Sherwood, 1995 - Google Patents
Health and Safety Plan for the Test Reactor Area OU 2-13 Comprehensive Remedial Investigation/Feasibility Study at the Idaho National Engineering LaboratorySherwood, 1995
- Document ID
- 8129522040783206990
- Author
- Sherwood J
- Publication year
External Links
- 230000036541 health 0 title abstract description 49
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/22—Health care, e.g. hospitals; Social work
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sherwood | Health and Safety Plan for the Test Reactor Area OU 2-13 Comprehensive Remedial Investigation/Feasibility Study at the Idaho National Engineering Laboratory | |
Peterson-Wright | Health and Safety Plan for Characterization and Removal of Underground Structures at Test Area North at the Idaho National Engineering Laboratory | |
Action | AIdaho | |
Trippet et al. | Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations | |
Elliott | Health and Safety Plan for the Group 3 Remedial Design/Remedial Action Sampling, Excavation, Backfilling, Packaging, and Shipment of Soil at Waste Area Group 1, Operable Unit 1-1 0 | |
Burman et al. | Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee | |
Gurney | Health and Safety Plan for Operable Unit 10-04 | |
Watson et al. | Health and Safety Plan for the Radioactive Waste Management Complex Cold Test Pits for OU 7-13/14 | |
Watson et al. | Health and Safety Plan for the Radioactive Waste Management Complex Cold Test Pits for Operable Unit 7-13/14 | |
Spang | Health and safety plan for operations performed for the Buried Waste Program, Environmental Restoration Program | |
Baxter | Health and safety plan for characterization sampling of ETR and MTR facilities | |
McKenzie | Health and Safety Plan for Vapor Vacuum Extraction with Treatment for OU 7-08, Organic Contamination in the Vadose Zone | |
Roberts | Health and Safety Plan for the Removal and Detonation of Unexploded Ordnance at the INEEL | |
Pickett et al. | Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02 | |
Salomon et al. | Health and Safety Plan for Operations Performed for the Environmental Restoration Department at OU 2-09 (Test Reactor Area Sewage Leach Pond) Track 2 Sampling | |
Gurney | Health and Safety Plan for the Environmental Restoration Long-Term Si tewide Groundwater Monitoring | |
Sawyer et al. | Contingency plans | |
Demolition et al. | Bruce P. Miller | |
Kirtland | DERIVATION OF CLEANUP CRITERIA | |
Bowman | Radiological Emergency Response Health and Safety Manual | |
Day | K basins interim remedial action health and safety plan | |
Roberts | Health and Safety Plan for Operable Unit 5-12 Rem ed i al Des ign/Rem ed ia I Action Projects | |
GGGLGLaLGGGGGGS | DOE LIIVIITED STANDARD | |
Francis | Health and Safety Plan for the Time Critical Removal Action Operable Unit 10-03 | |
REMEDIATION | Health AND Safety Plan |