CN106284976A - Revit-based aluminum alloy template matching method - Google Patents
Revit-based aluminum alloy template matching method Download PDFInfo
- Publication number
- CN106284976A CN106284976A CN201610853427.5A CN201610853427A CN106284976A CN 106284976 A CN106284976 A CN 106284976A CN 201610853427 A CN201610853427 A CN 201610853427A CN 106284976 A CN106284976 A CN 106284976A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- mould
- template
- revit
- joins
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000838 Al alloy Inorganic materials 0.000 title claims abstract description 99
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000013461 design Methods 0.000 claims abstract description 25
- 238000004088 simulation Methods 0.000 claims abstract description 20
- 238000009415 formwork Methods 0.000 claims description 34
- 238000010586 diagram Methods 0.000 claims description 17
- 238000005304 joining Methods 0.000 claims description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 239000011159 matrix material Substances 0.000 abstract description 3
- 238000012545 processing Methods 0.000 abstract description 2
- 238000011960 computer-aided design Methods 0.000 abstract 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 24
- 229910052782 aluminium Inorganic materials 0.000 description 24
- 230000008901 benefit Effects 0.000 description 10
- 238000010276 construction Methods 0.000 description 10
- 238000009408 flooring Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 238000007598 dipping method Methods 0.000 description 7
- 230000008859 change Effects 0.000 description 6
- 150000001875 compounds Chemical class 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000012800 visualization Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000036299 sexual function Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/02—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Architecture (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Business, Economics & Management (AREA)
- Computer Hardware Design (AREA)
- Health & Medical Sciences (AREA)
- Computational Mathematics (AREA)
- Human Resources & Organizations (AREA)
- General Health & Medical Sciences (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a Revit-based aluminum alloy template matching method, which comprises the following steps of: establishing a parameterized building matrix structure model and a parameterized aluminum alloy template family file by using Revit software; splicing the aluminum alloy template family file on a building matrix structure model according to engineering actual simulation according to a template matching rule to form a simulated splicing assembly; checking whether the simulation splicing assembly has interference or not, checking whether the simulation splicing assembly has interference with other cross operation models or not, and optimally designing an aluminum alloy template family file according to needs; and (4) counting the die matching model information of the aluminum alloy template to generate a detail table of the model component, a three-view drawing of a horizontal section and a template processing drawing. Compared with the traditional Auto CAD (computer-aided design) die matching method, the Revit-based aluminum alloy template die matching method provided by the invention does not excessively depend on the three-dimensional space imagination capability of operators, has high aluminum alloy template die matching efficiency and high accuracy, and shortens the design period of the aluminum alloy template.
Description
Technical field
The present invention relates to technical field of buildings, particularly relate to a kind of aluminum alloy mould plate based on Revit and join mould method.
Background technology
Aluminum alloy mould plate is a kind of new material, and it has, and construction is quick, convenient, efficiency is high, manually saves with facility, becomes
The advantages such as quality is good, security civilization degree is high, integrated cost is low, are the good green formwork systems of a kind of comprehensive benefit.
Along with China's low-carbon environment-friendly, the continuous lifting of green building idea, aluminum alloy mould plate also has wide in China
Development space.More traditional plank sheathing and steel form, aluminum alloy mould plate is with the obvious advantage.
At present, aluminum alloy mould plate is in the stage of promoting the use of, and the template configuration design majority of current aluminum alloy pattern plate uses
The CAD design of conventional two-dimensional, comparatively laborious, easily to make mistakes, flat, vertical, profile conversion complexity, efficiency with mold is the highest;Furthermore, this
After job demand designer possesses stronger three dimensions imaginative power, and aluminum alloy mould plate joins mould, check that difficulty is relatively big, meter
Calculation process is complicated, the problems such as template conflict or dimensional error easily occurs, and aluminum alloy mould plate is joined mould accuracy and cannot be ensured, needs
Expend designer's great effort.
And by combining BIM technology, utilize the three-dimensional visualization of Revit software, publishing picture property, flat deep cutting bumpless transfer with
And the advantage such as quantities Information Statistics are fast, aluminum alloy mould plate can be greatly improved joins mould design degree of accuracy and work efficiency.
Therefore, need a kind of suitable aluminum alloy mould plate based on Revit of design badly and join mould method, improve efficiency with mold and just join mould
Really rate.
Summary of the invention
It is an object of the invention to for above-mentioned technical problem, it is provided that a kind of aluminum alloy mould plate based on Revit joins mould side
Method, more traditional Auto CAD joins mould method, no longer depends on the three dimensions visionary of operator unduly, has aluminium alloy
The advantage that Compound of the formworks efficiency is high, and aluminum alloy mould plate to join mould accuracy rate higher, shorten the process-cycle of aluminum alloy mould plate.
Technical scheme
For solving above-mentioned technical problem, the aluminum alloy mould plate based on Revit that the present invention provides joins mould method, including following step
Rapid:
S1, uses Revit software, sets up parametrization building basal body structure model;
S2, uses Revit software, sets up parametrization aluminum alloy mould plate race file;
S3, according to joining mould rule, splices aluminum alloy mould plate race file at building basal body structure mould according to engineering realistic simulation
In type, form simulation splicing component;
S4, checks whether simulation splicing component exists interference, and checks whether are simulation splicing component and other cross-operation models
Exist and interfere, depending on aluminum alloy mould plate race file being optimized design;
S5, statistics aluminum alloy mould plate joins mould model information, and generates model component detail list, puts down, stands, cuts open three-view diagram and template adds
Work figure.
Further, in step sl, building basal body structure model include the absolute altitude of building, floor height, axle net, wall,
Post, beam, plate, stair.
Further, in step sl, including the secondary structure design to building basal body structure model.
Further, in step s 2, the parameter of aluminum alloy mould plate race file include the length of aluminum alloy mould plate, width,
Highly, material.
Further, in step s 2, aluminum alloy mould plate race file is set up on same benchmark job face.
Further, in step s3, described in join mould rule and include joining mould order and computation rule, described in join mould rule and relate to
And aluminum alloy pattern plate, support system join mould.
Further, described aluminum alloy pattern plate includes plane template, corner formwork, and wherein plane template includes wall column formwork, beam
Template die plate and undertaking template;Described support system includes early-dismantling device, adjustable steel support.
Further, its join mould order join mould for wall column formwork, adjustable steel support joins mould, beam-slab template joins mould, stair mould
Mould joined by plate and other accessories join mould.
The method have the benefit that
The aluminum alloy mould plate based on Revit that the present invention provides joins mould method, has the advantages that
(1) join mould degree of accuracy to improve, join mould increased quality
Tradition CAD two dimension is joined mould drawing and is become more solid image by the present invention, and the peace mode of tearing open for complex node becomes more
Add visual and clear.On the one hand greatly reducing the level requirement that template peace is torn open personnel, the peace reducing form work engineering splits into this;
On the other hand can reduce complex node and design the risk made mistakes, it is to avoid rejection and waste material;And it is more traditional to join mould accuracy rate
CAD join mould and improve a lot.
(2) speed of publishing picture is fast, and efficiency is high
Tradition CAD joins after mould figure completes, and still needs to repaint each template in-depth manuscript by calculating, the most loaded down with trivial details, and pole
Error-prone.And Revit joins Mo Tu and directly can generate template flat deep cutting manuscript according to race's file detail drawing, remove from and repaint ring
Joint, also improves efficiency.According to existing aluminum alloy mould plate race file, efficiency with mold joins mould compared to tradition CAD, effect of publishing picture
Rate can improve more than 1 times.
(3) quantities statistics is accurately
The aluminum alloy pattern plate quantities accurate count difficult problem that always puzzlement aluminum alloy pattern plate is promoted the use of because CAD join mould drawing cannot be right
Template area is directly added up, and is all to be processed drawing by aluminum alloy pattern plate designer, works out aluminum alloy pattern plate outbound inventory, logical
Cross outbound inventory and determine that aluminum alloy pattern plate purchases area.Owing to aluminum alloy pattern plate area is excessive, aluminum alloy pattern plate substantial amounts, cause checking work pole
Difficulty is carried out, and final checked result accuracy is the highest.BIM threedimensional model can carry out all-round statistics by detail list function, really
Fixed each specification aluminum alloy pattern plate quantity and area.On the one hand provide convenient for project templet quantities statistics, it is also possible to by project
Aluminum alloy pattern plate list is uploaded to aluminum alloy pattern plate and enters, deposits, sells platform, accurate count projects lease aluminum alloy pattern plate area, gives back area,
Reach company's target to aluminum alloy pattern plate fine-grained management.
(4) aluminum dipping form use cost is reduced
If aluminum alloy pattern plate has enough to meet the need between disparity items, turnover scheme is dominated by aluminum alloy pattern plate producer.On the one hand, CAD
Join mould figure thorough to changing plate program analysis, and producer provide to change plate scheme the most most economical the most reasonable;On the other hand, newly
Old CAD joins mould figure Accurate Analysis cannot change plate gauge lattice and quantity, so the template area data of aluminum alloy pattern plate producer offer is accurate
Property cannot be verified.Independently join mould can effectively take on a new look the monopoly position of aluminum dipping form producer, greatly aluminum dipping form is had enough to meet the need expense transparence.
(5) virtual preassembling, time-consuming, cost-effective
The present invention simulates preassembling process, can complete aluminum alloy pattern plate preassembling by threedimensional model and structural drawings being compared
Work, can check assembled situation in advance.Both shortened the duration, and also saved preassembling levelling of the land expense simultaneously and peace tears expense open
With.Joining mold process to generate in computer completely, Meteorological is few, and particularly after setting up race, similar engineering can be applied mechanically, after
The time of continuous Engineering Modeling is greatly shortened.
(6) scope is expanded wide
Utilize three-dimensional to join the model that mould generates, utilize its model characteristics, Virtual Construction, Digital manufacturing, quality can be extended to
The aspects such as safety management, for construction management service.
(7) architecture information and the requirement of industrialization trend are met
Aluminum alloy mould plate is joined mould design and is realized by BIM technology, is consistent with the megatrend of construction industry development, embodies architecture information
Change and industrialized feature, improve science decision and management level, promote fine-grained management.
Accompanying drawing explanation
By the detailed description made in conjunction with the following drawings, advantage of the present invention will be apparent from and be easier to reason
Solving, these accompanying drawings the most schematically, are not limiting as the present invention, wherein:
Fig. 1 is the flow chart of the present invention;
Fig. 2 is Compound of the formworks schematic diagram;
Fig. 3 is that body of wall joins mould precedence diagram;
Fig. 4 is that support system joins mould precedence diagram;
Fig. 5 is that beam forms joins mould precedence diagram;
Fig. 6 is that floorboard joins mould precedence diagram;
Fig. 7 is that mould precedence diagram joined by stair.
Detailed description of the invention
Below in conjunction with specific embodiments and the drawings, a kind of based on Revit aluminum alloy mould plate of the present invention is joined mould method to enter
Row describes in detail.
The embodiment recorded at this is the specific detailed description of the invention of the present invention, for the design of the present invention being described, all
It is explanatory and exemplary, should not be construed as the restriction to embodiment of the present invention and the scope of the invention.Except record at this
Outside embodiment, those skilled in the art can also based on the application claims and description disclosure of that use aobvious and
Other technical scheme being clear to, these technical schemes include use to the embodiment recorded at this make any obviously
The technical scheme of substitutions and modifications.
The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each several part
And mutual relation.Note that the structure of each parts for the ease of clearly showing the embodiment of the present invention, between each accompanying drawing
Do not draw according to identical ratio.Identical reference marker is used for representing identical part.
Fig. 1 is the flow chart that a kind of aluminum alloy mould plate based on Revit joins mould method.One its specifically include following steps:
S1, uses Revit software, sets up parametrization building basal body structure model;
In this step, building basal body structure model is set up in the Revit groupware, including the absolute altitude of building, floor height,
The primitive information such as axle net, wall, post, beam, plate, stair;And the employing of different structure component information is made a distinction without color, prominent
Display aluminum alloy mould plate primitive information.
In this step, it includes that the secondary structure to building basal body structure model designs, and takes one-shot forming as far as possible
Pour mode, to facilitate building engineering construction.
S2, uses Revit software, sets up parametrization aluminum alloy mould plate race file;
In this step, the parameter of aluminum alloy mould plate race file include the length of aluminum alloy mould plate, width, highly, material, aluminum close
Gold template race file is set up on same benchmark job face.
The Revit groupware is set up, including arrange aluminum alloy mould plate length, width, highly, the major control such as material
Parameter so that aluminum alloy pattern plate race file can drive template size according to its Parameters variation.
It addition, aluminum alloy mould plate race file need to be set up in same benchmark job face, as template pel at building base
Location plane in body structural model.
S3, according to joining mould rule, ties aluminum alloy mould plate race file at building matrix according to engineering realistic simulation splicing
On structure model, form simulation splicing component;
Aluminum alloy mould plate race file parametrization set up imports building basal body structure model, makes Prototype drawing unit according to benchmark work
It is accurately positioned as face;Join mould rule according to aluminum alloy mould plate, adjust each template parameter information, the most at last each template pel
Carry out assembly, form simulation splicing component.
In this step, join mould rule and include joining mould order and computation rule, be specifically related to aluminum alloy pattern plate, the joining of support system
Mould.
Aluminum alloy formwork system includes template, support and accessory.
Aluminum alloy pattern plate includes plane template and corner formwork, and plane template includes wall column formwork, beam forms and accepts template, turns
Angle formwork includes flooring internal corner formwork, flooring inner corner trim corner formwork, wall column internal corner formwork and external angle formwork;Support system includes early
Dismantling device, adjustable steel support, early-dismantling device includes that early dismantling head at the bottom of early dismantling head at the bottom of beam, plate, monocline early tear aluminum beam open, diclinic early tears aluminum beam open
And Quick Release bolt;Accessory includes pin, pin sheet, back cord, split bolt etc..
Fig. 2 is Compound of the formworks of the present invention order, and it is joined, and mould order joins mould for wall column formwork, adjustable steel support is joined
Mould, beam-slab template join mould, stair template joins mould and other accessories join mould.
Fig. 3 is that body of wall joins mould precedence diagram, body of wall inside elder generation, then outside body of wall.Inner side body of wall, outside body of wall join mould order
For: first joining wall Side Template, then join wall beam junction template, finally join mid portion, mid portion elder generation standard is the most nonstandard, last cloth
Put back cord, split bolt, diagonal brace etc..
Body of wall joins mould principle: template is vertically main, and edge uses dedicated templates or angle mould, according to wall, post, depth of beam and top
Plate thickness, in the case of meeting top and bottom interface template, uses standard size as far as possible, and one piece of template is to top, stitching position
As far as possible in stress smaller part position;Wall, post both sides modulus configuration should be consistent, with ensure to the position drawing system;Casting formwork needs
When connecing high, use standard edition traverse, it is impossible to when meeting, customization connects high template.
Support system joins mould precedence diagram, as shown in Figure 4.It is according to the sequence construction of first plate, girder, then secondary beam.Beam slab props up
Support ensures that horizontal both direction is in a row, in column as far as possible;Wall, the first beam-slab bracing system on post limit should ensure that wall, column template remove sky
Between;When isolated beam support is unsatisfactory for load, use dual-gripper form;The general supporting early dismantling head device of standard and adjustable of using
Bracing members.
Fig. 5 is that beam forms joins mould precedence diagram, and it first configures beam internal corner formwork, then supports and aluminum beam, then at the bottom of configuration beam
It is beam bottom mother plate, is followed by side template, last reinforcing beam formwork.
Floorboard joins mould precedence diagram, as shown in Figure 6.
The first step, internal corner formwork around the template of configuration bottom surface;Flooring corner design corner internal corner formwork, general employing turns
Angle inner corner trim is 350-350(mm) template.
Configure the flooring internal corner formwork between two corner inner corner trims: first arrange an oblique angle inner corner trim, general employing C-600's
Oblique angle inner corner trim;Arranging other inner corner trims again, the length kind of inner corner trim is the fewest.If occurring the situation at the bottom of beam base plate, the most not
Internal corner formwork is set.
Second step, configuration early tears aluminum beam open
1) according to Support Position, arrange that middle morning tears aluminum beam open.The middle size early tearing aluminum beam open maximum is 1200mm, and middle morning tears open
The dimension figure of aluminum beam should be integer.The middle kind early tearing aluminum beam open is avoided too much as far as possible.
2) arranging that edge early tears aluminum beam open, full-size 1100mm of aluminum beam is early torn on limit open, and the limit at two ends is early torn aluminum beam open and made as far as possible
Obtaining size the same, the kind that aluminum beam is early torn on limit open is also unsuitable too many.
3rd step, configuration design soffit template
1) after laying and early tearing aluminum beam open, early tearing open between aluminum beam, the distance of vacancy is usually 1200mm, the length of end face template is little
In 1200mm, it is ensured that the plate that floor template is 400 ~ 1200mm length of the overwhelming majority.
2) length of template is the multiple of 100mm as far as possible.
3) principle that the length and width direction of template is arranged: selection standard size template as far as possible, uses big-size formwork, subtracts
Few formwork edge joint.
4) for there being the flooring encorbelmented, in the support that returns back to top that marginal position design of encorbelmenting is identical with flooring.
5) floorboard designed and wallboard, beam slab are integrated, check position, hole the most perfectly aligned.
6), after all flooring has designed, data all to flooring are added up, and according to statistical result to templating species
And quantity is adjusted again.
Fig. 7 is that mould precedence diagram joined by stair, when stair template joins mould, should be noted following some:
For stair soffit base plate corner internal corner formwork, first according to bench base plate, at bench and wall, beam junction design base plate
Corner inner corner trim;Base plate corner inner corner trim should use standard inner corner trim to be welded.This inner corner trim should be unsuitable with the contact length of bench base plate
Too short, with mortar leakage prevention.
For stair soffit template, bench base plate should be made as far as possible to join the wide on-gauge plate of 400mm, facing sky side if having, facing sky side
Use on-gauge plate wide for 200mm to be supported as far as possible;Template is unsuitable with length A of stair inclined floor mating part wide, to the greatest extent
Amount controls within 300mm, to ensure the intensity of template.
When stair base plate joins mould design, it is important to note that the design at cleat stanchion, ladder beam, landing beam etc. and bench node, prevent
Spillage;Consider and have remaining template of matching relationship with base plate mould so that it is complementary modul board size is integer, in order to use standard
Plate;Bottom surface template uses 200mm, 400mm on-gauge plate, standard inner corner trim, standard oblique angle inner corner trim as far as possible.Standard inner corner trim length is not more than
2000mm.As shaped piece need to be designed at bench and the ladder node such as beam, cleat stanchion, landing beam, following principle should be followed: shaped piece structure
Other formwork structure should be made to simplify;Shaped piece structure should be easy to processing and mounting or dismounting.
For backplanes support, sky is faced in bench one side, it is necessary to add the support that support interval is not more than 1200mm;
Bench one side part faces sky, when part is body of wall, faces empty part and can ensure that safety processes;
For template of marking time, connecting plate of marking time is for connection to the template middleware with wall form of marking time;Template main molding table
The size in face must be with stair step consistent size, and the structure of connecting plate of marking time should be easy to body of wall and joins mould.
The size of template " L " shape molded surface must be with stair step consistent size.Mark time and intersect with landing beam, cleat stanchion etc.
Node at it is contemplated that use the template of marking time of long 300mm.Template of marking time should conveniently be passed through, and transports material.Step plate with mark time
The connecting hole of plate is away from preferably taking 200mm, 300mm.When structure limits, it is allowed to spacing 100mm;Baffle plate of marking time is for connection at the bottom of bench
The middleware of template die plate and template of marking time.Baffle arrangement of marking time should ensure that bench side is without spillage.It is easy to assembling, without interfering.Knot
Structure meets requirement of strength.
Side wall template is faced for bench, prevents wearing template: when stair bench side is whole face wall body, cloth is set up defences and worn template, anti-
Wear template width and preferably take 200mm;Trapezoidal plate: preferential employing 400mm width trapezoidal plate joins mould;Trapezoidal plate dual-side punches preferably from right angle
While start;Triangle plate: bench faces side wall according to joining the needs of template, can join triangle plate.Triangle plate should meet structure and set
Meter requirement, it is ensured that seam is good, without spillage;Sketch plate: according to joining mould needs, sketch plate can be joined.Sketch plate should meet structure and set
Meter requirement, it is ensured that seam is good, without spillage.
For inner corner trim corner mould between wall, between wall, join mould principle with corresponding wallboard identical for inner corner trim length, but is not required to deduct ditch
The height of aluminum;For wall external angle formwork, the external corner length of body of wall end, but it is not required to deduct the height of ground aluminum corner brace.
S4, checks whether simulation splicing component exists interference, and checks simulation splicing component and other cross-operation models
Whether existence is interfered, depending on aluminum alloy mould plate race file being optimized design;
In this step, by Revit software collision detection function, dimension information and the conflict feelings of simulation splicing component are checked
Condition, depending on being adjusted amendment.
First, the simulation splicing component completed is integrated in Revit model, clicks " observability/the figure in view option card
Shape " order, change wall, post, beam, plate and the filling pattern color of aluminum alloy mould plate pel, it is accordingly required in particular to aluminum alloy pattern plate fills face
Color highlights, and will not join mould position and forms sharp contrast with aluminum alloy mould plate, it is simple to looks into each detail treatment and lack benefit
Leakage;
Then, model is directed in Naviswork, carries out collision detection, return in Revit model, adjust and have repetition, punching
Prominent, the position relationship of embedded template;
Finally, according to joining the basic principle of mould, according to thin after the thickest, first in after outer order, the setting first checking for supporting is
No meet the requirements, be then examined in slab form, wall column formwork, stair template join mould, be finally template stay bolt system, with
Check, adjust in time.
S5, statistics aluminum alloy mould plate is joined mould model information, and is generated model component detail list, puts down, stands, cuts open three-view diagram and mould
Plate manuscript.
In this step, by the detail list statistical function of Revit software, each template size, quantity, area are carried out intelligence
Can add up, and generate list of templates;By the published picture sexual function of Revit software, generate flat deep cutting three-view diagram and complex node
Three-dimensional construction diagrams is constructed for guide field.
The aluminum alloy mould plate based on Revit that the present invention provides joins mould method, has certain application scalability.It is permissible
Threedimensional model is utilized to carry out aluminum dipping form construction animation and progress simulation and identification of dangerous source.
(1) use the Revit model of aluminum dipping form, model is imported Navisworks software, utilizes Animator instrument, arrange
Scene and animation collection, fabrication and installation, dismounting analog video, derive video file, carry out later stage process with video software.Build continuously
The structural model of vertical at least three layers, imports Navisworks software by model, simulates needs according to construction speed arrangement and 4D
Precision establishment Project file, after importing Project file is arranged, carries out 4D simulation, finally derives 4D video, can be clear
Show whole floor aluminum alloy mould plate construction overall process and the condition of construction of different time.
(2) BIM model can be utilized to carry out identification of dangerous source, identify horizontal hole, high-supported formwork equivalent risk source intuitively,
To formulate corresponding countermeasure.
In embodiment shown in Fig. 1, it is applicable to ordinary residence index bed (within floor height 3.3m) aluminum alloy mould plate and joins mould
Design, thin portion Deepen Design, quantities calculation and visualization of presence such as are told somebody what one's real intentions are at many-sided the use.Other are more than the knot of 3.3m floor height
Structure layer aluminum alloy mould plate is joined mould and is referred to this engineering method, and conceptual design and safety check result in conjunction with aluminum dipping form carry out three-dimensional and join
Mould.
The aluminum alloy mould plate based on Revit that the present invention provides joins mould method, defines aluminum alloy mould plate and joins the standard of mould
Work flow, more traditional Auto CAD joins mould method, no longer depends on the three dimensions visionary of operator unduly, joins mould
Accurately, efficiently, shorten the process-cycle of aluminum alloy mould plate, ensured the construction period of architectural engineering, specifically had the advantage that
(1) present invention utilizes the characteristic of three-dimensional visualization that Revit software realizes, completes two dimension drawing to threedimensional model, three-dimensional
After the visual design again from three-dimensional to two dimension conversion, make to join mould flow process more three-dimensional, directly perceived, accurate, it is achieved complexity join mould joint
The accurate embodiment of point, improves the efficiency joining mold process, publish picture the most convenient accurately;Especially after setting up component race, different
The joining mould and can directly invoke of engineering.
(2) present invention utilizes the aluminum alloy mould plate three-dimensional information model of Revit software arrangements, and component is deposited during organizational system
Store up relevant information, by information is extracted, the statistics of aluminum alloy mould plate specification, size, quantity, area can have been carried out, can
With the sound field bill of materials, it is simple to the management to construction material.
(3) present invention utilizes structure, the aluminum dipping form model having built up, can expansive approach further, it is achieved Maximum Value
Change.
The present invention is not limited to above-mentioned embodiment, and anyone can draw other various forms under the enlightenment of the present invention
Product, no matter but in its shape or structure, make any change, every have same as the present application or akin technical side
Case, within all falling within protection scope of the present invention.
Claims (8)
1. an aluminum alloy mould plate based on Revit joins mould method, it is characterised in that comprise the following steps:
S1, uses Revit software, sets up parametrization building basal body structure model;
S2, uses Revit software, sets up parametrization aluminum alloy mould plate race file;
S3, according to joining mould rule, splices aluminum alloy mould plate race file at building basal body structure mould according to engineering realistic simulation
In type, form simulation splicing component;
S4, checks whether simulation splicing component exists interference, and checks whether are simulation splicing component and other cross-operation models
Exist and interfere, depending on aluminum alloy mould plate race file being optimized design;
S5, statistics aluminum alloy mould plate joins mould model information, and generates model component detail list, puts down, stands, cuts open three-view diagram and template adds
Work figure.
Aluminum alloy mould plate based on Revit the most according to claim 1 joins mould method, it is characterised in that in step sl,
Building basal body structure model includes the absolute altitude of building, floor height, axle net, wall, post, beam, plate, stair.
Aluminum alloy mould plate based on Revit the most according to claim 1 joins mould method, it is characterised in that in step sl,
Including the secondary structure design to building basal body structure model.
Aluminum alloy mould plate based on Revit the most according to claim 1 joins mould method, it is characterised in that in step s 2,
The parameter of aluminum alloy mould plate race file include the length of aluminum alloy mould plate, width, highly, material.
Aluminum alloy mould plate based on Revit the most according to claim 1 joins mould method, it is characterised in that in step s 2,
Aluminum alloy mould plate race file is set up on same benchmark job face.
Aluminum alloy mould plate based on Revit the most according to claim 1 joins mould method, it is characterised in that in step s3,
Described mould rule of joining includes joining mould order and computation rule, described in join mould rule relate to aluminum alloy pattern plate, support system join mould.
Aluminum alloy mould plate based on Revit the most according to claim 6 joins mould method, it is characterised in that described aluminum alloy pattern plate
Including plane template, corner formwork, wherein plane template includes wall column formwork, beam-slab template and accepts template;Described supporter
System includes early-dismantling device, adjustable steel support.
8. join mould method according to the aluminum alloy mould plate based on Revit described in claim 6 or 7, it is characterised in that it is suitable that it joins mould
Sequence is that wall column formwork joins mould, adjustable steel support joins mould, beam-slab template joins mould, stair template joins mould and other accessories join mould.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610853427.5A CN106284976A (en) | 2016-09-27 | 2016-09-27 | Revit-based aluminum alloy template matching method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610853427.5A CN106284976A (en) | 2016-09-27 | 2016-09-27 | Revit-based aluminum alloy template matching method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284976A true CN106284976A (en) | 2017-01-04 |
Family
ID=57715272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610853427.5A Pending CN106284976A (en) | 2016-09-27 | 2016-09-27 | Revit-based aluminum alloy template matching method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284976A (en) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107729686A (en) * | 2017-11-08 | 2018-02-23 | 江苏国泰新点软件有限公司 | Component methods of exhibiting, device, electronic equipment and the storage medium of BUILDINGS MODELS |
CN107859176A (en) * | 2017-11-29 | 2018-03-30 | 湖北绿溪建筑科技有限公司 | A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate |
CN108252519A (en) * | 2018-03-14 | 2018-07-06 | 中铁八局集团第四工程有限公司 | A kind of construction method of the house construction engineering template construction technique model based on BIM |
CN108268707A (en) * | 2017-12-31 | 2018-07-10 | 安徽马钢工程技术集团有限公司 | A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT |
CN108280276A (en) * | 2018-01-09 | 2018-07-13 | 上海大学 | It is created and dosage statistical method based on Revit software stair model criterias |
CN108491631A (en) * | 2018-03-23 | 2018-09-04 | 中国十七冶集团有限公司 | A kind of aluminum alloy mould plate construction method based on BIM technology |
CN109424202A (en) * | 2017-09-05 | 2019-03-05 | 中铁十局集团电务工程有限公司 | A kind of secondary assembled wallboard building method |
CN110378039A (en) * | 2019-07-23 | 2019-10-25 | 广州优比建筑咨询有限公司 | A kind of aluminum alloy pattern plate design method and system based on Revit |
CN110700583A (en) * | 2019-05-28 | 2020-01-17 | 北京构力科技有限公司 | Aluminum template pre-assembly system and method based on three-dimensional BIM technology |
CN110704910A (en) * | 2019-09-18 | 2020-01-17 | 山东新汉唐数据科技有限公司 | Aluminum template matching method, system, computer readable storage medium and equipment |
CN110716701A (en) * | 2019-10-09 | 2020-01-21 | 周发喜 | Method for quickly plotting detailed prefabricated convex window graph based on Revit software |
CN111502246A (en) * | 2020-04-29 | 2020-08-07 | 中铁二局第一工程有限公司 | BIM technology-based design and optimization method for side wall unilateral template support system |
CN111618528A (en) * | 2019-02-27 | 2020-09-04 | 浙江树垚新材料科技有限公司 | Production process of aluminum template for building |
CN111832113A (en) * | 2020-07-31 | 2020-10-27 | 河南五建第二建筑安装有限公司 | Aluminum alloy template matching method based on BIM technology |
CN112528357A (en) * | 2019-08-31 | 2021-03-19 | 广东博越智慧建造科技有限公司 | Prefabricated part and aluminum mold arrangement simulation construction method based on building information model |
CN113378282A (en) * | 2021-06-30 | 2021-09-10 | 中国二冶集团有限公司 | BIM-based residential building template matching and collision inspection method and system |
CN113550570A (en) * | 2021-03-03 | 2021-10-26 | 中建八局发展建设有限公司 | Aluminum alloy template deepened design and installation process |
CN113609553A (en) * | 2021-07-12 | 2021-11-05 | 广联达科技股份有限公司 | Stair component creating method and device and electronic equipment |
CN114065336A (en) * | 2021-09-28 | 2022-02-18 | 广州优比建筑咨询有限公司 | Revit-based high formwork region inspection method, device, medium and equipment |
CN116446638A (en) * | 2023-04-27 | 2023-07-18 | 中国建筑第二工程局有限公司 | Construction method of ultra-high cast-in-situ wood form tower type early-dismantling support structure based on BIM |
-
2016
- 2016-09-27 CN CN201610853427.5A patent/CN106284976A/en active Pending
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109424202A (en) * | 2017-09-05 | 2019-03-05 | 中铁十局集团电务工程有限公司 | A kind of secondary assembled wallboard building method |
CN107729686B (en) * | 2017-11-08 | 2021-07-27 | 国泰新点软件股份有限公司 | Building model component display method and device, electronic equipment and storage medium |
CN107729686A (en) * | 2017-11-08 | 2018-02-23 | 江苏国泰新点软件有限公司 | Component methods of exhibiting, device, electronic equipment and the storage medium of BUILDINGS MODELS |
CN107859176A (en) * | 2017-11-29 | 2018-03-30 | 湖北绿溪建筑科技有限公司 | A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate |
CN108268707A (en) * | 2017-12-31 | 2018-07-10 | 安徽马钢工程技术集团有限公司 | A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT |
CN108268707B (en) * | 2017-12-31 | 2021-08-06 | 马钢集团设计研究院有限责任公司 | ReVIT-based transfer station standard template drawing method and transfer station construction method |
CN108280276A (en) * | 2018-01-09 | 2018-07-13 | 上海大学 | It is created and dosage statistical method based on Revit software stair model criterias |
CN108280276B (en) * | 2018-01-09 | 2022-02-08 | 上海大学 | Revit software based stair model standard creation and usage statistical method |
CN108252519A (en) * | 2018-03-14 | 2018-07-06 | 中铁八局集团第四工程有限公司 | A kind of construction method of the house construction engineering template construction technique model based on BIM |
CN108491631A (en) * | 2018-03-23 | 2018-09-04 | 中国十七冶集团有限公司 | A kind of aluminum alloy mould plate construction method based on BIM technology |
CN111618528A (en) * | 2019-02-27 | 2020-09-04 | 浙江树垚新材料科技有限公司 | Production process of aluminum template for building |
CN110700583A (en) * | 2019-05-28 | 2020-01-17 | 北京构力科技有限公司 | Aluminum template pre-assembly system and method based on three-dimensional BIM technology |
CN110378039A (en) * | 2019-07-23 | 2019-10-25 | 广州优比建筑咨询有限公司 | A kind of aluminum alloy pattern plate design method and system based on Revit |
CN110378039B (en) * | 2019-07-23 | 2022-04-19 | 广州优比建筑咨询有限公司 | Revit-based aluminum template design method and system |
CN112528357A (en) * | 2019-08-31 | 2021-03-19 | 广东博越智慧建造科技有限公司 | Prefabricated part and aluminum mold arrangement simulation construction method based on building information model |
CN110704910A (en) * | 2019-09-18 | 2020-01-17 | 山东新汉唐数据科技有限公司 | Aluminum template matching method, system, computer readable storage medium and equipment |
CN110704910B (en) * | 2019-09-18 | 2023-06-23 | 山东新汉唐数据科技有限公司 | Aluminum template matching method, system, computer readable storage medium and equipment |
CN110716701A (en) * | 2019-10-09 | 2020-01-21 | 周发喜 | Method for quickly plotting detailed prefabricated convex window graph based on Revit software |
CN111502246A (en) * | 2020-04-29 | 2020-08-07 | 中铁二局第一工程有限公司 | BIM technology-based design and optimization method for side wall unilateral template support system |
CN111832113B (en) * | 2020-07-31 | 2023-10-10 | 河南五建第二建筑安装有限公司 | Aluminum alloy template matching method based on BIM technology |
CN111832113A (en) * | 2020-07-31 | 2020-10-27 | 河南五建第二建筑安装有限公司 | Aluminum alloy template matching method based on BIM technology |
CN113550570A (en) * | 2021-03-03 | 2021-10-26 | 中建八局发展建设有限公司 | Aluminum alloy template deepened design and installation process |
CN113378282A (en) * | 2021-06-30 | 2021-09-10 | 中国二冶集团有限公司 | BIM-based residential building template matching and collision inspection method and system |
CN113609553A (en) * | 2021-07-12 | 2021-11-05 | 广联达科技股份有限公司 | Stair component creating method and device and electronic equipment |
CN113609553B (en) * | 2021-07-12 | 2023-12-22 | 广联达科技股份有限公司 | Stair component creation method and device and electronic equipment |
CN114065336A (en) * | 2021-09-28 | 2022-02-18 | 广州优比建筑咨询有限公司 | Revit-based high formwork region inspection method, device, medium and equipment |
CN116446638B (en) * | 2023-04-27 | 2023-12-05 | 中国建筑第二工程局有限公司 | Construction method of ultra-high cast-in-situ wood form tower type early-dismantling support structure based on BIM |
CN116446638A (en) * | 2023-04-27 | 2023-07-18 | 中国建筑第二工程局有限公司 | Construction method of ultra-high cast-in-situ wood form tower type early-dismantling support structure based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284976A (en) | Revit-based aluminum alloy template matching method | |
CN110569621B (en) | BIM technology-based multi-dimensional curved surface glass curtain wall design processing and installation method | |
CN108763710B (en) | BIM-based forward deepening design method for assembled building | |
WO2021128675A1 (en) | Bim technology-based method for constructing underground continuous wall | |
KR101607886B1 (en) | Automatic generation system of rebar shop drawing using 3D model | |
CN109543233A (en) | A kind of electromechanical pipeline assembly construction method based on BIM technology | |
CN104156544A (en) | Automatic beam and column steel bar joint arranging and constructing simulation method based on BIM technology | |
CN108491631A (en) | A kind of aluminum alloy mould plate construction method based on BIM technology | |
CN107273607A (en) | A kind of steel-structure factory building pre-assembly method based on BIM | |
CN110287513A (en) | A kind of built-in fitting construction method based on BIM technology | |
KR101425576B1 (en) | Method for acquiring and processing a three-dimensional data to product a precise wide-area scale model | |
CN105956257A (en) | BIM-based aluminum alloy template deep design method | |
KR20130016620A (en) | 3d process management method for bim(building information modeling) | |
CN107590334A (en) | A kind of complex object stay in place form construction method | |
CN107169231A (en) | The Deepen Design method of structural metal containment system based on BIM | |
JP2007277813A (en) | Method and device for changing construction plan using three-dimensional laser scanner | |
KR101301716B1 (en) | Method of manufacturing mold for free form architecture | |
Lee et al. | Automated system for form layout to increase the proportion of standard forms and improve work efficiency | |
CN110378039B (en) | Revit-based aluminum template design method and system | |
CN109025319A (en) | A kind of prefabricated components butt joint interface quality testing and method of disposal | |
Maboudi et al. | Current surveying methods for the integration of additive manufacturing in the construction process | |
CN108428032B (en) | Method and device for making component production plan | |
CN118228381A (en) | 3 DE-based digital design method for three-dimensional modeling of vertical ship lift system | |
CN116628832B (en) | Method for rapidly acquiring bottom contour line of foundation bedplate component | |
CN112814146A (en) | BIM technology-based wall green construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |