JPH11213855A - Fusible link fitting method - Google Patents
Fusible link fitting methodInfo
- Publication number
- JPH11213855A JPH11213855A JP1436798A JP1436798A JPH11213855A JP H11213855 A JPH11213855 A JP H11213855A JP 1436798 A JP1436798 A JP 1436798A JP 1436798 A JP1436798 A JP 1436798A JP H11213855 A JPH11213855 A JP H11213855A
- Authority
- JP
- Japan
- Prior art keywords
- bolt
- fusible link
- terminal
- state
- tightening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Connections By Means Of Piercing Elements, Nuts, Or Screws (AREA)
- Fuses (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、例えば、高い電流
特性が要求される螺着型のヒュージブルリンクの取付方
法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to, for example, a method of attaching a screw-type fusible link requiring high current characteristics.
【0002】[0002]
【先行技術】例えば、ボルトの締め付け作業をヒュージ
ブルリンクハウジングの上下方向から行うことができる
ヒュージブルリンクボックスを、本出願人の一人は特願
平9−120932号において出願した。これを、図4
〜図7によって具体的に説明すると、ヒュージブルリン
クボックス1は合成樹脂製のヒュージブルリンクハウジ
ング2を備えている。このヒュージブルリンクハウジン
グ2は、ヒュージブルリンク4の本体側が収納装着され
る箱形の前部2aと、ヒュージブルリンク4の一対の脚
部(タブ状端子)4a,4aが挿入配置される断面H形
の仕切部2bとを備えている。この仕切部2bの上下の
凹部内には下側が四角板状で上側が円筒状のナット5を
それぞれ嵌め込んである。2. Description of the Related Art For example, one of the present applicants has filed an application in Japanese Patent Application No. 9-120932 for a fusible link box capable of performing a bolt tightening operation from above and below a fusible link housing. This is shown in FIG.
7, a fusible link box 1 includes a fusible link housing 2 made of synthetic resin. The fusible link housing 2 has a box-shaped front portion 2a in which the main body side of the fusible link 4 is housed and mounted, and a cross section in which a pair of legs (tab terminals) 4a, 4a of the fusible link 4 are inserted and arranged. And an H-shaped partition 2b. In the upper and lower concave portions of the partition 2b, nuts 5 each having a rectangular plate-like lower side and a cylindrical upper side are fitted.
【0003】ヒュージブルリンクハウジング2の前部2
aの側壁2cの中央には仕切部2bの各凹部に連通する
一対の開口部2d,2dを形成してあり、該各開口部2
dよりヒュージブルリンク4の各脚部4aが仕切部2b
側に突出するようになっている。また、図4,図5
(a),(b)に示すように、ナット5には、ヒュージ
ブルリンク4の各脚部4aと電線7を圧着接続した端子
9を接続させるボルト6を予め(ヒュージブルリンクボ
ックス1の部品単品状態で)仮締めしてある。さらに、
端子9は、仮締め状態のボルト6の頭部6aを通る空間
を有するように垂直に起立したコ字形のブリッジ部9a
と、ヒュージブルリンク4の各脚部4aと接続されるU
字板状の接続部9bと、電線7が圧着接続される圧着部
9cとを備えている。尚、図4に示すように、ヒュージ
ブルリンク4の各脚部4aの中央にはボルト6のシャン
ク部6bが貫通する丸孔4bを形成してある。The front part 2 of the fusible link housing 2
A pair of openings 2d, 2d communicating with the respective recesses of the partition 2b are formed at the center of the side wall 2c of FIG.
d, each leg 4a of the fusible link 4 is a partition 2b.
It protrudes to the side. 4 and 5
As shown in (a) and (b), bolts 6 for connecting each leg 4a of the fusible link 4 to a terminal 9 to which the electric wire 7 is crimped are connected to the nut 5 in advance (parts of the fusible link box 1). Temporarily tightened (in a single item). further,
The terminal 9 has a U-shaped bridge portion 9a which is vertically erected so as to have a space passing through the head portion 6a of the bolt 6 in a temporarily tightened state.
And a U connected to each leg 4a of the fusible link 4
It has a connection part 9b in the shape of a letter board and a crimping part 9c to which the electric wire 7 is crimped. As shown in FIG. 4, a round hole 4b through which the shank 6b of the bolt 6 passes is formed at the center of each leg 4a of the fusible link 4.
【0004】以上先行技術のヒュージブルリンクボック
ス1によれば、図4に示すように、部品単品状態におい
てボルト仮締め前にヒュージブルリンクハウジング2の
前部2aにヒュージブルリンク4をセットしておき、こ
のセット後に、ボルト6を手作業や図示しない自動螺合
機等で予めヒュージブルリンクハウジング2の仕切部2
bの各凹部内に配置されたナット5に仮締めしておく。
そして、図7(b)に示すように、ボルト6に斜め締め
が発生した場合、図7(a)に示すボルト6の仮締め時
の正規の螺合状態と図7(b)に示すボルト6の斜め締
め状態にてボルト6の位置の変化量Xが生じるため、こ
の変化量Xを図示しない検知機等で検出することによ
り、ボルト6の斜め締め状態の有無の確認が可能とな
る。According to the fusible link box 1 of the prior art, as shown in FIG. 4, the fusible link 4 is set on the front portion 2a of the fusible link housing 2 before the bolts are temporarily tightened in a single component state. After the setting, the bolts 6 are previously removed by hand or by an automatic screwing machine (not shown).
b) Temporarily tighten the nuts 5 arranged in the respective recesses.
Then, as shown in FIG. 7B, when the bolt 6 is obliquely tightened, the normal screwing state of the bolt 6 shown in FIG. 7A at the time of temporary tightening and the bolt shown in FIG. Since the amount of change X in the position of the bolt 6 is generated in the diagonally tightened state of 6, the presence or absence of the diagonally tightened state of the bolt 6 can be confirmed by detecting the amount of change X with a detector (not shown) or the like.
【0005】そして、ワイヤハーネス製造工程におい
て、正規の螺合状態にボルト6が仮締めされた上記ヒュ
ージブルリンクハウジング2のみを用い、図5(a),
(b)に示すように、仮締めされたボルト6の頭部6a
を通るブリッジ部9aを備えた端子9をボルト締め付け
方向と直交する方向のヒュージブルリンクハウジング2
の仕切部2b上にスライド挿入させてボルト6の頭部6
aとヒュージブルリンク4の脚部4aとの間に端子9の
接続部9bを位置させ、次に、図示しないインパクトレ
ンチ等によりボルト6を本締めしてヒュージブルリンク
4の脚部4aと端子9の接続部9bとを接続する。この
ヒュージブルリンク4の最後の取付工程であるボルト6
の本締めを行った最終状態を図6に示す。[0005] In the wire harness manufacturing process, only the fusible link housing 2 in which the bolts 6 are temporarily tightened in a regular screwed state is used, and FIG.
As shown in (b), the head 6a of the bolt 6 temporarily tightened
Fusible link housing 2 in the direction orthogonal to the direction of bolt tightening, with terminal 9 having bridge portion 9a passing through
Of the bolt 6 by sliding it onto the partition 2b
a and the connecting portion 9b of the terminal 9 is located between the terminal 4a and the leg 4a of the fusible link 4. Then, the bolt 6 is fully tightened with an impact wrench (not shown) or the like, and the leg 4a of the fusible link 4 is connected to the terminal. 9 and the connection portion 9b. The bolt 6 which is the last attachment process of the fusible link 4
FIG. 6 shows the final state after the final tightening.
【0006】[0006]
【発明が解決しようとする課題】前記先行技術のヒュー
ジブルリンク4の取付方法では、ワイヤハーネス製造工
程前において、ヒュージブルリンクハウジング2の仕切
部2bの各凹部内に配置されたナット5にボルト6を予
め仮締めしていて、図7(b)に示すように、ボルト6
に斜め締めが発生した場合、図7(a)に示すボルト6
の仮締め時の正規の螺合状態と図7(b)に示すボルト
6の斜め締め状態にて生じるボルト6の位置の変化量X
を検知機等で検出することにより、ボルト6の斜め締め
状態の有無の確認を行っているが、該ボルト6の位置の
変化量Xが微小なため、ボルト6の斜め締めの確認が難
しく、高精度及び高価格の検知機等が必要不可欠とな
る。In the prior art method of mounting the fusible link 4, prior to the wire harness manufacturing process, bolts are attached to the nuts 5 arranged in the respective recesses of the partition 2b of the fusible link housing 2. 6 is temporarily tightened in advance, and as shown in FIG.
When diagonal tightening occurs, the bolt 6 shown in FIG.
7B, the amount of change X in the position of the bolt 6 caused by the regular screwing state at the time of the temporary tightening and the obliquely tightening state of the bolt 6 shown in FIG.
Is detected by a detector or the like to check whether or not the bolt 6 is obliquely tightened. However, since the amount of change X in the position of the bolt 6 is very small, it is difficult to confirm the oblique tightening of the bolt 6, High-precision and high-priced detectors are essential.
【0007】また、ヒュージブルリンクハウジング2に
配置されたナット5にボルト6を仮締めする際に、最初
は手作業でボルト6を締め付けているため、図7(a)
に示すボルト6の仮締め時の正規の螺合状態の位置(ボ
ルト高さH)を該ボルト6の手締めによる回転数(例え
ば1〜3回転)で管理することは難しく、新たにボルト
高さ検知用の治具が必要となる。In addition, when the bolts 6 are temporarily tightened to the nuts 5 arranged in the fusible link housing 2, the bolts 6 are initially manually tightened.
It is difficult to manage the position (bolt height H) of the regular screwing state at the time of temporary tightening of the bolt 6 shown in FIG. A jig for detecting the length is required.
【0008】そこで、本発明は、前記した課題を解決す
べくなされたものであり、ヒュージブルリンクと端子を
接続させる工程前のボルトの斜め締めの検出力の向上及
びボルトの仮締め状態の位置の寸法精度の向上を低コス
トで図ることができるヒュージブルリンクの取付方法を
提供することを目的とする。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to improve the detection force of diagonal tightening of a bolt before connecting a fusible link to a terminal and the position of the bolt in a temporarily tightened state. It is an object of the present invention to provide a method of attaching a fusible link that can improve the dimensional accuracy of a fusible link at low cost.
【0009】[0009]
【課題を解決するための手段】請求項1の発明は、ヒュ
ージブルリンクハウジングにヒュージブルリンクを装着
し、このヒュージブルリンクの脚部と電線の端子とをボ
ルトにより締め付けて接続する際に、前記ヒュージブル
リンクハウジングに取り付けられたナットに前記ボルト
を予め仮締めし、その後別工程にて前記端子をボルト締
め付け方向と直交する方向にスライド挿入させて前記ボ
ルトの頭部と前記ヒュージブルリンクの脚部との間に前
記端子の接続部を位置させ、次に前記ボルトを本締めし
て前記ヒュージブルリンクの脚部と前記端子の接続部と
を接続するようにしたヒュージブルリンクの取付方法で
あって、前記別工程に入る前に、前記ヒュージブルリン
クハウジングに取り付けられたナットに前記ボルトを一
旦本締めした後で、再度該ボルトを緩めて前記仮締め状
態に戻し、その後別工程にて前記ボルトを再度本締めし
て前記ヒュージブルリンクの脚部と前記端子の接続部と
を接続することを特徴とする。According to the first aspect of the present invention, when a fusible link is mounted on a fusible link housing and the legs of the fusible link are connected to the terminals of the electric wires by bolts, The bolt is temporarily tightened in advance to a nut attached to the fusible link housing, and then, in a separate step, the terminal is slid and inserted in a direction orthogonal to the bolt tightening direction to thereby secure the head of the bolt and the fusible link. A method of mounting a fusible link in which the connection portion of the terminal is located between the leg portion and the bolt, and then the bolt is fully tightened to connect the leg portion of the fusible link and the connection portion of the terminal. Before entering the separate step, after the bolt is once fully tightened to the nut attached to the fusible link housing Back to the temporarily fastened state is loosened again the bolt, characterized in that by then tightened again the bolt in a separate step connecting the connection portion of the terminal and the leg portion of the fusible link.
【0010】このヒュージブルリンクの取付方法では、
ヒュージブルリンクの脚部と電線の端子の接続部とをナ
ットに対するボルトの本締めにより接続する工程の前
に、ヒュージブルリンクハウジングに取り付けられたナ
ットにボルトを本締めした後で再度該ボルトを緩めて仮
締め状態に戻すことで、ボルトの本締め状態との比較に
よりボルトの斜め締めが簡単に検知される。これによ
り、ボルトの斜め締めが簡単かつ確実に防止され、ヒュ
ージブルリンクの脚部と端子の接続部とが常に良好な状
態で正確かつ確実に接続される。In this method of mounting a fusible link,
Before the step of connecting the leg portion of the fusible link and the connection portion of the terminal of the electric wire by fully tightening the bolt to the nut, after the bolt is fully tightened to the nut attached to the fusible link housing, the bolt is re-tightened. By loosening and returning to the temporarily tightened state, oblique tightening of the bolt can be easily detected by comparison with the fully tightened state of the bolt. As a result, the oblique tightening of the bolt is easily and reliably prevented, and the leg of the fusible link and the connecting portion of the terminal are always accurately and reliably connected in a favorable state.
【0011】請求項2の発明は、請求項1記載のヒュー
ジブルリンクの取付方法であって、前記別工程前の前記
本締め状態から前記仮締め状態に戻す時に剥がれる識別
手段をシャンク部に施したボルトを用いることを特徴と
する。According to a second aspect of the present invention, there is provided the method of attaching a fusible link according to the first aspect, wherein the shank portion is provided with identification means which is peeled off when returning from the final tightening state before the separate step to the temporary tightening state. It is characterized by using bolts that have been set.
【0012】このヒュージブルリンクの取付方法では、
ボルトの仮締め作業の完了が識別手段が剥がれることで
簡単に検知される。In this method of mounting a fusible link,
Completion of the temporary fastening operation of the bolt can be easily detected by peeling off the identification means.
【0013】[0013]
【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて説明する。Embodiments of the present invention will be described below with reference to the drawings.
【0014】図1(a)は本発明の実施形態のヒュージ
ブルリンクボックスのヒュージブルリンクと端子の接続
に用いるボルトのナットに対する本締め前の状態を示す
説明図、図1(b)は同ボルトの本締め締結途中の説明
図、図1(c)は同ボルトの正規の螺合状態である本締
め状態を示す説明図、図1(d)は同ボルトを本締め状
態から緩めて仮締め状態に戻した状態を示す説明図、図
1(e)は同ボルトの仮締め状態におけるヒュージブル
リンクボックスの斜視図である。このヒュージブルリン
クボックス1は先行技術と同一構成であるので、同一符
号を付して詳細な説明は省略する。FIG. 1A is an explanatory view showing a state of a bolt used for connecting a fusible link and a terminal of a fusible link box according to an embodiment of the present invention before a nut is fully tightened, and FIG. FIG. 1 (c) is an explanatory view of the bolt in the process of being fully tightened, FIG. 1 (c) is an explanatory view showing a fully tightened state of the bolt in a regular screwed state, and FIG. FIG. 1E is a perspective view of the fusible link box in a temporarily tightened state of the bolt, showing the state in which the bolt has been returned to the tightened state. Since the fusible link box 1 has the same configuration as the prior art, the same reference numerals are given and the detailed description is omitted.
【0015】このヒュージブルリンクボックス1に適用
されるヒュージブルリンク4の取付方法も、前述した先
行技術と同様に、ヒュージブルリンクハウジング2の仕
切部2bの各凹部内に配置されたナット5にボルト6を
予め仮締めし、その後ワイヤハーネス製造工程(別工
程)にて該仮締めされたボルト6の頭部6aを通るブリ
ッジ部9aを備えた端子9をボルト締め付け方向と直交
する方向にスライド挿入させて該ボルト6の頭部6aと
上記ヒュージブルリンク4の脚部4aとの間に上記端子
9の接続部9bを位置させ、次に、図示しないインパク
トレンチ等によりボルト6を本締めしてヒュージブルリ
ンク4の脚部4aと端子9の接続部9bとを接続するよ
うになっているが、上記ワイヤハーネス製造工程に入る
前に、図1(a)〜(c)に示すように、上記ヒュージ
ブルリンクハウジング2に配置されたナット5にボルト
6を一旦本締めした後で、図1(d)に示すように、再
度該ボルト6を緩めて上記仮締め状態に戻し(ボルト6
の斜め締め検知のため本締め状態で検知を行った後、規
定回数戻すことで仮締め状態とし)、その後、ワイヤハ
ーネス製造工程にて上記ボルト6を再度本締めして上記
ヒュージブルリンク4の脚部4aと上記端子9の接続部
9bとを接続するようにした点が、前記先行技術と異な
る。The method of mounting the fusible link 4 applied to the fusible link box 1 is the same as that of the prior art described above, except that the fusible link 4 is attached to the nut 5 disposed in each recess of the partition 2b of the fusible link housing 2. The bolt 6 is temporarily tightened in advance, and then, in a wire harness manufacturing process (another process), the terminal 9 having the bridge portion 9a passing through the head portion 6a of the temporarily tightened bolt 6 is slid in a direction orthogonal to the bolt tightening direction. The connecting portion 9b of the terminal 9 is located between the head 6a of the bolt 6 and the leg 4a of the fusible link 4, and then the bolt 6 is fully tightened by an impact wrench (not shown). The leg portion 4a of the fusible link 4 and the connecting portion 9b of the terminal 9 are connected to each other, but before the wire harness manufacturing process is started, FIGS. As shown in FIG. 1C, after the bolt 6 is once fully tightened to the nut 5 arranged in the fusible link housing 2, the bolt 6 is loosened again as shown in FIG. Return to the state (bolt 6
After the detection is performed in the final tightening state to detect the oblique tightening, the bolts 6 are fully tightened again in the wire harness manufacturing process by returning the specified number of times to the temporary tightening state. It differs from the prior art in that the leg 4a and the connection 9b of the terminal 9 are connected.
【0016】即ち、上記ワイヤハーネス製造工程に入る
前に、ヒュージブルリンクハウジング2に配置されたナ
ット5の雌ねじ部5aに正規に挿入されて螺合されたボ
ルト6は、図1(c)に示すように、ナット5に本締め
されて締結固定されるが、図2に示すように、ボルト6
の斜め締めが発生した場合には、ボルト6はナット5の
雌ねじ部5a内の途中で固定される。このボルト6の斜
め締めの場合、ボルト挿入開始位置からの変化量Xと、
図1(c)に示すように、ボルト6の正規の本締めの場
合のボルト挿入開始位置からの変化量Yとは差が大き
く、これから安価な検知機等によりボルト6の斜め締め
の検知が容易に可能となる(ボルト挿入開始からのボル
ト6の回転数に関しても同様のことがいえる)。That is, before starting the wire harness manufacturing process, the bolt 6 which is properly inserted and screwed into the female screw portion 5a of the nut 5 arranged in the fusible link housing 2 is shown in FIG. As shown in FIG. 2, it is fully tightened and fixed to the nut 5, but as shown in FIG.
When the oblique tightening occurs, the bolt 6 is fixed in the middle of the female screw portion 5a of the nut 5. In the case of the diagonal tightening of the bolt 6, the amount of change X from the bolt insertion start position,
As shown in FIG. 1 (c), there is a large difference from the change amount Y from the bolt insertion start position in the case of the regular full tightening of the bolt 6, and the detection of the oblique tightening of the bolt 6 can be detected by an inexpensive detector. This is easily possible (the same can be said for the number of rotations of the bolt 6 from the start of bolt insertion).
【0017】また、図1(d)に示すボルト6の仮締め
時の正規の螺合状態の位置Hについては、ボルト6を1
回転緩めることで該ボルト6の頭部6aがナット5に対
して何mm上昇されるかが設計的に決定されていること
を利用して、図1(c)に示すボルト6の本締めされ固
定された状態から、図1(d)に示すように、緩めるボ
ルト6の回転数を制御することにより精度良くその寸法
を設定することができる。Further, as shown in FIG. 1 (d), when the bolt 6 is temporarily screwed into the regular threaded position H, the bolt 6 is
By making use of the fact that how much the head 6a of the bolt 6 is raised with respect to the nut 5 by loosening the rotation is designed and determined, the bolt 6 shown in FIG. From the fixed state, as shown in FIG. 1D, by controlling the number of rotations of the bolt 6 to be loosened, the size can be set with high accuracy.
【0018】このように、ヒュージブルリンク4の取付
方法では、ワイヤハーネス製造工程の前に、ヒュージブ
ルリンクハウジング2に配置されたナット5にボルト6
を本締めした後で、再度該ボルト6を緩めて仮締め状態
に戻すことにより、正規の螺合状態であるボルト6の本
締め位置の変化量Yとボルト6の斜め締め位置の変化量
Xとの差が大きくなり、先行技術の方法よりもボルト6
の斜め締めを安価な検知機等により簡単かつ正確に検知
することができる。即ち、最もボルト6の斜め締めを起
こし易いボルト組み付けをワイヤハーネス製造工程では
なく部品単品状態の際に行い、しかも、ボルト6に斜め
締めが発生した場合にはその検知が極めて容易になって
該ボルト6の斜め締めを低コストで確実に防止すること
ができる。また、ワイヤハーネス製造工程にてボルト組
み付けをする必要がなくなるため、組立作業効率がアッ
プする。さらに、ボルト6の斜め締めが防がれるため、
ヒュージブルリンク4の脚部4aと端子9の接続部9b
が常に良好な状態で正確かつ確実に接続される。As described above, according to the method of mounting the fusible link 4, before the wire harness manufacturing process, the bolt 6 is attached to the nut 5 arranged in the fusible link housing 2.
After the bolts 6 are fully tightened, the bolts 6 are loosened again to return to the temporarily tightened state, so that the amount of change Y in the fully tightened position of the bolt 6 and the amount of change X in the obliquely tightened position of the bolt 6 in the normal screwed state. And the bolt 6 is larger than the prior art method.
Can be easily and accurately detected by an inexpensive detector or the like. In other words, the bolt assembly that is most likely to cause the bolt 6 to be diagonally tightened is performed not in the wire harness manufacturing process but in the state of a single component, and when diagonal tightening of the bolt 6 is detected, the detection becomes extremely easy. Diagonal tightening of the bolt 6 can be reliably prevented at low cost. Further, since it is not necessary to assemble bolts in the wire harness manufacturing process, the efficiency of assembling work is improved. Furthermore, since the diagonal tightening of the bolt 6 is prevented,
Connecting portion 9b between leg 4a of fusible link 4 and terminal 9
Are always connected in good condition accurately and reliably.
【0019】図3は他の実施形態のボルトを示し、図3
(a)は同ボルトのシャンク部に識別手段としての塗料
を施した状態を示す説明図、図3(b)は同ボルトによ
る仮締め状態を示す説明図である。FIG. 3 shows another embodiment of the bolt, and FIG.
FIG. 3A is an explanatory view showing a state in which a paint as an identification means is applied to a shank portion of the bolt, and FIG. 3B is an explanatory view showing a temporarily tightened state by the bolt.
【0020】このボルト6′は、シャンク部6bに識別
手段として所定色の塗料10を塗布してある。このボル
ト6′を用いると、図3(b)に示すように、ワイヤハ
ーネス製造工程前のボルト6′の本締め状態から仮締め
状態に戻す時に塗料10が剥がれて、該ボルト6′の仮
締め状態が簡単に検知される。即ち、ボルト6′の仮締
め作業の完了が、該ボルト6′のシャンク部6bに施さ
れた塗料10が剥がれることにより簡単に確認される。
また、ボルト6′の本締め、戻し仮締めの作業の中で
も、ボルト6′の本締め時に斜め締めが発生した場合
に、戻し仮締めの作業でボルト6′の外れ、戻し作業不
可等による斜め締めの検知も可能となる。The bolt 6 'has a predetermined color paint 10 applied to the shank 6b as identification means. When the bolt 6 'is used, as shown in FIG. 3B, the paint 10 is peeled off when the bolt 6' is returned from the fully tightened state to the temporarily tightened state before the wire harness manufacturing process, and the bolt 6 'is temporarily removed. The tightening state is easily detected. That is, the completion of the temporary tightening operation of the bolt 6 'can be easily confirmed by peeling off the paint 10 applied to the shank 6b of the bolt 6'.
Also, in the case where the bolt 6 'is fully tightened and the temporary return work is performed, when the diagonal tightening occurs during the final tightening of the bolt 6', the bolt 6 'is disengaged in the work of the temporary return tightening, and the slant due to the impossible return work. Tightening can also be detected.
【0021】尚、前記各実施形態によれば、高い電流特
性が要求される螺着型のヒュージブルリンクの取付方法
について説明したが、低い電流特性のヒュージブルリン
ク(ヒューズ)の取付方法等に応用しても良い。また、
ボルトのシャンク部に施される識別手段は塗料に限るも
のでないことは勿論である。According to each of the above embodiments, the method of mounting a screw-type fusible link requiring high current characteristics has been described. However, the method of mounting a fusible link (fuse) having low current characteristics, etc., has been described. May be applied. Also,
Of course, the identification means applied to the shank portion of the bolt is not limited to paint.
【0022】[0022]
【発明の効果】以上説明したように、請求項1の発明に
よれば、ヒュージブルリンクの脚部と電線の端子の接続
部とをナットに対するボルトの本締めにより接続する工
程の前に、ヒュージブルリンクハウジングに取り付けら
れたナットにボルトを本締めした後で再度該ボルトを緩
めて仮締め状態に戻すことにより、正規の螺合状態であ
るボルトの本締め位置とボルトの斜め締め位置との差が
大きくなり、先行技術の方法よりもボルトの斜め締めを
簡単かつ低コストで検知することができる。これによ
り、ボルトの斜め締めを簡単かつ確実に防止することが
でき、ヒュージブルリンクの脚部と端子の接続部とを常
に良好な状態で正確かつ確実に接続することができる。As described above, according to the first aspect of the present invention, before the step of connecting the leg of the fusible link and the connection part of the terminal of the electric wire by the final tightening of the bolt with respect to the nut, the fusible link is required. After the bolt is fully tightened to the nut attached to the bull link housing, the bolt is loosened again and returned to the temporarily tightened state, so that the final tightening position of the bolt and the obliquely tightened position of the bolt, which are in a normal screwed state, can be adjusted. The difference is greater and diagonal tightening of the bolt can be detected more simply and at lower cost than in prior art methods. Thereby, the diagonal tightening of the bolt can be easily and reliably prevented, and the leg portion of the fusible link and the connecting portion of the terminal can always be connected accurately and reliably in a good state.
【0023】請求項2の発明によれば、請求項1の効果
に加え、ボルトの仮締め作業の完了を、該ボルトのシャ
ンク部に施された識別手段が剥がれることにより簡単に
検知することができる。According to the second aspect of the present invention, in addition to the effect of the first aspect, the completion of the temporary fastening operation of the bolt can be easily detected by peeling off the identification means provided on the shank portion of the bolt. it can.
【図1】(a)は本発明の実施形態のヒュージブルリン
クボックスのヒュージブルリンクと端子の接続に用いる
ボルトのナットに対する本締め前の状態を示す説明図、
(b)は同ボルトの本締め締結途中の説明図、(c)は
同ボルトの正規の螺合状態である本締め状態を示す説明
図、(d)は同ボルトを本締め状態から緩めて仮締め状
態に戻した状態を示す説明図、(e)は同ボルトの仮締
め状態におけるヒュージブルリンクボックスの斜視図で
ある。FIG. 1 (a) is an explanatory view showing a state before a nut of a bolt used for connecting a fusible link and a terminal of a fusible link box according to an embodiment of the present invention before final tightening;
(B) is an explanatory view of the bolt in the process of being fully tightened, (c) is an explanatory view showing a fully tightened state of the bolt in a regular screwed state, and (d) is a state in which the bolt is loosened from the fully tightened state. FIG. 4E is an explanatory view showing a state in which the bolt is returned to a temporarily tightened state, and FIG. 7E is a perspective view of the fusible link box in a temporarily tightened state of the bolt.
【図2】上記ボルトの斜め締め状態を示す説明図であ
る。FIG. 2 is an explanatory view showing an obliquely tightened state of the bolt.
【図3】(a)はボルトのシャンク部に識別手段として
の塗料を施した状態を示す説明図、(b)は同ボルトに
よる仮締め状態を示す説明図である。FIG. 3A is an explanatory view showing a state in which a paint as an identification means is applied to a shank portion of a bolt, and FIG. 3B is an explanatory view showing a temporarily tightened state by the bolt.
【図4】先行技術のヒュージブルリンクボックスのヒュ
ージブルリンクと端子の接続前の状態を示す分解斜視図
である。FIG. 4 is an exploded perspective view showing a state before connection of a fusible link and a terminal of a fusible link box of the prior art.
【図5】(a)は上記先行技術の端子のスライド途中の
状態を示す説明図、(b)は同端子のスライド終了状態
を示す説明図である。FIG. 5A is an explanatory view showing a state in which the prior art terminal is being slid, and FIG. 5B is an explanatory view showing a state in which the terminal is slid.
【図6】上記先行技術のヒュージブルリンクと端子との
接続完了状態を示す斜視図である。FIG. 6 is a perspective view showing a state in which the connection between the fusible link and the terminal of the prior art is completed.
【図7】(a)は上記先行技術のヒュージブルリンクと
端子の接続に用いるボルトの仮締め時の正規の螺合状態
を示す説明図、(b)は同ボルトの斜め締め状態を示す
説明図である。FIG. 7A is an explanatory view showing a regular screwing state of a bolt used for connecting the fusible link and the terminal of the prior art at the time of temporary tightening, and FIG. 7B is an explanatory view showing an obliquely tightened state of the bolt. FIG.
2 ヒュージブルリンクハウジング 4 ヒュージブルリンク 4a 脚部 5 ナット 6,6′ ボルト 6a 頭部 6b シャンク部 7 電線 9 端子 9a ブリッジ部 9b 接続部 10 塗料(識別手段) 2 fusible link housing 4 fusible link 4a leg 5 nut 6, 6 'bolt 6a head 6b shank 7 wire 9 terminal 9a bridge 9b connection 10 paint (identification means)
Claims (2)
ジブルリンクを装着し、このヒュージブルリンクの脚部
と電線の端子とをボルトにより締め付けて接続する際
に、前記ヒュージブルリンクハウジングに取り付けられ
たナットに前記ボルトを予め仮締めし、その後別工程に
て前記端子をボルト締め付け方向と直交する方向にスラ
イド挿入させて前記ボルトの頭部と前記ヒュージブルリ
ンクの脚部との間に前記端子の接続部を位置させ、次に
前記ボルトを本締めして前記ヒュージブルリンクの脚部
と前記端子の接続部とを接続するようにしたヒュージブ
ルリンクの取付方法であって、 前記別工程に入る前に、前記ヒュージブルリンクハウジ
ングに取り付けられたナットに前記ボルトを一旦本締め
した後で、再度該ボルトを緩めて前記仮締め状態に戻
し、その後別工程にて前記ボルトを再度本締めして前記
ヒュージブルリンクの脚部と前記端子の接続部とを接続
することを特徴とするヒュージブルリンクの取付方法。When a fusible link is mounted on a fusible link housing and a leg of the fusible link is connected to a terminal of an electric wire by bolts, the nut is attached to the fusible link housing. The bolt is temporarily tightened in advance, and then, in a separate step, the terminal is slid and inserted in a direction orthogonal to the bolt tightening direction to connect the terminal of the terminal between the head of the bolt and the leg of the fusible link. And then tightening the bolts to connect the leg portion of the fusible link and the connection portion of the terminal, the fusible link mounting method, before entering the separate step After the bolt is once fully tightened to the nut attached to the fusible link housing, the bolt is loosened again to temporarily tighten the bolt. Back to state, the mounting method then fusible link, characterized in that by the tightening the bolt again connecting the connection portion of the terminal and the leg portion of the fusible link in a separate step.
付方法であって、前記別工程前の前記本締め状態から前
記仮締め状態に戻す時に剥がれる識別手段をシャンク部
に施したボルトを用いることを特徴とするヒュージブル
リンクの取付方法。2. The method for attaching a fusible link according to claim 1, wherein a bolt having a shank portion provided with an identification means that is peeled off when returning from the final tightening state before the separate step to the temporary tightening state is used. A method for mounting a fusible link characterized by the following.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1436798A JPH11213855A (en) | 1998-01-27 | 1998-01-27 | Fusible link fitting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1436798A JPH11213855A (en) | 1998-01-27 | 1998-01-27 | Fusible link fitting method |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH11213855A true JPH11213855A (en) | 1999-08-06 |
Family
ID=11859091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1436798A Pending JPH11213855A (en) | 1998-01-27 | 1998-01-27 | Fusible link fitting method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH11213855A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7914300B2 (en) | 2008-07-16 | 2011-03-29 | Toyota Auto Body Co., Ltd. | Terminal mounting structure in electrical junction box |
KR20170020038A (en) * | 2015-08-13 | 2017-02-22 | 현대자동차주식회사 | Junction Block Of Engine For Vehicle |
-
1998
- 1998-01-27 JP JP1436798A patent/JPH11213855A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7914300B2 (en) | 2008-07-16 | 2011-03-29 | Toyota Auto Body Co., Ltd. | Terminal mounting structure in electrical junction box |
EP2302750A1 (en) * | 2008-07-16 | 2011-03-30 | Toyota Auto Body Co., Ltd. | Terminal installation structure for electrical junction box |
EP2302750A4 (en) * | 2008-07-16 | 2012-04-04 | Toyota Auto Body Co Ltd | Terminal installation structure for electrical junction box |
KR20170020038A (en) * | 2015-08-13 | 2017-02-22 | 현대자동차주식회사 | Junction Block Of Engine For Vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH1131450A (en) | Fusible link mounting method, terminal used therein and fusible link housing | |
US6551147B2 (en) | Battery terminal provided with a current sensor | |
US6891463B2 (en) | Mounting structure of fuse connection terminals on board | |
JP2003182471A (en) | Housing for electronic control device in vehicle | |
JP2903011B2 (en) | Unit support | |
JP2006004733A (en) | Terminal connecting structure using bolt, and electric junction box provided with it | |
JPH11135102A (en) | Rotation preventing structure of battery terminal | |
JP2003506836A (en) | Electrical component fixing device | |
JPH11213855A (en) | Fusible link fitting method | |
JP2544371Y2 (en) | Mounting structure of the junk box | |
JP2002184299A (en) | Structure for preventing operator from forgetting to tighten inclined tightening preventive terminal | |
JPH10210631A (en) | Branch joint box and combining method of branch joint box | |
JP4134026B2 (en) | Fusible link mounting method and fusible link / terminal connection structure | |
JP2965512B2 (en) | Terminal device | |
EP2768081B1 (en) | Structure for connecting wiring conductor | |
JP3094144B2 (en) | Lock structure, lock release jig, and lock release method | |
JP3320993B2 (en) | Structure and method for fixing printed wiring board | |
JP3366215B2 (en) | Press-fit structure of nut in terminal fixing part | |
JP2001314013A (en) | Electric junction box | |
JP2002164141A (en) | Connector unfastening tool | |
JP3275763B2 (en) | Mounting structure of round plate terminals in electrical junction box | |
JP2001035745A (en) | Capacitor device | |
JPH024445Y2 (en) | ||
JP2003148441A (en) | Washer, washer with screw, mounting structure of electronic component, crimp terminal, crimp terminal with screw, and mounting structure of crimp terminal | |
JPH09120849A (en) | Locking structure for bolt and nut for terminal connection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Effective date: 20040715 Free format text: JAPANESE INTERMEDIATE CODE: A971007 |
|
A131 | Notification of reasons for refusal |
Effective date: 20041102 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
A521 | Written amendment |
Effective date: 20041224 Free format text: JAPANESE INTERMEDIATE CODE: A523 |
|
A02 | Decision of refusal |
Effective date: 20050628 Free format text: JAPANESE INTERMEDIATE CODE: A02 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050829 |
|
A911 | Transfer of reconsideration by examiner before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20050901 |
|
A912 | Removal of reconsideration by examiner before appeal (zenchi) |
Effective date: 20051118 Free format text: JAPANESE INTERMEDIATE CODE: A912 |