Remote home packing quality control system based on Internet of Things, video and artificial intelligence Download PDF

Info

Publication number
CN108469739A
CN108469739A CN201810170268.8A CN201810170268A CN108469739A CN 108469739 A CN108469739 A CN 108469739A CN 201810170268 A CN201810170268 A CN 201810170268A CN 108469739 A CN108469739 A CN 108469739A
Authority
CN
China
Prior art keywords
terminal
information
construction
owner
monitoring platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810170268.8A
Other languages
Chinese (zh)
Inventor
黎华练
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Create Network Technology Co Ltd
Original Assignee
Shenzhen Create Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Create Network Technology Co Ltd filed Critical Shenzhen Create Network Technology Co Ltd
Priority to CN201810170268.8A priority Critical patent/CN108469739A/en
Publication of CN108469739A publication Critical patent/CN108469739A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2642Domotique, domestic, home control, automation, smart house
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The remote home packing quality control system based on Internet of Things, video and artificial intelligence that the invention discloses a kind of, its key points of the technical solution are that:Including user terminal, equipped with quality monitoring platform on user terminal, quality monitoring platform has background server by network connection, quality monitoring platform is provided with user management module and engineering management module, the information that user management module is used for the user to logging in quality monitoring platform is managed, and engineering management module is used to be managed hot work in progress and the engineering information that will be constructed;Reach and saved construction party, management side and the time for communication of owner and the duration of engineering, improved family's packing quality, and owner is made to obtain the advantageous effect of higher Experience Degree.

Description

Remote home packing quality control system based on Internet of Things, video and artificial intelligence
Technical field
The present invention relates to house ornamentation Quality Control Technology field, more specifically, it relates to it is a kind of based on Internet of Things, video and The remote home packing quality control system of artificial intelligence.
Background technology
As the crowd of the fast development of urbanization, now city house-purchase is numerous, house ornamentation market is also unprecedented huge.Traditional family Dress is all subpackage pattern, pattern include construction intermediary, material intermediary, without supervision, worker it is horizontal it is irregular etc. it is unfavorable because Element causes numerous puzzlements such as house ornamentation of high cost, working-day claims, family's packing quality be low to owner.
Owner now effortlessly completes the house ornamentation in house in order to save worry, and selects brand house ornamentation company more and more House decoration is carried out, early period does initial communication by householder and house ornamentation company affiliations, with designer, then is carried out subsequently by house ornamentation company Selection finishing etc. work, improve a packing quality to a certain extent.
But during entire house ornamentation, to ensure construction period and construction quality, owner unavoidably will often with design Teacher and site operation personnel do to link up and follows up in time.Since urban work pressure is generally bigger, owner is while work It is difficult to keep the timely communication with designer and site operation personnel, often leads to finishing effect without decree client satisfaction or applies Work working-day claims and make cooperation barely satisfactory, while also will produce unnecessary contract dispute.
Invention content
It is a kind of based on Internet of Things, video and artificial in view of the deficiencies of the prior art, the present invention intends to provide The remote home packing quality control system of intelligence has and saves construction party, management side and the time for communication of owner and the work of engineering Phase, and make owner obtain higher Experience Degree the advantages of.
To achieve the above object, the present invention provides following technical solutions:One kind being based on Internet of Things, video and artificial intelligence Remote home packing quality control system, including user terminal, equipped with quality monitoring platform, quality monitoring platform on user terminal There are background server, quality monitoring platform to be provided with user management module and engineering management module, Yong Huguan by network connection Reason module is used to be managed the user information for logging in quality monitoring platform, and engineering management module is for hot work in progress and i.e. The engineering information of construction is managed.
Using above-mentioned technical proposal, construction party, management side and owner can understand project progress information, section in time in distal end Saved construction party, management side and the time for communication of owner and engineering duration, enable owner obtain higher Experience Degree.
The present invention is further arranged, and user management module includes user's additions and deletions unit and rights management unit, user's additions and deletions Unit is used for user management module add or delete user, and rights management unit is used for the use to being added to user management module Family is grouped, and distributes corresponding operating right.
Using above-mentioned technical proposal, phase can be carried out on quality monitoring platform convenient for construction party, management side and owner The data input and information inspection answered.
The present invention is further arranged, and engineering management module includes engineering creating unit and project progress unit, and engineering creates Unit is used for typing project progress information for creating the newly built construction that will be constructed, project progress unit.
Using above-mentioned technical proposal, the construction of engineering and examination progress are recorded in time convenient for construction party and management side Enter, construction party, management side and owner is enable to understand project progress information in time in distal end.
The present invention is further arranged, and user terminal includes construction party terminal, management side's terminal and owner's terminal;
Construction party by construction party terminal log in quality monitoring platform, project progress unit typing process construct start information, And start simultaneously at and construct, background server pushes process construction start information to management side's terminal and owner's terminal;
Construction party logs in quality monitoring platform after the completion of process is constructed by construction party terminal, in project progress unit typing work Information is completed in sequence construction, and background server completes information to management side's terminal and the push process construction of owner's terminal;
After process construction completion information is consulted by management side, quality monitoring platform is logged in by management side's terminal, in project progress list First typing process checks and accepts start information, and starts simultaneously at and carry out an acceptance inspection to the working procedure of completion, and background server is to construction party Terminal and owner's terminal push process check and accept start information;
Management side logs in quality monitoring platform after the completion of process is checked and accepted by construction party terminal, if acceptance(check), in engineering Scheduling unit typing process acceptance(check) information is checked and accepted unqualified if examination is unqualified in project progress unit typing process Information, background server check and accept unqualified letter to construction party terminal and owner's terminal push process acceptance(check) information or process Breath;
If construction party finds process and checks and accepts unqualified information, quality monitoring platform is logged in by construction party terminal, in engineering Scheduling unit typing process rectifies and improves start information, and starts simultaneously at and carry out construction rectification to process, and background server is to management side Terminal and owner's terminal push process rectify and improve start information;
Construction party logs in quality monitoring platform after the completion of process is rectified and improved by construction party terminal, in project progress unit typing work Information is completed in sequence rectification, and background server completes information to management side's terminal and the push process rectification of owner's terminal;
Management side consult process rectification complete information after, by management side's terminal log in quality monitoring platform, again engineering into It spends unit typing process and checks and accepts start information, and start simultaneously at and carry out an acceptance inspection to the rectification of the process of completion, background server is to applying Work side's terminal and owner's terminal push process check and accept start information;
Management side logs in quality monitoring platform after the completion of process is rectified and improved and checked and accepted by construction party terminal, if acceptance(check), Project progress unit typing process acceptance(check) information is checked and accepted not if examination is unqualified in project progress unit typing process Qualified information, background server do not conform to construction party terminal and owner's terminal push process acceptance(check) information or process examination Lattice information;
If construction party finds process acceptance(check) information, the construction and examination of the process are fully completed, and construction party starts The construction of subsequent processing.
Using above-mentioned technical proposal, in the construction of each process and the course of receiving, construction party, management side and owner are Project progress information can be distally being known in time, the slitless connection realized construction and checked and accepted saves construction party, management side and industry Main time for communication, and shorten the construction period, ensure construction quality.
The present invention is further arranged, and quality monitoring platform is additionally provided with environment data module, and environment data module passes through net Network is connected with environment monitoring module, and context detection module includes electrochemical sensor and controller;Electrochemical sensor is mounted on Construction site, the finishing pollution gas concentration for detecting construction site;Controller is electrically connected with electrochemical sensor, for Background server sends finishing pollution gas concentration information.
Using above-mentioned technical proposal, construction party can check the finishing pollution gas of construction site by environment data module Concentration value, if the concentration value exceeds certain range, construction party can stop constructing in due course, the finishing dirt at scene to be onstructed Dye gas is further continued for constructing after dispersing, to ensure the health of construction personnel.And owner can also pass through environmental data Module checks the concentration value of finishing pollution gas, and to ensure owner when moving into house, the concentration value of finishing pollution gas can It is reduced to qualified level, it is ensured that the health of family's packing quality and owner.
The present invention is further arranged, and quality monitoring platform is additionally provided with video and checks that module, video check that module passes through net Network is connected with video monitoring module, and video monitoring module includes the video camera of multiple installations at the construction field (site), for acquiring in real time The vision signal and audio data of construction site, and it is sent to background server.
Using above-mentioned technical proposal, owner can check that module checks the construction work of construction party at any time in distal end by video Make the checking and accepting with management side, further ensures that a packing quality, improve the Experience Degree of owner.
To sum up, the present invention mainly has the advantages that:First, in the construction of each process and the course of receiving, Construction party, management side and owner can understand project progress information in time in distal end, the slitless connection realized construction and checked and accepted, section Save construction party, management side and owner time for communication, and shorten the construction period, ensure construction quality, improve the Experience Degree of owner;Its Two, so that construction party and owner is relatively accurately known the dress of construction site by environment data module and context detection module Polluted gas concentration is repaiied, has ensured the health of construction personnel and owner;Third, owner can be checked in distal end by video Module checks the construction working of construction party and the checking and accepting of management side at any time, further ensures that a packing quality, improves owner's Experience Degree.
Description of the drawings
Fig. 1 is the functional block diagram of the embodiment of the present invention;
Fig. 2 is construction, examination and the rectification flow chart of steps of process in the embodiment of the present invention.
Reference numeral:100, user terminal;110, construction party terminal;120, management side's terminal;130, owner's terminal;200、 Quality monitoring platform;210, user management module;211, user's additions and deletions unit;212, rights management unit;220, engineering management Module;221, engineering creating unit;222, project progress unit;230, environment data module;240, video checks module;300、 Background server;400, context detection module;410, electrochemical sensor;420, controller;500, video monitoring module;510、 Video camera.
Specific implementation mode
It elaborates below in conjunction with the accompanying drawings to technical scheme of the present invention.
A kind of remote home packing quality control system based on Internet of Things, video and artificial intelligence, as shown in Figure 1, including using Family terminal 100, preferably mobile intelligent terminal, such as smart mobile phone, laptop.Equipped with matter on user terminal 100 Monitor supervision platform 200 is measured, quality monitoring platform 200 has background server 300 by network connection.Wherein, quality monitoring platform 200 Including user management module 210 and engineering management module 220;User logs in quality monitoring platform 200 by user terminal 100, User management module 210 is managed the user information for logging in quality monitoring platform 200, and user here includes mainly construction Side, management side and owner;Then, user can be in the engineering that engineering management module 220 checks hot work in progress and will construct Information, and the typing of corresponding information can be carried out to hot work in progress and the engineering that will be constructed in engineering management module 220 in real time, The progress msg of renewal project, other users can be by logging in quality monitoring platform 200 to the letter in engineering management module 220 Breath is checked, in order to which construction party, management side and owner can understand project progress information in time in distal end, saves construction Side, management side and the time for communication of owner and the duration of engineering improve family's packing quality, and owner is enabled to obtain higher Experience Degree.
Specifically, user management module 210 includes user's additions and deletions unit 211 and rights management unit 212, system passes through use Family additions and deletions unit 211 passes through rights management to 210 add or delete construction party of user management module, management side and owner Unit 212 is grouped the construction party, management side and the owner that are added to user management module 210, distributes to construction party, prison Reason side and the corresponding operating right of owner, in order to which construction party, management side and owner can be on quality monitoring platforms 200 Carry out corresponding data input and information inspection.
Specifically, engineering management module 220 includes engineering creating unit 221 and project progress unit 222, construction party and prison After reason side logs in quality monitoring platform 200 by user terminal 100, it can will construct in the establishment of engineering creating unit 221 new Engineering, and in subsequent work progress and the course of receiving, typing is carried out to project progress information in project progress unit 222, In order to which construction party and management side to the construction of engineering and can check and accept progress progress typing in time, make construction party, management side With owner project progress information can be distally being recognized in time.
As depicted in figs. 1 and 2, the user terminal 100 in the present embodiment includes construction party terminal 110, management side's terminal 120 With owner's terminal 130, controlled respectively by construction party, management side and owner.
When each process of house ornamentation starts, construction party logs in quality monitoring platform by construction party terminal 110 200, then in 222 typing process of project progress unit construction start information, and starts simultaneously at and construct, background server 300 push process construction start information to management side's terminal 120 and owner's terminal 130, so that management side and owner obtain in time Know the progress of engineering.
Construction party logs in quality monitoring platform 200 after the completion of process is constructed, by construction party terminal 110, engineering into It spends the construction of 222 typing process of unit and completes information, background server 300 is pushed to management side's terminal 120 and owner's terminal 130 Information is completed in process construction, so that management side and owner know the progress of engineering in time, convenient for management side in first time to complete At process carry out an acceptance inspection.
Management side logs in quality monitoring platform after finding process construction and completing information by management side's terminal 120 200, start information is checked and accepted in 222 typing process of project progress unit, and start simultaneously at and carry out an acceptance inspection to the working procedure of completion, Background server 300 pushes process to construction party terminal 110 and owner's terminal 130 and checks and accepts start information;When examination, management side It is measured using the instrument for meeting national standard, and records measurement data, the construction of process is evaluated, judge whether to test Fold lattice.
Management side logs in quality monitoring platform 200 after the completion of process is checked and accepted by construction party terminal 110, is closed if checking and accepting Lattice, if examination is unqualified, are recorded then in 222 typing process acceptance(check) information of project progress unit in project progress unit 222 Enter process and check and accept unqualified information, background server 300 pushes process to construction party terminal 110 and owner's terminal 130 and checks and accepts Qualified information or process check and accept unqualified information.
If construction party finds process and checks and accepts unqualified information, quality monitoring platform is logged in by construction party terminal 110 200, start information is rectified and improved in 222 typing process of project progress unit, and start simultaneously at and construction rectification is carried out to process, backstage takes Business device 300 pushes process to management side's terminal 120 and owner's terminal 130 and rectifies and improves start information.
Construction party logs in quality monitoring platform 200 after the completion of process is rectified and improved by construction party terminal 110, in project progress Information is completed in the rectification of 222 typing process of unit, and background server 300 pushes work to management side's terminal 120 and owner's terminal 130 Information is completed in sequence rectification.
After process rectification completion information is consulted by management side, quality monitoring platform 200 is logged in by management side's terminal 120, then It is secondary to check and accept start information in 222 typing process of project progress unit, and start simultaneously at and carry out an acceptance inspection to the process rectification of completion, after Platform server 300 pushes process to construction party terminal 110 and owner's terminal 130 and checks and accepts start information.
Management side logs in quality monitoring platform 200 after the completion of process is rectified and improved and checked and accepted by construction party terminal 110, if checking and accepting Qualification, then in 222 typing process acceptance(check) information of project progress unit, if examination is unqualified, in project progress unit 222 Typing process checks and accepts unqualified information, and background server 300 pushes process to construction party terminal 110 and owner's terminal 130 and tests It folds lattice information or process checks and accepts unqualified information, construction party is made to be rectified and improved again to process, until process acceptance(check) is Only.
If construction party finds process acceptance(check) information, the construction and examination of the process are fully completed, construction party Start the construction of subsequent processing.In this way, in the construction of each process and the course of receiving, construction party, management side and owner are Project progress information can be distally being known in time, the slitless connection realized construction and checked and accepted saves construction party, management side and industry Main time for communication, and shorten the construction period, ensure construction quality.
Fig. 1 is reviewed, in the present embodiment, quality monitoring platform 200 is additionally provided with environment data module 230, for constructing Side, management side and owner check the environmental data of construction site.Environment data module 230 has environmental monitoring mould by network connection Block, context detection module 400 include electrochemical sensor 410 and controller 420;It is existing that electrochemical sensor 410 is mounted on construction , such as in horizontal, parlor or kitchen, the finishing pollution gas concentration for detecting construction site;Controller 420 and electrochemistry Sensor 410 is electrically connected, for sending finishing pollution gas concentration information to background server 300.
During process is constructed and is rectified and improved, it may be difficult to generate the finishing pollution gas such as radon, formaldehyde, benzene with avoiding Body, the finishing pollution gas that electrochemical sensor 410 is generated with construction site react, and generate and construction site finishing pollution The directly proportional electric signal of gas concentration, and by the electric signal transmission to controller 420;Controller 420 is according to the electric signal of reception Size judges the concentration range of the finishing pollution gas of construction site, and generates the finishing pollution gas concentration of respective range Value, is then forwarded to background server 300;Construction party can check that the finishing of construction site is dirty by environment data module 230 The concentration value of gas is contaminated, if the concentration value exceeds certain range, construction party can stop constructing in due course, scene to be onstructed Finishing pollution gas is further continued for constructing after dispersing, to ensure the health of construction personnel.And it is complete in entire house ornamentation engineering Cheng Hou, owner can also check the concentration value of finishing pollution gas by environment data module 230, to ensure that owner is moving into room When room, the concentration value of finishing pollution gas can be reduced to qualified level, it is ensured that the health of family's packing quality and owner.
In the present embodiment, quality monitoring platform 200 is additionally provided with video and checks module 240, and construction is checked for owner The monitor video at scene;Video checks that module 240 has video monitoring module 500, video monitoring module 500 to wrap by network connection The video camera 510 of multiple installations at the construction field (site) is included, for the vision signal and audio data of acquisition construction site in real time, and It is sent to background server 300, in order to which owner can check that module 240 checks applying for construction party at any time in distal end by video Work works and the checking and accepting of management side, further ensures that a packing quality, improves the Experience Degree of owner.
Above example is only explanation of the invention, is not limitation of the present invention, those skilled in the art The modification that not creative contribution can be made to the present embodiment as needed after reading this specification, but as long as in this hair It is all protected by Patent Law in bright right.

Claims (6)

1. a kind of remote home packing quality control system based on Internet of Things, video and artificial intelligence, it is characterised in that:Including user Terminal (100) is connected equipped with quality monitoring platform (200), quality monitoring platform (200) by network on user terminal (100) It is connected to background server (300), quality monitoring platform (200) is provided with user management module (210) and engineering management module (220), user management module (210) is used to be managed the user information for logging in quality monitoring platform (200), engineering management Module (220) is used to be managed hot work in progress and the engineering information that will be constructed.
2. the remote home packing quality control system according to claim 1 based on Internet of Things, video and artificial intelligence, feature exist In:User management module (210) includes user's additions and deletions unit (211) and rights management unit (212), user's additions and deletions unit (211) it is used for user management module (210) add or delete user, rights management unit (212) is used for being added to user The user of management module (210) is grouped, and distributes corresponding operating right.
3. the remote home packing quality control system according to claim 2 based on Internet of Things, video and artificial intelligence, feature exist In:Engineering management module (220) includes engineering creating unit (221) and project progress unit (222), engineering creating unit (221) it is used to create the newly built construction that will be constructed, project progress unit (222) is used for typing project progress information.
4. the remote home packing quality control system according to claim 3 based on Internet of Things, video and artificial intelligence, feature exist In:User terminal (100) includes construction party terminal (110), management side's terminal (120) and owner's terminal (130);
Construction party logs in quality monitoring platform (200) by construction party terminal (110), in project progress unit (222) typing work Sequence construction start information, and start simultaneously at and construct, background server (300) is whole to management side's terminal (120) and owner Hold (130) push process construction start information;
Construction party logs in quality monitoring platform (200) after the completion of process is constructed by construction party terminal (110), in project progress Information is completed in the construction of unit (222) typing process, and background server (300) is to management side's terminal (120) and owner's terminal (130) information is completed in the construction of push process;
After process construction completion information is consulted by management side, quality monitoring platform (200) is logged in by management side's terminal (120), Project progress unit (222) typing process checks and accepts start information, and starts simultaneously at and carry out an acceptance inspection to the working procedure of completion, backstage Server (300) checks and accepts start information to construction party terminal (110) and owner's terminal (130) push process;
Management side logs in quality monitoring platform (200) after the completion of process is checked and accepted by construction party terminal (110), is closed if checking and accepting Lattice, then in project progress unit (222) typing process acceptance(check) information, if examination is unqualified, in project progress unit (222) typing process checks and accepts unqualified information, and background server (300) is to construction party terminal (110) and owner's terminal (130) It pushes process acceptance(check) information or process checks and accepts unqualified information;
If construction party finds process and checks and accepts unqualified information, quality monitoring platform is logged in by construction party terminal (110) (200), start information is rectified and improved in project progress unit (222) typing process, and starts simultaneously at and construction rectification is carried out to process, after Platform server (300) rectifies and improves start information to management side's terminal (120) and owner's terminal (130) push process;
Construction party logs in quality monitoring platform (200) after the completion of process is rectified and improved by construction party terminal (110), in project progress Information is completed in the rectification of unit (222) typing process, and background server (300) is to management side's terminal (120) and owner's terminal (130) information is completed in the rectification of push process;
After process rectification completion information is consulted by management side, quality monitoring platform (200) is logged in by management side's terminal (120), then It is secondary to check and accept start information in project progress unit (222) typing process, and start simultaneously at and carry out an acceptance inspection to the process rectification of completion, Background server (300) checks and accepts start information to construction party terminal (110) and owner's terminal (130) push process;
Management side logs in quality monitoring platform (200) after the completion of process is rectified and improved and checked and accepted by construction party terminal (110), if checking and accepting Qualification, then in project progress unit (222) typing process acceptance(check) information, if examination is unqualified, in project progress unit (222) typing process checks and accepts unqualified information, and background server (300) is to construction party terminal (110) and owner's terminal (130) It pushes process acceptance(check) information or process checks and accepts unqualified information;
If construction party finds process acceptance(check) information, the construction and examination of the process are fully completed, and construction party starts The construction of subsequent processing.
5. the remote home packing quality control system according to claim 1 based on Internet of Things, video and artificial intelligence, feature exist In:Quality monitoring platform (200) is additionally provided with environment data module (230), and environment data module (230) has by network connection Environment monitoring module, context detection module (400) include electrochemical sensor (410) and controller (420);Electrochemical sensor (410) it installs at the construction field (site), the finishing pollution gas concentration for detecting construction site;Controller (420) is passed with electrochemistry Sensor (410) is electrically connected, for sending finishing pollution gas concentration information to background server (300).
6. the remote home packing quality control system according to claim 1 based on Internet of Things, video and artificial intelligence, feature exist In:Quality monitoring platform (200) is additionally provided with video and checks that module (240), video check that module (240) has by network connection Video monitoring module (500), video monitoring module (500) includes the video camera (510) of multiple installations at the construction field (site), for real When acquire the vision signal and audio data of construction site, and be sent to background server (300).
CN201810170268.8A 2018-03-01 2018-03-01 Remote home packing quality control system based on Internet of Things, video and artificial intelligence Pending CN108469739A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810170268.8A CN108469739A (en) 2018-03-01 2018-03-01 Remote home packing quality control system based on Internet of Things, video and artificial intelligence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810170268.8A CN108469739A (en) 2018-03-01 2018-03-01 Remote home packing quality control system based on Internet of Things, video and artificial intelligence

Publications (1)

Publication Number Publication Date
CN108469739A true CN108469739A (en) 2018-08-31

Family

ID=63264033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810170268.8A Pending CN108469739A (en) 2018-03-01 2018-03-01 Remote home packing quality control system based on Internet of Things, video and artificial intelligence

Country Status (1)

Country Link
CN (1) CN108469739A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109784852A (en) * 2019-01-12 2019-05-21 重庆洪峰工业设备安装有限公司 A kind of electronic system and working method of Engineering Oriented debit
CN109784750A (en) * 2019-01-28 2019-05-21 珠海金慧科技有限公司 Finishing progress and the unmanned long-range policing algorithm of quality
CN111178762A (en) * 2019-12-30 2020-05-19 杭州产链数字科技有限公司 Block chain-based construction engineering quality acceptance system and method
CN112184068A (en) * 2020-10-27 2021-01-05 陕西交建云数据科技有限公司 ERP-based road engineering project information cooperation method
CN112631187A (en) * 2020-12-28 2021-04-09 江苏金迪木业股份有限公司 Customized home decoration monitoring and management system based on Internet of things and artificial intelligence
CN113065726A (en) * 2020-01-02 2021-07-02 宁波余慈一家电子商务有限公司 Decoration management system and management method thereof
CN113869681A (en) * 2021-09-17 2021-12-31 湖南方圆工程咨询监理有限公司 BIM and laser scanning based house building acceptance method, device and system
CN114186973A (en) * 2021-12-13 2022-03-15 金螳螂家装电子商务(苏州)有限公司 Online transaction service system of home decoration project full-service scene

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130079936A1 (en) * 2011-09-13 2013-03-28 Brian Cullen Remote access for water infrastructure management
CN103543709A (en) * 2013-09-24 2014-01-29 陕西明路光电技术有限责任公司 Environmental pollution monitoring and managing system of construction site
CN103853116A (en) * 2012-11-30 2014-06-11 西安众智惠泽光电科技有限公司 House decoration condition online monitoring system
CN205726151U (en) * 2016-04-29 2016-11-23 中国建筑第七工程局有限公司 Construction safety monitoring system
CN106408187A (en) * 2016-09-13 2017-02-15 安徽广行物联科技有限公司 Transparent regulation system for interior decoration design and construction
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN107423895A (en) * 2017-07-20 2017-12-01 浙江之江工程项目管理有限公司 A kind of quality control system of house fine fitment
CN206788132U (en) * 2016-11-10 2017-12-22 中国农业大学 One kind finishing harmful gas detection system
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130079936A1 (en) * 2011-09-13 2013-03-28 Brian Cullen Remote access for water infrastructure management
CN103853116A (en) * 2012-11-30 2014-06-11 西安众智惠泽光电科技有限公司 House decoration condition online monitoring system
CN103543709A (en) * 2013-09-24 2014-01-29 陕西明路光电技术有限责任公司 Environmental pollution monitoring and managing system of construction site
CN205726151U (en) * 2016-04-29 2016-11-23 中国建筑第七工程局有限公司 Construction safety monitoring system
CN106408187A (en) * 2016-09-13 2017-02-15 安徽广行物联科技有限公司 Transparent regulation system for interior decoration design and construction
CN206788132U (en) * 2016-11-10 2017-12-22 中国农业大学 One kind finishing harmful gas detection system
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN107423895A (en) * 2017-07-20 2017-12-01 浙江之江工程项目管理有限公司 A kind of quality control system of house fine fitment
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国档案学会编: "关于甲醛的国家标准及检测方法", 《档案事业发展与青年档案工作者的责任 2010年青年档案工作者研讨会论文集》 *
戴金增等: "甲醛检测", 《重大活动食品安全与卫生监督保障》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109784852A (en) * 2019-01-12 2019-05-21 重庆洪峰工业设备安装有限公司 A kind of electronic system and working method of Engineering Oriented debit
CN109784750A (en) * 2019-01-28 2019-05-21 珠海金慧科技有限公司 Finishing progress and the unmanned long-range policing algorithm of quality
CN111178762A (en) * 2019-12-30 2020-05-19 杭州产链数字科技有限公司 Block chain-based construction engineering quality acceptance system and method
CN113065726A (en) * 2020-01-02 2021-07-02 宁波余慈一家电子商务有限公司 Decoration management system and management method thereof
CN112184068A (en) * 2020-10-27 2021-01-05 陕西交建云数据科技有限公司 ERP-based road engineering project information cooperation method
CN112184068B (en) * 2020-10-27 2024-06-11 陕西交建云数据科技有限公司 Highway engineering project information collaboration method based on ERP
CN112631187A (en) * 2020-12-28 2021-04-09 江苏金迪木业股份有限公司 Customized home decoration monitoring and management system based on Internet of things and artificial intelligence
CN113869681A (en) * 2021-09-17 2021-12-31 湖南方圆工程咨询监理有限公司 BIM and laser scanning based house building acceptance method, device and system
CN114186973A (en) * 2021-12-13 2022-03-15 金螳螂家装电子商务(苏州)有限公司 Online transaction service system of home decoration project full-service scene

Similar Documents

Publication Publication Date Title
CN108469739A (en) Remote home packing quality control system based on Internet of Things, video and artificial intelligence
CN106940839B (en) Power transmission and transformation project quality data management and control system and method
CN106779380A (en) A kind of intelligent construction safety checks evaluation system and method
CN111586729B (en) Three-network signal detection method and system based on metering terminal communication
CN109067879A (en) A kind of Internet of Things multi-parameter water quality on-line monitoring system
CN105427571A (en) Binary channel communication remote meter reading monitoring and analysis system
CN104391244A (en) Closed loop test method of relay protection apparatus and system thereof
CN105956987A (en) Road traffic engineering test detection data acquisition and evaluation system
CN103974312A (en) WLAN (wireless local area network) equipment testing method, device and system
CN106991483A (en) It is a kind of that the implementation detected is examined applied to special equipment
CN105139471A (en) Inspection method for electrical equipment
CN105629094A (en) Transformer test data acquisition and processing system
WO2015149595A1 (en) Iec61850-based communication simulation method for insulation on-line monitoring device
CN113746891A (en) Voiceprint monitoring system for power equipment
CN104793270A (en) Comprehensive judging method of operation states of equipment in comprehensive meteorological observation network
CN108230803A (en) A kind of internet of things experimental device based on artificial intelligence
CN104301916A (en) Test and optimization method, device and system based on universal mobile intelligent terminal plug-in connector
CN111597227B (en) Electric power automation cloud detection platform and monitoring method based on big data platform technology
CN107979174B (en) Workflow operation method based on power grid operation management system
CN104282128A (en) Data transmission identification method in interactive system and intelligent system
CN110826668B (en) Intelligent inspection recording system and method for concrete production equipment
CN205176558U (en) Hand -held type anti -electricity -stealing machine of checking meter
CN108022049A (en) Quality of Water Conservancy Projects safety supervision risk evaluating system and method
CN203870674U (en) Clothes detection device
CN208902156U (en) Internet of Things real-time inspection and control system in a kind of property

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180831