[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN107859176A - A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate - Google Patents

A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate Download PDF

Info

Publication number
CN107859176A
CN107859176A CN201711226509.8A CN201711226509A CN107859176A CN 107859176 A CN107859176 A CN 107859176A CN 201711226509 A CN201711226509 A CN 201711226509A CN 107859176 A CN107859176 A CN 107859176A
Authority
CN
China
Prior art keywords
construction
floor
assembled architecture
cycling rate
staggered floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711226509.8A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Green Creek Construction Technology Co Ltd
Original Assignee
Hubei Green Creek Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Green Creek Construction Technology Co Ltd filed Critical Hubei Green Creek Construction Technology Co Ltd
Priority to CN201711226509.8A priority Critical patent/CN107859176A/en
Publication of CN107859176A publication Critical patent/CN107859176A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of staggered floor in assembled architecture to construct, and improves the construction method of form cycling rate.Its Method And Principle is according to building codes and layout, the division of horizontal and vertical direction is carried out to construction area, upper and lower floor staggered floor construction, with reference to construction period, the construction of each region is divided into some stages, by form work engineering, reinforced bar engineering, each subdivisional work separation such as concrete works, prefabricated component lifting, and successively in each region rotation operation.The construction method provided by the invention for improving form cycling rate is mainly for new type formworks such as aluminum alloy mould plate of the general usable number more than 100 times, steel forms, give full play to the strong advantage of this class template circulating cycle rate of rotation, during realize in same floor building template and recycle, the turnover of artificial and mechanical high-efficient, each operation is independent of each other, each construction area of building alternately rises, can significantly accelerating construction progress, template construction cost is reduced, realizes and completes complicated task with less material and machinery.

Description

A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate
Technical field
The present invention is a kind of staggered floor construction in assembled architecture, improves the construction method of form cycling rate, belongs to building mould Plate has enough to meet the need construction field.
Background technology
Chinese architectural trade industry experienced the process of an explosive growth, the lasting increasing of number of employees since reform and opening-up Add, the sustainable growth of qualification above company quantity in industry, constantly inject new vitality for national economy;But Industry Development Modes Extensive, industrialization, information-based, standardization is relatively low, and management means falls behind, and construction resource cost amount is big, and carbon emission amount protrudes The problems such as, become the major obstacle for restricting industry development, the emphasis that wherein form work engineering is constructed into urgently to reform.Mesh Before, the beam forms that domestic market uses has Steel-wood forming board, plank sheathing, steel form, aluminum alloy mould plate and bamboo blanket template, due to wood The general usable number such as template and bamboo blanket template is only 5~8 times, and material turnover is low, and recovery value is not high, and pollution is tight Weight, is unfavorable for the reasons such as energy-conserving and environment-protective, being substituted by the high template of the general usable number such as aluminum alloy mould plate, steel form has turned into A kind of inexorable trend.Wherein, the usable number of steel form is 100~120 times, and the usable number of aluminum alloy mould plate is 100 ~300 times, this is in the construction in a building, and how more preferably playing this class template, the high advantage of number to can be used to propose new Challenge, has fully agreed with green construction, the theory of energy-saving and emission-reduction.
The content of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of staggered floor construction in assembled architecture, improve The construction method of form cycling rate, with low, the waste of manpower that solves the template system efficiency of prior art, machinery and material turnover Rate is low, poor universality, pollute environment the problems such as.
To achieve these goals, the present invention is to realize by the following technical solutions:It is a kind of wrong in assembled architecture Layer construction, improve the construction method of form cycling rate, including form work engineering, reinforced bar engineering, concrete works, prefabricated component lifting etc. Each subdivisional work, the form work engineering include decking and form removal, and the reinforced bar engineering includes colligation reinforcing bar, colligation plate within the walls Reinforcing bar, the concrete works include and pour shear wall concrete, pour floor concrete, and the hoisting prefabricated part includes lifting The prefabricated components such as wall, hoisting prefabricated floor, lifting balcony, lifting door and window.
Further, the construction area subregion, different zones staggered floor construction up and down, each region rotation construction, floor are handed over For rising.
Further, the building template need to only configure a region, the circulation turnover of other regions, not be reconfigured at flood Template, cost is greatly lowered.
Further, the construction area partitioned mode can have a variety of, can be according to mechanical efficiency, personnel in Practical Project The requirement of configuration, duration and economy, selects optimum region division mode.
Further, it is described to can be applied to assembled architecture construction, it can also be applied to other construction environments.
Further, each subdivisional work that staggered, it is reasonable that working face arranges, and each operation is independent of each other, machinery and people Work operating efficiency improves, beneficial to standardized construction.
A kind of staggered floor construction, improves the construction method of form cycling rate, is advised according to building in the assembled architecture of the present invention Lattice and layout, horizontal and vertical direction is carried out to construction area and divided, upper and lower floor staggered floor construction, in combination with construction period, The construction of each region is divided into several stages, by each subitems such as form work engineering, reinforced bar engineering, concrete works, prefabricated component liftings Engineering separates, and successively in each region rotation operation, during realize building template in same floor and recycle, artificial and machine Tool efficiently has enough to meet the need, and each operation is independent of each other, and each construction area of building alternately rises, and one layer of standardization in six days can be achieved and apply Work, until topping out.Each subdivisional work rotation construction during because, it can greatly improve the turnover of material and machinery And utilization rate, especially building template, due to only needing to configure a region, other parts circulation turnover, it is not required to match somebody with somebody again The template of flood is put, cost can be greatly lowered, task of complex work is completed with less material and machinery is realized, meets The related request of building energy conservation emission reduction, solves that template system efficiency is low, and precision is low, waste of manpower, machinery and material turnover Rate is low, poor universality, pollute environment the problems such as.
Brief description of the drawings
The detailed description made by reading with reference to the following drawings to non-limiting example, further feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is the architectural plane region division schematic diagram of the present invention;
Fig. 2 is each regional compartmentalization rotation operation process chart of the present invention;
Fig. 3 is each regional compartmentalization rotation operation demonstration graph of the present invention;
Fig. 4 is each region template behaviour in service analysis chart of the present invention;
Fig. 5 is all kinds of subregion Analysis on construction scheme comparison diagrams of the present invention.
Embodiment
To be easy to understand the technical means, the inventive features, the objects and the advantages of the present invention, with reference to Embodiment, the present invention is expanded on further.
Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5 are referred to, the present invention provides a kind of staggered floor construction in assembled architecture, improves mould The construction method of plate turnover rate, cover decking, pour shear wall concrete, form removal, hoisting prefabricated floor, colligation floor steel Muscle, floor concrete is poured, other prefabricated components is lifted, ties up multiple construction links such as reinforcing bar within the walls.According to building codes with being laid out, And vertical direction division horizontal to construction area progress, is divided into several regions, in combination with duration, artificial, machinery and economy Property etc. require, the construction of upper and lower floor staggered floor, in each region rotation operation, during realize building template circulation in same floor and make With, artificial and mechanical high-efficient turnover, each operation is independent of each other, and each construction area of building alternately rises, can be achieved six days one layer Standardized construction, until top out.In terms of building template, due to only needing the template of configuration specific region, general portion Dividing only need to be a set of, other parts circulation turnover, is not required to be reconfigured at the template of flood, cost can be greatly lowered, realize The task of complex work is completed with less material and machinery, assembled architecture construction is can be applied to, can also be applied to other and apply Work environment, meet the related request of building energy conservation emission reduction.
By the analysis to architectural plan and space enrironment when user wants to use this patent, such as Fig. 5 institutes Show, list feasible construction area splitting scheme, by calculating, analyzing, verifying, list the quantities of all kinds of schemes, required people The quantity of work, mechanical strength, template number, the template turnover frequency and take the template deposit area on ground etc., with reference to the duration, Environmental protection and economy etc. require, selects optimal construction area splitting scheme, and by selected scheme enter administrative staff arrangement and The production of building template;In work progress, the subdivisional work that each region is carried out is misaligned, with the architectural plan shown in accompanying drawing Exemplified by:Building can be divided into A, B two, every is divided into the limb of A, B, C tri-, altogether the construction working of six construction areas, wherein Building A Face shifts to an earlier date 6 days than being higher by one layer of Building B by six days one layer of speed of applications, construction speed average specific Building B, Building A;Form fixer The subdivisional works such as journey, reinforced bar engineering, concrete works, prefabricated component lifting separate and the rotation operation in the way of shown in chart, with Exemplified by form work engineering, after Building A A wings concrete is completed to meet form removable condition, directly remove and be installed to the B wings;When B wing coagulations Soil is completed after meeting form removable condition, is directly removed and is installed to the C wings;Go to the A wings of Building B again after the completion of the C wings, so circulation Turnover, without any confusion, standardized construction operation, floor alternately rises for each subdivisional work linking, until construction is completed.Because process In each subdivisional work rotation construction, be independent of each other, greatly improve turnover and the utilization rate of material and machinery, especially build Building mould, realize task of complex work is completed with less building template.
The construction method provided by the invention for improving form cycling rate is mainly for general usable number more than 100 times Aluminum alloy mould plate, the new type formwork such as steel form, pass through each subdivisional work that staggers, upper and lower floor staggered floor is constructed, reasonable arrangement work Make face, give full play to the strong advantage of this class template circulating cycle rate of rotation, meet green construction, the actual requirement of energy-saving and emission-reduction;Have It is simple to operate, ultrahigh in efficiency, manpower is saved, strong adaptability is green, reduces the effect of cost, so as to be effectively prevented from mould Plate construction system efficiency is low, waste of manpower, mechanical, poor universality low with material turnover, pollutes the phenomenon of environment.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above, for this area skill For art personnel, it is clear that the invention is not restricted to the details of above-mentioned one exemplary embodiment, and without departing substantially from the present invention spirit or In the case of essential characteristic, the present invention can be realized in other specific forms.Which point therefore, no matter from the point of view of, all should incite somebody to action Embodiment regards exemplary as, and be it is nonrestrictive, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that all changes fallen in the implication and scope of the equivalency of claim are included in the present invention It is interior.Any reference in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (6)

