[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Baxter, 1994 - Google Patents

Health and safety plan for characterization sampling of ETR and MTR facilities

Baxter, 1994

View PDF
Document ID
4065524415997368646
Author
Baxter D
Publication year

External Links

Snippet

This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational …
Continue reading at inis.iaea.org (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/22Health care, e.g. hospitals; Social work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public service

Similar Documents

Publication Publication Date Title
Burlet-Vienney et al. Occupational safety during interventions in confined spaces
Baxter Health and safety plan for characterization sampling of ETR and MTR facilities
Sawyer et al. Contingency plans
Sherwood Health and Safety Plan for the Test Reactor Area OU 2-13 Comprehensive Remedial Investigation/Feasibility Study at the Idaho National Engineering Laboratory
Action AIdaho
Gurney Health and Safety Plan for the Environmental Restoration Long-Term Si tewide Groundwater Monitoring
Specification Document
Burman et al. Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee
Elliott Health and Safety Plan for the Group 3 Remedial Design/Remedial Action Sampling, Excavation, Backfilling, Packaging, and Shipment of Soil at Waste Area Group 1, Operable Unit 1-1 0
Dodd III PUREX Deactivation Health and Safety documentation
McKenzie Health and Safety Plan for Vapor Vacuum Extraction with Treatment for OU 7-08, Organic Contamination in the Vadose Zone
Trippet et al. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations
Superseding USACE/NAVFAC/AFCEC/NASA UFGS-01 35 29.13 (January 2008)
GGGLGLaLGGGGGGS DOE LIIVIITED STANDARD
kwork Plan pECEIV GGS DOE/ORK) 2-14838 D1 ja 7 3 937
Roberts Health and Safety Plan for Operable Unit 5-12 Rem ed i al Des ign/Rem ed ia I Action Projects
Pickett et al. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02
Sawyer et al. Health and Safety plans and contingency plans
Salomon et al. Health and Safety Plan for Operations Performed for the Environmental Restoration Department at OU 2-09 (Test Reactor Area Sewage Leach Pond) Track 2 Sampling
Bowman Radiological Emergency Response Health and Safety Manual
Day K basins interim remedial action health and safety plan
LeNeveu Health and Safety at the Whiteshell Nuclear Research Establishment
Roberts Health and Safety Plan for the Removal and Detonation of Unexploded Ordnance at the INEEL
Haney et al. Safety plan for the cooperative telerobotic retrieval system equipment development area
CH2M Environmental, Safety, and Health Plan for the remedial investigation of the liquid low-level waste tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee