WO2022070632A1 - 電力制御システムおよびプログラム - Google Patents
電力制御システムおよびプログラム Download PDFInfo
- Publication number
- WO2022070632A1 WO2022070632A1 PCT/JP2021/029821 JP2021029821W WO2022070632A1 WO 2022070632 A1 WO2022070632 A1 WO 2022070632A1 JP 2021029821 W JP2021029821 W JP 2021029821W WO 2022070632 A1 WO2022070632 A1 WO 2022070632A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- consumer
- power consumption
- equipment
- limit value
- time period
- Prior art date
Links
- 230000008859 change Effects 0.000 claims description 20
- 238000010586 diagram Methods 0.000 description 26
- 238000004378 air conditioning Methods 0.000 description 20
- 230000005611 electricity Effects 0.000 description 17
- 230000006870 function Effects 0.000 description 11
- 230000005540 biological transmission Effects 0.000 description 10
- 238000000034 method Methods 0.000 description 10
- 230000002123 temporal effect Effects 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 3
- 125000002066 L-histidyl group Chemical group [H]N1C([H])=NC(C([H])([H])[C@](C(=O)[*])([H])N([H])[H])=C1[H] 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000015654 memory Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 230000003936 working memory Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0202—Market predictions or forecasting for commercial activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0206—Price or cost determination based on market factors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/04—Billing or invoicing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/26—Pc applications
- G05B2219/2639—Energy management, use maximum of cheap power, keep peak load low
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00002—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/58—The condition being electrical
- H02J2310/60—Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Definitions
- This disclosure relates to power control systems and programs.
- Patent Document 1 describes a plurality of grouped consumers including a power meter that measures the power consumption consumed by the load, and each of the consumers who receives the power consumption measured by the power meter from each of the consumers.
- the group power consumption is output for each group using the power consumption of, and if the group power consumption of any group exceeds the group contract power preset for each group, the group power consumption of the power excess group is calculated.
- a power control system including a control device for controlling the group contract power or less is described.
- the electric power control system of the present disclosure is a system that controls electric power so as not to exceed a target electric power set for a group composed of a plurality of consumers, and is predetermined for each consumer belonging to the group. Based on the first prediction means that predicts the power consumption for each time period and the prediction result by the first prediction means, each demand so that the integrated value of the power consumption for each consumer does not exceed the target power in each time period. Based on the limit value setting means for setting the limit value of the power consumption of the house and the actual power consumption of the equipment of the consumer belonging to the group within the current time limit, the power consumption of the consumer in the time limit is set.
- the limit value of the power consumption of the consumer in the time period is not exceeded. It is a power control system provided with a control means for controlling the power consumption of the equipment of each consumer. In this way, when controlling the power consumption by a group consisting of multiple consumers, adjustments are made according to the specific operating conditions of each consumer equipment, and the power consumption for each consumer equipment is made. Can be controlled appropriately.
- the first forecasting means predicts the power consumption based on at least the historical information on the operation of the equipment of each consumer in the past
- the second predicting means predicts each demand within the current time limit. It is also possible to predict the power consumption in the relevant time period based on the information on the operating status of the equipment in the house. In this way, it is possible to make adjustments according to the specific operating conditions of the individual consumer equipment based on the operating conditions of the equipment of each consumer within the current time limit.
- control means may control the power consumption of the equipment of each consumer in the current time period so as to suppress the temporal change of the power consumption. By doing so, it is possible to suppress a sudden change in the power consumption of each consumer's equipment and to appropriately control the power consumption of each consumer's equipment.
- control means is based on the limit value of the power consumption in the time period following the current time period, the power consumption of the consumer in the current time period, and the prediction result of the power consumption of the current time.
- the power consumption of the equipment Before and after switching from the time limit to the subsequent time limit, the power consumption of the equipment may be controlled so as to suppress the change in the power consumption of the equipment of the consumer. By doing so, it is possible to suppress a sudden change in the power consumption of each consumer's equipment before and after the time limit is switched, and to appropriately control the power consumption of each consumer's equipment.
- the control means uses the consumer's equipment in the current time limit. It may be possible to control the power exceeding the limit value. By doing so, before and after the time limit is switched, the control exceeding the initial limit value is performed in the previous time limit, so that the sudden change in the power consumption in the equipment of each consumer can be suppressed, and each customer's equipment can be controlled. It is possible to appropriately control the power consumption of.
- the control means controls the equipment of one consumer to exceed the limit value of the power used by the one consumer in the current time limit
- the power used by the other consumer is the other. If there is a margin for the limit value of the power consumption of the consumer, the limit value of the power consumption of the other consumer is lowered, and the limit value of the power consumption of the one consumer is set to the above.
- the power consumption of other consumers may be increased by the amount corresponding to the decrease of the limit value. In this way, it is possible to appropriately control the power consumption of each consumer equipment by accommodating the available power consumption indicated by the initial limit value among the consumers.
- the program of the present disclosure is a computer that controls a system that controls power so as not to exceed a target power set for a group composed of a plurality of consumers. Based on the first prediction means that predicts the power consumption of each consumer belonging to the group for each predetermined time period and the prediction result by the first prediction means, the integrated value of the power consumption for each consumer in each time period. Based on the limit value setting means for setting the limit value of the power consumption of each consumer so that the power consumption does not exceed the target power, and the actual power consumption of the equipment of the consumer belonging to the group within the current time limit.
- the customer in the time period It is a program that functions as a control means for controlling the power consumption of the equipment of each consumer so as not to exceed the above-mentioned limit value of the power consumption.
- this program when controlling the power consumption by a group consisting of multiple consumers, adjustments are made according to the specific operating conditions of each consumer equipment, and the consumer equipment is installed. The power consumption for each can be controlled appropriately.
- FIG. 6C is a diagram showing an example of predicted values for each time period in the prediction results.
- FIG. 7 (A) is a figure which shows the forecast example for each consumer which constitutes a group
- FIG. 7 (B) is a group.
- FIG. 7C is a figure which shows the example of the prediction value for each time period in the prediction result of a group.
- FIG. 8A is a figure which shows the forecast example of the average power consumption for each time period of a group
- FIG. 8C which shows the result of allocating the limit value to each consumer, is a diagram showing an example of the limit value for each time period allocated to one customer in the group. It is a figure which shows the relationship between the target electric power of a group, and the limit value of each consumer which constitutes a group. It is a figure which shows the example of the relationship between the limit value of each consumer, and the value of the power consumption by the time-limited prediction.
- FIG. 11A is a diagram showing an example of the actual power consumption of each consumer when the limit value is adjusted
- FIG. 11A is a diagram showing an example of a case where the limit value is lowered by the adjustment
- FIG. 11B is a diagram. It is a figure which shows the example of the case where the limit value rises by adjustment. It is a figure which shows the other example of the relationship between the limit value of each consumer, and the value of the power consumption by the time-limited prediction.
- FIG. 1 is a diagram showing an overall configuration of a control system for equipment to which this embodiment is applied.
- the control system of the present embodiment includes a control device 100, equipment 200 which is a controlled device, and a server 300.
- the control device 100 and the equipment 200 are connected to each other via a network.
- This network may be a LAN (Local Area Network) using a dedicated line, or may use a WAN (Wide Area Network), a VPN (Virtual Private Network) set on the Internet, or the like.
- LAN Local Area Network
- WAN Wide Area Network
- VPN Virtual Private Network
- Equipment 200 is equipment or equipment that operates using electric power.
- the control device 100 controls the operation of one or a plurality of equipments 200.
- FIG. 1 shows a configuration example in which the control device 100 controls a plurality of equipment 200.
- the equipment 200 may be of any type as long as it is a facility or device that operates using electric power and whose operation is controlled by the control device 100.
- the control system of the present embodiment is applied to the control of the air conditioning equipment may be described.
- the equipment 200 is provided with a control means for controlling the own device according to an instruction from the control device 100.
- the control device 100 generates an instruction for controlling the equipment 200 to be controlled (hereinafter referred to as “control instruction”), and transmits the generated control instruction to each equipment 200.
- control instruction an instruction for controlling the equipment 200 to be controlled
- Each equipment 200 acquires a control instruction from the control device 100, sets the own device according to the acquired control instruction by the control means of the own device, and controls the operation.
- the control device 100 and the server 300 are connected via a network.
- a network In the configuration example shown in FIG. 1, one control device 100 connected to the server 300 is shown, but in reality, a plurality of control devices 100 are connected to the server 300. Then, one or a plurality of equipments and devices 200 are connected to each control device 100.
- the Internet is used as the network connecting the control device 100 and the server 300. Further, LAN or WAN may be used.
- Electricity charges are mainly composed of basic charges and electricity charges, and are specified monthly.
- the basic charge is calculated based on the basic charge unit price and the contracted power.
- the contracted power is the maximum value of the maximum demand power within one year from the current month.
- the maximum demand power is the maximum value of the average power consumption for each monthly time period (demand time period: 30 minutes).
- the average power consumption is the average value of the demand power (power consumption) in each period.
- the electric energy charge is calculated based on the electric energy charge unit price and the monthly electric energy consumption.
- the contract power is the maximum value of the maximum demand power within the past year. Therefore, if the maximum demand power of a month (in other words, the average power consumption of a certain period in that month) becomes the contract power, even if the maximum demand power lower than the contract power is maintained after that month, 1 A basic charge based on this contracted electricity will be levied over the year. In addition, when the average power consumption exceeds the value of the contracted power up to that time in a certain period and becomes the maximum demand power of the month including that time period, the average power consumption (maximum demand power) of this time period becomes the new contract power. , Used to calculate the basic charge after that.
- the electric energy charge unit price may be set to fluctuate based on predetermined conditions.
- the unit price of electric energy may be set to fluctuate according to the time zone of the day, whether it is a weekday or a holiday, the season, and the like.
- electric power may be traded in the market, and a variable electric energy charge unit price may be set to reflect the transaction price of electric power in the market.
- the control may be performed with the aim of reducing the electricity charge required for the operation of the equipment 200. In this case, it is required to control the equipment 200 so that the average power consumption does not exceed the current contract power.
- the unit price of electricity fluctuates, it is more efficient to reduce the amount of electricity used in the time zone when the unit price is high than in the time zone when the unit price is low, from the viewpoint of reducing the electricity charge.
- the unit price of electricity charges affects only the electricity charges for each period, the contracted electricity affects the electricity charges for one year after the current month. Therefore, the control considering the average power consumption is prioritized over the control considering the fluctuation of the electric energy charge unit price.
- Electricity charges are levied on power supply contractors.
- a group composed of a plurality of consumers is assumed as a contractor of electric power supply. Therefore, the average power consumption is obtained as an integrated value of the average power consumption for each time period by each of the plurality of consumers constituting this group.
- the basic charge is determined based on the maximum power demand for each group (the maximum value of the average power consumption for each time period in a month).
- the maximum demand power of each group is usually smaller than the sum of the maximum demand power of each consumer constituting the group. This is because the time limit for the maximum demand power is generally different among the consumers who make up the group. Therefore, the basic charge set for the group is lower than the sum of the basic charges set based on the maximum demand power for each consumer constituting the group.
- One or more control devices 100 are assigned to one group.
- the one or more control devices 100 are set every predetermined unit time for the equipment 200 of each customer constituting the group according to the electricity charge (basic charge and electric energy charge) set in the group unit. Control is performed in consideration of the average power consumption and the unit price of electricity.
- the consumer has one or more equipment 200, and the control device 100 controls the equipment 200 of one or more consumers.
- the control device 100 controls the equipment 200 of one or more consumers.
- one consumer does not always correspond to one control device 100.
- a plurality of equipments and devices 200 possessed by one consumer may be controlled by a plurality of control devices 100, and equipments and devices 200 possessed by a plurality of consumers may be controlled by one control device 100.
- one control device 100 may be assigned to a plurality of groups. However, in the following description, for the sake of simplicity, it is assumed that one control device 100 is assigned to one customer, and the equipment 200 of each customer is controlled by the control device 100 corresponding to each customer. I will explain.
- FIG. 2 is a diagram showing the configuration of the server 300.
- the server 300 is realized as, for example, a server (so-called cloud server) built on a cloud environment of a network.
- the server 300 includes a group management unit 310, a first prediction unit 320, a limit value setting unit 330, a control information generation unit 340, a second prediction unit 350, a performance information acquisition unit 360, and a limit value adjustment unit 370. And a transmission control unit 380.
- the group management unit 310 manages the above-mentioned group of consumers. As mentioned above, this group is set as a unit of power contract. The group management unit 310 acquires and holds information on the contracted power of the group, the maximum demand power, and the average power consumption for each time period. In addition, the group management unit 310 manages the consumers who make up the group. The group management unit 310 acquires and holds information on the contracted power, the maximum demand power, and the average power consumption for each time period of each consumer constituting the group. Information on the average power consumption of each consumer is obtained, for example, from the control device 100 that controls the equipment 200 of each consumer.
- the information on the average power consumption of the group is obtained from, for example, the control device 100 that controls the equipment 200 of the consumers constituting the group (hereinafter referred to as "equipment 200 of the group”).
- equipment 200 of the group the equipment 200 of the group
- the average power consumption for each time period of each consumer constituting the group is integrated to obtain the average power consumption of the group.
- the first prediction unit 320 predicts the average power consumption for each time period by the equipment 200 of each customer for each customer constituting the group.
- the first prediction unit 320 is an example of a prediction means.
- the prediction of the average power consumption for each time period by the first prediction unit 320 is performed, for example, based on the historical information regarding the past operation of the equipment 200 of each consumer constituting the group.
- the history information regarding the operation includes various information related to the operation of the equipment 200, such as information on the operating environment of the equipment 200, in addition to the information on the operating state of the equipment 200.
- Information on the operating state of the equipment 200 includes, for example, information such as an operating rate, continuous operating time, and the number of operating times.
- the information on the operating environment includes, for example, weather conditions such as weather, temperature, and humidity, and information such as month, day, and time zone.
- a reference time period for the specific time period is set based on historical information on operation, and the equipment 200 in this reference time period. It may be done based on the average power consumption of.
- the reference time limit may be, for example, a past time limit which is a weather condition similar to the weather condition expected at the date and time when the specific time limit corresponds, or a corresponding time limit on the same day of the same month one year ago.
- the average power consumption of the equipment 200 in the time before and after the reference time and the average power of the equipment 200 in the time period of several days up to the day including the reference time You may take into consideration the transition of power consumption.
- the limit value setting unit 330 sets a limit value for each customer constituting the group with respect to the average power consumption for each time period by the equipment 200 of each consumer based on the prediction result by the first prediction unit 320.
- the limit value setting unit 330 is an example of setting means. If the average power consumption of a group exceeds the contracted power of the group, this average power consumption becomes a new contracted power and raises the basic charge of electricity charges. Therefore, it is required to set a target power based on the contract power for the group and control the average power consumption for each time period so as not to exceed the target power in the entire equipment 200 of the group. Then, the limit value for each time limit is set so that the integrated value of the limit value of each consumer is equal to or less than the threshold value based on the target power.
- the target power is set to a value equal to or less than the contract power, for example, a value lower than the contract power by a certain value.
- the threshold value is set to a value equal to or less than the target power, for example, a value lower than the target power by a certain value.
- FIG. 9 is a diagram showing the relationship between the target power of the group and the limit value of each consumer constituting the group.
- the value of the target power and the above threshold value are equal to each other, and the value is compared with the integrated value of the limit value of each consumer.
- the value obtained by integrating the limit values of the 12 consumers (customers (1) to (12)) does not exceed the target power of the group composed of each consumer. It is shown that.
- the electric power corresponding to the target electric power set for the group is distributed to each consumer constituting the group.
- each consumer constituting the group is an example of a power consumption unit.
- the limit value of each of the consumers constituting the group is set based on, for example, the prediction of the average power consumption for each consumer by the first prediction unit 320. From the prediction of the first prediction unit 320, the ratio of the average power consumption predicted by each consumer of the group is specified for each time period. Therefore, for example, when the integrated value of the limit value of each consumer is set to be equal to the threshold value based on the above target power, the average power consumption corresponding to this threshold value is predicted by the first prediction unit 320. Allocate the power so that it is the ratio of the average power consumption by the consumers, and use it as the limit value for each consumer. In other words, the limit value means the power consumption available to each consumer in that time period.
- the limit value is set based on the actual value of the average power consumption for each time period in the past specific period of each customer, instead of the ratio of the average power consumption for each time period for each consumer. good.
- the ratio of the actual value of the average power consumption of each consumer in the reference time period shown in the same explanation is specified with respect to the specific time period shown in the explanation of the prediction by the first prediction unit 320.
- a limit value for each consumer in a specific time period may be set based on the ratio of the actual value.
- the specific period may be set according to the amount of information obtained as the actual value of the reference time period, for example, set for the past one year or several years, or between a specific date and a specific date. You may.
- the limit value may be set based on the maximum value of the average power consumption for each time period in a specific period of each consumer. For example, assuming that the specific period is the past one year, the maximum value of the average power consumption for each time period in the past one year can be obtained for each consumer. Then, the maximum value of each consumer may be compared, and the limit value of each consumer may be set at a ratio according to the ratio. In this case, unlike the case where the actual value of the reference time is used, the time when the average power consumption becomes the maximum value may be different for each consumer.
- a lower limit value may be set as the limit value.
- the lower limit is a value greater than 0.
- a limit value corresponding to the lower limit value is set even when the average power consumption in a certain time period is predicted to be 0 for a certain consumer. This is because when the average power consumption is predicted to be 0 for a certain consumer and the limit value is set to 0, the limit value is immediately exceeded when the consumer uses the equipment 200 in that time limit. Therefore, this is to avoid such inconvenience.
- the case where the average power consumption is predicted to be 0 may be, for example, the case where the average power consumption of the consumer in the reference time period used for the prediction by the first prediction unit 320 is 0.
- the lower limit setting method may be appropriately determined according to the operation and specifications of the control system, the agreement between the group and individual consumers, and the like. For example, a fixed value may be set in advance, or a value that fluctuates based on a predicted value of the average power consumption for each time period in the entire group may be used. When a fixed value is set as the lower limit value, the same value may be set for each consumer, or a separate value may be set for each consumer according to appropriate conditions and demands of the consumer.
- the predicted value of the average power consumption for each time period in the entire group is obtained by integrating the predicted value of the average power consumption for each time period in each consumer constituting the group by the first prediction unit 320.
- the lower limit threshold value is set for the limit value, and when the limit value given to a certain consumer is lower than the lower limit value, the lower limit value is applied as the limit value. Is also good.
- a value different from the lower limit value may be set. For example, if a value lower than the lower limit value is set as the lower limit threshold value, when the limit value assigned to a certain customer falls below the lower limit threshold value in a certain time period, the lower limit value larger than the lower limit threshold value is the demand in that time period. Set as a house limit.
- a limit value is set for the average power consumption of each time period by the equipment 200 for each customer.
- a configuration in which a limit value is set only for the average power consumption for a period satisfying a specific condition may be used. For example, by integrating the predicted values of the average power consumption of a certain time period in each consumer constituting the group by the first prediction unit 320, the predicted value of the average power consumption of the entire group in that time period can be obtained.
- a limit value may be set only for the average power consumption in such a time period, provided that the predicted value of the average power consumption of this group exceeds the above threshold value.
- the threshold is set based on the target power, and the target power is set based on the contract power. Therefore, when many of the consumers who make up a group do not use a large amount of power in a certain time period (for example, the time zone from midnight to dawn), the predicted value of the average power consumption of the group for that time period has a large threshold value. It is possible that it will fall below. In such a case, set the limit value of each consumer in the group to a value higher than the predicted value of the average power consumption of each consumer within the range where the integrated value of the limit value of each consumer does not exceed the threshold value. May be.
- the control information generation unit 340 generates control information for controlling the equipment 200 of each consumer constituting the group.
- the control information includes the equipment 200 in the control device 100 so that the average power consumption for each time period by the equipment 200 of the consumer does not exceed the time limit set by the limit value setting unit 330. Information to be controlled. Therefore, the control information includes information on the limit value for each consumer set by the limit value setting unit 330.
- the control information generation unit 340 generates the control information of the corresponding time period before the time period in which the control by each control information is performed is started.
- control information generation unit 340 controls the equipment 200 to control the adjustment result of the limit value when the limit value of each consumer set by the limit value setting unit 330 is adjusted by the limit value adjustment unit 370.
- general control information when distinguishing between the above control information based on the limit value set by the limit value setting unit 330 and the control information based on the limit value adjusted by the limit value adjustment unit 370, the former is referred to as “general control information”.
- the latter is called “individual control information”.
- the adjustment of the limit value by the limit value adjustment unit 370 is performed within the time limit in which the control to reflect the adjustment of the limit value is performed. Therefore, unlike the general control information, the individual control information is generated within the time period after the time period in which the control by the individual control information is performed is started.
- the second prediction unit 350 predicts the average power consumption of the equipment 200 in the current time within the currently ongoing time period (hereinafter referred to as “current time”) in which the control of the equipment 200 is being carried out. ..
- the estimation of the average power consumption by the second prediction unit 350 is performed, for example, based on the actual power consumption of the equipment 200 in the time period before the current time limit.
- in-time time prediction when the prediction of the average power consumption of the equipment 200 in the current time period by the second prediction unit 350 is distinguished from the prediction before the start of the time period by the first prediction unit 320, it is referred to as "in-time time prediction".
- the actual power consumption of the equipment 200 in a certain time period is determined after the time period ends. Therefore, the integrated value of the power used determined by the equipment 200 of each consumer as the actual result of the group in a certain period (for example, the period from 13:00 to 13:30) (hereinafter referred to as "integrated confirmed value”) is , Obtained after the next time period (13:30 to 14:00 time period).
- the in-time forecast by the second prediction unit 350 is performed based on the information on the operating status of the equipment 200 of each consumer in the current time and the integrated fixed value in the time before the current time.
- the time limit before the current time limit in which the accumulated fixed value is taken into consideration in the time limit prediction is not limited to the time limit immediately before the current time limit.
- the integrated fixed value from the current time period to the time period before a plurality of time periods may be used.
- the time-limited prediction may be performed by taking into consideration the accumulated fixed values of a plurality of time periods before the current time period.
- the information regarding the operating status includes, for example, information such as the operating status of the equipment 200 and the setting related to the operation. For example, when the equipment 200 is an air conditioner, information such as a difference between the set temperature and the actual room temperature can be used.
- the performance information acquisition unit 360 acquires performance information regarding the operating status of the equipment 200 of each customer constituting the group. In addition to the above-mentioned actual information in the current time period (actual information from the start of the current time period to the time when the actual information is acquired), the acquired actual information is acquired in the already completed time period. Is also good.
- the performance information may be acquired from the control device 100 that controls the equipment 200, or may be acquired from the equipment 200 itself.
- the actual information of the current time period acquired by the actual information acquisition unit 360 is used for the prediction of the average power consumption of the equipment 200 by the second prediction unit 350, the adjustment of the limit value by the limit value adjustment unit 370, and the like.
- the limit value adjustment unit 370 adjusts the limit value of each consumer constituting the group set by the limit value setting unit 330 based on a predetermined condition. As an example, the limit value adjustment unit 370 adjusts the limit value of each consumer based on the prediction by the second prediction unit 350. Further, as another example, the limit value adjusting unit 370 adjusts the limit value of each consumer based on the actual information regarding the operating status of the equipment 200 in the current time period acquired by the actual information acquisition unit 360. The adjustment of the limit value is adjusted so that the power consumption available to each consumer is interchanged among the consumers who make up the group. For example, the limit value is lowered for some of the consumers constituting the group, and the limit value is raised for other consumers by the amount corresponding to the decrease in the limit value of some consumers. Details of adjusting the limit value will be described later.
- the transmission control unit 380 transmits the control information generated by the control information generation unit 340 to the control device 100 that controls the equipment 200 of the consumer corresponding to each control information.
- the transmission control unit 380 transmits the general control information of the corresponding time period to the control device 100 before the time period in which the control by each control information is performed is started.
- the transmission control unit 380 immediately before the time period to transmit the general control information to be reduced from the power consumption in the time period immediately before the time period to be transmitted. It may be possible to transmit before the general control information that is increased from the power consumption in the time limit.
- the transmission control unit 380 immediately transmits the individual control information to the control device 100 that controls the equipment 200 to be controlled by the generated individual control information.
- the transmission control unit 380 transmits the individual control information to the control device 100, the individual control information for the equipment 200 whose limit value is lowered by the adjustment is obtained from the individual control information for the equipment 200 whose limit value is increased by the adjustment. May be sent first.
- FIG. 3 is a diagram showing the configuration of the control device 100.
- the control device 100 is realized as an information processing device connected to the server 300 and the equipment 200 via a network.
- the control device 100 may be a device (for example, an edge server) provided in the vicinity of the equipment 200 to be controlled, or may be a server (cloud server) built on a cloud environment.
- the control device 100 includes a control information acquisition unit 110, an operation information acquisition unit 120, a storage unit 130, a control instruction generation unit 140, a control instruction output unit 150, and an operation information output unit 160.
- the control information acquisition unit 110 acquires the control information of the equipment 200 from the server 300.
- the control information acquired by the control information acquisition unit 110 includes general control information acquired before the start of the time period and individual control information acquired during the progress of the time period as control information for a certain time period. be.
- the general control information includes information on the average power consumption limit value set for each consumer.
- the individual control information includes information on new limit values that adjust the limit values contained in the general control information for the ongoing time limit.
- the operation information acquisition unit 120 acquires the operation information of the equipment 200 to be controlled by the control device 100.
- the operation information acquired by the operation information acquisition unit 120 broadly includes various information regarding the operation of the equipment 200. For example, it includes information indicating an operating state such as an operating rate and continuous operating time of the equipment 200. In addition, it may include various information that is considered to affect the operation of the equipment 200, such as the operating time zone, the operation on weekdays and the operation on holidays. Further, the operation information acquisition unit 120 may acquire information on the environment in which the equipment 200 is installed, such as temperature and humidity. This information can be obtained by various existing methods depending on the type of information. For example, it can be obtained from the equipment 200 itself, or it can be obtained from various sensor devices and the like. Further, the date and time information can be obtained by, for example, a clock function or a calendar function provided in the control device 100.
- the storage unit 130 stores various types of information acquired by the control information acquisition unit 110 and the operation information acquisition unit 120.
- the control information acquired by the control information acquisition unit 110 is used to control the equipment 200.
- the general control information of each time period is stored in the storage unit 130 before the time period in which the control by each general control information is performed is started.
- the operation information of the equipment 200 acquired by the operation information acquisition unit 120 is sent to the server 300 at a predetermined timing, and is used for the prediction by the first prediction unit 320 and the second prediction unit 350 of the server 300.
- the control instruction generation unit 140 generates a control instruction for controlling the equipment 200 based on the control information acquired by the control information acquisition unit 110.
- the control instruction generation unit 140 issues a control instruction to operate the equipment 200 so that the average power consumption for each time period by the equipment 200 of each consumer does not exceed the limit value set for the customer for each time period. Generate.
- the integrated value of the average power consumption of all the equipment 200 possessed by the one consumer does not exceed the corresponding time limit for each time period.
- Control instructions are generated. In this case, there is no particular limitation on the method in which the consumer allocates electric power to his / her own plurality of equipment 200 in order not to exceed the limit value set for the consumer.
- control instruction generation unit 140 may generate a control instruction in consideration of the operation information of the equipment 200 acquired by the operation information acquisition unit 120. Of the control information acquired by the control information acquisition unit 110, the control instruction generated by the control instruction generation unit 140 based on the general control information is held in the storage unit 130.
- control instruction generation unit 140 generates a control instruction for operating each equipment 200 so that the time change of the power consumption is suppressed with respect to the operating state of the equipment 200 of each consumer within the current time limit. ..
- the time change of the power consumption in the equipment 200 is large, the value of the power consumption that changes with the passage of time has a large influence on the average power consumption that is determined at the end of the current time period. Therefore, as the power consumption increases near the end of the time period, the average power consumption in the current time period may exceed the limit value for the consumer.
- the accuracy of prediction by the second prediction unit 350 of the server 300 is deteriorated. Therefore, depending on the type of equipment 200, control is performed so that the time change of the power consumption is small in the operation within the time limit.
- an air-conditioning device as an example of the equipment 200 requires a certain amount of time to be affected by the ambient temperature and humidity even if the operating state is suddenly changed. Therefore, it is considered that there is little difference in the effect due to the operation of the equipment between the case where the strength of the operating state is frequently switched and the case where the operation is continued at a constant strength. Therefore, the control instruction generation unit 140 generates control instructions so that the time change of the operating state is small within the range where the setting conditions such as room temperature and humidity are satisfied.
- the average use that recognizes the operating state of the equipment 200 in the current time period and is determined when the current time period ends. It is necessary to predict the power within the current time limit. Therefore, the prediction result by the second prediction unit 350 of the server 300 is taken into consideration in such control.
- control instruction generation unit 140 suppresses the temporal change of the power consumption with respect to the operating state of the equipment 200 of each consumer before and after switching from the current time to the subsequent time (the time immediately after the current time).
- a control instruction for operating each equipment 200 is generated so as to be performed.
- the control may not satisfy the setting of the equipment 200. For example, in an air-conditioning device as an example of the equipment 200, it may occur that the set temperature is not reached because the control for suppressing the power consumption is performed.
- control instruction generation unit 140 is near the end of the current time period, and the actual power demand by the equipment 200 in the current time period and the prediction result of the average power consumption in the current time period by the second prediction unit 350 of the server 300. And, based on the limit value of the subsequent time limit, a control instruction is generated so that the time change of the operating state of the equipment 200 before and after the time limit is switched is small.
- the control instruction output unit 150 has a time limit in which the control instruction generated by the control instruction generation unit 140 based on the general control information is controlled by the general control information among the control information acquired by the control information acquisition unit 110. Is read from the storage unit 130 and transmitted to the equipment 200 to be controlled. Further, the control instruction output unit 150 immediately sends the control instruction generated by the control instruction generation unit 140 based on the individual control information among the control information acquired by the control information acquisition unit 110 to the equipment device 200 to be controlled. Send.
- the operation information output unit 160 reads the operation information of the equipment 200 acquired by the operation information acquisition unit 120 and held in the storage unit 130 from the storage unit 130 and transmits it to the server 300 according to a predetermined condition.
- the operation information may be read and transmitted in response to a request from the server 300, or may be periodically performed at a fixed time of the day or the like.
- FIG. 4 is a diagram showing a hardware configuration example of the control device 100 and the server 300.
- the control device 100 and the server 300 are realized by, for example, a computer. Even when the control device 100 and the server 300 are realized as a server constructed in a cloud environment, they are configured as a virtual system using the system resources of a physical computer as shown in FIG. 4 on the network. To.
- a computer that realizes the control device 100 includes a CPU (Central Processing Unit) 101 that is a calculation means, a RAM (RandomAccessMemory) 102, a ROM (ReadOnlyMemory) 103, and a storage device 104 that are storage means.
- the RAM 102 is a main storage device (main memory), and is used as a working memory when the CPU 101 performs arithmetic processing. Data such as a program and a set value prepared in advance are stored in the ROM 103, and the CPU 101 can directly read the program and the data from the ROM 103 and execute the process.
- the storage device 104 is a means for storing programs and data.
- a program is stored in the storage device 104, and the CPU 101 reads the program stored in the storage device 104 into the main storage device and executes the program. Further, the storage device 104 stores and stores the result of processing by the CPU 101.
- the storage device 104 for example, a magnetic disk device, an SSD (Solid State Drive), or the like is used.
- control information acquisition unit 110 When the control device 100 is realized by the computer shown in FIG. 4, the control information acquisition unit 110, the operation information acquisition unit 120, the control instruction generation unit 140, the control instruction output unit 150, and the operation information output are described with reference to FIG.
- Each function of the unit 160 is realized, for example, by the CPU 101 executing a program.
- the storage unit 130 is realized by, for example, a RAM 102 or a storage device 104.
- the server 300 is realized by the computer shown in FIG. 4, the group management unit 310, the first prediction unit 320, the limit value setting unit 330, the control information generation unit 340, and the second prediction unit described with reference to FIG. 2 are used.
- Each function of the unit 350, the performance information acquisition unit 360, the limit value adjustment unit 370, and the transmission control unit 380 is realized, for example, by the CPU 101 executing a program.
- the configuration example shown in FIG. 4 is only an example of the case where the control device 100 is realized by a computer.
- FIG. 5 is a diagram showing the configuration of the equipment 200.
- the equipment 200 includes a receiving unit 210, an operation control unit 220, and an output unit 230.
- the equipment 200 has a mechanism or an apparatus that operates to realize the function of the equipment 200 according to the type of the equipment 200.
- the equipment 200 is an air conditioner
- the equipment 200 has an indoor unit, an outdoor unit, and the like.
- the equipment 200 is a lighting equipment
- the equipment 200 has a lighting equipment, a control switch, and the like. Since the types and modes of such a mechanism and the like vary depending on the type of equipment 200, they are not shown here.
- the receiving unit 210 receives the control instruction output from the control device 100 via the network using a network interface (not shown).
- the operation control unit 220 controls the operation of the mechanism or device provided in the equipment 200 based on the control instruction received by the reception unit 210. Specifically, for example, when the equipment 200 is an air-conditioning device, the receiving unit 210 receives information for specifying the set temperature as a control instruction, and the operation control unit 220 receives the indoor unit and the indoor unit so that the received set temperature is reached. Control the operation of the outdoor unit. Although an example of control related to temperature setting is given here, control by the operation control unit 220 is performed for various controls related to gas that can be controlled by the air conditioner (for example, control of humidity and gas components). Instructional controls may be applied. Further, in various equipment 200 other than the air conditioning equipment, the operation control unit 220 executes control according to the type of the equipment 200 according to the control instruction received from the control device 100.
- the output unit 230 outputs information regarding the operating state of the equipment 200 to the control device 100 via the network using a network interface (not shown).
- the receiving unit 210, the operation control unit 220, and the output unit 230 are realized by, for example, a computer.
- the computer that realizes the motion control unit 220 may have the configuration described with reference to FIG.
- the functions of the receiving unit 210, the operation control unit 220, and the output unit 230 are realized, for example, by the CPU 101 shown in FIG. 4 executing the program.
- the functions of the receiving unit 210, the operation control unit 220, and the output unit 230 may be realized by dedicated hardware.
- it is realized by an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), and other circuits.
- the function realized by the CPU 101 executing the program (software) and the function realized by the dedicated hardware may be combined to form the receiving unit 210, the operation control unit 220, and the output unit 230.
- a group composed of a plurality of consumers is targeted for a contract, and the contract power is set based on the average power consumption for each time period of each group.
- the average power consumption for each time period in this group unit will be further described with reference to the drawings.
- FIG. 6 is a diagram showing an example of forecasting the power consumption of one consumer.
- FIG. 6A is a diagram showing an example of past actual power consumption
- FIG. 6B is a diagram showing a prediction result of daily power consumption
- FIG. 6C is a prediction value for each time period in the prediction result. It is a figure which shows the example of.
- the horizontal axis is the time period (48 time period) for one day (24 hours)
- the vertical axis is the average power consumption (kW) for each time period.
- the graphs of FIGS. 6A and 6B and the table of FIG. 6C show the actual and predicted results of the average power consumption of the equipment 200 in each time period of the day.
- FIGS. 6A to 6C show the actual results and forecast results of the entire equipment 200 owned by the consumer, and the actual results and forecasts of the air conditioning equipment among the equipment 200, with respect to the equipment 200 of one consumer. The result is shown.
- FIG. 6A shows the actual average power consumption for each time period for 3 days (3 days ago, 2 days ago, and 1 day ago) before the day when the power consumption is to be predicted.
- the light-colored graph shows the actual results of the equipment 200 as a whole
- the dark-colored graph shows the actual results of the air-conditioning equipment.
- FIG. 6B shows an example of the prediction result of the average power consumption for each time period predicted in consideration of the actual results as shown in FIG. 6A.
- the light-colored graph shows the prediction result of the entire equipment 200
- the dark-colored graph shows the prediction result of the air-conditioning equipment.
- 6C shows the average of the entire equipment 200 (in the figure, it is described as a “building” representing the facility where each equipment 200 is installed) in each time period (1st to 48th time periods) of the day.
- the predicted value of the power consumption and the predicted value of the average power consumption of the air-conditioning equipment in the equipment 200 are shown in association with each other.
- FIG. 7 is a diagram showing an integrated example of forecasting power consumption of a group composed of a plurality of consumers.
- FIG. 7 (A) is a diagram showing an example of forecast for each consumer constituting the group
- FIG. 7 (B) is a diagram showing the forecast result of the entire group
- FIG. 7 (C) is a forecast for each time period in the forecast result of the group. It is a figure which shows the example of a value.
- the horizontal axis is the time period (48 time period) for one day (24 hours)
- the vertical axis is the average power consumption (kW) for each time period.
- FIG. 7 (C) show the forecast results of the average power consumption of consumers and groups in each time period of the day.
- the forecast result of the average power consumption of the entire equipment 200 of each consumer is referred to as the forecast result of the average power consumption of the consumer or the forecast result of the consumer.
- FIG. 7 (A) shows the forecast result of the average power consumption for each time period for each of the consumers constituting the group.
- FIG. 7A shows only the prediction results of three consumers (customers (1) to (3)) among the plurality of consumers constituting the group, and the others are omitted.
- the light-colored graph shows the prediction result of the entire equipment 200
- the dark-colored graph shows the prediction result of the air-conditioning equipment.
- FIG. 7B shows the prediction result of the average power consumption for each time period in the entire group including the three consumers shown in FIG. 7A.
- the graph classification (color coding) of each time period indicates that the predicted value of the average power consumption of each consumer constituting the group is integrated in each time period.
- FIG. 7C shows an integrated value of the prediction result of the average power consumption of each consumer in each time period (1st time period to 48th time period) of the day.
- the target power of this group (described as “target value” in the figure) is set to 1000 kW, and referring to FIGS. 7 (B) and 7 (C), the average of the entire group is from the 22nd period to the 31st period.
- the predicted power consumption exceeds the target power. Therefore, at least in these time periods, a limit value is set for the power consumption of each consumer constituting the group so that the predicted value of the average power consumption of the entire group does not exceed the target power.
- the limit value itself for each consumer may be set not only in the time period in which the predicted value of the entire group exceeds the target power, but also in other time periods in which the predicted value of the entire group does not exceed the target power.
- FIG. 8 is a diagram showing an example of setting a limit value for each consumer constituting the group.
- FIG. 8A is a diagram showing an example of forecasting average power consumption for each time period of the group
- FIG. 8B is a diagram showing the distribution result of the limit value to each consumer constituting the group
- FIG. 8C is a diagram.
- It is a figure which shows the example of the limit value for each time period allocated to one consumer of a group.
- the horizontal axis is the time period (48 time period) for one day (24 hours)
- the vertical axis is the average power consumption (kW) for each time period.
- FIG. 8A shows the forecast result of the average power consumption for each time period for each of the consumers constituting the group.
- This graph is the same as the graph shown in FIG. 7 (B).
- FIG. 8B shows an example of the distribution result of the limit value set for each consumer constituting the group when the average power consumption in each time period of the group is aligned with the target power. ..
- the graph classification (color coding) of each time period represents the ratio of the limit value (power consumption available to that consumer) distributed to each consumer in each time period.
- the ratio of the limit value allocated to each consumer in each time period is, in principle, the ratio of the predicted value of the average power consumption of each consumer in the prediction of the average power consumption of the group shown in FIG. 8 (A).
- a lower limit value may be given as a limit value instead of the ratio of the predicted value of the average power consumption.
- one of the consumers constituting the group (customer (1)) is allocated to each time period (1st to 48th time periods) of the day. Limits are shown.
- Example of adjusting the limit value> for each time period in which control is performed for the equipment 200 of each customer constituting the group, the average power consumption of each customer is based on the prediction before the start of the corresponding time period. A limit value is set for, and the equipment 200 of each consumer is controlled based on the limit value. On the other hand, when the corresponding time limit is started, the limit value of each consumer is adjusted as necessary based on the time limit prediction, and the control of the equipment 200 within the time limit is changed. The adjustment of this limit value will be further described with reference to the drawings. In the following example, the case where the value of the target power and the threshold value based on the target power are equal and the integrated value of the limit value of each consumer constituting the group is controlled to be equal to or less than the target power of the group will be described.
- FIG. 10 is a diagram showing an example of the relationship between the limit value of each consumer and the value of the power consumption according to the timed prediction.
- a group is composed of three consumers (customers (1) to (3)).
- FIG. 10 shows a limit value (hereinafter referred to as “initial limit value”) of each consumer set before the time limit is started based on the prediction by the first prediction unit 320 in a certain time period, and a second.
- in-time forecast value Based on the forecast value of the average power consumption of each consumer in the relevant time period (hereinafter referred to as "in-time forecast value") obtained by the time-limited prediction by the prediction unit 350 and the time-limited prediction by the second prediction unit 350.
- the limit value of each consumer adjusted by the limit value adjustment unit 370 (hereinafter referred to as “adjusted limit value”) is shown.
- the target power of a group in a certain time period (14:00 to 14:30 in the figure) is 450 kW.
- the initial limit value of the consumer (1) is set to 100 kW
- the initial limit value of the consumer (2) is set to 150 kW
- the initial limit value of the consumer (3) is set to 200 kW.
- the actual result is the prediction before the start of the time period by the first prediction unit 320 due to the operating condition and environment of the equipment 200. Misalignment may occur.
- the in-time forecast value of the consumer (1) (indicated as “predicted value” in the figure) is 110 kW
- the in-time forecast value of the consumer (2) is within the time limit by the second prediction unit 350.
- the predicted value is 140 kW
- the time-limited predicted value of the consumer (3) is 230 kW.
- the predicted value within the time limit is 10 kW larger than the initial limit value for the consumer (1).
- the predicted value within the time limit is 10 kW smaller than the initial limit value.
- the predicted value within the time limit is 30 kW larger than the initial limit value. Therefore, in the entire group, the integrated value of the predicted value within the time limit increases (dissociates) by 30 kW with respect to the target power. Therefore, the limit value is adjusted in consideration of the discrepancy between the initial limit value and the predicted value within the time limit (in other words, in consideration of the operating status of the equipment 200 and the influence of the environment).
- the method of adjusting the limit value is not particularly limited.
- the difference between the integrated value of the initial limit value and the integrated value of the predicted value within the time limit is distributed equally to each consumer, and the difference between the integrated value of the initial limit value and the integrated value of the predicted value within the time limit is each. It is possible to take a method such as sorting according to the ratio of the initial limit value or the predicted value within the time limit in the consumer.
- the difference (30 kW) between the initial limit value and the in-time forecast value is equally divided by the three consumers constituting the group, and 10 kW is subtracted from each customer's in-time forecast value after adjustment. It was set as a limit value. Therefore, the adjusted limit value of the consumer (1) is 100 kW, the adjusted limit value of the consumer (2) is 130 kW, and the adjusted limit value of the consumer (3) is 220 kW.
- FIG. 11 is a diagram showing an example of the actual power consumption of each consumer when the limit value is adjusted.
- FIG. 11A is a diagram showing an example of a case where the limit value is lowered by adjustment
- FIG. 11B is a diagram showing an example of a case where the limit value is increased by adjustment.
- 11 (A) and 11 (B) show an example of the actual power consumption of the group of consumers (2) and customers (3) shown in FIG. 10 in one time period (time period 14: 00-14: 30). A graph showing is shown.
- the horizontal axis is the time period (30 minutes), and the vertical axis is the average power consumption for that time period estimated from the actual power demand up to each time point with the passage of time.
- the power consumption for one period is shown by a line that reaches the value of the average power consumption at the end of the time period.
- the power consumption graph becomes a straight line. The smaller the average power consumption of the time period, the smaller the angle of this straight line, and the larger the average power consumption of the time period, the larger the angle.
- the graphs shown in FIGS. 11A and 11B show a straight line C that reaches the initial limit value of each consumer at the end of the time limit and a curve P that represents the actual value, respectively.
- the initial limit value of the consumer (2) is 150 kW. Therefore, the straight line C in the graph of the consumer (2) shown in FIG. 11 (A) is a straight line reaching 150 kW at the end of the time limit (14:30).
- the actual power demand of the consumer (2) is smaller than the average power consumption corresponding to the initial limit value. Therefore, the curve P of the actual value deviates downward from the straight line C.
- the in-time prediction is performed in the middle of the time (14:15 in the figure), and 140 kW is obtained as the in-time predicted value (described as “predicted value” in the figure).
- the straight line C in the graph of the consumer (2) shown in FIG. 11 (A) is a straight line reaching 150 kW at the end of the time limit (14:30).
- the actual power demand of the consumer (2) is smaller than the average power consumption corresponding to the initial limit value. Therefore, the curve P of the actual value deviates downward from the straight line C.
- the in-time prediction is performed in the middle of the time (14:15
- the power consumption forecast by the consumer (2) from the time when the timed forecast is performed (14:15) to the time when the timed end (14:30) is predicted is the time point of the timed forecast (14:15). It is shown by a broken line branching from the curve P at 14:15).
- the limit value is adjusted based on the difference between the integrated value of the predicted value within the time limit and the target power (integrated value of the initial limit value), and the consumer (2). (In the figure, it is described as "final value”) is controlled so as to be within the adjusted limit value of 130 kW or less.
- the initial limit value of the consumer (3) is 200 kW. Therefore, the straight line C in the graph of the consumer (3) shown in FIG. 11B is a straight line reaching 200 kW at the end of the time limit (14:30).
- the actual power demand of the consumer (3) is larger than the average power consumption corresponding to the initial limit value. Therefore, the curve P of the actual value deviates upward from the straight line C.
- the in-time prediction is performed in the middle of the time (14:15 in the figure), and 230 kW is obtained as the in-time prediction value.
- the power consumption forecast by the consumer (3) from the time when the timed forecast is made (14:15) to the time when the timed end (14:30) is predicted is the time point of the timed forecast (14:15). It is shown by a broken line branching from the curve P at 14:15).
- the limit value is adjusted based on the difference between the integrated value of the predicted value within the time limit and the target power (integrated value of the initial limit value), and the power used by the consumer (3) is 220 kW or less after the adjusted limit value. It is controlled to fit in.
- the time during which the time limit is predicted is merely an example, and is not limited to the above-mentioned and illustrated times.
- the limit value will be adjusted after a certain amount of performance due to the operation of the equipment 200 in the current time limit, even if the time limit is started and a certain time elapses, the time limit prediction is performed. good.
- the in-time forecast itself may be continuously performed from the start of the time, and the limit value may be adjusted when conditions such as a deviation between the limit value and the actual result are satisfied.
- the difference between the integrated value of the initial limit value and the integrated value of the predicted value within the time limit for each consumer is equally divided among the consumers.
- the difference between the integrated value of the initial limit value and the integrated value of the in-time predicted value is distributed according to the ratio of the in-time predicted value in each consumer.
- FIG. 12 is a diagram showing another example of the relationship between the limit value of each consumer and the value of the power consumption according to the timed prediction.
- the consumers constituting the group, the target power of the group, the initial limit value set for each consumer, and the time-limited forecast value for each consumer are , The same as the example shown in FIG.
- the specific equipment 200 of each customer is used. It was decided to reflect the adjustment of the limit value for. It should be noted that the specific equipment 200 is not particularly limited, but here, among the equipment 200 of the consumer, the air-conditioning equipment that is expected to use a large amount of electric power is selected.
- the air-conditioning occupancy of the time-limited predicted value (110 kW) in the consumer (1) is 40 kW
- the air-conditioning occupancy of the time-limited predicted value (140 kW) in the consumer (2) is 50 kW
- the consumer (customer (2)) It is assumed that the air-conditioning occupancy of the predicted value (230 kW) within the time limit in 3) is 70 kW.
- the method of calculating the adjusted limit value shown in FIG. 12 is merely an example, and is not limited to the above calculation formula and calculation target (air conditioning occupancy).
- the control device 100 acquires the operation information from the equipment 200 and transmits it to the server 300.
- the second prediction unit 350 of the server 300 analyzes the acquired information to perform in-time prediction, and the limit value adjustment unit 370 adjusts the limit value as necessary based on the in-time prediction.
- the control information generation unit 340 of the server 300 generates individual control information including the adjusted limit value, and the generated individual control information is transmitted to the control device 100 by the transmission control unit 380.
- the control device 100 When the limit value is adjusted in the current time limit, the control device 100 replaces the initial limit value acquired in the general control information with the adjusted limit value newly acquired in the individual control information. Then, the control device 100 generates a control instruction for controlling the equipment 200 of each consumer so that the power used by each consumer does not exceed the adjusted limit value, and transmits the control instruction to each equipment 200.
- the adjusted limit value may exceed the initial limit value depending on the consumer to which the limit value is given. In other words, in this case, the control device 100 controls the equipment 200 of the consumer so that the power consumption exceeds the initial limit value given by the general control information.
- the adjusted limit value exceeds the initial limit value for a certain consumer and lowers the initial limit value for another consumer. Since both the total of the initial limit value and the total of the adjusted limit value are values corresponding to the target power of the group, the total of the increase of the adjusted limit value increasing from the initial limit value and the initial limit value are used. It is equal to the sum of the reductions in the decreasing adjusted limit. Therefore, in the group as a whole, when the equipment 200 of one consumer is controlled so that the power consumption exceeds the initial limit value, the initial limit value of another consumer who can afford the power consumption is initially set. The limit value shall be lowered to be the adjusted limit value, and the initial limit value of this one consumer shall be increased by the amount corresponding to the decrease of the initial limit value of the other consumer to be the adjusted limit value. Corresponds to.
- the limit value can be set before the start of the time limit in which the control based on the control information is performed, and the limit value can be adjusted after the start of the time limit, but before the start of the time limit. May not set a limit value, but may set a limit value according to the operating status of the equipment 200 within the time limit. Further, in the above embodiment, the limit value after the start of the time limit is adjusted in the server 300, but the limit value may be adjusted in the control device 100.
- the power consumption in the current time is predicted in consideration of the integrated fixed value in the time before the current time.
- information regarding the actual power consumption of the equipment 200 for the elapsed time in the current time period can be obtained. Therefore, after a certain period of time has passed since the start of the current time period, the integrated value of the power consumption of the equipment 200 by each consumer for the elapsed time in the current time period is replaced with the integrated value of the previous time period. It is conceivable to make a timed forecast in consideration of (hereinafter referred to as "mid-term integrated value").
- the timed prediction may be performed by taking into consideration both the accumulated fixed value of the previous time period and the mid-term integrated value of the current time period.
- the power control system of the present disclosure is a system that controls power so as not to exceed a target power set for a group composed of a plurality of consumers, and a predetermined time limit for each customer belonging to the group. Based on the prediction results of the 1st prediction unit 320 and the 1st prediction unit 320 that make predictions about the power consumption for each customer, each consumer so that the integrated value of the power consumption for each customer does not exceed the target power in each time period. Based on the limit value setting unit 330 that sets the limit value of the power consumption of, and the actual power consumption of the equipment of the consumer who belongs to the group within the current time limit, the power consumption of the consumer in this time limit is predicted.
- the equipment of each consumer Based on the predicted value of the power consumption of the consumer by the second prediction unit 350 and the second prediction unit 350 in the current time period, the equipment of each consumer so as not to exceed the limit value of the power consumption of the consumer in this time period. It is a power control system including a limit value adjusting unit 370 and a control information generation unit 340 that control the power consumption of the device. In this way, when controlling the power consumption by a group consisting of multiple consumers, adjustments are made according to the specific operating conditions of each consumer equipment, and the power consumption for each consumer equipment is made. Can be controlled appropriately.
- the first prediction unit 320 makes a prediction regarding the power consumption based on at least the history information regarding the operation of the equipment of each consumer in the past, and the second prediction unit 350 predicts each consumer within the current time limit. It is also possible to predict the power consumption in this time period based on the information on the operating status of the equipment of. In this way, it is possible to make adjustments according to the specific operating conditions of the individual consumer equipment based on the operating conditions of the equipment of each consumer within the current time limit.
- control information generation unit 340 may control the power consumption of the equipment of each consumer in the current time period so as to suppress the temporal change of the power consumption. By doing so, it is possible to suppress a sudden change in the power consumption of each consumer's equipment and to appropriately control the power consumption of each consumer's equipment.
- control information generation unit 340 is based on the limit value of the power consumption in the time period following the current time period and the prediction result of the power consumption and the power consumption of the consumer in the current time period, and the control information generation unit 340 is used from the current time period to the subsequent time period. It is also possible to control the power consumption of the equipment so as to suppress the change in the power consumption of the equipment of the consumer before and after switching to. By doing so, it is possible to suppress a sudden change in the power consumption of each consumer's equipment before and after the time limit is switched, and to appropriately control the power consumption of each consumer's equipment.
- the control information generation unit 340 indicates the power consumption of the consumer in the current time period with respect to the equipment of the consumer. It may be possible to perform control exceeding the limit value of. By doing so, before and after the time limit is switched, the control exceeding the initial limit value is performed in the previous time limit, so that the sudden change in the power consumption in the equipment of each consumer can be suppressed, and each customer's equipment can be controlled. It is possible to appropriately control the power consumption of.
- control information generation unit 340 controls the equipment of one consumer to exceed the limit value of the power consumption of one consumer in the current time limit, the power consumption of another consumer is used by another consumer. If there is a margin for the power consumption limit value of, lower the power consumption limit value of other consumers, and set the power consumption limit value of one consumer to the power consumption limit value of another consumer. It may be increased by the amount corresponding to the decrease of the limit value. In this way, it is possible to appropriately control the power consumption of each consumer equipment by accommodating the available power consumption indicated by the initial limit value among the consumers.
- the program of the present disclosure is a computer that controls a system that controls power so as not to exceed a target power set for a group composed of a plurality of consumers. Based on the prediction results of the first prediction unit 320, which predicts the power consumption of each consumer belonging to the group for each predetermined time period, and the prediction result of the first prediction unit 320, the integrated value of the power consumption of each consumer in each time period. Based on the limit value setting unit 330 that sets the limit value of the power consumption of each consumer so that the power consumption does not exceed the target power, and the actual power consumption of the equipment of the consumers belonging to the group within the current time limit.
- the limit value of the power consumption of the consumer in the time period based on the predicted value of the power consumption of the consumer by the second prediction unit 350 that predicts the power consumption of the consumer in this time period and the second prediction unit 350 in the current time period.
- It is a program that functions as a limit value adjustment unit 370 and a control information generation unit 340 that control the power consumption of the equipment of each consumer so as not to exceed the above.
- this program when controlling the power consumption by a group consisting of multiple consumers, adjustments are made according to the specific operating conditions of each consumer equipment, and the consumer equipment is installed. The power consumption for each can be controlled appropriately.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Economics (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Quality & Reliability (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Power Engineering (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Operations Research (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Steering Control In Accordance With Driving Conditions (AREA)
- Control Of Eletrric Generators (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
Abstract
Description
このようにすれば、複数の需要家からなるグループによる使用電力に対して制御を行う場合に、個々の需要家設備の具体的な動作状況に応じた調整を加え、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、現在の時限内における各需要家の設備機器の稼働状況に基づいて、個々の需要家設備の具体的な動作状況に応じた調整を行うことができる。
このようにすれば、各需要家の設備機器において使用電力の急激な変化を抑制し、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、時限が切り替わる前後において、各需要家の設備機器において使用電力の急激な変化を抑制し、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、時限が切り替わる前後において、前の時限で当初の制限値を超える制御が行われることにより、各需要家の設備機器において使用電力の急激な変化を抑制し、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、需要家どうしの間で当初の制限値により示される利用可能な使用電力を融通し合うことにより、需要家設備ごとの使用電力を適切に制御することができる。
前記グループに属する各需要家の予め定められた時限ごとの使用電力に関する予測を行う第1予測手段と、前記第1予測手段による予測結果に基づき、各時限において需要家ごとの使用電力の積算値が前記目標電力を超えないように、各需要家の使用電力の制限値を設定する制限値設定手段と、現在の時限内において、前記グループに属する需要家の設備機器の使用電力の実績に基づいて、当該時限における当該需要家の使用電力を予測する第2予測手段と、前記現在の時限における前記第2予測手段による当該需要家の使用電力の予測値に基づき、当該時限における当該需要家の使用電力の前記制限値を超えないように、各需要家の設備機器の使用電力を制御する制御手段として、機能させる、プログラムである。
このプログラムをインストールしたコンピュータによれば、複数の需要家からなるグループによる使用電力に対して制御を行う場合に、個々の需要家設備の具体的な動作状況に応じた調整を加え、需要家設備ごとの使用電力を適切に制御することができる。
<システム構成>
図1は、本実施形態が適用される設備機器の制御システムの全体構成を示す図である。本実施形態の制御システムは、制御装置100と、被制御装置である設備機器200と、サーバ300とを備える。制御装置100と設備機器200とは、ネットワークを介して接続されている。このネットワークは、専用回線によるLAN(Local Area Network)であっても良いし、WAN(Wide Area Network)やインターネット上に設定されたVPN(Virtual Private Network)等を用いても良い。
ここで、電気料金について説明する。電気料金は、主に基本料金と電力量料金とにより構成され、月ごとに特定される。基本料金は、基本料金単価と契約電力とに基づいて計算される。契約電力は、当月から遡って1年以内の最大需要電力の最大値とされる。最大需要電力とは、月間の時限(デマンド時限:30分)ごとの平均使用電力の最大値である。平均使用電力とは、各時限における需要電力(使用電力)の平均値である。また、電力量料金は、電力量料金単価と月ごとの使用電力量とに基づいて計算される。
図2は、サーバ300の構成を示す図である。サーバ300は、例えば、ネットワークのクラウド環境上に構築されたサーバ(いわゆるクラウドサーバ)等として実現される。サーバ300は、グループ管理部310と、第1予測部320と、制限値設定部330と、制御情報生成部340と、第2予測部350と、実績情報取得部360と、制限値調整部370と、送信制御部380とを備える。
図3は、制御装置100の構成を示す図である。制御装置100は、ネットワークを介してサーバ300および設備機器200と接続された情報処理装置として実現される。制御装置100は、制御対象の設備機器200の近隣に設けられた装置(例えば、エッジサーバ)であっても良いし、クラウド環境上に構築されたサーバ(クラウドサーバ)であっても良い。制御装置100は、制御情報取得部110と、稼働情報取得部120と、記憶部130と、制御指示生成部140と、制御指示出力部150と、稼働情報出力部160とを備える。
図4は、制御装置100およびサーバ300のハードウェア構成例を示す図である。制御装置100およびサーバ300は、例えば、コンピュータにより実現される。制御装置100およびサーバ300がクラウド環境に構築されたサーバとして実現される場合であっても、ネットワーク上の図4に示すような物理的なコンピュータのシステムリソースを用いた仮想的なシステムとして構成される。
図5は、設備機器200の構成を示す図である。設備機器200は、受け付け部210と、動作制御部220と、出力部230とを備える。なお、設備機器200は、その種類に応じて、設備機器200の機能を実現するために動作する機構や装置を有している。例えば、設備機器200が空調機器である場合、設備機器200は、室内機および室外機等を有する。また、設備機器200が照明設備である場合、設備機器200は、照明器具や制御スイッチ等を有する。このような機構等の種類や態様は、設備機器200の種類に応じて様々であるため、ここでは図示しない。
本実施形態では、複数の需要家により構成されるグループを契約対象とし、グループ単位の時限ごとの平均使用電力に基づいて契約電力を設定する。このグループ単位の時限ごとの平均使用電力について、図面を参照してさらに説明する。
本実施形態では、グループを構成する各需要家の設備機器200に対する制御が行われる時限ごとに、該当する時限が開始される前に、時限開始前の予測に基づいて各需要家の平均使用電力に対する制限値が設定され、かかる制限値に基づいて各需要家の設備機器200が制御される。一方、該当する時限が開始されると、時限内予測に基づいて、必要に応じて各需要家の制限値が調整され、時限内における設備機器200の制御が変更される。この制限値の調整について、図面を参照してさらに説明する。以下の例では、目標電力の値と目標電力に基づく閾値とが等しく、グループを構成する各需要家の制限値の積算値がグループの目標電力以下となるように制御される場合について説明する。
調整後制限値
=時限内予測値-30kW×対象の需要家の空調占有分/160kW
需要家(1)の調整後制限値は、102.5kW(=110-30×40/160)
需要家(2)の調整後制限値は、130.625kW(=140-30×50/160)需要家(3)の調整後制限値は、216.875kW(=230-30×70/160)となる。なお、図12に示す調整後制限値の計算方法は例示に過ぎず、上記の計算式や計算対象(空調占有分)には限定されない。
このようにすれば、複数の需要家からなるグループによる使用電力に対して制御を行う場合に、個々の需要家設備の具体的な動作状況に応じた調整を加え、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、現在の時限内における各需要家の設備機器の稼働状況に基づいて、個々の需要家設備の具体的な動作状況に応じた調整を行うことができる。
このようにすれば、各需要家の設備機器において使用電力の急激な変化を抑制し、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、時限が切り替わる前後において、各需要家の設備機器において使用電力の急激な変化を抑制し、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、時限が切り替わる前後において、前の時限で当初の制限値を超える制御が行われることにより、各需要家の設備機器において使用電力の急激な変化を抑制し、需要家設備ごとの使用電力を適切に制御することができる。
このようにすれば、需要家どうしの間で当初の制限値により示される利用可能な使用電力を融通し合うことにより、需要家設備ごとの使用電力を適切に制御することができる。
グループに属する各需要家の予め定められた時限ごとの使用電力に関する予測を行う第1予測部320と、第1予測部320による予測結果に基づき、各時限において需要家ごとの使用電力の積算値が目標電力を超えないように、各需要家の使用電力の制限値を設定する制限値設定部330と、現在の時限内において、グループに属する需要家の設備機器の使用電力の実績に基づいて、この時限における需要家の使用電力を予測する第2予測部350と、現在の時限における第2予測部350による需要家の使用電力の予測値に基づき、時限における需要家の使用電力の制限値を超えないように、各需要家の設備機器の使用電力を制御する制限値調整部370および制御情報生成部340として、機能させる、プログラムである。
このプログラムをインストールしたコンピュータによれば、複数の需要家からなるグループによる使用電力に対して制御を行う場合に、個々の需要家設備の具体的な動作状況に応じた調整を加え、需要家設備ごとの使用電力を適切に制御することができる。
Claims (7)
- 複数の需要家により構成されたグループを対象として設定された目標電力を超えないように電力制御するシステムであって、
前記グループに属する各需要家の予め定められた時限ごとの使用電力に関する予測を行う第1予測手段と、
前記第1予測手段による予測結果に基づき、各時限において需要家ごとの使用電力の積算値が前記目標電力を超えないように、各需要家の使用電力の制限値を設定する制限値設定手段と、
現在の時限内において、前記グループに属する需要家の設備機器の使用電力の実績に基づいて、当該時限における当該需要家の使用電力を予測する第2予測手段と、
前記現在の時限における前記第2予測手段による当該需要家の使用電力の予測値に基づき、当該時限における当該需要家の使用電力の前記制限値を超えないように、各需要家の設備機器の使用電力を制御する制御手段と、
を備える、電力制御システム。 - 前記第1予測手段は、少なくとも、過去の各需要家の設備機器の稼働に関する履歴情報に基づいて使用電力に関する予測を行い、
前記第2予測手段は、前記現在の時限内における各需要家の設備機器の稼働状況に関する情報に基づいて当該時限における使用電力を予測する、請求項1に記載の電力制御システム。 - 前記制御手段は、前記現在の時限における各需要家の設備機器の使用電力を、当該使用電力の時間的変化を抑制するように制御する、請求項1に記載の電力制御システム。
- 前記制御手段は、前記現在の時限に後続する時限における前記使用電力の前記制限値と、当該現在の時限における前記需要家の使用電力および当該使用電力の予測結果とに基づき、当該現在の時限から当該後続の時限に切り替わる前後において当該需要家の設備機器の使用電力の変化を抑制するように当該設備機器の使用電力を制御する、請求項1に記載の電力制御システム。
- 前記制御手段は、前記第1予測手段および前記第2予測手段による予測結果が予め定められた条件を満たす場合、当該需要家の設備機器に対し、前記現在の時限における当該需要家の使用電力の前記制限値を超える制御を行う、請求項4に記載の電力制御システム。
- 前記制御手段は、
一の需要家の前記設備機器に関して前記現在の時限における当該一の需要家の使用電力の前記制限値を超える制御を行う場合、他の需要家の使用電力が当該他の需要家の使用電力の前記制限値に対して余裕があるならば、当該他の需要家の使用電力の前記制限値を低下させ、
前記一の需要家の使用電力の前記制限値を、前記他の需要家の使用電力の前記制限値の低下分に相当するだけ上昇させる、請求項5に記載の電力制御システム。 - 複数の需要家により構成されたグループを対象として設定された目標電力を超えないように電力制御するシステムを制御するコンピュータを、
前記グループに属する各需要家の予め定められた時限ごとの使用電力に関する予測を行う第1予測手段と、
前記第1予測手段による予測結果に基づき、各時限において需要家ごとの使用電力の積算値が前記目標電力を超えないように、各需要家の使用電力の制限値を設定する制限値設定手段と、
現在の時限内において、前記グループに属する需要家の設備機器の使用電力の実績に基づいて、当該時限における当該需要家の使用電力を予測する第2予測手段と、
前記現在の時限における前記第2予測手段による当該需要家の使用電力の予測値に基づき、当該時限における当該需要家の使用電力の前記制限値を超えないように、各需要家の設備機器の使用電力を制御する制御手段として、
機能させる、プログラム。
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR112023005644-6A BR112023005644B1 (pt) | 2020-09-30 | 2021-08-13 | Sistema de controle de energia, e, meio legível por computador |
AU2021355061A AU2021355061B2 (en) | 2020-09-30 | 2021-08-13 | Power control system and program |
CN202180066269.8A CN116235384B (zh) | 2020-09-30 | 2021-08-13 | 电力控制系统和程序 |
EP21874935.6A EP4224672A4 (en) | 2020-09-30 | 2021-08-13 | ELECTRICAL POWER CONTROL SYSTEM AND PROGRAM |
US18/029,194 US12038731B2 (en) | 2020-09-30 | 2021-08-13 | Power control system and program |
MX2023003507A MX2023003507A (es) | 2020-09-30 | 2021-08-13 | Sistema de control de energia y programa. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020165451A JP7093034B2 (ja) | 2020-09-30 | 2020-09-30 | 電力制御システムおよびプログラム |
JP2020-165451 | 2020-09-30 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022070632A1 true WO2022070632A1 (ja) | 2022-04-07 |
Family
ID=80949956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2021/029821 WO2022070632A1 (ja) | 2020-09-30 | 2021-08-13 | 電力制御システムおよびプログラム |
Country Status (7)
Country | Link |
---|---|
US (1) | US12038731B2 (ja) |
EP (1) | EP4224672A4 (ja) |
JP (2) | JP7093034B2 (ja) |
CN (1) | CN116235384B (ja) |
AU (1) | AU2021355061B2 (ja) |
MX (1) | MX2023003507A (ja) |
WO (1) | WO2022070632A1 (ja) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002247757A (ja) * | 2001-02-16 | 2002-08-30 | Mitsubishi Electric Corp | デマンド監視制御システム |
JP2016135040A (ja) * | 2015-01-21 | 2016-07-25 | 三菱電機株式会社 | 電力需給調整要請量決定装置及びその方法 |
JP2018026912A (ja) * | 2016-08-08 | 2018-02-15 | パナソニックIpマネジメント株式会社 | 電力管理システム |
JP2019030087A (ja) | 2017-07-27 | 2019-02-21 | 東京瓦斯株式会社 | 電力制御システム |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5114026B2 (ja) * | 2006-06-28 | 2013-01-09 | 三洋電機株式会社 | デマンド制御装置 |
JP5276294B2 (ja) * | 2007-09-19 | 2013-08-28 | 大阪瓦斯株式会社 | 負荷低減計画策定システム及びデマンド制御システム |
JP5601500B2 (ja) * | 2010-05-07 | 2014-10-08 | 清水建設株式会社 | 需要電力制御装置および需要電力制御方法 |
JP6016681B2 (ja) * | 2013-03-18 | 2016-10-26 | 大崎電気工業株式会社 | 省エネルギーシステム |
JP6302197B2 (ja) | 2013-09-20 | 2018-03-28 | 株式会社東芝 | 電力需給制御装置及び電力需給制御方法 |
US9753520B2 (en) * | 2013-12-23 | 2017-09-05 | Dell Products, L.P. | Predictive power capping and power allocation to computing nodes in a rack-based information handling system |
JP6067602B2 (ja) * | 2014-02-14 | 2017-01-25 | 三菱電機ビルテクノサービス株式会社 | デマンド制御装置及びプログラム |
WO2015136920A1 (ja) * | 2014-03-12 | 2015-09-17 | 日本電気株式会社 | 蓄電池共有システム、情報処理装置、蓄電池共有方法、及び、蓄電池共有プログラムを記録した記録媒体 |
JP6137497B2 (ja) * | 2014-10-23 | 2017-05-31 | トヨタ自動車株式会社 | 電力供給管理システム |
GB2540364B (en) * | 2015-07-14 | 2020-07-22 | Samsung Electronics Co Ltd | Power load management apparatus and method |
CN109388488B (zh) * | 2017-08-02 | 2022-11-25 | 联想企业解决方案(新加坡)有限公司 | 计算机系统中的功率分配 |
JP2021118618A (ja) * | 2020-01-27 | 2021-08-10 | パナソニックIpマネジメント株式会社 | エネルギー管理システム、エネルギー管理方法、及び、プログラム |
-
2020
- 2020-09-30 JP JP2020165451A patent/JP7093034B2/ja active Active
-
2021
- 2021-08-13 AU AU2021355061A patent/AU2021355061B2/en active Active
- 2021-08-13 EP EP21874935.6A patent/EP4224672A4/en active Pending
- 2021-08-13 MX MX2023003507A patent/MX2023003507A/es unknown
- 2021-08-13 WO PCT/JP2021/029821 patent/WO2022070632A1/ja active Application Filing
- 2021-08-13 US US18/029,194 patent/US12038731B2/en active Active
- 2021-08-13 CN CN202180066269.8A patent/CN116235384B/zh active Active
-
2022
- 2022-06-16 JP JP2022097147A patent/JP2022113860A/ja active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002247757A (ja) * | 2001-02-16 | 2002-08-30 | Mitsubishi Electric Corp | デマンド監視制御システム |
JP2016135040A (ja) * | 2015-01-21 | 2016-07-25 | 三菱電機株式会社 | 電力需給調整要請量決定装置及びその方法 |
JP2018026912A (ja) * | 2016-08-08 | 2018-02-15 | パナソニックIpマネジメント株式会社 | 電力管理システム |
JP2019030087A (ja) | 2017-07-27 | 2019-02-21 | 東京瓦斯株式会社 | 電力制御システム |
Non-Patent Citations (1)
Title |
---|
See also references of EP4224672A4 |
Also Published As
Publication number | Publication date |
---|---|
US12038731B2 (en) | 2024-07-16 |
CN116235384B (zh) | 2024-03-05 |
MX2023003507A (es) | 2023-04-14 |
EP4224672A1 (en) | 2023-08-09 |
BR112023005644A2 (pt) | 2023-04-25 |
AU2021355061B2 (en) | 2024-01-18 |
AU2021355061A1 (en) | 2023-05-18 |
JP2022057282A (ja) | 2022-04-11 |
JP7093034B2 (ja) | 2022-06-29 |
AU2021355061A9 (en) | 2024-09-26 |
JP2022113860A (ja) | 2022-08-04 |
EP4224672A4 (en) | 2024-04-17 |
CN116235384A (zh) | 2023-06-06 |
US20230273581A1 (en) | 2023-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4363244B2 (ja) | エネルギー管理装置 | |
WO2022070633A1 (ja) | 電力制御システムおよびプログラム | |
Kircher et al. | Distributed peak shaving for small aggregations of cyclic loads | |
WO2022070632A1 (ja) | 電力制御システムおよびプログラム | |
WO2022070630A1 (ja) | 電力制御システムおよびプログラム | |
JP7093033B2 (ja) | 電力制御システム | |
ES2845798T3 (es) | Asignación y conexión de clientes de electricidad a fases de un alimentador de distribución | |
WO2022071259A1 (ja) | 電力制御システムおよびプログラム | |
JP2023004714A (ja) | 制御装置およびプログラム | |
US20230418346A1 (en) | Methods, systems, and media for automatic and continuous control of energy-consuming devices |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21874935 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 202317022040 Country of ref document: IN |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112023005644 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112023005644 Country of ref document: BR Kind code of ref document: A2 Effective date: 20230327 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2021874935 Country of ref document: EP Effective date: 20230502 |
|
ENP | Entry into the national phase |
Ref document number: 2021355061 Country of ref document: AU Date of ref document: 20210813 Kind code of ref document: A |