KR102509161B1 - Method For Constructing Rail Track Of Tram - Google Patents
Method For Constructing Rail Track Of Tram Download PDFInfo
- Publication number
- KR102509161B1 KR102509161B1 KR1020210093448A KR20210093448A KR102509161B1 KR 102509161 B1 KR102509161 B1 KR 102509161B1 KR 1020210093448 A KR1020210093448 A KR 1020210093448A KR 20210093448 A KR20210093448 A KR 20210093448A KR 102509161 B1 KR102509161 B1 KR 102509161B1
- Authority
- KR
- South Korea
- Prior art keywords
- rail
- reinforcing bar
- assembly
- installing
- bar assembly
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
- E01B25/28—Rail tracks for guiding vehicles when running on road or similar surface
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B5/00—Rails; Guard rails; Distance-keeping means for them
- E01B5/02—Rails
- E01B5/08—Composite rails; Compound rails with dismountable or non-dismountable parts
- E01B5/10—Composite grooved rails; Inserts for grooved rails
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/62—Rail fastenings incorporating resilient supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/02—Wheel tracks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
본 발명은 경제적이며 신속한 시공을 가능하게 하는 노면트램용 레일의 설치방법에 관한 것이다. 그의 구성은, 레일이 설치되는 지반을 구축하는 단계; 구축된 지반 위에 콘크리트를 타설하여 바닥판을 설치하는 단계; 사전 제작된 철근조립체를 상기 바닥판 위에 안착시키는 단계; 사전 제작된 레일조립체를 상기 철근조립체를 이용하여 정확한 위치에 세팅 및 고정하는 단계; 상기 바닥판 좌우측에 측벽 거푸집을 설치하고 상기 거푸집 내부에 콘크리트를 타설하여 콘크리트 도상을 설치하는 단계를 포함하되;상기 레일조립체는 공장에서 별도 제작되는 것으로서, 레일; 상기 레일의 좌우측에 고정되는 레일고정블록; 상기 레일고정블록의 좌우 외측에 고정 설치되는 것으로서 상기 철근조립체에 고정되는 레일설치판;을 포함하는 것을 특징으로 한다. The present invention relates to a method for installing rails for road trams that enable economical and rapid construction. Its configuration comprises the steps of building the ground on which the rails are installed; Installing a floor plate by pouring concrete on the built ground; Seating a prefabricated reinforcing bar assembly on the floor plate; Setting and fixing a prefabricated rail assembly to an accurate position using the reinforcing bar assembly; Installing a side wall formwork on the left and right sides of the floor plate and installing a concrete roadbed by pouring concrete inside the formwork; Rail fixing blocks fixed to the left and right sides of the rail; It is fixedly installed on the left and right outer sides of the rail fixing block and is fixed to the reinforcing bar assembly; characterized in that it comprises a.
Description
본 발명은 노면트램에 관한 것으로서, 보다 구체적으로는 경제적이며 신속한 시공을 가능하게 하는 노면트램용 레일의 설치방법에 관한 것이다. The present invention relates to a road tram, and more particularly, to a method of installing a rail for a road tram enabling economical and rapid construction.
경량전철에 속하는 노면트램은 도심용 대량교통수단으로서 과거에 널리 사용되었었으나 자동차의 발달로 인하여 많은 도시에서 운행이 중단되었다. 그러나 최근 노면트램에 관련된 기술의 발달, 도심의 과밀화에 따른 극심한 교통체증 및 환경의 문제로 인하여 여러 도시에서 다시금 설치되는 분위기에 있다.Street trams, which belong to the light rail system, were widely used in the past as mass transportation means for urban areas, but have been discontinued in many cities due to the development of automobiles. However, due to the recent development of technology related to street trams, extreme traffic congestion due to overcrowding in the city center, and environmental problems, many cities are in the mood to install them again.
노면트램은 중량전철인 지하철에 비하여 수송량은 다소 뒤지지만 버스보다는 많고, 건설비가 지하철에 비하여 상당히 적게 소요되고, 또한 운행시 대기오염과 소음공해가 발생하지 않아 도심 대중교통 수단으로 인정된다. Street trams are slightly behind the subway, which is a heavy train, in terms of transport volume, but are more than buses, require significantly less construction cost than subways, and do not cause air pollution and noise pollution during operation, so they are recognized as a means of public transportation in the city center.
노면트램의 궤도는 일반철도나 중량전철인 지하철과 상당히 다른 구조로 건설되는데, 통상적으로 지상에 설치되어 자동차와 보행자가 함께 다니는데 불편을 초래하지 않도록 레일이 지면 위로 돌출되지 않게끔 매립형으로 되어 있다.The track of a street tram is constructed in a structure quite different from that of a regular railway or a heavy subway, and is usually installed on the ground so that the rail does not protrude above the ground so as not to cause inconvenience to cars and pedestrians traveling together.
통상의 철도궤도는 지면에 자갈을 다지거나 버림 콘크리트를 타설하여 형성한 노반에 일정한 간격으로 침목을 설치하고, 침목의 양단에 레일을 2줄로 설치하여 시공된다. 이와 같은 철도궤도에서 레일은 통상적으로 단면이 I-자 형상인 I-자형 강철 레일이 주로 사용되나, 노면트램용 레일은 I-자형 레일을 사용하기도 하지만, 바퀴홈이 형성된 머리부, 침목에 고정되는 바닥부, 그리고 머리부와 바닥부를 연결하는 수직부로 구성된 그루브(Grooved)형 레일을 사용하고, 레일의 상면이 지면과 일치하도록 지중에 매설하여, 노면트램의 차량 바퀴가 레일의 바퀴홈에 삽입되어 레일 위를 주행할 수 있게끔 시공된다.A normal railroad track is constructed by installing sleepers at regular intervals on a roadbed formed by compacting gravel or pouring concrete on the ground, and installing two lines of rails at both ends of the sleepers. Rails in such railroad tracks are usually I-shaped steel rails with an I-shaped cross section, but I-shaped rails are sometimes used for road tram rails, but are fixed to the head with wheel grooves and sleepers. A grooved rail composed of a bottom part and a vertical part connecting the head part and the bottom part is used, and the upper surface of the rail is buried in the ground to match the ground, so that the vehicle wheels of the road tram are inserted into the wheel grooves of the rail It is built so that it can run on rails.
이와 같은 통상의 노면트램에 사용되는 레일은 트램 차량의 모든 하중을 레일이 직접 지지하여야 하는바, 재료가 많이 소요되고, 별도의 침목 또는 궤도슬래브를 구비하여야 하고, 부식에 의하여 레일의 강도가 저하되고, 일반 철도궤도에 준하여 시공하여야 하므로 시공이 어려운 등 많은 문제점이 있다. The rail used in such a normal road tram must directly support all the loads of the tram vehicle, so a lot of material is required, a separate sleeper or track slab must be provided, and the strength of the rail is reduced due to corrosion. And since it must be constructed in accordance with the general railroad track, there are many problems such as difficulty in construction.
종래의 노면트램의 궤도구조는 일반 철도궤도와 유사한 구조로 시공되는데, 근래는 매립식 궤도구조가 많이 설치되고 있다. The track structure of a conventional road tram is constructed in a structure similar to a general railroad track, but recently, a lot of buried track structures have been installed.
등록특허 10-0948279호 레일조정장치를 구비한 매립식 철도궤도 구조는 철도궤도의 레일을 침목으로 단속적으로 궤도슬래브에 지지하는 대신, 궤도슬래브에 레일이 설치될 홈통을 형성하여 레일을 매립하여 설치하는 매립식 철도궤도 구조를 제시하고 있다. Registered Patent No. 10-0948279 The buried railroad track structure equipped with a rail adjustment device is installed by burying the rail by forming a gutter in which the rail will be installed on the track slab instead of intermittently supporting the rail of the railroad track with sleepers on the track slab. A buried railroad track structure is proposed.
대한민국 특허등록 제10-1132952호, 제10-1678589호 역시 각각의 목적에 따른 노면트램의 구조를 제시하고 있다. Korean Patent Registration Nos. 10-1132952 and 10-1678589 also suggest the structure of a street tram according to each purpose.
한편 노면트램은 사용횟수나 기간에 따라 사용수명을 갖고 있다. 사용수명을 넘어서 사용할 경우에 구조 및 안전이 위협받을 수 있다. 그래서 사용 연한이 다할 경우에 새로운 것으로 교체를 해주어야 한다. On the other hand, the surface tram has a useful life depending on the number of times or period of use. Structure and safety may be threatened if used beyond the service life. Therefore, when the service life is over, it must be replaced with a new one.
노면트램의 레일은 매립식 구조로 되어 있다. 즉 레일은 레일홈통의 바닥에 깔린 레일패드 위에 얹혀 있고, 레일홈통과 레일 사이의 공간은 우레탄과 같은 탄성체로 채워져 있는 구조로 되어 있다. 탄성체는 레일로부터 노면으로 전달되는 진동과 소음을 저감시키는 작용을 한다. The rail of the street tram has a buried structure. That is, the rail is placed on a rail pad on the bottom of the rail gutter, and the space between the rail gutter and the rail is filled with an elastic material such as urethane. The elastic body acts to reduce vibration and noise transmitted from the rail to the road surface.
교체시기가 되면 레일은 레일홈통에서 분리하여 빼내는 작업을 통해 철거된다. 그리고 이 철거과정에서 레일을 감싸고 있던 탄성체는 손상되어 쓸모가 없어져 버려지게 된다. 특히 레일홈통의 측벽에 밀착되어 있던 탄성체의 가장자리 부분이 레일을 교체 설치할 때 심하게 손상된다. 결국 새로운 레일을 재차 설치하고자 할 때는 새로운 탄성체를 사용해야 했으며 이는 경제적으로 큰 낭비가 아닐 수 없다. When it is time to replace the rail, the rail is removed by separating it from the rail gutter and pulling it out. And in this process of demolition, the elastic body that was wrapped around the rail is damaged and becomes useless and discarded. In particular, the edge of the elastic body that was in close contact with the side wall of the rail gutter is severely damaged when the rail is replaced. In the end, when a new rail was to be installed again, a new elastic body had to be used, which was a huge waste of money.
레일을 새로 설치하거나 재설치하는 현장이 번화한 도심지에 위치하는 경우에는 작업시간 등에 제한이 많이 따른다. 그러므로 트램레일의 시공에 있어서 빠른 시공은 매우 중요한 요소가 되며, 지속적인 연구가 필요한 상황이다. If the site where the rail is newly installed or re-installed is located in a bustling downtown area, there are many restrictions on working hours. Therefore, rapid construction is a very important factor in the construction of tram rails, and continuous research is required.
위와 같은 문제에 대하여 본 발명의 목적은, 노면트램의 레일을 신속하고 경제적으로 설치할 수 있게 하는 시공방법 내지 이 방법에 의해 설치되는 노면트램 레일의 설치구조를 제공하는 것을 목적으로 한다. 좀 더 구체적으로는 사전에 별도의 현장에서 구성품을 사전 제작한 다음, 궤도의 시공현장으로 운반하여 바로 시공에 투입함으로써 공기를 크게 줄일 수 있게 하는 방법을 제공하는 것을 목적으로 한다. In relation to the above problems, an object of the present invention is to provide a construction method or an installation structure of a road tram rail installed by the method that enables the rail of a road tram to be installed quickly and economically. More specifically, an object of the present invention is to provide a method that significantly reduces the construction period by prefabricating components at a separate site in advance and then transporting them to the construction site of the track and immediately putting them into construction.
위와 같은 목적은, The above purpose is
레일이 설치되는 지반을 구축하는 단계; 구축된 지반 위에 콘크리트를 타설하여 바닥판을 설치하는 단계; Building the ground on which the rails are installed; Installing a floor plate by pouring concrete on the built ground;
사전 제작된 철근조립체를 상기 바닥판 위에 안착시키는 단계;Seating a pre-fabricated rebar assembly on the floor plate;
사전 제작된 레일조립체를 상기 철근조립체를 이용하여 정확한 위치에 세팅 및 고정하는 단계;Setting and fixing a prefabricated rail assembly to an accurate position using the reinforcing bar assembly;
상기 바닥판 좌우측에 측벽 거푸집을 설치하고 상기 거푸집 내부에 콘크리트를 타설하여 콘크리트 도상을 설치하는 단계를 포함하되;Installing side wall formwork on the left and right sides of the floor plate and pouring concrete into the formwork to install a concrete ballast;
상기 레일조립체는 공장에서 별도 제작되는 것으로서, The rail assembly is manufactured separately at the factory,
레일; 상기 레일의 좌우측에 고정되는 레일고정블록; 상기 레일고정블록의 좌우 외측에 고정 설치되는 것으로서 상기 철근조립체에 고정되는 레일설치판;을 포함하는 것을 특징으로 하는 노면트램용 레일의 설치방법에 의해 달성된다. rail; Rail fixing blocks fixed to the left and right sides of the rail; It is achieved by a rail installation method for a road tram, characterized in that it includes; a rail mounting plate fixed to the left and right outer sides of the rail fixing block and fixed to the reinforcing bar assembly.
본 발명의 다른 특징에 의하면, 상기 콘크리트도상에 박혀 앵커링 역할을 하도록 상기 레일설치판의 외측에 앵커핀이 더 설치될 수 있다. According to another feature of the present invention, an anchor pin may be further installed on the outside of the rail mounting plate to serve as an anchoring by being embedded in the concrete ballast.
본 발명의 다른 특징에 의하면, 상기 철근조립체의 길이방향을 따라 전체 구간에 걸쳐 상부 좌우측에는 상기 레일을 안착시키는 자리가 되는 레일안착부가 홈형태로 마련될 수 있다. According to another feature of the present invention, the rail seating portion serving as a seat for seating the rail may be provided in the form of a groove on the left and right sides of the upper portion over the entire section along the longitudinal direction of the reinforcing bar assembly.
본 발명의 또 다른 특징에 의하면, 상기 레일조립체에는 상기 레일의 바닥에 깔리는 레일패드와, 상기 레일의 좌우측에 공간을 채우는 댐퍼가 더 포함되며; 상기 댐퍼는 중공파이프 또는 발포체일 수 있다. According to another feature of the present invention, the rail assembly further includes a rail pad laid on the bottom of the rail and a damper filling a space on the left and right sides of the rail; The damper may be a hollow pipe or foam.
본 발명의 또 다른 특징에 의하면, 상기 레일패드, 레일의 하부 및 댐퍼를 에워싸서 한 몸체가 되도록 하기 위한 커버밴드가 더 포함될 수 있다. According to another feature of the present invention, a cover band may be further included to surround the rail pad, the lower portion of the rail, and the damper to form one body.
본 발명에 따르면, 철근조립체 및 레일조립체를 사전에 현장 밖에 있는 공장에서 제작한 다음 레일 시공현장으로 옮긴 다음 바로 설치할 수 있게 됨으로써 기존의 현장 설치공법에 비하여 공기를 40 ~ 50% 단축시킬 수 있게 하는 노면트램용 레일의 설치방법이 제공된다. 따라서 도심지에 노면트램을 새로 설치하거나 또는 재설치하는 부담이 크게 줄어들게 된다. According to the present invention, the reinforcing bar assembly and rail assembly can be manufactured in advance in a factory outside the site and then moved to the rail construction site and then installed immediately, thereby reducing the construction period by 40 to 50% compared to the existing on-site installation method A method of installing a rail for a road tram is provided. Therefore, the burden of newly installing or reinstalling a road tram in the downtown area is greatly reduced.
도 1은 본 발명의 실시예에 의한 노면트램용 레일의 설치상태의 단면 구성도이다.
도 2는 본 발명의 실시예에 의한 노면트램용 레일에 있어서 레일조립체의 사시도이다.
도 3은 본 발명의 실시예에 의한 노면트램용 레일에 있어서 레일조립체의 단면도이다.
도 4(a)(b)(c)(d)(e)는 본 발명의 실시예에 의한 노면트램용 레일의 시공하는 과정을 단계적으로 표시한 단면도이다.
도 5는 본 발명의 실시예에 의한 노면트램용 레일에 있어서 레일조립체의 측면도이다. 1 is a cross-sectional configuration diagram of an installation state of a rail for a road tram according to an embodiment of the present invention.
2 is a perspective view of a rail assembly in a rail for a road tram according to an embodiment of the present invention.
3 is a cross-sectional view of a rail assembly in a rail for a road tram according to an embodiment of the present invention.
Figure 4 (a) (b) (c) (d) (e) is a cross-sectional view showing the step-by-step construction process of the rail for the road tram according to an embodiment of the present invention.
5 is a side view of a rail assembly in a rail for a road tram according to an embodiment of the present invention.
이하, 첨부된 도면을 참조하여 본 발명의 구체적인 내용을 상세하게 설명한다. 도 1 내지 도 2를 기본적으로 참조하여 일실시예를 설명하되, 필요한 곳에서 나머지 도면을 참조하여 설명한다. Hereinafter, specific details of the present invention will be described in detail with reference to the accompanying drawings. An embodiment will be described with reference to FIGS. 1 and 2 basically, but will be described with reference to the remaining drawings where necessary.
본 발명에 의한 노면트램은 통상적으로 도심의 노면 상에 설치되는 것이다. The street tram according to the present invention is usually installed on the road surface in the city center.
노면트램의 레일은 일반 차량의 통행에 불편함이 없도록 노면과 같은 높이에 설치된다. 레일을 먼저 설치한 다음 그위 주변에 도로포장을 할 수도 있고, 레일을 설치하기 위해 도로를 일정한 깊이로 판 다음 여기에 레일을 설치할 수도 있다. 이 가운데 어느 방법이나 본 발명이 적용될 수 있다. The rail of the road tram is installed at the same height as the road surface so that there is no inconvenience to the passage of general vehicles. After installing the rail first, the road can be paved around it, or the road can be dug to a certain depth to install the rail and then the rail can be installed here. Any of these methods may be applied to the present invention.
먼저 도 1을 참조하여 본 발명에 의한 트램궤도의 구성을 설명한다. First, the configuration of the tram track according to the present invention will be described with reference to FIG.
콘크리트도상(1)에는 좌우 대칭으로 레일홈통(3)이 마련되어 있다. 레일(5)은 이 레일홈통(3) 내부에 설치되어 있다. 도시된 바에 의하면 레일(5)은 상면에 길이방향을 따라 홈이 패여 있는 그루브형(grooved) 레일이다. 그러나 여기에 한정되지 않으며 I형도 가능함은 물론이다. 레일과 레일홈통(3)의 바닥면 사이에는 레일패드(4)가 개입 설치된다. 즉 레일패드(4)는 레일(5)의 바닥에 깔리는 것으로서 보통 수지체로 되어 있다. The rail gutter (3) is provided symmetrically on the concrete ballast (1). The rail (5) is installed inside the rail gutter (3). As shown, the
레일(5)의 좌우측에는 레일고정블록(7,9)이 설치되어 있는데, 이는 레일(5)의 유동을 방지하는 것과 함께 진동과 소음을 저감시키기 위한 것이다.
레일고정블록(7,9)은 기본적으로 폴리우레탄 수지로 되어 있으며, 이종 재질이 복합되어 있을 수도 있다. 도시된 바에 의하면, 레일(5)의 측부 공간에 채워지며, 진동 감쇄작용을 강화하는 동시에 공간을 채우기 위한 댐퍼(11)가 레일고정블럭(7,9) 내부에 인서트(insert)되어 있다. 댐퍼(11)는 폴리우레탄 수지의 사용량을 줄여주는 것으로서 중공 파이프 또는 발포체로 되어 있을 수 있다. The
도 3에 도시된 바와 같이 레일패드(4), 레일(5)의 하부 및 댐퍼(11)를 에워싸서 한 몸체가 되도록 하기 위한 커버밴드(6)가 부가될 수 있다. 커버밴드(6)는 레일고정블록(7,9)을 레일(5)과 일체로 성형할 때 레일패드(4)와 댐퍼(11)가 정위치에 고정되도록 하기 위한 지그 수단이다. 커버밴드(6)는 절곡 형성된 박판일 수 있으며 레일(5)의 길이방향을 따라 군데군데 설치될 수도 있고 레일(5)의 길이 전체에 걸쳐 설치될 수도 있다. As shown in FIG. 3, a
레일고정블록(7,9)의 양측면에는 레일설치판(13)이 레일(5)의 길이방향을 따라 부착되어 있다. On both sides of the rail fixing blocks 7 and 9,
레일설치판(13)의 외부에는 앵커핀(15)이 용접으로 고정되어 있다. 앵커핀(15)은 레일설치판(13)의 길이를 따라 군데군데 설치되어 있으며 이는 콘크리트도상(1)과의 결합력을 높인다. 콘크리트도상(1) 내부에는 철근(17)이 배근되어 있다. An
위와 같은 구성의 트램궤도는 다음과 같은 방법에 의해 시공된다. 본 발명의 실질적인 핵심은 이 시공방법에 있는 것이다. 이하, 도 4를 주로 참조하면서 설명한다. The tram track of the above configuration is constructed by the following method. The practical core of the present invention lies in this construction method. Hereinafter, description is made mainly with reference to FIG. 4 .
레일(5)이 설치되는 지반(19)을 구축하는 단계가 선행된다. 지반(19)은 자갈, 모래 등으로 구성된다. 다져진 지반(19) 위에 일정한 두께로 콘크리트몰탈을 타설하여 바닥판(21)을 설치한다(도 4(a) 참조). The step of building the
도 4(b)에 도시된 바와 같이 사전 제작된 철근조립체(23)를 바닥판(21) 위에 안착시킨다. 철근조립체(23)는 입체적 형태를 가지고 있으며 콘크리트도상(1)에 매립되는 것이다. 도시된 것처럼 철근조립체(23)는 서포트(24)를 이용하여 바닥판(21)에서 소정 높이로 이격된 상태로 고정 설치될 수도 있다. As shown in FIG. 4 (b), the prefabricated reinforcing
철근조립체(23)는 공장에서 사전에 제작되는 것으로서 정확한 규격으로 제작된다. 철근조립체(23)의 중심이 궤도의 중심과 일치하게끔 되어 있다. 철근조립체(23)의 중앙지점은 중앙표시부에 의해 표지될 수 있다. 이 과정에서 먼저 레일의 중앙위치에 센터포스트(26)를 바닥판(21)에 고정시킬 수 있다. 철근조립체(23)를 바닥판(21)의 정확한 위치에 설치하기 용이하도록 하기 위함이다. 철근조립체(23)의 길이방향을 따라 전체 구간에 걸쳐 상부 좌우측에는 레일(5)을 안착시키는 자리가 되는 레일안착부(25)가 마련되어 있다. The reinforcing
이후, 도 4(c)에 도시된 것처럼 사전 제작된 레일조립체(27)를 철근조립체의 레일안착부(25)에 안착 고정시킨다. 이 과정에서 레일을 정확한 위치에 세팅한다. 높이, 경사도, 간격 등을 정확히 세팅하게 된다. Then, as shown in FIG. 4(c), the
레일조립체(27)는 레일(5)과, 레일(5)의 좌우측에 고정되는 레일고정블록(7,9)과, 레일고정블록(7,9)의 외측에 각각 고정 설치되는 레일설치판(13)을 포함한다. 레일(5)을 소정의 거푸집 내에 설치한 상태에서 액상의 폴리우레탄 수지를 거푸집 내에 붓고 경화시킨 다음 거푸집을 제거함으로써 레일고정블록(7,9)과 레일(5)이 일체형을 이루도록 할 수 있는 것이다. 레일설치판(13) 역시 이와 같은 방식으로, 즉 인서트 성형 방식에 의해 레일조립체(27)와 일체를 이루게 된다. The
그리고 레일(5)의 바닥면에는 부가적으로 레일패드(4)가 고정될 수 있다. 전술한 바와 같이 댐퍼(11)와 레일패드(4)가 레일조립체(27)에 포함되도록 커버밴드(6)가 사용될 수 있다. Also, a
레일패드(4)는 레일조립체(27)의 설치시 철근조립체(23)에 먼저 끼워 넣을 수도 있다. The
레일설치판(13)은 강판으로서 철근조립체(23)에 용접으로 고정시키기 위한 것이다. 다만, 레일설치판(13)이 우레탄과 직접 접촉하고 있기 때문에 직접 용접을 가할 경우에는 우레탄이 열화될 수 있다. The
그러므로 본 발명에 의하면 앵커핀(15)을 레일설치판(13)의 외측에 일정 간격으로 설치하고 있다. 즉 앵커핀(15)을 철근조립체(23)에 용접함으로써 레일설치판(13)을 고정하는 것이다. 이에 의해 우레탄으로 되어 있는 레일고정블록(7,9)을 열로부터 보호할 수 있는 것이다. 앵커핀(15)은 콘크리트도상에 박힘으로써 앵커링 역할을 하는 것이다. Therefore, according to the present invention, anchor pins 15 are installed outside the
앵커핀(15)은 철근 또는 막대를 ""와 같은 형태로 절곡한 다음 레일설치판(13)에 용접으로 붙인 것이다. 앵커핀(15)을 철근조립체(23)에 고정하는 과정에서 레일조립체(27)를 철근조립체(23)의 정확한 위치에 세팅 및 고정한다.
이후, 도 4(d)에 도시된 바와 같이 바닥판(21)의 좌우측에 측벽 거푸집(29)을 설치하고 상기 측벽 거푸집(29) 내부에 콘크리트를 타설하여 콘크리트도상(1)을 설치한다. Subsequently, as shown in FIG. 4(d),
그리고 도 4(e)에 도시된 바와 같이 측벽 거푸집(29)이 제거되고 그 자리에 아스팔트 등으로 도로포장(31)을 한다. 물론 전술한 것처럼 도로포장(31)을 일정한 깊이로 굴착한 다음 레일(5)을 설치하는 경우에는 측벽거푸집(29)의 설치 또는 측벽 거푸집(29)의 제거작업이 생략될 수 있다. And, as shown in FIG. 4(e), the
마감단계로서 콘크리트도상(1)의 표면에는 칼라하드너로써 마감도장(코팅)이 가해질 수 있다. As a finishing step, a finish painting (coating) may be applied to the surface of the concrete ballast (1) as a color hardener.
도 5에 도시된 바와 같이 사전 제작되는 레일조립체(27)는 단위길이(L)를 가지고 있다. 그리고 레일(5)과 레일(5)은 용접(W)에 의해 선형적으로 연결된다. As shown in FIG. 5, the
레일(5)의 용접시 수지로 되어 있는 레일고정블록(7,9)이 열화될 수 있다. 따라서 레일고정블록(7,9)은 레일(5)의 좌우 양단에서 일정 구간(B, 예를 들어 350mm)은 제외하고 설치된다. 그리고 이 구간(B)에 해당하는 부분은 레일(5)을 용접(W)으로 연결한 다음 폴리우레탄 수지로써 충전하여 마감한다. When welding the
위에 도시 및 설명된 구성은 본 발명의 기술적 사상에 근거한 바람직한 실시예에 지나지 아니한다. 당업자는 통상의 기술적 상식을 바탕으로 다양한 변경실시를 할 수 있을 것이지만 이는 본 발명의 보호범위에 포함될 수 있음을 주지해야 할 것이다. 위에 개시된 실시예는 다양한 조합이 가능할 것이며, 가능한 모든 조합은 본 발명의 권리범위 내에 있는 것이 된다. The configuration shown and described above is only a preferred embodiment based on the technical idea of the present invention. Those skilled in the art will be able to make various changes based on common technical knowledge, but it should be noted that these may be included in the protection scope of the present invention. Various combinations of the embodiments disclosed above are possible, and all possible combinations are within the scope of the present invention.
1 : 콘크리트도상 3 : 레일홈통
4 : 레일패드 5 : 레일
6 : 커버밴드 7,9 : 레일고정블록
11 : 댐퍼 13 : 레일설치판
15 : 앵커핀 17 : 철근
19 : 지반 21 : 바닥판
23 : 철근조립체 24 : 서포트
25 : 레일안착부 26 : 센터포스트
27 : 레일조립체 29 : 측벽 거푸집
31 : 도로포장 W : 용접부위1: concrete roadway 3: rail gutter
4: rail pad 5: rail
6:
11: damper 13: rail mounting plate
15: anchor pin 17: reinforcing bar
19: ground 21: bottom plate
23: rebar assembly 24: support
25: rail seating part 26: center post
27: rail assembly 29: side wall formwork
31: road pavement W: welding area
Claims (5)
사전 제작된 철근조립체(23)를 상기 바닥판(21) 위에 안착시키는 단계;
사전 제작된 레일조립체(27)를 상기 철근조립체(23)를 이용하여 정확한 위치에 세팅 및 고정하는 단계;
상기 바닥판(21) 좌우측에 측벽 거푸집(29)을 설치하고 상기 측벽 거푸집(29) 내부에 콘크리트를 타설하여 콘크리트도상(1)을 설치하는 단계를 포함하되;
상기 레일조립체(27)는 공장에서 별도 제작되는 것으로서,
레일(5); 상기 레일(5)의 좌우측에 고정되는 레일고정블록(7,9); 상기 레일고정블록(7,9)의 좌우 외측에 고정 설치되는 것으로서 상기 철근조립체(23)에 고정되는 레일설치판(13)을 포함하되;
상기 콘크리트도상(1)에 박혀 앵커링 역할을 하도록 상기 레일설치판(13)의 외측에 앵커핀(15)이 용접에 의해 설치하고;
상기 앵커핀은 상기 철근조립체(23)에 용접으로 고정함으로써;
상기 레일설치판(13)은 상기 앵커핀(15)에 의해 간접적으로 상기 철근조립체(23)에 고정되도록 하며;
상기 앵커핀(15)은 철근 또는 막대를 ""와 같은 형태로 절곡하여 형성하는 것을 특징으로 하는 노면트램용 레일의 설치방법.
Building the ground on which the rail 5 is installed; Installing the floor plate 21 by pouring concrete on the built ground;
Seating a prefabricated reinforcing bar assembly 23 on the bottom plate 21;
Setting and fixing the prefabricated rail assembly 27 to an accurate position using the reinforcing bar assembly 23;
Installing side wall formwork 29 on the left and right sides of the floor plate 21 and pouring concrete into the side wall formwork 29 to install the concrete ballast 1;
The rail assembly 27 is manufactured separately at the factory,
rail (5); Rail fixing blocks (7, 9) fixed to the left and right sides of the rail (5); It includes a rail mounting plate 13 fixed to the reinforcing bar assembly 23 as being fixed to the left and right outer sides of the rail fixing blocks 7 and 9;
An anchor pin 15 is installed on the outside of the rail mounting plate 13 by welding so as to be embedded in the concrete ballast 1 and serve as an anchoring;
By fixing the anchor pin to the reinforcing bar assembly 23 by welding;
The rail mounting plate 13 is indirectly fixed to the reinforcing bar assembly 23 by the anchor pin 15;
The anchor pin 15 is a reinforcing bar or rod " A method of installing a rail for a road tram, characterized in that it is formed by bending in the form of ".
상기 레일고정블록(7,9)은 레일(5)의 좌우 양단에서 일정 구간(B)은 제외하고 설치하며;
상기 구간(B)에 해당하는 부분은 상기 레일(5)을 용접(W)으로 연결한 다음 폴리우레탄 수지로써 충전하여 마감하는 것을 특징으로 하는 노면트램용 레일의 설치방법.
According to claim 1,
The rail fixing blocks 7 and 9 are installed at both left and right ends of the rail 5 except for a certain section (B);
The part corresponding to the section (B) is connected to the rail (5) by welding (W), and then filled with polyurethane resin to finish.
상기 레일조립체(27)에는 상기 레일의 바닥에 깔리는 레일패드(4)와, 상기 레일의 좌우측에 공간을 채우는 댐퍼(11)가 더 포함되며;
상기 댐퍼(11)는 중공파이프 또는 발포체로 하는 것을 특징으로 하는 노면트램용 레일의 설치방법. According to claim 1,
The rail assembly 27 further includes a rail pad 4 laid on the bottom of the rail and a damper 11 filling a space on the left and right sides of the rail;
The damper 11 is a method of installing a rail for a road tram, characterized in that the hollow pipe or foam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020210093448A KR102509161B1 (en) | 2021-07-16 | 2021-07-16 | Method For Constructing Rail Track Of Tram |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020210093448A KR102509161B1 (en) | 2021-07-16 | 2021-07-16 | Method For Constructing Rail Track Of Tram |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20230012770A KR20230012770A (en) | 2023-01-26 |
KR102509161B1 true KR102509161B1 (en) | 2023-03-10 |
Family
ID=85110926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020210093448A KR102509161B1 (en) | 2021-07-16 | 2021-07-16 | Method For Constructing Rail Track Of Tram |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102509161B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102700464B1 (en) * | 2023-11-23 | 2024-08-29 | 한국석유공업 주식회사 | Rail groove filling block for railroad crossing and the construction method thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998051863A1 (en) * | 1997-05-13 | 1998-11-19 | Mecno-Rail S.R.L. | Track superstructure, in particular for tramway, tram-railway and underground railway lines |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101421007B1 (en) * | 2011-03-09 | 2014-07-16 | (주)청도코퍼레이션 | rail embedded type precast concrete slab panel for track |
KR101132952B1 (en) | 2011-08-09 | 2012-04-09 | 주식회사 이알에스 | Composite rail for tramcar and rail track using the rail |
KR20130007077U (en) * | 2012-05-31 | 2013-12-10 | 주식회사 에이브이티 | Assembl reclamation rail structure |
KR101678588B1 (en) * | 2014-11-21 | 2016-11-23 | 빌트원 주식회사 | a Construction method of tramway |
KR101678589B1 (en) | 2014-11-21 | 2016-11-23 | 빌트원 주식회사 | a assembling apparatus for elastomers type tram track skeleton |
-
2021
- 2021-07-16 KR KR1020210093448A patent/KR102509161B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998051863A1 (en) * | 1997-05-13 | 1998-11-19 | Mecno-Rail S.R.L. | Track superstructure, in particular for tramway, tram-railway and underground railway lines |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102700464B1 (en) * | 2023-11-23 | 2024-08-29 | 한국석유공업 주식회사 | Rail groove filling block for railroad crossing and the construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR20230012770A (en) | 2023-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Michas | Slab track systems for high-speed railways. | |
KR101158466B1 (en) | Easily replaceable track block having three dimensions solid shape and method for manufacturing the same, method for laying concrete track and method for laying track of automated guideway type light rail transit using the same track block | |
KR102200955B1 (en) | Road way construction method for mountain railway | |
US8430333B2 (en) | Prefabricated module for the track of a self-guided urban transport vehicle on tyres | |
KR100891961B1 (en) | The construction infrastructure the use road the martial art as a matter of bridge of the bridge which is old in the railroad or the railroad respects the induction event a method of construction which shifts the bridge and the system | |
KR102509161B1 (en) | Method For Constructing Rail Track Of Tram | |
CN105133438A (en) | Embedded frame track plate and track structure comprising same | |
KR102424544B1 (en) | Double Rail Jacket Tram Rail Track System | |
KR101131745B1 (en) | Rail track structure for tramcar | |
KR102435459B1 (en) | Structure And Method For Constructing Track Of Mountain train | |
JP2002227101A (en) | Sleeper-integrated concrete ballast structure for railway line | |
KR101132952B1 (en) | Composite rail for tramcar and rail track using the rail | |
KR20040004819A (en) | Method for changing steel bridge of supporting rail into concreat bridge | |
ES2729949T3 (en) | Slab for a rail vehicle and / or a vehicle on guided tires | |
KR102488418B1 (en) | Apparatus constructing base concrete structure of embedded rail track having groove | |
KR20130009391A (en) | Method for manufacturing concrete block for railway track and method for laying railway track using concrete block manufactured by the same method | |
JP2006502323A (en) | Fixed track for railway transportation and method for manufacturing the same | |
KR100603901B1 (en) | Girder bridge construction make use of a part existing girder and that execution method | |
JP4162291B2 (en) | Railway work girder cradle and rail work girder cradle construction method | |
KR102249391B1 (en) | Method for constructing Precast Concrete Driving Road Block with Rubber Wheel AGT | |
JP4606665B2 (en) | Road construction method | |
NL1007815C2 (en) | Track construction. | |
KR20190124926A (en) | Precast Concrete Driving Road Block with Rubber Wheel AGT and Method for constructing this same | |
KR20120007785U (en) | Precoated Rail with Elastic Layer and Rail Track using the Precoated Rail | |
KR102700464B1 (en) | Rail groove filling block for railroad crossing and the construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |