[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
IDEAS home Printed from https://ideas.repec.org/p/arx/papers/1805.02909.html
   My bibliography  Save this paper

Analysis of the optimal exercise boundary of American put options with delivery lags

Author

Listed:
  • Gechun Liang
  • Zhou Yang
Abstract
A make-your-mind-up option is an American derivative with delivery lags. We show that its put option can be decomposed as a European put and a new type of American-style derivative. The latter is an option for which the investor receives the Greek Theta of the corresponding European option as the running payoff, and decides an optimal stopping time to terminate the contract. Based on this decomposition and using free boundary techniques, we show that the associated optimal exercise boundary exists and is a strictly increasing and smooth curve, and analyze the asymptotic behavior of the value function and the optimal exercise boundary for both large maturity and small time lag.

Suggested Citation

  • Gechun Liang & Zhou Yang, 2018. "Analysis of the optimal exercise boundary of American put options with delivery lags," Papers 1805.02909, arXiv.org, revised Dec 2020.
  • Handle: RePEc:arx:papers:1805.02909
    as

    Download full text from publisher

    File URL: http://arxiv.org/pdf/1805.02909
    File Function: Latest version
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Alvarez, Luis H. R. & Keppo, Jussi, 2002. "The impact of delivery lags on irreversible investment under uncertainty," European Journal of Operational Research, Elsevier, vol. 136(1), pages 173-180, January.
    2. Bayraktar, Erhan & Egami, Masahiko, 2007. "The effects of implementation delay on decision-making under uncertainty," Stochastic Processes and their Applications, Elsevier, vol. 117(3), pages 333-358, March.
    3. Huiwen Yan & Zhou Yang & Fahuai Yi & Gechun Liang, 2015. "Dynkin Game of Convertible Bonds and Their Optimal Strategy," Papers 1503.08961, arXiv.org.
    4. Avner Bar-Ilan & Agnès Sulem, 1995. "Explicit Solution of Inventory Problems with Delivery Lags," Mathematics of Operations Research, INFORMS, vol. 20(3), pages 709-720, August.
    5. Bar-Ilan, Avner & Strange, William C, 1996. "Investment Lags," American Economic Review, American Economic Association, vol. 86(3), pages 610-622, June.
    6. Huiwen Yan & Gechun Liang & Zhou Yang, 2015. "Indifference Pricing and Hedging in a Multiple-Priors Model with Trading Constraints," Papers 1503.08969, arXiv.org.
    7. Bruder, Benjamin & Pham, Huyên, 2009. "Impulse control problem on finite horizon with execution delay," Stochastic Processes and their Applications, Elsevier, vol. 119(5), pages 1436-1469, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bruder, Benjamin & Pham, Huyên, 2009. "Impulse control problem on finite horizon with execution delay," Stochastic Processes and their Applications, Elsevier, vol. 119(5), pages 1436-1469, May.
    2. Gapeev, Pavel V., 2020. "On the problems of sequential statistical inference for Wiener processes with delayed observations," LSE Research Online Documents on Economics 104072, London School of Economics and Political Science, LSE Library.
    3. M’hamed Gaïgi & Idris Kharroubi & Thomas Lim, 2020. "Optimal Exploitation of a General Renewable Natural Resource under State and Delay Constraints," Mathematics, MDPI, vol. 8(11), pages 1-25, November.
    4. Pavel V. Gapeev, 2020. "On the problems of sequential statistical inference for Wiener processes with delayed observations," Statistical Papers, Springer, vol. 61(4), pages 1529-1544, August.
    5. Jukka Lempa, 2020. "Some results on optimal stopping under phase-type distributed implementation delay," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 91(3), pages 559-583, June.
    6. Aïd, René & Federico, Salvatore & Pham, Huyên & Villeneuve, Bertrand, 2015. "Explicit investment rules with time-to-build and uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 51(C), pages 240-256.
    7. Sarkar, Sudipto & Zhang, Chuanqian, 2013. "Implementation lag and the investment decision," Economics Letters, Elsevier, vol. 119(2), pages 136-140.
    8. Madlener, Reinhard & Kumbaroglu, Gurkan & Ediger, Volkan S., 2005. "Modeling technology adoption as an irreversible investment under uncertainty: the case of the Turkish electricity supply industry," Energy Economics, Elsevier, vol. 27(1), pages 139-163, January.
    9. Abadie, Luis M. & Chamorro, José M., 2009. "Monte Carlo valuation of natural gas investments," Review of Financial Economics, Elsevier, vol. 18(1), pages 10-22, January.
    10. Erhan Bayraktar & Masahiko Egami, 2010. "A unified treatment of dividend payment problems under fixed cost and implementation delays," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 71(2), pages 325-351, April.
    11. Jeon, Haejun, 2021. "Investment and financing decisions in the presence of time-to-build," European Journal of Operational Research, Elsevier, vol. 288(3), pages 1068-1084.
    12. Fredrik Armerin & Han-Suck Song, 2021. "A framework for modelling cash flow lags," SN Business & Economics, Springer, vol. 1(10), pages 1-13, October.
    13. Bar-Ilan, Avner & Perry, David & Stadje, Wolfgang, 2004. "A generalized impulse control model of cash management," Journal of Economic Dynamics and Control, Elsevier, vol. 28(6), pages 1013-1033, March.
    14. Bar-Ilan, Avner & Sulem, Agnes & Zanello, Alessandro, 2002. "Time-to-build and capacity choice," Journal of Economic Dynamics and Control, Elsevier, vol. 26(1), pages 69-98, January.
    15. Thijssen, Jacco J.J., 2015. "A model for irreversible investment with construction and revenue uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 57(C), pages 250-266.
    16. Magnus Perninge, 2018. "A limited-feedback approximation scheme for optimal switching problems with execution delays," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 87(3), pages 347-382, June.
    17. Bayraktar, Erhan & Egami, Masahiko, 2007. "The effects of implementation delay on decision-making under uncertainty," Stochastic Processes and their Applications, Elsevier, vol. 117(3), pages 333-358, March.
    18. Thijssen, Jacco J.J., 2022. "Optimal investment and abandonment decisions for projects with construction uncertainty," European Journal of Operational Research, Elsevier, vol. 298(1), pages 368-379.
    19. Dai, Min & Huang, Shan & Keppo, Jussi, 2019. "Opaque bank assets and optimal equity capital," Journal of Economic Dynamics and Control, Elsevier, vol. 100(C), pages 369-394.
    20. Sarkar, Sudipto & Zhang, Chuanqian, 2015. "Investment policy with time-to-build," Journal of Banking & Finance, Elsevier, vol. 55(C), pages 142-156.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arx:papers:1805.02909. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: arXiv administrators (email available below). General contact details of provider: http://arxiv.org/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.