vertikalaufzug gehört, wenn dessen Funktion nicht von der Gestängehandhabungseinrichtung übernommen wird, zu einer als Arbeitsbühne fungierenden Basis der Bohranlage. Ohne Vertikalaufzug, also bei einem Portalkran, der die Funktionalität der Gestängehandhabungseinrichtung und gleichzeitig die Funktionalität eines Vertikalaufzugs übernimmt, liegt die Position zur Übergabe oder zur Übernahme von Bohrgestänge an die Bohranlage bzw. von der Bohranlage auf Höhe des Niveaus der Arbeitsbühne.The advantage of the alternative embodiment of the device for handling drill pipe, so the device with rod handling device, is mainly that with the rod handling device by method transverse to Gestängemagazinweg drill string is selectively transported from a respective rod magazine to a vertical elevator and vice versa. The vertical elevator, if its function is not taken over by the boom handling device, belongs to a base of the drilling rig functioning as a working platform. Without a vertical lift, ie with a gantry crane, which takes over the functionality of the boom handling device and at the same time the functionality of a vertical lift, the position for transferring or transferring drill pipe to the drilling rig or from the drilling rig is at the level of the working platform.
Das erfindungsgemäße Verfahren zum Betrieb einer Bohranlage wie hier und nachfolgend beschrieben zeichnet sich dadurch aus, dass je nach Bedarf ein Gestängemagazin oder mehrere gekoppelte Gestängemagazine auf dem Gestängemagazinweg verschoben werden und auf diesem Wege jeweils ein Gestängemagazin mit benötigtem Bohrgestänge in eine Übergabeposition gelangt, in der ein Entnehmen von Bohrgestänge aus dem Gestängemagazin oder ein Ablegen von Bohrgestänge im Gestängemagazin möglich ist. Die Vorrichtung zur Handhabung von Bohrgestänge kann insgesamt zusammen mit der Bohranlage verfahren werden, so dass sich eine variable, nicht ortsfeste Übergabeposition ergibt, die jeweils nur von der Position der Bohranlage abhängig ist.The inventive method for operating a drilling rig as described here and below is characterized in that as required a rod magazine or more coupled rod magazines are moved to the Gestängemagazinweg and passes in this way each rod magazine with a required drill string in a transfer position, in a Removal of drill pipe from the boom magazine or a placement of drill pipe in the boom magazine is possible. The apparatus for handling of drill pipe can be moved together with the drilling rig, so that there is a variable, non-stationary transfer position, which is dependent only on the position of the drilling rig.
Bei einer Vorrichtung zur Handhabung von Bohrgestänge, die eine Gestängehandhabungseinrichtung umfasst und bei der der Handhabungseinrichtungsweg eine Handhabungseinrichtungswarteposition bildet, zeichnet sich ein günstiges Verfahren dadurch aus, dass zumindest zwei oder sämtliche auf dem Gestängemagazinweg befindliche Gestängemagazine gekoppelt sind, so dass eine Bewegung oder Verlagerung eines Gestängemagazins alle gekoppelten Gestängemagazine betrifft, dass zwischen je zwei gekoppelten Gestängemagazinen ein mit diesen bewegliches Handhabungseinrichtungswegelement angeordnet ist oder zwischen je zwei gekoppelten Gestängemagazinen und zumindest auf einer Außenseite eines ersten oder eines letzten Gestängemagazins ein bewegliches Handhabungseinrichtungswegelement angeordnet ist, und dass zum Bewegen eines Gestängemagazins in die Übergabeposition oder aus der Übergabeposition heraus zunächst die Gestängehandhabungseinrichtung in die Handhabungseinrichtungswarteposition verfahren wird, sodann das Bewegen der Gestängemagazine erfolgt, und zwar so lange, bis zumindest ein mitbewegtes Handhabungseinrichtungswegelement fluchtend zu dem, oder bei zwei mitbewegten Wegelementen, jedem die Handhabungseinrichtungswarteposition bildenden Handhabungseinrichtungswegelement positioniert sind. Die Handhabungseinrichtungswarteposition ermöglicht das Verfahren der Gestängehandhabungseinrichtung an eine auch beim Bewegen der Gestängemagazine ortsfeste Position, so dass die Gestängehandhabungseinrichtung nicht zusammen mit den Gestängemagazinen verfahren werden muss und am Ende des Verfahrvorgangs noch im Bereich der Übergabeposition zur Verfügung steht. Wenn das oder jedes mitbewegte Handhabungseinrichtungswegelement am Ende des Bewegungsvorgangs fluchtend zu dem oder jedem die Handhabungseinrichtungswarteposition bildenden Handhabungseinrichtungswegelement positioniert ist, kann die Gestängehandhabungseinrichtung unmittelbar am Ende des Bewegens der Gestängemagazine wieder über das jetzt in der Übergabeposition befindliche Gestängemagazin verfahren werden und dort Bohrgestänge aufnehmen oder ablegen.In a drill pipe handling apparatus comprising a boom handling device and in which the handling path forms a handling device waiting position, a favorable method is characterized in that at least two or all of the boom magazines on the boom magazine path are coupled such that movement or displacement of a boom magazine all coupled rod journals, that between each pair of coupled rod magazines with a movable handling device path element is arranged or between two coupled rod magazines and at least on an outer side of a first or a last rod magazine a movable handling device Wegelement is arranged, and that for moving a rod magazine in the transfer position or from the transfer position, first the linkage handling device into the handling device waiting position is moved, then moving the linkage magazines takes place, until at least one moving handling device Wegelement aligned with the, or in two moving Wegelementen, each the handling device waiting position forming handling device Wegwegelement are positioned. The handling device waiting position enables the method of the boom handling device to a fixed position even when moving the rod magazines, so that the rod handling device must not be moved together with the rod magazines and is still available at the end of the movement in the transfer position. When the or each co-moving handler path member is positioned at the end of the travel operation in alignment with the or each handler waiting position handler path member, the link handler may again be moved over the now in transfer position rod magazine and pick up or drop drill string immediately thereafter.
Der Handhabungseinrichtungsweg umfasst je nach Ausgestaltung der Gestängehandhabungseinrichtung eine Spur oder zwei parallele Spuren, die aus jeweils zumindest einem Handhabungseinrichtungswegelement gebildet sind. Die benötigte Spuranzahl wird auch für die Handhabungseinrichtungswarteposition bereitgestellt. Eine fluchtende Anordnung zweier Spuren, also eine fluchtende Anordnung der zumindest zwei die Handhabungseinrichtungswarteposition bildenden Hand habungseinrichtungswegelemente mit den entsprechenden zusammen mit den kombinierten Gestängemagazinen mitbewegten Handhabungseinrichtungswegelementen wird dadurch erleichtert, dass der Abstand der Wegelemente im Bereich der Warteposition identisch mit dem Abstand der Wegelemente rechts und links von einem Gestängemagazin ist, weil nur so ein Befahren mit einem Portalkran als Gestängehandhabungseinrichtung möglich ist.The handling device path, depending on the configuration of the linkage handling device, comprises a track or two parallel tracks, which are each formed from at least one handling device path element. The required number of lanes is also provided for the haulage waiting position. An aligned arrangement of two tracks, so an aligned Arranging the at least two handler path elements forming the handler waiting position with the corresponding handler path elements moved along with the combined boom magazines is facilitated by the spacing of the path elements in the waiting area being identical to the distance of the path elements to the right and left of a boom magazine, because only so Driving with a gantry crane is possible as a rod handling device.
Zum erleichterten Übergang zwischen den beweglichen Handhabungseinrichtungswegelemente und den ortsfesten Handhabungseinrichtungswegelemente der Handhabungseinrichtungswarteposition kann vorgesehen sein, dass die entsprechenden Wegelemente an ihren einander zugewandten Seiten Profile zur Aufnahme von Verbindungsstücken aufweisen, so dass ohne ein solches Verbindungsstück und damit beim Bewegen der Gestängemagazine und der damit gekoppelten Wegelemente ein als Sicherheitsabstand fungierender Zwischenraum zwischen ortsfesten und beweglichen Handhabungseinrichtungswegelementen verbleibt.To facilitate the transition between the movable handling device path elements and the stationary handling device path elements of the handling device waiting position, it may be provided that the corresponding path elements have profiles for receiving connecting pieces on their mutually facing sides, so that without such a connecting piece and thus during movement of the rod magazines and the path elements coupled thereto a clearance acting as a safety gap remains between stationary and movable handling means path elements.
Insgesamt betrifft die Erfindung schließlich auch eine Verwendung einer Skiddingbahn zum Bewegen von Gestängemagazinen und/oder zum Bewegen von Gestängemagazinen zusammen mit einer ebenfalls entlang einer Skiddingbahn beweglichen Bohranlage. Die Verwendung einer zum Bewegen von Bohranlagen bereits bekannten Skiddingbahn ist für das Bewegen von Gestängemagazinen bisher noch nicht in Betracht gezogen worden. Bei einer Verwendung einer Skiddingbahn (auch) zum Bewegen von Gestängemagazinen ergeben sich die oben bereits geschilderten Vorteile hinsichtlich verringerter Entwicklungs-, Produktions-, Lagerungs- und Wartungskosten aufgrund der durchgängig verwendbaren Gleichteile. Beim Verwenden einer Skiddingbahn zum Bewegen von Gestängemagazinen ergibt sich als zusätzlicher Vorteil, dass die Bewegungsart der Gestängemagazine dann der Bewegungsart der Bohranlage entspricht, so dass die beiden Bewegungsvorgänge leichter synchronisierbar sind, z. B. durch eine entsprechend gesteuerte oder geregelte Ansteuerung der benötigten Hydraulikaggregate. Schließlich erlaubt die Verwendung einer Skiddingbahn zum Bewegen von Gestängemagazinen das Bewegen großer Lasten, wie dies bereits beim Bewegen einer kompletten Bohranlage auf einer Skiddingbahn erprobt ist, so dass Gestängemagazine mit einem Füllgrad beweglich sind, die mit bisherigen Mitteln nicht beweglich waren. Auf diese Weise sind auch Gestängemagazine mit doppelten oder dreifachen Gestängeelementen bewegbar, so dass Bohrgestänge in Form solcher kombinierter Elemente direkt der Bohranlage zuführbar ist und sich entsprechend eine Effizienzsteigerung beim Betrieb der Bohranlage ergibt, weil die Anzahl der bisher erforderlichen Kombinationsvorgänge einzelner Gestängeelemente reduziert wird.Overall, the invention finally also relates to a use of a skidding track for moving boom magazines and / or for moving boom magazines together with a drilling rig that is also movable along a skidding track. The use of a skidding track already known for moving drilling rigs has not hitherto been considered for the movement of boom magazines. When using a Skiddingbahn (also) for moving rod magazines resulting in the above-mentioned advantages in terms of reduced development, production, storage and maintenance costs due to the consistently usable common parts. When using a Skiddingbahn for moving linkage magazines results in an additional advantage that the movement of the linkage magazines then corresponds to the movement of the rig, so that the two movement processes are easier to synchronize, for. B. by a correspondingly controlled or regulated control of the required hydraulic units. Finally, the use of a skidding track to move boom magazines allows for the movement of large loads, as already proven when moving a complete drilling rig on a skidding track, so that boom magazines are movable with a degree of filling that was immovable with previous means. In this way, also rod magazines with double or triple linkage elements are movable, so that drill pipe in the form of such combined elements directly fed to the rig and accordingly results in an increase in efficiency in the operation of the rig, because the number of previously required combination operations individual linkage elements is reduced.
Nachfolgend wird ein Ausführungsbeispiel der Erfindung anhand der Zeichnung näher erläutert. Einander entsprechende Gegenstände oder Elemente sind in allen Figuren mit den gleichen Bezugszeichen versehen.An embodiment of the invention will be explained in more detail with reference to the drawing. Corresponding objects or elements are provided in all figures with the same reference numerals.
Das oder jedes Ausführungsbeispiel ist nicht als Einschränkung der Erfindung zu verstehen. Vielmehr sind im Rahmen der vorliegenden Offenbarung zahlreiche Abänderungen und Modifikationen möglich, insbesondere solche Varianten, Elemente und Kombinationen und/oder Materialien, die zum Beispiel durch Kombination oder Abwandlung von einzelnen in Verbindung mit den in der allgemeinen Beschreibung, der oder jeder Ausführungsform sowie den Ansprüchen beschriebenen und in den Zeichnungen enthaltenen Merkmalen bzw. Elementen oder Verfahrensschritten für den Fachmann im Hinblick auf die Lösung der Aufgabe entnehmbar sind und durch kombinierbare Merkmale zu einem neuen Gegenstand oder zu neuen Verfahrensschritten oder Verfahrensschrittfolgen führen, auch soweit sie z. B. Arbeitsverfahren betreffen.The or each embodiment is not to be understood as limiting the invention. Rather, numerous modifications and variations are possible within the scope of the present disclosure, in particular those variants, elements and combinations and / or materials, for example, by combination or modification of individual in conjunction with those in the general description, the or each embodiment and the claims described and contained in the drawings features or elements or method steps for the skilled in the art with regard to solving the problem and lead by combinable features to a new subject or to new process steps or process steps, even if they are such. B. work procedures.
Es zeigenShow it
In der perspektivischen Ansicht gemäß
Jedes der beiden in FIG gezeigten Gestängemagazine
Die gesamte Bohranlage
Der Vertikalaufzug
Zusätzlich zu der Situation in
Der Fahrweg
In
Jedes Gestängemagazin
Im Unterschied zu der Ausführungsform gemäß
Mit der Beweglichkeit der Gestängemagazine
Der Handhabungseinrichtungsweg
In
Bei nur einem Gestängemagazin
Bei einer Ausführungsform eines Gestängemagazinwegs
Die Gestängehandhabungseinrichtung
Für die Gestängehandhabungseinrichtung
Mit der Handhabungseinrichtungswarteposition
Damit lässt sich die Erfindung kurz wie folgt darstellen: Es werden zwei Varianten einer Vorrichtung zur Handhabung von Bohrgestänge
Es folgen eine Seite Bezugszeichenliste und fünfzehn Patentansprüche.Below are a page of reference numerals and fifteen claims.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- 1010
- Bohranlagedrilling rig
- 1212
- Bohrmastdrilling mast
- 1414
- Arbeitsbühneplatform
- 16, 1816, 18
- Bohrgestängedrill pipe
- 20, 2220, 22
- Gestängemagazinrod magazine
- 2424
- GestängemagazinwegGestängemagazinweg
- 2626
- SkiddingbahnSkiddingbahn
- 2828
- SkiddingmattenSkiddingmatten
- 3030
- Koppelstangencoupling rods
- 3232
- Bühnenelementestage elements
- 3434
- Fixierstangenfixing bars
- 3636
- Blow-out-PreventerBlow-out preventer
- 3838
- Vertikalaufzugvertical lift
- 4040
- Klinkepawl
- 4242
- Pipehandlerpipehandler
- 4444
- Gabelstaplerfork-lift truck
- 4646
- Fahrwegroadway
- 4848
- Ramperamp
- 5050
- Boxbox
- 5252
- GestängehandhabungseinrichtungPipe handling equipment
- 5454
- Portalkrangantry crane
- 5656
- HandhabungseinrichtungswegHandhabungseinrichtungsweg
- 5858
- HandhabungseinrichtungswegelementHandhabungseinrichtungswegelement
- 6060
- HandhabungseinrichtungswartepositionHandler waiting position
Claims (15)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201010016585 DE102010016585A1 (en) | 2010-04-22 | 2010-04-22 | Drill pipe handling device, method of operating the device and use of means for moving such device |
EP11163317.8A EP2381064A3 (en) | 2010-04-22 | 2011-04-21 | Device for handling drilling rods, method for operating the device and use of means to move such a device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201010016585 DE102010016585A1 (en) | 2010-04-22 | 2010-04-22 | Drill pipe handling device, method of operating the device and use of means for moving such device |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102010016585A1 true DE102010016585A1 (en) | 2011-10-27 |
Family
ID=44359779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE201010016585 Withdrawn DE102010016585A1 (en) | 2010-04-22 | 2010-04-22 | Drill pipe handling device, method of operating the device and use of means for moving such device |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2381064A3 (en) |
DE (1) | DE102010016585A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2617938A2 (en) | 2012-01-23 | 2013-07-24 | BENTEC GMBH Drilling & Oilfield Systems | Apparatus and method for handling rod-like elements, i.e. tubes, bars and rods for drilling machines and drilling systems |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113044501B (en) * | 2021-04-16 | 2024-08-02 | 河北华北石油荣盛机械制造有限公司 | Intelligent calandria device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2721342B2 (en) * | 1977-05-12 | 1980-03-13 | Wirth Maschinen- Und Bohrgeraete- Fabrik Gmbh, 5140 Erkelenz | Magazining and handling device for drill rod parts |
US4208158A (en) * | 1978-04-10 | 1980-06-17 | Franklin Enterprises, Inc. | Auxiliary offshore rig and methods for using same |
US4544135A (en) * | 1982-04-29 | 1985-10-01 | Dolphin Titan International, Inc. | Rig skidding system |
DE19837692A1 (en) * | 1998-08-19 | 2000-03-02 | Bentec Gmbh Drilling & Oilfield Systems | Integrated drilling device and method for drilling a hole |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO156699B (en) * | 1980-03-17 | Bj-Hughes Inc. | STEERING HANDLING APPLIANCE. | |
US5451129A (en) * | 1993-10-04 | 1995-09-19 | Varco International, Inc. | Pipe transfer system |
NO310736B1 (en) * | 2000-01-03 | 2001-08-20 | Aker Mh As | Module-based lightweight drilling rig |
GB0131031D0 (en) * | 2001-12-31 | 2002-02-13 | Maris Tdm Ltd | Pipe handling apparatus |
US20090272540A1 (en) * | 2008-04-30 | 2009-11-05 | Mary B. Dimmitt | Mobile hydraulic workover rig |
-
2010
- 2010-04-22 DE DE201010016585 patent/DE102010016585A1/en not_active Withdrawn
-
2011
- 2011-04-21 EP EP11163317.8A patent/EP2381064A3/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2721342B2 (en) * | 1977-05-12 | 1980-03-13 | Wirth Maschinen- Und Bohrgeraete- Fabrik Gmbh, 5140 Erkelenz | Magazining and handling device for drill rod parts |
US4208158A (en) * | 1978-04-10 | 1980-06-17 | Franklin Enterprises, Inc. | Auxiliary offshore rig and methods for using same |
US4544135A (en) * | 1982-04-29 | 1985-10-01 | Dolphin Titan International, Inc. | Rig skidding system |
DE19837692A1 (en) * | 1998-08-19 | 2000-03-02 | Bentec Gmbh Drilling & Oilfield Systems | Integrated drilling device and method for drilling a hole |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2617938A2 (en) | 2012-01-23 | 2013-07-24 | BENTEC GMBH Drilling & Oilfield Systems | Apparatus and method for handling rod-like elements, i.e. tubes, bars and rods for drilling machines and drilling systems |
DE102012100493A1 (en) | 2012-01-23 | 2013-07-25 | Bentec Gmbh Drilling & Oilfield Systems | Device and method for handling linkage elements, ie pipes, rods and linkage trains for drilling rigs and drilling rigs |
EP2617938A3 (en) * | 2012-01-23 | 2017-09-27 | BENTEC GMBH Drilling & Oilfield Systems | Apparatus and method for handling rod-like elements, i.e. tubes, bars and rods for drilling machines and drilling systems |
Also Published As
Publication number | Publication date |
---|---|
EP2381064A2 (en) | 2011-10-26 |
EP2381064A3 (en) | 2016-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2521834B1 (en) | Method and apparatus for supplying drill pipes to and removing them from a drilling apparatus | |
DE2400805C3 (en) | Drill rod storage facility | |
EP3049607B1 (en) | Handling device for drill pipes of a deep hole drilling device | |
EP2118406B1 (en) | Parking facility for motor vehicles and method of operating same | |
DE1223776B (en) | Drilling device for continuous and automatic lowering and lifting of the drill pipe string in deep drilling | |
DE102012016878A1 (en) | Boring bar handler, drilling rig for a drilling rig, and method of moving boring bars on a rig | |
DE2051148B2 (en) | STACKING DEVICE FOR HORIZONTAL STORAGE OF PIPES FOR OIL DRILLING AND THE LIKE | |
DE3013697C2 (en) | ||
DE102017109275A1 (en) | Method of constructing bridges, bridge and laying device | |
DE102004016218A1 (en) | Device for moving a heavy load | |
DE102005040272A1 (en) | Pillar retreating method for use during digging e.g. coal, in underground layer-like deposits, involves supporting inclination end with construction units before retreating face of extraction unit | |
DE102010016585A1 (en) | Drill pipe handling device, method of operating the device and use of means for moving such device | |
EP2839105B1 (en) | Pipe rack and method for feeding and removing tubular bodies to and from a drilling installation | |
DE102010005866B4 (en) | Plant for the production of precast concrete parts | |
EP1881110B1 (en) | Device and method for extending a track composed of track fields or track sections | |
EP3699393A1 (en) | Earth boring device, system comprising an earth boring device, earth boring method and use of an earth boring device | |
WO2020225368A1 (en) | Onshore drilling rig and method for moving a top drive in a drill mast of an onshore drilling rig | |
WO2005073498A1 (en) | Pipe bearing or rod bearing for a drilling system | |
DE3800118A1 (en) | Storage facility, in particular for motor vehicles | |
EP4001046B1 (en) | Maintenance device for railway vehicles, running gear of a railway vehicle and maintenance method | |
DE2140797A1 (en) | IN-HOUSE ASSEMBLY DEVICE | |
DE10114087A1 (en) | Device is for laying Y-shaped track sleepers on ballast track bed, sleepers being of material containing iron and laid horizontally turned through 180 degrees in relation to each other | |
DE19523679C1 (en) | Rail-borne track repair machine with shuttering and excavating devices | |
DE2849474A1 (en) | EXTRACTION MACHINE FOR UNDERGROUND MINING | |
DE10239518B3 (en) | Bay arrangement, for intermediate storage of radioactive materials and waste, has transposing unit in transfer region, so that bridge crane can move from one bay across to another bay |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R079 | Amendment of ipc main class |
Free format text: PREVIOUS MAIN CLASS: E21B0019080000 Ipc: E21B0019140000 |
|
R163 | Identified publications notified | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |