[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JPS6093521A - Plant operation control board - Google Patents

Plant operation control board

Info

Publication number
JPS6093521A
JPS6093521A JP58201000A JP20100083A JPS6093521A JP S6093521 A JPS6093521 A JP S6093521A JP 58201000 A JP58201000 A JP 58201000A JP 20100083 A JP20100083 A JP 20100083A JP S6093521 A JPS6093521 A JP S6093521A
Authority
JP
Japan
Prior art keywords
plant
signal
operation switch
switch
operated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP58201000A
Other languages
Japanese (ja)
Other versions
JPH0481202B2 (en
Inventor
Satoru Suzuki
知 鈴木
Hiroari Fukunishi
宏有 福西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP58201000A priority Critical patent/JPS6093521A/en
Publication of JPS6093521A publication Critical patent/JPS6093521A/en
Publication of JPH0481202B2 publication Critical patent/JPH0481202B2/ja
Granted legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B9/00Safety arrangements
    • G05B9/02Safety arrangements electric

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

PURPOSE:To secure the safety of a plant even when erroneous operation is performed by comparing an operation switch signal with an operationswitch specifying signal and rejecting improper operation. CONSTITUTION:A plant signal from a plant is fetched in a plant operation guidance device 2 through a process input/output device 7 and the device 2 generates a proper operation operation guidance signal. A comparative collating device compares the operation switch output signal Qi sent from an operation switch board 1 through a process input/output device device 8 with the operation switch specifying signal Gi. When they coincide with each other, the operation switch output signal Ri from a switch board 1 is supplied to the plant 6 as an operation signal Ti with the coincidence signal S3i through a passing gate 9 and the device 7. When they do not coincide with each other, the signal S3i is not obtained and the plant 6 is never put in wrong operation.

Description

【発明の詳細な説明】 〔発明の利用分野〕 本発明は、プラントを監視制御するための運転制御盤に
係シ、特に誤った制御操作が行なわれだ場合であって李
それによってはプラントが制御されないようにしたプラ
ント運転iij!制御盤に関するものである。
[Detailed Description of the Invention] [Field of Application of the Invention] The present invention relates to an operation control panel for monitoring and controlling a plant. Plant operation that is not controlled! It concerns the control panel.

〔発明の背景〕[Background of the invention]

一般にプラントの運転においては、運転操作員の錯誤な
どによる運転操作によってプラントの動作が危険状態に
陥るのを未然に回避すべく、運転操作員に対する訓練は
重要となっている。訓練の強化によってプラントが誤っ
て運転操作されないようにしているわけである。一方、
このような方法に対し運転制御盤を人間と機械とのイン
タフェイスという観点で見直し、運転操作員が識別する
際での誤認を少なくするといったことも考慮されつつお
るのが実状である。このような方法においては、例えば
プラントの運転状態がカラーCRT画面上に表示される
ことによって運転操作員の識別能力が高められるように
たっているわけでおる。
In general, in the operation of a plant, training for operators is important in order to prevent the operation of the plant from falling into a dangerous state due to operational errors or the like by the operators. By strengthening training, the plant is prevented from being operated incorrectly. on the other hand,
In response to this method, consideration is being given to reconsidering the operation control panel from the perspective of an interface between humans and machines, and reducing the possibility of misidentification by operators. In such a method, for example, the operating status of the plant is displayed on a color CRT screen to enhance the identification ability of the operating operator.

この際各種情報を多く表示せしめ運転操作員の判断を支
援するようにすれば、錯誤などによる誤運転操作は可及
的に減少され得るものである。
At this time, if a large amount of various information is displayed to support the driver's judgment, erroneous driving operations due to mistakes or the like can be reduced as much as possible.

しかしながら、上記方法は何れも誤運転操作を減少せし
めることに止まることから、もしも一旦誤運転操作が行
なわれた場合にはこれに対処し得ないことは明らかであ
る。したがって、何等かの誤運転操作が行なわれた場合
であってもプラントの安全性を確保するためには、運転
操作員による運転操作が妥当か否かが事前にチェックさ
れる必要がある。
However, since all of the above-mentioned methods only reduce the number of erroneous driving operations, it is clear that they cannot deal with the erroneous driving operation once it has occurred. Therefore, in order to ensure the safety of the plant even if some kind of erroneous operation is performed, it is necessary to check in advance whether the operation by the operator is appropriate.

〔発明の目的〕[Purpose of the invention]

よって本発明の目的は、誤運転操作が行なわれた場合で
あってもプラントの安全性を確保し得、また、不適当な
運転操作であっても場合によってはその操作が可能とさ
れたプラント運転制御盤を供するにある。
Therefore, it is an object of the present invention to ensure the safety of a plant even if an erroneous operation is performed, and to provide a plant that can be operated even if an inappropriate operation is performed. Provides an operation control panel.

〔発明の概要〕[Summary of the invention]

この目的のため本発明は、何等かの運転操作が行なわれ
た場合にはその操作が妥当か否かがチェックされ、不適
当と判断された場合にはその操作が拒否されるようにな
したものである。まだ、運転操作が不!Mであっても何
等かの特定の操作が行なわれた場合にはその運転操作が
許容されるようになしたものである。
For this purpose, in the present invention, when any driving operation is performed, it is checked whether the operation is appropriate or not, and if it is judged to be inappropriate, the operation is rejected. It is something. I still can't drive! Even if the vehicle is M, if some specific operation is performed, the driving operation is permitted.

〔発明の実施例〕[Embodiments of the invention]

以下、不発明を第1図から第6図によシ説明する。 Hereinafter, the invention will be explained with reference to FIGS. 1 to 6.

先ず本発明によるプラント運転制御盤における操作スイ
ッチについて説明する。巣1図は操作スイッチが所定に
配列された操作スイッチ盤を概念的に示したものである
。これによるとプラントの起動から停止に至るまでの開
操作スイッチ盤1においては操作スイッチA−Pが必要
に応じ操作されるものとなっている。ここである運転状
況において操作スイッチC,G、J、0がある時間に、
あるいはある条件が成立したときに適当に操作される必
要があシ、また、操作スイッチにはプラントを瞬時に停
止させる機能をもっとすれば、プラントの運転を継続さ
せるためには操作スイッチCG、J、0が操作される必
要があるが、その操作中に操作スイッチKが誤って操作
されることはプラントの安全性や稼動性を保持するうえ
で絶対回避されるべきである。一方、操作スイッチには
システム全体が緊急異常事態ともなれば操作されること
が必要である。しかしながら、操作スイッチC,G、J
、0をCRTなどによって表示される運転状態や操作ガ
イダンスを確認しつつ操作するにしてもそれらを操作中
に操作スイッチKを誤って操作することがあるというも
のである。このような誤操作を回避するためには、例え
ば操作スイッチC,G、J、0以外の操作スイッチはあ
る条件下、あるいはある時間帯ではたとえそれが操作さ
れたとしてもその操作による制御情報はプラントに入力
されないようにすることが必要である。
First, the operation switch in the plant operation control panel according to the present invention will be explained. Figure 1 conceptually shows an operation switch board in which operation switches are arranged in a predetermined manner. According to this, the operation switches A to P on the opening operation switch panel 1 from starting to stopping the plant are operated as necessary. Here, in a certain driving situation, at a time when operation switches C, G, J, and 0 are present,
Alternatively, it is necessary to operate the operation switch appropriately when a certain condition is met.Also, if the operation switch has a function to stop the plant instantly, in order to continue the operation of the plant, the operation switch CG, J , 0 must be operated, but erroneous operation of the operation switch K during this operation should be absolutely avoided in order to maintain the safety and operability of the plant. On the other hand, the operation switch needs to be operated if the entire system is in an emergency situation. However, operation switches C, G, and J
, 0 while checking the driving status and operation guidance displayed on a CRT or the like, there is a possibility that the operation switch K may be operated by mistake while operating them. In order to avoid such erroneous operations, for example, even if operation switches other than operation switches C, G, J, and 0 are operated under certain conditions or at certain times, the control information resulting from that operation will be lost to the plant. It is necessary to prevent it from being input.

即ち、操作スイッチ各々が予め定められたある条件下に
おいてのみ操作された場合にその操作が有効なものとす
れば、操作スイッチの誤操作は何等プラ/トの安全性に
影響を及はさないことになるわけである。
In other words, if each operation switch is valid only when operated under certain predetermined conditions, erroneous operation of the operation switch will not affect the safety of the platform in any way. So it becomes.

しかしながら、操作スイッチに対する操作がある条件下
でのみ有効であるとすれば、場合によっては不具合を生
じることになる。例えば操作スイッチには緊急時に操作
されるものであるが、ある状況下においてもその操作が
有効でないとすれば、却ってシステム全体の健全性を保
持させるうえで好ましくないというものである。このよ
うな場合には例えば操作スイッチKを複数回連続的に操
作したことを以てその操作を有効とするなど、ある特定
の操作を行なった場合には操作許容条件以外の条件下で
もその操作を有効なものとして取シ扱うようにすれば都
合がよいと考えられる。このように取扱する場合におい
て緊急性や優先操作性などに応じ操作スイッチに優先匿
をもたせる場合には、例えば操作スイッチには2回、操
作スイッチに以外のものは3回以上操作された場合にそ
の操作を有効なものとして取扱すればよいと考えられる
。このように操作許容条件以外の条件下でも操作スイッ
チの操作を有効なものと取扱することによって、緊急な
事態や状況の急、変に応じた運転が即採れることになる
ものである。
However, if the operation of the operation switch is effective only under certain conditions, problems may occur depending on the situation. For example, a control switch is operated in an emergency, but if the operation is not effective under certain circumstances, it is not desirable for maintaining the health of the entire system. In such a case, for example, if the operation switch K is operated multiple times in succession, the operation is valid.If a certain operation is performed, the operation is valid even under conditions other than the operation permissible conditions. It would be convenient to treat it as if it were something. When handling in this way, if you want to give priority to the operation switch depending on the urgency or priority operability, for example, if the operation switch is operated twice, and the other operation switch is operated three times or more, It is considered that the operation should be treated as valid. In this way, by treating the operation of the operation switch as valid even under conditions other than the operation permissible conditions, operation can be immediately adapted to emergency situations or sudden changes in the situation.

ところで、実際のシステムにおいて上記機能をもったプ
ラント運転制御盤は、操作ガイダンス1d号と操作スイ
ッチとの対応や、定められたプラント運転手順と操作ス
イッチとの対応付けによって構成可能である。ある時間
帯やある運転状況の下に操作される必要がある操作スイ
ッチ以外のものは、たとえそれが操作されたとしてもそ
の操作は誤操作と判定ぢれ、無効なものとして処理され
ればよいものである。誤操作と判定された場合には、操
作されるべき操作スイッチのランプを点灯させるなど、
運転操作員へ正しい操作を指示せしめることも容易に考
えられるわけである。
By the way, in an actual system, a plant operation control panel having the above-mentioned functions can be configured by associating the operation guidance No. 1d with the operation switches, and the correspondence between the predetermined plant operation procedures and the operation switches. If the operation switch is not one that needs to be operated at a certain time or under certain driving conditions, even if it is operated, the operation will be judged as an erroneous operation and should be treated as invalid. It is. If an erroneous operation is determined, measures such as lighting the lamp of the operation switch that should be operated, etc.
It is also easy to instruct the operator to perform the correct operation.

第2図はそのような機能をもったプラント運転制御盤の
構成を概念的に示したものである。これによるとプラン
ト操作ガイダンス装置あるいは運転シーケンス装置2に
おいては、プラントからの各種のプラント信号4や時間
帯にもとづきその時点で操作されるべき操作スイッチあ
るいは操作スイッチ群が指定されるものとなっている。
FIG. 2 conceptually shows the structure of a plant operation control panel with such functions. According to this, in the plant operation guidance device or operation sequence device 2, the operation switch or operation switch group to be operated at that time is specified based on various plant signals 4 from the plant and the time period. .

この操作スイッチ指定信号は比S ++@合装置3、更
には操作スイッチ盤1に与えられ操作スイッチ盤1にお
いては操作スイッチのランプが選択的に点灯せしめられ
ることによって操作されるべき操作スイッチが指示され
るようになっている。一方、操作スイッチ盤1において
操作された操作スイッチの出力信号は比較照合装置3に
て操作スイッチ指定信号と比較されるものとなっている
。指示通シに、あるいはその指示によることなく操作さ
れるべき操作スイッチが操作された場合には、その操作
スイッチからの出力信号は制御信号5としてプラントに
与えられるところとなるものである。また、もしも操作
されるべき操作スイッチ以外のものが操作された場合に
はこの旨は比較照合装置3によって知れるところとなシ
、その出力信号は原則的には制御信号5としてプラント
に与えられることはないわけで委る。
This operation switch designation signal is given to the ratio S++@combination device 3 and further to the operation switch panel 1, and in the operation switch panel 1, the operation switch to be operated is designated by selectively lighting the lamp of the operation switch. It is now possible to do so. On the other hand, the output signal of the operating switch operated on the operating switch panel 1 is compared with the operating switch designation signal by the comparison/verification device 3. When an operating switch that is to be operated with or without instructions is operated, an output signal from the operating switch is given to the plant as a control signal 5. Furthermore, if a switch other than the one that should be operated is operated, this fact will be known by the comparison/verification device 3, and its output signal will, in principle, be given to the plant as the control signal 5. That's why I leave it to you.

さて、本発明を事故時の運転ガイダンスシステムに例を
採って具体的に説明する。第3図は本発明によるプラン
ト運転制御盤の一例でのブロック構成をプラントととも
に示したものである。この図においてプラント6からの
プラント信号P+はプロセス入出力装置7を介しプラン
ト操作ガイダンス装置2に取シ込まれるものとなってい
る。プラント信号P+にもとづきプラント操作ガイダン
ス装置2は例えば予め格納されている、事故時のプラン
トの挙動を2値的に記述したOCT (原因結果関連樹
木図)などによって現時点でのプラント状態がそのOC
T上の何れの位置にあるかを判定したうえ適切な運転操
作ガイダンスを発生するようになっている。また、比較
照合装置3はプロセス入出力装置8を介する操作スイッ
チ盤1からの操作スイッチ出力信号Q+ と、プラント
操作ガイダンス装置2からの操作スイッチ指定信号GI
とを比較することによって、操作スイッチ出力信号Q、
が運転操作ガイダンス通シであるか否かを判定するもの
となっている。比較照合の結果一致している場合には、
一致信号S31をして操作スイッチ盤1からの操作スイ
ッチ出力信号R+は操作通過ゲート9、プロセス入出力
装置7を介し操作信号(制御信号)Tsとしてプラント
6に与えられるところとなるものである。また、もしも
不一致の場合は一致信号3H+は得られなく、シたがっ
て、プラント6は操作スイッチの誤操作によっては操作
あるいは制御されることはないわけである。
Now, the present invention will be specifically explained using an example of a driving guidance system in the event of an accident. FIG. 3 shows a block configuration of an example of a plant operation control panel according to the present invention together with a plant. In this figure, a plant signal P+ from a plant 6 is input to a plant operation guidance device 2 via a process input/output device 7. Based on the plant signal P+, the plant operation guidance device 2 determines the current state of the plant using, for example, a pre-stored OCT (cause-effect tree diagram) that describes the behavior of the plant in binary terms at the time of an accident.
After determining which position on T, appropriate driving guidance is generated. Further, the comparison and verification device 3 receives the operation switch output signal Q+ from the operation switch panel 1 via the process input/output device 8 and the operation switch designation signal GI from the plant operation guidance device 2.
By comparing the operation switch output signal Q,
It is determined whether or not the driving operation guidance is passed. If there is a match as a result of comparison,
The operation switch output signal R+ from the operation switch panel 1 with the coincidence signal S31 is given to the plant 6 as an operation signal (control signal) Ts via the operation passage gate 9 and the process input/output device 7. Further, if there is a mismatch, the coincidence signal 3H+ will not be obtained, and therefore the plant 6 will not be operated or controlled by erroneous operation of the operating switch.

操作スイッチが誤操作された場合にはこのようにプラン
ト6は原則的に操作あるいは制御されることはないが、
操作スイッチの誤操作が例えば所定回数連続的に行なわ
れた場合には、誤操作された操作スイッチ対応に操作ス
イッチ盤1からは操作禁止解除信号Blが出力されるも
のとなっている。この操作禁止解除信号BIは一致信号
3Hと機能的に同一に操作通過ゲート9に作用すること
から、意識的に誤操作された操作スイッチによってプラ
ント6は操作あるいは制御されるところとなるものであ
る。なお、CRTIOは表示装置としてのものであシ、
プラント操作ガイダンス装置2、比較照合装置3からの
それぞれのメッセージmI、m2を表示するようになっ
ている。また、音声出力装置11はプラント操作ガイダ
ンス装置2からの音声選択信号sIにもとづき音声メモ
リ12よシ運転操作メツセージを選択的に読み出し、そ
のメツセージは音声としてスピーカ13よ多出力される
ものとなっている。同様に比較照合装置3からの音声選
択信号s2によっては比較照合結果のメツセージが音声
としてスピーカ13よ多出力されるようになっている。
In principle, the plant 6 will not be operated or controlled in this way if the operation switch is operated incorrectly, but
For example, when the operation switch is erroneously operated a predetermined number of times, the operation switch panel 1 outputs an operation prohibition release signal Bl in response to the erroneously operated operation switch. Since this operation prohibition release signal BI acts on the operation passage gate 9 in the same way as the coincidence signal 3H, the plant 6 is operated or controlled by the operation switch that is intentionally operated erroneously. Note that the CRTIO is only used as a display device.
Messages mI and m2 from the plant operation guidance device 2 and the comparison and verification device 3 are displayed. Further, the voice output device 11 selectively reads operation operation messages from the voice memory 12 based on the voice selection signal sI from the plant operation guidance device 2, and the messages are output as voices from the speaker 13 in large numbers. There is. Similarly, depending on the audio selection signal s2 from the comparison and verification device 3, the message resulting from the comparison and verification is outputted as audio from the speaker 13 more often.

以上のようにしてなるプラント運転制御盤の動作を説明
すれば以下のようである。
The operation of the plant operation control panel constructed as described above will be explained as follows.

即ち、プラントに何等かの異常が発生した場合それによ
ってプラント信号PLも何等かの異常を示すことになる
が、プラント信号P+にもとづきプラント操作ガイダン
ス装置2は異常事象を知ったうえその異常拡大を防止す
るための運転操作メツセージm1をCRTIO画面上に
表示するところとなる。また、これと同時に音声選択信
号s1によシ操作メツセージガススピーカ13よシ音声
の形で運転操作員に報知される。したがって、運転操作
員は先ず聴覚で操作内容を把握したうえ視覚で操作内容
を再確認し得るものである。操作内容の確認後運転操作
員は操作メツセージに従って操作スイッチを操作するが
、その操作スイッチ出力信号R+はプロセス入出力装置
8を介し比較照合装置3でプラント操作ガイダンス装置
2からの操作スイッチ指定信号G凰と比較照合されると
ころとなるわけである。この比較照合で操作されるべき
操作スイッチが正しく操作されたと判定された場合、比
較照合装置3は一致信号S3+をして操作された操作ス
イッチ出力信号比iを操作通過ゲート9を介しプラント
6に与えるわけである。しかし、そうではないと判定さ
れた場合には、一致信号S3Iは得られず、したがって
、誤操作された操作スイッチ出力信号はプラント6に与
えられることはないものである。操作スイッチが誤操作
された場合には、比較照合装置3によってその旨がスピ
ーカ13よシ報知され、またCRTIO画面上に表示さ
れることから、運転操作員は操作スイッチを再操作する
ところとなるわけである。
That is, if some kind of abnormality occurs in the plant, the plant signal PL will also indicate some kind of abnormality, but based on the plant signal P+, the plant operation guidance device 2 learns of the abnormal event and can prevent the expansion of the abnormality. A driving operation message m1 to prevent this is displayed on the CRTIO screen. At the same time, an operation message is notified to the operating operator in the form of voice from the gas speaker 13 using the voice selection signal s1. Therefore, the operator can first grasp the operation details audibly and then reconfirm the operation details visually. After confirming the operation details, the operating operator operates the operation switch according to the operation message, and the operation switch output signal R+ is sent to the comparison and verification device 3 via the process input/output device 8, and is output as the operation switch designation signal G from the plant operation guidance device 2. This is where it will be compared and verified with 凰. If it is determined that the operation switch to be operated has been operated correctly in this comparison and verification, the comparison and verification device 3 sends a coincidence signal S3+ and sends the operated operation switch output signal ratio i to the plant 6 via the operation passage gate 9. That's why we give. However, if it is determined that this is not the case, the coincidence signal S3I will not be obtained, and therefore the erroneously operated operation switch output signal will not be given to the plant 6. If the operation switch is operated incorrectly, the comparison and verification device 3 will notify you through the speaker 13 and display it on the CRTIO screen, so the operator will have to operate the operation switch again. It is.

ところで、操作メツセージとは異なる運転操作を運転操
作員の判断で行なうことも可能となっている。例えば操
作スイッチの誤操作を所定回数行なえばその操作スイッ
チ対応に操作スイッチ盤1からは操作禁止解除信号Bi
が出力され、一致信号S3Iが存在しなくともその操作
スイッチ出力信号R+は操作通過ゲート9を介しプラン
ト6に与えられるところとなるものである。
By the way, it is also possible for the driver to perform a driving operation different from the operation message based on his or her judgment. For example, if an operation switch is erroneously operated a predetermined number of times, an operation prohibition release signal Bi is sent from the operation switch panel 1 corresponding to the operation switch.
is output, and even if the coincidence signal S3I does not exist, the operation switch output signal R+ is given to the plant 6 via the operation passage gate 9.

次に第3図における要部について説明する。Next, the main parts in FIG. 3 will be explained.

第4図はプラント操作ガイダンス装置の構成を示したも
のである。これによるとプラント操作ガイダンス装置2
はプラント挙動メモリ41および操作ガイダンス処理装
置42よシなる。このうちプラント挙動メモリ41はプ
ラント異常時の種々のプラント状態量の挙動変化を正常
、異常の2値論理で表わし、各プロセス状態量の変化の
因果関係から事故の波及を予測するためのCCT (C
auseConsequence ’pree :原因
結果関連樹木)を記憶するものとなっている。このプラ
ント挙動メモリ41にはまたプラント状態量が異常とな
るのを回避するだめの操作項目がCCTに付随された形
で、更にプラント状態量の異常と対応する操作メツセー
ジも併せて記憶されるようになっている。
FIG. 4 shows the configuration of the plant operation guidance device. According to this, the plant operation guidance device 2
consists of a plant behavior memory 41 and an operation guidance processing device 42. Among these, the plant behavior memory 41 represents behavior changes of various plant state quantities at the time of plant abnormality in binary logic of normal and abnormal, and is a CCT (CCT) for predicting the spread of an accident from the causal relationship of changes in each process state quantity. C
cause-effect relationship tree). The plant behavior memory 41 also stores operation items for preventing plant state variables from becoming abnormal, in a form attached to the CCT, as well as operation messages corresponding to abnormalities in plant state variables. It has become.

まだ、プロセスコンピュータ等として構成される操作ガ
イダンス処理装置42はプラント信号P+にもとづき現
時点でのプラント状態がCCT上の何れに位置するかを
周期的に監視するものとなっている。このような監視状
態で対応するしきい値P Itとの比較によってプラン
ト信号PLの何れかが異常と判定されれば、これに対応
するCCT上での位置が自動的に判定され、OCTによ
シ現時点の異常の波及を予測したうえこれを回避するだ
めの操作メツセージm1をテーブル参照形式で選択する
ところとなるわけである。この際同時にその操作メツセ
ージrn1に対応する音声選択信号Slも併せて選択さ
れるが、操作メツセージが選択されればこれよシ操作ス
イッチの何れが選択的に操作されるべきかを示す照合用
操作信号としての操作スイッチ指定信号GIも自ずと定
まるというものである。第5図は操作ガイダンス処理装
置での処理の70−を示すが、これについては特に説明
は要しない。
Still, the operation guidance processing device 42 configured as a process computer or the like periodically monitors where on the CCT the current plant state is located based on the plant signal P+. If any of the plant signals PL is determined to be abnormal by comparison with the corresponding threshold value P It in such a monitoring state, the corresponding position on the CCT is automatically determined, and the OCT is used to determine the corresponding position on the CCT. After predicting the spread of the current abnormality, the operation message m1 to avoid this is selected by referring to the table. At this time, the voice selection signal Sl corresponding to the operation message rn1 is also selected, but if the operation message is selected, this is the operation message. The operation switch designation signal GI as a signal is also determined automatically. FIG. 5 shows the process 70- in the operation guidance processing device, but no particular explanation is required regarding this.

プラント操作ガイダンス装置は以上のようであるが、次
に比較照合装置について説明すればその動作論理は以下
の表に示すようである。
The plant operation guidance device has been described above, but the comparison and verification device will now be explained. Its operation logic is shown in the table below.

表 現し得るが、以下、この論理について詳細に説明する。table However, this logic will be explained in detail below.

先ず操作スイッチ指定信号G1が操作要求している状態
(ON状態)において操作スイッチが正しく操作され、
その操作スイッチ出力信号QIがON状態となれば、比
較照合装置3はスピーカ13が6操作OK″である旨を
音声出力すべくその旨対応の音声選択信号S2を出力し
、また、CRTIOに対するメツセージm2としては”
操作OK’である旨の表示が行なわれるべくその旨対応
のメツセージを出力するものである。”操作OK”であ
る旨の表示は例えばCRTIO画面上に既に表示されて
いる操作メツセージの色を変化させるようにして行なう
など、種々の表示形態をとれるものとなっている。また
、この場合には操作スイッチ出力信号R+は操作信号T
Iとしてプラント6に出力されねばならないから、一致
信号83+は当然操作許可の信号状態におかれることに
なる。次に操作スイッチ指定信号GIが操作要求状態に
あるがまた操作スイッチが操作されていない場合につい
て説明する。この場合には音声選択信号S2としては音
声操作メツセージが周期的に繰シ返される信号状態に、
また、メツセージin2として1dcRTio画面上に
表示されている操作メツセージに対する操作を運転操作
員が行なうことを要求する旨の信号状態におかれる。操
作を行なうことの要求は、例えば表示されている操作メ
ツセージをフリッカ−状態のものとして表示するなどし
て表現し得る。また、この場合での一致信号S31は操
作禁止の信号状態におかれてもよいが、まだ操作スイッ
チが操作されていないのであるので、任意の信号状態に
おかれてもよいことになる。
First, the operation switch is operated correctly while the operation switch designation signal G1 is requesting operation (ON state).
When the operation switch output signal QI is in the ON state, the comparison and verification device 3 outputs a corresponding audio selection signal S2 so that the speaker 13 outputs audio to the effect that 6 operations are OK, and also sends a message to the CRTIO. As m2”
In order to display that the operation is OK', a corresponding message is output. The indication that "operation is OK" can be displayed in various forms, such as by changing the color of an operation message already displayed on the CRTIO screen. In addition, in this case, the operation switch output signal R+ is the operation signal T
Since it must be output as I to the plant 6, the coincidence signal 83+ is naturally placed in the operation permission signal state. Next, a case where the operation switch designation signal GI is in the operation request state but the operation switch is not operated will be described. In this case, the voice selection signal S2 is in a signal state in which the voice operation message is periodically repeated.
Also, a signal state is set to request that the driver perform an operation on the operation message displayed on the 1dcRTio screen as message in2. A request to perform an operation can be expressed, for example, by displaying a displayed operation message in a flicker state. Further, the coincidence signal S31 in this case may be placed in an operation-inhibited signal state, but since the operation switch has not yet been operated, it may be placed in any signal state.

更に操作スイッチ指定信号GIが操作要求していないに
も拘わらずそれに対する操作が行なわれた場合は、誤操
作である旨の表示が行なわれることになる。音声選択信
号S2としては、誤操作である旨のメツセージが音声出
力されることを要求する信号状態に、また、メツセージ
m2としてはその操作がCRTIO画面上に表示されて
いる操作メツセージと一致していない旨の誤操作メツセ
ージが表示されるべき信号状態におかれることになる。
Further, if an operation is performed even though the operation switch designation signal GI does not request an operation, a message indicating that the operation has been erroneous will be displayed. The voice selection signal S2 is in a signal state requesting that a message to the effect of an erroneous operation be outputted as voice, and the message m2 is that the operation does not match the operation message displayed on the CRTIO screen. This results in a signal state in which an erroneous operation message should be displayed.

誤操作である故一致信号8g+とじては当然操作禁止状
態におかれるところとなるものである。
Since it is an erroneous operation, the coincidence signal 8g+ naturally results in the operation being prohibited.

最後に操作スイッチ指定信号GIが操作要求していない
ときに何等の操作がまだ行なわれていない場合について
説明すれば、この場合には新たまった表示を何等行なう
必要はなく、また、一致信号Sg+は操作禁止の信号状
態におかれてもよいが、任意の信号状態におかれて十分
でおる。なお、比較照合装置における以上述べた論理動
作はプラント操作ガイダンス装置がプラント異常と判定
した場合のみ行なわれるものとなっている。プラントが
異常となった場合には比較照合開始信号S4が比較照合
装置に与えられるものでア)、プラントが正常な場合は
一致信号S31は常に操作許可状態におかれプラントは
操作スイッチの操作によって無条件に制御され得るよう
になっている。
Finally, we will explain the case where no operation has been performed when the operation switch designation signal GI does not request an operation. In this case, there is no need to perform any new display, and the coincidence signal Sg+ may be placed in a signal state that prohibits operation, but it is sufficient to place it in any signal state. The above-mentioned logical operation in the comparison and verification device is performed only when the plant operation guidance device determines that there is an abnormality in the plant. When the plant becomes abnormal, a comparison and verification start signal S4 is given to the comparison and verification device.A) When the plant is normal, the coincidence signal S31 is always in the operation permission state and the plant is activated by operating the operation switch. It can be controlled unconditionally.

最後に操作通過ゲートについて説明する。第6図はその
一例での構成を示したものでちる。これまでの説明から
も判るように操作スイッチ対応に操作スイッチ出力信号
’fLIs一致信号Sa+および操作禁止解除信号B+
が得られるが、これら信号を操作スイッチ対応にオアゲ
ート611およびアンドゲート62Iによシ図示の如く
にゲート論理するものである。一致信号831%操作禁
止解除信号BIの少なくとも何れか一方が得られている
場合には、操作スイツ≠出力信号R+はそのまま操作信
号TIとしてアンドゲート62tよシ出力されるわけで
ある。
Finally, the operation passage gate will be explained. FIG. 6 shows an example of the configuration. As can be seen from the previous explanation, the operation switch output signal 'fLIs match signal Sa+ and the operation prohibition release signal B+ correspond to the operation switch.
are obtained, and these signals are subjected to gate logic as shown in the figure using an OR gate 611 and an AND gate 62I corresponding to the operation switches. If at least one of the match signals 831% and the operation prohibition release signal BI is obtained, the operation switch≠output signal R+ is directly output from the AND gate 62t as the operation signal TI.

なお、操作禁止解除信号B+の発生機構を遅ればせなが
ら説明すれば、操作スイッチの操作回数を電気的にカウ
ントしたり、あるいは操作スイッチ対応に操作禁止解除
スイッチを設けるなど、容易に発生することが可能であ
る。
If we explain the generation mechanism of the operation prohibition release signal B+ with a delay, it will be possible to generate it easily by electrically counting the number of operation switches or by providing an operation prohibition release switch corresponding to the operation switch. It is.

〔発明の効果〕〔Effect of the invention〕

以上説明したように本発明は、操作スイッチ盤からの操
作スイッチ信号と操作ガイダンス装置からの操作スイッ
チ指定信号(ガイダンス信号)とを比較照合することに
よって、操作スイッチに対する操作が妥当でない場合に
はそれによってはプラントが原則的には制御されないよ
うになしたものである。したがって、本発明による場合
は、誤った運転操作が行なわれた場合であってもプラン
トの安全性を確保し得るという効果がある。
As explained above, the present invention compares and checks the operation switch signal from the operation switch panel and the operation switch designation signal (guidance signal) from the operation guidance device, and detects whether the operation of the operation switch is inappropriate. In some cases, the plant is essentially uncontrolled. Therefore, the present invention has the effect of ensuring the safety of the plant even if an erroneous operation is performed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、操作スイッチが所定に配された操作スイッチ
盤の概念を示す図、第2図は、本発明によるプラント運
転制御盤の構成を概念として示す図、第3図は、その−
例でのブロック構成をプラントトとともに示す図、第4
図は、その構成におけるプラント操作ガイダンス装置の
構成を示す図、第5図は、プラント操作ガイダンス装置
における処理装置のフローを示す図、第6図は、第3図
における操作通過ゲートの一例での構成を示す図である
。 1・・・操作スイッチ盤、2・・・プラント操作ガイダ
ンス装置(運転シーケンス装置)、3・・・比較照合装
置、9・・・操作通過ゲート、10・・・C几T113
・・・スピーカ。 代理人 弁理士 秋本正実 $ 1 目 / 3 83 口 第452) 第5 図
FIG. 1 is a diagram conceptually showing an operation switch panel in which operation switches are arranged in a predetermined manner, FIG. 2 is a diagram conceptually showing the configuration of a plant operation control panel according to the present invention, and FIG.
Diagram showing the block configuration in the example along with the plant, 4th
The figure shows the configuration of the plant operation guidance device in that configuration, FIG. 5 shows the flow of the processing device in the plant operation guidance device, and FIG. FIG. 3 is a diagram showing the configuration. DESCRIPTION OF SYMBOLS 1... Operation switch board, 2... Plant operation guidance device (operation sequence device), 3... Comparison verification device, 9... Operation passage gate, 10... C-box T113
...Speaker. Agent Patent Attorney Masami Akimoto $ 1 / 3 83 Mouth 452) Figure 5

Claims (1)

【特許請求の範囲】[Claims] 1、プラントを監視制御するためのプラント運転制御盤
にして、プラントを制御するための複数の操作スイッチ
が配され、該スイッチ対応に操作禁止解除信号を発生可
としてなる操作スイッチ盤と、プラントからのプラント
1ど号にもとづき次に操作されるべき操作スイッチを指
定する操作ガイダンス装置と、該ガイダンス装置からの
操作スイッチ指定信号と上記操作スイッチ盤からの操作
スイッチ出力16号とを比軟照合する比較照合装置と、
該照合装置からの一致に係る比較照合結果、上記操作ス
イッチ盤からの操作禁止解除信号の何れかが得られた場
合に上記操作スイッチ盤からの対応する操作スイッチ出
力信号を操作信号としてプラントに出力する操作通過ゲ
ートと、上記操作ガイダンス装置および比較照合装置か
らの制御下に操作上必要なメツセージおよび比較照合結
果を表示あるいは報知する手段とからなる構成を特徴と
するプラント運転制御盤。
1. A plant operation control panel for monitoring and controlling the plant, which is equipped with a plurality of operation switches for controlling the plant, and is capable of generating operation prohibition release signals in response to the switches; An operation guidance device that specifies the next operation switch to be operated based on which plant No. 1 of the plant, and a soft comparison between the operation switch designation signal from the guidance device and the operation switch output No. 16 from the operation switch panel. a comparison and verification device;
If either the matching result from the matching device or an operation prohibition release signal from the operation switch panel is obtained, the corresponding operation switch output signal from the operation switch panel is output to the plant as an operation signal. What is claimed is: 1. A plant operation control panel characterized by a structure comprising an operation pass gate that performs the operation, and means for displaying or notifying messages necessary for operation and comparison and verification results under control from the operation guidance device and the comparison and verification device.
JP58201000A 1983-10-28 1983-10-28 Plant operation control board Granted JPS6093521A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58201000A JPS6093521A (en) 1983-10-28 1983-10-28 Plant operation control board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58201000A JPS6093521A (en) 1983-10-28 1983-10-28 Plant operation control board

Publications (2)

Publication Number Publication Date
JPS6093521A true JPS6093521A (en) 1985-05-25
JPH0481202B2 JPH0481202B2 (en) 1992-12-22

Family

ID=16433836

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58201000A Granted JPS6093521A (en) 1983-10-28 1983-10-28 Plant operation control board

Country Status (1)

Country Link
JP (1) JPS6093521A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62184506A (en) * 1986-02-03 1987-08-12 ウエスチングハウス エレクトリック コ−ポレ−ション Method and apparatus for monitoring execution of procedure online for complicated process equipment
JPS63317802A (en) * 1987-06-22 1988-12-26 Mitsubishi Electric Corp Building control system
JPH07200047A (en) * 1993-12-28 1995-08-04 Mitsubishi Electric Corp Operating unit in plant operation system and erroneous operation prevention processing method thereof
JPH08161028A (en) * 1994-12-06 1996-06-21 Mitsubishi Electric Corp Operation support system
JP2009513266A (en) * 2005-10-25 2009-04-02 マリンクロット インコーポレイテッド Power head control in power injection system
JP2012168608A (en) * 2011-02-10 2012-09-06 Mitsubishi Electric Corp Plant monitoring controller

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62184506A (en) * 1986-02-03 1987-08-12 ウエスチングハウス エレクトリック コ−ポレ−ション Method and apparatus for monitoring execution of procedure online for complicated process equipment
JPS63317802A (en) * 1987-06-22 1988-12-26 Mitsubishi Electric Corp Building control system
JPH07200047A (en) * 1993-12-28 1995-08-04 Mitsubishi Electric Corp Operating unit in plant operation system and erroneous operation prevention processing method thereof
JPH08161028A (en) * 1994-12-06 1996-06-21 Mitsubishi Electric Corp Operation support system
JP2009513266A (en) * 2005-10-25 2009-04-02 マリンクロット インコーポレイテッド Power head control in power injection system
JP2012168608A (en) * 2011-02-10 2012-09-06 Mitsubishi Electric Corp Plant monitoring controller

Also Published As

Publication number Publication date
JPH0481202B2 (en) 1992-12-22

Similar Documents

Publication Publication Date Title
US8307356B2 (en) Safety controller and method for loading a new operating program onto the safety controller
JPS6093521A (en) Plant operation control board
US7437218B2 (en) Method and device for controlling the functional unit of a motor vehicle
Stanton et al. Alarms in human supervisory control: A human factors perspective
JPH02501960A (en) Monitoring method and circuit device for operating elements controlled by computer
JP2010141654A (en) Field communication system and method
JP2529402B2 (en) Operation control device for HA control equipment
JP2000267725A (en) Voice informing device
US11609999B2 (en) Control system
JPS60189653A (en) Trouble display unit for vehicles
JPH02281343A (en) Cpu operation monitor system
JPS62193585A (en) Servo mechanism
JPS6341903A (en) Backup system for controller
KR100277457B1 (en) Interlocking system control device and method of railway
JP2000347626A (en) Display device and method for preventing erroneous display
JPH0481911A (en) Power source protecting circuit
JPH05190407A (en) Semiconductor manufacturing system
JPH0681039U (en) Watchdog circuit diagnostic device
JPS6347801A (en) Controller
JPH04291428A (en) Fault information display device
JPH04266378A (en) Elevator monitoring and controlling device
JPH0612293A (en) Runaway preventing method for microcomputer
JPH08194558A (en) Computer system
JP2002255034A (en) Electronic interlocking device
JPH06202879A (en) Interrupt processing method