JPS59217530A - Coal yard system of coal shipment base - Google Patents
Coal yard system of coal shipment baseInfo
- Publication number
- JPS59217530A JPS59217530A JP4422283A JP4422283A JPS59217530A JP S59217530 A JPS59217530 A JP S59217530A JP 4422283 A JP4422283 A JP 4422283A JP 4422283 A JP4422283 A JP 4422283A JP S59217530 A JPS59217530 A JP S59217530A
- Authority
- JP
- Japan
- Prior art keywords
- coal
- ship
- equipment
- yard
- train
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/008—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for bulk material
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
Description
【発明の詳細な説明】 〔発明の利用分野〕 本発明は、石炭積出基地石炭ヤードシステムに関する。[Detailed description of the invention] [Field of application of the invention] The present invention relates to a coal shipping base coal yard system.
一般に、石炭ヤードシステムは設備構成上、次の点を満
たしていることが必要である。In general, a coal yard system must satisfy the following points in terms of its equipment configuration.
■ 石炭荷卸設備から石炭船積設備へ、石炭を直接的に
運搬できる石炭搬送設備を具備する。■ Equipped with coal transport equipment that can directly transport coal from coal unloading equipment to coal loading equipment.
■ 石炭荷卸設備の能力の方が、石炭切出設備(ヤード
上の石炭山から石炭を切出す設備)の能力より高い。■ The capacity of coal unloading equipment is higher than the capacity of coal cutting equipment (equipment that cuts coal from the coal pile on the yard).
■ 石炭搬入車輛の停留場を持つ。■ Has a stop for coal delivery vehicles.
石炭見直し以前の石炭積出基地は、規模を小さく、トー
タルな運用を含めた石炭ヤードシステムは、例がない。The coal shipping terminals before the coal review were small in scale, and there was no precedent for a coal yard system that included total operation.
直送に関しては、従来は、切出設備の故障時など、非常
時に行なうケースのみに限られていた。In the past, direct shipping was limited to emergencies such as when cutting equipment broke down.
銘柄の配置方式に関しては、従来は、銘柄毎に置場を固
定するのが一般であった。Regarding the placement method of brands, conventionally, it was common to fix the placement location for each brand.
本発明の目的は、滞船時間の短縮を可能とする石炭積出
基地石炭ヤードシステムを提供することである。An object of the present invention is to provide a coal shipping base coal yard system that enables shortening of ship demurrage time.
石炭積出基地石炭ヤードの概要
大型荷投機械を設置した大規模な石炭積出基地石炭ヤー
ドにおける荷役作業と石炭の流れを、第1図を用いて説
明する。Overview of a coal shipping base coal yard The cargo handling operations and coal flow in a large-scale coal shipping base coal yard equipped with large-scale loading machinery will be explained using Figure 1.
石炭は、山元から石炭専用列車31で運ばれてくる。到
着した石炭専用列車(以降、単に列車と呼ぶ)は、カー
ダンパ(Cd)1.2に位置決めする。カーダンパ1,
2は、1〜数輛単位で列車の荷台を横転し、石炭を下の
ホッパに投入する機器である。Coal is transported from Yamamoto by special coal train 31. The arriving coal-only train (hereinafter simply referred to as a train) is positioned at car damper (Cd) 1.2. car damper 1,
2 is a device that overturns the loading platform of a train in units of one to several cars and dumps coal into the hopper below.
石炭をヤードへ山積みする機器をスタッカ(st )a
〜6という。A stacker (st)a is a device that piles up coal in a yard.
~6.
列車の入線と並行して、スタッカ3〜6は所定の石炭積
付位置へ移動し、コンベア群は、カーダンパ1,2から
スタッカ3〜6へ石炭が流れるようにルートの切換を行
なう。In parallel with the arrival of the train, the stackers 3 to 6 move to predetermined coal loading positions, and the conveyor group switches routes so that the coal flows from the car dampers 1 and 2 to the stackers 3 to 6.
これらの準備が完了すると、カーダンパは数輛単位で荷
台を横転し、投下された石炭はコンベアを通υ、途中、
計量器21.22により重量を計測されて、スタッカ3
〜6によりヤード上に山積みされる。全車輛の石炭を荷
卸しした列車は、山元へ向けて出発する。以上が受入作
業である。When these preparations are completed, the car dumper overturns the loading platform in units of several cars, and the dropped coal passes through the conveyor, and on the way,
The weight is measured by the scales 21 and 22, and the stacker 3
~6 piles up on the yard. After unloading all the coal from the cars, the train departs for Yamamoto. The above is the acceptance work.
ヤードに積まれた石炭山をパイルと呼ぶ。A pile of coal piled up in a yard is called a pile.
石炭は、石炭専用船(以降、単に船と呼ぶ)により、搬
出される。空荷の状態で到着した船は、パース(岸壁)
20に着岸する。着岸すると、船にロープをかけたり、
ノ・ツチを開くなどの荷役準備作業が行なわれる。これ
と並行して、船への石炭積込機器であるシップローダ(
St)lo。Coal is transported by a coal vessel (hereinafter simply referred to as a vessel). Ships that arrive with empty cargo are transported to Perth (quay).
Arrive at 20. When we docked, we tied a rope to the boat,
Cargo handling preparation work such as opening the no-tsuchi will be carried out. In parallel with this, ship loaders (equipment for loading coal onto ships)
St) lo.
11は所定のハツチへ、パイルからの石炭切出機器であ
るリクレーマ(Rc)7〜9は切出すべきパイルのとこ
ろへ移動する。コンベア群は、リクレーマからシップロ
ーダへ石炭が流れるように、ルートの切換えを行なう。11 moves to a predetermined hatch, and reclaimers (Rc) 7 to 9, which are devices for cutting out coal from the pile, move to the pile to be cut. The conveyor group switches routes so that coal flows from the reclaimer to the ship loader.
これらの準備が完了すると、リクレーマは石炭を連続的
に切出す。切出された石炭はコンベアを通シ、途中、計
量器23.24によ多重量を計測されて、シップローダ
によシ船へ積込まれる。積込みが終了すると、ノ・ツチ
を閉じ、船は離岸、出港する。以上が積出作業である。Once these preparations are complete, the reclaimer continuously cuts out the coal. The cut coal passes through a conveyor, and along the way, its weight is measured by scales 23 and 24, and then loaded onto a ship by a ship loader. Once loading is complete, the no-tsuchi is closed and the ship leaves the berth and departs from port. The above is the shipping work.
石炭積出基地の運用目的と操作方式
石炭積出基地における運用の主な目的は、船の在港時間
(以降、滞船時間と呼ぶ)の短縮である。Operational purpose and method of operation of a coal shipping terminal The main purpose of operating a coal loading terminal is to shorten the time a ship spends in port (hereinafter referred to as vessel dwell time).
その理由は以下の通シである。The reason for this is as follows.
船は建造費が大きいので、船会社は採算を得るため、船
の効率良い運航をはかる。港湾での荷役に時間がかかシ
、出港が遅れると、船の効率良い運航に支障を来たすか
らである。Ships are expensive to build, so shipping companies strive to operate their ships efficiently in order to be profitable. This is because loading and unloading at a port takes time, and if departure from port is delayed, the efficient operation of the ship will be hindered.
本発明は前記の目的を達成するために、次の2つの操作
を用いたことに特徴がある。第1に直送であシ、第2に
銘柄の分散配置である。The present invention is characterized by using the following two operations to achieve the above object. The first is direct delivery, and the second is the distributed placement of brands.
直送とは、カーダンパで荷卸しした石炭を、ヤードに山
積みせずに、直接に船へ積込むことである。そのために
、第1図中、14.16に示す如く、カーダンパとシッ
プローダを結びつける一tyベアルートを設置しておく
。カーダンパの能力の方がリクレーマの能力より高けれ
ば、パイルから払出すよシ、直送する方が、船積みに要
する荷役時間は短くてすむ。Direct shipping means that the coal unloaded by a car dumper is loaded directly onto a ship without being piled up in a yard. For this purpose, as shown at 14.16 in FIG. 1, a bare route is installed to connect the car damper and the ship loader. If the capacity of the car damper is higher than that of the reclaimer, the cargo handling time required for loading will be shorter if the cargo is removed from the pile or sent directly.
船の積載量に比して、列車の積載量は小さいので、船の
到着周期よシ列車の到着周期の方が短かい。1隻の船の
荷役中に到着する、直送可能(つまり、その船の要求銘
柄と同じ銘柄を積載した)な列車の台数はわずかである
。そこで、船の到着予定情報を入手し、事前に、その要
求銘柄と同じ銘柄を載積した列車を、待避線26に停留
させておく。船が到着した後、その列車をカーダンパに
入れることKよシ、直送をさらに有効ならしめることが
できる。Since the carrying capacity of a train is small compared to the carrying capacity of a ship, the arrival cycle of a train is shorter than that of a ship. The number of trains that can arrive directly while a ship is unloading cargo (that is, loaded with the same brand as that ship's requested brand) is small. Therefore, the ship's arrival schedule information is obtained, and a train loaded with the same brand as the requested brand is stopped at the siding track 26 in advance. Direct delivery can be made even more effective by placing the train in a car dumper after the ship arrives.
銘柄の分散配置とは、どの銘柄についても、ノくイルを
各ヤードに作って、各銘柄のヤード別在庫量を均等化す
ることである。これにより、船がある銘柄を要求した時
、複数のヤードから同時に並行して払出しを行なえるの
で、船積みに要する荷役時間が短縮される。Dispersion of stocks means creating inventory in each yard for every brand, and equalizing the stock amount of each brand by yard. As a result, when a ship requests a certain brand, it can be simultaneously unloaded from multiple yards, reducing the cargo handling time required for loading.
銘柄の分散配置は、積付時にはその銘柄の在庫量が少な
いヤードを優先し、払出し時にはその銘柄の在庫量が多
いヤードを優先することにより実現できる。尚、一般の
石炭ヤードでは、在庫管理を容易にするため、銘柄毎に
使用ヤードを固定して、運用している。Distributed placement of brands can be achieved by giving priority to yards with a small inventory of the brand at the time of loading, and by giving priority to yards with a large inventory of the brand at the time of discharging. In addition, in general coal yards, in order to facilitate inventory management, a fixed yard is used for each brand.
これら2つの操作によシ、滞船時間の短縮が達成できる
。By performing these two operations, it is possible to shorten the time on board.
第1図を用いてシステムの構成を説明する。 The configuration of the system will be explained using FIG.
船要求銘柄設定盤41は、オペレータ室にあり、・i
計算機40と電気的に接続されている。オペ
レータが船の番号と要求銘柄を41に設定すると、その
情報は計算機40に伝送され、ファイル51に記入され
る。The ship's required brand setting panel 41 is located in the operator's room.
It is electrically connected to the computer 40. When the operator sets the ship number and requested brand to 41, the information is transmitted to computer 40 and entered in file 51.
操車場盤42は、操作場にあり、計算機40と電気的に
接続されている。係員が、列車積載銘柄と列車番号を盤
42に設定すると、それは計算機に伝送され、ファイル
52に記入される。また、待避線26人入/カーダンパ
ライン25人線信号や次処理列車番号などが、計算機4
0からこの盤42に伝えられてくる。The railyard board 42 is located at the operating station and is electrically connected to the computer 40. When the staff member sets the train loading brand and train number on the board 42, it is transmitted to the computer and entered in the file 52. In addition, the siding line for 26 people/car damper line for 25 people line signals and the next processing train number are displayed on the calculator 4.
It is transmitted from 0 to this board 42.
各荷投機器1〜18は計算機と電気的に結ばれており、
その稼働状況は計算機に伝えられて、ファイル54に記
入される。また、パイルへの積付指令、パイルからの切
出指令、直送指令などの信号が、計算機から各荷投機器
に送られる。Each loading device 1 to 18 is electrically connected to a computer,
The operating status is transmitted to the computer and entered in the file 54. In addition, signals such as loading commands to piles, cutting commands from piles, and direct delivery commands are sent from the computer to each loading device.
重量計21〜24は計算機と電気的に結ばれておシ、そ
の計測値によって、在庫管理ファイル53が更新される
。The weight scales 21 to 24 are electrically connected to a computer, and the inventory management file 53 is updated based on the measured values.
計算機40は、第2図に示すようなファイル、モジュー
ルから構成されている。各モジュールのフローチャート
を第3図に示す。The computer 40 is composed of files and modules as shown in FIG. A flowchart of each module is shown in FIG.
次に、本システムの動作を説明する。Next, the operation of this system will be explained.
オペレータは、船と交信を行ない、船の到着予定日と要
求銘柄の情報を入手する。到着予定日が基準日数以内に
近づくと、オペレータは、船要求銘柄設定盤41に、そ
の船名と要求銘柄を設定する。計算機40は、その情報
にもとづき、船銘柄ファイル51を更新する。The operator communicates with the ship and obtains information on the ship's expected arrival date and requested brand. When the scheduled arrival date approaches within the reference number of days, the operator sets the ship name and requested brand on the ship requested brand setting panel 41. The computer 40 updates the ship brand file 51 based on the information.
山元から列車が到着すると、操車場係員は、列車番号と
積載銘柄を、操車場盤42に設定する。When a train arrives from Yamamoto, the marshalling yard staff sets the train number and loading brand on the marshalling yard board 42.
計算機40は、その情報にもとづき、まず列車銘柄ファ
イル52を更新する。次に、モジュール60を起動する
。当列車の積載銘柄と同じ銘柄を要求する船の有無を調
べる。もし有れば、当列車を待避線26に入れるぺく、
待避線入線信号を操車場盤42に送信する。もし無けれ
ば、当列車をカーダンパライン25に入れるべく、ダン
パライン入線信号を操車場盤に送信する。同時に、ファ
イル55又は56を更新する。The computer 40 first updates the train brand file 52 based on the information. Next, module 60 is activated. Check whether there is a ship that requires the same brand as the one loaded on this train. If there is, please put this train on siding track 26.
A siding line entry signal is transmitted to the train yard board 42. If there is none, a damper line entry signal is sent to the yard board in order to put the train into the car damper line 25. At the same time, file 55 or 56 is updated.
運転員は、操作場盤42に表示される待避線入線/カー
ダンパライン入線信号にもとづき、当列車を操車する。The operator steers the train based on the siding line entry/car damper line entry signal displayed on the operating station panel 42.
カーダンパから列車が出発し、カーダンパが空き状態に
なると、計算機40は、モジュール61を起動し、次に
処理すべき列車番号を、操作場盤42に表示する。When a train departs from the car damper and the car damper becomes vacant, the computer 40 activates the module 61 and displays the train number to be processed next on the operation board 42.
運転員は、それKもとづき、当該列車をカーダンパに入
れる。Based on this, the operator places the train in the car damper.
列車がカーダンパに入った状態になると、計算機40は
、モジュール62を起動する。モジュール62は、もし
直送可能な状態(つまり、船の要求銘柄と列車の積載銘
柄が等しく、かつ、直送しうる設備が空き状態)であれ
ば、当該設備に作業指令を出し、もし直送不可能な状態
であれば、列車積載銘柄の在庫量が少ないヤードを優先
し、適切なスタッカに作業指令を出す。When the train enters the car damper, the computer 40 activates the module 62. The module 62 issues a work order to the equipment if direct delivery is possible (that is, the brand requested by the ship is equal to the brand loaded by the train, and the equipment capable of direct delivery is vacant), and if direct delivery is not possible. If this is the case, priority is given to a yard with a small inventory of the brand loaded on the train, and a work order is issued to the appropriate stacker.
船が到着し、パースへの着岸を完了すると、計算機40
は、モジュール62と63fc起動する。When the ship arrives and completes docking at Perth, the computer 40
starts modules 62 and 63fc.
もし、カーダンパで処理中の列車の銘柄が船の要求銘柄
と同じであれば、直送を実施するよう指令を出す。さら
に、その銘柄の在庫量の多いヤードを優先して、複数の
パイルからの払出しを指令する。If the brand of the train being processed by the car damper is the same as the brand requested by the ship, a command is issued to carry out direct delivery. Further, priority is given to a yard with a large inventory of that brand, and commands are given to payout from a plurality of piles.
ここで注意すべきは、もし、カーダンパで処理中の列車
の銘柄が船の要求銘柄と異なる場合であっても、その列
車が出発すると、モジュール62が起動され、船の要求
銘柄と同じ銘柄を積んでいる列車をカーダンパに入れる
よう指示を出す点である。これにより、直送が高頻度で
実施される。It should be noted here that even if the brand of the train being processed by the car damper is different from the brand requested by the ship, when the train departs, the module 62 is activated and the brand requested by the ship is changed. This is the point where instructions are given to place the loaded train into the car dumper. This allows direct delivery to be carried out with high frequency.
本発明によれば、直送を高頻度で実施でき、かつ、複数
パイルからの同時並行払出しが可能であるので、滞船時
間の短縮が実現できる。According to the present invention, it is possible to carry out direct shipping with high frequency and simultaneously pay out from a plurality of piles, so it is possible to shorten ship time.
第1図は本発明の一実施例のシステム構成図、第2図は
計算機のファイル、モジュール構成図、第3図は各モジ
ュールの処理フロー、第4図は船第 3 図(2)
そシューツム t2
趨ジュールt3
y4−ロFigure 1 is a system configuration diagram of an embodiment of the present invention, Figure 2 is a computer file and module configuration diagram, Figure 3 is the processing flow of each module, and Figure 4 is a ship diagram. t2 Joule t3 y4-ro
Claims (1)
出基地への石炭搬入車輛を一時的に保管する停留場と、
ヤード上の石炭山から石炭を切出す設備の作業能力よシ
も高い作業能力を有する石炭荷卸設備(石炭搬入車輛か
ら石炭を荷卸しする設備)と、 上記石炭荷卸設備から石炭船積設備(石炭運搬専用船へ
石炭を船積みする設備)へ石炭を直接的に搬送できる石
炭搬送設備とを具備し、近い将来到着予定の石炭運搬船
の積込要求銘柄の情報を入手し、その船の到着以前にそ
の銘柄と同じ銘柄を積載してきた石炭搬入車輛を、上記
停留場に停車させておき、その船が到着すると、予め停
留場に停車させておいた車輛を優先的に石炭荷卸設備に
割付け、さらに、当車輛が積載している石炭を、上記石
炭搬送設備を/″′r明して、直接石炭船積設備へ搬送
し、その船へ積込むという操作と、それぞれの銘柄につ
き、石炭山が各ヤード上に均等に存在するように分散配
置しておき、複数の石炭山から同時並行的に石炭運搬船
に積込む、という操作を、単独に又は組合わせて使用す
ることを特徴とする石炭積出基地石炭ヤードシステム。[Scope of Claims] 1. A parking area for temporarily storing vehicles carrying coal from the pile to the coal shipping base in a coal yard at a coal shipping base;
Coal unloading equipment (equipment that unloads coal from coal delivery vehicles) has a working capacity higher than that of the equipment that cuts coal from the coal pile on the yard, Coal loading equipment (coal transporting equipment) from the above coal unloading equipment The company is equipped with coal transport equipment that can directly transport coal to specialized ships (equipment for loading coal onto specialized ships), and obtains information on the brands requested to be loaded on coal carriers scheduled to arrive in the near future, and carries out the necessary procedures before the ship arrives. Coal delivery vehicles loaded with the same brand as the brand are parked at the above-mentioned stop, and when the ship arrives, the vehicles that have stopped at the stop in advance are assigned to the coal unloading equipment with priority, and further, The coal loaded by this vehicle is transported directly to the coal loading equipment through the above-mentioned coal transport equipment, and then loaded onto the ship. A coal shipping base that is characterized by being used alone or in combination to simultaneously load coal from multiple coal piles onto a coal carrier ship by distributing the coal piles so that they are distributed evenly over the top of the coal piles. Coal yard system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4422283A JPS59217530A (en) | 1983-03-18 | 1983-03-18 | Coal yard system of coal shipment base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4422283A JPS59217530A (en) | 1983-03-18 | 1983-03-18 | Coal yard system of coal shipment base |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS59217530A true JPS59217530A (en) | 1984-12-07 |
Family
ID=12685509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4422283A Pending JPS59217530A (en) | 1983-03-18 | 1983-03-18 | Coal yard system of coal shipment base |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS59217530A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2161229A1 (en) * | 2008-09-06 | 2010-03-10 | Smirnov, OLeksandr | Method of transfer of coal at port terminal |
-
1983
- 1983-03-18 JP JP4422283A patent/JPS59217530A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2161229A1 (en) * | 2008-09-06 | 2010-03-10 | Smirnov, OLeksandr | Method of transfer of coal at port terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5411151A (en) | Automatic distribution center system | |
US11110945B2 (en) | Intermodal transportation terminal control system and method | |
CN109242379B (en) | Container unloading and loading transportation system and method for molten iron combined transport railway bay station | |
WO2018048138A1 (en) | Railway cargo delivery system | |
JP2003500312A (en) | Transshipment facilities for small cargo, especially ISO containers | |
KR101013430B1 (en) | Method for loading and unloading | |
US7021449B2 (en) | Method and apparatus for storing travel luggage | |
EP4037973B1 (en) | Sorting system for luggage as well as method for sorting luggage | |
US3550796A (en) | Method of transshipment of containers from a container ship to loading platforms | |
JP2003292168A (en) | Container terminal and operating method of automatically guided vehicle in container terminal | |
US20210398074A1 (en) | Terminal control system and method | |
JPH11246048A (en) | Marine-transported container and container unloading harbor facilities | |
JPS59217530A (en) | Coal yard system of coal shipment base | |
Khafid et al. | A concept to reduce idle time on stevedoring activities in a container terminal | |
JPS6017728B2 (en) | Long material loading/unloading system | |
CN114089698A (en) | AGV (automatic guided vehicle) scheduling system and method based on transition platform | |
JPH0741115A (en) | Processing/loading-on/controlling system | |
Liu et al. | A simulation approach for performance evaluation of proposed automated container terminals | |
CN207226514U (en) | A kind of high ferro physical-distribution intelligent handling system based on AGV trolleies | |
JPS59230924A (en) | Load material handling control system | |
KR20180101308A (en) | Method for providing integratively loading plan using cloud service | |
TWI808343B (en) | Reconfigurable decentralized real-time delivery system and real-time delivery method | |
JPH0948519A (en) | Truck transfer system and transfer method in market | |
JPS58212529A (en) | Method for transferring goods | |
CN117709820A (en) | Intelligent loading and unloading distribution system for port container |