[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JPS6248011B2 - - Google Patents

Info

Publication number
JPS6248011B2
JPS6248011B2 JP57052313A JP5231382A JPS6248011B2 JP S6248011 B2 JPS6248011 B2 JP S6248011B2 JP 57052313 A JP57052313 A JP 57052313A JP 5231382 A JP5231382 A JP 5231382A JP S6248011 B2 JPS6248011 B2 JP S6248011B2
Authority
JP
Japan
Prior art keywords
plate
casing
shaped iron
concrete
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP57052313A
Other languages
Japanese (ja)
Other versions
JPS58173217A (en
Inventor
Tomoyuki Ueno
Teruo Abe
Masami Ito
Tadashi Kaneko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP5231382A priority Critical patent/JPS58173217A/en
Publication of JPS58173217A publication Critical patent/JPS58173217A/en
Publication of JPS6248011B2 publication Critical patent/JPS6248011B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 本発明は地中連続壁の構築法に関するものであ
り、より具体的には軟弱あるいは超軟弱地盤にお
ける地中連続壁の構築法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a continuous underground wall, and more specifically to a method for constructing a continuous underground wall in soft or extremely soft ground.

従来軟弱あるいは超軟弱地盤についての地中連
続壁の構築法としては、地中壁を構築するための
掘削前に、貧配合ソルトセメント、薬液等を地盤
に注入したり、ウエルポイント、デイーブウエル
等の工法により地下水を排除する等の周辺地盤の
改良を行い、その後に地中連続壁を構築するもの
であつた。このような従来工法にあつては、前記
地盤改良にコストがかかり、その後の掘削に際し
ても高価な泥水を使用しなければならず、さらに
このようにして構築された連続壁の表面は、周辺
の地盤が軟弱あるいは超軟的なため、表面はザラ
ついたりコブが生じたりする。そのため構築後に
表面を削つたり、打し増したりする必要があり経
済性あるいは工期を短縮する上で問題があつた。
Conventional methods for constructing underground continuous walls on soft or extremely soft ground include injecting poorly blended salt cement, chemical solutions, etc. The construction method involved improving the surrounding ground, including removing groundwater, and then constructing an underground continuous wall. In such conventional construction methods, the ground improvement is costly, expensive muddy water must be used for subsequent excavation, and the surface of the continuous wall constructed in this way is Because the ground is soft or extremely soft, the surface may be rough or lumpy. Therefore, it was necessary to scrape the surface or add additional hammering after construction, which caused problems in terms of economy and shortening the construction period.

本発明はこのような技術的問題点に鑑みなされ
たもので、軟弱地盤中に所定間隔を置いてボツク
ス型鉄板ケーシングを安定地盤に到達するまで打
込み、鉄板ケーシング内の土砂を掘削してから前
記ケーシング内に鉄筋コンクリートを打設し、ケ
ーシング内のコンクリートが完全に固化する前に
前記ケーシングを引き抜いて両端に半円状の凹部
が形成された先行パネルを分離形成し、該先行パ
ネル間に該パネルを挾み込むように一対のプレー
ト型鉄板を打ち込み、プレート型鉄板間の土砂を
掘削してからこの鉄板間に鉄筋コンクリートを打
設し、コンクリートが完全に固化する前に前記プ
レート型鉄板を引き抜いて、前記先行パネルと一
体的に結合された後行パネルを形成していくこと
を特徴とする、軟弱地盤における地中連続壁構築
法である。本発明においては前記のような構成を
採用することにより、軟弱地盤中に地中連続壁を
構築する場合において、周辺の地盤改良が不要と
なり、土砂を掘削する場合においても高価な泥水
を使用することなく掘削が可能となり、更には構
築された地中連続壁のコンクリート面が一様な平
滑面となる、経済性及び工期短縮の面で有利な軟
弱地盤中の地中連続壁の構築法を提供するもので
ある。
The present invention was developed in view of these technical problems, and involves driving box-shaped steel plate casings into soft ground at predetermined intervals until they reach stable ground, excavating the earth and sand inside the steel plate casings, and then excavating the Reinforced concrete is placed in the casing, and before the concrete in the casing completely hardens, the casing is pulled out to separate and form a preceding panel with semicircular recesses formed at both ends, and the panel is placed between the preceding panels. A pair of plate-shaped iron plates are driven in such a way as to sandwich the two plate-shaped iron plates, and after excavating the earth and sand between the plate-shaped iron plates, reinforced concrete is poured between the plates, and the plate-shaped iron plates are pulled out before the concrete completely hardens. , a method for constructing a continuous underground wall in soft ground, characterized by forming a trailing panel that is integrally connected with the preceding panel. In the present invention, by adopting the above configuration, when constructing an underground continuous wall in soft ground, there is no need to improve the surrounding ground, and when excavating earth and sand, expensive muddy water is not used. We have developed a method for constructing underground walls in soft ground, which is advantageous in terms of economy and shortening construction time, by making it possible to excavate without any damage, and by making the concrete surface of the constructed underground wall uniformly smooth. This is what we provide.

以下に本発明の好適な一実施例について、添付
図面を参照しながら説明する。第1図は本発明は
係わる地中連続壁の構築法の施工順序を示す断面
図であり、第2図はその上面図である。施工順序
としては、まず地中連続壁を所定の個所に構築す
るため、周辺の土水圧、地盤の状況により決定さ
れる所定の間隔の場所にガイドトレンチ1を設置
する。そしてこのガイドトレンチ1に合わせて、
ボツクス型鉄板ケーシング2をバイブロハンマ
ー、モンケン等で軟弱地盤層3より以深の安定地
盤層4まで打ち込む。このボツクス型鉄板ケーシ
ング2は、前後面が平坦で両端面が角形の平面細
長の略八角形状の小断面を有しており、該ケーシ
ングを安定した地盤4まで打ち込むことにより、
該ケーシング内の掘削時に軟弱地盤の上壁面の崩
壊を生じることなく、高価な泥水に代えて清水の
使用が可能となるものである。このように上壁面
の崩壊を防止しつつ、前記ボツクス型鉄板ケーシ
ング2内を掘削機5により所定の深さまで掘削
後、前記ボツクス型鉄板ケーシング2の両側端に
接した状態で一対のジヨイントパイプ6を挿入す
る。このジヨイントパイプ6は周辺の地盤の状況
によつては必ずしも必要とされず、ジヨイントパ
イプ6を使用しない場合にあつては、前記ボツク
ス型鉄板ケーシング2は、前後面が平坦で両端面
が内側に半円状凹んだ形状のものを用いる。そし
て前記鉄板ケーシング2の内面と、前記ジヨイン
トパイプ6の外面とによつて画成された空間に鉄
筋コンクリート7を打設し、このコンクリートが
完全に固化する前に、前記ボツクス型ケーシング
2及び前記ジヨイントパイプ6とを油圧ジヤツ
キ、バイブロハンマクレーン等で引き抜き、両端
に半円状の凹部が形成された先行パネル8を分離
形成する。その後前記先行パネル8を挾み込むよ
うに一対のプレート型鉄板9を、前記ボツクス型
ケーシング2と同様な方法により所定の深さまで
打ち込み、前記プレート型鉄板9間の土砂を掘削
し、鉄筋コンクリートを打設し、このコンクリー
トが完全に固化する前に、前記一対のプレート型
鉄板9を油圧ジヤツキ等で引き抜き、後行パネル
10を前記先行パネル8と一体に形成する。前記
プレート型鉄板9間の土砂を掘削するに当つて
は、上記ケーシング2内の掘削時と同様に泥水を
使用することなく施工できるが、例えば深度が深
い場合や、周囲の地盤の状況が悪く掘削した状態
でプレート型鉄板ケーシング9が内側へたわむ危
険性のある場合には、前記プレート型鉄板9間に
H形の切梁材11を打ち込んだ後内部を掘削す
る。尚前記先行パネル8の両側端部を半円状凹部
となすのは、掘削時に機械掘削を容易ならしめる
ためである。
A preferred embodiment of the present invention will be described below with reference to the accompanying drawings. FIG. 1 is a sectional view showing the construction order of the underground continuous wall construction method according to the present invention, and FIG. 2 is a top view thereof. As for the construction order, first, in order to construct an underground continuous wall at a predetermined location, guide trenches 1 are installed at predetermined intervals determined by the surrounding soil water pressure and ground conditions. And according to this guide trench 1,
The box-shaped iron plate casing 2 is driven into the stable ground layer 4 deeper than the soft ground layer 3 using a vibro hammer, Monken, etc. This box-shaped iron plate casing 2 has a small cross-section of an approximately octagonal shape with flat front and rear surfaces and square end faces.By driving the casing into stable ground 4,
It is possible to use fresh water instead of expensive muddy water without causing collapse of the upper wall surface of the soft ground during excavation inside the casing. After excavating the inside of the box type iron plate casing 2 to a predetermined depth with the excavator 5 while preventing collapse of the upper wall surface in this way, a pair of joint pipes are inserted in contact with both ends of the box type iron plate casing 2. Insert 6. This joint pipe 6 is not necessarily required depending on the surrounding ground conditions, and when the joint pipe 6 is not used, the box-type iron plate casing 2 has flat front and rear surfaces and both end surfaces. Use one with a semicircular concave shape on the inside. Then, reinforced concrete 7 is placed in a space defined by the inner surface of the iron plate casing 2 and the outer surface of the joint pipe 6, and before this concrete is completely hardened, the box-shaped casing 2 and the The joint pipe 6 is pulled out using a hydraulic jack, a vibrohammer crane, etc., and a leading panel 8 having semicircular recesses formed at both ends is separated and formed. Thereafter, a pair of plate-shaped iron plates 9 are driven to a predetermined depth by the same method as the box-type casing 2 so as to sandwich the preceding panel 8, earth and sand between the plate-shaped iron plates 9 are excavated, and reinforced concrete is poured. The pair of plate-shaped iron plates 9 are pulled out using a hydraulic jack or the like, and the trailing panel 10 is formed integrally with the leading panel 8 before the concrete completely hardens. Excavation of the earth and sand between the plate-shaped iron plates 9 can be carried out without using muddy water in the same way as when excavating the inside of the casing 2. If there is a risk that the plate-shaped iron plate casing 9 will bend inward in the excavated state, the inside is excavated after driving H-shaped struts 11 between the plate-shaped iron plates 9. The reason why both ends of the preceding panel 8 are formed into semicircular recesses is to facilitate mechanical excavation during excavation.

このようにして順次先行パネルと後行パネルと
を一体に形成していくことにより、所定の長さの
地中連続壁を構築するものである。以上のように
本発明は、軟弱地盤中に地中連続壁を構築する場
合に、軟弱地盤中に所定間隔を置いてボツクス型
鉄板ケーシングを安定地盤に到達するまで打ち込
み、鉄板ケーシング内の土砂を掘削してからケー
シング内に鉄筋コンクリートを打設し、コンクリ
ートが固化する前に鉄板ケーシングを引き抜いて
打設コンクリートの硬化により両端に半円状凹部
が形成された先行パネルを分離形成し、先行パネ
ル間にこれを挾み込むように一対のプレート型鉄
板を打ち込み、プレート型鉄板間の土砂を掘削し
てから、鉄板間に鉄筋コンクリートを打設後、コ
ンクリートの固化する前に該プレート型鉄板を引
き抜いて先行パネルと一体的に後行パネルを形成
することにより地中連続壁を構築することによ
り、従来工法で問題とされていた軟弱地盤の地盤
改良が不要となるばかりでなく、構築された壁面
の研削や打ち増しも必要とされず、経済性の向
上、工期の短縮をも可能ならしめる地中連続壁構
築法が提供されるものである。
By sequentially integrally forming the leading panel and the trailing panel in this manner, an underground continuous wall of a predetermined length is constructed. As described above, when constructing an underground continuous wall in soft ground, the present invention enables box-shaped steel plate casings to be driven into the soft ground at predetermined intervals until stable ground is reached, and the earth and sand in the steel plate casings to be removed. After excavation, reinforced concrete is placed inside the casing, and before the concrete hardens, the steel plate casing is pulled out and the preceding panels, which have semicircular recesses formed at both ends as the poured concrete hardens, are separated and formed. A pair of plate-shaped iron plates are driven in between the plates, the earth and sand between the plates is excavated, and reinforced concrete is poured between the plates, and the plate-shaped iron plates are pulled out before the concrete hardens. By constructing a continuous underground wall by forming a trailing panel integrally with a leading panel, not only does ground improvement of soft ground, which was a problem with conventional construction methods, become unnecessary, but the constructed wall surface The present invention provides a method of constructing an underground continuous wall that does not require grinding or additional hammering, improves economic efficiency, and shortens the construction period.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、本発明に係わる地中連続壁構築法の
施工順序を示す断面図であり、第2図はその上面
図である。施工順序は順次aからdの順である。 図中、1……ガイドトレンチ、2……ボツクス
型鉄板ケーシング、3……軟弱地盤層、4……安
定地盤層、5……掘削機、6……ジヨイントパイ
プ、7……鉄筋コンクリート、8……先行パネ
ル、9……プレート型鉄板ケーシング、10……
後行パネル、11……切梁材。
FIG. 1 is a cross-sectional view showing the construction sequence of the underground continuous wall construction method according to the present invention, and FIG. 2 is a top view thereof. The construction order is from a to d. In the figure, 1... Guide trench, 2... Box type steel plate casing, 3... Soft ground layer, 4... Stable ground layer, 5... Excavator, 6... Joint pipe, 7... Reinforced concrete, 8 ...Advanced panel, 9...Plate type iron plate casing, 10...
Trailing panel, 11... strut material.

Claims (1)

【特許請求の範囲】[Claims] 1 軟弱地盤中に所定間隔を置いてボツクス型鉄
板ケーシングを安定地盤に到達するまで打込み、
該鉄板ケーシング内の土砂を掘削してから該ケー
シング内に鉄筋コンクリートを打設し、該コンク
リートが完全に固化する前に該鉄板ケーシングを
引き抜いて両端に半円状の凹部が形成された該鉄
筋コンクリートからなる先行パネルを分離形成
し、該先行パネル間にこれを挾み込むように一対
のプレート型鉄板を打ち込み、該プレート型鉄板
間の土砂を掘削してから該鉄板間に鉄筋コンクリ
ートを打設し、該コンクリートが完全に固化する
前に該プレート型鉄板を引き抜いて該先行パネル
と一体的に結合された後行パネルを形成していく
ことを特徴とする軟弱地盤における地中連続壁構
築法。
1. Drive box-shaped iron plate casings into soft ground at specified intervals until stable ground is reached.
After excavating the earth and sand inside the iron plate casing, reinforced concrete is placed inside the casing, and before the concrete completely hardens, the iron plate casing is pulled out and semicircular recesses are formed at both ends of the reinforced concrete. Separately form the preceding panels, drive a pair of plate-shaped iron plates so as to sandwich them between the preceding panels, excavate the earth and sand between the plate-shaped iron plates, and then pour reinforced concrete between the iron plates, A method for constructing an underground continuous wall on soft ground, characterized in that the plate-shaped iron plate is pulled out before the concrete completely hardens to form a trailing panel that is integrally connected to the leading panel.
JP5231382A 1982-04-01 1982-04-01 Construction of underground continuous wall in soft ground Granted JPS58173217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5231382A JPS58173217A (en) 1982-04-01 1982-04-01 Construction of underground continuous wall in soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5231382A JPS58173217A (en) 1982-04-01 1982-04-01 Construction of underground continuous wall in soft ground

Publications (2)

Publication Number Publication Date
JPS58173217A JPS58173217A (en) 1983-10-12
JPS6248011B2 true JPS6248011B2 (en) 1987-10-12

Family

ID=12911287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5231382A Granted JPS58173217A (en) 1982-04-01 1982-04-01 Construction of underground continuous wall in soft ground

Country Status (1)

Country Link
JP (1) JPS58173217A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6178915A (en) * 1984-09-25 1986-04-22 Fudo Constr Co Ltd Formation work of underground continuous wall
JPS62133210A (en) * 1985-12-06 1987-06-16 Sumitomo Kensetsu Kk Forming method for impermeable wall
JPS63142119A (en) * 1986-12-05 1988-06-14 Ohbayashigumi Ltd Box-shaped formwork for construction of continuous wall
WO1998037279A1 (en) * 1997-02-19 1998-08-27 Yuy Architects And Engineers Co., Ltd. Method for constructing an underground structure, excavating method, an excavating tool and a reinforceing bar fixing tool therefor
KR20010048073A (en) * 1999-11-17 2001-06-15 우오현 The construction method of a concrete retaining wall

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52152609A (en) * 1976-06-14 1977-12-19 Toshima Kensetsu Kogyo Kk Method of building underground water stop wall using hollow panel
JPS5531854A (en) * 1978-08-28 1980-03-06 Nippon Kasei Kk Crosslinkable composition

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52152609A (en) * 1976-06-14 1977-12-19 Toshima Kensetsu Kogyo Kk Method of building underground water stop wall using hollow panel
JPS5531854A (en) * 1978-08-28 1980-03-06 Nippon Kasei Kk Crosslinkable composition

Also Published As

Publication number Publication date
JPS58173217A (en) 1983-10-12

Similar Documents

Publication Publication Date Title
US1993291A (en) Retaining wall
JPS6248011B2 (en)
JPS6117696A (en) Construction of underground head
JPS5869923A (en) Construction of underground continuous wall with drain layer
JPH041811B2 (en)
JP3868959B2 (en) Waterway construction method
JPS6049734B2 (en) How to form a basement
JPH03147923A (en) Construction method for underground continuous wall with curvature
JPH0366452B2 (en)
JPS61257529A (en) Underground continuous wall construction work
JPS5853321Y2 (en) Element for mountain retainer
JP3674439B2 (en) Composite type underground continuous wall and construction method of the same wall
JP2003027885A (en) Construction method for underground tunnel and underground tunnel
JPH0465932B2 (en)
JP2556415B2 (en) Construction method of self-supporting retaining wall
JPH0428044B2 (en)
JPH0510084A (en) Execution method of deeper depth man hole
JP2005213798A (en) Method for constructing retaining wall
JPS5918815A (en) Construction of coupling part of continuous underground wall
JPH04136395A (en) Construction method of manhole in middle portion of pipe line
JPH01178675A (en) Construction of basement below existing structure
JPS6011177B2 (en) Construction method of underground continuous wall
JPH054490B2 (en)
JP2002206239A (en) Earth retaining wall
JPH0317314A (en) Execution of underground continuous wall