1. a kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate, it is characterised in that:Cover die-filling Plate, shear wall concrete, form removal are poured, hoisting prefabricated floor, colligation floor steel bar, floor concrete is poured, lifts other Prefabricated component, tie up multiple construction links such as reinforcing bar within the walls.
2. a kind of staggered floor construction in assembled architecture according to claim 1, the construction method of form cycling rate is improved, its It is characterised by:The construction area subregion, different zones staggered floor construction up and down, each region rotation construction, floor alternately rise.
3. a kind of staggered floor construction in assembled architecture according to claim 1, the construction method of form cycling rate is improved, its It is characterised by:The building template need to only configure a region, the circulation turnover of other regions, not be reconfigured at the template of flood, Cost is greatly lowered.
4. a kind of staggered floor construction in assembled architecture according to claim 1, the construction method of form cycling rate is improved, its It is characterised by:The construction area partitioned mode can have it is a variety of, can be according to mechanical efficiency, personnel depaly, work in Practical Project Phase and the requirement of economy, select optimum region division mode.
5. a kind of staggered floor construction in assembled architecture according to claim 1, the construction method of form cycling rate is improved, its It is characterised by:It is described to can be applied to assembled architecture construction, it can also be applied to other construction environments.
6. a kind of staggered floor construction in assembled architecture according to claim 1, the construction method of form cycling rate is improved, its It is characterised by:Each subdivisional work that staggered, it is reasonable that working face arranges, and each operation is independent of each other, machinery and manual working effect Rate improves, beneficial to standardized construction.
CN201711226509.8A 2017-11-29 2017-11-29 A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate Pending CN107859176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711226509.8A CN107859176A (en) 2017-11-29 2017-11-29 A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711226509.8A CN107859176A (en) 2017-11-29 2017-11-29 A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate

Publications (1)

Publication Number Publication Date
CN107859176A true CN107859176A (en) 2018-03-30

Family

ID=61704500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711226509.8A Pending CN107859176A (en) 2017-11-29 2017-11-29 A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate

Country Status (1)

Country Link
CN (1) CN107859176A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117703075A (en) * 2023-12-11 2024-03-15 中国二十冶集团有限公司 Horizontal circulation construction method for metal template

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140175259A1 (en) * 2012-10-12 2014-06-26 Norton Baum Modular Panel Concrete Form For Self-Lifting Concrete Form System
CN104153579A (en) * 2014-08-26 2014-11-19 中国建筑第八工程局有限公司 Pouring formwork structure for non-standard layer structure and construction method
CN104196231A (en) * 2014-09-25 2014-12-10 成都市第六建筑工程公司 Concrete floor aluminum alloy template and construction method thereof
US20160298344A1 (en) * 2014-10-09 2016-10-13 Hui Linda Technology Co., Ltd Assembling and dismantling-beforehand structural template system and construction method thereof
CN106285001A (en) * 2016-08-31 2017-01-04 中天建设集团有限公司天津分公司 A kind of little area segmentation quickly intersects flowing water construction method
CN106284976A (en) * 2016-09-27 2017-01-04 中国建筑局(集团)有限公司 Revit-based aluminum alloy template matching method
CN106988525A (en) * 2017-04-25 2017-07-28 中国水利水电第十工程局有限公司 A kind of skyscraper aluminum alloy mould plate construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140175259A1 (en) * 2012-10-12 2014-06-26 Norton Baum Modular Panel Concrete Form For Self-Lifting Concrete Form System
CN104153579A (en) * 2014-08-26 2014-11-19 中国建筑第八工程局有限公司 Pouring formwork structure for non-standard layer structure and construction method
CN104196231A (en) * 2014-09-25 2014-12-10 成都市第六建筑工程公司 Concrete floor aluminum alloy template and construction method thereof
US20160298344A1 (en) * 2014-10-09 2016-10-13 Hui Linda Technology Co., Ltd Assembling and dismantling-beforehand structural template system and construction method thereof
CN106285001A (en) * 2016-08-31 2017-01-04 中天建设集团有限公司天津分公司 A kind of little area segmentation quickly intersects flowing water construction method
CN106284976A (en) * 2016-09-27 2017-01-04 中国建筑局(集团)有限公司 Revit-based aluminum alloy template matching method
CN106988525A (en) * 2017-04-25 2017-07-28 中国水利水电第十工程局有限公司 A kind of skyscraper aluminum alloy mould plate construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117703075A (en) * 2023-12-11 2024-03-15 中国二十冶集团有限公司 Horizontal circulation construction method for metal template

Similar Documents

Publication Publication Date Title
CN101538897B (en) Construction method for main project of reinforced concrete building
Pittau et al. Environmental consequences of refurbishment versus demolition and reconstruction: a comparative life cycle assessment of an Italian case study
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN105133731B (en) A kind of assembled steel performance
CN112464342A (en) BIM-based design and construction method for integrally assembled frame structure system
Lupíšek et al. Design strategies for low embodied carbon and low embodied energy buildings: principles and examples
CN110359631A (en) Secondary structure Constructional Col-umn Construction method
CN104790675A (en) Reinforced concrete block masonry structure assemblage construction method
Safa et al. A decision-making method for choosing concrete forming systems
CN104631513A (en) Construction method for closing basement exterior wall post-cast strip
CN109853956A (en) Residential building construction method
CN105839784B (en) Assembled jacking type construction techniques
CN106088657A (en) Reinforcing structure of empty bucket wall and construction method thereof
CN107859176A (en) A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate
CN105019593B (en) Building heat preservation prefabricated section and modular arrangement of reinforcement cast-in-place method construction method thereof
CN204418229U (en) Poured band of outer wall of basement concrete draw-in groove
CN110344844A (en) A kind of track engineering section of track well construction method
CN203499262U (en) One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure
CN107012973A (en) The masonry structure and its construction method of a kind of new ribs building block
CN106759933A (en) Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures
CN105844016B (en) A method of the proposed building quantity of acquisition based on buildings model cutting
CN108979205A (en) Super high-rise dwelling house structure staggered floor cross construction method
CN204876276U (en) Building heat preservation prefabricated section
CN103243913A (en) Plugging method for grout blanket at connecting position of upper layer and lower layer of assembling shear wall building
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180330