WO2022152206A1 - 功率控制方法、装置及用户设备 - Google Patents
功率控制方法、装置及用户设备 Download PDFInfo
- Publication number
- WO2022152206A1 WO2022152206A1 PCT/CN2022/071784 CN2022071784W WO2022152206A1 WO 2022152206 A1 WO2022152206 A1 WO 2022152206A1 CN 2022071784 W CN2022071784 W CN 2022071784W WO 2022152206 A1 WO2022152206 A1 WO 2022152206A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power control
- target
- control parameters
- pusch
- resources
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 93
- 230000005540 biological transmission Effects 0.000 claims abstract description 111
- 230000011664 signaling Effects 0.000 claims description 44
- 238000013507 mapping Methods 0.000 claims description 15
- 238000004891 communication Methods 0.000 description 14
- 230000006870 function Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 101100020598 Homo sapiens LAPTM4A gene Proteins 0.000 description 1
- 235000008694 Humulus lupulus Nutrition 0.000 description 1
- 102100034728 Lysosomal-associated transmembrane protein 4A Human genes 0.000 description 1
- 241000699670 Mus sp. Species 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/14—Separate analysis of uplink or downlink
- H04W52/146—Uplink power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/08—Closed loop power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/10—Open loop power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/18—TPC being performed according to specific parameters
- H04W52/24—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
- H04W52/242—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters taking into account path loss
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/32—TPC of broadcast or control channels
- H04W52/325—Power control of control or pilot channels
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/36—TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/54—Signalisation aspects of the TPC commands, e.g. frame structure
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
- H04W72/231—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal the control data signalling from the layers above the physical layer, e.g. RRC or MAC-CE signalling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
- H04W72/232—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal the control data signalling from the physical layer, e.g. DCI signalling
Definitions
- the present application belongs to the field of communication technologies, and in particular relates to a power control method, apparatus and user equipment.
- PUSCH Physical Uplink Shared Channel
- Multi-TRP/panel MTRP
- PUSCH may be switched and sent on different panels by time division.
- DCI Downlink Control Information
- the PUSCH transmission needs to be associated with multiple different sounding reference signal (Sounding Reference Signal, SRS) resources in some cases, different SRS resource configurations Different spatial relationship information.
- SRS Sounding Reference Signal
- Embodiments of the present application provide a power control method, apparatus, and user equipment, which can implement transmit power adjustment in a scenario where PUSCH transmission is associated with multiple different SRS resources.
- a power control method executed by a user equipment (User Equipment, UE), the method includes: receiving DCI from a network side device; the DCI is used to schedule PUSCH transmission; the above PUSCH transmission is associated with N different Target resources; the above target resources include: SRS resources or SRS resource groups; according to DCI, determine target power control parameters corresponding to different target resources associated with the above PUSCH transmission.
- UE User Equipment
- a power control apparatus comprising: a receiving module for receiving DCI from a network side device; the DCI is used for scheduling PUSCH transmission; the above-mentioned PUSCH transmission is associated with N different target resources; the above-mentioned target resources include : SRS resource or SRS resource group; according to the DCI received by the receiving module, determine the target power control parameters corresponding to the above-mentioned PUSCH transmission associated with different target resources.
- a UE in a third aspect, includes a processor, a memory, and a program or instruction stored on the memory and executable on the processor, when the program or instruction is executed by the processor. The steps of implementing the method as described in the first aspect.
- a readable storage medium is provided, and a program or an instruction is stored on the readable storage medium, and when the program or instruction is executed by a processor, the steps of the method described in the first aspect or the The steps of the method described in the third aspect.
- a fifth aspect provides a chip, the chip includes a processor and a communication interface, the communication interface is coupled to the processor, and the processor is configured to run a network-side device program or instruction, implementing the method described in the first aspect. method described.
- the UE in a scenario where PUSCH transmission is associated with N different target resources (SRS resources or SRS resource groups), after the UE receives the DCI for scheduling the PUSCH transmission from the network side device, it can The target power control parameters corresponding to different target resources are determined for the above-mentioned PUSCH transmission, thereby ensuring that the PUSCH transmission adopts multiple sets of transmit powers matched with multiple target resources, thereby ensuring the reliability of the PUSCH transmission.
- SRS resources or SRS resource groups target resources
- FIG. 1 is a schematic diagram of a system architecture of a wireless communication system provided by an embodiment of the present application
- FIG. 2 is a method flowchart of a power control method provided by an embodiment of the present application
- FIG. 3 is one of the schematic structural diagrams of a power control apparatus provided by an embodiment of the present application.
- FIG. 4 is a second schematic structural diagram of a power control apparatus provided by an embodiment of the present application.
- FIG. 5 is a schematic structural diagram of a communication device provided by an embodiment of the present application.
- FIG. 6 is a schematic diagram of a hardware structure of a UE according to an embodiment of the present application.
- first, second and the like in the description and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It is to be understood that the terms so used are interchangeable under appropriate circumstances so that the embodiments of the present application can be practiced in sequences other than those illustrated or described herein, and that "first”, “second” distinguishes Usually it is a class, and the number of objects is not limited.
- the first object may be one or multiple.
- “and/or” in the description and claims indicates at least one of the connected objects, and the character “/" generally indicates that the associated objects are in an "or” relationship.
- LTE Long Term Evolution
- LTE-Advanced LTE-Advanced
- LTE-A Long Term Evolution
- CDMA Code Division Multiple Access
- TDMA Time Division Multiple Access
- FDMA Frequency Division Multiple Access
- OFDMA Orthogonal Frequency Division Multiple Access
- SC-FDMA Single-carrier Frequency-Division Multiple Access
- system and “network” in the embodiments of the present application are often used interchangeably, and the described technology can be used not only for the above-mentioned systems and radio technologies, but also for other systems and radio technologies.
- NR New Radio
- the following description describes a New Radio (NR) system for example purposes, and NR terminology is used in most of the description below, although these techniques are also applicable to applications other than NR system applications, such as 6th Generation (6th Generation) , 6G) communication system.
- 6th Generation 6th Generation
- 6G 6th Generation
- FIG. 1 shows a schematic diagram of a wireless communication system to which an embodiment of the present application can be applied.
- the wireless communication system includes a terminal 11 and a network-side device 12 .
- the terminal 11 may also be called a terminal device or a user terminal (User Equipment, UE), and the terminal 11 may be a mobile phone, a tablet computer (Tablet Personal Computer), a laptop computer (Laptop Computer) or a notebook computer, a personal digital computer Assistant (Personal Digital Assistant, PDA), PDA, Netbook, Ultra-mobile Personal Computer (UMPC), Mobile Internet Device (MID), Wearable Device (Wearable Device) or vehicle-mounted device (VUE), pedestrian terminal (PUE) and other terminal-side devices, wearable devices include: bracelets, headphones, glasses, etc.
- PDA Personal Digital Assistant
- MID Mobile Internet Device
- MID Wearable Device
- VUE vehicle-mounted device
- PUE pedestrian terminal
- wearable devices include: bracelets, headphones, glasses, etc.
- the network side device 12 may be a base station or a core network, wherein the base station may be referred to as a Node B, an evolved Node B, an access point, a Base Transceiver Station (BTS), a radio base station, a radio transceiver, a basic service Set (Basic Service Set, BSS), Extended Service Set (Extended Service Set, ESS), Node B, Evolved Node B (eNB), Home Node B, Home Evolved Node B, WLAN Access Point, WiFi Node, Send Transmitting Receiving Point (TRP) or some other suitable term in the field, as long as the same technical effect is achieved, the base station is not limited to specific technical terms.
- the base station in the NR system is taken as an example, but the specific type of the base station is not limited.
- the transmit power of the UE at the PUSCH transmission opportunity i is P PUSCH,b,f,c (i,j,q d ,l):
- b represents the BWP in the uplink active state where the PUSCH is located
- f represents the PUSCH carrier in the BWP
- c represents the serving cell.
- PO_PUSCH,b,f,c (j) PO_NOMINAL_PUSCH,f,c(j)+PO_UE_PUSCH,b,f,c(j).
- j ⁇ 0,1,...,J-1 ⁇ PO_NOMINAL_PUSCH,f,c(j) is configured by the network side
- PO_UE_PUSCH,b,f,c(j) that is, P0, is dynamically indicated by the network side.
- PL b,f,c (q d ) Indicates the downlink path loss estimate, obtained from the path loss-reference signal (PL-RS) measurement with index q d
- f b, f, c (i, l) represents the closed-loop power control adjustment value corresponding to the power control adjustment state l.
- target power control parameters eg, ⁇ and P0
- the technical solutions provided in the embodiments of the present application can be applied to the power adjustment process described above to perform uplink power adjustment.
- FIG. 2 shows a schematic flowchart of a parameter adjustment method provided by an embodiment of the present invention.
- the parameter adjustment method may include the following steps:
- Step 201 The UE receives DCI.
- the UE receives the DCI from the network side device.
- the above-mentioned DCI is used to schedule PUSCH transmission; the above-mentioned PUSCH transmission is associated with different target resources; the above-mentioned target resources include: SRS resources or SRS resource groups.
- Step 202 The UE determines the target power control parameter corresponding to the PUSCH transmission according to the DCI.
- the above-mentioned target power control parameter includes at least one of the following:
- Open loop power control parameters eg, ⁇ P0, ⁇
- the closed loop power control adjusts the state index.
- the above-mentioned P0 and ⁇ are target received power and path loss compensation factors, and the above-mentioned closed-loop power control adjustment state index is used to indicate the closed-loop power control adjustment state that the SRS can maintain.
- the DCI further includes a closed-loop power control adjustment state index and a power adjustment value corresponding to the closed-loop power control adjustment state index; wherein the target power control parameter includes the power adjustment value.
- the closed-loop power control adjustment state index may be multiple closed-loop power control adjustment state indexes, and the multiple closed-loop power control adjustment state indexes may select different values.
- the TPC field in the above-mentioned DCI is used to indicate the power adjustment value, and the size of the above-mentioned TPC field is indicated by higher layer signaling.
- the above-mentioned high-level signaling is RRC or MAC CE.
- RRC Radio Resource Control
- MAC CE MAC CE
- the above-mentioned target resource maintains multiple closed-loop power control adjustment states.
- the above-mentioned closed-loop power control adjustment state satisfies at least one of the following: the above-mentioned closed-loop power control adjustment state is indicated by high-level signaling; the above-mentioned closed-loop power control adjustment state is associated with the SRS resource set; wherein, the above-mentioned SRS resource set includes target resources (that is, PUSCH transmission associated SRS resource or SRS resource group).
- the UE receives high-layer signaling, and the high-layer signaling indicates that the UE has multiple closed-loop power control adjustment states of SRS resources or SRS resource groups.
- the foregoing SRS resource set configuration includes a closed-loop power control adjustment state index.
- Target power control parameters corresponding to different target resources associated with the PUSCH transmission can be determined according to the DCI, thereby ensuring that the PUSCH transmission adopts multiple sets of transmit powers matching multiple target resources, thereby ensuring the reliability of the PUSCH transmission.
- the above-mentioned target power control parameters include power control parameters in at least one set of first power control parameters.
- a set of first power control parameters may be referred to as an SRI-PUSCH power control parameter set (SRI-PUSCH-Power Control).
- the above-mentioned first power control parameter may include at least one of the following parameters: target received power and path loss compensation factor (such as P0 and ⁇ ), the index of the path loss reference signal PL-RS, and the closed-loop power control state index (such as , l) above.
- the above-mentioned SRI field is used to indicate at least one set of first power control parameters; wherein, the above-mentioned target power control parameters include the above-mentioned at least one set of first power control parameters A power control parameter in a power control parameter.
- the above-mentioned first power control parameter may be referred to as SRI-PUSCH-PowerControl.
- the power control method provided by the embodiment of the present application may include the following step 201a:
- Step 201a The UE determines at least one set of first power control parameters corresponding to at least one first sequence.
- the above-mentioned first sequence is: a sequence that has a mapping relationship with the first value; the above-mentioned first value includes any one of the following: the domain value of the SRI domain in the DCI, and the domain value of the SRI domain in the DCI is superimposed with different first values. The value obtained after the offset value.
- the above-mentioned first offset value satisfies at least one of the following:
- the above-mentioned first offset value is configured by high-layer signaling
- the above first offset value is an integer
- the above-mentioned first offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the above-mentioned at least first sequence is associated with Y SRS resource sets; one first sequence is associated with at least one SRS resource set, and Y is a positive integer; wherein, the above-mentioned Y SRS resource sets include different targets associated with the above-mentioned PUSCH transmission resource.
- the domain value of the SRI domain in the above DCI is mapped to one or more sets of sri-PUSCH mapping addition/modification sequences (sri-PUSCH-MappingToAddModList) (ie the above first sequence), so as to obtain one or more sets of sri-PUSCH-MappingToAddModList Set of first power control parameters (SRI-PUSCH-PowerControl).
- sri-PUSCH-MappingToAddModList sequence is associated with an SRS resource set (the SRS resource set includes at least one SRS associated with the above-mentioned PUSCH).
- the SRI field in the above DCI corresponds to at least one field value, and a field value has a mapping relationship with a first sequence.
- the DCI contains two SRI fields, and one SRI field corresponds to one SRI value (that is, the above SRI field. field value), or the SRI field of the DCI jointly indicates two SRI values.
- the above DCI indicates that one or more SRI values are respectively mapped to a set of sri-PUSCH-MappingToAddModList sequences, thereby obtaining one or more sets of SRI-PUSCH-PowerControl.
- the at least one set of first power control parameters indicated by the SRI field included in the DCI is related to the M target resources indicated by the SRI field, where M is a positive integer.
- the above M target resources satisfy at least one of the following: the above M target resources belong to different SRS resource sets respectively; all SRS resources in one SRS resource group belong to the same SRS resource set.
- one or more sets of SRI-PUSCH-PowerControl indicated by the SRI field in the above DCI are associated with one or more SRS resources/SRS resource groups indicated by the SRI field.
- multiple SRS resource/SRS resource groups come from different SRS resource sets; all SRS resources in one SRS resource group come from the same SRS resource set.
- the power adjustment method provided by the embodiment of the present application may include the following steps:
- Step 203 The UE determines at least one set of first power control parameters; the above-mentioned target power control parameters are power control parameters in the above-mentioned at least one set of first power control parameters.
- the above-mentioned at least one set of first power control parameters includes open-loop power control parameters
- the above step 203 may include the following step 203a:
- Step 203a The UE determines a target open-loop power control parameter group from the power control parameter set configured by high-level signaling; the above-mentioned power control parameter set includes one or more groups of open-loop power control parameters, and the above-mentioned target open-loop power control parameter group Belonging to the power control parameter set, the target open-loop control parameter group includes at least one set of first power control parameters, and the target power control parameter is a power control parameter in the at least one set of first power control parameters.
- a target open-loop control parameter group includes: target received power P0 and path loss compensation factor; or, one or more target received powers P0. It should be noted that a target open-loop control parameter group may contain one P0 or two P0s.
- the open-loop power control parameters of the above-mentioned one or more sets of first power parameters may be obtained from one or more sets of open-loop power control parameter sets (eg, P0-AlphaSets). Power control parameters (such as P0-PUSCH-AlphaSet) are obtained.
- P0-AlphaSets open-loop power control parameter sets
- Power control parameters such as P0-PUSCH-AlphaSet
- the above target open-loop power control parameter group satisfies at least one of the following:
- the position of the target open-loop power control parameter group in the power control parameter set is determined based on the second offset value
- the target open-loop power control parameter group is an open-loop power control parameter group corresponding to a group index that satisfies the first condition in the power control parameter set.
- the above-mentioned second offset value satisfies at least one of the following:
- the above-mentioned second offset value is configured by high-layer signaling
- the above second offset value is an integer
- the above-mentioned second offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the positions of the above-mentioned one or more sets of P0-PUSCH-AlphaSets in the p0-AlphaSets set may be 1, 1+offset1, 1+offset2, and so on, respectively.
- the above offset1, offset2...offsetK are configured by high-level signaling and are associated with the SRS resource set.
- the at least one set of first power control parameters includes: parameters indicating at least one set of path loss reference signals; and the parameters of the at least one set of path loss reference signals are determined based on at least one of the following :
- the index of the path loss reference signal configured by the uplink physical control channel (Physical Uplink Control Channel, PUCCH) resource;
- One or more sets of path loss reference signals indicated by consecutive multiple indices starting from a first preset index (eg, index 0);
- the target power control parameters include at least one of the following: power control parameters in the at least one set of first power control parameters, and power control parameters in the at least one set of second power control parameters.
- a set of first power control parameters may be called SRI-PUSCH-PowerControl
- a set of second power control parameters may be called a PUSCH target received power set (P0-PUSCH-Set-r16), the P0-PUSCH- The target received power P0 is included in Set-r16.
- the power control method provided in this embodiment of the present application may include the following step 204:
- Step 204 The UE determines at least one set of second power control parameters among the multiple sets of second power control parameters configured by high-layer signaling.
- the set of second power control parameters includes at least two second power control parameters.
- one set of second power control parameters corresponds to one index; the at least one set of second power control parameters is: at least one set of the above-mentioned multiple sets of second power control parameters corresponding to the target index The second power control parameter; wherein, the above-mentioned target index is obtained based on the third offset value on the basis of the preset index.
- the above-mentioned third offset value satisfies at least one of the following:
- the above-mentioned third offset value is configured by high-layer signaling
- the above third offset value is an integer
- the above-mentioned third offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the above one or more sets of P0-PUSCH-Set-r16 may be P0 corresponding to indexes such as index a, index (a+offset1), index (a+offset2), ..., index (a+offsetH), etc. -PUSCH-Set-r16.
- the above offset1, offset2...offsetH are configured by higher layer signaling and are associated with the SRS resource set.
- the above-mentioned index a may be the smallest index.
- the above-mentioned target power control parameter includes: a target third power control parameter (for example, the above-mentioned target received power P0), and the above-mentioned step 202 may include the following step 202b:
- Step 202b Under the condition that both the above-mentioned at least one set of first power control parameters and the above-mentioned at least one set of second power control parameters both include the third power control parameter, according to the open-loop power control parameter set indication in the above DCI The threshold value of the domain, the target third power control parameter is determined from the at least one set of first power control parameters and the at least one set of second power control parameters.
- the above-mentioned open-loop power control parameter set indication field may be referred to as an OLPC (Open-loop power control parameter set indication) field.
- OLPC Open-loop power control parameter set indication
- the OLPC domain and the SRI domain in the DCI indicate at least one set of second power control parameters for the UE.
- the UE receives the high-level signaling and obtains the bit size of the OLPC domain of the DCI format0_1 and DCI format0_2 of the scheduled PUSCH, which is 1 bit or 2 bits.
- the above-mentioned OLPC field is used to indicate the source of the target third power control parameter (ie, P0).
- the field value of the above-mentioned OLPC field is used to indicate: the target third power control parameter is from at least one set of first power control parameters, or whether from at least one second set of power control parameters.
- Example 1 For the scenario where the OLPC domain is 1 valid bit (ie 1 bit).
- the OLPC field When the OLPC field is "0", it indicates that one or more sets of P0s for PUSCH transmission take the P0 in one or more SRI-PUSCH-PowerControl indicated by the SRI field; or, when the OLPC field is "1", it indicates that One or more sets of P0 for PUSCH transmission respectively take the P0 in one or more sets of P0-PUSCH-Set-r16 indicated by the SRI field.
- each group of effective bits in the above-mentioned open-loop power control parameter set indication field corresponds to one of the above-mentioned target resources; the above-mentioned X effective bits include: : at least one set of significant digits; where X is an integer greater than 1. Further, the value of any group of valid bits in the above-mentioned open-loop power control parameter set indication field is used to indicate: the target third power control parameter associated with the target resource corresponding to any group of valid bits.
- Example 2 In the case where the DCI contains the SRI field, for the scenario where the OLPC field contains 2 significant bits. Assuming that the most significant bit is associated with the first SRS resource and the least significant bit is associated with the second SRS resource, the indication manner of the source of the above P0 is shown in Table 1 below.
- the OLPC field is used to indicate the source of the P0 of the significant bits corresponding to the SRS resource or SRS resource group.
- Example 3 When the DCI does not contain the SRI field, for the scenario where the OLPC field contains 4 significant bits. It is assumed that the first two significant bits are associated with the first SRS resource, the last two significant bits are associated with the second SRS resource, and each set of second power control parameters includes two second power control parameters (ie P0-1 and P0-2) Then, the indication mode of the source of the above P0 is shown in Table 2 below.
- step 204 may include the following step 204a:
- Step 204a In the case that the DCI includes the SRI field, the UE determines at least one set of second power control parameters corresponding to the at least one second sequence according to the sequence configuration of the at least one second sequence included in the higher layer signaling.
- the second sequence is: a sequence that has a mapping relationship with the second value; the second value includes any of the following: the domain value of the SRI domain included in the DCI, the domain value of the SRI domain included in the DCI respectively The value obtained by superimposing the different fourth offset values.
- the above-mentioned fourth offset value satisfies at least one of the following:
- the above-mentioned fourth offset value is configured by high-layer signaling
- the above fourth offset value is an integer
- the above-mentioned fourth offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the SRI domain included in the above-mentioned DCI corresponds to at least one domain value, and one domain value has a mapping relationship with at least one second sequence.
- the above-mentioned second sequence may be referred to as P0-PUSCH-SetList-r16.
- the UE receives high-layer signaling to obtain one or more sets of sequence configurations of P0-PUSCH-SetList-r16.
- the above sequence configuration is used to indicate that the above one or more sets of P0-PUSCH-SetList-r16 are respectively associated with multiple SRS resource sets, and each set of P0-PUSCH-SetList-r16 contains multiple sets of P0-PUSCH-Set-r16, each set of P0-PUSCH-Set-r16 contains a P0-PUSCH-r16 (P0).
- the SRI fields in the above-mentioned DCI may be mapped to different P0-PUSCH-SetList-r16, respectively, to obtain multiple sets of P0-PUSCH-Set-r16.
- the UE receives high-layer signaling, obtains a set of P0-PUSCH-SetList-r16 configurations, and obtains multiple fourth offset values. After the SRI values in the SRI field are superimposed with different fourth offset values, they are respectively mapped to One set of P0-PUSCH-SetList-r16, and multiple sets of P0-PUSCH-Set-r16 are obtained.
- the UE receives high-level signaling.
- the high-level signaling configures two SRS resource sets for codebook transmission.
- the UE receives DCI for scheduling PUSCH transmission, the SRI field of the DCI indicates that two SRS resources from different SRS resource sets are used for PUSCH transmission.
- the value of the SRI field of the DCI is mapped to two sri-PUSCH-MappingToAddModLists, respectively, to obtain two SRI-PUSCH-PowerControls (including P0_a, P0_b) associated with the two SRS resources. Then, map the value of the SRI field of the DCI to the two P0-PUSCH-SetList-r16 respectively, and obtain two P0-PUSCH-Set-r16 (including P0_c, P0_d respectively) associated with the two SRS resources ).
- '0' indicates that the two P0s of the two sets of power control parameters are respectively equal to P0_a and P0_b in the two SRI-PUSCH-PowerControls.
- '1' indicates that the two P0s of the two sets of power control parameters take the P0_c and P0_d in the two P0-PUSCH-SetList-r16.
- the interpretation of the value of the OLPC field is shown in Table 3 below:
- At least one time-frequency resource information transmitted by the PUSCH corresponds to at least one set of power control parameters.
- time-frequency resource information is used to indicate any of the following:
- one time domain resource includes multiple consecutive orthogonal frequency division multiplex (Orthogonal frequency division multiplex, OFDM) symbols.
- the above-mentioned first transmission opportunity is one of the above-mentioned at least one transmission opportunity;
- the above-mentioned target power control parameter includes a power control parameter in the above-mentioned at least one set of power control parameters.
- the above power control parameters may be power control parameters in the at least one set of first power control parameters, or may be power control parameters in the at least one set of second power control parameters. Not limited.
- the at least one transmission occasion may be at least one repeated transmission occasion of the PUSCH.
- a set of power control parameters is used to calculate the transmit power for a repeated transmission occasion of the PUSCH.
- the above-mentioned repeated transmission timing is the same as the SRS resource or SRS resource group associated with the power control parameter.
- the power control method provided in this embodiment of the present application may further include the following steps 205a and 205b:
- Step 205a The UE performs K frequency hopping on the PUSCH, each frequency hopping of the PUSCH corresponds to a set of power control parameters, and K is an integer greater than or equal to 1.
- Step 205b During each frequency hopping process of the PUSCH, the UE adjusts the transmission power of the PUSCH according to the power control parameters corresponding to each frequency hopping.
- each frequency hopping of the above-mentioned PUSCH satisfies any one of the following:
- Different frequency hopping points corresponding to the transmission opportunity of the PUSCH are associated with different target resources
- Each frequency hopping point is the same as the target resource associated with its corresponding power control parameter.
- one hop (frequency hopping) of the above-mentioned PUSCH uses a set of power control parameters to calculate the transmit power, (that is, the power adjustment of the PUSCH is performed based on one hop).
- different hops corresponding to the above-mentioned PUSCH transmission occasions are associated with different SRS resources or SRS resource groups.
- the hop of the above-mentioned PUSCH is the same as the SRS resource or SRS resource group associated with the power control parameter corresponding to the hop.
- one transmission opportunity corresponds to at least one set of power control parameters.
- each of the time domain resources in the first transmission occasion corresponds to one set of power control parameters.
- the target resources associated with the consecutive multiple OFDM symbols are the same; or, the target resources associated with the consecutive multiple OFDM symbols are the targets associated with the power control parameters corresponding to the consecutive multiple OFDM symbols The resources are the same.
- the PUSCH repetition opportunity adopts at least one set of first power control parameters or at least one set of second power control parameters indicated by the SRI field.
- a set of power control parameters may be used to calculate the transmit power of consecutive multiple OFDM symbols in one transmission opportunity of the PUSCH (that is, power adjustment may be performed based on consecutive multiple OFDM symbols with the same spatial relationship).
- the SRS resource or SRS resource group associated with the consecutive OFDM symbols are the same (that is, the transmit beams are the same), and the SRS associated with the power control parameters corresponding to the consecutive OFDM symbols and the consecutive OFDM symbols resource or SRS resource group is the same.
- the number of repeated transmissions of the PUSCH is 1, if multiple sets of power control parameters are used for the transmission opportunity of the PUSCH, the first half of the OFDM symbols use one set of power control parameters, and the second half of the OFDM symbols use another set of power control parameters control parameter.
- the first N/2 symbols of the PUSCH transmission opportunity use the same
- the first SRS resource in the code point is transmitted in the same spatial relationship, and the remaining N-N/2 symbols are transmitted in the same spatial relationship as the second SRS resource in the code point.
- the SRI field is mapped to two sri-PUSCH-MappingToAddModLists, and two sets of power control parameter groups SRI-PUSCH-PowerControl are obtained.
- the transmit power used in the first N/2 symbols of the above-mentioned PUSCH transmission opportunity is calculated from the power control parameters mapped on the PUSCH-MappingToAddModList associated with the first SRS resource set, and the transmit power of the remaining N-N/2 symbols is calculated by the second SRS Calculated from the power control parameters mapped on the PUSCH-MappingToAddModList associated with the resource set.
- a set of power control parameters is used for one transmission opportunity of the PUSCH.
- the execution body may be a power control apparatus, or a control module in the power control apparatus for executing the power control method.
- the power control device provided by the embodiment of the present application is described by taking the power control method performed by the power control device as an example.
- the executing subject of the above-mentioned power control method may also be other devices or apparatuses that can execute the power control method, which is not limited in this embodiment of the present application.
- the power control apparatus 400 includes: a receiving module 401 and a determining module 402, wherein:
- the receiving module 401 is used for receiving DCI; the above-mentioned DCI is used for scheduling PUSCH transmission; the above-mentioned PUSCH transmission is associated with different target resources; the above-mentioned target resources include: SRS resources or SRS resource groups; , and determine the target power control parameter corresponding to the above-mentioned PUSCH transmission.
- the SRI field is used to indicate at least one set of first power control parameters; wherein the target power control parameters include the SRI field indicating power control parameters.
- the above-mentioned determining module 402 is further configured to determine at least one set of first power control parameters corresponding to at least one first sequence; wherein, the above-mentioned first sequence is: a sequence that has a mapping relationship with the first value;
- the above-mentioned first value includes any one of the following: the above-mentioned domain value of the SRI domain, and the above-mentioned domain value of the SRI domain respectively superimposed the value obtained after different first offset values;
- the above-mentioned first offset value satisfies at least one of the following:
- the above-mentioned first offset value is configured by high-layer signaling
- the above first offset value is an integer
- the above-mentioned first offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the at least first sequence is associated with Y SRS resource sets; one first sequence is associated with at least one SRS resource set, and Y is a positive integer; wherein the Y SRS resource sets include the target resource.
- the above-mentioned SRI field corresponds to at least one field value, and a field value has a mapping relationship with a first sequence.
- the above-mentioned determining module 402 is further configured to determine a target open-loop power control parameter group from the power control parameter set configured by the high-level signaling in the case that the SRI field is not included in the above-mentioned DCI; the above-mentioned power control parameter set It includes one or more open-loop power control parameter groups; the target open-loop power control parameter group belongs to a power control parameter set; the target open-loop control parameter group includes at least one set of first power control parameters, and the target power control parameter is at least A power control parameter in a set of first power control parameters.
- the above target open-loop power control parameter group satisfies at least one of the following:
- the position of the target open-loop power control parameter group in the power control parameter set is determined based on the second offset value
- the target open-loop power control parameter group is an open-loop power control parameter group corresponding to a group index that satisfies the first condition in the power control parameter set;
- the above-mentioned second offset value satisfies at least one of the following:
- the above-mentioned second offset value is configured by high-layer signaling
- the above-mentioned second offset value is an integer
- the above-mentioned second offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the at least one set of first power control parameters includes: parameters indicating at least one set of path loss reference signals;
- the above at least one set of path loss reference signals is determined based on at least one of the following:
- the index of the path loss reference signal configured by the PUCCH resource of the uplink physical control channel
- the above-mentioned determining module 402 is further configured to determine at least one set of second power control parameters in multiple sets of second power control parameters configured by high-level signaling;
- the above-mentioned target power control parameters include at least one of the following:
- the set of second power control parameters includes at least two second power control parameters.
- one set of second power control parameters corresponds to one index;
- the at least one set of second power control parameters is: at least one set of second power control parameters corresponding to the target index among the multiple sets of second power control parameters;
- the above-mentioned target index is obtained based on the third offset value on the basis of the preset index
- the above-mentioned third offset value satisfies at least one of the following:
- the above-mentioned third offset value is configured by high-layer signaling
- the above third offset value is an integer
- the above-mentioned third offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the above-mentioned target power control parameters include: a target third power control parameter; and the above-mentioned determining module 402 is specifically configured to: in both the above-mentioned at least one set of first power control parameters and the above-mentioned at least one set of second power control parameters In the case where the third power control parameter is included, according to the threshold value of the open-loop power control parameter set indication field in the above-mentioned DCI, from the above-mentioned at least one set of first power control parameters and the above-mentioned at least one set of second power control parameters, determine The above target third power control parameter.
- each group of effective bits in the above-mentioned open-loop power control parameter set indication field corresponds to one of the above-mentioned target resources; wherein, X is greater than 1 the integer.
- the value of any group of valid bits in the above-mentioned open-loop power control parameter set indication field is used to indicate: the above-mentioned target third power control parameter corresponding to the target resource corresponding to the above-mentioned any group of valid bits.
- the above-mentioned determining module 402 is specifically configured to, in the case that the above-mentioned DCI includes the above-mentioned SRI field, according to the sequence configuration of the at least one second sequence included in the high-level signaling, determine the at least one corresponding to the above-mentioned at least one second sequence.
- the above-mentioned second value includes any one of the following: the above-mentioned domain value of the SRI domain, and the above-mentioned domain value of the SRI domain respectively superimposed the value obtained after different fourth offset values;
- the above-mentioned fourth offset value satisfies at least one of the following:
- the above-mentioned fourth offset value is configured by high-layer signaling
- the above fourth offset value is an integer
- the above-mentioned fourth offset value is associated with an SRS resource set, and the above-mentioned SRS resource set includes at least one above-mentioned target resource.
- the above-mentioned SRI domain corresponds to at least one domain value, and one domain value has a mapping relationship with at least one second sequence.
- the at least one set of first power control parameters indicated by the SRI field is related to the M target resources indicated by the SRI field, where M is a positive integer.
- the above-mentioned M target resources satisfy at least one of the following:
- the above-mentioned M target resources belong to different SRS resource sets respectively;
- All SRS resources in one SRS resource group belong to the same SRS resource set.
- At least one time-frequency resource information transmitted by the above-mentioned PUSCH corresponds to at least one set of power control parameters
- time-frequency resource information is used to indicate any of the following:
- one time domain resource includes multiple consecutive OFDM symbols
- the above-mentioned first transmission opportunity is one of the above-mentioned at least one transmission opportunity
- the above-mentioned target power control parameters include power control parameters in the above-mentioned at least one set of power control parameters.
- the power control apparatus 400 further includes: an execution module 403, wherein the execution module 403 is configured to perform K frequency hopping on the PUSCH, and each frequency hopping of the PUSCH corresponds to one set Power control parameter, K is an integer greater than or equal to 1; in each frequency hopping process of the above PUSCH, the transmission power of the above PUSCH is adjusted according to the power control parameter corresponding to each frequency hopping.
- each frequency hopping of the above PUSCH satisfies any of the following:
- Different frequency hopping points corresponding to the above-mentioned PUSCH transmission opportunities are associated with different target resources
- Each frequency hopping point is the same as the target resource associated with its corresponding power control parameter.
- one transmission occasion corresponds to at least one set of power control parameters.
- each of the time domain resources in the first transmission opportunity corresponds to one set of power control parameters.
- the target resources associated with the multiple consecutive OFDM symbols are the same; or, the target resources associated with the multiple consecutive OFDM symbols are the same as the target resources associated with the power control parameters corresponding to the multiple consecutive OFDM symbols. .
- the DCI further includes a closed-loop power control adjustment state index and a power adjustment value corresponding to the closed-loop power control adjustment state index; wherein, the target power control parameter includes the power adjustment value.
- the TPC field in the above-mentioned DCI is used to indicate the above-mentioned power adjustment value, and the size of the above-mentioned TPC field is indicated by higher layer signaling.
- the above-mentioned target resource maintains multiple closed-loop power control adjustment states.
- the closed-loop power control adjustment state satisfies at least one of the following: the closed-loop power control adjustment state is indicated by high-level signaling; the closed-loop power control adjustment state is associated with an SRS resource set; wherein the SRS resource set includes target resources.
- the device in a scenario where PUSCH transmission is associated with different target resources (SRS resources or SRS resource groups), after the device receives the DCI for scheduling the PUSCH transmission, it can The target power control parameters corresponding to different target resources are determined for the above-mentioned PUSCH transmission, thereby ensuring that the PUSCH transmission adopts multiple sets of transmit powers matched with multiple target resources, thereby ensuring the reliability of the PUSCH transmission.
- SRS resources or SRS resource groups target resources
- the power control device in this embodiment of the present application may be a device, or may be a component, an integrated circuit, or a chip in a terminal.
- the device may be a mobile terminal or a non-mobile terminal.
- the mobile terminal may include, but is not limited to, the types of terminals 11 listed above, and the non-mobile terminal may be a server, a network attached storage (NAS), a personal computer (personal computer, PC), a television ( television, TV), teller machine, or self-service machine, etc., which are not specifically limited in the embodiments of the present application.
- the power control device in this embodiment of the present application may be a device with an operating system.
- the operating system may be an Android (Android) operating system, an iOS operating system, or other possible operating systems, which are not specifically limited in the embodiments of the present application.
- the power control apparatus provided in the embodiments of the present application can implement the various processes implemented in the foregoing method embodiments, and achieve the same technical effect. To avoid repetition, details are not repeated here.
- an embodiment of the present application further provides a communication device 500, including a processor 501, a memory 502, a program or instruction stored in the memory 502 and executable on the processor 501,
- a communication device 500 including a processor 501, a memory 502, a program or instruction stored in the memory 502 and executable on the processor 501
- the communication device 500 is a UE
- the program or instruction is executed by the processor 501
- each process of the foregoing power control method embodiments can be implemented, and the same technical effect can be achieved.
- FIG. 6 is a schematic diagram of a hardware structure of a terminal implementing an embodiment of the present application.
- the terminal 100 includes but is not limited to: a radio frequency unit 101, a network module 102, an audio output unit 103, an input unit 104, a sensor 105, a display unit 106, a user input unit 107, an interface unit 108, a memory 109, a processor 110 and other components .
- the terminal 100 may also include a power source (such as a battery) for supplying power to various components, and the power source may be logically connected to the processor 110 through a power management system, so as to manage charging, discharging, and power consumption through the power management system management and other functions.
- a power source such as a battery
- the terminal structure shown in FIG. 6 does not constitute a limitation on the terminal, and the terminal may include more or less components than shown, or combine some components, or arrange different components, which will not be repeated here.
- the above-mentioned radio frequency unit 101 is used for receiving DCI; the above-mentioned DCI is used for scheduling PUSCH transmission; the above-mentioned PUSCH transmission is associated with different target resources; the above-mentioned target resources include: SRS resources or SRS resource groups; The received DCI determines the target power control parameters corresponding to the above-mentioned PUSCH transmission.
- the terminal in a scenario where PUSCH transmission is associated with different target resources (SRS resources or SRS resource groups), after the terminal receives the DCI used to schedule the PUSCH transmission, it can determine according to the DCI
- the above-mentioned PUSCH transmission is associated with target power control parameters corresponding to different target resources, thereby ensuring that the PUSCH transmission adopts multiple sets of transmit powers matched with multiple target resources, thereby ensuring the reliability of PUSCH transmission.
- the input unit 104 may include a graphics processor (Graphics Processing Unit, GPU) 1041 and a microphone 1042. Such as camera) to obtain still pictures or video image data for processing.
- the display unit 106 may include a display panel 1061, which may be configured in the form of a liquid crystal display, an organic light emitting diode, or the like.
- the user input unit 107 includes a touch panel 1071 and other input devices 1072 .
- the touch panel 1071 is also called a touch screen.
- the touch panel 1071 may include two parts, a touch detection device and a touch controller.
- Other input devices 1072 may include, but are not limited to, physical keyboards, function keys (such as volume control keys, switch keys, etc.), trackballs, mice, and joysticks, which will not be described herein again.
- the radio frequency unit 101 receives the downlink data from the network side device, and then processes it to the processor 110; in addition, sends the uplink data to the network side device.
- the radio frequency unit 101 includes, but is not limited to, an antenna, at least one amplifier, a transceiver, a coupler, a low noise amplifier, a duplexer, and the like.
- Memory 109 may be used to store software programs or instructions as well as various data.
- the memory 109 may mainly include a storage program or instruction area and a storage data area, wherein the stored program or instruction area may store an operating system, an application program or instruction required for at least one function (such as a sound playback function, an image playback function, etc.) and the like.
- the memory 109 may include a high-speed random access memory, and may also include a non-volatile memory, wherein the non-volatile memory may be a read-only memory (Read-Only Memory, ROM), a programmable read-only memory (Programmable ROM) , PROM), erasable programmable read-only memory (Erasable PROM, EPROM), electrically erasable programmable read-only memory (Electrically EPROM, EEPROM) or flash memory.
- ROM Read-Only Memory
- PROM programmable read-only memory
- PROM erasable programmable read-only memory
- Erasable PROM Erasable PROM
- EPROM electrically erasable programmable read-only memory
- EEPROM electrically erasable programmable read-only memory
- flash memory for example at least one magnetic disk storage device, flash memory device, or other non-volatile solid state storage device.
- the processor 110 may include one or more processing units; optionally, the processor 110 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, application programs or instructions, etc., Modem processors mainly deal with wireless communications, such as baseband processors. It can be understood that, the above-mentioned modulation and demodulation processor may not be integrated into the processor 110 .
- Embodiments of the present application further provide a readable storage medium, where a program or an instruction is stored on the readable storage medium, and when the program or instruction is executed by a processor, each process of the foregoing power control method embodiment can be achieved, and can achieve the same In order to avoid repetition, the technical effect will not be repeated here.
- the processor is the processor in the terminal described in the foregoing embodiment.
- the readable storage medium includes a computer-readable storage medium, such as a computer read-only memory (Read-Only Memory, ROM), a random access memory (Random Access Memory, RAM), a magnetic disk or an optical disk, and the like.
- An embodiment of the present application further provides a chip, where the chip includes a processor and a communication interface, the communication interface is coupled to the processor, and the processor is used for running network-side device programs or instructions to implement the above power control method
- the chip includes a processor and a communication interface
- the communication interface is coupled to the processor
- the processor is used for running network-side device programs or instructions to implement the above power control method
- the chip mentioned in the embodiments of the present application may also be referred to as a system-on-chip, a system-on-chip, a system-on-chip, or a system-on-a-chip, or the like.
- the method of the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is better implementation.
- the technical solution of the present application can be embodied in the form of a software product in essence or in a part that contributes to the prior art, and the computer software product is stored in a storage medium (such as ROM/RAM, magnetic disk, CD-ROM), including several instructions to make a terminal (which may be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) execute the methods described in the various embodiments of this application.
- a storage medium such as ROM/RAM, magnetic disk, CD-ROM
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims (43)
- 一种功率调整方法,所述方法包括:用户设备UE接收下行控制信息DCI;所述DCI用于调度物理上行共享信道PUSCH传输;所述PUSCH传输关联不同目标资源;所述目标资源包括:探测参考信号SRS资源或者SRS资源组;根据所述DCI,确定所述PUSCH传输对应的目标功率控制参数。
- 根据权利要求1所述的方法,其中,在所述DCI中包含SRS资源指示SRI域的情况下,所述SRI域用于指示至少一套第一功率控制参数;其中,所述目标功率控制参数包括所述SRI域指示的功率控制参数。
- 根据权利要求2所述的方法,其中,所述接收DCI之后,所述方法还包括:确定至少一个第一序列对应的至少一套第一功率控制参数;其中,所述第一序列为:与第一值存在映射关系的序列;所述第一值包括以下任一项:所述SRI域的域值,所述SRI域的域值分别叠加不同第一偏移值后得到的值;所述第一偏移值满足以下至少一项:所述第一偏移值由高层信令配置,所述第一偏移值为整数,所述第一偏移值与SRS资源集合关联,所述SRS资源集合包括至少一个所述目标资源。
- 根据权利要求3所述的方法,其中,所述至少一个第一序列与Y个SRS资源集合关联;一个第一序列与至少一个所述SRS资源集合关联,Y为正整数;其中,所述Y个SRS资源集合包括所述不同目标资源。
- 根据权利要求3所述的方法,其中,所述SRI域对应至少一个域值,一个域值与一个第一序列存在映射关系。
- 根据权利要求1所述的方法,其中,在所述DCI中不包含SRI域的情况下,根据所述DCI,确定所述PUSCH传输对应的目标功率控制参数之前,所述方法还包括:从高层信令配置的功率控制参数集合中,确定目标开环功率控制参数组;其中,所述功率控制参数集合包括一个或多个开环功率控制参数组;所述目标开环功率控制参数组属于所述功率控制参数集合;所述目标开环控制参数组包括至少一套第一功率控制参数,所述目标功率控制参数为所述至少一套第一功率控制参数中的功率控制参数。
- 根据权利要求6所述的方法,其中,所述目标开环功率控制参数组满足以下至少一项:所述目标开环功率控制参数组在所述功率控制参数集合中的位置是基于第二偏移值确定,所述目标开环功率控制参数组为所述功率控制参数集合中满足第一条件的组索引所对应的开环功率控制参数组;所述第二偏移值满足以下至少一项:所述第二偏移值由高层信令配置,所述第二偏移值为整数,所述第二偏移值与SRS资源集合关联,所述SRS资源集合包括至少一个所述目标资源。
- 根据权利要求1所述的方法,其中,在所述DCI中不包含SRI域的情况下,根据所述DCI,确定所述PUSCH传输对应的目标功率控制参数之前,所述方法还包括:确定至少一套第一功率控制参数;其中,所述至少一套第一功率控制参数包括:指示至少一套路损参考信号的参数;所述至少一套路损参考信号的参数是基于以下至少一项确定的:上行物理控制信道PUCCH资源配置的路损参考信号的索引;从第一预设索引开始的连续多个索引指示的一套或多套路损参考信号;从第二预设索引开始的连续多个索引指示的多个控制资源集CORESET的传输配置指示TCI状态中的参考信号。
- 根据权利要求2至8任一项所述的方法,其中,所述根据所述DCI,确定所述PUSCH对应的目标功率控制参数之前,所述方法还包括:确定高层信令配置的多套第二功率控制参数中的至少一套第二功率控制参数;其中,所述目标功率控制参数包括以下至少一项:所述至少一套第一功率控制参数中的功率控制参数,所述至少一套第二功率控制参数中的功率控制参数。
- 根据权利要求9所述的方法,其中,在所述DCI中不包含SRI域的情况下,一套第二功率控制参数中包含至少两个第二功率控制参数。
- 根据权利要求9所述的方法,其中,一套第二功率控制参数对应一个索引;所述至少一套第二功率控制参数为:所述多套第二功率控制参数中目标索引对应的至少一套第二功率控制参数;其中,所述目标索引是在预设索引的基础上基于第三偏移值得到;所述第三偏移值满足以下至少一项:所述第三偏移值由高层信令配置,所述第三偏移值为整数,所述第三偏移值与SRS资源集合关联,所述SRS资源集合包括至少一个所述目标资源。
- 根据权利要求9所述的方法,其中,所述目标功率控制参数包括:目标第三功率控制参数;所述根据所述DCI,确定所述PUSCH传输对应的目标功率控制参数,包括:在所述至少一套第一功率控制参数和所述至少一套第二功率控制参数中均包含第三功率控制参数的情况下,根据所述DCI中的开环功率控制参数集指示域的域值,从所述至少一套第一功率控制参数和所述至少一套第二功率控制参数中,确定所述目标第三功率控制参数。
- 根据权利要求12所述的方法,其中,所述开环功率控制参数集指示域包含X个有效位,所述开环功率控制参数集指示域的每组有效位各对应一个所述目标资源;其中,X为大于1的整数。
- 根据权利要求13所述的方法,其中,所述开环功率控制参数集指示域的任一组有效位的值用于指示:关联所述任一组有效位对应目标资源的目标第三功率控制参数。
- 根据权利要求9所述的方法,其中,所述确定高层信令配置的多套第二功率控制参数中的至少一套第二功率控制参数,包括:在所述DCI中包含所述SRI域的情况下,根据高层信令中包含的至少一个第二序列的序列配置,确定所述至少一个第二序列对应的至少一套第二功率控制参数;其中,所述第二序列为:与第二值存在映射关系的序列;所述第二值包括以下任一项:所述SRI域的域值,所述SRI域的域值分别叠加不同第四偏移值后得到的值;所述第四偏移值满足以下至少一项:所述第四偏移值由高层信令配置,所述第四偏移值为整数,所述第四偏移值与SRS资源集合关联,所述SRS资源集合包括至少一个所述目标资源。
- 根据权利要求15所述的方法,其中,所述SRI域对应至少一个域值,一个域值与至少一个第二序列存在映射关系。
- 根据权利要求2所述的方法,其中,所述SRI域指示的所述至少一套第一功率控制参数与所述SRI域指示的M个所述目标资源相关;其中,M为正整数。
- 根据权利要求17所述的方法,其中,所述M个目标资源满足以下至少一项:所述M个目标资源分别属于不同的SRS资源集合;一个SRS资源组中的所有SRS资源属于同一SRS资源集合。
- 根据权利要求1所述的方法,其中,所述PUSCH传输的至少一个时频资源信息对应至少一套功率控制参数;其中,所述时频资源信息用于指示以下任一项:所述PUSCH的至少一个传输时机,所述PUSCH的每次跳频的时频资源,所述PUSCH的第一传输时机内的多个时域资源,一个时域资源包括连续多个正交频分复用OFDM符号;所述第一传输时机为所述至少一个传输时机中的一个;所述目标功率控制参数包括所述至少一套功率控制参数中的功率控制参数。
- 根据权利要求1或19所述的方法,其中,所述根据所述DCI,确定所述PUSCH传输对应的目标功率控制参数之后,所述方法还包括:对所述PUSCH进行K次跳频,所述PUSCH的每次跳频对应一套功率控制参数,K为大于或等于1的整数;在所述PUSCH的每次跳频过程中,分别根据每次跳频对应的功率控制参数,调整所述PUSCH的发送功率。
- 根据权利要求20所述的方法,其中,所述PUSCH的每次跳频满足以下任一项:所述PUSCH的传输时机对应的不同跳频点关联不同的目标资源;每个跳频点与各自对应的功率控制参数所关联的目标资源相同。
- 根据权利要求19所述的方法,其中,一个传输时机对应至少一套功率控制参数。
- 根据权利要求19所述的方法,其中,在所述第一传输时机对应至少两套功率控制参数的情况下,所述第一传输时机中的每个所述时域资源对应一套功率控制参数。
- 根据权利要求23所述的方法,其中,所述连续的多个OFDM符号关联的目标资源相同;或者,所述连续的多个OFDM符号关联的目标资源,与所述连续的多个OFDM符号对应的功率控制参数所关联的目标资源相同。
- 根据权利要求1所述的方法,其中,所述DCI中还包含闭环功率控制调整状态索引和所述闭环功率控制调整状态索引对应的功率调整值;其中,所述目标功率控制参数包括所述功率调整值。
- 根据权利要求25所述的方法,其中,所述DCI中的TPC域用于指示所述功率调整值,所述TPC域的大小由高层信令指示。
- 根据权利要求1所述的方法,其中,所述目标资源维持多个闭环功率控制调整状态;其中,所述闭环功率控制调整状态满足以下至少一项:所述闭环功率控制调整状态是高层信令指示的;所述闭环功率控制调整状态与SRS资源集合关联;其中,所述SRS资源集合包括所述目标资源。
- 一种功率控制装置,所述装置包括:接收模块,用于接收DCI;所述DCI用于调度PUSCH传输;所述PUSCH传输关联不同目标资源;所述目标资源包括:SRS资源或者SRS资源组;确定模块,用于根据所述接收模块接收到的所述DCI,确定所述PUSCH传输对应的目标功率控制参数。
- 根据权利要求28所述的装置,其中,在所述DCI中包含SRS资源指示SRI域的情况下,所述SRI域用于指示至少一套第一功率控制参数;其中,所述目标功率控制参数包括所述SRI域指示的功率控制参数。
- 根据权利要求29所述的装置,其中,所述确定模块,还用于:确定至少一个第一序列对应的至少一套第一功率控制参数;其中,所述第一序列为:与第一值存在映射关系的序列;所述第一值包括以下任一项:所述SRI域的域值,所述SRI域的域值分别叠加不同第一偏移值后得到的值;所述第一偏移值满足以下至少一项:所述第一偏移值由高层信令配置,所述第一偏移值为整数,所述第一偏移值与SRS资源集合关联,所述SRS资源集合包括至少一个所述目标资源。
- 根据权利要求29或30所述的装置,其中,所述确定模块,还用于确定高层信令配置的多套第二功率控制参数中的至少一套第二功率控制参数;其中,所述目标功率控制参数包括以下至少一项:所述至少一套第一功率控制参数中的功率控制参数,所述至少一套第二功率控制参数中的功率控制参数。
- 根据权利要求31所述的装置,其中,在所述DCI中不包含SRI域的情况下,一套第二功率控制参数中包含至少两个第二功率控制参数。
- 根据权利要求31所述的装置,其中,所述目标功率控制参数包括:目标第三功率控制参数;所述确定模块,具体用于:在所述至少一套第一功率控制参数和所述至少一套第二功率控制参数中均包含第三功率控制参数的情况下,根据所述DCI中的开环功率控制参数集指示域的域值,从所述至少一套第一功率控制参数和所述至少一套第二功率控制参数中,确定所述目标第三功率控制参数。
- 根据权利要求33所述的装置,其中,所述开环功率控制参数集指示域包含X个有效位,所述开环功率控制参数集指示域的每组有效位各对应一个所述目标资源;其中,X为大于1的整数。
- 根据权利要求34所述的装置,其中,所述开环功率控制参数集指示域的任一组有效位的值用于指示:关联所述任一组有效位对应目标资源的目标第三功率控制参数。
- 根据权利要求31所述的装置,其中,所述确定模块,具体用于:在所述DCI中包含所述SRI域的情况下,根据高层信令中包含的至少一个第二序列的序列配置,确定所述至少一个第二序列对应的至少一套第二功率控制参数;其中,所述第二序列为:与第二值存在映射关系的序列;所述第二值包括以下任一项:所述SRI域的域值,所述SRI域的域值分别叠加不同第四偏移值后得到的值;所述第四偏移值满足以下至少一项:所述第四偏移值由高层信令配置,所述第四偏移值为整数,所述第四偏移值与SRS资源集合关联,所述SRS资源集合包括至少一个所述目标资源。
- 根据权利要求28所述的装置,其中,所述PUSCH传输的至少一个时频资源信息对应至少一套功率控制参数;其中,所述时频资源信息用于指示以下任一项:所述PUSCH的至少一个传输时机,所述PUSCH的每次跳频的时频资源,所述PUSCH的第一传输时机内的多个时域资源,一个时域资源包括连续多个正交频分复用OFDM符号;所述第一传输时机为所述至少一个传输时机中的一个;所述目标功率控制参数包括所述至少一套功率控制参数中的功率控制参数。
- 根据权利要求28或37所述的装置,其中,所述装置还包括:执行模块,其中:所述执行模块,用于:对所述PUSCH进行K次跳频,所述PUSCH的每次跳频对应 一套功率控制参数,K为大于或等于1的整数;在所述PUSCH的每次跳频过程中,分别根据每次跳频对应的功率控制参数,调整所述PUSCH的发送功率。
- 根据权利要求38所述的装置,其中,所述PUSCH的每次跳频满足以下任一项:所述PUSCH的传输时机对应的不同跳频点关联不同的目标资源;每个跳频点与各自对应的功率控制参数所关联的目标资源相同。
- 根据权利要求37所述的装置,其中,在所述第一传输时机对应至少两套功率控制参数的情况下,所述第一传输时机中的每个所述时域资源对应一套功率控制参数。
- 根据权利要求40所述的装置,其中,所述连续的多个OFDM符号关联的目标资源相同;或者,所述连续的多个OFDM符号关联的目标资源,与所述连续的多个OFDM符号对应的功率控制参数所关联的目标资源相同。
- 一种UE,处理器,存储器及存储在所述存储器上并可在所述处理器上运行的程序或指令,所述程序或指令被所述处理器执行时实现如权利要求1至27任一项所述的功率控制方法的步骤。
- 一种可读存储介质,所述可读存储介质上存储程序或指令,所述程序或指令被处理器执行时实现如权利要求1至27任一项所述的功率控制方法的步骤。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020237023928A KR20230121122A (ko) | 2021-01-15 | 2022-01-13 | 전력 제어 방법, 장치 및 사용자 기기 |
EP22739082.0A EP4258755A4 (en) | 2021-01-15 | 2022-01-13 | POWER REGULATION METHOD AND APPARATUS, AND USER EQUIPMENT |
JP2023541050A JP2024502121A (ja) | 2021-01-15 | 2022-01-13 | パワー制御方法、装置及びユーザ機器 |
US18/349,773 US20230354208A1 (en) | 2021-01-15 | 2023-07-10 | Power control method and apparatus, and user equipment |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110057780.3 | 2021-01-15 | ||
CN202110057780.3A CN114765845B (zh) | 2021-01-15 | 2021-01-15 | 功率控制方法、装置及用户设备 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US18/349,773 Continuation US20230354208A1 (en) | 2021-01-15 | 2023-07-10 | Power control method and apparatus, and user equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022152206A1 true WO2022152206A1 (zh) | 2022-07-21 |
Family
ID=82364568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2022/071784 WO2022152206A1 (zh) | 2021-01-15 | 2022-01-13 | 功率控制方法、装置及用户设备 |
Country Status (6)
Country | Link |
---|---|
US (1) | US20230354208A1 (zh) |
EP (1) | EP4258755A4 (zh) |
JP (1) | JP2024502121A (zh) |
KR (1) | KR20230121122A (zh) |
CN (2) | CN114765845B (zh) |
WO (1) | WO2022152206A1 (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4292373A4 (en) * | 2021-03-19 | 2024-08-07 | Samsung Electronics Co Ltd | METHOD AND APPARATUS FOR CONTROLLING UPLINK TRANSMISSION POWER FOR A NETWORK COORDINATION COMMUNICATIONS SYSTEM |
WO2024055251A1 (zh) * | 2022-09-15 | 2024-03-21 | 深圳传音控股股份有限公司 | 控制方法、通信设备及存储介质 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109151973A (zh) * | 2017-06-16 | 2019-01-04 | 华为技术有限公司 | 功率控制方法及装置 |
CN109803362A (zh) * | 2017-11-17 | 2019-05-24 | 中兴通讯股份有限公司 | 功率控制方法、ue、基站、参数配置方法和控制方法 |
WO2020118574A1 (zh) * | 2018-12-12 | 2020-06-18 | Oppo广东移动通信有限公司 | 一种上行传输的功率控制方法及终端设备 |
CN111867078A (zh) * | 2019-04-30 | 2020-10-30 | 大唐移动通信设备有限公司 | 上行信号传输方法、调度信息确定方法和相关设备 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018202014A1 (en) * | 2017-05-05 | 2018-11-08 | Huawei Technologies Co., Ltd. | Method of power control for uplink transmission |
CN109803363B (zh) * | 2017-11-17 | 2022-11-08 | 华为技术有限公司 | 通信方法、通信装置和系统 |
CN112703753B (zh) * | 2019-01-23 | 2023-03-21 | Oppo广东移动通信有限公司 | 传输信号的方法、终端设备和网络设备 |
-
2021
- 2021-01-15 CN CN202110057780.3A patent/CN114765845B/zh active Active
- 2021-01-15 CN CN202411201546.3A patent/CN118870493A/zh active Pending
-
2022
- 2022-01-13 JP JP2023541050A patent/JP2024502121A/ja active Pending
- 2022-01-13 WO PCT/CN2022/071784 patent/WO2022152206A1/zh active Application Filing
- 2022-01-13 KR KR1020237023928A patent/KR20230121122A/ko active Search and Examination
- 2022-01-13 EP EP22739082.0A patent/EP4258755A4/en active Pending
-
2023
- 2023-07-10 US US18/349,773 patent/US20230354208A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109151973A (zh) * | 2017-06-16 | 2019-01-04 | 华为技术有限公司 | 功率控制方法及装置 |
CN109803362A (zh) * | 2017-11-17 | 2019-05-24 | 中兴通讯股份有限公司 | 功率控制方法、ue、基站、参数配置方法和控制方法 |
WO2020118574A1 (zh) * | 2018-12-12 | 2020-06-18 | Oppo广东移动通信有限公司 | 一种上行传输的功率控制方法及终端设备 |
CN111867078A (zh) * | 2019-04-30 | 2020-10-30 | 大唐移动通信设备有限公司 | 上行信号传输方法、调度信息确定方法和相关设备 |
Non-Patent Citations (3)
Title |
---|
HUAWEI, HISILICON: "Independent Power control for SRS", 3GPP DRAFT; R1-1804449, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Sanya, China; 20180416 - 20180420, 15 April 2018 (2018-04-15), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051426729 * |
SAMSUNG: "Remaining Issues on UL Power Control", 3GPP DRAFT; R1-1720361 REMAINING ISSUES ON UL POWER CONTROL-SAMSUNG, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Reno, USA; 20171127 - 20171201, 18 November 2017 (2017-11-18), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051369934 * |
See also references of EP4258755A4 * |
Also Published As
Publication number | Publication date |
---|---|
CN114765845B (zh) | 2024-07-23 |
EP4258755A1 (en) | 2023-10-11 |
US20230354208A1 (en) | 2023-11-02 |
JP2024502121A (ja) | 2024-01-17 |
KR20230121122A (ko) | 2023-08-17 |
CN114765845A (zh) | 2022-07-19 |
CN118870493A (zh) | 2024-10-29 |
EP4258755A4 (en) | 2024-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022117035A1 (zh) | Pusch的调度传输方法、终端和网络侧设备 | |
WO2022007930A1 (zh) | 一种载波切换处理方法、装置及终端 | |
WO2022206997A1 (zh) | 功率控制参数指示方法、终端及网络侧设备 | |
US20230354208A1 (en) | Power control method and apparatus, and user equipment | |
WO2022078502A1 (zh) | 功率确定方法、装置、终端及可读存储介质 | |
CN114363986A (zh) | Pucch重复传输次数确定方法、装置及终端 | |
WO2022083634A1 (zh) | 资源配置方法、装置、设备及可读存储介质 | |
WO2022228341A1 (zh) | 上行信道的传输参数方法、终端及网络侧设备 | |
WO2022194176A1 (zh) | 传输处理方法及相关设备 | |
WO2022206554A1 (zh) | 传输方向的确定方法、装置、终端及网络侧设备 | |
WO2022028468A1 (zh) | 信息确定方法、信息发送方法、终端及网络侧设备 | |
WO2021073605A1 (zh) | 一种功率控制参数确定方法及终端 | |
CN114765728A (zh) | 发送、接收定位信号的方法、终端和网络侧设备 | |
WO2022001848A1 (zh) | 一种传输处理方法、装置及终端 | |
WO2022117039A1 (zh) | Srs的功控指示方法、资源集簇的划分方法和设备 | |
WO2022253312A1 (zh) | 上行数据传输方法、装置、终端及介质 | |
WO2022078451A1 (zh) | 配置授权的重复传输方法、装置、设备及可读存储介质 | |
US20230239896A1 (en) | Transmission mode determining method and apparatus, and communications device | |
EP3739972A1 (en) | Power control method, related apparatus and product | |
WO2022188836A1 (zh) | Cot确定方法、上行传输方法和设备 | |
WO2022063102A1 (zh) | 功率控制方法、终端及网络侧设备 | |
WO2022199359A1 (zh) | 半静态harq码本的构造方法、装置、设备及可读存储介质 | |
WO2022028597A1 (zh) | 控制辅小区的方法、终端及网络侧设备 | |
WO2022166622A1 (zh) | Srs资源配置方法、装置、设备及可读存储介质 | |
WO2023151519A1 (zh) | 功率控制pc参数的确定方法、装置及终端 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22739082 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 12023551827 Country of ref document: PH |
|
WWE | Wipo information: entry into national phase |
Ref document number: 202317045062 Country of ref document: IN Ref document number: 2023541050 Country of ref document: JP |
|
ENP | Entry into the national phase |
Ref document number: 20237023928 Country of ref document: KR Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 2022739082 Country of ref document: EP Effective date: 20230706 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |