CN105239804A - Assembly and lift-erecting method of indirect air-cooling system stretching platforms - Google Patents

Assembly and lift-erecting method of indirect air-cooling system stretching platforms Download PDF

Info

Publication number
CN105239804A
CN105239804A CN201510552349.0A CN201510552349A CN105239804A CN 105239804 A CN105239804 A CN 105239804A CN 201510552349 A CN201510552349 A CN 201510552349A CN 105239804 A CN105239804 A CN 105239804A
Authority
CN
China
Prior art keywords
internode
broadening platform
unit
broadening
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510552349.0A
Other languages
Chinese (zh)
Other versions
CN105239804B (en
Inventor
黄正斌
李军
刘慧兰
兰京成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201510552349.0A priority Critical patent/CN105239804B/en
Publication of CN105239804A publication Critical patent/CN105239804A/en
Application granted granted Critical
Publication of CN105239804B publication Critical patent/CN105239804B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an assembly and lift-erecting method of an indirect air-cooling system stretching platforms. The method includes the steps of preparing before lifting; assembling stretching platforms of inter-joint units and stretching platforms of ex-joint units, and fixing slanting supports to lower portions of the stretching platforms of the inter-joint units; lifting the stretching platforms of the inter-joint units to an erection elevation, adjusting slant of the stretching platforms of the inter-joint units, and then welding the stretching platforms to tower body X-column embedded parts of an intercooling tower; adjusting the angle of the slanting supports with a lifting appliance, and welding the slanting supports to the tower body X-column embedded parts; in correspondence to the position between every two adjacent X-columns of an intercooling tower body, lifting the stretching platforms of the ex-joint units until lifting of the stretching platforms of the ex-joint units is complete; fixedly welding the stretching platforms of the adjacent inter-joint units to the stretching platforms of the ex-joint units. The ground assembly is easily operable, connecting is convenient, adjusting is convenient, danger coefficient is low, and safety is better guaranteed. The lifting cost is low, arrangement of little labor is required, and economic benefit is improved.

Description

A kind of indirect air cooling system broadening platform combination lifting mounting method
Technical field
The present invention relates to a kind of indirect air cooling system broadening platform combination lifting mounting method.
Background technology
Since indirect air cooling technology was introduced from 1993, due to the advantage of its water saving, be developed rapidly in arid, semiarid zone.But indirect air cooling appliance arrangement, pipeline combination installation workload is large, the optimization of installation procedure and technique has very important effect to raising installation quality, shortening installation period, minimizing construction input.
Indirect air cooling system combination is installed first step work and is the lifting of broadening platform combination.First have good positioning during lifting X post internode unit and manhole unit radial girders spacing after assemble hoop beam, ring secondary beam, purlin again, 50t and 25t mobile crane is adopted to coordinate lifting during lifting, after 50t mobile crane lifting broadening platform to installation site, adjustment angle starts to be welded and fixed, 25t mobile crane sling adjustment bearing diagonal angle and setting angle after below two bearing diagonals to broadening platform qualified consistent afterwards and X intercolumniation slugging.
During due to lifting broadening platform and bearing diagonal, belong to work high above the ground, when bearing diagonal is sling, adjustment difficulty is large, high-altitude cage operating personnel operating difficulties, danger coefficient increases, and reduces broadening platform lifting efficiency, add the cost of a mobile crane, financial cost is high simultaneously.
Summary of the invention
The object of the invention is for overcoming above-mentioned the deficiencies in the prior art, a kind of indirect air cooling system broadening platform combination is provided to lift mounting method, bearing diagonal is carried out ground adjustment, fixedly secure on broadening platform, lift with broadening platform combination, prevent it from shaking in hoisting process and cause adjustment difficulty, reduce personnel adjustment difficulty and work high above the ground danger coefficient, reduce mobile crane machine-team cost.
For achieving the above object, the present invention adopts following technical proposals:
A kind of indirect air cooling system broadening platform combination lifting mounting method, comprises the following steps:
Step 1: preparation before lifting: assemble the broadening platform of multiple internode unit and the broadening platform of the outer unit of multiple internode, fix bearing diagonal at the broadening platform lower of internode unit, the lower end of bearing diagonal is unsettled;
Step 2: the position of corresponding indirect cool tower tower body X post, starts the broadening platform lifting internode unit, and between the broadening platform and bearing diagonal of internode unit suspension hoisting device, lifting appliance tangles the unsettled lower end of bearing diagonal;
Step 3: by the lifting of the broadening platform of internode unit to installed height mark, welds the broadening platform of internode unit with indirect cool tower tower body X post first built-in fitting after the broadening platform gradient of adjustment internode unit;
Step 4: by lifting appliance adjustment bearing diagonal angle, welded by bearing diagonal with indirect cool tower tower body X post second built-in fitting, the broadening platform lifting completing internode unit is installed;
Step 5: repeat step 2-step 4, installs the broadening platform of all internode unit along the lifting in peripheral a week of indirect cool tower tower body;
Step 6: the position between adjacent two the X posts of corresponding indirect cool tower tower body, utilizes the mode identical with the broadening platform of lifting internode unit to lift the broadening platform of the outer unit of internode, until the broadening platform of the outer unit of internode has all lifted;
Step 7: the broadening platform of outer to the broadening platform of unit between adjacent segments and internode unit is welded and fixed mutually.
The concrete steps of described step 1 are:
Assemble the broadening platform of multiple internode unit and the broadening platform of the outer unit of multiple internode respectively, use interim hinge to be fixed on the broadening platform of internode unit by bearing diagonal at the broadening platform lower of internode unit, the broadening platform of unit outside the broadening platform of internode unit and internode is transported to indirect cool tower and prepares lifting outward.
The step of assembling the broadening platform of internode unit in described step 1 is:
According to the distance between the broadening platform radial girders of the spacing determination internode unit of the upper end open of indirect cool tower tower body X post, then the radial girders of the broadening platform of internode unit, hoop beam and ring secondary beam are assembled by designing requirement, form the broadening platform framework of internode unit; In the broadening platform framework inside of internode unit, some purlins are installed, complete the assembling of the broadening platform of internode unit.
The spacing of the broadening platform radial girders of described internode unit is equal with the spacing of the upper end open of indirect cool tower tower body X post.
The step of assembling the broadening platform of the outer unit of internode in described step 1 is:
According to the distance between the broadening platform radial girders of the outer unit of the spacing determination internode of the upper end open of indirect cool tower tower body X post, then the radial girders of the broadening platform of outer for internode unit, hoop beam and ring secondary beam are assembled by designing requirement, form the broadening platform framework of the outer unit of internode; In the broadening platform framework inside of the outer unit of internode, some purlins are installed, complete the assembling of the broadening platform of the outer unit of internode.
The spacing of the broadening platform radial girders of the outer unit of described internode is equal with the spacing of the upper end open of indirect cool tower tower body X post.
The concrete steps of described step 2 are:
The position of corresponding indirect cool tower tower body X post outside indirect cool tower tower body, the broadening platform of internode unit is first lifted with 70t crawler crane, one end of lifting appliance is hung between the broadening platform and bearing diagonal of internode unit, the other end of lifting appliance tangles the unsettled lower end of bearing diagonal, stablizes bearing diagonal; Simultaneously when the soft cat ladder of a side mounting that the non-suspension slant of broadening platform lower of internode unit supports welds for bearing diagonal.
The step of the broadening platform gradient of internode unit is adjusted in described step 3:
Level gauge is placed on the side of the broadening platform of internode unit, utilize the gradient of the broadening platform of 70t crawler crane adjustment internode unit, absolute altitude consistent with installation requirement, then the broadening platform of internode unit is welded with indirect cool tower tower body X post first built-in fitting near the side of indirect cool tower tower body.
The concrete steps of described step 4 are:
Constructor stands in the soft cat ladder position of the broadening platform of internode unit, coordinate level gauge adjustment bearing diagonal angle consistent with installation requirement angle with lifting appliance, then bearing diagonal is welded with indirect cool tower tower body X post second built-in fitting, welded rear excision lifting appliance.
Beneficial effect of the present invention is:
1, ground of the present invention combination is easy to operate, easy to connect, and convenient adjustment, danger coefficient is little, better ensures safety.
2, hoisting cost of the present invention is low, and artificial arrangement less, improves economic benefit.
3, fixed by the bearing diagonal at two places in the present invention, bearing diagonal has been fixed on broadening platform, and angle is the same with installation site, prevents rocking of bearing diagonal, reduces the difficulty of angle adjustment, decreases work high above the ground danger, has saved crane machine-team cost.
Accompanying drawing explanation
Fig. 1 is the top view that the present invention has lifted rear broadening platform and indirect cool tower tower body X post;
In figure, 1 is the broadening platform of internode unit, and 2 is the broadening platform of the outer unit of internode.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further described.
As shown in Figure 1, indirect air cooling system broadening platform combination lifting mounting method of the present invention, comprises the following steps:
Preparation before lifting: assemble the broadening platform 1 of multiple internode unit and the broadening platform 2 of the outer unit of multiple internode, fix bearing diagonal in broadening platform 1 bottom of internode unit, the lower end of bearing diagonal is unsettled;
The position of corresponding indirect cool tower tower body X post, starts the broadening platform 1 lifting internode unit, and between the broadening platform 1 and bearing diagonal of internode unit suspension hoisting device, lifting appliance tangles the unsettled lower end of bearing diagonal;
The broadening platform 1 of internode unit is lifted to installed height mark, after broadening platform 1 gradient of adjustment internode unit, the broadening platform 1 of internode unit is welded with indirect cool tower tower body X post first built-in fitting;
By lifting appliance adjustment bearing diagonal angle, welded by bearing diagonal with indirect cool tower tower body X post second built-in fitting, the broadening platform 1 completing internode unit lifts to be installed;
Repeat above-mentioned steps, the broadening platform 1 of all internode unit is installed along the lifting in peripheral a week of indirect cool tower tower body;
Position between adjacent two the X posts of corresponding indirect cool tower tower body, utilizes the mode identical with the broadening platform of lifting internode unit to lift the broadening platform of the outer unit of internode, until the broadening platform 2 of the outer unit of internode has all lifted;
The broadening platform 2 of outer to the broadening platform 1 of unit between adjacent segments and internode unit is welded and fixed mutually.
The step of the broadening platform 1 of assembling internode unit is:
According to the distance between the broadening platform radial girders of the spacing determination internode unit of the upper end open of indirect cool tower tower body X post, the spacing of the broadening platform radial girders of internode unit is equal with the spacing of the upper end open of indirect cool tower tower body X post.Then the radial girders of the broadening platform of internode unit, hoop beam and ring secondary beam are assembled by designing requirement, form the broadening platform framework of internode unit; In the broadening platform framework inside of internode unit, some purlins are installed, complete the assembling of the broadening platform of internode unit.
The assembling process of broadening platform 2 of the outer unit of internode is identical with the assembling process of the broadening platform of internode unit.
Detailed process is installed in the lifting of indirect air cooling system broadening platform combination:
(the broadening platform of internode unit corresponds to the position of indirect cool tower tower body X post during assembling, the broadening platform of unit outside the broadening platform of internode unit and internode to be combined into entirety respectively, the broadening platform of the outer unit of internode corresponds to the position between indirect cool tower tower body X post), use interim hinge to be fixed on the broadening platform of internode unit by bearing diagonal at broadening platform away from tower body side, use float to be transported to the lifting work starting broadening platform outside indirect cool tower.
70t crawler crane is used in lifting, first lift the broadening platform 1 of internode unit, two 2t chain blocks are hung with tower body weld side two ends flat 1 of the broadening of internode unit, the chain block other end tangles bearing diagonal lower end simultaneously, adjustment bearing diagonal angle is consistent with setting angle, when the soft cat ladder of suspension simultaneously two cover welds for bearing diagonal; After crane works broadening platform 1 installed height mark rising to internode unit, use the broadening platform gradient of level gauge adjustment internode unit, absolute altitude consistent with installation requirement, prevent cooling triangle lifting absolute altitude from occurring deviation, then weld inside the broadening platform of internode unit with tower body X post built-in fitting.
By 2 2t chain block adjustment bearing diagonal angles, qualified rear and tower body X post slugging, has welded rear excision suspender.With the broadening platform 2 of the outer unit of same method lifting internode, until whole broadening platform has all lifted.After having been lifted by the broadening platform 2 of outer for internode unit, be welded and fixed mutually by the broadening platform 2 of outer to the broadening platform 1 of unit between adjacent segments and internode unit, now, whole broadening platform is around being arranged on indirect cool tower tower body peripheral one week.
Meanwhile, the present invention reaffirmed that before broadening platform hangs bearing diagonal is correctly installed firmly, can not landing.After broadening platform and bearing diagonal welding, interim hanging apparatus need be removed.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (9)

1. an indirect air cooling system broadening platform combination lifting mounting method, is characterized in that, comprise the following steps:
Step 1: preparation before lifting: assemble the broadening platform of multiple internode unit and the broadening platform of the outer unit of multiple internode, fix bearing diagonal at the broadening platform lower of internode unit, the lower end of bearing diagonal is unsettled;
Step 2: the position of corresponding indirect cool tower tower body X post, starts the broadening platform lifting internode unit, and between the broadening platform and bearing diagonal of internode unit suspension hoisting device, lifting appliance tangles the unsettled lower end of bearing diagonal;
Step 3: by the lifting of the broadening platform of internode unit to installed height mark, welds the broadening platform of internode unit with indirect cool tower tower body X post first built-in fitting after the broadening platform gradient of adjustment internode unit;
Step 4: by lifting appliance adjustment bearing diagonal angle, welded by bearing diagonal with indirect cool tower tower body X post second built-in fitting, the broadening platform lifting completing internode unit is installed;
Step 5: repeat step 2-step 4, installs the broadening platform of all internode unit along the lifting in peripheral a week of indirect cool tower tower body;
Step 6: the position between adjacent two the X posts of corresponding indirect cool tower tower body, utilizes the mode identical with the broadening platform of lifting internode unit to lift the broadening platform of the outer unit of internode, until the broadening platform of the outer unit of internode has all lifted;
Step 7: the broadening platform of outer to the broadening platform of unit between adjacent segments and internode unit is welded and fixed mutually.
2. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 1, it is characterized in that, the concrete steps of described step 1 are:
Assemble the broadening platform of multiple internode unit and the broadening platform of the outer unit of multiple internode respectively, use interim hinge to be fixed on the broadening platform of internode unit by bearing diagonal at the broadening platform lower of internode unit, the broadening platform of unit outside the broadening platform of internode unit and internode is transported to indirect cool tower and prepares lifting outward.
3. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 1, it is characterized in that, the step of assembling the broadening platform of internode unit in described step 1 is:
According to the distance between the broadening platform radial girders of the spacing determination internode unit of the upper end open of indirect cool tower tower body X post, then the radial girders of the broadening platform of internode unit, hoop beam and ring secondary beam are assembled by designing requirement, form the broadening platform framework of internode unit; In the broadening platform framework inside of internode unit, some purlins are installed, complete the assembling of the broadening platform of internode unit.
4. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 3, it is characterized in that, the spacing of the broadening platform radial girders of described internode unit is equal with the spacing of the upper end open of indirect cool tower tower body X post.
5. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 1, is characterized in that, the step of assembling the broadening platform of the outer unit of internode in described step 1 is:
According to the distance between the broadening platform radial girders of the outer unit of the spacing determination internode of the upper end open of indirect cool tower tower body X post, then the radial girders of the broadening platform of outer for internode unit, hoop beam and ring secondary beam are assembled by designing requirement, form the broadening platform framework of the outer unit of internode; In the broadening platform framework inside of the outer unit of internode, some purlins are installed, complete the assembling of the broadening platform of the outer unit of internode.
6. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 5, is characterized in that, the spacing of the broadening platform radial girders of the outer unit of described internode is equal with the spacing of the upper end open of indirect cool tower tower body X post.
7. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 1, it is characterized in that, the concrete steps of described step 2 are:
The position of corresponding indirect cool tower tower body X post outside indirect cool tower tower body, the broadening platform of internode unit is first lifted with 70t crawler crane, one end of lifting appliance is hung between the broadening platform and bearing diagonal of internode unit, the other end of lifting appliance tangles the unsettled lower end of bearing diagonal, stablizes bearing diagonal; Simultaneously when the soft cat ladder of a side mounting that the non-suspension slant of broadening platform lower of internode unit supports welds for bearing diagonal.
8. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 1, is characterized in that, adjust the step of the broadening platform gradient of internode unit in described step 3:
Level gauge is placed on the side of the broadening platform of internode unit, utilize the gradient of the broadening platform of 70t crawler crane adjustment internode unit, absolute altitude consistent with installation requirement, then the broadening platform of internode unit is welded with indirect cool tower tower body X post first built-in fitting near the side of indirect cool tower tower body.
9. indirect air cooling system broadening platform combination lifting mounting method as claimed in claim 1, it is characterized in that, the concrete steps of described step 4 are:
Constructor stands in the soft cat ladder position of the broadening platform of internode unit, coordinate level gauge adjustment bearing diagonal angle consistent with installation requirement angle with lifting appliance, then bearing diagonal is welded with indirect cool tower tower body X post second built-in fitting, welded rear excision lifting appliance.
CN201510552349.0A 2015-09-01 2015-09-01 Assembly and lift-erecting method of indirect air-cooling system stretching platforms Active CN105239804B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510552349.0A CN105239804B (en) 2015-09-01 2015-09-01 Assembly and lift-erecting method of indirect air-cooling system stretching platforms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510552349.0A CN105239804B (en) 2015-09-01 2015-09-01 Assembly and lift-erecting method of indirect air-cooling system stretching platforms

Publications (2)

Publication Number Publication Date
CN105239804A true CN105239804A (en) 2016-01-13
CN105239804B CN105239804B (en) 2017-05-24

Family

ID=55037601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510552349.0A Active CN105239804B (en) 2015-09-01 2015-09-01 Assembly and lift-erecting method of indirect air-cooling system stretching platforms

Country Status (1)

Country Link
CN (1) CN105239804B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882339A (en) * 2017-11-07 2018-04-06 中国化学工程第三建设有限公司 A kind of construction method of the indirect cool tower of large-scale full steel structure form
CN108131026A (en) * 2017-12-25 2018-06-08 中国化学工程第三建设有限公司 A kind of installation method for the platform high-altitude floor that is widened
CN108518008A (en) * 2018-03-23 2018-09-11 中建钢构有限公司 Rigid roof structure in flexible cable structure and its installation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008202289A (en) * 2007-02-20 2008-09-04 Kajima Corp Construction method of tower structure
CN201850761U (en) * 2010-11-19 2011-06-01 东北电业管理局烟塔工程公司 Attached supporting truss of ring girder of cooling tower
CN202611291U (en) * 2012-04-27 2012-12-19 上海电气斯必克工程技术有限公司 Spread platform sealing structure of indirect air-cooling system
CN203487820U (en) * 2013-09-16 2014-03-19 中化工程沧州冷却技术有限公司 Steel member anti-corrosion cooling tower
JP2014129697A (en) * 2012-12-28 2014-07-10 Shimizu Corp Lifting device, lifting method, and demolition method for building
CN203924695U (en) * 2014-06-23 2014-11-05 山东电力建设第一工程公司 A kind of indirect cool tower mould-lifting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008202289A (en) * 2007-02-20 2008-09-04 Kajima Corp Construction method of tower structure
CN201850761U (en) * 2010-11-19 2011-06-01 东北电业管理局烟塔工程公司 Attached supporting truss of ring girder of cooling tower
CN202611291U (en) * 2012-04-27 2012-12-19 上海电气斯必克工程技术有限公司 Spread platform sealing structure of indirect air-cooling system
JP2014129697A (en) * 2012-12-28 2014-07-10 Shimizu Corp Lifting device, lifting method, and demolition method for building
CN203487820U (en) * 2013-09-16 2014-03-19 中化工程沧州冷却技术有限公司 Steel member anti-corrosion cooling tower
CN203924695U (en) * 2014-06-23 2014-11-05 山东电力建设第一工程公司 A kind of indirect cool tower mould-lifting device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
尚建新: "钢结构安装在空冷平台中的应用", 《太原科技》 *
张晋芳: "国内首台220MW机组空冷平台安装工艺", 《山西建筑》 *
赵玉青: "大同二电厂三期空冷平台钢结构吊装方案探讨", 《山西建筑》 *
黄焕来: "吊模法施工及吊模钢架设计", 《广西水利水电》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882339A (en) * 2017-11-07 2018-04-06 中国化学工程第三建设有限公司 A kind of construction method of the indirect cool tower of large-scale full steel structure form
CN108131026A (en) * 2017-12-25 2018-06-08 中国化学工程第三建设有限公司 A kind of installation method for the platform high-altitude floor that is widened
CN108518008A (en) * 2018-03-23 2018-09-11 中建钢构有限公司 Rigid roof structure in flexible cable structure and its installation method

Also Published As

Publication number Publication date
CN105239804B (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106759883B (en) The tower crane construction method of large-scale steel structure air cooling tower
CN104234200B (en) A kind of suspen-shell structure rope leverage is by ring lifting installation method
WO2021120687A1 (en) Method for entire removal of space truss and assistive support mechanism
CN104895335B (en) Method for mounting hanging pillar
CN208899886U (en) Cantilever frame platform
CN109138454A (en) A kind of installation method of super high-rise building outline border bandy truss
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
CN105239804A (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN105804400A (en) Curved surface net frame lifting construction method
CN102496771B (en) Method and device for installing large-sized steel structural antenna
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN102587676B (en) Method for mounting internal girder structure of nuclear island at nuclear power station
CN103333973B (en) Preferential locating installation method of blast furnace five-way ball
CN106287645A (en) Tower-type furnace buckstay integral installation method
CN208748518U (en) A kind of formwork for placing support device
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN204530492U (en) A kind of hydraulic climbing mould construction platform
CN116835444A (en) Installation method and auxiliary device for steel containment
CN105350698A (en) Large-span dome installation construction method
CN205369948U (en) Lifting device for daylighting top is used for installing
CN110847616B (en) Method for mounting large-volume steel frame flue
CN203222810U (en) Steel column and base structure system
CN204530491U (en) A kind of high pier hydraulic climbing mould construction frame
CN103306533B (en) Steel column band base construction system and disposable installing and fixing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant