WO2011075893A1 - Low carbon ecological and anti-disaster type building - Google Patents
Low carbon ecological and anti-disaster type building Download PDFInfo
- Publication number
- WO2011075893A1 WO2011075893A1 PCT/CN2009/075885 CN2009075885W WO2011075893A1 WO 2011075893 A1 WO2011075893 A1 WO 2011075893A1 CN 2009075885 W CN2009075885 W CN 2009075885W WO 2011075893 A1 WO2011075893 A1 WO 2011075893A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- commercial
- building
- activity area
- area
- disaster
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/02—Dwelling houses; Buildings for temporary habitation, e.g. summer houses
- E04H1/04—Apartment houses arranged in two or more levels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/04—Air-ducts or air channels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/10—Arrangements in buildings for the disposal of refuse
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/06—Office buildings; Banks
Definitions
- the present invention relates to a building, in particular a building having a low-carbon ecological and disaster-resistant structure that meets the long-term development requirements of the environment.
- the technical problem to be solved by the present invention is to provide a low-carbon ecological and disaster-resistant structure with low energy consumption, low emission, full utilization of renewable resources, and good earthquake resistance, wind resistance and fire protection functions.
- a low-carbon ecological and disaster-resistant structure including a building main body and a green energy collection system installed on the main body, rainwater, wastewater, garbage recycling and resource regeneration system,
- Each floor of the main building includes a greening activity area and at least two commercial and residential areas.
- the commercial and residential area is located outside the greening activity area.
- the commercial and residential area and the greening activity area are reinforced concrete monolithic structures. Greening is carried out in each greening activity area. In the green activity area of the whole building, there are vertically ventilated light wells that run vertically through the green areas of each layer.
- the commercial and residential areas on each floor are separated from each other, which is beneficial to the horizontal ventilation and dimming of the green areas. Elevators and walking stairs They are all installed in the greening activity area;
- the green energy collection system includes a plurality of wind power generators disposed in the main body and photovoltaic solar panels disposed on the periphery of the main body, and the wind power generator and the solar panels convert wind energy and solar energy into electric energy, and pass through the main body of the building.
- the power grid directly supplies electricity to the building;
- the rainwater, waste water, garbage collection and resource recycling system includes a garbage collection pipe disposed in each floor, and a treatment device for collectively treating the garbage and recovering, and each garbage collection pipe is connected to the treatment recovery device.
- the cross section of the greening activity area is a centrally symmetrical regular shape, and the commercial and residential area is evenly distributed around the outer periphery of the greening activity area, and a trumpet shape is formed between adjacent commercial and residential areas to facilitate the lateral wind entering the greening activity area.
- An elevator is arranged in the greening activity area, and a plurality of ventilation and light wells are arranged according to the ventilation and glazing, and a rotary walking ladder connecting the upper and lower layers is arranged in the ventilation and light well.
- An elevator hall is arranged in the main body of the building, and a pool for purifying sewage is arranged at the top of the elevator hall.
- the sewage pipes in each floor are connected with the pool on the next floor, and the pool is provided with a multi-stage filtration and purification layer.
- the wind power generator is disposed at a position between adjacent commercial and residential areas on the outer periphery of the main greening activity area.
- the wind power generator is installed at the top of the position between the adjacent commercial and residential areas on the outer periphery of the greening activity area of each layer.
- the wind turbine includes at least two flared blades, the blade opening direction is horizontally disposed, the blades are mounted on the vertically disposed rotating shaft through the spokes, and the air inlet duct corresponding to the blade opening and the air outlet are disposed on the side of the wind power generator Pipe, inlet and outlet ducts of wind turbines in opposite directions Cross connected.
- a solid waste recovery pipeline is provided at designated locations on each floor, and the solid waste recovery pipeline is connected to the solid waste treatment device at the bottom of the main body of the building.
- each commercial and residential area there is a home garden leading to the center of the greening activity area.
- the two sides of the entrance garden are commercial houses, and green belts are laid on the garden of the household.
- the entrance garden is a flared exterior with an elevator on the outside.
- villas and green belts can be built at the top of the main body.
- the invention uses wind energy and solar energy as the energy source of the whole building, and is environmentally friendly.
- the treatment of domestic garbage is also treated by internal treatment and recycling, which eliminates adverse effects on the environment and is in the housing level of each building.
- the green belt is set up, and the buildings have large spaces and comfortable living. At the same time, the structure of the building and the layout of each floor are scientific, with fire, earthquake and wind resistance.
- FIG. 1 is a schematic perspective view of an embodiment of the present invention
- FIG. 2 is a schematic view of the top layer structure of the embodiment
- FIG. 3 is a schematic structural view of each standard layer of the embodiment
- FIG. 4 is a schematic structural view of a rainwater and domestic wastewater filtration and recovery system according to the present embodiment
- Figure 5 is a schematic diagram showing the structure of a wind power generator of the present embodiment
- FIG. 6 is a schematic diagram showing the installation of a wind power generator on a main body of a building according to the present embodiment
- Figure 7 is a schematic view showing another layout structure of the standard layer of the present invention.
- Figure 8 is a schematic view showing another layout structure of the standard layer of the present invention.
- Figure 9 is a schematic view showing another layout structure of the standard layer of the present invention.
- the building disclosed in this embodiment is a bulky, high-rise and super high-rise commercial and residential building.
- the building consists of the main building, and the standard floor of the main body is divided into two areas: green activity area 1 and commercial and residential area 2.
- the activity green area 1 is located in the center of the main body and is an area of approximately circular or polygonal. The area is large in area and high in floor, and can be ventilated in all directions, which is favorable for horizontal ventilation and glare.
- the elevator hall 5 has a ring structure in section, and each elevator is installed on the outer circumference of the elevator hall.
- green belts 11 and ventilated light wells 12 are planted in the green areas of each layer.
- the ventilated light well 12 vertically and vertically penetrates the greening activity area 1 of each layer, and the area is also large.
- three ventilated light wells 12 uniformly disposed on the periphery of the elevator hall 5 are provided, which can ensure each floor. Both have good ventilation and calendering effect.
- a rotating walking ladder 121 is installed in the ventilation and light well 12.
- the commercial and residential area 2 is provided with six, located on the periphery of the greening activity area 1, and is evenly distributed in a radial manner, thereby forming a favorable lateral wind into the greening activity area between adjacent commercial and residential areas 2
- the trumpet shape regardless of the direction of the wind, can enter the green activity area 1, ensuring good ventilation throughout the year.
- each commercial and residential area 2 and the greening activity area 1 is a reinforced concrete monolithic structure, which can greatly improve the overall strength and rigidity of the main body of the building, and can withstand large wind and earthquake disasters.
- each commercial and residential area 2 center is provided with a home garden 15 leading to the center of the greening activity area, and the two sides of the household garden 15 are commercial houses, and the entrance garden 15 is designed as an outward-facing horn.
- an elevator 16 is installed at the outer end.
- green belts are also planted in the home garden 15 .
- the building designed by this scheme has a large occupied area and a high floor, it still has good lighting and ventilation effects, and each floor has a large area of green belt, even if it is located 100 meters away from the ground.
- the high-rise still has the green comfort on the ground, enjoying the same fresh air as the ground.
- the green energy collection system mainly collects wind energy and solar energy, and converts wind energy and solar energy into electrical energy for use by the building itself.
- the system includes a plurality of wind power generators 3 disposed on the main body of the building and is disposed outside the main body. Surface photovoltaic panels, wind turbines 3 and solar panels convert wind and light energy into The electric energy directly supplies electric energy to the building through the power grid inside the main building.
- FIG. 5 is a schematic diagram showing the structure of the wind power generator.
- the wind power generator 3 is installed at the top of the position between the adjacent commercial and residential areas on the outer periphery of the greening activity area of each layer, and includes at least two flared blades 31.
- the blade 31 is horizontally arranged in the opening direction, and the blades 31 are installed in the vertical direction through the spokes 32.
- an air inlet duct 34 corresponding to the opening of the vane 31 and an air outlet duct 35 are disposed on the side of the wind turbine, and the air inlet duct 34 of the wind turbine generator 3 in opposite directions is in cross communication with the air outlet duct 35.
- Fig. 6 a schematic diagram of the installation of the wind power generator on the main body of the building is shown. When the wind blows from the right side to the main body of the building, the wind turbine on the right side is driven by the wind, and the wind blowing through the blade 31 is blown to the left side through the air duct through the air duct of the left wind generator.
- the generator which drives the wind turbine on the left side to rotate.
- the two corresponding generators can also be driven to rotate.
- a wind deflecting glass 17 is disposed outside the position between the adjacent commercial and residential areas on the outer periphery of each greening activity area, and the inclination angle of the wind deflecting glass 17 can be adjusted according to the natural wind power of the outside, and the wind power entering the greening active area is controlled, and This slanted mounting form also forms a flare so that the wind blown to the wind turbine is greater.
- the wastewater, garbage recovery treatment and resource regeneration system includes a garbage collection pipeline installed in each floor and a treatment device for collectively treating the garbage and recovering, and each garbage recovery pipeline is connected to the treatment recovery device.
- a solid waste recovery pipeline is provided at designated positions of each layer, and the solid waste recovery pipeline is connected with the solid waste treatment device at the bottom of the main body of the building, and the arrangement of each pipeline can be arranged with the existing pipeline.
- the method is the same, and can also be determined according to the actual needs. It is not mentioned here.
- the solid waste recycling pipeline is disposed at the junction of each commercial and residential area and the greening activity area, and the solid waste treatment device can be used The solid waste treatment device is not mentioned here.
- a pool 51 for purifying sewage may be provided at the top of each floor of the elevator hall 5, and of course, pools may be provided on certain floors as needed.
- the wastewater pipe in each floor and the rainwater discharge pipe at the top of the building are connected to the pool on the next floor, and a multi-stage filtration and purification layer is installed in the pool to purify the sewage.
- the purified water thus formed can be recycled to the building.
- the arrangement of each pipe can be consistent with the existing pipe arrangement, or it can be determined according to actual needs, and will not be mentioned here.
- the filtration and purification layer to be used can be determined as needed, as this part of the sewage treatment industry is a conventional prior art and will not be mentioned here.
- the building disclosed in the present invention is in line with the low carbon production from the input of energy to the discharge of garbage.
- the requirements of the state, and the specific accumulation, the characteristics of the stiffness and the internal reasonable structure, making it more resistant to wind, earthquake and fire, is a building that meets the long-term development of science.
- FIG. 48 shows another layout structure of the standard layer.
- the commercial and residential area is designed as a villa.
- Each villa has a villa.
- 6 private gardens are set up.
- the rest of the building is identical to the above building and will not be mentioned here.
- This form of building can be used in buildings with relatively small building areas to form a three-dimensional high-end villa area.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Wind Motors (AREA)
Abstract
A low carbon ecological and anti-disaster type building comprises a main body of the building, a collection and utilization system for green energy, a recovery and regeneration system for rain water, sewage and garbage, wherein each floor of the main body of the building includes a vegetational activity zone (1) and a business/residential area (2), both being integral structure formed by reinforced concrete. The vegetational activity zone (1) is arranged with vegetational zone (11) and provided with a vertical air shaft (12) for ventilation and lighting that extends through each floor. The collection and utilization system for green energy collects wind energy and solar energy and converts them into electric energy. The recovery and regeneration system for rain water, sewage and garbage collects and treats waste water and garbage. The building has functions of saving energy and resisting disaster.
Description
说明书 Instruction manual
Title of Invention:一种氏碳生态与抗灾型结构的楼房 说明 书 Title of Invention: A description of a carbon-environment and disaster-resistant structure
[1] 说明 书 [1] Instruction book
[2] 一种低碳生态与抗灾型结构的楼房 [2] A low-carbon ecological and disaster-resistant structure of the building
[3] 技术领域 [3] Technical field
[4] 本发明涉及一种楼房, 具体地说一种符合环境长远发展要求的低碳生态与抗灾 型结构的楼房。 [4] The present invention relates to a building, in particular a building having a low-carbon ecological and disaster-resistant structure that meets the long-term development requirements of the environment.
[5] 背景技术 [5] Background Art
[6] 低碳, 英文为 low carbon, 意指较低 (更低) 的温室气体 (二氧化碳为主) 排 放。 随着世界工业经济的发展、 人口的剧增、 人类欲望的无限上升和生产生活 方式的无节制, 世界气候面临越来越严重的问题, 二氧化碳排放量愈来愈大, 地球臭氧层正遭受前所未有的危机, 全球灾难性气候变化屡屡出现, 已经严重 危害到人类的生存环境和健康安全, 即使人类曾经引以为豪的高速增长或膨胀 的 GDP也因为环境污染、 气候变化而"大打折扣"。 [6] Low carbon, English low carbon, means lower (lower) greenhouse gas (carbon dioxide-based) emissions. With the development of the world industrial economy, the rapid increase of population, the infinite rise of human desires and the uncontrolled production and lifestyle, the world's climate is facing more and more serious problems. The carbon dioxide emissions are getting bigger and bigger, and the earth's ozone layer is suffering unprecedented. Crisis, global catastrophic climate change has repeatedly occurred, has seriously jeopardized human living environment and health and safety, even if the high-speed growth or expansion of GDP that human beings once proud of is also "big discount" due to environmental pollution and climate change.
[7] 房屋是人类生存和生活的基本场所, 也是反映人类发展和生活质量的重要标志 [7] Housing is the basic place for human survival and life, and an important indicator of human development and quality of life.
。 不同的房屋给人以不同的生活感受, 同吋也与人的身心健康息息相关。 随着 人类的进步, 社会和经济的发展, 人类对居住条件的要求越来越高, 房屋也越 建越高, 特别是随着城市化建设的迅速发展, 流向城市工作和生活的人越来越 多, 城市土地资源越来越少, 城市的高层建筑不仅越来越高, 也越来越多, 给 城市环境带来严重污染以及考验和挑战, 同吋, 城市能源的消耗也越来越大, 在能源日趋短缺的今天, 如何设计有利于生态环境城市发展的低能耗、 低排放 的低碳生态建筑是建筑领域急需解决的问题。 . Different houses give people different life feelings, and their peers are also closely related to people's physical and mental health. With the progress of mankind, social and economic development, human beings have higher and higher requirements for living conditions, and housing has become more and more built. Especially with the rapid development of urbanization, people who come to work and live in cities are coming. The more urban land resources are less and less, the higher-rise buildings in the city are not only getting higher and higher, but also increasing, causing serious pollution, challenges and challenges to the urban environment. At the same time, urban energy consumption is also increasing. Large, in the current shortage of energy, how to design low-energy, low-emission, low-carbon ecological buildings that are conducive to the development of eco-environment cities is an urgent problem to be solved in the construction field.
[8] 而同吋, 由于传统高层建筑的特点, 楼内的电梯和楼梯成了火灾发生吋火势蔓 延的直通道, 一旦楼内某处发生火灾, 直接影响整栋楼的安全, 而且人员疏散 、 救援和灭火相当困难, 另外, 自然灾害 (台风、 地震) 又频频发生, 如何使 建筑具有良好的抗灾性能, 也是建筑领域急需解决的问题。
发明内容 [8] At the same time, due to the characteristics of traditional high-rise buildings, the elevators and stairs in the building became a direct channel for the fire to spread. Once a fire broke out in the building, it directly affected the safety of the entire building, and evacuated personnel. Rescue and fire fighting are quite difficult. In addition, natural disasters (typhoons and earthquakes) occur frequently. How to make buildings have good disaster resistance performance is also an urgent problem to be solved in the construction field. Summary of the invention
本发明要解决的技术问题是提供一种低能耗、 低排放、 充分利用了再生资源并 且具有良好抗震、 抗风、 消防功能的低碳生态与抗灾型结构的楼房。 The technical problem to be solved by the present invention is to provide a low-carbon ecological and disaster-resistant structure with low energy consumption, low emission, full utilization of renewable resources, and good earthquake resistance, wind resistance and fire protection functions.
根据上述技术要求, 本发明釆用以下技术方案实现: According to the above technical requirements, the present invention is implemented by the following technical solutions:
一种低碳生态与抗灾型结构的楼房, 包括楼房主体以及安装于主体上的绿色能 源釆集利用系统, 雨水、 废水、 垃圾回收处理及资源再生系统, A low-carbon ecological and disaster-resistant structure, including a building main body and a green energy collection system installed on the main body, rainwater, wastewater, garbage recycling and resource regeneration system,
楼房主体各层均包括绿化活动区以及至少两个商住区, 商住区设置于绿化活动 区外围, 商住区与绿化活动区为钢筋混凝土整体结构, 在各层绿化活动区均种 植有绿化带, 在整个楼房绿化活动区设置有垂直贯穿各层绿化活动区的竖直通 风釆光井, 每层的各商住区之间相互间隔, 利于各绿化活动区横向通风釆光, 电梯、 步行楼梯均安装于绿化活动区; Each floor of the main building includes a greening activity area and at least two commercial and residential areas. The commercial and residential area is located outside the greening activity area. The commercial and residential area and the greening activity area are reinforced concrete monolithic structures. Greening is carried out in each greening activity area. In the green activity area of the whole building, there are vertically ventilated light wells that run vertically through the green areas of each layer. The commercial and residential areas on each floor are separated from each other, which is beneficial to the horizontal ventilation and dimming of the green areas. Elevators and walking stairs They are all installed in the greening activity area;
所述的绿色能源釆集利用系统包括设置于主体中的多个风力发电机以及设置于 主体外围的光伏太阳能板, 风力发电机以及太阳能板将风能和太阳光能转换为 电能, 通过楼房主体内电网直接向楼房提供电力能源; The green energy collection system includes a plurality of wind power generators disposed in the main body and photovoltaic solar panels disposed on the periphery of the main body, and the wind power generator and the solar panels convert wind energy and solar energy into electric energy, and pass through the main body of the building. The power grid directly supplies electricity to the building;
所述的雨水、 废水、 垃圾回收处理及资源再生系统包括设置于各层的垃圾回收 管道以及用于集中处理垃圾并回收的处理装置, 各垃圾回收管道与处理回收装 置连通。 The rainwater, waste water, garbage collection and resource recycling system includes a garbage collection pipe disposed in each floor, and a treatment device for collectively treating the garbage and recovering, and each garbage collection pipe is connected to the treatment recovery device.
所述的绿化活动区截面为中心对称的规则形状, 商住区均布于绿化活动区外周 , 相邻商住区之间形成利于横向风进入绿化活动区的喇叭状。 The cross section of the greening activity area is a centrally symmetrical regular shape, and the commercial and residential area is evenly distributed around the outer periphery of the greening activity area, and a trumpet shape is formed between adjacent commercial and residential areas to facilitate the lateral wind entering the greening activity area.
所述的绿化活动区中设置有电梯, 按照通风釆光需要设置有多个通风釆光井, 通风釆光井中设置有连接上下层的旋转式步行梯。 An elevator is arranged in the greening activity area, and a plurality of ventilation and light wells are arranged according to the ventilation and glazing, and a rotary walking ladder connecting the upper and lower layers is arranged in the ventilation and light well.
在楼房主体中设置有电梯厅, 在电梯厅顶部设置有净化污水的水池, 各层住户 内的排污管道均与下一楼层的水池连通, 所述水池内设置有多级过滤净化层。 所述的风力发电机设置于主体绿化活动区外周相邻商住区之间位置。 所述的风 力发电机安装于各层主体绿化活动区外周相邻商住区之间位置顶 An elevator hall is arranged in the main body of the building, and a pool for purifying sewage is arranged at the top of the elevator hall. The sewage pipes in each floor are connected with the pool on the next floor, and the pool is provided with a multi-stage filtration and purification layer. The wind power generator is disposed at a position between adjacent commercial and residential areas on the outer periphery of the main greening activity area. The wind power generator is installed at the top of the position between the adjacent commercial and residential areas on the outer periphery of the greening activity area of each layer.
部, 该风力发电机包括至少两片喇叭状叶片, 叶片开口方向水平设置, 叶片通 过辐条安装于垂直设置的转轴上, 在风力发电机侧面设置有与叶片开口对应的 进风管道、 以及出风口管道, 两相对方向的风力发电机的进风管道与出风管道
交叉连通。 The wind turbine includes at least two flared blades, the blade opening direction is horizontally disposed, the blades are mounted on the vertically disposed rotating shaft through the spokes, and the air inlet duct corresponding to the blade opening and the air outlet are disposed on the side of the wind power generator Pipe, inlet and outlet ducts of wind turbines in opposite directions Cross connected.
[21] 在各层指定位置均设置有固体垃圾回收管道, 固体垃圾回收管道与楼房主体底 部的固体垃圾处理装置连通。 [21] A solid waste recovery pipeline is provided at designated locations on each floor, and the solid waste recovery pipeline is connected to the solid waste treatment device at the bottom of the main body of the building.
[22] 各商住区中设置有通向绿化活动区中心的入户花园, 入户花园两侧为商住房, 在入户花园上铺设有绿化带。 [22] In each commercial and residential area, there is a home garden leading to the center of the greening activity area. The two sides of the entrance garden are commercial houses, and green belts are laid on the garden of the household.
[23] 入户花园为朝外的喇叭状, 外端设置有电梯。 [23] The entrance garden is a flared exterior with an elevator on the outside.
[24] 并且, 在主体顶部还可建别墅群以及绿化带。 [24] Also, villas and green belts can be built at the top of the main body.
[25] 本发明釆用风能、 太阳能作为整个楼房的能量来源, 环保生态, 对于生活垃圾 的处理也釆用内部处理、 回收的方式, 消除了对环境的不良影响, 并且在楼房 各住户层均设置了绿化带, 楼房各层空间大, 居住舒适。 同吋, 楼房结构、 各 层布局科学, 具有消防、 抗震、 抗风的抗灾功能。 [25] The invention uses wind energy and solar energy as the energy source of the whole building, and is environmentally friendly. The treatment of domestic garbage is also treated by internal treatment and recycling, which eliminates adverse effects on the environment and is in the housing level of each building. The green belt is set up, and the buildings have large spaces and comfortable living. At the same time, the structure of the building and the layout of each floor are scientific, with fire, earthquake and wind resistance.
[26] 附图说明 [26] BRIEF DESCRIPTION OF THE DRAWINGS
[27] 附图 1为本发明实施例立体示意简图; 1 is a schematic perspective view of an embodiment of the present invention;
[28] 附图 2为本实施例顶层结构示意图; 2 is a schematic view of the top layer structure of the embodiment;
[29] 附图 3为本实施例各标准层结构示意图; [29] FIG. 3 is a schematic structural view of each standard layer of the embodiment;
[30] 附图 4为本实施例雨水、 生活废水过滤回收系统结构示意图; [30] FIG. 4 is a schematic structural view of a rainwater and domestic wastewater filtration and recovery system according to the present embodiment;
[31] 附图 5为本实施例风力发电机结构示意简图; Figure 5 is a schematic diagram showing the structure of a wind power generator of the present embodiment;
[32] 附图 6为本实施例风力发电机在楼房主体上的安装示意简图; [32] FIG. 6 is a schematic diagram showing the installation of a wind power generator on a main body of a building according to the present embodiment;
[33] 附图 7为本发明标准层另一种布局结构示意图; Figure 7 is a schematic view showing another layout structure of the standard layer of the present invention;
[34] 附图 8为本发明标准层再一种布局结构示意图; Figure 8 is a schematic view showing another layout structure of the standard layer of the present invention;
[35] 附图 9为本发明标准层另一种布局结构示意图。 Figure 9 is a schematic view showing another layout structure of the standard layer of the present invention.
[36] 具体实施方式 [36] Specific implementation
[37] 为了便于本领域技术人员的理解, 下面将结具体实施例及附图对本发明结构原 理作进一步详细描述: [37] In order to facilitate the understanding of those skilled in the art, the structural principle of the present invention will be further described in detail below with reference to specific embodiments and the accompanying drawings:
[38] 本实施例所揭示的楼房是一种体积庞大、 高层和超高层商住楼。 该楼房包括楼 房主体, 主体的标准层主要分为两个区域: 绿化活动区 1和商住区 2。 活动绿化 区 1位于主体中心, 是一个近似圆形或者多边形的区域, 该区域面积大、 楼层高 , 各个方向均可通风, 利于横向通风釆光。 在绿化活动区 1中心设置有电梯厅 5
, 电梯厅 5截面为环形结构, 各电梯安装于电梯厅外周。 为了利于各层绿化以及 通风釆光, 在各层活动绿化区 1均种植有绿化带 11以及通风釆光井 12。 所述的通 风釆光井 12竖直向下垂直贯穿各层绿化活动区 1, 面积也较大, 本方案中, 设置 了三个均布于电梯厅 5外围的通风釆光井 12, 可以保证每层均具有良好的通风、 釆光效果。 为了便于绿化活动区 1上下楼方便, 在通风釆光井 12中安装有旋转步 行梯 121。 [38] The building disclosed in this embodiment is a bulky, high-rise and super high-rise commercial and residential building. The building consists of the main building, and the standard floor of the main body is divided into two areas: green activity area 1 and commercial and residential area 2. The activity green area 1 is located in the center of the main body and is an area of approximately circular or polygonal. The area is large in area and high in floor, and can be ventilated in all directions, which is favorable for horizontal ventilation and glare. There is an elevator hall 5 in the center of the green activity area 1 The elevator hall 5 has a ring structure in section, and each elevator is installed on the outer circumference of the elevator hall. In order to facilitate the greening and ventilation of all layers, green belts 11 and ventilated light wells 12 are planted in the green areas of each layer. The ventilated light well 12 vertically and vertically penetrates the greening activity area 1 of each layer, and the area is also large. In the present scheme, three ventilated light wells 12 uniformly disposed on the periphery of the elevator hall 5 are provided, which can ensure each floor. Both have good ventilation and calendering effect. In order to facilitate the convenience of the greening activity area 1 and the upper and lower floors, a rotating walking ladder 121 is installed in the ventilation and light well 12.
[39] 本实施例中的商住区 2设置了六个, 位于绿化活动区 1外围, 呈辐射状均匀分布 , 由此使得相邻商住区 2之间形成利于横向风进入绿化活动区 1的喇叭状, 不论 哪个方向的风, 都可以进入绿化活动区 1, 保证了一年四季绿化活动区通风良好 。 并且各商住区 2与绿化活动区 1为钢筋混凝土整体结构, 该结构可以极大提高 楼房主体的整体强度和刚度, 能抵抗较大的风力以及地震灾害。 [39] In the present embodiment, the commercial and residential area 2 is provided with six, located on the periphery of the greening activity area 1, and is evenly distributed in a radial manner, thereby forming a favorable lateral wind into the greening activity area between adjacent commercial and residential areas 2 The trumpet shape, regardless of the direction of the wind, can enter the green activity area 1, ensuring good ventilation throughout the year. Moreover, each commercial and residential area 2 and the greening activity area 1 is a reinforced concrete monolithic structure, which can greatly improve the overall strength and rigidity of the main body of the building, and can withstand large wind and earthquake disasters.
[40] 在本实施例中, 各商住区 2中心设置有通向绿化活动区中心的入户花园 15, 入 户花园 15两侧为商住房, 并且入户花园 15设计成为朝外的喇叭状, 外端安装有 电梯 16。 为了提高绿化面积, 在入户花园 15上也种植有绿化带。 [40] In this embodiment, each commercial and residential area 2 center is provided with a home garden 15 leading to the center of the greening activity area, and the two sides of the household garden 15 are commercial houses, and the entrance garden 15 is designed as an outward-facing horn. In the shape, an elevator 16 is installed at the outer end. In order to increase the green area, green belts are also planted in the home garden 15 .
[41] 由于整个楼房主体绿化活动区 1和各商住区 2辐射的面积很大, 因此在楼房主体 顶部形成一个大空间, 为了提高其利用率、 增加绿化面积以及增强整体美观, 在主体顶部还建有别墅群 6以及绿化带, 甚至还可以修建其他专用建筑, 如泳池 、 健身器材等设施。 [41] Due to the large area of the main building greening activity area 1 and the commercial and residential area 2, a large space is formed at the top of the main body of the building. In order to improve its utilization rate, increase the green area and enhance the overall appearance, at the top of the main body There are also villas 6 and green belts, and even other special buildings such as swimming pools and fitness equipment.
[42] 由上述结构可知, 本方案设计的楼房虽然整个占用面积大、 楼层高, 但是仍然 具有良好的釆光、 通风效果, 且各层均具有大面积的绿化带, 即使居于距离地 面百米的高层, 仍然具有身处地面享受绿色的舒畅, 享受与地面相同的清新空 气。 [42] According to the above structure, although the building designed by this scheme has a large occupied area and a high floor, it still has good lighting and ventilation effects, and each floor has a large area of green belt, even if it is located 100 meters away from the ground. The high-rise, still has the green comfort on the ground, enjoying the same fresh air as the ground.
[43] 为了使整个楼房更具有低碳生态的功能, 整个楼房均釆用绿色能源釆集利用系 统, 雨水、 废水、 垃圾回收处理及资源再生系统分别用来提供其能源和垃圾的 处理回收。 [43] In order to make the entire building more low-carbon ecological, the entire building is equipped with a green energy collection system. Rainwater, wastewater, garbage collection and resource recycling systems are used to provide energy and waste disposal.
[44] 该绿色能源釆集利用系统主要是釆集风能和太阳能, 将风能和太阳能转换为电 能供楼房本身使用, 该系统包括设置于楼房主体上的多个风力发电机 3以及设置 于主体外表面的光伏太阳能板, 风力发电机 3以及太阳能板将风能和光能转换为
电能, 通过楼房主体内电网直接向楼房提供电力能源。 再如附图 5所示为风力发 电机结构示意简图。 该风力发电机 3安装于各层主体绿化活动区外周相邻商住区 之间位置顶部, 包括至少两片喇叭状叶片 31, 叶片 31开口方向水平设置, 叶片 3 1通过辐条 32安装于垂直设置的转轴 33上, 在风力发电机侧面设置有与叶片 31开 口对应的进风管道 34、 以及出风口管道 35, 两相对方向的风力发电机 3的进风管 道 34与出风管道 35交叉连通。 如附图 6所示为风力发电机在楼房主体上的安装示 意简图。 当风从右侧吹向楼房主体吋, 右侧的风力发电机在风力的驱动下旋转 , 吹过叶片 31的风通过出风管道经过左侧风力发电机的进风管道吹向左侧的风 力发电机, 从而驱动左侧的风力发电机旋转。 当风反向吋, 同样可以驱动两对 应的发电机旋转。 同吋, 在各层绿化活动区外周相邻商住区之间位置外部设置 有导风玻璃 17, 导风玻璃 17倾斜角度根据外界自然风力大小可调节, 控制进入 绿化活动区的风力大小, 并且这种倾斜安装形式也形成喇叭口从而使吹向风力 发电机的风力更大。 [44] The green energy collection system mainly collects wind energy and solar energy, and converts wind energy and solar energy into electrical energy for use by the building itself. The system includes a plurality of wind power generators 3 disposed on the main body of the building and is disposed outside the main body. Surface photovoltaic panels, wind turbines 3 and solar panels convert wind and light energy into The electric energy directly supplies electric energy to the building through the power grid inside the main building. FIG. 5 is a schematic diagram showing the structure of the wind power generator. The wind power generator 3 is installed at the top of the position between the adjacent commercial and residential areas on the outer periphery of the greening activity area of each layer, and includes at least two flared blades 31. The blade 31 is horizontally arranged in the opening direction, and the blades 31 are installed in the vertical direction through the spokes 32. On the rotating shaft 33, an air inlet duct 34 corresponding to the opening of the vane 31 and an air outlet duct 35 are disposed on the side of the wind turbine, and the air inlet duct 34 of the wind turbine generator 3 in opposite directions is in cross communication with the air outlet duct 35. As shown in Fig. 6, a schematic diagram of the installation of the wind power generator on the main body of the building is shown. When the wind blows from the right side to the main body of the building, the wind turbine on the right side is driven by the wind, and the wind blowing through the blade 31 is blown to the left side through the air duct through the air duct of the left wind generator. The generator, which drives the wind turbine on the left side to rotate. When the wind is reversed, the two corresponding generators can also be driven to rotate. At the same time, a wind deflecting glass 17 is disposed outside the position between the adjacent commercial and residential areas on the outer periphery of each greening activity area, and the inclination angle of the wind deflecting glass 17 can be adjusted according to the natural wind power of the outside, and the wind power entering the greening active area is controlled, and This slanted mounting form also forms a flare so that the wind blown to the wind turbine is greater.
[45] 所述的废水、 垃圾回收处理及资源再生系统包括设置于各层的垃圾回收管道以 及用于集中处理垃圾并回收的处理装置, 各垃圾回收管道与处理回收装置连通 。 为了便于收集各层的固体垃圾, 在各层指定位置均设置有固体垃圾回收管道 , 固体垃圾回收管道与楼房主体底部的固体垃圾处理装置连通, 各管道的排布 可与现有的管道排布方式一致, 也可以根据实际需要而定, 在此不作赞述, 本 实施例中, 固体垃圾回收管道设置于各商住区与绿化活动区连接处, 并且该固 体垃圾处理装置可釆用现有的固体垃圾处理装置, 在此也不作赞述。 [45] The wastewater, garbage recovery treatment and resource regeneration system includes a garbage collection pipeline installed in each floor and a treatment device for collectively treating the garbage and recovering, and each garbage recovery pipeline is connected to the treatment recovery device. In order to facilitate the collection of solid waste in each layer, a solid waste recovery pipeline is provided at designated positions of each layer, and the solid waste recovery pipeline is connected with the solid waste treatment device at the bottom of the main body of the building, and the arrangement of each pipeline can be arranged with the existing pipeline. The method is the same, and can also be determined according to the actual needs. It is not mentioned here. In this embodiment, the solid waste recycling pipeline is disposed at the junction of each commercial and residential area and the greening activity area, and the solid waste treatment device can be used The solid waste treatment device is not mentioned here.
[46] 而对于液体垃圾以及自然雨水的收集处理, 可在每层电梯厅 5顶部均设置有净 化污水的水池 51, 当然, 也可以根据需要在某些层设置水池。 各层住户内的废 水管道以及楼房顶部的雨水排放管道均与下一楼层的水池连通, 并且在水池内 设置有多级过滤净化层, 用于净化污水, 由此形成的净水可回收供楼房内使用 , 各管道的排布可与现有的管道排布方式一致, 也可以根据实际需要而定, 在 此不作赞述。 所釆用的过滤净化层可根据需要而定, 因在污水处理行业该部分 为常规的现有技术, 在此不作赞述。 [46] For the collection of liquid waste and natural rainwater, a pool 51 for purifying sewage may be provided at the top of each floor of the elevator hall 5, and of course, pools may be provided on certain floors as needed. The wastewater pipe in each floor and the rainwater discharge pipe at the top of the building are connected to the pool on the next floor, and a multi-stage filtration and purification layer is installed in the pool to purify the sewage. The purified water thus formed can be recycled to the building. For internal use, the arrangement of each pipe can be consistent with the existing pipe arrangement, or it can be determined according to actual needs, and will not be mentioned here. The filtration and purification layer to be used can be determined as needed, as this part of the sewage treatment industry is a conventional prior art and will not be mentioned here.
[47] 由此可见, 本发明揭示的楼房从能源的输入到垃圾的排放处理, 均符合低碳生
态的要求, 并且兼具体积大、 刚度大的特征以及内部合理的格局, 使之更具有 抵抗风灾、 地震以及火灾的功能, 是一种符合科学长远发展的楼房。 [47] It can be seen that the building disclosed in the present invention is in line with the low carbon production from the input of energy to the discharge of garbage. The requirements of the state, and the specific accumulation, the characteristics of the stiffness and the internal reasonable structure, making it more resistant to wind, earthquake and fire, is a building that meets the long-term development of science.
[48] 再如附图 5所示。 本图表示的标准层另外一种布局结构示意图, 该图中将商住 区设计成为别墅形式, 每个商住区设置了一个别墅 6, 在别墅 6朝外方向设置了 私家花园 7。 除此之外, 该楼房其他部分均与上述楼房一致, 在此不做赞述。 [48] Again as shown in Figure 5. This figure shows another layout structure of the standard layer. In this figure, the commercial and residential area is designed as a villa. Each villa has a villa. In the villa, 6 private gardens are set up. In addition, the rest of the building is identical to the above building and will not be mentioned here.
[49] 这种形式的楼房可以应用于建筑面积相对较小的建筑中, 形成立体的高档别墅 区。 [49] This form of building can be used in buildings with relatively small building areas to form a three-dimensional high-end villa area.
[50] 再如附图 6所示。 本图表示的标准层与附图 5个标准层区别之处仅为在商住区设 置了两个并列的别墅 6, 并在各别墅 6朝外方向设置了私家花园 7。 这种形式的楼 房相对附图 5中楼房来说适用于建筑面积较大的场合, 同样形成一个立体的高档 别墅区。 [50] Again as shown in Figure 6. The standard layer shown in this figure differs from the five standard layers in the figure in that only two side-by-side villas 6 are set up in the commercial and residential area, and a private garden 7 is set in the outward direction of each villa. Compared with the building in Figure 5, this type of building is suitable for a large-scale building area, and also forms a three-dimensional high-end villa area.
[51] 再如附图 7所示。 本图表示的标准层与附图 5个标准层区别之处仅为在商住区 2 设置了一排并列的别墅 6, 在商住区 2另一侧则设置了与各别墅 6配套的私家花园 7。 这种形式的楼房在同一楼层的商住区可以设置多个别墅, 适用于整体建筑面 积相对附图 5、 附图 6更大的场合。 [51] Again as shown in Figure 7. The standard layer shown in this figure differs from the five standard layers in the figure in that only one row of villas 6 is arranged in the commercial and residential area 2, and the other side of the commercial and residential area 2 is provided with a private house supporting each villa. Garden 7. This type of building can be provided with multiple villas in the commercial and residential area on the same floor, which is suitable for the case where the overall building area is larger than that of Figure 5 and Figure 6.
[52] 上述实施例本发明构思中较具体的优选实施方案, 需要说明的是, 在没有脱离 本发明构思前提下的任何显而易见的替换, 均在本发明保护范围之内。
[52] The above-described embodiments are more specifically described in the present invention, and it is to be understood that any obvious alternatives without departing from the inventive concept are within the scope of the invention.
Claims
1.一种低碳生态与抗灾型结构的楼房, 包括楼房主体以及安装于 主体上的绿色能源釆集利用系统, 雨水、 废水、 垃圾回收处理及 资源再生系统, 其特征在于: 1. A low-carbon ecological and disaster-resistant structure, including a building main body and a green energy collection system installed on the main body, a rainwater, a waste water, a garbage recycling treatment and a resource regeneration system, which are characterized by:
楼房主体各层均包括绿化活动区 (1) 以及至少两个商住区 (2) , 商住区设置于绿化活动区外围, 商住区与绿化活动区为钢筋混 凝土整体结构, 在各层绿化活动区均种植有绿化带 (11) , 在整 个楼房绿化活动区设置有垂直贯穿各层绿化活动区的竖直通风釆 光井 (12) , 每层的各商住区之间相互间隔, 利于各绿化活动区 横向通风釆光, 电梯 (13) 、 步行楼梯 (14) 均安装于绿化活动 区; Each floor of the main building includes a greening activity area (1) and at least two commercial and residential areas (2). The commercial and residential area is located outside the greening activity area. The commercial and residential area and the greening activity area are reinforced concrete structures, and greening in each layer. The activity area is planted with green belts (11). In the whole building greening activity area, vertical ventilation and light wells (12) are vertically arranged to penetrate the green areas of each layer. The commercial and residential areas on each floor are separated from each other, which is beneficial to each. The greening activity area is horizontally ventilated, and the elevator (13) and the walking stairs (14) are installed in the greening activity area;
所述的绿色能源釆集利用系统包括设置于主体中的多个风力发电 机 (3) 以及设置于主体外围的光伏太阳能板, 风力发电机以及太 阳能板将风能和光能转换为电能, 通过楼房主体内电网直接向楼 房提供电力能源; The green energy collection system includes a plurality of wind power generators (3) disposed in the main body and photovoltaic solar panels disposed on the periphery of the main body, and the wind power generator and the solar panels convert wind energy and light energy into electric energy through the main body of the building. The internal power grid directly supplies electric energy to the building;
所述的雨水、 废水、 垃圾回收处理及资源再生系统包括设置于各 层的垃圾回收管道以及用于集中处理垃圾并回收的处理回收装置 , 各垃圾回收管道与处理回收装置连通。 The rainwater, waste water, garbage recovery treatment and resource regeneration system include a garbage collection pipeline disposed in each floor, and a treatment recovery device for collectively treating the garbage and recovering, and each garbage collection pipeline is connected to the treatment recovery device.
2.根据权利要求 1所述的低碳生态与抗灾型结构的楼房, 其特征在 于: 所述的绿化活动区截面为中心对称的规则形状, 商住区均布 于绿化活动区外周, 相邻商住区之间形成利于横向风进入绿化活 动区的喇叭状。 2 . The low carbon ecological and disaster resistant structure building according to claim 1 , wherein: the greening activity area has a central symmetric shape, and the commercial and residential area is uniformly distributed around the green area, adjacent to each other. A trumpet shape is formed between the commercial and residential areas to facilitate the horizontal wind entering the greening activity area.
3.根据权利要求 2所述的低碳生态与抗灾型结构的楼房, 其特征在 于: 所述的绿化活动区中设置有电梯, 按照通风釆光需要设置有 多个通风釆光井, 通风釆光井中设置有连接上下层的旋转式步行 梯 (121) 。 The low carbon ecological and disaster-resistant structure building according to claim 2, wherein: the greening activity area is provided with an elevator, and a plurality of ventilation and light wells are arranged according to ventilation and light, and the ventilation and light well are arranged. There is a rotary walking ladder (121) connected to the upper and lower floors.
4.根据权利要求 3所述的低碳生态与抗灾型结构的楼房, 其特征在 于: 在楼房主体中心设置有电梯厅 (5) , 在电梯厅顶部设置有净 化污水的水池 (51) , 各层住户内的排污管道均与下一楼层的水 池连通, 所述水池内设置有多级过滤净化层。 The low carbon ecological and disaster-resistant structure building according to claim 3, characterized in that: an elevator hall (5) is arranged in the center of the main building, and a net is arranged at the top of the elevator hall. The sewage pool (51), the sewage pipelines in each floor are connected with the pool on the next floor, and the pool is provided with a multi-stage filtration and purification layer.
5.根据权利要求 2所述的低碳生态与抗灾型结构的楼房, 其特征在 于: 所述的风力发电机设置于主体绿化活动区外周相邻商住区之 间位置。 The low carbon ecological and disaster-resistant structure building according to claim 2, wherein: the wind power generator is disposed at a position between adjacent commercial and residential areas on the outer periphery of the main greening activity area.
6.根据权利要求 5所述的低碳生态与抗灾型结构的楼房, 其特征在 于: 所述的风力发电机安装于各层主体绿化活动区外周相邻商住 区之间位置顶部, 该风力发电机包括至少两片喇叭状叶片 (31) The low carbon ecological and disaster-resistant structure building according to claim 5, wherein: the wind power generator is installed at the top of the position between the adjacent commercial and residential areas on the outer periphery of the greening activity area of each layer, the wind The generator includes at least two flared blades (31)
, 叶片开口方向水平设置, 叶片通过辐条 (32) 安装于垂直设置 的转轴 (33) 上, 在风力发电机侧面设置有与叶片开口对应的进 风管道 (34) 、 以及出风口管道 (35) , 两相对方向的风力发电 机的进风管道与出风管道交叉连通。 The blade opening direction is horizontally arranged, the blade is mounted on the vertically disposed rotating shaft (33) through the spoke (32), and the air inlet pipe (34) corresponding to the blade opening and the air outlet pipe (35) are disposed on the side of the wind power generator. The air inlet ducts of the two opposite wind turbines are in cross communication with the air outlet ducts.
7.根据权利要求 2所述的低碳生态与抗灾型结构的楼房, 其特征在 于: 在各层指定位置均设置有固体垃圾回收管道, 固体垃圾回收 管道与楼房主体底部的固体垃圾处理装置连通。 The low carbon ecological and disaster-resistant structure building according to claim 2, wherein: a solid garbage recovery pipeline is disposed at a designated position of each layer, and the solid waste recovery pipeline is connected to the solid waste treatment device at the bottom of the main body of the building. .
8.根据权利要求 1〜7中任一项所述的低碳生态与抗灾型结构的楼 房, 其特征在于: 各商住区中设置有通向绿化活动区中心的入户 花园 (15) , 入户花园两侧为商住房, 在入户花园上铺设有绿化 带, 该入户花园为朝外的喇叭状, 外端设置有电梯 (16) 。 The low-carbon ecological and disaster-resistant structure building according to any one of claims 1 to 7, characterized in that: a commercial garden (15) leading to the center of the greening activity area is arranged in each commercial and residential area, Commercial housing is placed on both sides of the entrance garden, and a green belt is placed on the entrance garden. The entrance garden is an outward-facing trumpet-shaped, and the outer end is provided with an elevator (16).
9.根据权利要求 8所述的低碳生态与抗灾型结构的楼房, 其特征在 于: 在主体顶部还建有别墅群 (6) 以及绿化带。 The low-carbon ecological and disaster-resistant structure building according to claim 8, characterized in that: a villa group (6) and a green belt are also built on the top of the main body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2009/075885 WO2011075893A1 (en) | 2009-12-23 | 2009-12-23 | Low carbon ecological and anti-disaster type building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2009/075885 WO2011075893A1 (en) | 2009-12-23 | 2009-12-23 | Low carbon ecological and anti-disaster type building |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011075893A1 true WO2011075893A1 (en) | 2011-06-30 |
Family
ID=44194910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2009/075885 WO2011075893A1 (en) | 2009-12-23 | 2009-12-23 | Low carbon ecological and anti-disaster type building |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2011075893A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110173093A (en) * | 2019-05-08 | 2019-08-27 | 郑州工程技术学院 | A kind of box building for wet environment |
CN112065108A (en) * | 2020-08-28 | 2020-12-11 | 新疆天地集团有限公司 | Aerial garden house based on intelligent lighting |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1497282A (en) * | 1975-06-12 | 1978-01-05 | Sandey W | Building |
JPH07279448A (en) * | 1994-04-12 | 1995-10-27 | Mitsui Constr Co Ltd | Apartment house structure |
JP2002004604A (en) * | 2000-06-26 | 2002-01-09 | Sekisui House Ltd | Apartment house with community space |
CN2773210Y (en) * | 2005-03-08 | 2006-04-19 | 齐向春 | Rotary and solar-generating ecological house |
CN101126281A (en) * | 2007-07-18 | 2008-02-20 | 李远辉 | Building with fire-proof type structure |
CN101294450A (en) * | 2008-06-19 | 2008-10-29 | 陈仁多 | Hanging garden of city |
-
2009
- 2009-12-23 WO PCT/CN2009/075885 patent/WO2011075893A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1497282A (en) * | 1975-06-12 | 1978-01-05 | Sandey W | Building |
JPH07279448A (en) * | 1994-04-12 | 1995-10-27 | Mitsui Constr Co Ltd | Apartment house structure |
JP2002004604A (en) * | 2000-06-26 | 2002-01-09 | Sekisui House Ltd | Apartment house with community space |
CN2773210Y (en) * | 2005-03-08 | 2006-04-19 | 齐向春 | Rotary and solar-generating ecological house |
CN101126281A (en) * | 2007-07-18 | 2008-02-20 | 李远辉 | Building with fire-proof type structure |
CN101294450A (en) * | 2008-06-19 | 2008-10-29 | 陈仁多 | Hanging garden of city |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110173093A (en) * | 2019-05-08 | 2019-08-27 | 郑州工程技术学院 | A kind of box building for wet environment |
CN112065108A (en) * | 2020-08-28 | 2020-12-11 | 新疆天地集团有限公司 | Aerial garden house based on intelligent lighting |
CN112065108B (en) * | 2020-08-28 | 2021-09-24 | 新疆天地集团有限公司 | Aerial garden house based on intelligent lighting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202023371U (en) | Building structure system conforming to human architecture | |
WO2010051755A1 (en) | Three-dimensional planting construction | |
CN101761246B (en) | Building with low-carbon ecological and anti-disaster structure | |
Zhigulina et al. | Energy efficiency of high-rise buildings | |
Yeang | Ecoskyscrapers and Ecomimesis: New tall building typologies | |
CN102493678B (en) | Fabricated construction method of ecological-type house | |
CN209926536U (en) | Energy-saving environment-friendly ventilation system of green building | |
WO2011075893A1 (en) | Low carbon ecological and anti-disaster type building | |
CN110080568A (en) | Assembled resource collects corridor | |
CN101205767A (en) | Combined type air ecological villa | |
CN107761945A (en) | prefabricated assembled balcony | |
CN102061778B (en) | A kind of eco-house and construction method thereof | |
CN204817043U (en) | Self -cleaning essay fountain of solar energy static | |
RU2007145754A (en) | DOME MULTIFUNCTIONAL BUILDING | |
RU2418931C2 (en) | Technogenic-resistant biosphere multifunctional building | |
CN201560592U (en) | Building with low-carbon ecological anti-disaster structure | |
CN100999955A (en) | Green building structure, distributed 'wind collecting' design and reusing of wind energy source and water resources thereof | |
JP2013053628A (en) | House architectural complex wind-concentrating type and open-field structure group wind-concentrating type wind power hub generating station or power station | |
CN214659096U (en) | High-rise green building | |
CN103956964A (en) | Tower type surrounding distributed wind-solar complementary power generation device | |
CN204311777U (en) | Three layers of shell overall structure anti-seismic heat-preservation generating green building | |
CN104404862B (en) | Steel pipe rack people's row Pipeline Bridge | |
CN101545322B (en) | Novel energy-saving method of high-storey business building and common residential building | |
CN208951952U (en) | A kind of multifunctional solar energy streetlight | |
CN217154390U (en) | Utilize utility tunnel's building tunnel wind system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09852443 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 09852443 Country of ref document: EP Kind code of ref document: A1 |