WO2015041916A1 - Tandem and side-by-side mooring offloading systems and associated methods - Google Patents
Tandem and side-by-side mooring offloading systems and associated methods Download PDFInfo
- Publication number
- WO2015041916A1 WO2015041916A1 PCT/US2014/055111 US2014055111W WO2015041916A1 WO 2015041916 A1 WO2015041916 A1 WO 2015041916A1 US 2014055111 W US2014055111 W US 2014055111W WO 2015041916 A1 WO2015041916 A1 WO 2015041916A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- mooring
- vessel
- line
- mooring line
- certain embodiments
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/20—Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
- B63B22/021—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
- B63B22/025—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids and comprising a restoring force in the mooring connection provided by means of weight, float or spring devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
- B63B27/34—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/20—Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
- B63B2021/206—Weights attached to mooring lines or chains, or the like; Arrangements thereof
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/448—Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
Definitions
- the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- Floating production storage and offloading vessels FPSOs
- FSOs floating storage and offloading vessels
- An FPSO may designed to receive crude oil produced from subsea wells or a nearby platform, process that crude oil, and then store the processed oil until it can be offloaded to a tanker or transported through a pipeline.
- An FSO is a simplified FPSO without the ability to process crude oil.
- An FSO typically receives and stores oil that has already been processed at a platform, and then offloads the stored oil to a tanker or through a pipeline.
- FPSOs and FSOs are particularly suited in offshore regions where there is no pipeline infrastructure in place for transporting produced oil to shore.
- the FPSO/FSO is employed to store the produced oil until it can be offloaded for transport to another location.
- FPSOs and FSOs are ship-shaped floating vessels or barges that are moored to the sea floor when receiving crude or processed oil from a platform.
- a shuttle vessel may be moored and connected to the FPSO or FSO, or alternatively to the platform itself, and then transfer can take place.
- U.S. Patent Application Publication No. 2010/00212570 the entirety of which is hereby incorporated by reference, describes an example of such a system.
- the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- the present disclosure provides a mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
- the present disclosure provides a method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
- the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
- the present disclosure provides a method for offloading oil and/or gas from an offshore structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
- Figure 1 illustrates a mooring system
- Figure 2 illustrates a side-by-side mooring system.
- Figure 3 illustrates a tandem mooring system.
- the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
- FIG. 1 illustrates mooring system 100.
- mooring system 100 may comprise offshore structure 110; vessel 120; first mooring line 130; second mooring line 140; and hawser 150.
- offshore structure 110 may comprise a floating liquid natural gas facility.
- the floating liquid natural gas facility may comprise one or more liquid natural gas storage tanks and cryogenic offloading equipment.
- offshore structure 110 may comprise a floating structure floating on sea surface 170. Examples of suitable floating structures include FPSOs, FSOs, spars, TLPs, semi-submersibles, or other floating structures known in the art.
- offshore structure 110 may be connected to sea floor 160 with one or more catenary or taut mooring lines 165.
- offshore structure 110 may be a fixed structure such as a pier, compliant tower, gravity based structure, jack-up platform, or jacket platform resting on sea floor 160.
- offshore structure 110 may comprise one or more winches 111.
- offshore structure 110 may comprise one or more transfer devices 112.
- the one or more transfer devices 112 may be capable of offloading oil and/or gas from offshore structure 110.
- the one or more transfer devices 112 may comprise a hose or a loading arm.
- vessel 120 may comprise any vessel capable of transporting oil and/or natural gas.
- vessel 120 may be a liquid natural gas carrier vessel.
- vessel 120 may be a shuttle tanker.
- Vessel 120 may comprise storage facilities 121 capable of storing oil and/or gas.
- one or more hoses 112 of offshore structure 110 may be connected to storage facility 121 of vessel 120 to facilitate transfer of oil and/or gas from offshore structure 110 to vessel 120.
- vessel 120 may further comprise one or more bollards or mooring bitts 122.
- first mooring line 130, second mooring line 140, and hawser 150 may be attached individually to at least three different bollard or mooring bitts 122 of vessel 120.
- first mooring line 130 and second mooring line 140 may each comprise chain, wire, polyester, HMPE segments, or any combination thereof.
- first end 131 of first mooring line 130 may be anchored to sea floor 160.
- first end 131 of first mooring line 130 may be attached to chain 132 which is attached to anchor or pile 133 on sea floor 160.
- first end 141 of second mooring line 140 may be anchored to sea floor 160.
- first end 141 of second mooring line 140 may be attached to chain 142 which is attached to anchor or pile 143 on sea floor 160.
- anchor 133 and/or anchor 143 may comprise mooring connectors linked to conventional anchors, vertical load anchors, or suction piles.
- first mooring line 130 may comprise buoy 134 attached directly or indirectly to first mooring 130 at buoyed point 135.
- second mooring line 140 may comprise buoy 144 attached directly or indirectly to second mooring 140 at buoyed point 145.
- buoy 134 and/or buoy 144 may be submersible buoys.
- buoy 134 and/or buoy 144 may be modular or single mooring buoys of elastomer or foam construction, connected via chain-throughs, pick-ups, or pendants.
- buoy 134 and buoy 144 may be connected to buoyed points 135 and 145 respectively through buoy lines 136 and 146.
- first mooring line 130 may further comprise marker buoy 138.
- marker buoy 138 may be floating on sea surface 170.
- marker buoy 138 may be a small float or high-visibility buoy to help pick up messenger lines.
- second mooring line 140 may further comprise marker buoy 148.
- marker buoy 148 may be floating on sea surface 170.
- marker buoy 148 may be a small float or high-visibility buoy to help pick up messenger lines.
- marker buoy 138 and marker buoy 148 may be connected to each other by chord line 180.
- chord line 180 may comprise a lightweight synthetic line composed of polyester or HMPE segments.
- second end 139 of first mooring line 130 may be connected to bollard or mooring bitt 122 of vessel 120 and second end 149 of second mooring line 140 may be connected to bollard or mooring bitt 122 of vessel 120.
- hawser 150 may comprise a nylon or HMPE line with pick-up equipment such as messenger lines, connecting shackles, floats, and weight chains. In certain embodiments, hawser 150 may comprise a single hawser 150 or multiple hawsers 150. In certain embodiments, first end 151 of hawser 150 may be attached to the winch 111 of vessel 110. In certain embodiments, not illustrated in Figure 1, second end 152 hawser 150 may be attached to the one or more bollards or mooring bitts 122 of vessel 120.
- Figure 2 illustrates a side-by-side mooring system 200.
- side -by-side mooring system 200 may comprise any of the features of mooring system 100.
- each of the individual components of side-by-side mooring system 200 may comprise the same features of each of the individual components of mooring system 100.
- side-by-side mooring system 200 may comprise structure 210, vessel 220, first mooring line 230, second mooring line 240, and two hawsers 250.
- structure 210 may be floating on sea surface 170 and attached to sea floor 160 by one or more mooring lines 265.
- two hawsers 250 may connect structure 210 to vessel 220.
- first ends 251 of hawsers 250 may be attached to one or more winches 211 of structure 210.
- second ends 252 of hawsers 250 may be attached to one or more bollards or mooring bitts 222 of vessel 220.
- one or more transfer devices 212 of structure 210 may be connected to storage facility 221 of vessel 220 to facilitate transfer of oil and/or gas from structure 210 to vessel 220.
- vessel 220 may be moored to the seafloor 260 by mooring lines 230 and 240.
- mooring line 230 may comprise a first end 231 anchored to sea floor 260 by anchor 233 and chain 232, second end 239 connected to bollard or mooring bitt 222 of vessel 220, buoy 234 connected to buoyed point 235 by buoyed line 236, and marker buoy 238.
- mooring line 240 may comprise a first end 241 anchored to sea floor 260 by anchor 243 and chain 242, second end 249 connected to bollard or mooring bitt 222 of vessel 220, buoy 244 connected to buoyed point 245 by buoyed line 246, and marker buoy 248.
- a chord line 280 may connected marker buoy 238 to marker buoy 248.
- side-by-side mooring system 200 allows for a vessel to be moored to a structure in a side-by-side fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by two points of contact.
- the vessel is pointed parallel with the structure.
- the relative motions between the vessel and the structure are smaller compared to a tandem mooring system, allowing for shorter loading arms. Shorter loading arms may minimize heat loss and mechanical stresses during transfers.
- tandem mooring system 300 may comprise any of the features of mooring system 100 and certain features of side-by-side mooring system 200. Furthermore, each of the individual components of tandem mooring system 300 may comprise the same features of each of the individual components of mooring system 100.
- tandem mooring system 300 may comprise an offshore structure 310, a vessel 320, a first mooring line 330, a second mooring line 340, and hawser 350.
- offshore structure 310 may be floating on sea surface 370 and attached to sea floor 360 by one or more mooring lines 370.
- hawser 350 may connect offshore structure 310 to vessel 320.
- first end 351 of hawser 350 may be attached to winch 311 of offshore structure 310.
- second end 352 of hawser 350 may be attached to one or more bollards or mooring bitts 322 of vessel 320.
- one or more transfer devices 312 of offshore structure 310 may be connected to storage facility 321 of vessel 320 to facilitate transfer of oil and/or gas from offshore structure 310 to vessel 320.
- vessel 320 may be moored to the seafloor 360 by mooring lines 330 and 340.
- mooring line 330 may comprise a first end 331 anchored to sea floor 360 by anchor 333 and chain 332, second end 339 connected to bollard or mooring bitt 322 of vessel 320, buoy 334 connected to buoyed point 335 by buoyed line 336, and marker buoy 338.
- mooring line 340 may comprise a first end 341 anchored to sea floor 360 by anchor 343 and chain 342, second end 349 connected to bollard or mooring bitt 322 of vessel 320, buoy 344 connected to buoyed point 345 by buoyed line 346, and marker buoy 348.
- a chord line 380 may connected marker buoy 338 to marker buoy 348.
- tandem mooring system 200 allows for a vessel to be moored to a structure in a tandem fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by one point of contact. In such a system, the vessel is pointed directly toward the structure. Such a system may allow for an easier, more controlled approach maneuvering to the structure. Lines 330 and 340 may provide increasing resistance to the vessel as it advances. Such an orientation also makes use of bow chain stoppers that are commonly found in most tankers, and that easily and safely connected to hawsers.
- the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising a structure, a vessel, a first mooring line, a second mooring line, and two hawsers; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
- side-by-side is used to indicate that the vessel and the offshore structure are in a parallel arrangement as illustrated in Figure 2.
- the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
- tandem is used to indicate that the vessel and the offshore structure are in a perpendicular arrangement as illustrated in Figure 3.
- a liquid natural gas carrier vessel may approach a floating liquid natural gas facility.
- the vessel may then be connected to two mooring lines and then two hawsers from the facility.
- the facility may then winch in the hawsers by first winching in a single hawser and then winching in the remaining hawser.
- liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel.
- the loading arms may be disconnected from the vessel and the facility may winch out the two hawsers allowing the mooring lines to pull the vessel away from the facility.
- the vessel may then be disconnected from the hawsers and the mooring lines and the facility may take back in the hawsers.
- a liquid natural gas carrier vessel may approach a floating liquid natural gas facility.
- the vessel may then be connected to two mooring lines and then a hawser from the facility.
- the facility may then winch in the hawser.
- liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel.
- the loading arms may be disconnected from the vessel and the facility may winch out the hawser allowing the mooring lines to pull the vessel away from the facility.
- the vessel may then be disconnected from the hawser and the mooring lines and the facility may take back in the hawser.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2014321620A AU2014321620A1 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offloading systems and associated methods |
CN201480051442.7A CN105555654A (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offloading systems and associated methods |
EP14846525.5A EP3046831A4 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offloading systems and associated methods |
US15/022,419 US20160236756A1 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offlaoding systems and associated methods |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201361879503P | 2013-09-18 | 2013-09-18 | |
US61/879,503 | 2013-09-18 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2015041916A1 true WO2015041916A1 (en) | 2015-03-26 |
Family
ID=52689290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2014/055111 WO2015041916A1 (en) | 2013-09-18 | 2014-09-11 | Tandem and side-by-side mooring offloading systems and associated methods |
Country Status (5)
Country | Link |
---|---|
US (1) | US20160236756A1 (en) |
EP (1) | EP3046831A4 (en) |
CN (1) | CN105555654A (en) |
AU (1) | AU2014321620A1 (en) |
WO (1) | WO2015041916A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106035169A (en) * | 2016-06-29 | 2016-10-26 | 大连昊昇海事服务有限公司 | Offshore aquaculture facility modified based on general bulk vessel |
NO20171967A1 (en) * | 2017-12-08 | 2019-06-10 | Can Systems As | A mooring system |
WO2021094460A1 (en) * | 2019-11-15 | 2021-05-20 | Single Buoy Moorings Inc. | Spread mooring arrangement, use thereof and method therefor |
US11319036B2 (en) | 2019-08-19 | 2022-05-03 | Sofec, Inc. | Mooring systems and processes for using same |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11198490B2 (en) * | 2018-07-31 | 2021-12-14 | Sofec, Inc. | Disconnectable spread mooring and riser tower system and method |
CN112319700B (en) * | 2020-11-17 | 2021-08-24 | 厦门天吴海洋科技有限公司 | Anchoring method of mother ship without anchor machine |
US20220306244A1 (en) * | 2021-03-02 | 2022-09-29 | Exmar Offshore Company | Split mooring system and methods for vessels |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6571723B1 (en) * | 1999-06-30 | 2003-06-03 | Navion Asa | System for mooring a tanker near an offshore floating unit |
EP1413511B1 (en) * | 2002-10-24 | 2005-07-06 | Bluewater Energy Services B.V. | Apparatus for mooring vessels side by side |
US20080096448A1 (en) * | 2004-09-28 | 2008-04-24 | Lokken Roald T | Combined Riser, Offloading and Mooring System |
US20100212570A1 (en) * | 2007-06-27 | 2010-08-26 | Hugo Antonio Corvalan San Martin | Vessel mooring systems and methods |
WO2012072292A1 (en) * | 2010-11-30 | 2012-06-07 | Single Buoy Moorings Inc. | Floating lng plant |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3833032A (en) * | 1972-10-31 | 1974-09-03 | Exxon Research Engineering Co | Tandem mooring-loading system |
US4067282A (en) * | 1976-10-04 | 1978-01-10 | Guinn David C | Releasable and retrievable mooring system |
US6692192B2 (en) * | 2002-05-03 | 2004-02-17 | Single Buoy Moorings Inc. | Spread moored midship hydrocarbon loading and offloading system |
GB0321768D0 (en) * | 2003-09-17 | 2003-10-15 | Ocean Power Delivery Ltd | Mooring system |
US7299760B2 (en) * | 2004-03-05 | 2007-11-27 | Sofec, Inc. | Floating LNG import terminal and method for docking |
DK1826116T3 (en) * | 2006-02-23 | 2008-09-08 | Bluewater Energy Services Bv | Anchoring system for a floating structure |
NO336244B1 (en) * | 2006-10-17 | 2015-06-29 | Sevan Marine Asa | Procedure for mooring a conventional tanker |
-
2014
- 2014-09-11 AU AU2014321620A patent/AU2014321620A1/en not_active Abandoned
- 2014-09-11 US US15/022,419 patent/US20160236756A1/en not_active Abandoned
- 2014-09-11 EP EP14846525.5A patent/EP3046831A4/en not_active Withdrawn
- 2014-09-11 CN CN201480051442.7A patent/CN105555654A/en active Pending
- 2014-09-11 WO PCT/US2014/055111 patent/WO2015041916A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6571723B1 (en) * | 1999-06-30 | 2003-06-03 | Navion Asa | System for mooring a tanker near an offshore floating unit |
EP1413511B1 (en) * | 2002-10-24 | 2005-07-06 | Bluewater Energy Services B.V. | Apparatus for mooring vessels side by side |
US20080096448A1 (en) * | 2004-09-28 | 2008-04-24 | Lokken Roald T | Combined Riser, Offloading and Mooring System |
US20100212570A1 (en) * | 2007-06-27 | 2010-08-26 | Hugo Antonio Corvalan San Martin | Vessel mooring systems and methods |
WO2012072292A1 (en) * | 2010-11-30 | 2012-06-07 | Single Buoy Moorings Inc. | Floating lng plant |
Non-Patent Citations (1)
Title |
---|
See also references of EP3046831A4 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106035169A (en) * | 2016-06-29 | 2016-10-26 | 大连昊昇海事服务有限公司 | Offshore aquaculture facility modified based on general bulk vessel |
NO20171967A1 (en) * | 2017-12-08 | 2019-06-10 | Can Systems As | A mooring system |
WO2019112444A1 (en) * | 2017-12-08 | 2019-06-13 | Can Systems As | A mooring system |
NO344968B1 (en) * | 2017-12-08 | 2020-08-03 | Can Systems As | A mooring system |
US11377174B2 (en) | 2017-12-08 | 2022-07-05 | Can Systems As | Mooring system |
US11319036B2 (en) | 2019-08-19 | 2022-05-03 | Sofec, Inc. | Mooring systems and processes for using same |
WO2021094460A1 (en) * | 2019-11-15 | 2021-05-20 | Single Buoy Moorings Inc. | Spread mooring arrangement, use thereof and method therefor |
Also Published As
Publication number | Publication date |
---|---|
US20160236756A1 (en) | 2016-08-18 |
EP3046831A1 (en) | 2016-07-27 |
CN105555654A (en) | 2016-05-04 |
AU2014321620A1 (en) | 2016-03-10 |
EP3046831A4 (en) | 2017-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20160236756A1 (en) | Tandem and side-by-side mooring offlaoding systems and associated methods | |
US20210245845A1 (en) | Jetty-Less Offshore Terminal Configurations | |
CN101297144B (en) | A system using a catenary flexible conduit for transferring a cryogenic fluid | |
US9032892B2 (en) | Mooring system and connector assembly | |
US6983712B2 (en) | Offloading arrangements and method for spread moored FPSOs | |
US10059409B2 (en) | Taut inverted catenary mooring system | |
Rutkowski | A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore | |
EP2576334B1 (en) | Floating production unit with disconnectable transfer system | |
CN107107994B (en) | Tensioning inverted catenary mooring system | |
US9409631B2 (en) | Loading hose | |
US8156884B2 (en) | Vessel mooring systems and methods | |
WO2000064732A1 (en) | System for transferring fluids and methods for installing, modifying and operating the system | |
EP2398695B1 (en) | Deep water and ultra deep water mooring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201480051442.7 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14846525 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2014321620 Country of ref document: AU Date of ref document: 20140911 Kind code of ref document: A |
|
REEP | Request for entry into the european phase |
Ref document number: 2014846525 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2014846525 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112016005753 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112016005753 Country of ref document: BR Kind code of ref document: A2 Effective date: 20160316 |