Baxter, 1994 - Google Patents
Health and safety plan for characterization sampling of ETR and MTR facilitiesBaxter, 1994
View PDF- Document ID
- 4065524415997368646
- Author
- Baxter D
- Publication year
External Links
Snippet
This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational …
- 238000005070 sampling 0 title abstract description 49
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/22—Health care, e.g. hospitals; Social work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public service
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Burlet-Vienney et al. | Occupational safety during interventions in confined spaces | |
Baxter | Health and safety plan for characterization sampling of ETR and MTR facilities | |
Sawyer et al. | Contingency plans | |
Sherwood | Health and Safety Plan for the Test Reactor Area OU 2-13 Comprehensive Remedial Investigation/Feasibility Study at the Idaho National Engineering Laboratory | |
Action | AIdaho | |
Gurney | Health and Safety Plan for the Environmental Restoration Long-Term Si tewide Groundwater Monitoring | |
Specification | Document | |
Burman et al. | Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee | |
Elliott | Health and Safety Plan for the Group 3 Remedial Design/Remedial Action Sampling, Excavation, Backfilling, Packaging, and Shipment of Soil at Waste Area Group 1, Operable Unit 1-1 0 | |
Dodd III | PUREX Deactivation Health and Safety documentation | |
McKenzie | Health and Safety Plan for Vapor Vacuum Extraction with Treatment for OU 7-08, Organic Contamination in the Vadose Zone | |
Trippet et al. | Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations | |
Superseding | USACE/NAVFAC/AFCEC/NASA UFGS-01 35 29.13 (January 2008) | |
GGGLGLaLGGGGGGS | DOE LIIVIITED STANDARD | |
kwork Plan | pECEIV GGS DOE/ORK) 2-14838 D1 ja 7 3 937 | |
Roberts | Health and Safety Plan for Operable Unit 5-12 Rem ed i al Des ign/Rem ed ia I Action Projects | |
Pickett et al. | Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02 | |
Sawyer et al. | Health and Safety plans and contingency plans | |
Salomon et al. | Health and Safety Plan for Operations Performed for the Environmental Restoration Department at OU 2-09 (Test Reactor Area Sewage Leach Pond) Track 2 Sampling | |
Bowman | Radiological Emergency Response Health and Safety Manual | |
Day | K basins interim remedial action health and safety plan | |
LeNeveu | Health and Safety at the Whiteshell Nuclear Research Establishment | |
Roberts | Health and Safety Plan for the Removal and Detonation of Unexploded Ordnance at the INEEL | |
Haney et al. | Safety plan for the cooperative telerobotic retrieval system equipment development area | |
CH2M | Environmental, Safety, and Health Plan for the remedial investigation of the liquid low-level waste tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee |