US20210245845A1 - Jetty-Less Offshore Terminal Configurations - Google Patents
Jetty-Less Offshore Terminal Configurations Download PDFInfo
- Publication number
- US20210245845A1 US20210245845A1 US17/218,966 US202117218966A US2021245845A1 US 20210245845 A1 US20210245845 A1 US 20210245845A1 US 202117218966 A US202117218966 A US 202117218966A US 2021245845 A1 US2021245845 A1 US 2021245845A1
- Authority
- US
- United States
- Prior art keywords
- platform
- gas
- jack
- storage unit
- tubing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000003949 liquefied natural gas Substances 0.000 claims abstract description 114
- 239000007789 gas Substances 0.000 claims abstract description 99
- 238000007667 floating Methods 0.000 claims abstract description 48
- 238000000034 method Methods 0.000 claims abstract description 15
- 239000012530 fluid Substances 0.000 claims description 15
- 239000003915 liquefied petroleum gas Substances 0.000 claims description 6
- 230000009193 crawling Effects 0.000 claims description 4
- 238000009434 installation Methods 0.000 description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 15
- 230000008901 benefit Effects 0.000 description 8
- 238000012546 transfer Methods 0.000 description 8
- 239000013505 freshwater Substances 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 7
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 239000003345 natural gas Substances 0.000 description 2
- JTJMJGYZQZDUJJ-UHFFFAOYSA-N phencyclidine Chemical class C1CCCCN1C1(C=2C=CC=CC=2)CCCCC1 JTJMJGYZQZDUJJ-UHFFFAOYSA-N 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000002829 reductive effect Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 239000004606 Fillers/Extenders Substances 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000002277 temperature effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/24—Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
- B63B22/021—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/16—Arrangement of ship-based loading or unloading equipment for cargo or passengers of lifts or hoists
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/22—Arrangement of ship-based loading or unloading equipment for cargo or passengers of conveyers, e.g. of endless-belt or screw-type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
- B63B27/34—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/448—Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
Definitions
- the present invention relates to offshore terminals for vessels, and in particular, jetty-less systems and methods for the offloading or loading of fluid cargo off or onto a vessel at an offshore terminal.
- the cargo is liquefied natural gas (LNG), and a regasification unit can be utilized for regasifying the LNG into gas.
- LNG liquefied natural gas
- Terminals of various kinds have been devised for loading fluid cargo onto a vessel or offloading fluid cargo from a vessel.
- Infrastructure and cost for onshore terminals can be considerable, and approval processes can be demanding.
- a traditional solution for an LNG receiving terminal is to construct a near-shore jetty where a floating storage unit (FSU), or a floating storage and regasification unit (FSRU) is moored to the jetty.
- FSU floating storage unit
- FSRU floating storage and regasification unit
- Such jetties may be very capital intensive, and can take a long time to construct.
- It may also be challenging to obtain an environmental permit for construction of the near-shore jetty as the footprint is typically large (typical length of 300-400 m +potential breakwater structure).
- solutions have been proposed for offloading LNG from the cargo vessel offshore.
- mooring an FSU/FSRU to an exposed offshore jetty during high wind and waves may be challenging and provide significant limitations for such a terminal set-up.
- a system for offloading liquefied gas from a cargo vessel and regasifying the offloaded gas at a location offshore comprising: a floating storage unit which is moored to the seabed offshore; first tubing for offloading liquefied gas from the cargo vessel to the storage unit; a jack-up platform positioned offshore in proximity to the floating storage unit, the jack-up platform comprising legs which are arranged to be supported on the seabed and a hull which is arranged to be jacked up along the legs to a position above the sea surface; a regasification facility on the jack-up platform; second tubing extending between the storage unit and the regasification facility of the jack-up platform for transferring liquified gas from the cargo vessel to the regasification facility for regasification of the liquified gas; and third tubing for communicating regasified gas away from the regasification facility.
- the floating storage unit may be spread-moored to the seabed.
- the floating storage unit may comprise a floating storage vessel, e.g. a ship, or other vessel.
- the system may further include the cargo vessel.
- the cargo vessel may be spread-moored to the seabed.
- the cargo vessel may be moored side-by-side to the floating storage unit.
- the cargo vessel may be spread moored at sea to a plurality of mooring points for mooring the cargo vessel in a desired orientation, the liquefied gas to be offloaded from the cargo vessel.
- the first tubing may be configured to be connected to the cargo vessel for fluid communication between the cargo vessel and the floating storage unit.
- the first tubing may comprise a first portion configured to be connected to the cargo vessel and a second portion configured to be connected to the floating storage unit.
- the system may further comprise a travel unit operable to travel across the sea and carry part of the first tubing, e.g. from a stand-by location, to a position at or adjacent to the cargo vessel, e.g.
- the unit may have at least one lifting and handling device, e.g. crane or articulated arm extender, which with the first portion of the first tubing coupled thereto and when the travel unit is positioned at or adjacent to the cargo vessel may be operable to lift, maneuver, and land the end of the first portion of the first tubing on the cargo vessel for arranging the end of the first portion of the first tubing at or near a manifold on the cargo vessel for connection thereto.
- lifting and handling device e.g. crane or articulated arm extender
- the system may further comprise a chain crawling propulsion system wherein at least one chain may be anchored to the seabed, and the travel unit may be configured to draw in the chain while the chain is anchored in order to propel the unit for travel across the sea into the position adjacent to the cargo vessel.
- a chain crawling propulsion system wherein at least one chain may be anchored to the seabed, and the travel unit may be configured to draw in the chain while the chain is anchored in order to propel the unit for travel across the sea into the position adjacent to the cargo vessel.
- the system may further comprise a power plant on the jack-up platform provided with a regasification facility or the regasification facility is provided or on another jack-up platform.
- the power plant may be configured to be supplied with regasified gas from the regasification facility.
- the system may further comprise a fresh water generation facility which may be configured to be powered using electrical power generated by the power plant.
- the fresh water generation facility may be disposed on one of: the jack-up platform with the regasification facility; the jack-up platform with the power plant; or another jack-up platform.
- the liquified gas may typically comprise liquefied natural gas, LNG, or liquefied petroleum gas, LPG.
- a system for offloading liquefied gas from a cargo vessel at a location offshore comprising: a floating storage unit which is moored to the seabed; first tubing for offloading liquified gas from the cargo vessel to the storage unit; a regasification facility; an intermediate structure positioned offshore in proximity to the storage unit, the intermediate structure arranged to be supported on the seabed; a connection manifold or device above the sea surface on the intermediate structure; second tubing configured to extend between the storage unit and the connection manifold or device on the intermediate structure for transferring liquified gas from the cargo vessel to the intermediate structure; third tubing arranged on the seabed for conveying liquefied gas from the intermediate structure to the regasification facility.
- system for offloading liquefied gas from a cargo vessel and regasifying the offloaded gas at a location offshore comprising: a floating storage unit which is moored to the seabed offshore, the floating storage unit comprising an upright cylindrical hull; tubing for offloading fluid from the cargo vessel to the storage unit; and a regasification facility on the floating storage unit.
- a system for offloading liquefied gas from a cargo vessel at a location offshore and regasifying the offloaded gas comprising: a floating storage unit which is moored to the seabed offshore; tubing for offloading fluid from the cargo vessel to the storage unit; at least one jack-up platform; and a regasification facility; wherein any one or more of the regasification facility a power production facility and a water generation facility is disposed on the jack-up platform; the power production facility being operable using regasified gas from the regasification facility.
- a system for offloading liquefied gas from at least one cargo vessel and regasifying the offloaded gas at a location offshore comprising: a jack-up platform; tubing for offloading liquified gas from the cargo vessel to the jack-up platform; and a regasification facility on the jack-up platform for regasifying the offloaded gas.
- a sixth aspect of the invention there is provided a method of offloading liquified gas from a cargo vessel and regasifying the offloaded gas using the system in accordance with any of the first to fifth aspects of the invention.
- a system for liquefying gas and loading the liquefied gas onto a cargo vessel and at a location offshore comprising: a floating storage unit which is moored to the seabed; a jack-up platform positioned offshore in proximity to the floating storage unit, the jack-up platform comprising legs which are arranged to be supported on the seabed and a hull which is arranged to be jacked up along the legs to a position above the sea surface; a liquefaction facility on the jack-up platform; tubing for loading liquefied gas fluid from the floating storage unit to the cargo vessel; tubing extending between the floating storage unit and the liquification facility of the jack-up platform for transferring liquified gas from the liquification facility to the cargo vessel; and third tubing for transporting the gas to the liquefaction facility.
- an eighth aspect of the invention there is provided a method of liquefying gas and loading liquified gas onto a cargo vessel using the system in accordance with the seventh aspect of the invention.
- any of the aspects of the invention may include further features as described in relation to any other aspect, anywhere herein.
- the system in any of the aspects is preferably and advantageously a jetty-less system.
- FIG. 1 is an overhead representation of a system for offloading liquefied gas from a cargo vessel and regasifying the offloaded gas at a location offshore;
- FIG. 2 is a side-view representation of part of the system of FIG. 1 showing the floating storage unit end-on;
- FIG. 3 is a side-view representation of a regasification unit on a jack-up rig for the system of FIGS. 1 and 2 ;
- FIG. 4 is an overhead representation of the jack-up rig of FIG. 3 ;
- FIGS. 5A to 5C are side-view representations of the jack-up rig of FIGS. 3 and 4 in successive stages of installation;
- FIG. 6 is an overhead representation of a system for liquefying gas and loading the liquefied gas onto a cargo vessel;
- FIG. 7 is an overview representation of the system of FIG. 1 expanded to include a power plant
- FIG. 8 is a side view of the power plant of the system of FIG. 7 when installed on seabed;
- FIG. 9 is a top view of the power plant of FIG. 8 ;
- FIG. 10 is another side view of the power plant of FIGS. 7 and 8 in larger scale
- FIG. 11 is an overhead representation of a system of FIGS. 1 and 7 expanded to include a water generation facility;
- FIG. 12 is an overhead representation of a system for offloading liquefied gas and regasifying the offloaded gas at a location offshore;
- FIG. 13 is a side view of the system of FIG. 12 ;
- FIG. 14 is a side view representation of the system of FIGS. 12 and 13 with the cargo vessel absent;
- FIG. 15 is an overhead representation of the system in the configuration of FIG. 14 ;
- FIG. 16 is an overhead representation of is an overhead representation of a system for offloading liquefied gas and regasifying the offloaded gas at a location offshore;
- FIG. 17 is a side-view representation of the system of FIG. 16 ;
- FIG. 18 is a side-view representation of part of the system of FIGS. 16 and 17 in larger scale
- FIG. 19 is an overhead view of a system for offloading liquefied gas and storing the offloaded gas in a circular platform;
- FIG. 20 is a close-up view of the platform of the system of FIG. 19 ;
- FIG. 21 is an overhead view of another system for offloading and regasifying gas from a vessel.
- a system 1 is generally depicted for offloading liquefied natural gas (LNG) from a cargo vessel in the form of an LNG carrier 10 and regasifying the offloaded gas at a location offshore.
- the system 1 includes a floating storage unit (FSU) in the form of a storage vessel 20 .
- the storage vessel 20 is spread-moored to the seabed by seabed moorings 24 .
- a jack-up platform 30 is positioned offshore in proximity to the storage vessel 20 , and a regasification facility is provided on the jack-up rig for regasifying the LNG which is offloaded from the LNG carrier 10 .
- the jack-up platform 30 has legs 31 which are arranged to be supported on the seabed and a hull 32 which is arranged to be jacked up along the legs 31 to a position above the sea surface 3 .
- the installation of the jack-up 30 takes place through manoeuvring the hull 32 into the indicated position with the legs 31 in raised position ( FIG. 5A ), lowering the legs 31 to engage the seabed 2 ( FIG. 5B ), and then moving the hull 32 upward along the legs to the position where the bottom of the hull is spaced well above the wave zone of the sea surface 3 ( FIG. 5C ).
- First tubing 70 extends between the carrier 10 and the storage vessel 20 and provides fluid communication for offloading the LNG from the LNG carrier 10 to the storage vessel 20 through the first tubing.
- Second tubing 80 extends between the storage vessel 20 and the regasification facility 35 of the jack-up rig 30 for transferring LNG from the storage vessel 20 to the regasification facility for regasification.
- the second tubing 80 is in the form of hoses which are aerial hoses (not in the water) which are suspended in U-shape in the air between the storage vessel 20 and the jack-up 30 .
- Third tubing 90 is provided for transporting the regasified gas from the regasification facility 35 to shore, e.g. through a seabed pipeline.
- the LNG carrier 10 is moored to the seabed through seabed buoy moorings 14 (e.g. a conventional buoy mooring system—CBM), a distance away from the storage vessel 20 .
- the LNG carrier 10 visits from time to time to offload LNG to the storage vessel 10 .
- the LNG carrier 10 departs, e.g. to collect a new amount of LNG from a supplier.
- the storage vessel 20 has greater storage capacity for LNG than the LNG carrier 10 .
- the storage vessel 20 remains in place on a permanent basis, and together with the jack-up platform 30 provides an offshore terminal which provides regasification.
- the system 1 includes in this example a floating travel unit 60 .
- the floating travel unit 60 is configured to travel between the storage unit 20 and the LNG carrier 10 to facilitate connection of the first tubing 70 to the mid-ships cargo manifold 11 of the LNG carrier 10 .
- the floating travel unit 60 travels from an initial position, typically near the storage vessel 20 , across the sea on a path toward and into position adjacent to a side of the LNG carrier 10 .
- a length of the tubing 70 to be connected to LNG carrier 10 is carried by the travel unit to the LNG carrier 10 .
- the travel unit 60 has a lifting and handling device, e.g.
- a crane which comprises a boom which is used to reach over the side of the LNG carrier and lift and manoeuvre a tubular end section 70 e of the first tubing 70 , over the side of the LNG carrier and land the end section 70 e onto a surface in front of the cargo manifold of the cargo vessel for connection thereto.
- the travel unit 60 operates to move into the position adjacent to the LNG carrier 10 by a chain crawling propulsion system.
- Seabed anchored chains 64 are provided and the travel unit 60 has winches or devices which are selectively operable to draw in the relevant anchored chain 64 so as to propel the unit 60 across sea and into the position adjacent to the LNG carrier 10 as depicted.
- the travel unit 60 can be the connection unit 30 as described in published US patent application US 2017/0253302, and the chain crawling propulsion system may be that as described in published US patent application US 2017/0253302 for the connection unit described therein, and the disclosures of these are incorporated herein by reference.
- the fluid cargo may in other variants be liquefied petroleum gas (LPG).
- LPG liquefied petroleum gas
- the system 1 does not require use of a jetty or any mooring to the jetty of any of: the storage vessel 20 ; the regasification facility 35 and/or platform 30 ; and the LNG carrier 10 . Nor are any of these moored to each other in the system 1 .
- the moorings are to the seabed only.
- the system 1 can advantageously allow transfer of fluid cargo offshore, far away from shore, at sea. Large separation distance is also achieved between the cargo vessel and the storage vessel (typ. 150 m or more) providing safe fluid transfer between the vessels.
- the installation and removal of the jack-up platform 30 can for example be performed as in the following.
- the platform 30 uses an onboard jacking system to lower the platform legs 31 onto the seabed 2 .
- the jacking system operates to lift the hull 32 of the platform off the water to suitable elevation, e.g. 15-20 m above the waterline.
- the platform legs are locked at this position and the jacking system is removed from the platform and returned to shore.
- the jacking system can thus be standardized and leased to each project to save cost as well as maintenance. Removal of the jack-up platform can be performed in the reverse order to the installation, e.g. when a project is finished and/or to relocate the jack-up platform.
- the jacking system is brought out to the platform 30 and the hull 32 is jacked down until it floats.
- the legs 31 are pulled up and the platform 30 can simply be towed to the new location by a standard tug boat or use of a submersible barge.
- a gas liquefaction facility 135 is provided on jack-up 130 .
- the system 101 in FIG. 6 is therefore arranged for liquefying gas supplied to the liquefaction facility 135 through third tubing 90 .
- the liquefied gas e.g. LNG
- the gas for liquefaction is delivered to the facility 135 by other means.
- the system 1 is expanded to include a power plant 235 on a separate jack-up platform 230 which includes a hull 232 and legs 231 .
- the jack-up platform 230 can be installed in the same manner as the jack-up platform 30 .
- Some of the regasified gas from the regasification facility 35 is supplied to the power plant 235 to produce electrical power.
- the electrical power is supplied to shore or other receiver through power cable 297 .
- Some of the regasified gas is also supplied to shore through third tubing 90 , e.g. through subsea pipeline.
- the regasification facility may also be located on the same jack-up platform as the power plant.
- the system 1 is expanded further to include a water generation facility 335 on a separate jack-up platform 330 .
- Power from the power plant 235 is used to operate the facility 235 which converts seawater to freshwater.
- the freshwater may be supplied to shore through water pipe 397 .
- the water generation facility may also be located on the same jack-up platform as the power plant.
- the LNG carrier 10 is instead moored side-by-side to the storage vessel 20 .
- the system 401 of FIGS. 12 to 14 therefore does not have the travel unit 60 of the above described system 1 .
- the first tubing is in the form of hosing 470 for offloading LNG from the LNG carrier 10 to the storage vessel 20 .
- the storage vessel 20 is moored to the seabed 2
- the LNG carrier 10 is moored to the storage vessel 20 .
- LNG is transferred from the storage vessel 20 through hosing 80 h and regasified on the regas facility 35 of the jack-up platform 30 .
- the LNG carrier 10 When offloaded, the LNG carrier 10 departs, leaving the storage vessel 20 and the regas platform in place (see FIGS. 14 and 15 ), where it may continue to process and regasify the LNG from the tanks of the storage vessel 20 and supply the regasified gas to shore through third tubing 90 .
- the mooring lines 426 from the storage vessel 20 are connected slightly below the keel of the FSU 20 . Additional water depth may typically then be required to accommodate this mooring configuration.
- the solution may be best suitable for areas where sufficient water depth while preferably close enough to shore to avoid installation of a long high-pressure gas pipeline.
- the described side-by side mooring configuration may also be used in combination with a power plant, water generation facility or gas liquefaction facility described previously.
- a seabed tower 530 is used in place of the jack-up platform 30 with the regasification plant.
- the seabed tower has a manifold 534 into which end portion 80 e of the second tubing 80 is connected.
- the manifold 534 is positioned on a platform 532 above the sea surface.
- the platform 532 is supported on the seabed 2 on at least one leg 531 which extends upward from the seabed penetrating through the sea surface 3 .
- a conduit connects the manifold fluidly with a seabed pipeline 90 p .
- the system 501 is therefore provided such that the LNG is offloaded and transferred to the storage vessel (FSU) 20 in the same way as in the system 1 .
- the LNG in this example is transported from the storage vessel 20 , into the manifold 534 on the tower 530 , through the conduit 536 and into the pipeline 90 p through which it travels in liquefied form at high pressure to shore or to a downstream facility for regasification.
- An insulated LNG pipe in pipe PIP
- the storage vessel 20 FSU may typically be located in very shallow water for obtaining a preferably shortest possible LNG pipeline to shore.
- the storage vessel 20 can include a regasification facility, i.e. forms an FSRU, such that regasified LNG is conveyed from the storage unit 20 to the tower 530 and into the pipeline 90 to shore.
- the tower 530 e.g. a “tripod tower” can make it feasible to moor a FSRU in shallower water and yet still enable a safe and robust transfer of high-pressure gas from the FSRU to the onshore gas pipeline 90 p.
- the seabed tower 530 may also be used in combination with the side-by-side mooring configuration described previously instead of the travel unit 60 shown in FIG. 16 .
- a regasification unit 630 is provided in the form of a platform having a circular section moored to the seabed. LNG is offloaded from the LNG carrier 10 through tubing 70 to the unit 620 and regasified gas is transferred through tubing 90 to shore.
- the regasification unit 630 includes a power production facility and/or fresh water production facility, or alternatively either of these can be provided on separate platforms.
- the unit provides storage for offloaded LNG and a regasification facility 635 for regasifying the LNG from tanks on the unit. This can be suitable for small scale LNG operations where the amount or frequency of LNG received is limited so as to be within the storage capacities and processing rates.
- a travel unit 60 may be used to connect the tubing 70 to the unit 630 .
- the unit 630 is circular in section which provides highly favourable motion characteristics when exposed to waves.
- the unit 630 may have bi-lobe-shaped IMO Type C LNG tanks 613 for storing the offloaded LNG. These tanks 613 are arranged as 60 degree “cake slices” around the circumference of the unit 630 and may be an attractive solution for efficient and maximizing storage. In other implementations however, other LNG containment systems or tanks may alternatively be used.
- a jack-up platform 730 is provided with a regasification facility 735 .
- the system 701 does not require use of the travel unit 60 or floating storage vessel 20 .
- a first articulated tug and barge 710 arrives and is moored to the seabed buoy mooring system.
- a floating LNG hose is reeled out form the platform 730 and connected to a specially designed hose connector at the barge 710 .
- LNG is pumped from the first barge 710 to the platform 730 and the regasification operation starts using the regasification facility 735 .
- the tug 723 used for the first barge 710 then leaves to pick up a second articulated tug and barge 720 .
- the second barge 720 arrives and is moored to seabed moorings.
- the process of pumping the LNG from second barge 720 starts and progresses slowly when the first barge 710 is nearly empty.
- the pumping rate from the second barge 720 is reduced until the first barge 710 is empty.
- continuous LNG supply to the regasification platform can be obtained without installing an FSU or onshore LNG storage.
- the regasified LNG is conveyed from the facility 735 to shore via a pipeline 90 p .
- the solution can be advantageous for small scale LNG terminals where it may not be economical to invest in onshore LNG storage or to install a permanently moored floating storage unit (FSU).
- FSU permanently moored floating storage unit
- the offloaded gas may be used to generate power, and the power can be transmitted to shore from the platform 730 via an electrical power cable.
- Two specially designed hoses reels with floating LNG hose are installed on the platform 730 , and the platform 730 is further equipped with complete LNG regasification system, power generation system and other facilities required to enable a complete the facility.
- the DP system at the PSV may also be used to assist in positioning of the vessel in addition to the mooring lines provided by the mooring system.
- the system solutions described above for jetty-less terminals may significantly reduce the overall cost for construction of new LNG receiving terminals. Furthermore, higher availability and uptime may be obtained as the FSU can be designed to stay at location on a permanent basis. Hence, the FSU (or FSRU) does not need to be disconnected and removed from the LNG terminal in case of strong wind or high waves. This can help to achieve the highest possible gas delivery regularity for new LNG receiving facilities.
- Provision of the regasification, power production, and/or water production on jack-up platforms can offer flexibility, convenience of use, and suitability for adverse weather.
- the jack-up platform can be built at any yard and towed location by a tug boat. When arrived at location, it can simply be installed using it its leg jacking system and without use of any large installation vessels or other expensive facilities. This in effect makes the jack-up platforms “self-installing”.
- a self-installed jack-up platform providing the regasification facility can significantly lower overall cost compared to traditional solutions.
- the jack-up platform After installation, the jack-up platform will be situated well above the exposed wave zone, and will therefore avoid exposure to high wave forces, such that it may be well suited for use in areas exposed to large waves and strong wind (hurricane, cyclone and monsoon areas).
- the jack-up platforms may also be removed and relocated to another LNG terminal location without use of expensive installation vessels.
- the jack-up solution can enable a very flexible and cost-effective installation of a regasification platform 30 . No special or expensive installation vessels are needed for providing the terminal.
- the jack-up solution can also enable offshore LNG terminals with a regasification facility to be installed at shallower water depth than typically possible with the traditional spread moored FSRU. This can allow the length of the high-pressure gas pipeline to the onshore facilities to be minimized and may increase location flexibility.
- an old and inexpensive LNG Carrier can be used to provide the storage vessel 20 (constituting an FSU).
- An advantage of using the FSU together with a separate jack-up regasification platform 30 can be that expensive LNG regasification equipment and associated facilities can be installed on a newly built jack-up platform instead of by converting an LNG carrier to an FSRU.
- This may make it possible to use an old LNG carrier (e.g. 25 years old) as the FSU until it has to be scrapped (e.g. after an 5-10 additional years of use). Then, this retired FSU can be replaced with another old FSU that may operate for the next 5-10 years.
- This can have cost and availability benefits and can increase flexibility.
- the mooring systems may therefore be re-used (typical lifetime 25-30 years).
- the required modification of the LNG storage vessel 20 (FSU) can be very moderate and extensive life extension of the FSU can be minimized.
- the jack-up regasification platform solution can also help to solve another challenge that traditional spread moored FSRU techniques are facing. Since the regasification platform is fixed to the seabed, the platform will not move in waves. Hence, a fixed, static high-pressure pipeline can be used from the deck of the regasification platform and down to the seabed, rather than flexible gas risers which can be exposed to significant wave dynamics in extreme weather, (hurricane, cyclones, etc), as used in prior art solutions of connecting an FSRU to a pipeline end manifold (PLEM) and as often can be a limiting factor as to whether an FSRU can be installed at a given location or not.
- LNG transfer from the storage vessel (FSU) 20 to the regasification platform 30 can advantageously be by use of LNG hoses arranged well above the wave action zone.
- the solution of providing offshore power production on a jack-up platform using regasified LNG, e.g. the platform 230 can be advantageous for the same or similar reasons as described above for regasification in relation to installation, conveyance (in this case of power) to shore, weather, and location, etc.
- Installing the power plant on the platform 230 offshore may avoid space/cost restrictions as may otherwise be associated with onshore installation.
- the produced power can be conveniently transmitted to shore by use of a high-voltage power cable.
- Utilizing a jetty-less liquefaction platform 130 in combination with an old and inexpensive storage vessel 20 (FSU), may allow for stranded gas to be liquified and transported by vessel to consumers in a way that can be economical to develop.
- Large amounts of “stranded” natural gas can be found at offshore and onshore fields around the world far away from existing gas pipelines such that they can be considered “stranded” in location.
- the only economical way to transport such gas to the consumers may be to liquefy the natural gas to LNG and transport it to the consumers by LNG ships, and the liquefaction platform 130 can facilitate such activity.
- the platform 130 can conveniently also be used in a near shore configuration where the gas is fed from an onshore location.
- the solution of the liquefaction platform 130 can otherwise be advantageous in a similar way to the regasification platform 30 in relation to installation, fluid conveyance (in this case of gas to the platform 130 ), weather, and location, etc.
- a particular advantage can be the relocation flexibility as some of the “stranded” gas fields may have a moderate amount of gas. The liquefaction platform may therefore be relocated several times between various stranded gas fields during its lifetime.
- the solution of water generation platform on the jack-up 330 is advantageous in a similar way to the regasification platform 30 in relation to installation, fluid conveyance (in this case of fresh water to shore), weather, and location, etc.
- the solution can facilitate provision of fresh water for developing countries and clean gas power for consumers.
- the use of the travel unit 60 can allow ship to ship transfer of LNG for a spread moored FSU (or FSRU) via spread-mooring lines installed from the deck level of the FSU 20 where the LNG carrier is moored typical 150 m from the FSU.
- the LNG carrier can therefore be moored without interference with the deck mounted FSU mooring lines, but yet be connected readily to the LNG carrier 10 for transfer of LNG.
- the solution can cope well with high sea states and avoids problems of relative movement between the LNG carrier and the storage vessel 20 as can typically occur when moored in a side-by-side configuration with typically 5 m vessel separation. This may facilitate higher LNG transfer regularity than for example side by side mooring to the FSU.
- the small-scale solution using the offshore regasification platform 730 served by tugs and barges can be advantageous for the same or similar reasons as described above for regasification e.g. by the jack-up platform 30 in relation to installation, conveyance of gas (regasified LNG) and/or power to shore, weather, and location, etc.
- a number of small-scale LNG receiving facilities are planned to be installed in hurricane/cyclone exposed areas like Caribbean and South-East Asia.
- the temporary storage vessel e.g. the barge or PSV, can disconnect from the connecting tubing, and leave in due time before the hurricane/cyclone arrives at the site.
- the only facilities that is left in place is then the regasification platform 730 and the mooring buoys. Since the regasification platform 730 is jack-up and elevated well above the maximum wave height, the platform can be very well suited for such locations.
- the primary need may be electric power. Such need may be particularly apparent for countries with island communities e.g. where there are thousands of small islands such as Indonesia, Philippines, or the Caribbean. A small offshore LNG to power solution may therefore be perfectly suited for these locations.
- the solutions of the regassification platform 730 in combination with a temporary storage vessel e.g. barge or PSV, may also be expanded to include offshore power generation on the same platform 730 as the regas equipment is installed. In such case, no gas pipeline will be needed between the platform and shore. Instead, a high-voltage power cable may be used to transmit power to shore with minimum of power loss.
- the solution of transfer using the platform tower 530 can be useful where onshore regasification may be preferred. It can nonetheless benefit from use of an old FSU located offshore as the LNG storage.
- the solution uses areal LNG hoses and the connection between the LNG hoses and the pipe in pipe (PIP) pipeline via the inside column 31 can thus be protected from any wave forces (more safe and robust solution).
- the tower provides an effective fixed connection on the seabed to the pipe in pipe pipeline 90 and overcomes challenges in risks of exposure in prior art submerged LNG hoses in the event of waves and extreme events such as e.g. a 100-year wave as well as Tsunami condition.
- Small scale LNG business may be facilitated by the solution of the “circular” regasification unit 630 for import of smaller quantities of LNG (say 20,000-30,000 m3) by use of smaller LNG ships.
- the solution can provide robust LNG receiving terminal. Motion characteristics of such a circular unit can be verified to be very favorable when exposed to large waves compared to for instance a barge-shaped or ship-shaped hull. Bi-lobe tanks can have a well proven performance in an LNG containment system.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
- The present application is a continuation of U.S. patent application Ser. No. 16/204,182, filed Nov. 29, 2018, which application claims the benefit of U.S. Provisional Application Ser. No. 62/591,821, filed Nov. 29, 2017, both of which are hereby incorporated by reference in their entirety.
- The present invention relates to offshore terminals for vessels, and in particular, jetty-less systems and methods for the offloading or loading of fluid cargo off or onto a vessel at an offshore terminal. In some examples, the cargo is liquefied natural gas (LNG), and a regasification unit can be utilized for regasifying the LNG into gas.
- Terminals of various kinds have been devised for loading fluid cargo onto a vessel or offloading fluid cargo from a vessel. Infrastructure and cost for onshore terminals can be considerable, and approval processes can be demanding.
- In the LNG industry, a traditional solution for an LNG receiving terminal is to construct a near-shore jetty where a floating storage unit (FSU), or a floating storage and regasification unit (FSRU) is moored to the jetty. Such jetties may be very capital intensive, and can take a long time to construct. It may also be challenging to obtain an environmental permit for construction of the near-shore jetty as the footprint is typically large (typical length of 300-400 m +potential breakwater structure). To address this, solutions have been proposed for offloading LNG from the cargo vessel offshore. However, mooring an FSU/FSRU to an exposed offshore jetty during high wind and waves may be challenging and provide significant limitations for such a terminal set-up.
- Published US Patent Application US 2017/0253302 describes an LNG terminal where LNG may be transferred offshore from a visiting LNG carrier to a spread-moored floating storage unit (FSU) or Floating Storage and Regasification Unit (FSRU). The solution is “jetty-less”. No jetty is required for mooring the vessels or other facilities.
- There is currently a large demand for offshore LNG receiving terminals where the LNG is regasified and sent to an onshore power plant or to an onshore gas pipeline. If regasification is required for transport to land, this can be achieved through the regasification facility onboard the FSRU. However, FSRU's are typically relative expensive and can have limitations.
- Alternatives of transporting large volumes of LNG to shore in liquid form in insulated pipelines may be prohibitively expensive and/or require high performance characteristics.
- According to a first aspect of the invention, there is provided a system for offloading liquefied gas from a cargo vessel and regasifying the offloaded gas at a location offshore, the system comprising: a floating storage unit which is moored to the seabed offshore; first tubing for offloading liquefied gas from the cargo vessel to the storage unit; a jack-up platform positioned offshore in proximity to the floating storage unit, the jack-up platform comprising legs which are arranged to be supported on the seabed and a hull which is arranged to be jacked up along the legs to a position above the sea surface; a regasification facility on the jack-up platform; second tubing extending between the storage unit and the regasification facility of the jack-up platform for transferring liquified gas from the cargo vessel to the regasification facility for regasification of the liquified gas; and third tubing for communicating regasified gas away from the regasification facility.
- The floating storage unit may be spread-moored to the seabed. The floating storage unit may comprise a floating storage vessel, e.g. a ship, or other vessel.
- The system may further include the cargo vessel. The cargo vessel may be spread-moored to the seabed. Alternatively, the cargo vessel may be moored side-by-side to the floating storage unit.
- The cargo vessel may be spread moored at sea to a plurality of mooring points for mooring the cargo vessel in a desired orientation, the liquefied gas to be offloaded from the cargo vessel. The first tubing may be configured to be connected to the cargo vessel for fluid communication between the cargo vessel and the floating storage unit. The first tubing may comprise a first portion configured to be connected to the cargo vessel and a second portion configured to be connected to the floating storage unit. The system may further comprise a travel unit operable to travel across the sea and carry part of the first tubing, e.g. from a stand-by location, to a position at or adjacent to the cargo vessel, e.g. so as to allow an end of the first portion of the first tubing to be connected to the cargo vessel for offloading the liquefied gas through the tubing, whereby the liquefied gas may be transmitted to the travel unit through the first portion of tubing and away from the travel unit to the floating storage unit through the second portion of first tubing. The unit may have at least one lifting and handling device, e.g. crane or articulated arm extender, which with the first portion of the first tubing coupled thereto and when the travel unit is positioned at or adjacent to the cargo vessel may be operable to lift, maneuver, and land the end of the first portion of the first tubing on the cargo vessel for arranging the end of the first portion of the first tubing at or near a manifold on the cargo vessel for connection thereto. The system may further comprise a chain crawling propulsion system wherein at least one chain may be anchored to the seabed, and the travel unit may be configured to draw in the chain while the chain is anchored in order to propel the unit for travel across the sea into the position adjacent to the cargo vessel.
- The system may further comprise a power plant on the jack-up platform provided with a regasification facility or the regasification facility is provided or on another jack-up platform. The power plant may be configured to be supplied with regasified gas from the regasification facility.
- The system may further comprise a fresh water generation facility which may be configured to be powered using electrical power generated by the power plant. The fresh water generation facility may be disposed on one of: the jack-up platform with the regasification facility; the jack-up platform with the power plant; or another jack-up platform.
- The liquified gas may typically comprise liquefied natural gas, LNG, or liquefied petroleum gas, LPG.
- According to a second aspect of the invention, there is provided a system for offloading liquefied gas from a cargo vessel at a location offshore, the system comprising: a floating storage unit which is moored to the seabed; first tubing for offloading liquified gas from the cargo vessel to the storage unit; a regasification facility; an intermediate structure positioned offshore in proximity to the storage unit, the intermediate structure arranged to be supported on the seabed; a connection manifold or device above the sea surface on the intermediate structure; second tubing configured to extend between the storage unit and the connection manifold or device on the intermediate structure for transferring liquified gas from the cargo vessel to the intermediate structure; third tubing arranged on the seabed for conveying liquefied gas from the intermediate structure to the regasification facility.
- According to a third aspect of the invention, there is provided system for offloading liquefied gas from a cargo vessel and regasifying the offloaded gas at a location offshore, the system comprising: a floating storage unit which is moored to the seabed offshore, the floating storage unit comprising an upright cylindrical hull; tubing for offloading fluid from the cargo vessel to the storage unit; and a regasification facility on the floating storage unit.
- According to fourth aspect of the invention, there is provided a system for offloading liquefied gas from a cargo vessel at a location offshore and regasifying the offloaded gas, the system comprising: a floating storage unit which is moored to the seabed offshore; tubing for offloading fluid from the cargo vessel to the storage unit; at least one jack-up platform; and a regasification facility; wherein any one or more of the regasification facility a power production facility and a water generation facility is disposed on the jack-up platform; the power production facility being operable using regasified gas from the regasification facility.
- According to a fifth aspect of the invention, there is provided a system for offloading liquefied gas from at least one cargo vessel and regasifying the offloaded gas at a location offshore, the system comprising: a jack-up platform; tubing for offloading liquified gas from the cargo vessel to the jack-up platform; and a regasification facility on the jack-up platform for regasifying the offloaded gas.
- According to a sixth aspect of the invention, there is provided a method of offloading liquified gas from a cargo vessel and regasifying the offloaded gas using the system in accordance with any of the first to fifth aspects of the invention.
- According to seventh aspect of the invention, there is provided a system for liquefying gas and loading the liquefied gas onto a cargo vessel and at a location offshore, the system comprising: a floating storage unit which is moored to the seabed; a jack-up platform positioned offshore in proximity to the floating storage unit, the jack-up platform comprising legs which are arranged to be supported on the seabed and a hull which is arranged to be jacked up along the legs to a position above the sea surface; a liquefaction facility on the jack-up platform; tubing for loading liquefied gas fluid from the floating storage unit to the cargo vessel; tubing extending between the floating storage unit and the liquification facility of the jack-up platform for transferring liquified gas from the liquification facility to the cargo vessel; and third tubing for transporting the gas to the liquefaction facility.
- According to an eighth aspect of the invention, there is provided a method of liquefying gas and loading liquified gas onto a cargo vessel using the system in accordance with the seventh aspect of the invention.
- Any of the aspects of the invention may include further features as described in relation to any other aspect, anywhere herein. The system in any of the aspects is preferably and advantageously a jetty-less system. Various advantages and improvements will be apparent from throughout the present specification.
- These and other aspects of the invention will now be described, by way of example only, with reference to the accompanying drawings, in which:
-
FIG. 1 is an overhead representation of a system for offloading liquefied gas from a cargo vessel and regasifying the offloaded gas at a location offshore; -
FIG. 2 is a side-view representation of part of the system ofFIG. 1 showing the floating storage unit end-on; -
FIG. 3 is a side-view representation of a regasification unit on a jack-up rig for the system ofFIGS. 1 and 2 ; -
FIG. 4 is an overhead representation of the jack-up rig ofFIG. 3 ; -
FIGS. 5A to 5C are side-view representations of the jack-up rig ofFIGS. 3 and 4 in successive stages of installation; -
FIG. 6 is an overhead representation of a system for liquefying gas and loading the liquefied gas onto a cargo vessel; -
FIG. 7 is an overview representation of the system ofFIG. 1 expanded to include a power plant; -
FIG. 8 is a side view of the power plant of the system ofFIG. 7 when installed on seabed; -
FIG. 9 is a top view of the power plant ofFIG. 8 ; -
FIG. 10 is another side view of the power plant ofFIGS. 7 and 8 in larger scale; -
FIG. 11 is an overhead representation of a system ofFIGS. 1 and 7 expanded to include a water generation facility; -
FIG. 12 is an overhead representation of a system for offloading liquefied gas and regasifying the offloaded gas at a location offshore; -
FIG. 13 is a side view of the system ofFIG. 12 ; -
FIG. 14 is a side view representation of the system ofFIGS. 12 and 13 with the cargo vessel absent; -
FIG. 15 is an overhead representation of the system in the configuration ofFIG. 14 ; -
FIG. 16 is an overhead representation of is an overhead representation of a system for offloading liquefied gas and regasifying the offloaded gas at a location offshore; -
FIG. 17 is a side-view representation of the system ofFIG. 16 ; -
FIG. 18 is a side-view representation of part of the system ofFIGS. 16 and 17 in larger scale; -
FIG. 19 is an overhead view of a system for offloading liquefied gas and storing the offloaded gas in a circular platform; -
FIG. 20 is a close-up view of the platform of the system ofFIG. 19 ; and -
FIG. 21 is an overhead view of another system for offloading and regasifying gas from a vessel. - Referring to
FIGS. 1 to 4 andFIGS. 5A to 5C , asystem 1 is generally depicted for offloading liquefied natural gas (LNG) from a cargo vessel in the form of anLNG carrier 10 and regasifying the offloaded gas at a location offshore. Thesystem 1 includes a floating storage unit (FSU) in the form of astorage vessel 20. Thestorage vessel 20 is spread-moored to the seabed byseabed moorings 24. - A jack-up
platform 30 is positioned offshore in proximity to thestorage vessel 20, and a regasification facility is provided on the jack-up rig for regasifying the LNG which is offloaded from theLNG carrier 10. - The jack-up
platform 30 haslegs 31 which are arranged to be supported on the seabed and ahull 32 which is arranged to be jacked up along thelegs 31 to a position above thesea surface 3. The installation of the jack-up 30 takes place through manoeuvring thehull 32 into the indicated position with thelegs 31 in raised position (FIG. 5A ), lowering thelegs 31 to engage the seabed 2 (FIG. 5B ), and then moving thehull 32 upward along the legs to the position where the bottom of the hull is spaced well above the wave zone of the sea surface 3 (FIG. 5C ). -
First tubing 70 extends between thecarrier 10 and thestorage vessel 20 and provides fluid communication for offloading the LNG from theLNG carrier 10 to thestorage vessel 20 through the first tubing. -
Second tubing 80 extends between thestorage vessel 20 and theregasification facility 35 of the jack-uprig 30 for transferring LNG from thestorage vessel 20 to the regasification facility for regasification. Thesecond tubing 80 is in the form of hoses which are aerial hoses (not in the water) which are suspended in U-shape in the air between thestorage vessel 20 and the jack-up 30. -
Third tubing 90 is provided for transporting the regasified gas from theregasification facility 35 to shore, e.g. through a seabed pipeline. - The
LNG carrier 10 is moored to the seabed through seabed buoy moorings 14 (e.g. a conventional buoy mooring system—CBM), a distance away from thestorage vessel 20. TheLNG carrier 10 visits from time to time to offload LNG to thestorage vessel 10. After offloading to thestorage vessel 20, theLNG carrier 10 departs, e.g. to collect a new amount of LNG from a supplier. - Typically, the
storage vessel 20 has greater storage capacity for LNG than theLNG carrier 10. Thestorage vessel 20 remains in place on a permanent basis, and together with the jack-upplatform 30 provides an offshore terminal which provides regasification. - The
system 1 includes in this example a floatingtravel unit 60. The floatingtravel unit 60 is configured to travel between thestorage unit 20 and theLNG carrier 10 to facilitate connection of thefirst tubing 70 to themid-ships cargo manifold 11 of theLNG carrier 10. When theLNG carrier 10 has been moored, the floatingtravel unit 60 travels from an initial position, typically near thestorage vessel 20, across the sea on a path toward and into position adjacent to a side of theLNG carrier 10. A length of thetubing 70 to be connected toLNG carrier 10 is carried by the travel unit to theLNG carrier 10. Thetravel unit 60 has a lifting and handling device, e.g. a crane, which comprises a boom which is used to reach over the side of the LNG carrier and lift and manoeuvre atubular end section 70 e of thefirst tubing 70, over the side of the LNG carrier and land theend section 70 e onto a surface in front of the cargo manifold of the cargo vessel for connection thereto. - The
travel unit 60 operates to move into the position adjacent to theLNG carrier 10 by a chain crawling propulsion system. Seabed anchoredchains 64 are provided and thetravel unit 60 has winches or devices which are selectively operable to draw in the relevant anchoredchain 64 so as to propel theunit 60 across sea and into the position adjacent to theLNG carrier 10 as depicted. Thetravel unit 60 can be theconnection unit 30 as described in published US patent application US 2017/0253302, and the chain crawling propulsion system may be that as described in published US patent application US 2017/0253302 for the connection unit described therein, and the disclosures of these are incorporated herein by reference. - The fluid cargo may in other variants be liquefied petroleum gas (LPG).
- As can be appreciated, the
system 1 does not require use of a jetty or any mooring to the jetty of any of: thestorage vessel 20; theregasification facility 35 and/orplatform 30; and theLNG carrier 10. Nor are any of these moored to each other in thesystem 1. The moorings are to the seabed only. Thesystem 1 can advantageously allow transfer of fluid cargo offshore, far away from shore, at sea. Large separation distance is also achieved between the cargo vessel and the storage vessel (typ. 150 m or more) providing safe fluid transfer between the vessels. - The installation and removal of the jack-up
platform 30 can for example be performed as in the following. When arrived at location, theplatform 30 uses an onboard jacking system to lower theplatform legs 31 onto theseabed 2. The jacking system operates to lift thehull 32 of the platform off the water to suitable elevation, e.g. 15-20 m above the waterline. The platform legs are locked at this position and the jacking system is removed from the platform and returned to shore. The jacking system can thus be standardized and leased to each project to save cost as well as maintenance. Removal of the jack-up platform can be performed in the reverse order to the installation, e.g. when a project is finished and/or to relocate the jack-up platform. To do so, the jacking system is brought out to theplatform 30 and thehull 32 is jacked down until it floats. Thelegs 31 are pulled up and theplatform 30 can simply be towed to the new location by a standard tug boat or use of a submersible barge. - Referring to
FIG. 6 , instead of theregasification facility 35 on the jack-upplatform 30, agas liquefaction facility 135 is provided on jack-up 130. Thesystem 101 inFIG. 6 is therefore arranged for liquefying gas supplied to theliquefaction facility 135 throughthird tubing 90. The liquefied gas, e.g. LNG, is transferred throughsecond tubing 80 onto the long-term storage vessel 20, then transferred throughfirst tubing 70 and loaded onto a visitingcargo vessel 10 through thecargo manifold 11. Alternatively, the gas for liquefaction is delivered to thefacility 135 by other means. - In
FIGS. 7 to 10 , thesystem 1 is expanded to include apower plant 235 on a separate jack-upplatform 230 which includes ahull 232 andlegs 231. The jack-upplatform 230 can be installed in the same manner as the jack-upplatform 30. Some of the regasified gas from theregasification facility 35 is supplied to thepower plant 235 to produce electrical power. The electrical power is supplied to shore or other receiver throughpower cable 297. Some of the regasified gas is also supplied to shore throughthird tubing 90, e.g. through subsea pipeline. The regasification facility may also be located on the same jack-up platform as the power plant. - In
FIG. 11 , thesystem 1 is expanded further to include awater generation facility 335 on a separate jack-upplatform 330. Power from thepower plant 235 is used to operate thefacility 235 which converts seawater to freshwater. The freshwater may be supplied to shore throughwater pipe 397. The water generation facility may also be located on the same jack-up platform as the power plant. - Referring now to
FIGS. 12 to 14 , theLNG carrier 10 is instead moored side-by-side to thestorage vessel 20. Thesystem 401 ofFIGS. 12 to 14 , therefore does not have thetravel unit 60 of the above describedsystem 1. The first tubing is in the form of hosing 470 for offloading LNG from theLNG carrier 10 to thestorage vessel 20. Thestorage vessel 20 is moored to theseabed 2, and theLNG carrier 10 is moored to thestorage vessel 20. LNG is transferred from thestorage vessel 20 through hosing 80 h and regasified on theregas facility 35 of the jack-upplatform 30. When offloaded, theLNG carrier 10 departs, leaving thestorage vessel 20 and the regas platform in place (seeFIGS. 14 and 15 ), where it may continue to process and regasify the LNG from the tanks of thestorage vessel 20 and supply the regasified gas to shore throughthird tubing 90. - In such a case, to allow the LNG carrier to be positioned alongside the
storage vessel 20, themooring lines 426 from thestorage vessel 20 are connected slightly below the keel of theFSU 20. Additional water depth may typically then be required to accommodate this mooring configuration. Hence, the solution may be best suitable for areas where sufficient water depth while preferably close enough to shore to avoid installation of a long high-pressure gas pipeline. - The described side-by side mooring configuration may also be used in combination with a power plant, water generation facility or gas liquefaction facility described previously.
- Turning now to
FIGS. 16 to 18 , aseabed tower 530 is used in place of the jack-upplatform 30 with the regasification plant. The seabed tower has a manifold 534 into whichend portion 80 e of thesecond tubing 80 is connected. The manifold 534 is positioned on aplatform 532 above the sea surface. Theplatform 532 is supported on theseabed 2 on at least oneleg 531 which extends upward from the seabed penetrating through thesea surface 3. A conduit connects the manifold fluidly with aseabed pipeline 90 p. Thesystem 501 is therefore provided such that the LNG is offloaded and transferred to the storage vessel (FSU) 20 in the same way as in thesystem 1. However, the LNG in this example is transported from thestorage vessel 20, into the manifold 534 on thetower 530, through theconduit 536 and into thepipeline 90 p through which it travels in liquefied form at high pressure to shore or to a downstream facility for regasification. An insulated LNG pipe in pipe (PIP) is then typically used from the FSU to the onshore facilities. To limit cost and potential temperature effects, the storage vessel 20 (FSU) may typically be located in very shallow water for obtaining a preferably shortest possible LNG pipeline to shore. - Alternatively, the
storage vessel 20 can include a regasification facility, i.e. forms an FSRU, such that regasified LNG is conveyed from thestorage unit 20 to thetower 530 and into thepipeline 90 to shore. Thetower 530 e.g. a “tripod tower” can make it feasible to moor a FSRU in shallower water and yet still enable a safe and robust transfer of high-pressure gas from the FSRU to theonshore gas pipeline 90 p. - The
seabed tower 530 may also be used in combination with the side-by-side mooring configuration described previously instead of thetravel unit 60 shown inFIG. 16 . - Referring to
FIGS. 19 and 20 , aregasification unit 630 is provided in the form of a platform having a circular section moored to the seabed. LNG is offloaded from theLNG carrier 10 throughtubing 70 to theunit 620 and regasified gas is transferred throughtubing 90 to shore. Optionally, theregasification unit 630 includes a power production facility and/or fresh water production facility, or alternatively either of these can be provided on separate platforms. The unit provides storage for offloaded LNG and aregasification facility 635 for regasifying the LNG from tanks on the unit. This can be suitable for small scale LNG operations where the amount or frequency of LNG received is limited so as to be within the storage capacities and processing rates. Atravel unit 60 may be used to connect thetubing 70 to theunit 630. Theunit 630 is circular in section which provides highly favourable motion characteristics when exposed to waves. - The
unit 630 may have bi-lobe-shaped IMO TypeC LNG tanks 613 for storing the offloaded LNG. Thesetanks 613 are arranged as 60 degree “cake slices” around the circumference of theunit 630 and may be an attractive solution for efficient and maximizing storage. In other implementations however, other LNG containment systems or tanks may alternatively be used. - In
FIG. 21 , a jack-upplatform 730 is provided with aregasification facility 735. Thesystem 701 does not require use of thetravel unit 60 or floatingstorage vessel 20. In use, a first articulated tug andbarge 710 arrives and is moored to the seabed buoy mooring system. A floating LNG hose is reeled out form theplatform 730 and connected to a specially designed hose connector at thebarge 710. LNG is pumped from thefirst barge 710 to theplatform 730 and the regasification operation starts using theregasification facility 735. Thetug 723 used for thefirst barge 710 then leaves to pick up a second articulated tug andbarge 720. Thesecond barge 720 arrives and is moored to seabed moorings. The process of pumping the LNG fromsecond barge 720 starts and progresses slowly when thefirst barge 710 is nearly empty. The pumping rate from thesecond barge 720 is reduced until thefirst barge 710 is empty. In this way, continuous LNG supply to the regasification platform can be obtained without installing an FSU or onshore LNG storage. The regasified LNG is conveyed from thefacility 735 to shore via apipeline 90 p. The solution can be advantageous for small scale LNG terminals where it may not be economical to invest in onshore LNG storage or to install a permanently moored floating storage unit (FSU). - In other variants, the offloaded gas may be used to generate power, and the power can be transmitted to shore from the
platform 730 via an electrical power cable. - Two specially designed hoses reels with floating LNG hose are installed on the
platform 730, and theplatform 730 is further equipped with complete LNG regasification system, power generation system and other facilities required to enable a complete the facility. - The above example is given with use of two barges to be towed by tugs. However, in other variants, the same principle may also be used with any type of small-scale LNG ships. An alternative is to convert old platform supply vessels (PSV's) to LNG ships. Currently, there are a number or PSV's in lay-up due to reduced activity in the upstream oil & gas sector. Such PSV's may therefore be converted to small-scale LNG ships that will be attractive to use in combination with the SRP as described. A key advantage of such PSV's compared to traditional LNG ships is that the PSV's normally are equipped with dynamically position system (DP) and several thrusters and propellers to obtain unique manoeuvring capabilities. With such DP system, mooring of the PSV to seabed moored buoys (e.g. CBM) can take place without tugs. During heavy weather, the DP system at the PSV may also be used to assist in positioning of the vessel in addition to the mooring lines provided by the mooring system.
- Possible Advantages and Applications
- The system solutions described above for jetty-less terminals may significantly reduce the overall cost for construction of new LNG receiving terminals. Furthermore, higher availability and uptime may be obtained as the FSU can be designed to stay at location on a permanent basis. Hence, the FSU (or FSRU) does not need to be disconnected and removed from the LNG terminal in case of strong wind or high waves. This can help to achieve the highest possible gas delivery regularity for new LNG receiving facilities.
- Provision of the regasification, power production, and/or water production on jack-up platforms can offer flexibility, convenience of use, and suitability for adverse weather. The jack-up platform can be built at any yard and towed location by a tug boat. When arrived at location, it can simply be installed using it its leg jacking system and without use of any large installation vessels or other expensive facilities. This in effect makes the jack-up platforms “self-installing”. A self-installed jack-up platform providing the regasification facility can significantly lower overall cost compared to traditional solutions. After installation, the jack-up platform will be situated well above the exposed wave zone, and will therefore avoid exposure to high wave forces, such that it may be well suited for use in areas exposed to large waves and strong wind (hurricane, cyclone and monsoon areas). The jack-up platforms may also be removed and relocated to another LNG terminal location without use of expensive installation vessels. The jack-up solution can enable a very flexible and cost-effective installation of a
regasification platform 30. No special or expensive installation vessels are needed for providing the terminal. The jack-up solution can also enable offshore LNG terminals with a regasification facility to be installed at shallower water depth than typically possible with the traditional spread moored FSRU. This can allow the length of the high-pressure gas pipeline to the onshore facilities to be minimized and may increase location flexibility. - In the systems described above, an old and inexpensive LNG Carrier can be used to provide the storage vessel 20 (constituting an FSU). An advantage of using the FSU together with a separate jack-up
regasification platform 30 can be that expensive LNG regasification equipment and associated facilities can be installed on a newly built jack-up platform instead of by converting an LNG carrier to an FSRU. This may make it possible to use an old LNG carrier (e.g. 25 years old) as the FSU until it has to be scrapped (e.g. after an 5-10 additional years of use). Then, this retired FSU can be replaced with another old FSU that may operate for the next 5-10 years. This can have cost and availability benefits and can increase flexibility. The mooring systems may therefore be re-used (typical lifetime 25-30 years). The required modification of the LNG storage vessel 20 (FSU) can be very moderate and extensive life extension of the FSU can be minimized. - The jack-up regasification platform solution can also help to solve another challenge that traditional spread moored FSRU techniques are facing. Since the regasification platform is fixed to the seabed, the platform will not move in waves. Hence, a fixed, static high-pressure pipeline can be used from the deck of the regasification platform and down to the seabed, rather than flexible gas risers which can be exposed to significant wave dynamics in extreme weather, (hurricane, cyclones, etc), as used in prior art solutions of connecting an FSRU to a pipeline end manifold (PLEM) and as often can be a limiting factor as to whether an FSRU can be installed at a given location or not. In the examples of the invention, LNG transfer from the storage vessel (FSU) 20 to the
regasification platform 30 can advantageously be by use of LNG hoses arranged well above the wave action zone. - The solution of providing offshore power production on a jack-up platform using regasified LNG, e.g. the
platform 230, can be advantageous for the same or similar reasons as described above for regasification in relation to installation, conveyance (in this case of power) to shore, weather, and location, etc. Installing the power plant on theplatform 230 offshore may avoid space/cost restrictions as may otherwise be associated with onshore installation. The produced power can be conveniently transmitted to shore by use of a high-voltage power cable. - Utilizing a
jetty-less liquefaction platform 130 in combination with an old and inexpensive storage vessel 20 (FSU), may allow for stranded gas to be liquified and transported by vessel to consumers in a way that can be economical to develop. Large amounts of “stranded” natural gas can be found at offshore and onshore fields around the world far away from existing gas pipelines such that they can be considered “stranded” in location. In such cases, the only economical way to transport such gas to the consumers may be to liquefy the natural gas to LNG and transport it to the consumers by LNG ships, and theliquefaction platform 130 can facilitate such activity. Theplatform 130 can conveniently also be used in a near shore configuration where the gas is fed from an onshore location. The solution of theliquefaction platform 130 can otherwise be advantageous in a similar way to theregasification platform 30 in relation to installation, fluid conveyance (in this case of gas to the platform 130), weather, and location, etc. A particular advantage can be the relocation flexibility as some of the “stranded” gas fields may have a moderate amount of gas. The liquefaction platform may therefore be relocated several times between various stranded gas fields during its lifetime. - Also, the solution of water generation platform on the jack-up 330 is advantageous in a similar way to the
regasification platform 30 in relation to installation, fluid conveyance (in this case of fresh water to shore), weather, and location, etc. The solution can facilitate provision of fresh water for developing countries and clean gas power for consumers. - The use of the
travel unit 60 can allow ship to ship transfer of LNG for a spread moored FSU (or FSRU) via spread-mooring lines installed from the deck level of theFSU 20 where the LNG carrier is moored typical 150 m from the FSU. The LNG carrier can therefore be moored without interference with the deck mounted FSU mooring lines, but yet be connected readily to theLNG carrier 10 for transfer of LNG. The solution can cope well with high sea states and avoids problems of relative movement between the LNG carrier and thestorage vessel 20 as can typically occur when moored in a side-by-side configuration with typically 5 m vessel separation. This may facilitate higher LNG transfer regularity than for example side by side mooring to the FSU. - The small-scale solution using the
offshore regasification platform 730 served by tugs and barges can be advantageous for the same or similar reasons as described above for regasification e.g. by the jack-upplatform 30 in relation to installation, conveyance of gas (regasified LNG) and/or power to shore, weather, and location, etc. A number of small-scale LNG receiving facilities are planned to be installed in hurricane/cyclone exposed areas like Caribbean and South-East Asia. In the event of extreme weather, the temporary storage vessel, e.g. the barge or PSV, can disconnect from the connecting tubing, and leave in due time before the hurricane/cyclone arrives at the site. The only facilities that is left in place is then theregasification platform 730 and the mooring buoys. Since theregasification platform 730 is jack-up and elevated well above the maximum wave height, the platform can be very well suited for such locations. - At many locations, the primary need may be electric power. Such need may be particularly apparent for countries with island communities e.g. where there are thousands of small islands such as Indonesia, Philippines, or the Caribbean. A small offshore LNG to power solution may therefore be perfectly suited for these locations. The solutions of the
regassification platform 730 in combination with a temporary storage vessel e.g. barge or PSV, may also be expanded to include offshore power generation on thesame platform 730 as the regas equipment is installed. In such case, no gas pipeline will be needed between the platform and shore. Instead, a high-voltage power cable may be used to transmit power to shore with minimum of power loss. - The solution of transfer using the
platform tower 530 can be useful where onshore regasification may be preferred. It can nonetheless benefit from use of an old FSU located offshore as the LNG storage. - The solution uses areal LNG hoses and the connection between the LNG hoses and the pipe in pipe (PIP) pipeline via the
inside column 31 can thus be protected from any wave forces (more safe and robust solution). The tower provides an effective fixed connection on the seabed to the pipe inpipe pipeline 90 and overcomes challenges in risks of exposure in prior art submerged LNG hoses in the event of waves and extreme events such as e.g. a 100-year wave as well as Tsunami condition. - Small scale LNG business may be facilitated by the solution of the “circular”
regasification unit 630 for import of smaller quantities of LNG (say 20,000-30,000 m3) by use of smaller LNG ships. - In areas mentioned above typically are exposed to hurricanes, cyclones and monsoons, the solution can provide robust LNG receiving terminal. Motion characteristics of such a circular unit can be verified to be very favorable when exposed to large waves compared to for instance a barge-shaped or ship-shaped hull. Bi-lobe tanks can have a well proven performance in an LNG containment system.
Claims (18)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/218,966 US20210245845A1 (en) | 2017-11-29 | 2021-03-31 | Jetty-Less Offshore Terminal Configurations |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201762591821P | 2017-11-29 | 2017-11-29 | |
US16/204,182 US20190161146A1 (en) | 2017-11-29 | 2018-11-29 | Jetty-Less Offshore Terminal Configurations |
US17/218,966 US20210245845A1 (en) | 2017-11-29 | 2021-03-31 | Jetty-Less Offshore Terminal Configurations |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/204,182 Continuation US20190161146A1 (en) | 2017-11-29 | 2018-11-29 | Jetty-Less Offshore Terminal Configurations |
Publications (1)
Publication Number | Publication Date |
---|---|
US20210245845A1 true US20210245845A1 (en) | 2021-08-12 |
Family
ID=66634841
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/204,182 Abandoned US20190161146A1 (en) | 2017-11-29 | 2018-11-29 | Jetty-Less Offshore Terminal Configurations |
US17/218,966 Abandoned US20210245845A1 (en) | 2017-11-29 | 2021-03-31 | Jetty-Less Offshore Terminal Configurations |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/204,182 Abandoned US20190161146A1 (en) | 2017-11-29 | 2018-11-29 | Jetty-Less Offshore Terminal Configurations |
Country Status (1)
Country | Link |
---|---|
US (2) | US20190161146A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210131612A1 (en) * | 2019-10-30 | 2021-05-06 | Exxonmobil Upstream Research Company | Method of Supplying LNG From A Supply Hub Using A Dual Purpose LNG Carrier And A Smaller-Volume Storage At A Receiving Terminal |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10876514B2 (en) * | 2017-10-17 | 2020-12-29 | Dinh Chinh Nguyen | Ocean wave energy exploiting and storing device |
CN110667789A (en) * | 2019-10-31 | 2020-01-10 | 中国船舶重工集团应急预警与救援装备股份有限公司 | Modularized oil conveying system quickly constructed by barge carrier |
US20220306244A1 (en) * | 2021-03-02 | 2022-09-29 | Exmar Offshore Company | Split mooring system and methods for vessels |
FR3123687B1 (en) * | 2021-06-03 | 2024-04-26 | Technip France | Process for producing electricity by means of an installation intended to be placed in a body of water |
CN114354885B (en) * | 2021-12-20 | 2023-07-14 | 应急管理部国家自然灾害防治研究院 | Quick identification measuring device for seabed seismic liquefaction in wave flow environment |
DE102022201201A1 (en) | 2022-02-04 | 2023-08-10 | Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung eingetragener Verein | Surface floating body, in particular a buoy or ton |
US11541973B1 (en) | 2022-03-25 | 2023-01-03 | Stena Power & Lng Solutions As | Floating storage vessel with extension sections and offshore terminal |
WO2023182887A1 (en) | 2022-03-25 | 2023-09-28 | Stena Power & Lng Solutions As | Floating storage vessel with extension sections and offshore terminal |
DE102022109821A1 (en) | 2022-04-22 | 2023-10-26 | Offcon GmbH | ACTIVE FENDER, ACTIVE FENDER SYSTEM AND METHOD FOR CONTROLLING RELATIVE MOVEMENT |
US20230348025A1 (en) | 2022-05-02 | 2023-11-02 | Stena Power & Lng Solutions As | Marine fluid cargo handling system with standoff |
WO2023244124A1 (en) * | 2022-06-15 | 2023-12-21 | Stena Power & Lng Solutions As | System for offshore production of fuel |
US11970404B2 (en) | 2022-06-15 | 2024-04-30 | Stena Power & Lng Solutions As | System for offshore production of fuel |
US11958575B2 (en) | 2022-06-15 | 2024-04-16 | Stena Power & Lng Solutions As | System for offshore production of fuel |
WO2024155196A2 (en) * | 2023-01-18 | 2024-07-25 | Stena Power & Lng Solutions As | Hybrid marine regasification system |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3715890A (en) * | 1971-01-15 | 1973-02-13 | Shell Oil Co | Mooring system for pipelaying barges |
US6983712B2 (en) * | 2001-08-03 | 2006-01-10 | Fmc Technologies, Inc. | Offloading arrangements and method for spread moored FPSOs |
US7543613B2 (en) * | 2005-09-12 | 2009-06-09 | Chevron U.S.A. Inc. | System using a catenary flexible conduit for transferring a cryogenic fluid |
US20120049622A1 (en) * | 2010-08-25 | 2012-03-01 | James Young | Offshore compound renewable power plant |
KR101018742B1 (en) * | 2010-12-30 | 2011-03-04 | 삼성물산 주식회사 | The facilities for offshre lng floating storage with jack-up platform regasification unit |
KR20140119997A (en) * | 2013-04-01 | 2014-10-13 | 에스티엑스조선해양 주식회사 | Float type lng and hfo supplying apparatus |
KR20140011997A (en) * | 2013-07-22 | 2014-01-29 | 주식회사 씽크풀 | Digital system for card settlement by tagging, settlment side system and providing method thereof |
-
2018
- 2018-11-29 US US16/204,182 patent/US20190161146A1/en not_active Abandoned
-
2021
- 2021-03-31 US US17/218,966 patent/US20210245845A1/en not_active Abandoned
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210131612A1 (en) * | 2019-10-30 | 2021-05-06 | Exxonmobil Upstream Research Company | Method of Supplying LNG From A Supply Hub Using A Dual Purpose LNG Carrier And A Smaller-Volume Storage At A Receiving Terminal |
Also Published As
Publication number | Publication date |
---|---|
US20190161146A1 (en) | 2019-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210245845A1 (en) | Jetty-Less Offshore Terminal Configurations | |
US6829901B2 (en) | Single point mooring regasification tower | |
CN101297144B (en) | A system using a catenary flexible conduit for transferring a cryogenic fluid | |
US7836840B2 (en) | Subsea cryogenic fluid transfer system | |
US7543543B2 (en) | Floating LNG import terminal and method for docking | |
EP2703277A1 (en) | Floating LNG plant | |
US7308863B2 (en) | Offshore LNG regasification system and method | |
CA2934071C (en) | A mobile system and method for fluid transfer involving ships | |
WO2012021205A2 (en) | Process, apparatus and vessel for transferring fluids between two structures | |
US10526046B2 (en) | Cargo transfer vessel | |
US10150535B2 (en) | Systems, methods and units for offloading or loading cargo at sea | |
US20160236756A1 (en) | Tandem and side-by-side mooring offlaoding systems and associated methods | |
US7056177B2 (en) | Spread moored midship hydrocarbon loading and offloading system | |
EP1618330B1 (en) | A cargo evaporation device for use when unloading ships | |
WO2006088371A1 (en) | System and method for offshore offloading and regasification of LNG | |
US20070175377A1 (en) | Ocean-based device for loading and unloading of ships | |
US20220348294A1 (en) | Support vessel for assisting in loading fluid hydrocarbon cargo onto a carrier vessel, and related system and method | |
ZA200403825B (en) | Single point mooring regastification tower. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: 7 SEAS LNG & POWER AS, NORWAY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HELLESMARK, SVEIN BOERGE;REEL/FRAME:055918/0299 Effective date: 20181205 |
|
AS | Assignment |
Owner name: STENA POWER & LNG SOLUTIONS AS, NORWAY Free format text: CHANGE OF NAME;ASSIGNOR:7 SEAS LNG & POWER AS;REEL/FRAME:057017/0787 Effective date: 20210723 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |