WO2023236385A1 - Eurosilo intelligent device mounting apparatus and method - Google Patents

Eurosilo intelligent device mounting apparatus and method Download PDF

Info

Publication number
WO2023236385A1
WO2023236385A1 PCT/CN2022/118866 CN2022118866W WO2023236385A1 WO 2023236385 A1 WO2023236385 A1 WO 2023236385A1 CN 2022118866 W CN2022118866 W CN 2022118866W WO 2023236385 A1 WO2023236385 A1 WO 2023236385A1
Authority
WO
WIPO (PCT)
Prior art keywords
euro
equipment
trestle
warehouse
frame
Prior art date
Application number
PCT/CN2022/118866
Other languages
French (fr)
Chinese (zh)
Inventor
陈喆
尹祥宇
尤雪春
梅英宝
陈洪帅
Original Assignee
上海建工七建集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海建工七建集团有限公司 filed Critical 上海建工七建集团有限公司
Publication of WO2023236385A1 publication Critical patent/WO2023236385A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor

Definitions

  • the invention relates to the technical field of Euro warehouse equipment installation and construction, and in particular to a Euro warehouse intelligent equipment installation device and method.
  • Euro silo is a new type of silo introduced from the Netherlands for storing and handling bulk materials. It has the advantages of small footprint, large storage capacity, fully enclosed, no dust, anti-spontaneous combustion, and equipped with an intelligent management system. At the same time, There is also a lot of room for promotion in China.
  • Euro warehouse equipment as a key component of the entire Euro warehouse system, needs to be responsible for both the storage and processing of bulk materials.
  • the Euro warehouse equipment is mainly composed of a central rotating part, a winch system, a spiral side rotating trestle, an A-frame side rotating trestle, a spiral frame, an A-frame, a telescopic blanking pipe, etc., with a total weight of 220t.
  • the entire set of Euro warehouse equipment is suspended on the steel structure coal conveying trestle installed on the roof of the Euro warehouse.
  • the equipment also has the characteristics of large volume and weight and high installation accuracy requirements. Therefore, the safety, stability and high-precision control of the entire Euro warehouse equipment installation process are particularly important. Examples of successful applications in foreign countries currently use large-scale lifting equipment to hoist from outside the warehouse to the inside of the warehouse and connect them at high altitude.
  • the main purpose of the present invention is to provide an installation device and method for intelligent equipment of a Euro warehouse to solve the problem of how to achieve high-precision installation of large Euro warehouse equipment in a small construction site.
  • Hydraulic overall synchronous lifting technology is used to synchronously lift part of the Euro warehouse equipment and the steel trestle on the Euro warehouse roof into place, and the remaining equipment is installed in sequence using lifting equipment.
  • a Euro warehouse intelligent equipment installation device including:
  • Euro warehouse equipment lifting components, pre-assembled sections of steel trestles, steel trestles, tire frames, equipment moving platforms and guide rails, central rotating parts, winch systems, lifting equipment, spiral frames, telescopic blanking tubes, A-frames, A-frame side rotating trestle, spiral frame side rotating trestle, in which the steel trestle is assembled inside the Euro warehouse structure; central rotating parts, winch system, lifting equipment, spiral frame, telescopic blanking pipe, A-type frame, The A-frame side rotating trestle and the spiral frame side rotating trestle are assembled on the outside of the Euro warehouse structure.
  • the invention also provides a method for installing Euro warehouse intelligent equipment, utilizing the aforementioned Euro warehouse intelligent equipment installation device, and the method includes the following steps:
  • Step S1 Design the lifting components according to the total weight of the steel trestle, the central rotating part and the hoisting system; install the lifting components and the pre-assembled section of the steel trestle on the top ring beam of the Euro warehouse structure; install them on the inside of the Euro warehouse structure
  • Step S2 Use lifting equipment to lift the central rotating part and the hoisting system along the wall of the Euro warehouse to the equipment moving platform and guide rails for assembly, installation and leveling;
  • Step S3 Use lifting components to lift the steel trestle to the specified height after the assembly is completed;
  • Step S4 Use the equipment moving platform and guide rails to move the central rotating part and the hoisting system along the sides of the Euro warehouse structure to just below the steel trestle.
  • the center of the lifting equipment and the center of the steel trestle are leveled and aligned; the steel trestle drops back to the design height. Docking connection with the central rotating part and winch system;
  • Step S5 Use lifting components to synchronously lift the central rotating part, the hoisting system and the steel trestle to the designated elevation on the roof of the Euro warehouse structure, and connect the steel trestle to the pre-assembled section of the steel trestle;
  • Step S6 After completing the connection between the steel trestle and the pre-assembled section of the steel trestle, unload the lifting components; then use lifting equipment to lift the spiral frame into the inside of the Euro warehouse structure in three sections for installation; use lifting equipment to sequentially Hoist the telescopic drop tube, A-frame, A-frame side rotating trestle and spiral frame side rotating trestle until the Euro warehouse structure is installed.
  • step S1 also includes using lifting equipment to lift the central rotating part and the hoisting system along the warehouse wall of the Euro warehouse equipment to the equipment moving platform and guide rails, and combining the central rotating part and the hoisting system. installed together.
  • step S3 is 12.0m.
  • step S4 is 9.018m.
  • step S5 is 55.40m.
  • step S6 includes:
  • Step 1 After removing the tire frame, divide the spiral frame into three sections, and use lifting equipment to lift it along the wall of the Euro warehouse equipment to the equipment moving platform and guide rails; then use lifting equipment to lift the telescopic blanking pipe. Enter the Euro warehouse and combine it with the spiral frame; then use the equipment moving platform and guide rails to move the spiral frame and telescopic blanking pipe to the other side of the Euro warehouse; after the lifting components are unloaded, dismantle the lifting components; use lifting equipment to first Lift the A-frame into the inside of the Euro warehouse structure and complete the connection with the spiral frame; then lift the side rotating trestle of the A-frame into the top of the A-frame in the Euro warehouse structure and connect and install it with the winch system;
  • Step 2 Finally, use lifting equipment to lift the rotating trestle on the side of the spiral frame into the top of the spiral frame in the Euro warehouse structure, and connect and install it with the winch system;
  • Step 3 The entire set of Euro warehouse equipment is installed. Use the steel wire rope provided by the equipment to lift and rotate, and enter the debugging stage.
  • the present invention uses lifting components to synchronously lift the central rotating part, the hoisting system and the steel trestle into place as a whole, and the other equipment is hoisted into place in sequence.
  • This installation method of Euro warehouse equipment not only reduces the safety risks of high-altitude operations, but also meets the requirements for high installation accuracy. At the same time, it effectively saves the occupation of construction site and greatly saves the construction period and cost. It has well realized the precise installation of Euro warehouse equipment in a small construction site. It can provide new reference for subsequent similar equipment installation and construction, especially renovation projects in existing factories.
  • Figure 1 is an installation plan view of the European warehouse intelligent equipment installation device in one embodiment of the present invention
  • FIGS 2 to 7 are installation flow charts of steps S1 to S6 of the European warehouse intelligent equipment installation method in one embodiment of the present invention
  • step S6 of the European warehouse intelligent equipment installation method in one embodiment of the present invention.
  • the assembly site is divided into the outer and inner sides of the Euro warehouse structure 1.
  • the steel trestle 3 is assembled inside the Euro warehouse structure 1; the central rotating part 7, the winch system 8, the lifting equipment 9, the spiral frame 10, the telescopic drop tube 11, the A-type frame 12, and the A-type frame side rotating trestle 13 ,
  • the spiral frame side rotating trestle 14 is assembled at the site outside the Euro warehouse structure 1.
  • the lifting member 2 is designed, and the lifting member 2 and the steel trestle prefabricated section 3 are installed on the top of the Euro warehouse structure 1 On the ring beam. Then install the tire frame 5 and the equipment moving platform and guide rail 6 in the Euro warehouse structure 1. Then the central rotating part 7 and the hoisting system 8 are assembled on the outside of the Euro warehouse structure 1, and the steel trestle 4 is assembled on the tire frame 5.
  • the assembled steel trestle 4 is lifted to a height of 12.0m using the lifting member 2, and the central rotating part 7 and the hoisting system 8 are ready for movement.
  • the steel trestle 4 together with the central rotating member 7 and the hoisting system 8, are synchronously lifted to a height of 55.40m using the lifting member 2, and the steel trestle 4 is connected to the steel trestle pre-assembly section 3.
  • the lifting member 2 is dismantled.
  • the lifting equipment 9 first lift the A-type frame 12 into the inside of the Euro warehouse structure 1 and complete the connection with the spiral frame 10; then lift the A-frame side rotating trestle 13 into the inside of the Euro warehouse structure 1. Above, and connected to the hoisting system 8 for installation.
  • the spiral frame side rotating trestle 14 is hoisted into the top of the spiral frame 10 in the Euro warehouse structure 1 using the lifting equipment 9, and is connected and installed with the hoisting system 8.
  • the entire set of Euro warehouse equipment 1 is installed.
  • the equipment is lifted and rotated using its own wire rope, and the equipment enters the debugging stage.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The present invention relates to the technical field of Eurosilo device mounting construction, provides a Eurosilo intelligent device mounting apparatus and method, and aims to solve the problem of how to realize high-precision mounting of large Eurosilo devices in small construction sites. The mounting apparatus comprises a Eurosilo device, lifting members, steel trestle preassembled sections, a steel trestle, a jig, a device moving platform and guide rail, a central rotating piece, a winching system, a hoisting device, a spiral frame, a telescopic blanking pipe, an A-shaped frame, an A-shaped frame side rotating trestle, and a spiral frame side rotating trestle, wherein the steel trestle is assembled inside a Eurosilo structure; the central rotating piece, the winching system, the hoisting device, the spiral frame, the telescopic blanking pipe, the A-shaped frame, the A-shaped frame side rotating trestle, and the spiral frame side rotating trestle are assembled at a site outside the Eurosilo structure. By using the lifting members, the central rotating piece, the winching system, and the steel trestle are integrally and synchronously lifted in place, and the other devices are sequentially hoisted in place.

Description

一种欧罗仓智能化设备安装装置及方法A kind of Euro warehouse intelligent equipment installation device and method 技术领域Technical field
本发明涉及欧罗仓设备安装施工技术领域,具体涉及一种欧罗仓智能化设备安装装置及方法。The invention relates to the technical field of Euro warehouse equipment installation and construction, and in particular to a Euro warehouse intelligent equipment installation device and method.
背景技术Background technique
欧罗仓是由荷兰引进的一种新型的用于存储和处理散装物料的新型筒仓,具有占地面积小、储量大、全封闭、无扬尘、防自燃、配备智能管理系统等优点,同时在国内也具有很大的推广空间。在欧罗仓整个系统中,欧罗仓设备作为整个欧罗仓系统的关键组成部分,既需要承担散装物料的存储,又需要承担散装物料的处理。欧罗仓设备主要由中心旋转件、卷扬系统、螺旋侧旋转栈桥、A型框架侧旋转栈桥、螺旋框架、A型框架、伸缩落料管等组成,共重220t。整套欧罗仓设备是悬挂于设置在欧罗仓屋面的钢结构输煤栈桥之上,同时设备也具有体积重量大,安装精度要求高等特点。因此整套欧罗仓设备安装过程的安全稳定,高精度控制尤为重要。国外目前已成功应用的实例,均为利用大型起重设备,由仓外向仓内进行吊装,并在高空进行连接。Euro silo is a new type of silo introduced from the Netherlands for storing and handling bulk materials. It has the advantages of small footprint, large storage capacity, fully enclosed, no dust, anti-spontaneous combustion, and equipped with an intelligent management system. At the same time, There is also a lot of room for promotion in China. In the entire Euro warehouse system, Euro warehouse equipment, as a key component of the entire Euro warehouse system, needs to be responsible for both the storage and processing of bulk materials. The Euro warehouse equipment is mainly composed of a central rotating part, a winch system, a spiral side rotating trestle, an A-frame side rotating trestle, a spiral frame, an A-frame, a telescopic blanking pipe, etc., with a total weight of 220t. The entire set of Euro warehouse equipment is suspended on the steel structure coal conveying trestle installed on the roof of the Euro warehouse. At the same time, the equipment also has the characteristics of large volume and weight and high installation accuracy requirements. Therefore, the safety, stability and high-precision control of the entire Euro warehouse equipment installation process are particularly important. Examples of successful applications in foreign countries currently use large-scale lifting equipment to hoist from outside the warehouse to the inside of the warehouse and connect them at high altitude.
然而,国外已成功应用的实例,多为新建厂区内施工或施工场地条件较大的情况。目前国内多涉及到既有厂区内区域的改建更新,施工场地较为狭小,不能直接采用国外流行的大型起重设备吊装的方法。同时,大面积的采用大型起重设备高空吊装的方法,还存在安全风险系数更大,场地占用较多等问题。However, the examples that have been successfully applied abroad are mostly construction in newly built factories or situations where construction site conditions are relatively high. At present, most of the projects in China involve the renovation and renovation of existing factory areas. The construction site is relatively small, and the hoisting method of large-scale lifting equipment popular abroad cannot be directly used. At the same time, the high-altitude hoisting method of large-scale lifting equipment also has problems such as greater safety risks and more space occupied.
公开于该背景技术部分的信息仅仅旨在增加对本发明的总体背景的理解,而不应当视为承认或以任何形式暗示该信息为本领域一般技术人员所公知的现有技术。The information disclosed in this Background section is merely intended to enhance an understanding of the general background of the invention and should not be construed as an admission or in any way implying that the information is prior art to a person of ordinary skill in the art.
发明内容Contents of the invention
本发明的主要目的在于提供一种欧罗仓智能化设备安装装置和方法,解决如何实现狭小施工场地中大型欧罗仓设备高精度安装的问题。利用液压整体同步提升技术,将部分欧罗仓设备与欧罗仓屋面的钢栈桥同步提升就位,其余设备利用起重设备依次安装就位。The main purpose of the present invention is to provide an installation device and method for intelligent equipment of a Euro warehouse to solve the problem of how to achieve high-precision installation of large Euro warehouse equipment in a small construction site. Hydraulic overall synchronous lifting technology is used to synchronously lift part of the Euro warehouse equipment and the steel trestle on the Euro warehouse roof into place, and the remaining equipment is installed in sequence using lifting equipment.
为了实现上述目的,本发明的技术方案是:In order to achieve the above objects, the technical solution of the present invention is:
一种欧罗仓智能化设备安装装置,包括:A Euro warehouse intelligent equipment installation device, including:
欧罗仓设备、提升构件、钢栈桥预装段、钢栈桥、胎架、设备移动平台与导轨、中心旋转件、卷扬系统、起重设备、螺旋框架、伸缩落料管、A型框架、A型框架侧旋转栈桥、螺旋框架侧旋转栈桥,其中,钢栈桥在欧罗仓结构内侧进行拼装;中心旋转件、卷扬系统、起重设备、螺旋框架、伸缩落料管、A型框架、A型框架侧旋转栈桥以及螺旋框架侧旋转栈桥在欧罗仓结构外侧场地进行拼装。Euro warehouse equipment, lifting components, pre-assembled sections of steel trestles, steel trestles, tire frames, equipment moving platforms and guide rails, central rotating parts, winch systems, lifting equipment, spiral frames, telescopic blanking tubes, A-frames, A-frame side rotating trestle, spiral frame side rotating trestle, in which the steel trestle is assembled inside the Euro warehouse structure; central rotating parts, winch system, lifting equipment, spiral frame, telescopic blanking pipe, A-type frame, The A-frame side rotating trestle and the spiral frame side rotating trestle are assembled on the outside of the Euro warehouse structure.
本发明还提供了一种欧罗仓智能化设备安装方法,利用前述的欧罗仓智能化设备安装装置,所述方法包括如下步骤:The invention also provides a method for installing Euro warehouse intelligent equipment, utilizing the aforementioned Euro warehouse intelligent equipment installation device, and the method includes the following steps:
步骤S1、根据钢栈桥、中心旋转件以及卷扬系统的总重量,设计提升构件;将提升构件和钢栈桥预装段安装在欧罗仓结构顶部压顶环梁上;在欧罗仓结构内侧安装胎架、设备移动平台与导轨;胎架安装完成后,在胎架上进行钢栈桥整体拼装;同时,在欧罗仓结构外侧进行欧罗仓设备各个主要部件的分段组装;Step S1: Design the lifting components according to the total weight of the steel trestle, the central rotating part and the hoisting system; install the lifting components and the pre-assembled section of the steel trestle on the top ring beam of the Euro warehouse structure; install them on the inside of the Euro warehouse structure The tire frame, equipment moving platform and guide rails; after the tire frame is installed, the steel trestle is assembled on the tire frame as a whole; at the same time, the main components of the Euro warehouse equipment are assembled in sections on the outside of the Euro warehouse structure;
步骤S2、利用起重设备,将中心旋转件与卷扬系统沿欧罗仓仓壁吊至设备移动平台与导轨上进行组合安装并调平;Step S2: Use lifting equipment to lift the central rotating part and the hoisting system along the wall of the Euro warehouse to the equipment moving platform and guide rails for assembly, installation and leveling;
步骤S3、采用提升构件将钢栈桥拼装完成后整体提升至指定高度;Step S3: Use lifting components to lift the steel trestle to the specified height after the assembly is completed;
步骤S4、利用设备移动平台与导轨将中心旋转件和卷扬系统沿欧罗仓结构边侧移动至钢栈桥正下方,起重设备中心与钢栈桥中心调平对齐;钢栈桥 回落至设计高度,与中心旋转件和卷扬系统进行对接连接;Step S4: Use the equipment moving platform and guide rails to move the central rotating part and the hoisting system along the sides of the Euro warehouse structure to just below the steel trestle. The center of the lifting equipment and the center of the steel trestle are leveled and aligned; the steel trestle drops back to the design height. Docking connection with the central rotating part and winch system;
步骤S5、采用提升构件将中心旋转件、卷扬系统以及钢栈桥同步提升至欧罗仓结构仓顶指定标高,并将钢栈桥与钢栈桥预装段进行连接;Step S5: Use lifting components to synchronously lift the central rotating part, the hoisting system and the steel trestle to the designated elevation on the roof of the Euro warehouse structure, and connect the steel trestle to the pre-assembled section of the steel trestle;
步骤S6、完成钢栈桥和钢栈桥预装段的连接后,进行提升构件卸载;然后利用起重设备,将螺旋框架分三段依次吊入欧罗仓结构内侧进行安装;利用起重设备,依次吊装伸缩落料管、A型框架、A型框架侧旋转栈桥以及螺旋框架侧旋转栈桥,直至完成欧罗仓结构安装。Step S6: After completing the connection between the steel trestle and the pre-assembled section of the steel trestle, unload the lifting components; then use lifting equipment to lift the spiral frame into the inside of the Euro warehouse structure in three sections for installation; use lifting equipment to sequentially Hoist the telescopic drop tube, A-frame, A-frame side rotating trestle and spiral frame side rotating trestle until the Euro warehouse structure is installed.
进一步地,所述步骤S1还包括利用起重设备将中心旋转件和卷扬系统,沿欧罗仓设备的仓壁,吊至设备移动平台与导轨上,并将中心旋转件与卷扬系统组合安装在一起。Further, the step S1 also includes using lifting equipment to lift the central rotating part and the hoisting system along the warehouse wall of the Euro warehouse equipment to the equipment moving platform and guide rails, and combining the central rotating part and the hoisting system. installed together.
进一步地,所述步骤S3的指定高度为12.0m。Further, the designated height of step S3 is 12.0m.
进一步地,所述步骤S4的设计高度为9.018m.Further, the design height of step S4 is 9.018m.
进一步地,所述步骤S5的指定标高为55.40m。Further, the designated altitude in step S5 is 55.40m.
进一步地,所述步骤S6包括:Further, the step S6 includes:
步骤一:拆除胎架后将螺旋框架分三段,并利用起重设备,沿欧罗仓设备仓壁,吊至设备移动平台与导轨之上;随后利用起重设备,将伸缩落料管吊入欧罗仓仓内,与螺旋框架进行组合;然后利用设备移动平台与导轨将螺旋框架、伸缩落料管移动至欧罗仓另一侧;提升构件卸载后,拆除提升构件;利用起重设备,先将A型框架吊入欧罗仓结构内侧,与螺旋框架完成连接;随后将A型框架侧旋转栈桥吊入欧罗仓结构内A型框架的上方,与卷扬系统进行连接安装;Step 1: After removing the tire frame, divide the spiral frame into three sections, and use lifting equipment to lift it along the wall of the Euro warehouse equipment to the equipment moving platform and guide rails; then use lifting equipment to lift the telescopic blanking pipe. Enter the Euro warehouse and combine it with the spiral frame; then use the equipment moving platform and guide rails to move the spiral frame and telescopic blanking pipe to the other side of the Euro warehouse; after the lifting components are unloaded, dismantle the lifting components; use lifting equipment to first Lift the A-frame into the inside of the Euro warehouse structure and complete the connection with the spiral frame; then lift the side rotating trestle of the A-frame into the top of the A-frame in the Euro warehouse structure and connect and install it with the winch system;
步骤二:最后利用起重设备将螺旋框架侧旋转栈桥吊入欧罗仓结构内螺旋框架的上方,与卷扬系统进行连接安装;Step 2: Finally, use lifting equipment to lift the rotating trestle on the side of the spiral frame into the top of the spiral frame in the Euro warehouse structure, and connect and install it with the winch system;
步骤三:整套欧罗仓设备安装完成,利用设备自带钢丝绳,进行起升、转动,进入调试阶段。Step 3: The entire set of Euro warehouse equipment is installed. Use the steel wire rope provided by the equipment to lift and rotate, and enter the debugging stage.
与现有技术相比,本发明有益的技术效果在于:Compared with the existing technology, the beneficial technical effects of the present invention are:
本发明通过利用提升构件,将中心旋转件、卷扬系统与钢栈桥整体同步提升就位,其余设备按顺序依次吊装就位。此欧罗仓设备安装方法,既降低了高空作业安全风险,也满足了高安装精度的要求。同时有效节约了施工场地占用,也大大节约了工期和成本。很好的实现了狭小施工场地内,欧罗仓设备的精准就位安装。可为对后续类似的设备安装施工,特别是既有厂区内改造类工程,提供新的参考。The present invention uses lifting components to synchronously lift the central rotating part, the hoisting system and the steel trestle into place as a whole, and the other equipment is hoisted into place in sequence. This installation method of Euro warehouse equipment not only reduces the safety risks of high-altitude operations, but also meets the requirements for high installation accuracy. At the same time, it effectively saves the occupation of construction site and greatly saves the construction period and cost. It has well realized the precise installation of Euro warehouse equipment in a small construction site. It can provide new reference for subsequent similar equipment installation and construction, especially renovation projects in existing factories.
附图说明Description of the drawings
图1为本发明一实施例中欧罗仓智能化设备安装装置的安装平面图;Figure 1 is an installation plan view of the European warehouse intelligent equipment installation device in one embodiment of the present invention;
图2至图7为本发明一实施例中欧罗仓智能化设备安装方法步骤S1~S6的安装流程图;Figures 2 to 7 are installation flow charts of steps S1 to S6 of the European warehouse intelligent equipment installation method in one embodiment of the present invention;
图8至图10为本发明一实施例中欧罗仓智能化设备安装方法步骤S6的安装流程图。8 to 10 are installation flow charts of step S6 of the European warehouse intelligent equipment installation method in one embodiment of the present invention.
图中:In the picture:
欧罗仓设备-1,提升构件-2,钢栈桥预装段-3,钢栈桥-4,胎架-5,设备移动平台与导轨-6,中心旋转件-7,卷扬系统-8,起重设备-9,螺旋框架-10,伸缩落料管-11,A型框架-12,A型框架侧旋转栈桥-13,螺旋框架侧旋转栈桥-14。Euro warehouse equipment-1, lifting components-2, steel trestle pre-assembly section-3, steel trestle-4, tire frame-5, equipment moving platform and guide rail-6, central rotating part-7, winch system-8, Lifting equipment - 9, spiral frame - 10, telescopic drop tube - 11, A-frame - 12, A-frame side rotating trestle - 13, spiral frame side rotating trestle - 14.
具体实施方式Detailed ways
以下结合附图和具体实施例对本发明提出的欧罗仓智能化设备安装装置及方法作进一步详细说明。根据下面说明,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。为叙述方便,下文中所述的“上”、“下”与附图的上、下的方向一致,但这不能成为本发明技术方案的限制。The Euro warehouse intelligent equipment installation device and method proposed by the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer from the following description. It should be noted that the drawings are in a very simplified form and use imprecise proportions, and are only used to conveniently and clearly assist in explaining the embodiments of the present invention. For the convenience of description, the "upper" and "lower" mentioned below are consistent with the upward and downward directions in the drawings, but this cannot be a limitation of the technical solution of the present invention.
实施例一Embodiment 1
下面结合图1至图10,详细说明本发明的欧罗仓智能化设备安装方法。The installation method of the Euro warehouse intelligent equipment of the present invention will be described in detail below with reference to Figures 1 to 10 .
如图1所示,拼装场地分为欧罗仓结构1外侧与内侧。钢栈桥3在欧罗仓结构1内侧进行拼装;中心旋转件7、卷扬系统8、起重设备9、螺旋框架10、伸缩落料管11、A型框架12、A型框架侧旋转栈桥13、螺旋框架侧旋转栈桥14在欧罗仓结构1外侧场地进行拼装。As shown in Figure 1, the assembly site is divided into the outer and inner sides of the Euro warehouse structure 1. The steel trestle 3 is assembled inside the Euro warehouse structure 1; the central rotating part 7, the winch system 8, the lifting equipment 9, the spiral frame 10, the telescopic drop tube 11, the A-type frame 12, and the A-type frame side rotating trestle 13 , The spiral frame side rotating trestle 14 is assembled at the site outside the Euro warehouse structure 1.
如图2所示,首先根据钢栈桥4、中心旋转件7、卷扬系统8的总重量,设计提升构件2,并将提升构件2和钢栈桥预装段3安装于欧罗仓结构1顶部环梁上。然后在欧罗仓结构1内安装胎架5和设备移动平台与导轨6。随后在欧罗仓结构1外侧组装中心旋转件7、卷扬系统8,在胎架5之上拼装钢栈桥4。As shown in Figure 2, firstly, according to the total weight of the steel trestle 4, the central rotating part 7, and the hoisting system 8, the lifting member 2 is designed, and the lifting member 2 and the steel trestle prefabricated section 3 are installed on the top of the Euro warehouse structure 1 On the ring beam. Then install the tire frame 5 and the equipment moving platform and guide rail 6 in the Euro warehouse structure 1. Then the central rotating part 7 and the hoisting system 8 are assembled on the outside of the Euro warehouse structure 1, and the steel trestle 4 is assembled on the tire frame 5.
如图3所示,利用起重设备9将中心旋转件7、卷扬系统8,沿欧罗仓结构1仓壁吊至设备移动平台与导轨6之上,并将中心旋转件7与卷扬系统8组合安装在一起。As shown in Figure 3, use the lifting equipment 9 to lift the central rotating part 7 and the winch system 8 along the wall of the Euro warehouse structure 1 to the equipment moving platform and the guide rail 6, and lift the central rotating part 7 and the winch System 8 combinations are installed together.
如图4所示,将拼装完成的钢栈桥4利用提升构件2提升至12.0m的高度,中心旋转件7与卷扬系统8做好移动准备。As shown in Figure 4, the assembled steel trestle 4 is lifted to a height of 12.0m using the lifting member 2, and the central rotating part 7 and the hoisting system 8 are ready for movement.
如图5所示,将中心旋转件7、卷扬系统8利用设备移动平台与导轨6沿欧罗仓结构1边侧移动至钢栈桥4正下方,与中心旋转件7、卷扬系统8调平,同时与钢栈桥4的中心对齐;钢栈桥4回落至9.018m的高度,同中心旋转件7及卷扬系统8完成对接连接。As shown in Figure 5, move the central rotating part 7 and the hoisting system 8 along the side of the Euro warehouse structure 1 to just below the steel trestle 4 using the equipment moving platform and the guide rail 6, and adjust them with the central rotating part 7 and the hoisting system 8. flat, and at the same time aligned with the center of the steel trestle 4; the steel trestle 4 drops back to a height of 9.018m, and completes the butt connection with the central rotating part 7 and the winch system 8.
如图6所示,钢栈桥4连同中心旋转件7、卷扬系统8利用提升构件2整体同步提升至55.40m的高度,并将钢栈桥4与钢栈桥预装段3进行连接。As shown in Figure 6, the steel trestle 4, together with the central rotating member 7 and the hoisting system 8, are synchronously lifted to a height of 55.40m using the lifting member 2, and the steel trestle 4 is connected to the steel trestle pre-assembly section 3.
如图7所示,拆除胎架5,随后将螺旋框架10分三段,利用起重设备9,沿欧罗仓结构1仓壁吊至设备移动平台与导轨6之上,随后将伸缩落料管11利用起重设备9,吊入欧罗仓结构1之内,与螺旋框架10进行组合。然后利用设备移动平台与导轨6将螺旋框架10、伸缩落料管11移动至欧罗仓结构1另一侧。As shown in Figure 7, remove the tire frame 5, and then divide the spiral frame 10 into three sections. Use the lifting equipment 9 to lift it along the wall of the Euro warehouse structure 1 to the equipment moving platform and guide rail 6, and then telescopically blank the material. The pipe 11 is hoisted into the Euro warehouse structure 1 using the lifting equipment 9 and assembled with the spiral frame 10 . Then the equipment moving platform and guide rails 6 are used to move the spiral frame 10 and telescopic drop tube 11 to the other side of the Euro warehouse structure 1 .
如图8所示,提升构件2卸载后,拆除提升构件2。利用起重设备9,先将A型框架12吊入欧罗仓结构1内侧,与螺旋框架10完成连接;随后将A型 框架侧旋转栈桥13吊入欧罗仓结构1内A型框架12的上方,并与卷扬系统8进行连接安装。As shown in Figure 8, after the lifting member 2 is unloaded, the lifting member 2 is dismantled. Using the lifting equipment 9, first lift the A-type frame 12 into the inside of the Euro warehouse structure 1 and complete the connection with the spiral frame 10; then lift the A-frame side rotating trestle 13 into the inside of the Euro warehouse structure 1. Above, and connected to the hoisting system 8 for installation.
如图9所示,利用起重设备9将螺旋框架侧旋转栈桥14吊入欧罗仓结构1内螺旋框架10的上方,并与卷扬系统8进行连接安装。As shown in Figure 9, the spiral frame side rotating trestle 14 is hoisted into the top of the spiral frame 10 in the Euro warehouse structure 1 using the lifting equipment 9, and is connected and installed with the hoisting system 8.
如图10所示,整套欧罗仓设备1安装完成,利用设备自带钢丝绳,进行起升、转动,进入调试阶段。As shown in Figure 10, the entire set of Euro warehouse equipment 1 is installed. The equipment is lifted and rotated using its own wire rope, and the equipment enters the debugging stage.
上述描述仅是对本发明较佳实施例的描述,并非对本发明范围的任何限定。本领域的技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求的保护范围。The above description is only a description of the preferred embodiments of the present invention and does not limit the scope of the present invention in any way. Any changes or modifications made by those skilled in the art based on the above disclosure shall fall within the protection scope of the claims.

Claims (7)

  1. 一种欧罗仓智能化设备安装装置,其特征在于,包括:An intelligent equipment installation device for Euro warehouse, which is characterized by including:
    欧罗仓设备、提升构件、钢栈桥预装段、钢栈桥、胎架、设备移动平台与导轨、中心旋转件、卷扬系统、起重设备、螺旋框架、伸缩落料管、A型框架、A型框架侧旋转栈桥、螺旋框架侧旋转栈桥,其中,钢栈桥在欧罗仓结构内侧进行拼装;中心旋转件、卷扬系统、起重设备、螺旋框架、伸缩落料管、A型框架、A型框架侧旋转栈桥以及螺旋框架侧旋转栈桥在欧罗仓结构外侧场地进行拼装。Euro warehouse equipment, lifting components, pre-assembled sections of steel trestles, steel trestles, tire frames, equipment moving platforms and guide rails, central rotating parts, winch systems, lifting equipment, spiral frames, telescopic blanking tubes, A-frames, A-frame side rotating trestle, spiral frame side rotating trestle, in which the steel trestle is assembled inside the Euro warehouse structure; central rotating parts, winch system, lifting equipment, spiral frame, telescopic blanking pipe, A-type frame, The A-frame side rotating trestle and the spiral frame side rotating trestle are assembled on the outside of the Euro warehouse structure.
  2. 一种欧罗仓智能化设备安装方法,其特征在于,利用权利要求1所述的欧罗仓智能化设备安装装置,所述方法包括如下步骤:A method for installing Euro warehouse intelligent equipment, characterized by utilizing the Euro warehouse intelligent equipment installation device according to claim 1, and the method includes the following steps:
    步骤S1、根据钢栈桥、中心旋转件以及卷扬系统的总重量,设计提升构件;将提升构件和钢栈桥预装段安装在欧罗仓结构顶部压顶环梁上;在欧罗仓结构内侧安装胎架、设备移动平台与导轨;胎架安装完成后,在胎架上进行钢栈桥整体拼装;同时,在欧罗仓结构外侧进行欧罗仓设备各个主要部件的分段组装;Step S1: Design the lifting components according to the total weight of the steel trestle, the central rotating part and the hoisting system; install the lifting components and the pre-assembled section of the steel trestle on the top ring beam of the Euro warehouse structure; install them on the inside of the Euro warehouse structure The tire frame, equipment moving platform and guide rails; after the tire frame is installed, the steel trestle is assembled on the tire frame as a whole; at the same time, the main components of the Euro warehouse equipment are assembled in sections on the outside of the Euro warehouse structure;
    步骤S2、利用起重设备,将中心旋转件与卷扬系统沿欧罗仓仓壁吊至设备移动平台与导轨上进行组合安装并调平;Step S2: Use lifting equipment to lift the central rotating part and the hoisting system along the wall of the Euro warehouse to the equipment moving platform and guide rails for assembly, installation and leveling;
    步骤S3、采用提升构件将钢栈桥拼装完成后整体提升至指定高度;Step S3: Use lifting components to lift the steel trestle to the specified height after the assembly is completed;
    步骤S4、利用设备移动平台与导轨将中心旋转件和卷扬系统沿欧罗仓结构边侧移动至钢栈桥正下方,起重设备中心与钢栈桥中心调平对齐;钢栈桥回落至设计高度,与中心旋转件和卷扬系统进行对接连接;Step S4: Use the equipment moving platform and guide rails to move the central rotating part and the hoisting system along the sides of the Euro warehouse structure to just below the steel trestle. The center of the lifting equipment and the center of the steel trestle are leveled and aligned; the steel trestle drops back to the design height. Docking connection with the central rotating part and winch system;
    步骤S5、采用提升构件将中心旋转件、卷扬系统以及钢栈桥同步提升至欧罗仓结构仓顶指定标高,并将钢栈桥与钢栈桥预装段进行连接;Step S5: Use lifting components to synchronously lift the central rotating part, the hoisting system and the steel trestle to the designated elevation on the roof of the Euro warehouse structure, and connect the steel trestle to the pre-assembled section of the steel trestle;
    步骤S6、完成钢栈桥和钢栈桥预装段的连接后,进行提升构件卸载;然后利用起重设备,将螺旋框架分三段依次吊入欧罗仓结构内侧进行安装; 利用起重设备,依次吊装伸缩落料管、A型框架、A型框架侧旋转栈桥以及螺旋框架侧旋转栈桥,直至完成欧罗仓结构安装。Step S6: After completing the connection between the steel trestle and the pre-assembled section of the steel trestle, unload the lifting components; then use the lifting equipment to lift the spiral frame into the inside of the Euro warehouse structure in three sections for installation; use the lifting equipment, in sequence Hoist the telescopic drop tube, A-frame, A-frame side rotating trestle and spiral frame side rotating trestle until the Euro warehouse structure is installed.
  3. 根据权利要求2所述的安装方法,其特征在于,所述步骤S1还包括利用起重设备将中心旋转件和卷扬系统,沿欧罗仓设备的仓壁,吊至设备移动平台与导轨上,并将中心旋转件与卷扬系统组合安装在一起。The installation method according to claim 2, characterized in that step S1 also includes using lifting equipment to lift the central rotating member and the hoisting system along the wall of the Euro warehouse equipment to the equipment moving platform and guide rails. , and install the central rotating part and the winch system together.
  4. 根据权利要求2所述的安装方法,其特征在于,所述步骤S3的指定高度为12.0m。The installation method according to claim 2, characterized in that the designated height of step S3 is 12.0m.
  5. 根据权利要求2所述的安装方法,其特征在于,所述步骤S4的设计高度为9.018m.The installation method according to claim 2, characterized in that the design height of step S4 is 9.018m.
  6. 根据权利要求2所述的安装方法,其特征在于,所述步骤S5的指定标高为55.40m。The installation method according to claim 2, characterized in that the designated elevation of step S5 is 55.40m.
  7. 根据权利要求2所述的安装方法,其特征在于,所述步骤S6包括:The installation method according to claim 2, characterized in that step S6 includes:
    步骤一:拆除胎架后将螺旋框架分三段,并利用起重设备,沿欧罗仓设备仓壁,吊至设备移动平台与导轨之上;随后利用起重设备,将伸缩落料管吊入欧罗仓仓内,与螺旋框架进行组合;然后利用设备移动平台与导轨将螺旋框架、伸缩落料管移动至欧罗仓另一侧;提升构件卸载后,拆除提升构件;利用起重设备,先将A型框架吊入欧罗仓结构内侧,与螺旋框架完成连接;随后将A型框架侧旋转栈桥吊入欧罗仓结构内A型框架的上方,与卷扬系统进行连接安装;Step 1: After removing the tire frame, divide the spiral frame into three sections, and use lifting equipment to lift it along the wall of the Euro warehouse equipment to the equipment moving platform and guide rails; then use lifting equipment to lift the telescopic blanking pipe. Enter the Euro warehouse and combine it with the spiral frame; then use the equipment moving platform and guide rails to move the spiral frame and telescopic blanking pipe to the other side of the Euro warehouse; after the lifting components are unloaded, dismantle the lifting components; use lifting equipment to first Lift the A-frame into the inside of the Euro warehouse structure and complete the connection with the spiral frame; then lift the side rotating trestle of the A-frame into the top of the A-frame in the Euro warehouse structure and connect and install it with the winch system;
    步骤二:最后利用起重设备将螺旋框架侧旋转栈桥吊入欧罗仓结构内螺旋框架的上方,与卷扬系统进行连接安装;Step 2: Finally, use lifting equipment to lift the rotating trestle on the side of the spiral frame into the top of the spiral frame in the Euro warehouse structure, and connect and install it with the winch system;
    步骤三:整套欧罗仓设备安装完成,利用设备自带钢丝绳,进行起升、转动,进入调试阶段。Step 3: The entire set of Euro warehouse equipment is installed. Use the steel wire rope provided by the equipment to lift and rotate, and enter the debugging stage.
PCT/CN2022/118866 2022-06-06 2022-09-15 Eurosilo intelligent device mounting apparatus and method WO2023236385A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202210627076.1A CN115196523B (en) 2022-06-06 2022-06-06 Euro bin intelligent equipment installation device and method
CN202210627076.1 2022-06-06

Publications (1)

Publication Number Publication Date
WO2023236385A1 true WO2023236385A1 (en) 2023-12-14

Family

ID=83576844

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/118866 WO2023236385A1 (en) 2022-06-06 2022-09-15 Eurosilo intelligent device mounting apparatus and method

Country Status (2)

Country Link
CN (1) CN115196523B (en)
WO (1) WO2023236385A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218628A (en) * 1995-02-14 1996-08-27 Ohbayashi Corp Construction of roof for cylindrical structure
JPH1077749A (en) * 1996-09-04 1998-03-24 Tomoe Corp Roof constructing method for tower-shaped structure
WO2019072992A1 (en) * 2017-10-11 2019-04-18 Egavic Serveis d'Enginyeria, S.L. A silo and process for transporting and assembling said silo
CN113044610A (en) * 2021-03-29 2021-06-29 华能国际电力股份有限公司上海石洞口第一电厂 Little fog dust suppression device for coal storage Euro storehouse
CN214786109U (en) * 2021-01-05 2021-11-19 郑州一建集团有限公司 Guiding device for assembling conical-top umbrella-frame type steel truss of squat silo
CN113738122A (en) * 2021-08-27 2021-12-03 中国二十冶集团有限公司 Mounting method of circular silo steel structure

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619376B (en) * 2012-04-18 2015-04-08 二十三冶建设集团有限公司 Method for installing inner barrel of reinforced concrete tail gas chimney and lifting system for method
CN105041030B (en) * 2015-06-24 2017-10-31 中冶天工上海十三冶建设有限公司 A kind of installation method of pin-connected panel warehouse
CN105133506B (en) * 2015-09-11 2016-09-14 中铁四局集团有限公司 Steel trestle construction method and facility combining impact drill limiting pore-forming implantation with crawler crane
CN206032726U (en) * 2016-07-26 2017-03-22 中煤西安设计工程有限责任公司 Modular pipe truss coal transporting trestle
CN108590322A (en) * 2017-12-20 2018-09-28 中冶天工集团有限公司 A kind of method of free-standing steel chimney upside-down method of hull-section construction assembling segmental hoisting
CN110805448A (en) * 2019-10-31 2020-02-18 中铁二局集团有限公司 Construction method for belt storage bin framework in horizontal belt conveyor tunnel
CN111236315A (en) * 2020-03-26 2020-06-05 沈阳促晋科技有限公司 Oval-shaped utility tunnel in variable storehouse of assembled
CN111779286A (en) * 2020-07-24 2020-10-16 中冶建工集团重庆钢结构有限公司 Construction method for assembling planar truss on site

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218628A (en) * 1995-02-14 1996-08-27 Ohbayashi Corp Construction of roof for cylindrical structure
JPH1077749A (en) * 1996-09-04 1998-03-24 Tomoe Corp Roof constructing method for tower-shaped structure
WO2019072992A1 (en) * 2017-10-11 2019-04-18 Egavic Serveis d'Enginyeria, S.L. A silo and process for transporting and assembling said silo
CN214786109U (en) * 2021-01-05 2021-11-19 郑州一建集团有限公司 Guiding device for assembling conical-top umbrella-frame type steel truss of squat silo
CN113044610A (en) * 2021-03-29 2021-06-29 华能国际电力股份有限公司上海石洞口第一电厂 Little fog dust suppression device for coal storage Euro storehouse
CN113738122A (en) * 2021-08-27 2021-12-03 中国二十冶集团有限公司 Mounting method of circular silo steel structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ZHE CHEN: "Installation of Bulk Material Storage Equipment in Eurosilo", BUILDING CONSTRUCTION., CHINA CONSTRUCTION SECOND ENGINEERING BUREAU CO., LTD. SOUTH CHINA BRANCH, SHENZHEN, GUANGDONG 518048, vol. 44, no. 6, 25 June 2022 (2022-06-25), pages 1293 - 1297, XP093113934, ISSN: 1004-1001, DOI: 10.14144/j.cnki.jzsg.2022.06.042 *

Also Published As

Publication number Publication date
CN115196523A (en) 2022-10-18
CN115196523B (en) 2023-11-10

Similar Documents

Publication Publication Date Title
CN111042539B (en) Single-point support installation construction method for large-span steel structure truss
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN109057309B (en) Suspension type operating platform and assembling and disassembling method thereof
CN214882985U (en) Bridge assembled rapid construction platform
CN113944363A (en) Ultrahigh chimney barrel and liner synchronous construction platform and method
CN210263867U (en) Climb a passageway plate turnover
WO2023236385A1 (en) Eurosilo intelligent device mounting apparatus and method
CN112554577B (en) Construction method of large-diameter thick-wall continuous Y-shaped steel pipe column
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN220723383U (en) Adjusting mechanism for tower crane wall-attached supporting platform
CN209369277U (en) Mounting platform is used in daylighting top steel construction
CN209704036U (en) Large-span truss segmental hoisting high-altitude closes up measure device
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN105239804A (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN110453836A (en) inclined glass curtain wall mounting system and mounting method
CN213204913U (en) Modular prefabricated staircase operation platform
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
JP2002097819A (en) Method and device for assembling transmission tower
CN108979152A (en) Fetal membrane and its construction method for the high-altitude segmented assembly of large span steel truss
CN106368434A (en) Supporting device for pumping tube of concrete pumping equipment and construction method
CN211114774U (en) Mounting tool for erecting external scaffold
CN112160608A (en) Lifting and mounting method for high-altitude full-transparent steel ring gallery
CN220564092U (en) Construction and lifting device for refractory bricks in shaft lime kiln
CN202787927U (en) Van-type protective full-automatic lifting construction platform
CN110424808A (en) A kind of covering construction method of steel construction indirect cool tower

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22945518

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 11202403428S

Country of ref document: SG