KR102562383B1 - Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof - Google Patents

Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof Download PDF

Info

Publication number
KR102562383B1
KR102562383B1 KR1020210142082A KR20210142082A KR102562383B1 KR 102562383 B1 KR102562383 B1 KR 102562383B1 KR 1020210142082 A KR1020210142082 A KR 1020210142082A KR 20210142082 A KR20210142082 A KR 20210142082A KR 102562383 B1 KR102562383 B1 KR 102562383B1
Authority
KR
South Korea
Prior art keywords
abutment
horizontal
girder
earth pressure
constructed
Prior art date
Application number
KR1020210142082A
Other languages
Korean (ko)
Other versions
KR20230058252A (en
Inventor
김대상
김태훈
김웅진
Original Assignee
한국철도기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국철도기술연구원 filed Critical 한국철도기술연구원
Priority to KR1020210142082A priority Critical patent/KR102562383B1/en
Publication of KR20230058252A publication Critical patent/KR20230058252A/en
Application granted granted Critical
Publication of KR102562383B1 publication Critical patent/KR102562383B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

교량접속부 시공에 있어, 뒤채움을 선시공한 후, 교대부를 프리캐스트 방식으로 적층 시공하면서 완충부도 함께 단계적으로 시공하여 교대부 배면의 완충부 시공의 어려움 및 교대부의 수평변형을 최소화시키면서, 교대부 상면 힌지부를 이용하여 거더와 상판와 일체화된 교대부에 작용하는 수평변형을 흡수하면서, 완충부가 거더와 상판으로부터 전달되는 수평변형을 추가로 흡수시켜 교대부 슬림화 시공이 가능한 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법이 개시된다.In the construction of the bridge connection, after pre-constructing the backfill, the abutment is laminated in the precast method and the buffer is also constructed step by step to minimize the difficulty of constructing the buffer on the back of the abutment and the horizontal deformation of the abutment, while minimizing the top surface of the abutment. While absorbing the horizontal deformation acting on the abutment integrated with the girder and the top plate by using the hinge part, the buffer section additionally absorbs the horizontal deformation transmitted from the girder and the top plate, so that the abutment part can be slimmed down. Horizontal earth pressure reduction type precast bridge connection and The construction method is disclosed.

Description

수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법{BRIDGE ABUTMENT EMBANKMENT TRANSITION FOR HORIZONTAL EARTH PRESSURE REDUCTION AND AND CONSTRUCTING METHOD THEREOF}Horizontal earth pressure reducing type precast bridge connection and its construction method

본 발명은 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법에 관한 것이다, 더욱 구체적으로 교량접속부 시공에 있어, 뒤채움을 선시공한 후, 후시공되는 교대부를 프리캐스트 방식으로 적층 시공하면서 완충부도 함께 단계적으로 시공하여 교대부 배면의 완충부 시공의 어려움 및 교대부의 수평변형을 최소화시킬 수 있어 교대부 슬림화 시공이 가능한 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법에 관한 것이다.The present invention relates to a horizontal earth pressure reducing type precast bridge connection and a construction method thereof. More specifically, in the construction of a bridge connection, backfilling is pre-constructed, and then the post-construction abutment part is stacked in a precast method while the buffer part is also stacked. It relates to a horizontal earth pressure reducing type precast bridge connection that can be constructed in stages to minimize the difficulty of constructing the buffer part on the back of the abutment and the horizontal deformation of the abutment, thereby enabling slim construction of the abutment and its construction method.

도 1a는 종래 교량구조물의 교량접속부 시공예시도이다. 1A is a construction example of a bridge connection part of a conventional bridge structure.

즉, 철도가 통행하는 교량구조물에 있어 교량받침과 신축이음장치를 설치한 상태의 시공도를 도시한 것이다.That is, it shows a construction drawing in a state where the bridge support and the expansion joint are installed in the bridge structure through which the railroad passes.

이때 상기 교량받침은 거더 저면과 교대부 상면 사이에 설치되고, 신축이음장치는 교대부와 거더 단부 사이에 각각 별도 시공된다.At this time, the bridge support is installed between the lower surface of the girder and the upper surface of the abutment part, and the expansion joint device is separately constructed between the abutment part and the girder end.

이에 신축이음장치 및 교량받침에 의한 초기 건설비와 유지관리비의 과다 소요될 수밖에 없고,As a result, the initial construction cost and maintenance cost due to the expansion joint and bridge support are inevitably required,

콘크리트교 등 교량구조물의 경간장 증가 시 온도 및 열차 종방향 시제동 하중 증가에 따른 교량접속부 응력이 증가할 수밖에 없으며, 나아가, 교량받침에서의 과도한 응력 발생하기 때문에 교대기초에 시공되는 말뚝기초 등 교대기초에 과도한 하중 전달로 기초 건설비용 증대할 수밖에 없다는 문제점이 있었다.When the span length of a bridge structure such as a concrete bridge increases, the stress at the bridge connection inevitably increases due to the increase in temperature and the longitudinal braking load of the train. There was a problem that the foundation construction cost could not but be increased due to excessive load transmission.

도 1b는 종래 교량구조물의 교량접속부 침하를 방지하기 위한 보강예시도를 도시한 것이다.Figure 1b shows an example of reinforcement for preventing settlement of a bridge connection part of a conventional bridge structure.

즉, 강성 구조체인 교량의 교대부(30)가 시공될 위치의 후방에서 토공부(10)의 선침하를 유도하기 위하여 토공부(10)를 먼저 형성하고;That is, in order to induce pre-settlement of the earthworks 10 at the rear of the position where the abutment 30 of the bridge, which is a rigid structure, is to be constructed, the earthworks 10 are first formed;

토공부(10)의 경사면(좌측)에는 교량의 교대부(30) 배면에 접하게 될 수직부와 지면에 나란한 수평부로 구성된 보강재(22)를 설치하고, On the inclined surface (left side) of the earthworks 10, a reinforcing member 22 composed of a vertical part to be in contact with the rear surface of the abutment part 30 of the bridge and a horizontal part parallel to the ground is installed,

보강재(22)의 수평부 상면으로는 토목섬유(23)를 포설하고, 토목섬유(23)의 상면은 채움재(24)로 채워 접속부층(21)를 형성하며;Geotextile 23 is laid on the upper surface of the horizontal portion of the reinforcing material 22, and the upper surface of the geotextile 23 is filled with a filling material 24 to form a connection layer 21;

접속부층(21)은 보강재(22) 설치, 토목섬유(23)의 포설 및 채움재(24)의 충진 작업을 반복하여 교대부(30) 높이가 되도록 교량 접속부(20)를 형성하고 있음을 알 수 있다.It can be seen that the connection layer 21 forms the bridge connection part 20 so that the height of the abutment part 30 is reached by repeating the installation of the reinforcing material 22, the laying of the geotextile 23, and the filling of the filling material 24. there is.

이에 교량 접속부(20)와 토공부(10)를 먼저 시공하여 잔류침하를 수렴시킨 후 교대부(30)를 연결 시공하여 부등침하를 최소화 함으로서 이동하중이나 기타 작용하중에 대한 강성 구조체 접속부의 안정성을 최대한 확보할 수 있도록 하고 있음을 알 수 있다.Accordingly, the bridge connection part 20 and the earthworks 10 are first constructed to converge the residual settlement, and then the abutment part 30 is connected and constructed to minimize differential settlement, thereby improving the stability of the rigid structure connection part against moving loads or other working loads. It can be seen that we are trying to secure as much as possible.

하지만 교량 접속부(20)와 토공부(10)를 먼저 시공하는 방식으로 교량 접속부의 침하를 방지할 수 있지만, 교량 접속부(20)에서 교대부(30)으로 가해지는 수평토압, 지진하중등에 의한 신축(수평변형, 변위)가 고려되지 않아 실제 교대부(30) 단면은 단면이 커질 수 밖에 없고, 이에 효율성과 경제성이 저하될 수 밖에 없다는 한계가 있었다.However, although the settlement of the bridge connection can be prevented by constructing the bridge connection 20 and the earthworks 10 first, horizontal earth pressure applied from the bridge connection 20 to the abutment 30, expansion and contraction due to earthquake loads, etc. Since (horizontal deformation, displacement) is not considered, the cross section of the actual abutment part 30 inevitably becomes large, and there is a limit in that efficiency and economic efficiency are inevitably lowered.

도 1c는 종래 교량구조물의 교량접속부 침하를 방지하기 위한 완충부(70)를 이용한 보강예시도를 도시한 것이다.Figure 1c shows an example of reinforcement using a buffer 70 for preventing the bridge connection part of a conventional bridge structure from subsidence.

종래 교량 접속부(20)는 교대부(30) 뒤채움에 완충부(70)를 추가로 적용한 완전일체형 교량 및 부분 일체형 교량을 들 수 있다.The conventional bridge connection part 20 includes a fully integrated bridge and a partially integrated bridge in which the buffer part 70 is additionally applied to the backfill of the abutment part 30.

이때 완전 일체형 교량(도 1c의 위쪽 기준, 교량받침 없이 교대부와 상판이 서로 일체화되는 라멘구조)은 상판(60)에서 온도 및 열차 하중에 의한 수평변형이 발생 할경우 교대벽이 하중을 지지해야 하므로 교대벽이 비대해질 수 있어 이를 완충부(70)에 일부 흡수할 수 있도록 하고 있음을 알 수 있으며,At this time, in the fully integrated bridge (the upper part of FIG. 1c, the ramen structure in which the abutment part and the upper plate are integrated with each other without a bridge support), when horizontal deformation occurs in the upper plate 60 due to temperature and train load, the abutment wall must support the load. Therefore, it can be seen that the abutment wall can be enlarged so that it can be partially absorbed by the buffer unit 70,

부분 일체형 교량(도 1c의 아래쪽 기준, 교량받침에 의하여 교대부와 상판이 서로 분리)도 완충부(70)에 의하여 수평변형을 완전 허용하는 교량받침에 의해 역시 상판과 교대부에 과도한 상대 변위가 발생하여 구조적 안정성을 저하할 수 있게 됨을 알 수 있다.Even in a partially integrated bridge (the lower part of FIG. 1C, the abutment part and the upper plate are separated from each other by the bridge bearing), excessive relative displacement of the upper plate and the abutment part is also caused by the bridge support completely allowing horizontal deformation by the buffer unit 70. It can be seen that this occurs and the structural stability can be deteriorated.

도 1d는 종래 교대부(30)와 거더(41)의 수평변위를 흡수하기 위한 변형흡수부의 설치예시도를 도시한 것이다.Figure 1d shows an example of the installation of a strain-absorbing unit for absorbing the horizontal displacement of the conventional shifting unit 30 and the girder 41.

즉 변형흡수부는 거더(41)의 단부 저면에 노출된 수직홀 형태의 수용공간(43)이 형성되도록 하고, That is, the deformation absorbing part allows the vertical hole-shaped accommodation space 43 exposed at the bottom of the end of the girder 41 to be formed,

상기 수용공간(43)을 관통하도록 하되 거더 단부 저면으로부터 돌출되도록 하방으로 철근을 포함하는 변형흡수부(42)가 형성되도록 한 후, After penetrating the accommodation space 43 and forming a strain-absorbing portion 42 including a reinforcing bar downward so as to protrude from the bottom surface of the girder end,

교대(30) 상면에 변형흡수부(42)의 하부가 일체화되도록 시공하고 있음을 알 수 있다.It can be seen that the upper surface of the abutment 30 is constructed so that the lower portion of the strain absorbing portion 42 is integrated.

이때 상기 변형흡수부(42)는 하부가 교대(30)에 구속되어 거더(41)가 신축될 경우 수용공간(43)에 노출된 영역이 상기 수용공간(43) 내에서 거더(41)의 신축에 대응되도록 변형됨에 따라, At this time, when the lower part of the deformation absorbing part 42 is constrained to the abutment 30 and the girder 41 is stretched, the area exposed to the accommodating space 43 expands and contracts the girder 41 within the accommodating space 43. As it is transformed to correspond to

상기 거더(41)의 신축에 의해 교대(30)에 변위가 발생하는 것을 방지하고, 상기 거더(41)에 복원력을 제공하도록 하고 있음을 알 수 있다.It can be seen that displacement of the abutment 30 due to the expansion and contraction of the girder 41 is prevented and restoring force is provided to the girder 41.

하지만 거더(41) 단부 저면에 추가로 수용공간(43) 하방으로 돌출되는 철근을 포함하는 변형흡수부(42)가 형성되도록 하는 것은 거더(41) 제작효율성에 영향을 주게 되고, 교대(30)도 현장 타설콘크리트 방식으로 시공해야 하기 때문에 시공성도 상당히 저하될 수 밖에 없다는 문제점이 있게 된다.However, forming the strain absorbing portion 42 including the reinforcing bars protruding downward from the receiving space 43 in addition to the bottom surface of the end of the girder 41 affects the manufacturing efficiency of the girder 41, and the shift 30 There is also a problem that the workability is inevitably lowered because the construction must be performed in the form of cast-in-place concrete.

대한민국 특허 제10-1006900호(발명의 명칭: 강성 구조체의 뒷채움 보강구조의 시공방법, 공개일자: 2009년12월24일)Republic of Korea Patent No. 10-1006900 (Title of Invention: Construction Method of Reinforcing Structure Backfilling of Rigid Structure, Publication Date: December 24, 2009) 대한민국 특허 제10-1175098호(발명의 명칭: 중간 보조지지대를 이용하여 수직도를 유지하는 강성 구조체와 뒷채움의 결속구조 및 결속시공방법, 공개일자: 2012년08월21일)Republic of Korea Patent No. 10-1175098 (Title of Invention: Rigid Structure Maintaining Verticality Using Intermediate Auxiliary Support and Backfill Binding Structure and Binding Construction Method, Publication Date: August 21, 2012) 대한민국 특허 제10-1896403호(발명의 명칭: 일체식 교량구조물 및 그 시공방법, 공개일자: 2018년02월26일)Republic of Korea Patent No. 10-1896403 (Title of Invention: Integrated Bridge Structure and Construction Method, Publication Date: February 26, 2018) 대한민국 특허 제10-0971004호(발명의 명칭: 벽체를 이루는 패널과 강성 벽체구조를 이용한 보강토 옹벽, 공개일자: 2009년09월02일)Republic of Korea Patent No. 10-0971004 (Title of Invention: Reinforced Soil Retaining Wall Using Wall Panels and Rigid Wall Structure, Publication Date: September 2, 2009)

이에 본 발명은 뒤채움(뒷채움)을 선시공하고, 교대부를 후시공하는 교량의 교량접속부 시공에 있어, 뒤채움을 먼저 선시공한 후, 교대부를 프리캐스트 방식으로 적층 시공하면서 완충부도 함께 단계적으로 교대부 배면에 적층 시공하는 방식으로 후시공하여, 완충부 시공의 어려움을 해결할 수 있는 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.Therefore, in the construction of the bridge connection part of the bridge in which the backfill is pre-constructed and the abutment is post-constructed, the backfill is first pre-constructed, and then the abutment is laminated in a precast method while the abutment is also applied step by step. It is a technical task to solve the problem of providing a horizontal earth pressure reducing type precast bridge connection and its construction method that can solve the difficulties of buffer construction by post-construction in a method of layering construction on the rear surface.

또한 본 발명은 완충부 시공에 따라 교대부에 작용하는 수평토압을 교대부의 연결면 힌지부에 의하여 흡수하여 1차적으로 저감시키고, 상면 힌지부에 의하여 2차적으로 거더가 시공된 교대부의 수평변형을 흡수하고, 교대부와 거더와 일체화된 상판의 배면과 접하여 최소화된 수평변형을 3차적으로 완충부에서 흡수하는 역할을 하여, 교대부에 작용하는 모멘트 저감에 의하여 교대부를 슬림화시켜 보다 신속하고 경제적인 교량접속부 시공이 가능한 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.In addition, the present invention absorbs and primarily reduces the horizontal earth pressure acting on the abutment portion according to the construction of the buffer portion by the hinge portion of the connection surface of the abutment portion, and secondarily reduces the horizontal deformation of the abutment portion where the girder is constructed secondarily by the upper surface hinge portion Absorbs and plays a role of absorbing the minimized horizontal deformation in the buffer part thirdly by contacting the rear surface of the upper plate integrated with the abutment and the girder, and by reducing the moment acting on the abutment, it slims the abutment so that it is more rapid and economical It is a technical task to solve the provision of a horizontal earth pressure reduction type precast bridge connection part capable of constructing a bridge connection part and its construction method.

상기 과제를 달성하기 위한 본 발명의 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법은, 뒤채움을 선시공하고, 교대부를 후시공하는 수평토압 저감형 프리캐스트 교량접속부에 있어서, 선시공된 뒤채움; 상기 뒤채움으로부터 이격되어 프리캐스트 방식으로 교대부 세그먼트를 1단씩 적층 시공하여 형성시킨 교대부; 및 상기 교대부 세그먼트로 적층시키면서, 각각의 교대부 세그먼트 배면에 함께 적층 시공시킨 완충부;를 포함하여, 교대부를 프리캐스트 방식으로 적층 시공하면서 완충부도 함께 단계적으로 교대부 배면에 후시공하여, 뒤채움과 교대부 사이에 완충부를 단계적으로 적층시공할 수 있도록 하며,
상기 교대부 세그먼트의 연결면에는 연결면 힌지부가 형성되어,각각의 교대부 세그먼트도 상,하 연결로 인한 일체성을 확보하면서, 상기 교대부에 작용하는 수평토압을 흡수하여 1차적으로 저감되도록 하되, 상기 연결면 힌지부는, 교대부 세그먼트의 연결면에 형성된 전단홈에 하부가 매립되도록 형성되며 연결되는 교대부 세그먼트 저면에 노출되도록 형성된 스플라이스슬리브에 삽입되는 스플라이스를 포함하여, 상,하로 연결된 교대부 세그먼트는 단계적으로 적층되는 완충부에 의한 수평토압에 의한 수평변위를 흡수하면서 적층시공이 가능하게 되며, 교대부에 작용하는 수평토압을 연결면 힌지부에 의하여 흡수하여 1차적으로 저감되도록 하게 된다.
The horizontal earth pressure reducing type precast bridge connection and the construction method of the present invention for achieving the above object are the horizontal earth pressure reduction type precast bridge connection in which the backfill is pre-constructed and the alternating part is post-constructed, the pre-constructed backfill; an abutment portion formed by stacking and constructing abutment portion segments one step at a time in a precast manner away from the backfill; and a buffer part laminated with the alternating part segments and laminated together on the rear surface of each alternating part segment; It allows the buffer part to be laminated in stages between the filling and the shift part,
A connecting surface hinge is formed on the connecting surface of the shifting segment, so that each shifting segment also absorbs the horizontal earth pressure acting on the shifting part and primarily reduces it while securing integrity due to the upper and lower connection. , The connecting surface hinge part is formed so that the lower portion is buried in the shear groove formed on the connecting surface of the alternating portion segment and is connected up and down, including a splice inserted into a splice sleeve formed to be exposed to the bottom surface of the connected alternating portion segment The abutment segment enables stacking construction while absorbing the horizontal displacement caused by the horizontal earth pressure caused by the step-by-step buffer, and the horizontal earth pressure acting on the abutment is absorbed by the hinge portion of the connection surface to reduce it primarily. do.

삭제delete

삭제delete

삭제delete

본 발명의 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법에 의하면 시공과정에서 프리캐스트 방식으로 교대부를 적층시키고, 그 배면에 완충부를 무다짐으로 시공함에 따라 현장에서 교대부를 후 시공하되 완충부를 함께 단계적으로 시공 함에 따른 시공성과 작업성을 충분히 확보할 수 있어 보다 효율적인 교량접속부 시공이 가능한 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법 제공이 가능하게 된다.According to the horizontal earth pressure reducing type precast bridge connection and its construction method of the present invention, the abutment is laminated in a precast method in the construction process, and the buffer is constructed on the backside without compaction, so that the abutment is constructed after the abutment at the site, but with the buffer. It is possible to sufficiently secure workability and workability according to step-by-step construction, making it possible to provide a horizontal earth pressure reducing type precast bridge connection and its construction method that can construct more efficient bridge connections.

또한 본 발명의 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법에 의하면 1차적으로는 교대부 세그먼트의 연결면, 2차적으로는 교대부의 상면 힌지부, 3차적으로는 완충부에 의하여 교량구조물에 작용하는 하중, 내진에 의한 수평변형을 최소화시킬 수 있어 교대부 슬림화에 의한 시공의 효율성과 경제성을 확보할 수 있게 된다.In addition, according to the horizontal earth pressure reducing type precast bridge connection part and the construction method of the present invention, firstly, the connection surface of the abutment segment, secondly, the upper surface hinge part of the abutment part, and thirdly, the bridge structure by the buffer part It is possible to minimize horizontal deformation due to applied load and seismic resistance, so it is possible to secure the efficiency and economic feasibility of construction by slimming the abutment part.

또한, 본 발명의 수평토압 저감형 프리캐스트 교량접속부 및 그 시공방법에 의하면 교대부 상면에 거더를 거치시킴에 있어 교량받침 기능을 가진 상면힌지부를 이용하기 때문에 교량받침 설치가 필요없어 및 관련 유지관리비용을 절감할 수 있게 되며, 교대부와 거더의 일체성 확보에 의한 지진 등에 의한 수평변형 흡수에 의한 내진성능도 확보할 수 있게 된다.In addition, according to the horizontal earth pressure reducing type precast bridge connection and its construction method of the present invention, since the upper surface hinge with a bridge support function is used to mount the girder on the upper surface of the abutment, there is no need to install a bridge support and related maintenance Costs can be reduced, and seismic performance can be secured by absorbing horizontal deformation caused by earthquakes by securing the integrity of the abutment and the girder.

도 1a는 종래 교량구조물의 교량접속부 시공예시도,
도 1b는 종래 교량구조물의 교량접속부 침하를 방지하기 위한 보강예시도,
도 1c는 종래 교량구조물의 교량접속부 침하를 방지하기 위한 완충부를 이용한 보강예시도,
도 1d는 종래 교대부와 거더의 수평변위를 흡수하기 위한 변형흡수부의 설치예시도,
도 2는 본 발명의 수평토압 저감형 프리캐스트 교량접속부의 예시도,
도 3a 및 도 3b는 본 발명의 수평토압 저감형 프리캐스트 교량접속부 시공방법의 시공도를 도시한 것이다.
1a is a construction example of a bridge connection part of a conventional bridge structure;
Figure 1b is an example of reinforcement for preventing settlement of the bridge connection of a conventional bridge structure;
Figure 1c is an example of reinforcement using a buffer to prevent subsidence of the bridge connection of a conventional bridge structure;
1D is an example of installation of a deformation absorbing unit for absorbing horizontal displacement of a conventional abutment unit and a girder;
2 is an exemplary view of the horizontal earth pressure reducing type precast bridge connection of the present invention;
Figures 3a and 3b show the construction diagram of the horizontal earth pressure reduction type precast bridge connection construction method of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail so that those skilled in the art can easily practice with reference to the accompanying drawings. However, the present invention may be embodied in many different forms and is not limited to the embodiments described herein. And in order to clearly explain the present invention in the drawings, parts irrelevant to the description are omitted, and similar reference numerals are attached to similar parts throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when a certain component is said to "include", it means that it may further include other components without excluding other components unless otherwise stated.

[ 본 발명의 수평토압 저감형 프리캐스트 교량접속부(100) ][Horizontal earth pressure reducing type precast bridge connection part 100 of the present invention]

도 2는 본 발명의 수평토압 저감형 프리캐스트 교량접속부(100)의 구성도를 도시한 것이다.2 shows a configuration diagram of the horizontal earth pressure reducing type precast bridge connection part 100 of the present invention.

상기 교량접속부(100)는 예컨대, 도로, 철도를 횡단하는 교량구조물을 시공하는 과정에서 교량구조물의 교대부(110)와 접속되는 뒤채움(140), 완충부(150)에 보강되는 경계구간을 의미한다.The bridge connection part 100, for example, in the process of constructing a bridge structure that crosses roads and railroads, the boundary section reinforced in the backfill 140 and the buffer part 150 connected to the abutment part 110 of the bridge structure it means.

이에 교량접속부(100)에 시공되는 교량구조물은 도 2와 같이, 양 교대부(110), 거더(120)와 일체화된 상판(130)을 포함하여 구성되며, 거더(120)는 상판(220)과 일체화 시공되고, 상판(220)은 교량의 슬래브로서 상면에 포장층이 시공된다.Accordingly, as shown in FIG. 2, the bridge structure constructed on the bridge connection part 100 is composed of both bridge parts 110 and the upper plate 130 integrated with the girder 120, and the girder 120 is the upper plate 220 It is integrated with, and the upper plate 220 is a slab of a bridge, and a pavement layer is constructed on the upper surface.

이러한 교량구조물의 거더(120)와 상판(130)은 콘크리트로 시공하기 때문에 온도에 의하여 수평방향으로 변형이 발생하게 되며, 이러한 수평변형은 종래 교량구조물의 신축이음장치와 교량받침에 의하여 상쇄시키게 된다.Since the girder 120 and the top plate 130 of the bridge structure are constructed of concrete, deformation occurs in the horizontal direction due to temperature, and this horizontal deformation is offset by the expansion joints and bridge bearings of the conventional bridge structure. .

하지만 이러한 신축이음장치와 교량받침은 유지관리 비용이 많이 소요되기 때문에 본 발명은 신축이음장치와 교량받침을 설치하지 않고, 교대부(110), 거더(120)와 일체화된 상판(130)의 온도 등에 의한 수평변형을 상면 힌지부(160b), 완충부(150)에 의하여 흡수할 수 있도록 하게 된다.However, since these expansion joints and bridge bearings require a lot of maintenance costs, the present invention does not install the expansion joints and bridge bearings, and the temperature of the upper plate 130 integrated with the abutment 110 and the girder 120 The horizontal deformation caused by the etc. is absorbed by the upper surface hinge part 160b and the buffer part 150.

이로서 본 발명은 교량구조물의 교량받침을 설치하지 않기 때문에 유지관리 비용을 절감할 수 있게 되며, 교량구조물의 교대부(110) 단면을 슬림화시킬 수 있어 효율적이고 경제적인 교량구조물 시공이 가능하게 된다.As a result, the present invention can reduce the maintenance cost because the bridge support of the bridge structure is not installed, and the cross section of the abutment portion 110 of the bridge structure can be slimmed down, enabling efficient and economical construction of the bridge structure.

또한, 교량접속부(100)의 교대부(110)와 뒤채움(140) 사이에는 완충부(150)가 시공되며, 본 발명은 상기 뒤채움(140)과 교대부(110)를 먼저 선시공하되, 교대부(110)를 프리캐스트 방식으로 적층시공하면서 완충부(150)도 교대부(110)와 뒤채움(140) 사이에 단계적으로 후시공하게 된다.In addition, the buffer part 150 is constructed between the alternating part 110 and the backfilling 140 of the bridge connection part 100, and the present invention pre-constructs the backfilling 140 and the alternating part 110 first, While the abutment part 110 is laminated in the precast method, the buffer part 150 is also post-constructed in stages between the abutment part 110 and the backfill 140.

이때 교대부(110)를 프리캐스트 방식으로 적층시공하면서 연결면 힌지부(160a)를 교대부 세그먼트 연결면에 형성시킴과 더불어 교대부 상면과 거더(120)의 단부 저면에 상면 힌지부(160b)를 형성시켜,At this time, while the abutment part 110 is laminated in the precast method, the connection surface hinge part 160a is formed on the abutment segment connection surface, and the upper surface hinge part 160b is formed on the upper surface of the abutment part and the lower end of the girder 120 to form,

완충부(150) 시공에 따라 교대부에 작용하는 수평토압을 연결면 힌지부(160a)의하여 흡수하여 1차적으로 저감시키고, 상기 상면 힌지부(160b)에 의하여 2차적으로 거더(120)가 시공된 교대부의 수평변형을 흡수하고, 교대부(110)와 거더와 일체화된 상판(130)의 배면과 접하여 최소화된 수평변형을 완충부(150)에서 3차적으로 흡수하는 역할을 하게 된다.According to the construction of the buffer part 150, the horizontal earth pressure acting on the shift part is absorbed and primarily reduced by the connection surface hinge part 160a, and the girder 120 is secondarily constructed by the upper surface hinge part 160b It absorbs the horizontal deformation of the abutment portion, and serves to absorb the minimized horizontal deformation in the buffer portion 150 thirdly by contacting the rear surface of the top plate 130 integrated with the abutment portion 110 and the girder.

본 발명은 상기 연결면 힌지부(160a)와 상면 힌지부(160b)를 힌지부(160)라 지칭하게 된다.In the present invention, the connection surface hinge part 160a and the upper surface hinge part 160b are referred to as the hinge part 160.

이에 상기 수평토압 저감형 프리캐스트 교량접속부(100)는 도 2와 같이, 교대부(110), 거더(120), 상판(130), 뒤채움(140), 완충부(150), 연결면 힌지부(160a)와 상면 힌지부(160b)로 구분되는 힌지부(160)를 포함한다.Accordingly, the horizontal earth pressure reducing type precast bridge connection part 100, as shown in FIG. It includes a hinge part 160 divided into a branch part 160a and an upper surface hinge part 160b.

먼저, 상기 교대부(110)는 도 2와 같이, 교량구조물의 하부구조로서 콘크리트로 시공되는 벽체구조물로 시공하게 된다. First, as shown in FIG. 2, the shift unit 110 is constructed as a wall structure constructed of concrete as a lower structure of a bridge structure.

교량구조물의 경간장에 따라 서로 종방향으로 대향되도록 시공되는 것이 통상적이며, 특히 본 발명은 프리캐스트 방식으로 일정한 높이로서 교대부 세그먼트(111)를 1단씩 적층 시공하게 된다.It is common to construct so as to face each other in the longitudinal direction according to the span length of the bridge structure.

종래에는 뒤채움(140)과 완충부(150)를 먼저 일체로 시공한 이후에, 완충부(150)와 교대부(110)를 서로 연결시공하는 방식으로 교량구조물의 교량접속부를 시공하였기 때문에,Conventionally, after constructing the backfill 140 and the buffer part 150 integrally, the bridge connection part of the bridge structure is constructed in such a way that the buffer part 150 and the alternating part 110 are connected to each other.

먼저 시공된 완충부(150)와 교대부(110)를 연결시켜 일체화 시공하기 위해서 교대부(110)는 현장타설 콘크리트 시공방식으로 시공할 수 밖에 없게 된다.In order to integrate the buffer unit 150 and the abutment unit 110, which have been constructed first, in order to perform integrated construction, the abutment unit 110 has no choice but to be constructed by the cast-in-place concrete construction method.

물론 뒤채움(140)과 교대부(110)를 먼저 시공한 이후에 완충부(150)를 뒤채움(140)과 교대부(110) 사이 공간에 후시공 할 수도 있는데 이럴 경우 제한된 공간에서 완충부(150)를 교대부(110) 배면에 밀실하게 채워 시공하는 작업성이 저하되는 문제점이 발생하게 된다.Of course, after constructing the backfilling 140 and the shifting part 110 first, the buffer 150 may be post-constructed in the space between the backfilling 140 and the shifting part 110. In this case, the buffering part in a limited space There is a problem that the workability of filling the rear surface of the shift part 110 tightly with 150 is lowered.

이에 본 발명은 뒤채움(140)와 교대부(110)를 선시공 함에 있어서,Accordingly, in the present invention, in pre-constructing the backfill 140 and the alternating portion 110,

교대부(110)와 뒤채움(140) 사이의 제한된 공간에 완충부(150)를 시공해야 하는 어려움을 극복하기 위하여 뒤채움(140)로부터 이격시켜 교대부(110)를 시공하되,In order to overcome the difficulty of constructing the buffer part 150 in the limited space between the shift part 110 and the backfill 140, the shift part 110 is constructed by separating it from the backfill 140,

상기 교대부(110)는 교대부 세그먼트(111)로 적층시키면서, 각각의 교대부 세그먼트(111)의 시공 높이에 따라 완충부(150)를 교대부 세그먼트(111) 배면에 함께 적층 시공함으로서, 이러한 문제점을 해결하게 된다.The alternating part 110 is laminated with the alternating part segments 111, and the buffer part 150 is stacked together on the rear surface of the alternating part segment 111 according to the construction height of each of the alternating part segments 111, such that will solve the problem.

또한, 도 2와 같이, 각각의 교대부 세그먼트(111)도 상,하 연결로 인한 일체성 확보를 위하여 연결면 힌지부(160a)가 교대부 세그먼트(111) 연결면에 형성되도록 하고, 연결면 힌지부(160a)를 구성하는 전단홈(161)에는 스플라이스(165)가 하부가 매립되도록 하는 방식으로 형성되도록 하게 된다.In addition, as shown in FIG. 2, in order to secure integrity due to the upper and lower connection of each alternating segment 111, the connecting surface hinge portion 160a is formed on the connecting surface of the alternating segment 111, and the connecting surface The splice 165 is formed in the shear groove 161 constituting the hinge portion 160a in such a way that the lower portion is buried.

이에 상기 스플라이스(165)는 연결되는 교대부 세그먼트(111) 저면에 노출되도록 형성된 스플라이스슬리브(164)에 삽입되도록 하여, 상,하로 연결된 교대부 세그먼트(111)는 단계적으로 적층되는 완충부(150)에 의한 수평토압에 의한 수평변위를 흡수하면서 보다 안정적인 적층시공이 가능하게 되며, 교대부에 작용하는 수평토압을 연결면 힌지부(160a)의하여 흡수하여 1차적으로 저감시킬 수 있게 된다.Accordingly, the splice 165 is inserted into the splice sleeve 164 formed to be exposed on the bottom surface of the connected alternating portion segment 111, so that the alternating portion segment 111 connected up and down is a buffer portion ( 150), more stable laminated construction is possible while absorbing the horizontal displacement caused by the horizontal earth pressure, and the horizontal earth pressure acting on the abutment can be absorbed by the connecting surface hinge portion 160a to primarily reduce it.

또한 교대부 세그먼트(111)가 적층되도록 하여 최종 일정 높이로 시공된 교대부(110)의 상면에는 상면 힌지부(160b)로서 역시 전단홈(161)을 형성시키게 되며, 교대부(110)는 횡방향으로도 연장되어 형성되므로 상기 전단홈(161)도 상면에 횡방향으로 연속 또는 이격되어 형성되도록 하게 된다.In addition, a shear groove 161 is also formed as an upper surface hinge portion 160b on the upper surface of the abutment portion 110 constructed to a final predetermined height by stacking the abutment segments 111, and the abutment portion 110 is transverse Since it is formed extending in the direction, the shear groove 161 is also formed continuously or spaced apart in the transverse direction on the upper surface.

이러한 전단홈(161)에는 역시 스플라이스(165)가 미리 하부가 매립되도록 하는 방식으로 형성되도록 하게 된다.The splice 165 is also formed in such a shear groove 161 in such a way that the lower part is buried in advance.

이에 상기 스플라이스(165)는 거더(120) 저면에 노출되도록 형성된 스플라이스슬리브(164)에 역시 삽입되도록 함으로서 상기 상면 힌지부(160b)에 의하여 2차적으로 거더(120)가 시공된 교대부(110)의 수평변형을 흡수하고, 교대부(110)와 거더와 일체화된 상판(130)의 배면과 접하여 최소화된 수평변형을 3차적으로 완충부(150)가 흡수하게 된다.Accordingly, the splice 165 is also inserted into the splice sleeve 164 formed to be exposed on the bottom surface of the girder 120, so that the shift portion where the girder 120 is secondarily constructed by the upper surface hinge portion 160b ( 110) absorbs the horizontal deformation, and the shock absorber 150 thirdly absorbs the minimized horizontal deformation by coming into contact with the rear surface of the upper plate 130 integrated with the alternating portion 110 and the girder.

이러한 교대부 세그먼트(111)은 최종 미도시 하였지만 수직으로 자립 및 서로 강결되도록 최종 시공하게 됨은 당연하다.Although these alternating segments 111 are not shown in the end, it is natural that they are finally constructed to be vertically self-supporting and rigid to each other.

다음으로 거더(120)는 도 2와 같이, 교량구조물의 상부구조로서 역시 콘크리트로 시공된 것을 이용할 수 있으며, 양 교대부(110) 상면에 양 단부가 지지되도록 거치시켜 시공되며, 수평으로 연장된 휨 부재로서 작용하게 된다.Next, as shown in FIG. 2, the girder 120 can be used as the upper structure of the bridge structure, which is also constructed of concrete, and is constructed by placing both ends on the upper surface of both abutments 110 so that they are supported. It will act as a bending member.

이에 교량구조물에 작용하는 교통하중등에 의한 외력에 의한 휨 모멘트를 주로 저항하게 되는데, 온도등에 의하여 신축이 발생하게 되기 때문에 수평변형(종방향 및/또는 횡방향)이 발생하게 된다.As a result, it mainly resists the bending moment caused by external force such as traffic load acting on the bridge structure, but horizontal deformation (longitudinal direction and / or transverse direction) occurs because expansion and contraction occur due to temperature.

이에 교대부(110) 상면에는 종래에는 이러한 수평변형을 흡수하기 위한 교량받침을 교대부 상면에 설치하고, 교량받침 상면에 거더(120)의 양 단부가 지지되도록 거치하게 되는데, Accordingly, on the upper surface of the abutment part 110, conventionally, a bridge support for absorbing this horizontal deformation is installed on the upper surface of the abutment part, and both ends of the girder 120 are supported on the upper surface of the bridge support.

이러한 교량받침은 유지관리에 비용과 시간이 소요되므로, 본 발명은 이러한 교량받침의 수평변형 흡수 기능을 후술하는 상면 힌지부(160b)로 대체하여 교량받침을 설치하지 않도록 하여 유지관리비용을 절감할 수 있도록 있게 된다.Since these bridge bearings require cost and time for maintenance, the present invention replaces the horizontal deformation absorbing function of these bridge bearings with the upper surface hinge part 160b to be described later, thereby reducing maintenance costs by not installing bridge bearings. will be able to

이에 도 2에 의하면 거더(120)의 양 단부 저면에는 하방으로 돌출된 전단키(162)가 일체로 형성되도록 하고, 앞서 살펴본 교대부(110) 상면의 전단홈(161)에 상기 전단키(162)가 하방으로 삽입되어 맞물려지면서 탄성패드를 포함하는 충격흡수재(163)를 이용하여 수평방향 수평변형의 제어 및 흡수가 가능하도록 하면서,Accordingly, according to FIG. 2, the shear key 162 protruding downward is integrally formed on the bottom surface of both ends of the girder 120, and the shear key 162 is formed in the shear groove 161 on the upper surface of the shifting part 110 described above. Using the shock absorber 163 including the elastic pad while being inserted downward and engaged, it is possible to control and absorb horizontal deformation in the horizontal direction,

전단홈(161)에는 스플라이스(165)가 미리 하부가 매립되도록 하는 방식으로 형성되도록 하고, 상기 스플라이스(165)는 거더(120) 저면에 노출되도록 형성된 스플라이스슬리브(164)에 역시 삽입되도록 함으로서 상기 상면 힌지부(160b)에 의하여 2차적으로 거더(120)가 시공된 교대부(110)의 수평변형을 흡수하도록 하게 된다.In the shear groove 161, a splice 165 is formed in such a way that the lower portion is buried in advance, and the splice 165 is also inserted into the splice sleeve 164 formed to be exposed on the bottom surface of the girder 120. By doing so, the horizontal deformation of the shift part 110 on which the girder 120 is secondarily constructed is absorbed by the upper surface hinge part 160b.

다음으로 상판(130)은 도 2와 같이, 교량구조물의 상부구조로서 교량구조물의 슬래브를 포함하게 된다. Next, as shown in FIG. 2, the top plate 130 includes a slab of the bridge structure as an upper structure of the bridge structure.

거더(120)와 상판(130)은 서로 일체화시켜 시공하게 되는데 역시 콘크리트로 시공하기 때문에 교대부에 시공되는 거더(120)의 수평변형은 교대부(110)의 상면과 교대부 세그먼트(111)의 연결면에 형성된 상면 힌지부(160b)에 의하여 2차적으로 흡수되도록 하고,The girder 120 and the top plate 130 are constructed by integrating with each other. Since they are also constructed with concrete, the horizontal deformation of the girder 120 installed on the abutment part is the difference between the upper surface of the abutment part 110 and the abutment segment 111. It is secondarily absorbed by the upper hinge portion 160b formed on the connection surface,

거더(120)와 일체화된 상판(130)의 수평변형은 배면과 접하도록 시공된 완충부(150)에 의하여 3차적으로 흡수되도록 하게 된다.The horizontal deformation of the upper plate 130 integrated with the girder 120 is thirdly absorbed by the buffer part 150 constructed to contact the rear surface.

이로서 단순히 교대부(110)를 시공하는 경우와 대비하여 1,2,3차적으로 흡수된 최소화된 수평변형을 기준으로 교대부 시공이 가능하기 때문에 거더(120)와 상판(130)을 지지하는 교대부(110)의 단면을 최적화(슬림화)시킬 수 있어 교량구조물의 공사비 절감이 가능하도록 할 수 있게 되며, 프리캐스트 방식으로 시공되는 교대부(110)의 장점을 극대화시킬 수 있게 된다.As a result, in contrast to the case of simply constructing the shift part 110, the shift part supporting the girder 120 and the upper plate 130 is possible because it is possible to construct the shift part based on the minimized horizontal deformation absorbed in the first, second, and third order. It is possible to optimize (slim) the cross section of the section 110, thereby reducing the construction cost of the bridge structure, and maximizing the advantages of the abutment section 110 constructed in the precast method.

이러한 상판(130)은 거더(120) 상면과 단부에 일정한 두께로 교대부(110) 상면에 일체로 시공되도록 하게 되면, 상판(130)의 상면은 포장층을 더 형성시킬 수 있다.When such a top plate 130 is integrally constructed on the upper surface of the alternating portion 110 with a constant thickness on the upper surface and end of the girder 120, the upper surface of the top plate 130 can further form a pavement layer.

다음으로, 뒤채움(140)은 도 2와 같이, 교량접속부의 일부분으로서 토공부이다.Next, the backfill 140 is an earthwork as a part of the bridge connection, as shown in FIG.

즉, 상기 뒤채움(140)은 교량구조물의 완충부(150)의 배면(A)쪽으로 연직방향으로 자립성토 되도록 시공된 것으로서, 교대부(110)의 배면(B)으로부터 이격되어 완충부(150)가 교대부(110) 배면과 뒤채움(140) 사이에 형성될 수 있도록 시공되는 토공체이다.That is, the backfill 140 is constructed so as to be self-supporting in the vertical direction toward the back surface (A) of the buffer part 150 of the bridge structure, and is spaced apart from the rear surface (B) of the abutment part 110 so that the buffer part 150 ) is an earthworks body constructed so that it can be formed between the rear surface of the alternating part 110 and the backfill 140.

이러한 뒤채움(140)은 일정한 높이를 가진 토공체이기 때문에 하방으로 갈수록 커지는 토압에 저항하면서 연직 자립을 위해 지오그리드(격자형 보강재)와 같은 보강재를 이용하여 교대부(110)의 배면(B)과 이격되어 연직 자립되도록 시공하는 것이 바람직하며, 일종의 보강토라 시공될 수 있다.Since this backfill 140 is an earthworks body with a certain height, it resists the earth pressure that increases downward and uses a reinforcing material such as a geogrid (lattice-type reinforcing material) to achieve vertical independence and It is preferable to construct it so that it is spaced apart and vertically independent, and it can be constructed as a kind of reinforcement soil.

이때 상기 뒤채움(140)이 연직으로 자립 성토되도록 시공하는 이유는 뒤채움(140)을 교대부(110)보다 먼저 시공하기 때문에 시공 시 자립이 가능하도록 하기 위한 것이다.At this time, the reason why the backfill 140 is constructed so that it is vertically self-supporting is to enable self-reliance during construction because the backfill 140 is constructed before the shift part 110.

이러한 뒤채움(140)은 시멘트 처리된 토사 또는 자갈을 일정높이 포설, 다짐하여 적층시켜 가면서 일정한 높이(H)로 시공하게 되는데 1회 적층 시 마다 상면에 보강재(지반보강용 지오그리드등)를 포설하여 다수 적층된 뒤채움(140)이 상,하로 일체화되도록 할 수 있다.This backfill 140 is constructed at a certain height (H) while cemented soil or gravel is laid, compacted, and stacked at a certain height. A plurality of stacked backfills 140 may be integrated up and down.

이에 상기 뒤채움(140)은 완충부(150)의 배면(A) 쪽으로 연직으로 자립성토 되도록 하되, 교대부(110)의 저면을 기준으로 상판(130)까지 연직으로 자립된 저면폭이 상면폭 보다 큰 사다리꼴 단면 형태로 시공하도록 하되, 보강재도 다층으로 시공되며, 작용 토압에 대응하여 상부로 갈수록 수평 연장길이가 짧아지도록 시공되고 있음을 알 수 있다.Accordingly, the backfill 140 is vertically self-supporting toward the rear surface (A) of the buffer unit 150, but the bottom width vertically independent from the bottom surface of the shifting unit 110 to the top plate 130 is the top width. It is to be constructed in the form of a larger trapezoidal cross section, but the reinforcement is also constructed in multiple layers, and it can be seen that the horizontal extension length is shortened toward the top in response to the applied earth pressure.

다음으로 상기 완충부(150)는 도 2와 같이, 뒤채움(140)과 교량구조물의 교대부(110), 거더(120)와 일체화된 상판(130)의 배면 사이에 연직으로 형성된 공간(S)에 형성되도록 하게 되며, 본 발명의 경우 앞서 살펴본 뒤채움(140)을 시공한 후, 이격시켜 교대부 세그먼트(111) 1단을 시공한 후, 교대부 세그먼트(111) 배면에 1단의 완충부(150)를 적층 시공하는 방식으로 형성시키게 된다.Next, as shown in FIG. 2, the buffer part 150 is a space (S) formed vertically between the backfill 140, the alternating part 110 of the bridge structure, and the rear surface of the upper plate 130 integrated with the girder 120. ), and in the case of the present invention, after constructing the back filling 140 described above, spaced apart and constructing one stage of the shift segment 111, and then one stage of buffer on the rear surface of the shift segment 111 The portion 150 is formed by layering construction.

이에 교대부(110)와 완충부(150)를 일체로 먼저 형성시키고, 완충부(150)를 교대부(110)와 일체화시키기 위하여 교대부(110)를 현장타설 콘크리트 방식으로 시공해야만 하는 종래 시공의 한계성을 극복할 수 있게 된다.Therefore, the conventional construction in which the abutment part 110 and the buffer part 150 must be formed integrally first, and the abutment part 110 must be constructed in a cast-in-place concrete method in order to integrate the buffer part 150 with the abutment part 110. can overcome the limitations of

즉, 본 발명은 교대부(110)를 프리캐스트 방식으로 본 발명은 완충부(150)를 교대부 세그먼트(111)와 함께 1단씩 단계적으로 시공함으로서, 뒤채움(140)와 프리캐스트 방식으로 교대부(110)를 선 시공한 후, 완충부(150)를 후시공 하는 방식을 채택하게 된다.In other words, the present invention constructs the shifting part 110 in a precast manner, and the present invention constructs the buffer part 150 together with the shifting part segment 111 step by step, and alternates with the backfilling 140 in a precast manner. After pre-construction of the unit 110, a method of post-construction of the buffer unit 150 is adopted.

이러한 완충부(150)는 특히 거더(120)와 교대부(110) 및 교대부 세그먼트(111)의 연결면에 형성된 연결면 힌지부(160a)와 상면 힌지부(160b)에 의하여 1차 및 2차적으로 흡수된 수평변형을 3차적으로 더 흡수하는 역할을 하게 된다. The shock absorber 150 is formed by the connection surface hinge portion 160a and the upper surface hinge portion 160b formed on the connection surfaces of the girder 120, the abutment portion 110, and the abutment portion segment 111. It plays the role of tertiarily absorbing the horizontal strain absorbed in the second order.

즉, 교량구조물의 교대부(110)와 거더(120)와 일체화된 상판(130)으로부터 전달되는 열차를 포함하는 차량의 제어하중, 온도하중등에 의한 수평변형을 상면 힌지부(160b)와 함께 완충부(150)가 분담하게 된다.That is, the horizontal deformation caused by the control load, temperature load, etc. of the vehicle including the train transmitted from the upper plate 130 integrated with the shift part 110 and the girder 120 of the bridge structure is buffered together with the upper surface hinge part 160b Part 150 will share.

이로서 프리캐스트 방식으로 시공되는 교대부(110)와 거더(120)와 일체화된 상판(130)이 부담하는 토압, 하중을 감소시켜 교대부(110) 단면 슬림화가 가능하도록 하는 역할을 하게 된다.This serves to reduce the earth pressure and load applied to the abutment part 110 constructed by the precast method and the top plate 130 integrated with the girder 120, thereby enabling the cross-section of the abutment part 110 to be slimmed.

이러한 완충부(150)는 수평력 및 하중에 의하여 변형이 가능하도록 시멘트를 사용하지 않는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하지 않고, 교량구조물의 신축을 흡수하도록 하게 된다.The buffer 150 uses soil or gravel that does not use cement so that it can be deformed by horizontal force and load, so that the constituent particles are bound to each other and do not act as a rigid body, and absorb the expansion and contraction of the bridge structure.

다음으로 상기 힌지부(160)는 도 2 및 도 3a와 같이, 1단 씩 최종 교대부 높이에 따라 프리캐스트 방식으로 적층 시공되는 교대부(110)의 연결면에 형성되어 수평토압(뒤채움, 완충부 후 시공에 의한 수평토압)에 의한 수평변형을 역시 1차적으로 흡수하여 보아 안정적인 교대부(110) 시공이 가능하도록 하는 역할과,Next, as shown in FIGS. 2 and 3A, the hinge part 160 is formed on the connection surface of the shift part 110 that is laminated in a precast method according to the height of the final shift part by one stage, and the horizontal earth pressure (backfill, The role of enabling stable construction of the shifting part 110 by primarily absorbing the horizontal deformation caused by the horizontal earth pressure caused by the construction after the buffer part,

교대부(110) 상면과 거더(120)의 저면에 형성시켜 거더(120)가 시공된 교대부(110)에 작용하는 수평변형을 2차적으로 흡수하여 종래 교량받침을 대체하는 역할을 하게 된다.It is formed on the upper surface of the abutment part 110 and the lower surface of the girder 120 to secondarily absorb the horizontal deformation acting on the abutment part 110 on which the girder 120 is constructed, and serves to replace the conventional bridge bearing.

이러한 힌지부(160)는 교대부 세그먼트(111)의 연결면에 형성된 연결면 힌지부(160a)와 교대부 상면과 거더(120) 단부 저면에 형성되는 상면 힌지부(160b)로 구비되며, 연결면 힌지부(160a)와 상면 힌지부(160b) 모두, 도 2와 같이, The hinge part 160 is provided with a connection surface hinge part 160a formed on the connection surface of the abutment segment 111 and an upper surface hinge part 160b formed on the upper surface of the abutment part and the bottom surface of the end of the girder 120, Both the surface hinge part 160a and the upper surface hinge part 160b, as shown in FIG. 2,

전단홈(161), 전단키(162), 충격흡수재(163), 스플라이스슬리브(164), 스플라이스(165)를 포함하게 된다.A shearing groove 161, a shearing key 162, a shock absorber 163, a splice sleeve 164, and a splice 165 are included.

먼저 상기 전단홈(161)은 도 2 및 도 3a와 같이, 교대부(110) 상면, 교대부 세그먼트(111) 연결면에 일정 깊이로 횡방향으로 연속 또는 이격되어 형성시킨 오목홈으로서 거더(120)와 교대부 세그먼트(111)의 전단키(162)가 하강하여 삽입되도록 형성시킨 것이다.First, as shown in FIGS. 2 and 3A, the shear groove 161 is a concave groove formed continuously or spaced apart in the transverse direction at a certain depth on the upper surface of the abutment part 110 and the connecting surface of the abutment segment 111, and the girder 120 ) and the shear key 162 of the alternating segment 111 is formed so that it is lowered and inserted.

이에 전단키(162)는 전단홈(161) 내부에 수용되어 기준 이상의 수평변형을 제어하는 기본적인 역할을 하게 된다.Accordingly, the shear key 162 is accommodated inside the shear groove 161 and plays a basic role in controlling the horizontal deformation beyond the standard.

이러한 전단홈(161)으로서 사다리꼴 단면의 홈 형태로 개시되어 있지만 단면 형태는 다양하게 형성시킬 수 있음은 당연하고, 상기 수평변형을 흡수하기 위한 크기로 형성시키면 된다.Although the shear groove 161 is disclosed in the form of a trapezoidal cross-section, it is natural that the cross-sectional shape can be formed in various ways, and it is only necessary to form it in a size to absorb the horizontal deformation.

다음으로 상기 전단키(162)는 도 2 및 도 3a와 같이, 교대부 상면 및 교대부 연결면에 형성되는 전단홈(161)에 삽입되는 돌출키로서 거더(120)의 양 단부 저면에 일체화시켜 형성시키게 된다.Next, as shown in FIGS. 2 and 3A, the shear key 162 is a protruding key inserted into the shear groove 161 formed on the upper surface of the abutment part and the connecting surface of the abutment part, and is formed by integrating into the lower surface of both ends of the girder 120. will make

이에 거더(120)를 인양하거나, 교대부(110) 상면에서 거더(12)를 제작할 때 및 교대부(110)를 적층 시공한 때, 전단키(162)가 전단홈(161)에 수용되어 작용하는 하중에 의한 수평변형이 제어되도록 하는 역할을 하게 된다.Accordingly, when the girder 120 is lifted, the girder 12 is manufactured on the upper surface of the alternating part 110, or the alternating part 110 is laminated, the shear key 162 is accommodated in the shear groove 161 and acts It serves to control the horizontal deformation caused by the load.

이러한 전단키(162)는 전단홈(161)의 형태에 대응하여 사다리꼴 단면의 홈 형태로 개시되어 있지만 역시 단면 형태는 다양하게 형성시킬 수 있음은 당연하고, 상기 수평변형을 흡수하기 위한 크기로 형성시키는 것은 전단키와 동일하다.Although this shear key 162 is disclosed in the shape of a trapezoidal cross-section corresponding to the shape of the shear groove 161, it is natural that the cross-sectional shape can be formed in various ways, and is formed in a size to absorb the horizontal deformation. It is the same as the shear key.

다음으로 상기 충격흡수재(163)는 도 2 및 도 3a와 같이, 전단홈(161)에 끼워져 설치하여, 전단키(162)가 접하도록 설치되는 탄성재질의 부재로서 탄성패드등을 이용하게 된다.Next, as shown in FIGS. 2 and 3A, the shock absorber 163 is inserted into and installed in the shear groove 161, and an elastic pad or the like is used as a member of an elastic material installed so that the shear key 162 comes into contact with it.

이러한 충격흡수재(163)는 거더(120)와 거더와 일체화된 상판(130) 및 교대부(110)의 연결면에 작용하는 하중에 대한 충격에 의한 전단홈 및 전단키의 파손을 방지하면서, 달리 유지관리가 필요하지 않다는 장점이 있게 된다. The shock absorber 163 prevents damage to the shear groove and the shear key due to the impact of the load acting on the connection surface of the girder 120, the top plate 130 integrated with the girder, and the connecting portion 110, while maintaining the other It has the advantage of not requiring maintenance.

또한 전단홈(161)에 수용된 전단키(162)의 수평변형에 대한 흡수성능을 보완하는 역할도 함께 하게 된다.In addition, it also serves to supplement the absorption performance for the horizontal deformation of the shear key 162 accommodated in the shear groove 161.

상기 스플라이스슬리브(164) 및 스플라이스(165)는 도 2 및 도 3a와 같이, 연결면 힌지부(160a)와 상면 힌지부(160b)에 형성되어 1차적으로 교대부(110)의 수평변형을 흡수하면서, 2차적으로 거더(120)가 시공된 교대부(110)의 수평변형을 2차적으로 흡수하는 역할을 하게 된다.As shown in FIGS. 2 and 3A, the splice sleeve 164 and the splice 165 are formed on the connection surface hinge part 160a and the upper surface hinge part 160b, so that the horizontal deformation of the shift part 110 is primarily While absorbing, it serves to secondarily absorb the horizontal deformation of the abutment 110 on which the girder 120 is constructed.

이를 위해 먼저 전단홈(161) 저면에 수직으로 상방 연장된 철근등의 스플라이스(일종의 수직철근,165)와 상기 스플라이스(165)의 두부가 삽입되는 스플라이스슬리브(164)를 전단키(162)의 저면에 매입시키고, To this end, first, a splice (a kind of vertical reinforcing bar, 165) of a reinforcing bar extending vertically upward on the bottom surface of the shear groove 161 and a splice sleeve 164 into which the head of the splice 165 is inserted are shear key 162 embedded in the bottom of

상기 스플라이스슬리브(164)에 스플라이스(165)가 삽입되어 수평변형에 저항하도록 하게 된다. 상기 스플라이스슬리브(164) 내부는 충진시켜도 되고 충진시키지 않아도 된다.A splice 165 is inserted into the splice sleeve 164 to resist horizontal deformation. The inside of the splice sleeve 164 may or may not be filled.

이에 교대부(110) 연결면 또는 거더(120)의 단부 저면에 미리 스플라이스슬리브(164)가 노출되도록 간단하게 형성되도록 하고, 스플라이스(165)는 전단홈(161)에 노출되도록 형성시킬 수 있기 때문에 Therefore, the splice sleeve 164 can be simply formed to be exposed in advance on the connection surface of the alternating part 110 or the bottom surface of the end of the girder 120, and the splice 165 can be formed to be exposed to the shear groove 161. because there is

도 1d와 대비하여 힌지부(160) 형성이 매우 간단해지게 되며, 전단키(162)와 전단홈(161)에 일체로 형성시킬 수 있기 때문에 힌지부(160)의 역할을 극대화시킬 수 있게 된다.Compared to FIG. 1D, the formation of the hinge part 160 becomes very simple, and since the shear key 162 and the shear groove 161 can be integrally formed, the role of the hinge part 160 can be maximized.

[ 본 발명의 수평토압 저감형 프리캐스트 교량접속부(100) 시공방법 ][Construction method of horizontal earth pressure reducing type precast bridge connection part 100 of the present invention]

도 3a 및 도 3b는 본 발명의 수평토압 저감형 프리캐스트 교량접속부(100) 시공방법의 시공순서도를 도시한 것이다.3a and 3b show a construction flow chart of the construction method of the horizontal earth pressure reducing type precast bridge connection 100 of the present invention.

상기 교량접속부(100) 시공은 뒤채움(140)을 시공하여 발생된 침하를 수용하면서, 프리캐스트 방식으로 시공된 교대부(110)를 뒤채움(140)으로부터 이격시켜 역시 선시공하고, The construction of the bridge connection part 100 is also pre-constructed by separating the abutment part 110 constructed by the precast method from the backfill 140 while accommodating the settlement caused by the construction of the backfill 140,

완충부(150)를 교대부 세그먼트(111)와 함께 단계적으로 시공하여 완충부(150)를 뒤채움(140)과 교대부(110) 사이에 시공함으로서 완충부 후시공에 따른 문제점을 해결하면서, 거더(120)와 일체화된 상판(130)을 완충부(150)에 연결시키는 방식으로 시공하게 된다.By constructing the buffer 150 together with the alternating segment 111 step by step to construct the buffer 150 between the backfilling 140 and the alternating portion 110, solving the problems caused by the post-construction of the buffer, It is constructed in such a way as to connect the upper plate 130 integrated with the girder 120 to the buffer unit 150.

이에 도 3a와 같이, 먼저 기준틀(미도시)을 이용하여 보강재를 적층하면서, 뒤채움(140)를 적층 형성시키게 된다.Accordingly, as shown in FIG. 3A, the backfill 140 is laminated and formed while the reinforcing material is first laminated using a reference frame (not shown).

다음으로는 상기 뒤채움(140) 전면으로부터 완충부(150)가 시공되어야 공간을 감안하여 이격되도록 교대부(110)를 이격 시공하게 되며, Next, the buffer unit 150 must be installed from the front of the backfill 140 so that the shift unit 110 is spaced apart in consideration of space,

이러한 교대부(110)는 교대부 세그먼트(111)를 1 단씩 연결면에서 충격흡수재(163)가 설치된 전단홈(161)에 삽입된 전단키(162)에 있어, 전단키 저면에 시공된 스플라이스슬리브(164)와 전단홈(161)에 형성된 스플라이스(165)에 의한 연결면 힌지부(160a)를 이용하여 연결시켜 적층시키되, 1단 씩 교대부 세그먼트(111)를 시공하면서 완충부(150)도 1단씩 상기 공간에 무다짐으로 시공하게 된다.The alternating part 110 is a shear key 162 inserted into the shear groove 161 in which the shock absorber 163 is installed on the connecting surface of the alternating segment 111 step by step, and the splice sleeve ( 164) and the shear groove 161 by using the connection surface hinge portion 160a formed by the splice 161 to connect and stack, while constructing the shift segment 111 one by one, the buffer portion 150 also It is constructed without compaction in the space one step at a time.

이에 도 3b를 참조하면, 최종 교대부(110) 상면은 완충부(150)의 상면 보다 높이가 적게 형성되도록 하고 있으며, 교대부(110) 상면에는 상면 힌지부(160b)의 전단홈(161)이 형성되어 있음을 알 수 있다.Accordingly, referring to FIG. 3B, the upper surface of the final alternating unit 110 is formed to have a lower height than the upper surface of the shock absorber 150, and the upper surface of the alternating unit 110 has a shear groove 161 of the upper hinge portion 160b It can be seen that this is formed.

이러한 전단홈(161)에는 충격흡수재(163)를 설치하고, 역시 스플라이스(165)를 함께 설치하면 된다.A shock absorber 163 may be installed in the shear groove 161, and a splice 165 may also be installed together.

다음으로는 단부 저면에 스플라이스슬리브(164)가 노출되도록 매립된 거더(120)를 별도 제작하여 현장에서 인양후, Next, the buried girder 120 is separately manufactured so that the splice sleeve 164 is exposed on the bottom of the end, and after lifting at the site,

거더(120)의 단부 저면에 일체로 형성된 전단키(162)가 전단홈(161)에 설치된 충격흡수재(163)와 접하도록 거치시키면서, 스플라이스슬리브(164)에 스플라이스(165)가 삽입되도록 하여 거더와 일체화된 상판(130) 및 수평토압에 의한 수평변형을 2차적으로 흡수할 수 있도록 하게 된다.While the shear key 162 integrally formed on the bottom surface of the end of the girder 120 is placed in contact with the shock absorber 163 installed in the shear groove 161, the splice 165 is inserted into the splice sleeve 164 to The upper plate 130 integrated with the girder and the horizontal deformation caused by the horizontal earth pressure can be secondarily absorbed.

이때 거더(120)의 단부면(D)은 완충부(150)와 접하지 않도록 시공되고 있음을 알 수 있다.At this time, it can be seen that the end surface D of the girder 120 is constructed so as not to come into contact with the buffer part 150.

다음으로는 도 3b와 같이, 거더(120) 상면, 교대부(110) 상면에 콘크리트를 타설하는 방식으로 상판(130)을 시공하되, 상판(130)과 거더(120)가 일체화되도록 하여 일체 거동하도록 시공하게 된다.Next, as shown in FIG. 3B, the upper plate 130 is constructed by pouring concrete on the upper surface of the girder 120 and the upper surface of the abutment part 110, but the upper plate 130 and the girder 120 are integrated so that the integral behavior will be built to do so.

이에 상판(130)과 교대부(110)의 배면은 완충부(150)와 접하면서 3차적인 수평변형 흡수가 완충부(150)에서 발생할 수 있도록 하게 된다.Accordingly, the upper plate 130 and the rear surfaces of the shifting unit 110 come into contact with the buffer unit 150 so that the tertiary horizontal strain absorption can occur in the buffer unit 150 .

다음으로는 완충부(150) 상면과 상판(130)의 상면과 일치하도록 어프로치 슬래브를 시공하여 완성시키게 된다.Next, the approach slab is constructed so that the upper surface of the buffer unit 150 and the upper surface of the upper plate 130 coincide with each other to complete the construction.

이로서, 교량구조물의 교대부에 작용하는 수평변형은 1차적으로 교대부(110) 연결면에 형성되는 연결면 힌지부(160a) 및 2차적으로 교대부 상면과 거더 저면의 상면 힌지부(160b)에 의하여 흡수되도록 하고, 지진등에 의한 과도한 수평변형은 3차적으로 완충부(150)에 의하여 흡수되도록 함으로서, 교대부(110)의 슬림화를 통하 최적화 시공이 가능하게 된다.As a result, the horizontal deformation acting on the abutment portion of the bridge structure is primarily the connection surface hinge portion 160a formed on the connection surface of the abutment portion 110 and secondarily the upper surface hinge portion 160b of the upper surface of the abutment portion and the lower surface of the girder , and excessive horizontal deformation caused by an earthquake is thirdly absorbed by the buffer unit 150, so that optimization construction is possible through the slimming of the shift unit 110.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustrative purposes, and those skilled in the art can understand that it can be easily modified into other specific forms without changing the technical spirit or essential features of the present invention. will be. Therefore, the embodiments described above should be understood as illustrative in all respects and not limiting. For example, each component described as a single type may be implemented in a distributed manner, and similarly, components described as distributed may be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the following claims rather than the detailed description above, and all changes or modifications derived from the meaning and scope of the claims and equivalent concepts should be interpreted as being included in the scope of the present invention. do.

100: 교량접속부
110: 교대부 111: 교대부 세그먼트
120: 거더 130: 상판
140: 뒤채움 150: 완충부
160: 힌지부
160a: 연결면 힌지부 160b: 상면 힌지부
161: 전단홈 162: 전단키
163: 충격흡수재 164: 스플라이스슬리브
165: 스플라이스
A: 완충부의 배면 B: 교대부의 배면
D: 거더의 단부면
100: bridge connection
110 shift part 111 shift part segment
120: girder 130: top plate
140: backfill 150: buffer
160: hinge part
160a: connection surface hinge portion 160b: upper surface hinge portion
161: shear groove 162: shear key
163: shock absorber 164: splice sleeve
165: splice
A: the back of the buffer part B: the back of the shifting part
D: end face of girder

Claims (13)

뒤채움(140)을 선시공하고, 교대부(110)를 후시공하는 수평토압 저감형 프리캐스트 교량접속부(100)에 있어서,
선시공된 뒤채움(140);
상기 뒤채움으로부터 이격되어 프리캐스트 방식으로 교대부 세그먼트(111)를 1단씩 적층 시공하여 형성시킨 교대부(110); 및
상기 교대부 세그먼트(111)로 적층시키면서, 각각의 교대부 세그먼트(111) 배면에 함께 적층 시공시킨 완충부(150);를 포함하여,
교대부를 프리캐스트 방식으로 적층 시공하면서 완충부도 함께 단계적으로 교대부 배면에 후시공 가능하도록 하며,
상기 교대부 세그먼트(111)의 연결면에는 연결면 힌지부(160a)가 형성되어,각각의 교대부 세그먼트(111)도 상,하 연결로 인한 일체성을 확보하면서, 상기 교대부(110)에 작용하는 수평토압을 흡수하여 1차적으로 저감되도록 하되,
상기 연결면 힌지부(160a)는, 교대부 세그먼트(111)의 연결면에 형성된 전단홈(161)에 하부가 매립되도록 형성되며 연결되는 교대부 세그먼트(111) 저면에 노출되도록 형성된 스플라이스슬리브(164)에 삽입되는 스플라이스(165)를 포함하여, 상,하로 연결된 교대부 세그먼트(111)는 단계적으로 적층되는 완충부(150)에 의한 수평토압에 의한 수평변위를 흡수하면서 적층시공이 가능하게 되며, 교대부에 작용하는 수평토압을 연결면 힌지부(160a)에 의하여 흡수하여 1차적으로 저감되도록 하는 수평토압 저감형 프리캐스트 교량접속부.
In the horizontal earth pressure reducing type precast bridge connection part 100 in which the backfill 140 is pre-constructed and the alternating part 110 is post-constructed,
pre-installed backfill (140);
an abutment portion 110 formed by stacking the abutment portion segments 111 one-by-one in a precast manner away from the backfilling; and
A buffer unit 150 stacked together on the rear surface of each alternating segment 111 while being laminated with the alternating segment 111; including,
While the abutment part is laminated in the precast method, the buffer part can also be post-constructed on the back of the abutment part in stages,
A connecting surface hinge portion 160a is formed on the connecting surface of the alternating portion segment 111, so that each of the alternating portion segments 111 also secures integrity due to the upper and lower connection, and the alternating portion 110 Absorb the acting horizontal earth pressure and reduce it primarily,
The connecting surface hinge portion 160a is formed so that the lower part is buried in the shear groove 161 formed on the connecting surface of the alternating portion segment 111 and is formed to be exposed to the bottom surface of the connected alternating portion segment 111. Splice sleeve ( 164), the abutment segment 111 connected up and down, including the splice 165, absorbs the horizontal displacement caused by the horizontal earth pressure caused by the buffer part 150, which is stacked in stages, enabling stacking construction. A horizontal earth pressure reducing type precast bridge connection part that absorbs the horizontal earth pressure acting on the abutment part by the connecting surface hinge part 160a and reduces it primarily.
삭제delete 삭제delete 제1항에 있어서,
상기 교대부 상면과 거더(120)의 단부 저면에 상면 힌지부(160b)가 더 형성되어,
거더(120)가 시공된 교대부(110)에 작용하는 수평변형을 2차적으로 흡수하여 교량받침을 대체하는 역할을 하는 수평토압 저감형 프리캐스트 교량접속부.
According to claim 1,
An upper surface hinge portion 160b is further formed on the upper surface of the alternating portion and the lower surface of the end of the girder 120,
A horizontal earth pressure reducing type precast bridge connection that serves to replace the bridge support by secondarily absorbing the horizontal deformation acting on the abutment 110 on which the girder 120 is constructed.
제4항에 있어서,
상기 상면 힌지부(160b)는,
교대부(110) 상면에 형성된 전단홈(161)에 하부가 매립되도록 형성되며 연결되는 거더(120) 저면에 노출되도록 형성된 스플라이스슬리브(164)에 삽입되는 스플라이스(165)를 포함하여,
상기 교대부 상면과 거더(120)의 단부 저면에 상면 힌지부(160b)에 의하여 교대부(110)에 작용하는 수평토압을 흡수하여 1차적으로 저감되도록 함과 더불어, 거더(120)가 시공된 교대부(110)에 작용하는 수평변형을 2차적으로 흡수하여 교량받침을 대체하는 역할을 하는 수평토압 저감형 프리캐스트 교량접속부.
According to claim 4,
The upper surface hinge portion 160b,
Including the splice 165 inserted into the splice sleeve 164 formed so that the lower part is buried in the shear groove 161 formed on the upper surface of the alternating part 110 and exposed to the bottom surface of the connected girder 120,
In addition to absorbing and primarily reducing the horizontal earth pressure acting on the abutment portion 110 by the upper surface hinge portion 160b on the upper surface of the abutment portion and the bottom surface of the end of the girder 120, the girder 120 is constructed A horizontal earth pressure reducing type precast bridge connection that serves to replace the bridge support by secondarily absorbing the horizontal deformation acting on the abutment 110.
제5항에 있어서,
상기 완충부(150)는,
거더(120)와 교대부(110) 및 교대부 세그먼트(111)의 연결면에 형성된 연결 면 힌지부(160a)와 상면 힌지부(160b)에 의하여 1차 및 2차적으로 흡수된 수평변형을 3차적으로 더 흡수하는 역할을 하는 수평토압 저감형 프리캐스트 교량접속부.
According to claim 5,
The buffer part 150,
The horizontal strain absorbed primarily and secondarily by the connection surface hinge portion 160a and the upper surface hinge portion 160b formed on the connection surfaces of the girder 120, the abutment portion 110, and the abutment portion segment 111 is 3 Horizontal earth pressure reducing type precast bridge connection that acts as a differential absorber.
제1항에 있어서,
상기 전단홈(161)에 전단키(162)가 하방으로 삽입되어 맞물려지면서 탄성패드를 포함하는 충격흡수재(163)가 더 형성되도록 하여 수평변형의 제어 및 흡수가 가능하도록 하는 수평토압 저감형 프리캐스트 교량접속부.
According to claim 1,
The shear key 162 is inserted downward into the shear groove 161 and engaged so that a shock absorber 163 including an elastic pad is further formed to control and absorb horizontal deformation. A horizontal earth pressure reducing type precast bridge junction.
제1항에 있어서,
상기 스플라이스슬리브(164)는,
전단홈(161) 저면에 수직으로 상방 연장된 스플라이스의 두부가 삽입되는 슬리브를 거더 단부의 전단키(162) 저면에 매입시키고, 상기 슬리브에 스플라이스가 삽입되도록 하는 수평토압 저감형 프리캐스트 교량접속부.
According to claim 1,
The splice sleeve 164,
A horizontal earth pressure reducing type precast bridge connection in which a sleeve into which the head of a splice extending vertically upward is inserted into the bottom surface of the shear groove 161 is embedded in the bottom surface of the shear key 162 at the end of the girder, and the splice is inserted into the sleeve .
제4항에 있어서,
상기 교대부(110)는 교량구조물의 하부구조로서 콘크리트로 시공되는 벽체구조물로 시공되며,
상기 거더(120)는 교량구조물의 상부구조로서 콘크리트로 시공된 것으로서 양 교대부(110) 상면에 단부가 지지되도록 거치시켜 시공되며, 수평으로 연장된 휨 부재로서 작용하며,
상기 완충부(150)는, 수평력 및 하중에 의하여 변형이 가능하도록 시멘트를 사용하지 않는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하지 않고, 교량구조물의 신축을 흡수하도록 하는 수평토압 저감형 프리캐스트 교량접속부.
According to claim 4,
The shift part 110 is constructed as a wall structure constructed of concrete as a lower structure of a bridge structure,
The girder 120 is constructed of concrete as an upper structure of the bridge structure, and is constructed by supporting the ends on the upper surfaces of both abutments 110, and acts as a horizontally extended bending member,
The buffer unit 150 uses soil or gravel that does not use cement so that it can be deformed by horizontal force and load, so that the constituent particles are bound to each other and do not act as a rigid body, and absorb the expansion and contraction of the bridge structure. Earth pressure reduction type precast bridge connection.
(a) 뒤채움(140)을 선시공하는 단계;
(b) 상기 뒤채움(140)으로부터 이격되어 프리캐스트 방식으로 교대부 세그먼트(111)를 1단씩 적층 시공하여 교대부(110)를 형성시키는 단계;
(c) 상기 교대부 세그먼트(111)로 적층시키면서, 각각의 교대부 세그먼트(111) 배면에 함께 완충부(150)를 적층 시공시키는 단계; 및
(d) 거더(120) 상면에 교량구조물의 슬래브를 포함하는 상판(130)을 일체로 형성시키는 단계;를 포함하여,
교대부를 프리캐스트 방식으로 적층 시공하면서 완충부도 함께 단계적으로 교대부 배면에 후시공할 수 있도록 하며,
상기 (b) 단계의 교대부 세그먼트(111)의 연결면에는 연결면 힌지부(160a)가 더 형성되어, 각각의 교대부 세그먼트(111)도 상,하 연결로 인한 일체성을 확보하면서, 상기 교대부(110)에 작용하는 수평토압을 흡수하여 1차적으로 저감되도록 하며, 상기 연결면 힌지부(160a)는, 교대부 세그먼트(111)의 연결면에 형성된 전단홈(161)에 하부가 매립되도록 형성되며 연결되는 교대부 세그먼트(111) 저면에 노출되도록 형성된 스플라이스슬리브(164)에 삽입되는 스플라이스(165)를 포함하여, 상,하로 연결된 교대부 세그먼트(111)는 단계적으로 적층되는 완충부(150)에 의한 수평토압에 의한 수평변위를 흡수하면서 적층시공이 가능하게 되며, 교대부에 작용하는 수평토압을 연결면 힌지부(160a)에 의하여 흡수하여 1차적으로 저감되도록 하되,
상기 (b) 단계의 상기 교대부 상면과 거더(120)의 단부 저면에 상면 힌지부(160b)가 더 형성되어, 거더(120)가 시공된 교대부(110)에 작용하는 수평변형을 2차적으로 흡수하여 교량받침을 대체하는 역할을 하며, 상기 상면 힌지부(160b)는, 교대부(110) 상면에 형성된 전단홈(161)에 하부가 매립되도록 형성되며 연결되는 거더(120) 저면에 노출되도록 형성된 스플라이스슬리브(164)에 삽입되는 스플라이스(165)를 포함하여, 상기 교대부 상면과 거더(120)의 단부 저면에 상면 힌지부(160b)에 의하여 교대부(110)에 작용하는 수평토압을 흡수하여 1차적으로 저감되도록 함과 더불어, 거더(120)가 시공된 교대부(110)에 작용하는 수평변형을 2차적으로 흡수하여 교량받침을 대체하는 역할을 하는
수평토압 저감형 프리캐스트 교량접속부 시공방법.
(a) pre-constructing the backfill 140;
(b) forming the abutment portion 110 by laminating the abutment portion segments 111 step by step in a precast manner away from the backfill 140;
(c) stacking and constructing the shock absorber 150 together on the back surface of each of the abutment segments 111 while stacking the abutment segments 111; and
(d) integrally forming the upper plate 130 including the slab of the bridge structure on the upper surface of the girder 120; including,
While the abutment part is laminated in the precast method, the buffer part can also be post-constructed on the back of the abutment part step by step.
A connecting surface hinge portion 160a is further formed on the connecting surface of the alternating segment 111 in step (b), so that each alternating segment 111 also secures integrity due to the upper and lower connection, Absorbs the horizontal earth pressure acting on the abutment portion 110 to reduce it primarily, and the lower portion of the connecting surface hinge portion 160a is buried in the shear groove 161 formed on the connecting surface of the abutment segment 111 The abutment segments 111 connected up and down, including the splice 165 inserted into the splice sleeve 164 formed to be exposed on the bottom surface of the abutment segment 111 connected thereto, are stacked in stages. Lamination construction is possible while absorbing the horizontal displacement caused by the horizontal earth pressure caused by the part 150, and the horizontal earth pressure acting on the abutment part is absorbed by the connecting surface hinge part 160a so as to be primarily reduced,
An upper surface hinge portion 160b is further formed on the upper surface of the abutment portion and the bottom surface of the end of the girder 120 in step (b), so that the horizontal deformation acting on the abutment portion 110 on which the girder 120 is constructed is secondary The upper surface hinge part 160b is formed so that the lower part is buried in the shear groove 161 formed on the upper surface of the alternating part 110 and exposed to the bottom surface of the connected girder 120 Including the splice 165 inserted into the splice sleeve 164 formed to be horizontal, In addition to absorbing the earth pressure and reducing it primarily, it also serves to replace the bridge support by secondarily absorbing the horizontal deformation acting on the abutment 110 on which the girder 120 is constructed
Horizontal earth pressure reduction type precast bridge connection construction method.
삭제delete 삭제delete 제 10항에 있어서,
상기 (c) 단계의 완충부(150)는,
수평력 및 하중에 의하여 변형이 가능하도록 시멘트를 사용하지 않는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하지 않고, 교량구조물의 신축을 흡수하도록 하여, 거더(120)와 교대부(110) 및 교대부 세그먼트(111)의 연결면에 형성된 연결면 힌지부(160a)와 상면 힌지부(160b)에 의하여 1차 및 2차적으로 흡수된 수평변형을 3차적으로 더 흡수하는 역할을 하는 수평토압 저감형 프리캐스트 교량접속부 시공방법.
According to claim 10,
The buffer unit 150 of the step (c),
By using soil or gravel that does not use cement so that it can be deformed by horizontal force and load, the constituent particles are bound to each other so that they do not act as a rigid body and absorb the expansion and contraction of the bridge structure, so that the girder 120 and the abutment ( 110) and the connecting surface hinge portion 160a formed on the connecting surface of the alternating segment 111 and the upper surface hinge portion 160b. Horizontal earth pressure reduction type precast bridge connection construction method.
KR1020210142082A 2021-10-22 2021-10-22 Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof KR102562383B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210142082A KR102562383B1 (en) 2021-10-22 2021-10-22 Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210142082A KR102562383B1 (en) 2021-10-22 2021-10-22 Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof

Publications (2)

Publication Number Publication Date
KR20230058252A KR20230058252A (en) 2023-05-03
KR102562383B1 true KR102562383B1 (en) 2023-08-02

Family

ID=86380630

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210142082A KR102562383B1 (en) 2021-10-22 2021-10-22 Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof

Country Status (1)

Country Link
KR (1) KR102562383B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101512998B1 (en) * 2014-09-25 2015-04-17 주식회사 강동건설엔지니어링 Rahmen Bridge And Contruction Method Thereof
KR101651495B1 (en) 2014-09-15 2016-08-26 박종면 Constructing Method of Non-Bridge Seat Bridge
KR101656069B1 (en) 2015-10-20 2016-09-08 충남대학교산학협력단 Integral Abutment Bridge Having deflection Absorbing Part
KR101761477B1 (en) 2015-07-28 2017-07-27 (주)지승컨설턴트 Construction method of jointless bridge with reinforced earth retaining wall and spread bearing block
KR101888590B1 (en) 2017-04-28 2018-08-14 한국도로공사 Monolithic reinforced-earth abutment and method for constructing the same

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100519234B1 (en) * 2002-11-22 2005-10-06 한국건설기술연구원 joint structure of precast bridge slab and girder and bridge construction method using the same
KR100971004B1 (en) 2008-02-29 2010-07-20 한국철도기술연구원 Retaining Wall with Panels
KR101006900B1 (en) 2008-06-16 2011-01-14 한국철도기술연구원 Construction Method of Fill-Up Structure for Back-Area of Rigid Structure
KR101139058B1 (en) * 2009-07-07 2012-05-14 경희대학교 산학협력단 Precast Segment and Precast Concrete Structure
KR101175098B1 (en) 2011-10-25 2012-08-21 주식회사 한화건설 Fill-up structure for back-area of rigid wall structure and construction method of the same
KR101341506B1 (en) * 2012-02-13 2013-12-20 충남대학교산학협력단 Semi-Integral Abutment Allowing Rotational Displacement
KR101896403B1 (en) 2016-08-16 2018-09-07 한국토지주택공사 Integral bridge structure and construction method thereof
KR20190006671A (en) * 2017-07-11 2019-01-21 한국철도기술연구원 Structural continuation method of reinforcing concrete structure and earth transitional zone
KR20210007420A (en) * 2019-07-11 2021-01-20 한국철도기술연구원 Intergrated structure transitional zone using damping section and constructing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101651495B1 (en) 2014-09-15 2016-08-26 박종면 Constructing Method of Non-Bridge Seat Bridge
KR101512998B1 (en) * 2014-09-25 2015-04-17 주식회사 강동건설엔지니어링 Rahmen Bridge And Contruction Method Thereof
KR101761477B1 (en) 2015-07-28 2017-07-27 (주)지승컨설턴트 Construction method of jointless bridge with reinforced earth retaining wall and spread bearing block
KR101656069B1 (en) 2015-10-20 2016-09-08 충남대학교산학협력단 Integral Abutment Bridge Having deflection Absorbing Part
KR101888590B1 (en) 2017-04-28 2018-08-14 한국도로공사 Monolithic reinforced-earth abutment and method for constructing the same

Also Published As

Publication number Publication date
KR20230058252A (en) 2023-05-03

Similar Documents

Publication Publication Date Title
KR101006900B1 (en) Construction Method of Fill-Up Structure for Back-Area of Rigid Structure
KR100972884B1 (en) Construction method of semi-integral abutment bridge using steel box girder
KR100971004B1 (en) Retaining Wall with Panels
KR100743832B1 (en) Bridge construction method using preflex girder and integral abutment
JP2007321452A (en) Construction method for bridge and bridge structure thereof
KR101364805B1 (en) Underground structure construction method with unit wall block
KR101216511B1 (en) Method for constructing a abutment of integral abutment bridge
KR20140132144A (en) Slab track structure for railway with lattice approach block, and construction method for the same
KR100971200B1 (en) Precast box structure construction method using steel connection member
KR102369701B1 (en) Transitional zone available deformation absorption and subsidence reduction and constructing method therefor
KR101653606B1 (en) Method for constructing integral abutment bridge
KR20150132945A (en) Constructing Method of Fill-up Groung
KR102562383B1 (en) Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof
KR101198286B1 (en) Non-wale strut system for top-down construction and top-down construction method thereby
KR20210007420A (en) Intergrated structure transitional zone using damping section and constructing method thereof
KR101017127B1 (en) Connecting Structure between Foundation and Pier, and Construction Method thereof
KR102377895B1 (en) Hinge-type abutment embankment transition for monent reduction and and constructing method thereof
KR100555433B1 (en) Structure of Integral Abutment with Concrete Filled Composite Pile for Jointless Bridge and Its Construction Method
JP5915074B2 (en) How to form an underground space under a ground transportation
CN215165799U (en) Reinforced retaining wall
KR20090046309A (en) Reinforced retaining wall and construction method thereof
JP6536895B2 (en) Concrete wall structure and construction method for reinforced embankment integrated bridge
KR102562385B1 (en) Protrusive transitional zone available deformation absorption and subsidence reduction and constructing method therefor
KR102027480B1 (en) Construction method for the rahmen bridge using facing of geosynthetics reinforced soil retaining wall
KR101341147B1 (en) Structure of integrated pavement on road-bridge and the method