CN104361419A - Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration - Google Patents

Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration Download PDF

Info

Publication number
CN104361419A
CN104361419A CN201410458815.4A CN201410458815A CN104361419A CN 104361419 A CN104361419 A CN 104361419A CN 201410458815 A CN201410458815 A CN 201410458815A CN 104361419 A CN104361419 A CN 104361419A
Authority
CN
China
Prior art keywords
defect
information
equipment
equipment state
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410458815.4A
Other languages
Chinese (zh)
Other versions
CN104361419B (en
Inventor
鲁华永
郭泓佐
王星海
刘华伟
陈重
李立访
张文武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tai Hao Software Inc Co
State Grid Corp of China SGCC
State Grid Henan Electric Power Co Ltd
Original Assignee
Tai Hao Software Inc Co
State Grid Corp of China SGCC
State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tai Hao Software Inc Co, State Grid Corp of China SGCC, State Grid Henan Electric Power Co Ltd filed Critical Tai Hao Software Inc Co
Priority to CN201410458815.4A priority Critical patent/CN104361419B/en
Publication of CN104361419A publication Critical patent/CN104361419A/en
Application granted granted Critical
Publication of CN104361419B publication Critical patent/CN104361419B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration. The method is characterized in that an electric power regulation and control center is used to monitor the operation of newly added power transmission equipment in a centralized manner, monitor the electric transmission and transformation equipment state online and build an analyzing service so as to perform statistical analysis, processing and monitoring, and closed-loop tracking on equipment defect conditions, summarize defect variation trends and occurrence regularity, and promote comprehensive extension, from scheduling operation to equipment operation, of power grid safety control. Resources of an operation on-duty system, a production management system and other equipment management systems are integrated to build a complete and good working interface, electric transmission and transformation equipment monitoring defect multidimensional information is input, and by the aid of management modules of traverse connection, inner control monitoring and closed-loop tracking, the real-time operation states of the electric transmission and transformation equipment can be controlled, inquiring and statistical counting of various key information can be achieved, screening and tracking of family defects are achieved, and equipment health states can be monitored and analyzed.

Description

Based on power transmission and transformation equipment state monitoring fault management system and the method for regulation and control unification
Technical field
The present invention relates to a kind of power transmission and transformation equipment state monitoring fault management system based on regulation and control unification and method.
Background technology
Current, converting equipment is run Centralized Monitoring business and includes dispatching control center unified management in by " running greatly " System Construction, is guaranteeing safe basis to realize the integrative operation of regulation and control business.Along with deepening continuously of " running greatly " System Construction, the iterative method of unattended operation transformer station work, the business cooperation that monitoring runs between O&M unit becomes particularly important, monitoring operations staff grasps the Real-time Alarm information of equipment, O&M unit is responsible for the on-the-spot operation maintenance of equipment, and the circulation of monitor message, disposal, analysis become " run greatly " and the key of horizontal coordination between " general overhaul " system.
Real time monitoring abnormal information, fills in defect record to the abnormal information of the non-involution of action, and various dimensions equipment deficiency is registered and initiated equipment deficiency treatment scheme, and the typing of equipment deficiency comprises following information:
1) device name, affiliated transformer station, type, date of putting into operation, manufacturer, electric pressure etc.
2) defect technical reason, defect type (being divided into critical, serious, general), defect numbering (system generates automatically), particular content, discovery date, finder etc.
At present, domestic relevant technical research exists blank, is worth going deep into Research on Mining.
Summary of the invention
The present invention is in order to solve the problem, propose a kind of power transmission and transformation equipment state monitoring fault management system based on regulation and control unification and method, native system is by formulating equipment deficiency standardization registration form, the defect that equipment exists is made overall arrangements, accomplishes to have looked into record, stockpile, be convenient to post analysis and summing up experience.
To achieve these goals, the present invention adopts following technical scheme:
A kind of power transmission and transformation equipment state monitoring fault management system based on regulation and control unification, comprise dispatching management information system (OMS), data acquisition module, report generation module, integrated data platform and equipment state operation management system (PMS), wherein:
Described dispatching management information system, for realizing the unified maintenance and management of dispatching of power netwoks Back ground Information; Realize the specialization of production business, standardization and orderly management; And for the comprehensive analysis and evaluation of power grid security, operation, plan, secondary device information and displaying and issue from various visual angles;
Described data acquisition module, for gathering various kinds of equipment basic data, real time data, inspection travel data, the weather information data of reflection equipment health status index;
Described integrated data platform, for the basis at electrical network unified model, to from the model of each system, figure and in real time and non-real-time data carry out integrations and process, the passage providing each application system near-realtime data to exchange and share, implementation model, graphics management and data management, represents;
Described report generation module, for generating the equipment state defect form comprising device category, defective item, degree, by equipment state, defect abnormal conditions showing by graph direct, be convenient to progress, processing procedure that regulation and control personnel grasp defect, understand whole grid equipment running status, supervise operation maintenance personnel to carry out corresponding disposal, improve electric network reliability;
Described equipment state operation management system, for setting up unified, efficient, intensive O&M overhaul management informatization platform, realizes all standing to operation layer, administration and supervision authorities, decision-making level's professional ability, supports O&M integration and maintenance specialization.
Described dispatching management information system, comprise ftp server, data switching exchane, OMS database and abnormal information analysis and administration module, ftp server connects integrated data platform, receive the E language file that its timed sending comes, and it is resolved, ftp server communicates with data switching exchane, data switching exchane is classified to the E language file of resolving and preserves as OMS database, the information in OMS database is read in abnormal information analysis with administration module, carry out analyzing to the abnormal information of monitoring of tools state and manage, user is analyzed and administration module by client-access abnormal information.
Described report generation module, support multidimensional inquiry, its keyword statistical content comprises defect distribution, defect elimination rate, year, season, the moon or fixed time section, device type, manufacturer, title, electric pressure, defect technical reason, equipment affiliated unit, time of putting into operation, defect type or combination condition.
The exhibition method of described report generation module comprises three-dimensional dynamic graphical, curve, form or list, and possesses printing function.
Carry out data sharing between described dispatching management information system and equipment state operation management system, shared information comprises facility information, grid graph information, operation of power networks information, appraisal of equipment information, tour information, defect information and service information aspect.
Carry out business cooperation demand between described dispatching management information system and equipment state operation management system, cooperation service comprises turnaround plan workflow management, the management of power failure application process, protects definite value workflow management, scheduling makes workflow management and monitor the workflow management of discovery defect; Operation flow cooperation interaction adopts the mode of definition interaction node, only regulation interaction node content, and dispatching management information system and equipment state operation management system all need to provide the service of flow process current-status query simultaneously.
Based on the method for work of above-mentioned fault management system, comprise the following steps:
(1) register defect and initial characterization, data collecting module collected equipment state, is passed to dispatching management information system and equipment state operation management system, is entered integrated data platform, carried out defect registration and initial characterization by input system;
(2) defect examination & verification, qualitative, equipment state operation management system is audited defect, qualitative, if the disfigurement discovery input system mistake of reporting and submitting or fill in existing problems, then sends defect information to dispatching management information system and reminds; If no problem, defect elimination will be carried out;
(3) defect elimination process: after dispatching management information system arranges personnel to carry out defect elimination process, maintainer logs in input system by client and fills in defect elimination information, comprise defect property, defect elimination time, defect elimination people, and submit to abnormal information analysis and administration module;
(4) defect elimination is checked and accepted: abnormal information analysis and administration module send information to operations staff, and operations staff carries out an acceptance inspection to defect processing situation, and defect elimination is checked and accepted archive information typing, feed back to equipment state operation management system;
(5) equipment state operation management system is checked and accepted audit defect elimination process, defect elimination, and the defective data that integrated data platform will be preserved is transferred to report generation module, report generation CMOS macro cell defect form.
In described step (1), abnormal information analysis and administration module are analyzed supervisory system abnormality alarming signal, after confirming as the defect information of plant stand end production equipment or supervising device, scheduling OMS registers in time, and defect information is committed to equipment state operation management system.
In described step (2), concrete steps are:
2-1) abnormal information analysis and administration module carry out fundamental analysis to abnormal information, judge whether this abnormal information exists the flow process of the process that circulating, if existed, then abnormal information frequency in this circulation is added up, otherwise, abnormal information is included within the scope of statistical study, proceed to step 2-2);
2-2) judge whether exception level has reached multiple or taken place frequently, if the determination result is YES, then start treatment flow process, otherwise, the newly-increased accidental shortcoming information of prompting.
In described step (2), Flaw discrimination adjustment needs both sides to confirm, if equipment state operation management system is in defect review process, Flaw discrimination is adjusted, then jointly carry out defect both sides confirmation with dispatching management information system, each subsystem is according to the qualitative information each self-adjusting Flaw discrimination information after confirmation.
In described step (2), defect information prompting comprises graphical prompting, system Pop-up message frame is reminded and note informs prompting; Equipment state operation management system is analyzed different plant stand, different manufacturers same type equipment, same manufacturer distinct device, same producer same type equipment with the form of three-dimensional picture in setting-up time, forms abnormal information and defect information comparative analysis report according to contrast comparative analysis result.
In described step (5), if defect elimination process, defect elimination check and accept defective, return to abnormal information analysis and administration module; Otherwise equipment state operation management system confirms that monitoring alarm information stores defect after resetting.
Beneficial effect of the present invention is:
(1) stability, reliability and security: make full use of proven technique, ripe research theory and investigation instrument, to ensure that achievement in research completes on time, with guaranteeing both quality and quantity, mature and stable property follow through is among whole investigation, design, investigation process.
(2) practicality and advance: adhere to that practicality and advance combine, under the prerequisite ensureing achievement in research practicality, the continuous expansion of achievement in research scale and application function and perfect can be met, make great efforts to reduce investment and operating cost, ensure the raising of technical merit and application level.
(3) compatible: adhere rigidly to relevant regulations, for the Development System software introduced, what means such as adopting rational communication mode, data exchange ways realized between related system is mutual, other stipulations extendible;
(4) by report generation module, by equipment state, defect abnormal conditions showing by graph direct, be convenient to progress, processing procedure that regulation and control personnel grasp defect, understand whole grid equipment running status, supervise operation maintenance personnel to carry out corresponding disposal, improve electric network reliability;
(5) abnormal defect intelligent set reminder time as required, a reminder time of setting before dissimilar defect regulation place lacks end, regulation and control personnel are reminded to supervise on-the-spot defect elimination in time; For the defect affecting equipment operating, before this equipment of operation, eject dialog box, the feasibility of the conscientious evaluation operation of prompt, adjusting and control personnel; Set up abnormal defect prediction scheme storehouse simultaneously, when inputting a certain type exception defect, can search for and be positioned to corresponding equipment prediction scheme, shortening fault handling time, realize the intelligent management of abnormal defect prediction scheme and have access to.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is schematic flow sheet of the present invention;
Fig. 3 is the structural representation of OMS of the present invention;
Fig. 4 is abnormal information statistical study schematic flow sheet of the present invention;
Fig. 5 is OMS and PMS information interchange figure of the present invention.
Embodiment:
Below in conjunction with accompanying drawing and embodiment, the invention will be further described.
As Figure 1-Figure 5, a kind of power transmission and transformation equipment state monitoring fault management system based on regulation and control unification, comprise dispatching management information system (OMS), data acquisition module, report generation module, integrated data platform and equipment state operation management system (PMS), wherein:
Described dispatching management information system, for realizing the unified maintenance and management of dispatching of power netwoks Back ground Information; Realize the specialization of main production business, standardization and orderly management; The comprehensive analysis and evaluation of power grid security, operation, plan, secondary device information and various visual angles are shown and are issued;
Described data acquisition module, for gathering various kinds of equipment basic data, real time data, inspection travel data, the weather information data of reflection equipment health status index;
Described integrated data platform, for the basis at electrical network unified model, to from the model of each system, figure and in real time and non-real-time data carry out integrations and process, the passage providing each application system near-realtime data to exchange and share, implementation model, graphics management and data management, represents;
Described report generation module, for generating the equipment state defect form comprising device category, defective item, degree, by equipment state, defect abnormal conditions showing by graph direct, be convenient to progress, processing procedure that regulation and control personnel grasp defect, understand whole grid equipment running status, supervise operation maintenance personnel to carry out corresponding disposal, improve electric network reliability;
Described equipment state operation management system, for setting up unified, efficient, intensive O&M overhaul management informatization platform, realizes all standing to operation layer, administration and supervision authorities, decision-making level's professional ability, supports O&M integration and maintenance specialization.
Described dispatching management information system, comprise ftp server, data switching exchane, OMS database and abnormal information analysis and administration module, ftp server connects integrated data platform, receive the E language file that its timed sending comes, and it is resolved, ftp server communicates with data switching exchane, data switching exchane is classified to the E language file of resolving and preserves as OMS database, the information in OMS database is read in abnormal information analysis with administration module, carry out analyzing to the abnormal information of monitoring of tools state and manage, user is analyzed and administration module by client-access abnormal information.
Data send
The every day interval of integrated data platform generates a monitoring abnormal information E language data file for 1 hour, and is sent to the ftp server in OMS framework, amounts to transmission 24 abnormal information files every day;
Data receiver
The monitoring of tools abnormal information E language file of data exchange server timing acquisition every day ftp server, amounts to acquisition every day 24 times, is all put in storage by abnormal information Data Analysis at every turn, and carries out statistics deciding grade and level to abnormal information.
Described report generation module, support multidimensional inquiry, its keyword statistical content comprises defect distribution, defect elimination rate, year, season, the moon or fixed time section, device type, manufacturer, title, electric pressure, defect technical reason, equipment affiliated unit, time of putting into operation, defect type or combination condition.
The exhibition method of described report generation module comprises three-dimensional dynamic graphical, curve, form or list, and possesses printing function.
Carry out data sharing between described dispatching management information system and equipment state operation management system, shared information comprises facility information, grid graph information, operation of power networks information, appraisal of equipment information, tour information, defect information and service information aspect.
Carry out business cooperation demand between described dispatching management information system and equipment state operation management system, cooperation service comprises turnaround plan workflow management, the management of power failure application process, protects definite value workflow management, scheduling makes workflow management and monitor the workflow management of discovery defect; Operation flow cooperation interaction adopts the mode of definition interaction node, only regulation interaction node content, and dispatching management information system and equipment state operation management system all need to provide the service of flow process current-status query simultaneously.
The defect information found is registered by dispatching and monitoring personnel, and is dispatching start flow on OMS.Flow process is through through the information of OMS and PMS, on PMS by dispatching and monitoring personnel find, relate to Yun Jian unit be responsible for defect information, submit to that fortune inspection personnel carry out that examination & verification is qualitative, arrangement defect elimination, defect elimination process and examination, and whole defect processing procedure information is passed to dispatching and monitoring personnel, and undertaken auditing, filing by dispatching and monitoring personnel.Dispatching and monitoring personnel can tracking equipment defect workflow real time inspection equipment deficiency processing procedure, and provide guiding suggestion can to fortune inspection personnel.
Based on the method for work of above-mentioned fault management system, comprise the following steps:
(1) register defect and initial characterization, data collecting module collected equipment state, is passed to dispatching management information system and equipment state operation management system, is entered integrated data platform, carried out defect registration and initial characterization by input system;
(2) defect examination & verification, qualitative, equipment state operation management system is audited defect, qualitative, if the disfigurement discovery input system mistake of reporting and submitting or fill in existing problems, then sends defect information to dispatching management information system and reminds; If no problem, defect elimination will be carried out;
(3) defect elimination process: after dispatching management information system arranges personnel to carry out defect elimination process, maintainer logs in input system by client and fills in defect elimination information, comprise defect property, defect elimination time, defect elimination people, and submit to abnormal information analysis and administration module;
(4) defect elimination is checked and accepted: abnormal information analysis and administration module send information to operations staff, and operations staff carries out an acceptance inspection to defect processing situation, and defect elimination is checked and accepted archive information typing, feed back to equipment state operation management system;
(5) equipment state operation management system is checked and accepted audit defect elimination process, defect elimination, and the defective data that integrated data platform will be preserved is transferred to report generation module, report generation CMOS macro cell defect form.
In described step (1), abnormal information analysis and administration module are analyzed supervisory system abnormality alarming signal, after confirming as the defect information of plant stand end production equipment or supervising device, scheduling OMS registers in time, and defect information is committed to equipment state operation management system.
In described step (2), concrete steps are:
2-1) abnormal information analysis and administration module carry out fundamental analysis to abnormal information, judge whether this abnormal information exists the flow process of the process that circulating, if existed, then abnormal information frequency in this circulation is added up, otherwise, abnormal information is included within the scope of statistical study, proceed to step 2-2);
2-2) judge whether exception level has reached multiple or taken place frequently, if the determination result is YES, then start treatment flow process, otherwise, the newly-increased accidental shortcoming information of prompting.
In described step (2), Flaw discrimination adjustment needs both sides to confirm, if equipment state operation management system is in defect review process, Flaw discrimination is adjusted, then jointly carry out defect both sides confirmation with dispatching management information system, each subsystem is according to the qualitative information each self-adjusting Flaw discrimination information after confirmation.
In described step (2), defect information prompting comprises graphical prompting, system Pop-up message frame is reminded and note informs prompting; Equipment state operation management system is analyzed different plant stand, different manufacturers same type equipment, same manufacturer distinct device, same producer same type equipment with the form of three-dimensional picture in setting-up time, forms abnormal information and defect information comparative analysis report according to contrast comparative analysis result.
In described step (5), if defect elimination process, defect elimination check and accept defective, return to abnormal information analysis and administration module; Otherwise equipment state operation management system confirms that monitoring alarm information stores defect after resetting.
By setting up the management tool of similar Gantt chart, by equipment state, defect abnormal conditions showing by graph direct, be convenient to progress, processing procedure that regulation and control personnel grasp defect, understand whole grid equipment running status, supervise operation maintenance personnel to carry out corresponding disposal, improve electric network reliability.
The defect information found is registered, and is dispatching start flow on OMS.Flow process is through through the information of OMS and PMS, on PMS by dispatching and monitoring personnel find, relate to Yun Jian unit be responsible for defect information, submit to that fortune inspection personnel carry out that examination & verification is qualitative, arrangement defect elimination, defect elimination process and examination, and whole defect processing procedure information is passed to dispatching and monitoring personnel, and undertaken auditing, filing by dispatching and monitoring personnel.Dispatching and monitoring personnel can tracking equipment defect workflow real time inspection equipment deficiency processing procedure, and provide guiding suggestion can to fortune inspection personnel.
With the form of three-dimensional picture, different plant stand, different manufacturers same type equipment, same manufacturer distinct device, same producer same type equipment etc. are analyzed in setting-up time.Abnormal information and defect information comparative analysis report is formed according to contrast comparative analysis result.
Set up abnormal defect storehouse, to the abnormal defect processing process formation processing report of historical Device, and stored in abnormal defect storehouse.Abnormal, defect processing reports retrieval, when inputting a certain type exception defect, can search for and be positioned to the report of corresponding device processes, shortening single equipment fault handling time, realizing abnormal scarce intelligent management and have access to.
Abnormal, the defect occurred according to equipment and feed through to associate device setting monitoring Response project, sets to the Response project of power grid security according to abnormal, the defective effect that equipment occurs.The similarity quick-searching of monitoring prediction scheme, allows regulation and control personnel do execution plan at short notice, and carries out disposal guarantee electric power netting safe running.
Defect information specialty statistics
1) statistics is carried out by following keyword and analyzing defect distributes, defect elimination rate: year, season, the moon or fixed time section, device type, manufacturer, title, electric pressure, defect technical reason, equipment affiliated unit, puts into operation the time, defect type, combination condition etc.
2) realize comparing the same period of defect incidence, defect elimination rate.
3) statistics realizes the various ways such as three-dimensional dynamic graphical, curve, form, list and exports and possess printing function.
Set up abnormal defect storehouse, to the abnormal defect processing process formation processing report of historical Device, and stored in abnormal defect storehouse.Abnormal, defect processing reports retrieval, when inputting a certain type exception defect, can search for and be positioned to the report of corresponding device processes, shortening single equipment fault handling time, realizing abnormal scarce intelligent management and have access to.
1) PMS and OMS are in provincial optimized integration data and flow process docking.In order to ensure the atomicity of two systems, and the agility of data sharing and business cooperation and stability, according to the deployment scenario of two systems, two systems should concentrate on company of province and realize data sharing between two systems and business cooperation.Effectively can reduce the maintenance complexity between PMS and OMS, ensure that the path of data sharing and business cooperation is clear.
2) the power transmission and transformation equipment state monitoring fault management system based on regulation and control unification relies on OMS and PMS basic data to share, realize the mutual of power transmission and transformation equipment state monitoring defect management flow processing, service data interaction can adopt the mutual and mutual two kinds of interface shapes of all data of incremental data, data sharing employing E formatted file.
Adopt WEB browsing mode
Overhauling company fortune inspection personnel carry out defect business flow processing by login OMS or power transmission and transformation equipment state monitoring fault management system.
1) data providing encapsulates data into the WF file meeting workflow Description standard, is sent to local message mail directory, and data receiver scans local message mail directory, resolves WF file, starts or activates native system workflow;
2) message mail service of both sides' system deployment is according to the addresses of items of mail in flow process header file, WF file is sent to the other side's Mail assigned catalogue.
Equipment deficiency all standing
By formulating equipment deficiency standardization registration form, contain device name, affiliated plant stand, type, date of putting into operation, manufacturer, electric pressure and the details such as defect technical reason, defect type (being divided into critical, serious, general), defect numbering (system generates automatically), particular content, discovery date, finder, the defect that equipment exists is made overall arrangements, accomplishes to have looked into record, stockpile, be convenient to post analysis and summing up experience.
Multidimensional inquiry mode
System adopts leading (browser/server) mode of operation, implements closed loop management by multiple control of authority and Row control to power equipments defect.By the advantage of network information processing, achieve the Suresh Kumar statistics to the relevant device information of existing defect, OMS and comprehensive inquiry function.System can by individual event condition, comprise unit or device type, defect type character, manufacturer, device name, defect numbering, equipment electric pressure, equipment deficiency technical reason, discovery time, defect elimination time and combination condition carry out quick position to defect, complicated inquiry work is made to become convenient, fast, equipment deficiency is made to obtain quick defect elimination, managerial personnel can be exercised supervision to equipment deficiency at any time, greatly improve work efficiency, ensure that the safe operation of equipment.
Real-time follow-up feeds back
By setting up the management tool of similar Gantt chart, by equipment state, defect abnormal conditions showing by graph direct, be convenient to progress, processing procedure that regulation and control personnel grasp defect, understand whole grid equipment running status, supervise operation maintenance personnel to carry out corresponding disposal, improve electric network reliability.
Abnormal defect Intelligent Service
Abnormal defect intelligent set reminder time as required, a reminder time of setting before dissimilar defect regulation place lacks end, regulation and control personnel are reminded to supervise on-the-spot defect elimination in time.For the defect affecting equipment operating, before this equipment of operation, eject dialog box, the feasibility of the conscientious evaluation operation of prompt, adjusting and control personnel.Set up abnormal defect prediction scheme storehouse simultaneously, when inputting a certain type exception defect, can search for and be positioned to corresponding equipment prediction scheme, shortening fault handling time, realize the intelligent management of abnormal defect prediction scheme and have access to.
System starts day process
After each timing acquisition abnormal information, by monitoring, operations staff audits monitor message secondary classification and corrects, accidental, multiple according to respective rule automatic distinguishing according to the abnormal information data on the same day by system after examination & verification has corrected, to take place frequently exception level, grade reaches abnormal information system that is multiple and that take place frequently and points out this abnormal information, requires that monitoring operations staff starts monitoring abnormal information examination & approval management process and circulates.
System starts week process
After monitor message process every day completes, system gathers the accidental grade abnormal information naturally occurred in week belonging to current date, as same abnormal information transmission times adds up reach the multiple of all exception level or take place frequently, system is pointed out this abnormal information, requires that regulation and control operations staff starts monitoring abnormal information examination & approval management process and circulates.
Manual analysis start treatment
Monitoring operations staff, managerial personnel all can manually boot treatment scheme to untreated accidental abnormal informations all in system.
OMS internal module is mutual
Monitor message is held a conference or consultation in process needs the content such as power failure plan, Centralized Monitoring defect to support as aid decision making, need timing to obtain grid power blackout plan in the specific period from power failure schedule module, obtain from Centralized Monitoring defect module and complete process monitoring defect, untreated circulation defect, the contents such as untreated defect of exceeding the time limit.
With PMS system interaction
Need to find the contents such as defect with reference to a secondary device account, power transformation operation in monitor message process and process of holding a conference or consultation, need the account obtaining associate device from PMS equipment account module, comprise unit type, manufacturer, put into operation the information such as the time limit, need to obtain relevant power transformation operation equipment deficiency situation from equipment deficiency administration module, in conjunction with interconnecting of OMS and PMS system, progressively realize correlation inquiry.
With IOSS system interaction
Realize monitor message defect or the dynamic management and control of anomalous varianceization, need to adjust the contents such as monitor message deciding grade and level, processing time, processing requirements in time according to electrical network risk, need the power grid risk situation obtained in time from IOSS system in special time period, adjust so that dispose arrangement to monitor message in time.
Monthly interruption maintenance planning business coordination requirement:
Operation flow describes
Power transmission and transforming equipment turnaround plan is worked out by transporting inspection department liable, submits scheduling examination & approval after internal balance to.By the turnaround plan of scheduling approval, dispatch and carry out filing process as power off notifying information, and feed back to Yun Jian department, Yun Jian department release plan also arranges to perform.
Yun Jian unit of prefecture-level company adjusts with submitting to, and the province that overhauling company of province adjusts scope tube to submit to correspondence according to equipment adjusts or network regulation, and operation branch office adjusts scope tube to submit to corresponding province's tune, network regulation or state according to equipment and adjusts.
(1) monthly power failure plan is submitted to: Yun Jian department submits to monthly power failure plan to traffic department (collaborative point 1).
(2) operation plan balance, examination & verification: traffic department balances power failure plan, audits, can return (collaborative point 2) in-problem plan.
(3) operation plan is given an written reply and is filed: traffic department's reply power failure plan is also filed, and reply result is passed to Yun Jian department (collaborative point 3).
As shown in Figure 5, OMS2.0 and PMS2.0 makes workflow management and monitoring find to there is business cooperation demand in defect workflow management etc. in turnaround plan workflow management, the management of power failure application process, protection definite value workflow management, scheduling.
Operation flow cooperation interaction adopts the mode of definition interaction node, only regulation interaction node content, and OMS2.0 and PMS2.0 all needs to provide the service of flow process current-status query simultaneously.
PMS2.0 realizes the flat management of transformer station's possessionization in For Provincial Power Grid Corporation, and OMS2.0 divides fraction to blame management by electric pressure and scheduling authority to transformer station.OMS2.0 and PMS2.0 realizes the business cooperation based on flow process in For Provincial Power Grid Corporation, and the longitudinal direction realizing respective business cooperation flow is respectively through.
Primary equipment is newly thrown and is changed business cooperation
Operation flow describes
When primary equipment is newly thrown or changes, transformer station, circuit and equipment scheduling is provided to name to fortune inspection personnel by dispatcher, as having the power station of equipment scheduling name, the foundation of the interior primary equipment establishment of circuit and station.Dispatcher completes primary connection circuit figure in station and draws and after confirmation is consistent with actual electric network structure, pass to fortune inspection personnel, draws the foundation of primary connection circuit figure in station as fortune inspection personnel.
Fortune inspection personnel pass to scheduling after completing interval, Unit account of plant nameplate parameter, technical parameter and technical information maintenance; After dispatcher supplements regulation and control operational factor and actual measurement parameter, pass to fortune inspection personnel.
The equipment scope that business cooperation was newly thrown or changed to primary equipment comprises: primary equipment and line facility in standing.
(1) when equipment is newly thrown or changed, the modification application of fortune inspection personnel initiating equipment;
(2) transformer station, circuit and equipment scheduling name are distributed to fortune inspection personnel (collaborative point 1) by dispatcher;
(3) dispatcher draws primary connection circuit figure in station according to equipment scheduling name, and passes to fortune inspection personnel (collaborative point 2);
(4) transport the primary connection circuit figure that inspection personnel draw according to equipment scheduling name, dispatcher, carry out primary connection circuit figure drafting, equipment creates and equipment key parameter is safeguarded;
(5) transport inspection personnel and carry out figure and the examination & verification of equipment key parameter, by after pass to dispatcher's (collaborative point 3)
(6) after equipment formally puts into operation, by O&M, class monitor and group leader issues equipment, supplements other parameter of Improving Equipment and equipment and technology document information simultaneously, and passes to dispatcher's (collaborative point 4).
(7) the management and running parameter of dispatcher's ancillary equipment and actual measurement parameter, and pass to fortune inspection personnel (collaborative point 5).
When fortune inspection, personnel need to check operation of power networks state, or during use power network topology analysis function (as: analysis of power failure coverage, fault effects customer analysis, failure reason analysis etc.), need to use switch changed position information, operation of power networks state accurately can be grasped to transport inspection personnel and carry out correct power network topology analysis.In addition, personnel are when carrying out operation order graphics aided or work ticket graphics aided in fortune inspection, also need to carry out based on correct power system operating mode operation of making out an invoice.
For staffed station, after fortune inspection personnel carry out transformer gear adjustment, the adjustment of registration gear is recorded and passes to dispatcher; Be registered in monitoring daily record after the sub-connecting switch of transformer of dispatcher's remote control adjustment unattended station, and pass to fortune inspection personnel, to transport inspection personnel grasping transformer gear adjustment number of times, auxiliary prompting shunting switch overhauls.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (10)

1., based on a power transmission and transformation equipment state monitoring fault management system for regulation and control unification, it is characterized in that: comprise dispatching management information system, data acquisition module, report generation module, integrated data platform and equipment state operation management system, wherein:
Described dispatching management information system, for realizing the unified maintenance and management of dispatching of power netwoks Back ground Information; Realize the specialization of production business, standardization and orderly management; And for the comprehensive analysis and evaluation of power grid security, operation, plan, secondary device information and displaying and issue from various visual angles;
Described data acquisition module, for gathering various kinds of equipment basic data, real time data, inspection travel data, the weather information data of reflection equipment health status index;
Described integrated data platform, for the basis at electrical network unified model, to from the model of each system, figure and in real time and non-real-time data carry out integrations and process, the passage providing each application system near-realtime data to exchange and share, implementation model, graphics management and data management, represents;
Described report generation module, for generating the equipment state defect form comprising device category, defective item, degree, by equipment state, defect abnormal conditions showing by graph direct, be convenient to progress, processing procedure that regulation and control personnel grasp defect, understand whole grid equipment running status, supervise operation maintenance personnel to carry out corresponding disposal, improve electric network reliability;
Described equipment state operation management system, for setting up unified, efficient, intensive O&M overhaul management informatization platform, realizes all standing to operation layer, administration and supervision authorities, decision-making level's professional ability, supports O&M integration and maintenance specialization.
2. a kind of power transmission and transformation equipment state based on regulation and control unification monitors fault management system as claimed in claim 1, it is characterized in that: described dispatching management information system, comprise ftp server, data switching exchane, OMS database and abnormal information analysis and administration module, ftp server connects integrated data platform, receive the E language file that its timed sending comes, and it is resolved, ftp server communicates with data switching exchane, data switching exchane is classified to the E language file of resolving and preserves as OMS database, the information in OMS database is read in abnormal information analysis with administration module, carry out analyzing to the abnormal information of monitoring of tools state and manage, user is analyzed and administration module by client-access abnormal information.
3. a kind of power transmission and transformation equipment state based on regulation and control unification monitors fault management system as claimed in claim 1, it is characterized in that: described report generation module, support multidimensional inquiry, its keyword statistical content comprises defect distribution, defect elimination rate, year, season, the moon or fixed time section, device type, manufacturer, title, electric pressure, defect technical reason, equipment affiliated unit, time of putting into operation, defect type or combination condition.
4. a kind of power transmission and transformation equipment state based on regulation and control unification monitors fault management system as claimed in claim 1, it is characterized in that: the exhibition method of described report generation module comprises three-dimensional dynamic graphical, curve, form or list, and possesses printing function.
5. a kind of power transmission and transformation equipment state based on regulation and control unification monitors fault management system as claimed in claim 1, it is characterized in that: carry out data sharing between described dispatching management information system and equipment state operation management system, shared information comprises facility information, grid graph information, operation of power networks information, appraisal of equipment information, tour information, defect information and service information aspect.
6. a kind of power transmission and transformation equipment state based on regulation and control unification monitors fault management system as claimed in claim 1, it is characterized in that: carry out business cooperation demand between described dispatching management information system and equipment state operation management system, cooperation service comprises turnaround plan workflow management, the management of power failure application process, protects definite value workflow management, scheduling makes workflow management and monitor the workflow management of discovery defect; Operation flow cooperation interaction adopts the mode of definition interaction node, only regulation interaction node content, and dispatching management information system and equipment state operation management system all need to provide the service of flow process current-status query simultaneously.
7. based on the method for work of the fault management system such as according to any one of claim 1-6, it is characterized in that: comprise the following steps:
(1) register defect and initial characterization, data collecting module collected equipment state, is passed to dispatching management information system and equipment state operation management system, is entered integrated data platform, carried out defect registration and initial characterization by input system;
(2) defect examination & verification, qualitative, equipment state operation management system is audited defect, qualitative, if the disfigurement discovery input system mistake of reporting and submitting or fill in existing problems, then sends defect information to dispatching management information system and reminds; If no problem, defect elimination will be carried out;
(3) defect elimination process: after dispatching management information system arranges personnel to carry out defect elimination process, maintainer logs in input system by client and fills in defect elimination information, comprise defect property, defect elimination time, defect elimination people, and submit to abnormal information analysis and administration module;
(4) defect elimination is checked and accepted: abnormal information analysis and administration module send information to operations staff, and operations staff carries out an acceptance inspection to defect processing situation, and defect elimination is checked and accepted archive information typing, feed back to equipment state operation management system;
(5) equipment state operation management system is checked and accepted audit defect elimination process, defect elimination, and the defective data that integrated data platform will be preserved is transferred to report generation module, report generation CMOS macro cell defect form.
8. method of work as claimed in claim 7, it is characterized in that: in described step (1), abnormal information analysis and administration module are analyzed supervisory system abnormality alarming signal, after confirming as the defect information of plant stand end production equipment or supervising device, scheduling OMS registers in time, and defect information is committed to equipment state operation management system.
9. method of work as claimed in claim 7, is characterized in that: in described step (2), concrete steps are:
2-1) abnormal information analysis and administration module carry out fundamental analysis to abnormal information, judge whether this abnormal information exists the flow process of the process that circulating, if existed, then abnormal information frequency in this circulation is added up, otherwise, abnormal information is included within the scope of statistical study, proceed to step 2-2);
2-2) judge whether exception level has reached multiple or taken place frequently, if the determination result is YES, then start treatment flow process, otherwise, the newly-increased accidental shortcoming information of prompting.
10. method of work as claimed in claim 7, it is characterized in that: in described step (2), Flaw discrimination adjustment needs both sides to confirm, if equipment state operation management system is in defect review process, Flaw discrimination is adjusted, then jointly carry out defect both sides confirmation with dispatching management information system, each subsystem is according to the qualitative information each self-adjusting Flaw discrimination information after confirmation;
Defect information prompting comprises graphical prompting, system Pop-up message frame is reminded and note informs prompting; Equipment state operation management system is analyzed different plant stand, different manufacturers same type equipment, same manufacturer distinct device, same producer same type equipment with the form of three-dimensional picture in setting-up time, forms abnormal information and defect information comparative analysis report according to contrast comparative analysis result.
CN201410458815.4A 2014-09-10 2014-09-10 Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification Expired - Fee Related CN104361419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410458815.4A CN104361419B (en) 2014-09-10 2014-09-10 Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410458815.4A CN104361419B (en) 2014-09-10 2014-09-10 Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification

Publications (2)

Publication Number Publication Date
CN104361419A true CN104361419A (en) 2015-02-18
CN104361419B CN104361419B (en) 2018-01-23

Family

ID=52528677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410458815.4A Expired - Fee Related CN104361419B (en) 2014-09-10 2014-09-10 Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification

Country Status (1)

Country Link
CN (1) CN104361419B (en)

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105590170A (en) * 2015-12-23 2016-05-18 国家电网公司 Electric power regulation and control data management system and method based on customized service
CN105608561A (en) * 2016-01-12 2016-05-25 浪潮通用软件有限公司 Method and apparatus for processing mail
CN105701546A (en) * 2016-01-12 2016-06-22 国家电网公司 Electric power system defect processing method, apparatus and system thereof
CN105787089A (en) * 2016-03-15 2016-07-20 国家电网公司 Power distribution network scheduling foundation data integrating method
CN106485598A (en) * 2016-09-28 2017-03-08 国家电网公司 A kind of three-dimensional digital electrical network prediction type examination and repair system
CN106651087A (en) * 2016-09-18 2017-05-10 国网山东省电力公司聊城供电公司 Mysql database technology-based method for managing and optimizing operation and maintenance of power transformation
CN106845760A (en) * 2016-12-12 2017-06-13 国网北京市电力公司 Management system for safety instruments and management method
CN107657399A (en) * 2017-11-16 2018-02-02 国网江苏省电力有限公司 A kind of online management-control method of transformer station's electric energy balance for cooperateing with defect elimination
CN107680194A (en) * 2017-09-22 2018-02-09 国网天津市电力公司 A kind of information system for power enterprise automates cruising inspection system
CN107784485A (en) * 2018-01-22 2018-03-09 柴建霖 A kind of grid equipment state evaluation system
CN107844873A (en) * 2016-08-26 2018-03-27 国家电网公司 One introduces a collection net coordinates performance whole-life cycle fee system and its management method
CN107977714A (en) * 2017-11-08 2018-05-01 天津市普迅电力信息技术有限公司 A kind of intelligent control platform of power transformation fortune inspection
CN108039774A (en) * 2017-12-29 2018-05-15 成都素寺图科技有限公司 A kind of photovoltaic power supply low-power consumption contact net and power supply unit monitor system and method
CN108197771A (en) * 2017-12-06 2018-06-22 国网江苏省电力公司泰兴市供电公司 It is a kind of using problem as be oriented to the safe operation management method of grid equipment
CN108808853A (en) * 2018-05-18 2018-11-13 广东电网有限责任公司 A kind of power grid alarm signal flow system Internet-based
CN109102255A (en) * 2018-08-16 2018-12-28 国网福建省电力有限公司龙岩供电公司 A kind of electric flux unusual fluctuation and defect whole process collaborative management method
CN109165753A (en) * 2018-08-22 2019-01-08 国网冀北电力有限公司唐山供电公司 A kind of substation's defect management method based on mobile platform
CN109583846A (en) * 2018-12-14 2019-04-05 国网湖南省电力有限公司 A kind of data check method and system for powered communication management system
CN109800227A (en) * 2018-12-26 2019-05-24 贵州电网有限责任公司 Dispatching of power netwoks utilization logger system based on Structured Design
CN110489721A (en) * 2019-08-09 2019-11-22 国网山西省电力公司 Power equipment typical defect prediction technique, terminal device and storage medium
CN110502751A (en) * 2019-08-09 2019-11-26 国网山西省电力公司 Bulk power grid operation situation cognitive method, terminal device and storage medium
CN110516828A (en) * 2019-09-20 2019-11-29 国网山东省电力公司泰安供电公司 Monitoring information processing system and method
CN110688389A (en) * 2019-08-30 2020-01-14 国网重庆市电力公司璧山供电分公司 Transformer substation secondary equipment defect cloud management system
CN110689260A (en) * 2019-09-25 2020-01-14 云南电网有限责任公司大理供电局 Intelligent assistant system applied to integration of district and county regulation and control
CN110866695A (en) * 2019-11-15 2020-03-06 国网天津市电力公司 Auxiliary maintenance decision method based on association of equipment running state and maintenance work
CN110866617A (en) * 2019-11-15 2020-03-06 国网天津市电力公司 Maintenance aid decision-making method associated with equipment life cycle
CN111080128A (en) * 2019-12-17 2020-04-28 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Big data analysis and reliability evaluation management system for thermal power station metal equipment
CN111460772A (en) * 2020-02-28 2020-07-28 上海维信荟智金融科技有限公司 Automatic report processing method and system
CN112184483A (en) * 2020-09-29 2021-01-05 国网北京市电力公司 Scheduling work display system based on OMS and computer equipment
CN112785006A (en) * 2019-10-22 2021-05-11 捷普电子(广州)有限公司 Machine equipment state monitoring system and method, computer readable storage medium
CN113052715A (en) * 2021-04-12 2021-06-29 中煤北京煤矿机械有限责任公司 Be used for hydraulic support technology supervision information-based management system
CN113177647A (en) * 2021-04-28 2021-07-27 四川嘉能佳网创新能源科技有限责任公司 Operation and maintenance big data analysis system and method based on power transformation equipment
CN113255940A (en) * 2021-05-18 2021-08-13 国网山东省电力公司东平县供电公司 Transformer substation operation inspection management and control system and method
CN113610250A (en) * 2021-08-13 2021-11-05 西安热工研究院有限公司 Method for online calculating number of wind field fault outages exceeding 24 hours based on defect list
CN114237098A (en) * 2021-12-02 2022-03-25 深圳市环球众一科技有限公司 Intelligent digital management system of electrical product
CN114462956A (en) * 2021-12-22 2022-05-10 国网湖南省电力有限公司 Transformer substation equipment defect/hidden danger management and control system combining maintenance plan
CN115314360A (en) * 2022-07-27 2022-11-08 浪潮软件股份有限公司 Message queue service performance monitoring system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101770612A (en) * 2009-09-17 2010-07-07 宁波北电源兴电力工程有限公司 Device defect management module of EAM (Enterprise Asset Management) system in power plant
CN102004955A (en) * 2010-11-16 2011-04-06 福建省电力有限公司 Power dispatching, operation and management application system
CN102682355A (en) * 2011-03-17 2012-09-19 快威科技集团有限公司 Reconfigurable production management information system based on SOA (Service-Oriented Architecture) composite application for power grid enterprises

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101770612A (en) * 2009-09-17 2010-07-07 宁波北电源兴电力工程有限公司 Device defect management module of EAM (Enterprise Asset Management) system in power plant
CN102004955A (en) * 2010-11-16 2011-04-06 福建省电力有限公司 Power dispatching, operation and management application system
CN102682355A (en) * 2011-03-17 2012-09-19 快威科技集团有限公司 Reconfigurable production management information system based on SOA (Service-Oriented Architecture) composite application for power grid enterprises

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
颜碧炎: "湖南省电力公司生产管理信息系统建设研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 *

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105590170A (en) * 2015-12-23 2016-05-18 国家电网公司 Electric power regulation and control data management system and method based on customized service
CN105608561A (en) * 2016-01-12 2016-05-25 浪潮通用软件有限公司 Method and apparatus for processing mail
CN105701546A (en) * 2016-01-12 2016-06-22 国家电网公司 Electric power system defect processing method, apparatus and system thereof
CN105787089A (en) * 2016-03-15 2016-07-20 国家电网公司 Power distribution network scheduling foundation data integrating method
CN105787089B (en) * 2016-03-15 2019-02-26 国家电网公司 A kind of distribution network planning basic data integrated approach
CN107844873A (en) * 2016-08-26 2018-03-27 国家电网公司 One introduces a collection net coordinates performance whole-life cycle fee system and its management method
CN106651087A (en) * 2016-09-18 2017-05-10 国网山东省电力公司聊城供电公司 Mysql database technology-based method for managing and optimizing operation and maintenance of power transformation
CN106485598A (en) * 2016-09-28 2017-03-08 国家电网公司 A kind of three-dimensional digital electrical network prediction type examination and repair system
CN106845760A (en) * 2016-12-12 2017-06-13 国网北京市电力公司 Management system for safety instruments and management method
CN107680194A (en) * 2017-09-22 2018-02-09 国网天津市电力公司 A kind of information system for power enterprise automates cruising inspection system
CN107977714A (en) * 2017-11-08 2018-05-01 天津市普迅电力信息技术有限公司 A kind of intelligent control platform of power transformation fortune inspection
CN107657399A (en) * 2017-11-16 2018-02-02 国网江苏省电力有限公司 A kind of online management-control method of transformer station's electric energy balance for cooperateing with defect elimination
CN108197771A (en) * 2017-12-06 2018-06-22 国网江苏省电力公司泰兴市供电公司 It is a kind of using problem as be oriented to the safe operation management method of grid equipment
CN108039774A (en) * 2017-12-29 2018-05-15 成都素寺图科技有限公司 A kind of photovoltaic power supply low-power consumption contact net and power supply unit monitor system and method
CN108039774B (en) * 2017-12-29 2023-08-29 成都素寺图科技有限公司 Photovoltaic power supply low-power consumption contact net and power supply equipment monitoring system and method
CN107784485A (en) * 2018-01-22 2018-03-09 柴建霖 A kind of grid equipment state evaluation system
CN108808853A (en) * 2018-05-18 2018-11-13 广东电网有限责任公司 A kind of power grid alarm signal flow system Internet-based
CN108808853B (en) * 2018-05-18 2022-02-22 广东电网有限责任公司 Power grid alarm signal circulation system based on internet
CN109102255A (en) * 2018-08-16 2018-12-28 国网福建省电力有限公司龙岩供电公司 A kind of electric flux unusual fluctuation and defect whole process collaborative management method
CN109102255B (en) * 2018-08-16 2020-12-08 国网福建省电力有限公司龙岩供电公司 Full-process cooperative management method for electric energy transaction and defect
CN109165753A (en) * 2018-08-22 2019-01-08 国网冀北电力有限公司唐山供电公司 A kind of substation's defect management method based on mobile platform
CN109165753B (en) * 2018-08-22 2022-03-04 国网冀北电力有限公司唐山供电公司 Transformer substation defect management method based on mobile platform
CN109583846A (en) * 2018-12-14 2019-04-05 国网湖南省电力有限公司 A kind of data check method and system for powered communication management system
CN109800227A (en) * 2018-12-26 2019-05-24 贵州电网有限责任公司 Dispatching of power netwoks utilization logger system based on Structured Design
CN109800227B (en) * 2018-12-26 2022-04-22 贵州电网有限责任公司 Power grid dispatching operation recording system based on structural design
CN110489721A (en) * 2019-08-09 2019-11-22 国网山西省电力公司 Power equipment typical defect prediction technique, terminal device and storage medium
CN110502751A (en) * 2019-08-09 2019-11-26 国网山西省电力公司 Bulk power grid operation situation cognitive method, terminal device and storage medium
CN110688389A (en) * 2019-08-30 2020-01-14 国网重庆市电力公司璧山供电分公司 Transformer substation secondary equipment defect cloud management system
CN110688389B (en) * 2019-08-30 2023-04-18 国网重庆市电力公司璧山供电分公司 Cloud management system for defects of secondary equipment of transformer substation
CN110516828A (en) * 2019-09-20 2019-11-29 国网山东省电力公司泰安供电公司 Monitoring information processing system and method
CN110516828B (en) * 2019-09-20 2023-08-22 国网山东省电力公司泰安供电公司 Monitoring information processing system and method
CN110689260A (en) * 2019-09-25 2020-01-14 云南电网有限责任公司大理供电局 Intelligent assistant system applied to integration of district and county regulation and control
CN112785006A (en) * 2019-10-22 2021-05-11 捷普电子(广州)有限公司 Machine equipment state monitoring system and method, computer readable storage medium
CN110866695A (en) * 2019-11-15 2020-03-06 国网天津市电力公司 Auxiliary maintenance decision method based on association of equipment running state and maintenance work
CN110866617A (en) * 2019-11-15 2020-03-06 国网天津市电力公司 Maintenance aid decision-making method associated with equipment life cycle
CN111080128A (en) * 2019-12-17 2020-04-28 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Big data analysis and reliability evaluation management system for thermal power station metal equipment
CN111460772A (en) * 2020-02-28 2020-07-28 上海维信荟智金融科技有限公司 Automatic report processing method and system
CN112184483A (en) * 2020-09-29 2021-01-05 国网北京市电力公司 Scheduling work display system based on OMS and computer equipment
CN113052715A (en) * 2021-04-12 2021-06-29 中煤北京煤矿机械有限责任公司 Be used for hydraulic support technology supervision information-based management system
CN113177647A (en) * 2021-04-28 2021-07-27 四川嘉能佳网创新能源科技有限责任公司 Operation and maintenance big data analysis system and method based on power transformation equipment
CN113255940A (en) * 2021-05-18 2021-08-13 国网山东省电力公司东平县供电公司 Transformer substation operation inspection management and control system and method
CN113610250A (en) * 2021-08-13 2021-11-05 西安热工研究院有限公司 Method for online calculating number of wind field fault outages exceeding 24 hours based on defect list
CN114237098A (en) * 2021-12-02 2022-03-25 深圳市环球众一科技有限公司 Intelligent digital management system of electrical product
CN114237098B (en) * 2021-12-02 2022-08-16 深圳市环球众一科技有限公司 Intelligent digital management system of electrical product
CN114462956A (en) * 2021-12-22 2022-05-10 国网湖南省电力有限公司 Transformer substation equipment defect/hidden danger management and control system combining maintenance plan
CN115314360A (en) * 2022-07-27 2022-11-08 浪潮软件股份有限公司 Message queue service performance monitoring system and method
CN115314360B (en) * 2022-07-27 2024-04-12 浪潮软件股份有限公司 Message queue service performance monitoring system and method

Also Published As

Publication number Publication date
CN104361419B (en) 2018-01-23

Similar Documents

Publication Publication Date Title
CN104361419A (en) Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration
CN113450065B (en) Production operation management system and method for wind power plant
CN106815709B (en) Service quick response center support system and method
CN108320069B (en) Production and manufacturing execution system
CN106557991B (en) Voltage monitoring data platform
CN111815132B (en) Network security management information publishing method and system for power monitoring system
CN102870056B (en) Intelligent network
US10116165B2 (en) Powergrid operation and supervision system
CN110570101A (en) Intelligent OMS system for power grid distribution network
CN113902237A (en) On-site operation risk management and control system
CN112132443B (en) Reliability distribution network power supply management and control system
CN112036766B (en) Gridding distribution network service management method, gridding distribution network service management device, computer equipment and storage medium
CN104951905A (en) Equipment dynamic ledger management system
CN110879327B (en) 10KV line monitoring method by multi-data fusion
CN103268531A (en) Secondary energy management platform for energy center
CN110399363B (en) Problem data full life cycle data quality management method and system
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN109377180A (en) A kind of electric system industry expansion procedure information managing and control system
CN109359900A (en) A kind of inspection management platform
CN112633531A (en) Wind power plant operation maintenance system
CN109992599A (en) The full channel customer demand big data analysis platform of power supply
CN116503021A (en) Digital tool system and method for on-site rush repair of power base unit
CN115994187A (en) Hidden danger link type full-period safety management method and system based on distributed collaboration
CN112862242A (en) A production overall process acceptance tool for transformer substation capital construction engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123