Dodd III, 1995 - Google Patents
PUREX Deactivation Health and Safety documentationDodd III, 1995
View PDF- Document ID
- 11412416857479481298
- Author
- Dodd III E
- Publication year
External Links
Snippet
Distribution 607487 ^ / J i 4 ^ ^ rs '77 M rtv?/W f, (M 7-?'\ Page 1 ENGINEERING DATA
TRANSMITTAL 2. To: (Receiving Organization) Distribution 3. From: (Originating Organization)
PUREX/U03 Technical Safety Support Page 1 of, I.BJT 607487 4. Related EDT No.: NA 5 …
- 230000036541 health 0 title abstract description 57
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Burlet-Vienney et al. | Occupational safety during interventions in confined spaces | |
Schaufelberger et al. | Construction project safety | |
Gonzalez-Cortes et al. | Inherently Safer Design (ISD) solutions in confined spaces: Experts' practical feedback in Quebec, Canada | |
Ferrett | Introduction to Health and Safety at Work Revision Cards | |
HSE | Regulations | |
Dodd III | PUREX Deactivation Health and Safety documentation | |
Chinniah et al. | Development of a Confined Space Risk Analysis and Work Categorization Tool | |
Joyston-Bechal et al. | Health and safety law for the construction industry | |
Specification | Document | |
Mickle | Tank farm health and safety plan. Revision 2 | |
Burman et al. | Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee | |
Elliott | Health and Safety Plan for the Group 3 Remedial Design/Remedial Action Sampling, Excavation, Backfilling, Packaging, and Shipment of Soil at Waste Area Group 1, Operable Unit 1-1 0 | |
McKenzie | Health and Safety Plan for Vapor Vacuum Extraction with Treatment for OU 7-08, Organic Contamination in the Vadose Zone | |
Superseding | USACE/NAVFAC/AFCEC/NASA UFGS-01 35 29.13 (January 2008) | |
Gurney | Health and Safety Plan for the Environmental Restoration Long-Term Si tewide Groundwater Monitoring | |
Watson et al. | Health and Safety Plan for the Radioactive Waste Management Complex Cold Test Pits for Operable Unit 7-13/14 | |
Watson et al. | Health and Safety Plan for the Radioactive Waste Management Complex Cold Test Pits for OU 7-13/14 | |
Roberts | Health and Safety Plan for Operable Unit 5-12 Rem ed i al Des ign/Rem ed ia I Action Projects | |
Durand | SITE-SPECIFIC HEALTH AND SAFETY PLAN ADDENDUM Building 807 Characterization and Removal Project. | |
Sherwood | Health and Safety Plan for the Test Reactor Area OU 2-13 Comprehensive Remedial Investigation/Feasibility Study at the Idaho National Engineering Laboratory | |
GGGLGLaLGGGGGGS | DOE LIIVIITED STANDARD | |
Baxter | Health and safety plan for characterization sampling of ETR and MTR facilities | |
Abston et al. | Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee | |
Action | AIdaho | |
Berg | Phase II--Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan |