CN111598411A - Intelligent safety control system for operation site of transformer substation - Google Patents
Intelligent safety control system for operation site of transformer substation Download PDFInfo
- Publication number
- CN111598411A CN111598411A CN202010333838.8A CN202010333838A CN111598411A CN 111598411 A CN111598411 A CN 111598411A CN 202010333838 A CN202010333838 A CN 202010333838A CN 111598411 A CN111598411 A CN 111598411A
- Authority
- CN
- China
- Prior art keywords
- management
- control
- safety
- plan
- intelligent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 claims abstract description 157
- 238000000034 method Methods 0.000 claims abstract description 32
- 238000010276 construction Methods 0.000 claims abstract description 31
- 238000012423 maintenance Methods 0.000 claims abstract description 31
- 230000008569 process Effects 0.000 claims abstract description 27
- 238000013475 authorization Methods 0.000 claims abstract description 23
- 238000012544 monitoring process Methods 0.000 claims abstract description 17
- 238000005516 engineering process Methods 0.000 claims abstract description 16
- 230000000007 visual effect Effects 0.000 claims abstract description 5
- 238000007689 inspection Methods 0.000 claims description 27
- 230000006870 function Effects 0.000 claims description 13
- 238000012946 outsourcing Methods 0.000 claims description 11
- 238000009826 distribution Methods 0.000 claims description 10
- 230000010354 integration Effects 0.000 claims description 10
- 238000011156 evaluation Methods 0.000 claims description 7
- 238000013439 planning Methods 0.000 claims description 7
- 238000012986 modification Methods 0.000 claims description 6
- 230000004048 modification Effects 0.000 claims description 6
- 230000009471 action Effects 0.000 claims description 4
- 238000004891 communication Methods 0.000 claims description 4
- 238000011161 development Methods 0.000 claims description 4
- 230000002452 interceptive effect Effects 0.000 claims description 4
- 238000011835 investigation Methods 0.000 claims description 4
- 230000007246 mechanism Effects 0.000 claims description 4
- 238000012552 review Methods 0.000 claims description 4
- 230000008439 repair process Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 21
- 230000009466 transformation Effects 0.000 abstract description 8
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 17
- 238000004458 analytical method Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 6
- 230000004308 accommodation Effects 0.000 description 3
- 230000003442 weekly effect Effects 0.000 description 3
- 238000012550 audit Methods 0.000 description 2
- 238000012854 evaluation process Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000009529 body temperature measurement Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002650 habitual effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000013468 resource allocation Methods 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to an intelligent safety control system for a transformer substation operation site, which plans the construction of a plurality of modules such as operation resource management, operation plan management, operation site management and control, mobile APP application, intelligent terminal management and control, data application and the like aiming at the construction of a transformer substation safety control system, and simultaneously plans and constructs a panoramic visual large-screen display function, thereby providing the intelligent safety control system for the transformer substation operation site, which realizes the beneficial management and control of the whole process of transformer substation production operation and maintenance operation, improves the safety operation management and control of the transformer substation and improves the safety management and control capability of the operation site; the intelligent power transformation maintenance operation management and control system can realize automatic authorization, automatic monitoring and alarming of more than 90% of operation, provide front-end experience for intelligent construction of an unattended station, cover resource management and control, plan management and control, field management and control, mobile application management and control and intelligent terminal management and control technologies based on a whole process management and control platform of power transformation maintenance operation, and improve operation management and control capability.
Description
Technical Field
The invention relates to the technical field of safety control, in particular to an intelligent safety control system for a transformer substation operation field.
Background
The transformer substation is an important component of a power system, high-speed development of a power utility puts high requirements on daily management work of transformer substation production and operation personnel, and the number and the whole scale of the transformer substation are rapidly increased along with continuous improvement of the economic level and the energy demand of China. In recent years, the technology of the internet of things is rapidly developed and rapidly applied to various industrial fields of industrial manufacturing, logistics, high-speed rail, civil aviation and production, powerful support is provided for resource allocation optimization of enterprises, the internet of things is becoming popular in the world, a production technology innovation is led, electric power production operation has various elements of industrial internet of things thinking, including plans, personnel, appliances, vehicles, site environments and the like, five elements of safe production are covered, and the safety control capability of electric power production is certainly and greatly improved by introduction of the technology of the internet of things.
The safety control of the current power grid production operation has the following management pain points:
1) the number of subpackaged personnel is large, the liquidity is high, the condition of entering and leaving is difficult to monitor, the personnel reuse phenomenon often occurs, and the difficulty of operation safety control is increased;
2) construction operation points are diverse and wide, planning management and control are not comprehensive enough, supervision force is limited, operation information cannot be comprehensively mastered, and safety supervision is difficult;
3) the bearing capacity analysis of the construction team is not sufficient, and overload operation is also a frequent accident factor;
4) the data management in the construction operation process is dispersed, especially in the field construction process, most of the data are recorded by paper files, which is not beneficial to statistical analysis and lacks the trace management in the whole process;
5) the production operation is not standard, the habitual and empiric violations still frequently occur, and most of safety events are caused by that the standard operation specifications cannot be strictly executed;
6) the responsibility accommodation situation of the supervision and arrival post personnel is difficult to track, the responsibility accommodation assessment of the safety responsibility list lacks a control means, and the responsibility accommodation is promoted to land through an effective management method;
7) the quality of the operating personnel is uneven, the operating process lacks an evaluation mechanism, the culture and screening of high-quality operating teams cannot be realized, and the intrinsic safety is not facilitated;
8) the number of the operating devices of the power grid is huge, so that comprehensive monitoring cannot be achieved, and particularly in the aspect of power distribution and utilization, the devices are numerous and lack of terminal authorization control; therefore, it is very necessary to provide an intelligent safety control system for a transformer substation operation site, which realizes the comprehensive process of the production operation and the maintenance operation of the transformer substation, improves the safety operation control of the transformer substation, and improves the safety control capability of the operation site.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, and provides the intelligent safety control system for the transformer substation operation site, which realizes the comprehensive process of the production operation and the maintenance operation of the transformer substation, improves the safety operation control of the transformer substation and improves the safety control capability of the operation site.
The purpose of the invention is realized as follows: intelligent safety control system in transformer substation's operation scene includes:
the safety control platform is used for building an integral development integration platform based on the technology of the Internet of things, realizing basic functions of open integration, basic support, data service and authority control, and comprehensively controlling the intelligent terminal equipment, and comprises equipment state management and an equipment data triggering mechanism;
the operation resource management comprises personnel, vehicles and appliances, wherein the personnel are divided into internal personnel and external personnel;
the operation plan management is the management of maintenance operation plans and capital construction operation plans, and the operation plans comprise year plans, month plans, week plans and day arrangements;
the operation field management and control relates to the behavior flows of a plurality of roles of a plurality of departments, and the operation field management and control objects comprise work licensors, work responsible persons, post arriving persons, inspectors, field monitoring terminals and rear commanders;
safety inspection management, including inspection team management, regulation and modification against regulations, inspection list management, regulation and modification against regulations and regulation problem management;
the mobile APP application realizes the requirements of operation information query, operation resource safety files, safety level query, first-aid repair information report and on-site inspection of internal business, and realizes the requirements of interactive management of construction acceptance (distribution) contractors and outsourcing personnel on operation information and on-site inspection information;
the intelligent terminal management realizes the functions of field authorization management and control and automatic robot supervision reminding, comprises an intelligent access authorization gate machine, a device area authorization lock according to a plan, an intelligent robot and an electronic grating, and integrates intelligent terminal hardware into a management and control system through communication integration.
And the large visual screen is used for displaying service indexes, risk distribution, real-time on-site state monitoring, comprehensive resource distribution and intelligent terminal access information.
The job resource management comprises:
appliance management: establishing a safety tool machine account, wherein the name and the number of tools required by construction need to be determined when a working responsible person arranges a planned day, so that the field inspection and checking are facilitated;
vehicle management: the data of each unit vehicle is acquired by integrating unified vehicle information, the vehicles determined in the daily schedule can directly pass through a gate of an operation area, and the gate feeds back the entry and exit time records to a safety control platform;
equipment account management: through integrated PMS system equipment standing book information, simultaneously, carry out the management and control through intelligent tool to lock and operation equipment, avoid along with operation and unauthorized operation action.
The operation plan management is that a professional department fills in a week plan and a team filling in a day plan, the plans comprise operation team names, work categories, work responsible persons, the number of work team members, plan start time, plan completion time and application cases, complete processes of plan reporting, plan initial review, plan release and plan implementation tracking are achieved, and the operation plan management is compatible with a single plan release function.
The operation site management and control needs to establish an operation site safety management and control execution evaluation flow, which comprises operation plan issuing, planned construction scheme, site investigation order, maintenance of risk early warning order, maintenance of work ticket of the operation site, maintenance of three measures and one case and the like, and operation site evaluation.
Remove APP application and intelligent robot wireless connection.
The invention has the beneficial effects that: the intelligent power transformation maintenance operation management and control system can realize automatic authorization, automatic monitoring and alarming of more than 90% of operation, provide front-end experience for intelligent construction of an unattended station, cover resource management and control, plan management and control, field management and control, mobile application management and control and intelligent terminal management and control technologies based on a whole process management and control platform of power transformation maintenance operation, and improve operation management and control capability. The method has the advantages that the whole process of production operation and maintenance operation of the transformer substation is controlled in a lean mode, the full coverage of safety control is achieved, the safety operation control of the transformer substation is improved, the safety control capability of an operation site is improved, and the total-station safety management target is achieved through access authorization, operation authorization and important equipment real-time monitoring; the invention has the advantages of realizing the lean management and control of the whole process of production operation and maintenance operation of the transformer substation, improving the safe operation management and control of the transformer substation and improving the safe management and control capability of an operation site.
Drawings
Fig. 1 is a diagram of an intelligent management and control system of a transformer substation.
FIG. 2 is a schematic diagram of the resource management rule of the present invention.
FIG. 3 is a table of the envelope unit of the present invention.
Fig. 4 is a vehicle information list display diagram according to the present invention.
Fig. 5 is a detailed information diagram of the outsourcing unit of the present invention.
FIG. 6 is a detailed view of the operation plan of the present invention.
FIG. 7 is a diagram of a new year plan page of the present invention.
FIG. 8 is a diagram of a project liability week project to-do according to the present invention.
Fig. 9 is a two-ticket flow diagram of the present invention.
Fig. 10 is a work ticket list presentation page of the present invention.
Fig. 11 is a flow chart of the work site management and control of the present invention.
FIG. 12 is a job site listing diagram of the present invention.
FIG. 13 is a flow chart of the present invention for on-site inspection.
Fig. 14 is a diagram showing information of an audit team list according to the present invention.
FIG. 15 is the mobile APP Login page of the present invention.
FIG. 16 is a mobile APP workbench page diagram of the present invention.
Detailed Description
The invention is further described below with reference to the accompanying drawings.
Example 1
The intelligent safety control system for the transformer substation operation site aims at the construction of a transformer substation safety control system, the construction of a plurality of modules such as operation resource management, operation plan management, operation site management and control, mobile APP application, intelligent terminal management and control, data application and the like is planned, and meanwhile, a panoramic visual large-screen display function is planned and constructed; the overall business architecture is shown in fig. 1.
As shown in fig. 2, the operation resources are basic production elements, including personnel, vehicles, appliances, and other elements, wherein the personnel are further divided into internal personnel and external personnel, and for the management of the external personnel, corresponding external packet unit management is performed; the system formulates security file information for various operating resources. Outsourcing personnel management: outsourcing personnel construction is an important operation resource of an operation site, and establishing a perfect, stable and masterable external construction team is an important element for ensuring the stability of the operation site. And associating outsourcing units, and carrying out centralized and unified management and unified examination on violation conditions in the provinces. The basic information, qualification information, security files, security levels, examination information and other contents of outsourcing personnel are inquired. Internal personnel management: and establishing a comprehensive internal personnel safety management system, evaluating in real time and performing dynamic assessment. The basic information, the safety files, the safety levels, the examination information and other contents of the internal personnel are inquired; as shown in fig. 3 and 4, the exterior unit list diagram and the vehicle information list display diagram are respectively shown, and fig. 5 is a detailed information diagram of the exterior unit.
The operation plan management includes plan management of multiple departments such as maintenance operation plan and capital construction operation plan. The system comprises a plan management form of a year plan, a month plan, a week plan and a day arrangement, realizes complete processes of plan reporting, plan initial review, plan release, plan implementation tracking and the like, and is compatible with a single plan release function.
Filling an operation plan: the technical department fills in a weekly plan and a team filling in a daily plan, wherein the plans comprise operation team names, work categories, work responsible persons, the number of work team members, planned start time, planned completion time and the like, and application cases. And secondly, a professional management department preliminarily examines the operation condition and the risk level, determines the adjustment of production resources, and determines the adjustment of a production demand coefficient according to seasons and the power grid condition.
Adjusting and releasing the operation plan: when each professional management department prepares a weekly operation plan, the bearing capacity indexes of the work responsible persons and the work class members are controlled in a green area and a yellow area. When the area is in the yellow zone, the early warning of the risk of the overload capacity is started; when the red zone is reached, the weekly work plan is adjusted to make the bearing capacity index separate from the red zone.
And (3) analyzing the group bearing capacity: and establishing a team bearing capacity analysis model according to the team work resources and the team work information and calculating a team bearing capacity coefficient. The team work resources comprise 'three-person' information of a team work responsible person, a work ticket issuer and a work licensor, team member information, outsourcing unit information and outsourcing personnel information related to the team; the job plan is detailed as shown in FIG. 6; FIG. 7 is a page diagram of a new year plan, wherein the month plan, the week plan and the year plan are similar; FIG. 8 is a plan responsibility week plan to Do diagram.
The system further comprises an operation and maintenance plan, the operation and maintenance plan mainly refers to automatic inspection work based on the intelligent robot, the robot replaces manual work to carry out routine inspection temperature measurement, routine inspection and other work in the station, and the robot can automatically work and develop and report generation through periodic plan management and control.
The operation field management relates to the behavior processes of a plurality of roles of a plurality of departments, such as an operation team, a supervision team, a worker who arrives at a post and the like, and the task execution of each worker is required to be completed respectively; establishing a complete process track of operation field safety risk management and control: and establishing a safety control execution evaluation flow of the operation site. The method comprises the steps of issuing an operation plan, maintaining a planned construction scheme, a site investigation order and a risk early warning order, maintaining a work ticket, a three measure one case and the like of the operation site and evaluating the operation site. The differentiated and humanized operation plan security risk management and control means not only improves the security coefficient of the key business link, but also does not increase too much workload of the basic operation, as shown in fig. 11, a flow chart of the operation field management and control is shown, and fig. 12 is a list chart of the operation field.
And (3) carrying out post arrival process management and control: in the planning stage, the post just in place is determined, all levels of post-corresponding personnel need to confirm post arrival according to the planning arrangement, and if the post arrival cannot be achieved, other personnel in the department should be entrusted to arrive at the scene and perform post responsibility; when the worker arrives at the site, the worker needs to check the work ticket, the safety arrangement condition, the working state of the constructor and the like, and upload the related image data.
Video recording and violation analysis of the whole process of the intelligent robot technology field construction operation:
intelligent robot technology field construction operation overall process video recording and violation analysis
The intelligent robot is used as a monitoring terminal, primarily realizes the on-site safety supervision and control responsibility, and realizes the return and analysis of on-site audio-video data; the auxiliary work responsible person finishes the work of singing tickets, reading and guiding the operation standard card according to steps, and the like, simultaneously, the whole process of the video recording operation is carried out, and video signals are accessed into an internal network through a unified video interface in the station for being watched by the security department and the related functional departments; the voice interaction technology is adopted to realize the interaction between a working responsible person and the robot, and the next working step, the monitoring point and the like are determined; the intelligent following technology is adopted, so that a camera carried by the robot locks a certain operation target or a plurality of targets; through a video stream analysis technology, the violation phenomenon in the operation field is found in real time, voice alarm is given in real time, and meanwhile a violation record sheet is created; performing robot action path planning and monitoring point planning by scanning modeling in a station; and the post in-place check is realized through a face recognition technology.
The safety inspection management realizes the standardized, normalized and specialized management of anti-violation work around the anti-violation work flow established in five links of 'prevention, inspection, correction, penalty and training', and the on-site inspection flow chart shown in FIG. 13; fig. 14 is an information diagram showing an audit team list.
The integrated operation field safety control application system realizes the seamless connection of an internal network and an external network according to the functions of the existing operation field safety control system in the operation field safety control system mobile APP project, and is a deepened application of deeply applying the Internet + to the operation field safety control. The method mainly meets the internal business requirements of operation information query, operation resource safety file, safety level query, emergency maintenance information report, field inspection and the like, and meets the requirements of interactive management of construction (branch) underwriters and outsourcing personnel on operation information and field inspection information, as shown in figure 15, a mobile APP login page is shown, and figure 16 is a mobile APP workbench page diagram.
The intelligent terminal management integrates intelligent management and control terminal hardware into a management and control system through communication integration, functions of field authorization management and control, automatic robot supervision and reminding and the like are achieved, and the intelligent management and control system comprises an intelligent access authorization gate machine, a device area authorization lockset according to a plan, an intelligent robot, an electronic grating and the like.
The intelligent power transformation maintenance operation management and control system can realize automatic authorization, automatic monitoring and alarming of more than 90% of operation, provide front-end experience for intelligent construction of an unattended station, cover resource management and control, plan management and control, field management and control, mobile application management and control and intelligent terminal management and control technologies based on a whole process management and control platform of power transformation maintenance operation, and improve operation management and control capability. The method has the advantages that the whole process of production operation and maintenance operation of the transformer substation is controlled in a lean mode, the full coverage of safety control is achieved, the safety operation control of the transformer substation is improved, the safety control capability of an operation site is improved, and the total-station safety management target is achieved through access authorization, operation authorization and important equipment real-time monitoring; the invention has the advantages of realizing the lean management and control of the whole process of production operation and maintenance operation of the transformer substation, improving the safe operation management and control of the transformer substation and improving the safe management and control capability of an operation site.
Example 2
As shown in fig. 1 to 16, the intelligent safety control system for the substation operation site includes:
the safety control platform is used for building an integral development integration platform based on the technology of the Internet of things, realizing basic functions of open integration, basic support, data service and authority control, and comprehensively controlling the intelligent terminal equipment, and comprises equipment state management and an equipment data triggering mechanism; the operation resource management comprises personnel, vehicles and appliances, wherein the personnel are divided into internal personnel and external personnel; the operation plan management is the management of maintenance operation plans and capital construction operation plans, and the operation plans comprise year plans, month plans, week plans and day arrangements; the operation field management and control relates to the behavior flows of a plurality of roles of a plurality of departments, and the operation field management and control objects comprise work licensors, work responsible persons, post arriving persons, inspectors, field monitoring terminals and rear commanders; safety inspection management, including inspection team management, regulation and modification against regulations, inspection list management, regulation and modification against regulations and regulation problem management; the mobile APP application realizes the requirements of operation information query, operation resource safety files, safety level query, first-aid repair information report and on-site inspection of internal business, and realizes the requirements of interactive management of construction acceptance (distribution) contractors and outsourcing personnel on operation information and on-site inspection information; the intelligent terminal management is used for realizing the functions of field authorization management and control and automatic robot supervision reminding, comprises an intelligent access authorization gate machine, a device area authorization lock according to a plan, an intelligent robot and an electronic grating, and integrates intelligent terminal hardware into a management and control system through communication integration; and the large visual screen is used for displaying service indexes, risk distribution, real-time on-site state monitoring, comprehensive resource distribution and intelligent terminal access information.
The job resource management comprises: appliance management: establishing a safety tool machine account, wherein the name and the number of tools required by construction need to be determined when a working responsible person arranges a planned day, so that the field inspection and checking are facilitated; vehicle management: the data of each unit vehicle is acquired by integrating unified vehicle information, the vehicles determined in the daily schedule can directly pass through a gate of an operation area, and the gate feeds back the entry and exit time records to a safety control platform; equipment account management: through integrated PMS system equipment standing book information, simultaneously, carry out the management and control through intelligent tool to lock and operation equipment, avoid along with operation and unauthorized operation action.
The operation plan management is that a professional department fills in a week plan and a team filling in a day plan, the plans comprise operation team names, work categories, work responsible persons, the number of work team members, planned start time and planned completion time, application cases realize complete processes of plan reporting, plan initial review, plan release and plan implementation tracking, and are compatible with a single plan release function, operation site management and control need to establish operation site safety management and control execution evaluation processes, the operation site safety management and control execution evaluation processes comprise operation plan release, planned construction schemes, site investigation orders, risk early warning orders, operation tickets of an operation site, maintenance of three-measure one-case and the like, and operation site evaluation, and the mobile APP is wirelessly connected with the intelligent robot.
The intelligent power transformation maintenance operation management and control system can realize automatic authorization, automatic monitoring and alarming of more than 90% of operation, provide front-end experience for intelligent construction of an unattended station, cover resource management and control, plan management and control, field management and control, mobile application management and control and intelligent terminal management and control technologies based on a whole process management and control platform of power transformation maintenance operation, and improve operation management and control capability. The method has the advantages that the whole process of production operation and maintenance operation of the transformer substation is controlled in a lean mode, the full coverage of safety control is achieved, the safety operation control of the transformer substation is improved, the safety control capability of an operation site is improved, and the total-station safety management target is achieved through access authorization, operation authorization and important equipment real-time monitoring; the invention has the advantages of realizing the lean management and control of the whole process of production operation and maintenance operation of the transformer substation, improving the safe operation management and control of the transformer substation and improving the safe management and control capability of an operation site.
Claims (5)
1. Intelligent safety control system in transformer substation's operation scene, its characterized in that: comprises that
The safety control platform is used for building an integral development integration platform based on the technology of the Internet of things, realizing basic functions of open integration, basic support, data service and authority control, and comprehensively controlling the intelligent terminal equipment, and comprises equipment state management and an equipment data triggering mechanism;
the operation resource management comprises personnel, vehicles and appliances, wherein the personnel are divided into internal personnel and external personnel;
the operation plan management is the management of maintenance operation plans and capital construction operation plans, and the operation plans comprise year plans, month plans, week plans and day arrangements;
the operation field management and control relates to the behavior flows of a plurality of roles of a plurality of departments, and the operation field management and control objects comprise work licensors, work responsible persons, post arriving persons, inspectors, field monitoring terminals and rear commanders;
safety inspection management, including inspection team management, regulation and modification against regulations, inspection list management, regulation and modification against regulations and regulation problem management;
the mobile APP application realizes the requirements of operation information query, operation resource safety files, safety level query, first-aid repair information report and on-site inspection of internal business, and realizes the requirements of interactive management of construction acceptance (distribution) contractors and outsourcing personnel on operation information and on-site inspection information;
the intelligent terminal management is used for realizing the functions of field authorization management and control and automatic robot supervision reminding, comprises an intelligent access authorization gate machine, a device area authorization lock according to a plan, an intelligent robot and an electronic grating, and integrates intelligent terminal hardware into a management and control system through communication integration;
and the large visual screen is used for displaying service indexes, risk distribution, real-time on-site state monitoring, comprehensive resource distribution and intelligent terminal access information.
2. The substation operation site intelligent safety control system of claim 1, characterized in that: the job resource management comprises
Appliance management: establishing a safety tool machine account, wherein the name and the number of tools required by construction need to be determined when a working responsible person arranges a planned day, so that the field inspection and checking are facilitated;
vehicle management: the data of each unit vehicle is acquired by integrating unified vehicle information, the vehicles determined in the daily schedule can directly pass through a gate of an operation area, and the gate feeds back the entry and exit time records to a safety control platform;
equipment account management: through integrated PMS system equipment standing book information, simultaneously, carry out the management and control through intelligent tool to lock and operation equipment, avoid along with operation and unauthorized operation action.
3. The substation operation site intelligent safety control system of claim 1, characterized in that: the operation plan management is characterized in that a professional department reports week plans and team reporting day plans, the plans comprise operation team names, work categories, work responsible persons, the number of work team members, planning start time, planning completion time and application cases, complete processes of plan reporting, plan initial review, plan release and plan implementation tracking are achieved, and the operation plan management is compatible with a single plan release function.
4. The substation operation site intelligent safety control system of claim 1, characterized in that: the operation site management and control needs to establish an operation site safety management and control execution evaluation flow, which comprises operation plan issuing, planned construction schemes, site investigation orders, maintenance of risk early warning orders, maintenance of work tickets of an operation site, maintenance of three measures and one case and the like, and operation site evaluation.
5. The substation operation site intelligent safety control system of claim 1, characterized in that: remove APP and intelligent robot wireless connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010333838.8A CN111598411A (en) | 2020-04-24 | 2020-04-24 | Intelligent safety control system for operation site of transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010333838.8A CN111598411A (en) | 2020-04-24 | 2020-04-24 | Intelligent safety control system for operation site of transformer substation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111598411A true CN111598411A (en) | 2020-08-28 |
Family
ID=72190566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010333838.8A Pending CN111598411A (en) | 2020-04-24 | 2020-04-24 | Intelligent safety control system for operation site of transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111598411A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111931960A (en) * | 2020-09-08 | 2020-11-13 | 浙江海盐力源环保科技股份有限公司 | Power station work ticket intelligent transportation and management system with dynamic feedback of Internet of things |
CN113110263A (en) * | 2021-05-24 | 2021-07-13 | 国网湖北省电力有限公司直流运检公司 | Intelligent management and control system for operation and inspection operation of converter station |
CN113537783A (en) * | 2021-07-19 | 2021-10-22 | 国网吉林省电力有限公司吉林供电公司 | Intelligent management and control method for power grid maintenance safety risk |
CN113762920A (en) * | 2021-08-23 | 2021-12-07 | 迟源 | Electric energy metering operation control method, device, equipment and medium |
CN113887777A (en) * | 2021-06-01 | 2022-01-04 | 贵州电网有限责任公司 | Three-phase-exceeding prevention early warning system for electric power field operation |
CN114118456A (en) * | 2021-10-28 | 2022-03-01 | 国网天津市电力公司 | Power transformation operation management device based on data overall planning association |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107977714A (en) * | 2017-11-08 | 2018-05-01 | 天津市普迅电力信息技术有限公司 | A kind of intelligent control platform of power transformation fortune inspection |
CN109767121A (en) * | 2019-01-11 | 2019-05-17 | 云南电网有限责任公司保山供电局 | A kind of substation distant place intelligent operation managing and control system and method |
-
2020
- 2020-04-24 CN CN202010333838.8A patent/CN111598411A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107977714A (en) * | 2017-11-08 | 2018-05-01 | 天津市普迅电力信息技术有限公司 | A kind of intelligent control platform of power transformation fortune inspection |
CN109767121A (en) * | 2019-01-11 | 2019-05-17 | 云南电网有限责任公司保山供电局 | A kind of substation distant place intelligent operation managing and control system and method |
Non-Patent Citations (2)
Title |
---|
张晓枫,杨军等: "电力生产作业现场标准化综合管控应用在国网湖北省电力公司的实践", 《2017智能电网新技术发展与应用研讨会论文集》 * |
赵善俊,樊彦国等: "泛在电力物联网在电网生产作业安全管控工作中的应用实践", 《电气时代》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111931960A (en) * | 2020-09-08 | 2020-11-13 | 浙江海盐力源环保科技股份有限公司 | Power station work ticket intelligent transportation and management system with dynamic feedback of Internet of things |
CN113110263A (en) * | 2021-05-24 | 2021-07-13 | 国网湖北省电力有限公司直流运检公司 | Intelligent management and control system for operation and inspection operation of converter station |
CN113887777A (en) * | 2021-06-01 | 2022-01-04 | 贵州电网有限责任公司 | Three-phase-exceeding prevention early warning system for electric power field operation |
CN113537783A (en) * | 2021-07-19 | 2021-10-22 | 国网吉林省电力有限公司吉林供电公司 | Intelligent management and control method for power grid maintenance safety risk |
CN113762920A (en) * | 2021-08-23 | 2021-12-07 | 迟源 | Electric energy metering operation control method, device, equipment and medium |
CN114118456A (en) * | 2021-10-28 | 2022-03-01 | 国网天津市电力公司 | Power transformation operation management device based on data overall planning association |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111598411A (en) | Intelligent safety control system for operation site of transformer substation | |
CN113902237A (en) | On-site operation risk management and control system | |
CN104361419B (en) | Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification | |
CN112508417A (en) | Civil aviation professional engineering general contract project management system based on BIM technology | |
CN112163747A (en) | Construction engineering project quality management system | |
CN107222523B (en) | Terminal data processing method, device and system | |
CN104076767B (en) | Railway signal equipment overhauling control system and method | |
CN110137940B (en) | Intelligent electric power management and control system based on mobile visualization | |
CN111861799A (en) | Intelligent construction site management system and method | |
CN112529436B (en) | Safety management platform and method for railway marshalling station | |
CN114548656B (en) | Safe emergency management commanding and dispatching system | |
CN113379370A (en) | Segment production informatization management system | |
CN116957341A (en) | Intelligent safety risk management and control system based on steel mill | |
CN114186955A (en) | Standardized management system for safety production | |
CN110544007A (en) | Establishment method for enterprise performance management and quantification and information system device | |
CN115470940A (en) | Building engineering operation and maintenance management system based on BIM technology | |
CN109360291A (en) | A kind of construction machinery equipment inspection service system | |
CN117933914A (en) | Production operation risk supervision method and system based on Internet of things | |
CN116882729A (en) | Security management platform based on 5g wisdom power plant | |
CN112381494B (en) | Intelligent supervision system and method for urban construction | |
CN116050693A (en) | Nuclear power building construction management system | |
CN115456219A (en) | Operation and maintenance monitoring method and device of equipment and related equipment | |
CN113592268A (en) | On-site operation safety monitoring system and method | |
CN112085341A (en) | Master station system suitable for risk management and control of overall process of power production operation | |
CN116307531B (en) | Digital supervision command and dispatch method based on 5G+ internet of things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200828 |
|
RJ01 | Rejection of invention patent application after publication |