JPH10292618A - Working scaffolding for wall construction work - Google Patents
Working scaffolding for wall construction workInfo
- Publication number
- JPH10292618A JPH10292618A JP10129997A JP10129997A JPH10292618A JP H10292618 A JPH10292618 A JP H10292618A JP 10129997 A JP10129997 A JP 10129997A JP 10129997 A JP10129997 A JP 10129997A JP H10292618 A JPH10292618 A JP H10292618A
- Authority
- JP
- Japan
- Prior art keywords
- scaffold
- scaffolding
- work
- wall
- exterior wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Movable Scaffolding (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、壁(内壁・外壁)
工事用の作業足場に関する。TECHNICAL FIELD The present invention relates to a wall (inner wall / outer wall)
Related to work scaffolding for construction.
【0002】[0002]
【従来の技術】壁工事の高所作業の足場として、工事現
場では、枠組足場が用いられている。枠組足場は、図2
7の枠組足場ユニット21を上層へ複層段、水平方向へ
複数列並べ図28の枠組足場構成図の如く組み合わせた
ものである。2. Description of the Related Art A framework scaffold is used at a construction site as a scaffold for work at a high place in wall construction. Fig. 2
7 is a combination of the framework scaffolding units 21 as shown in the framework scaffold configuration diagram of FIG.
【0003】枠組足場の1ユニットは、建枠22を2枚
並列に並べ、交差筋かい23を取り付け、建枠22の上
部に布枠24を掛け渡したものである。この作業を繰り
返し、さらにアームロック、階段25、まぐさ、手すり
等を取り付け、図28の枠組足場全体20を構成する。[0003] One unit of the framed scaffold is a structure in which two building frames 22 are arranged in parallel, a cross bracing 23 is attached, and a cloth frame 24 is laid over the building frame 22. This operation is repeated, and arm locks, stairs 25, lintels, handrails, and the like are attached to form the entire framework scaffold 20 of FIG.
【0004】[0004]
【発明が解決しようとする課題】上記の枠組足場の組立
及び不必要になった場合のばらしは、人手によって行わ
れ高所作業となり、作業員の落下事故による人身災害が
多い。また、高所で突風や強風に吹かれると作業中バラ
ンスを失い、墜落事故につながる。また、枠組足場は、
作業のため壁面全体に架け渡す必要があるが、壁面工事
の工事種類が少なく工事量が少ない場合には、足場の稼
働率が悪く枠組足場の費用が割高となる。しかし、工事
種類、工事量が少なくても足場がなくては作業ができな
いのでやめるわけにはいかない。The above-mentioned assembling of the framework scaffolding and disassembly when it becomes unnecessary is performed manually and is performed at a high place, and there are many personal injuries due to accidents of falling workers. In addition, gusts and strong winds at high altitudes can cause loss of balance during work, leading to a crash. Also, the framework scaffold is
Although it is necessary to bridge the entire wall for work, if the type of wall construction is small and the amount of construction is small, the operation rate of the scaffold is poor and the cost of the framework scaffold is expensive. However, even if the type of construction and the amount of construction are small, work cannot be done without scaffolding, so it cannot be stopped.
【0005】従って、本発明は、足場の組立及びばらし
(解体)の危険作業をなくするために、高所での組立及
びばらし作業をなくし省力となるだけでなく、足場の稼
働率を上げて足場コストを低減することのできる作業足
場を提供することを目的とするものである。Accordingly, the present invention eliminates the danger of assembling and disassembling (disassembling) the scaffold, thereby eliminating the need for assembling and disassembling operations at a high place, saving labor, and increasing the operating rate of the scaffold. It is an object of the present invention to provide a work scaffold capable of reducing a scaffold cost.
【0006】[0006]
【課題を解決するための手段】本発明によれば、作業床
を複数持つ枠組を数列並べた枠組のユニットに自動昇降
装置を取り付け、且つ枠組ユニットと自動昇降装置の荷
重を支持して上下動をガイドする壁面に取り付けられる
ガイドレールより構成して成る壁工事用の作業足場とす
る。また、枠組ユニットとしては、作業者が床に立ち作
業の出来る高さを一層分とし上に複数層の床を構成し横
方向に複数列並べた格子状枠組が好適である。また、格
子状枠組の両側に通路用のドアを設けるのが好ましい。
また、自動昇降装置としては、上下一対のラチェットユ
ニットを備え各ラチェットユニットのラチェット爪がガ
イドレールに形成した角穴に交互に入り込む油圧昇降方
式のものが好適である。According to the present invention, an automatic elevating device is attached to a frame unit having a plurality of frames having a plurality of working floors arranged in a line, and the vertical movement of the frame unit and the automatic elevating device is supported. Work scaffolding for wall construction, consisting of guide rails attached to the wall that guides the work. Further, as the framework unit, a lattice-shaped framework in which an operator can stand on the floor and work on one layer, and a plurality of layers are formed on the floor and a plurality of rows are arranged in the horizontal direction is preferable. Further, it is preferable to provide a passage door on both sides of the lattice frame.
Also, as the automatic lifting / lowering device, a hydraulic lifting / lowering type which includes a pair of upper and lower ratchet units and in which ratchet claws of each ratchet unit alternately enter square holes formed in the guide rail is preferable.
【0007】更に、本発明によれば、上記の作業足場に
外壁の型枠を取り付け固定し足場と型枠を同時に上段へ
上昇させることができる。また、ガイドレールを短く
し、足場ユニットとレールを交互に上昇、下降すること
もできる。Further, according to the present invention, a formwork of an outer wall is attached to and fixed to the work scaffold, and the scaffold and the formwork can be simultaneously raised to an upper stage. Further, the guide rail can be shortened, and the scaffold unit and the rail can be alternately raised and lowered.
【0008】本発明によれば、自動昇降装置により自動
的に足場を昇降させることができ、足場の高所での組立
及びばらし作業をなくして省力化でき、また足場の稼働
率を上げて足場コストを低減することができる。According to the present invention, the scaffold can be automatically moved up and down by the automatic elevating device, the labor and labor for assembling and disassembling the scaffold at a high place can be eliminated, and the operation efficiency of the scaffold can be increased. Cost can be reduced.
【0009】[0009]
【発明の実施の形態】図1ないし図4に、作業者が床に
立ち作業の出来る高さを一層分とし上に複数層(図示の
例では5層)の床を構成し横方向に複数列(図示の例で
は3列)並べた格子状枠組から成る足場1を示す。この
格子状枠組から成る足場1には、詳細を後述する自動昇
降装置2が左右一対取り付けられている。格子状枠組か
ら成る足場1には、タラップ4、開口蓋5等が設けられ
ている。図中5aは作業員が隣接する格子状枠組に移動
するためのドアである。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIGS. 1 to 4 show a plurality of layers (five layers in the illustrated example) on which a worker can stand on a floor and work on one floor. A scaffold 1 composed of a grid-like framework arranged in rows (three rows in the illustrated example) is shown. A pair of left and right automatic elevating devices 2, which will be described in detail later, are attached to the scaffold 1 made of the lattice-shaped framework. A scaffold 1 composed of a lattice frame is provided with a ramp 4, an opening lid 5, and the like. In the figure, reference numeral 5a denotes a door for an operator to move to an adjacent lattice frame.
【0010】図5及び図6に示す様に、外壁Tにアンカ
ーボルト6が埋め込まれブラケット7を介してガイドレ
ール8が外壁Tに沿って上下に設けられている。As shown in FIGS. 5 and 6, an anchor bolt 6 is embedded in an outer wall T, and a guide rail 8 is provided vertically along the outer wall T via a bracket 7.
【0011】図7に自動昇降装置2の一例を示し、上下
一対のラチェットユニット9A、9Bを備え、各ラチェ
ットユニット9A、9Bのラチェット爪10が切り替え
ノブ(図示せず)の操作でガイドレール8に形成した角
穴(図示せず)に交互に入り込み、左右一対の油圧シリ
ンダ11A、11Bにより尺取り虫形式で昇降するもの
であり、それ自体は周知のものである。FIG. 7 shows an example of the automatic elevating device 2, which includes a pair of upper and lower ratchet units 9A and 9B, and the ratchet pawls 10 of the ratchet units 9A and 9B are operated by a switching knob (not shown) to operate the guide rail 8. Are alternately inserted into square holes (not shown) formed in the above, and ascend and descend by a pair of left and right hydraulic cylinders 11A and 11B in the form of a measuring insect, and are well known per se.
【0012】図4ではドア5aが足場1の両側に設けら
れていたが、作業員が直交する外壁に設けた2つの足場
間を移動する場合には、一方の足場に外壁面から突出す
る部分を設け、その突出した部分の足場の背面にドアを
設ければよい。In FIG. 4, the doors 5a are provided on both sides of the scaffold 1. However, when the worker moves between two scaffolds provided on the orthogonal outer wall, one of the scaffolds projects from the outer wall. And a door may be provided on the back of the protruding portion of the scaffold.
【0013】次に、図8ないし図15を参照し足場の自
動昇降の態様について説明する。Next, referring to FIGS. 8 to 15, a description will be given of a mode of automatic lifting and lowering of the scaffold.
【0014】(1) 地上で自動昇降足場1を寝かせた
状態で組み立てる。(1) Assemble with the automatic elevating scaffold 1 lying on the ground.
【0015】(2) 自動昇降足場(以下、足場とい
う)1を地上に垂直に設置し、1階の構造体を構築する
1階の外壁型枠12を外し、昇降装置2により2階へ迫
り上げる。(図8) (3) 足場1を利用してガイドレール8を吊り上げ、
1階の外壁Tに予め埋め込まれたレール取付用のアンカ
ーボルト6のブラケット7と接続して、1階の外壁Tに
取り付ける。(図8) (4) 型枠据付、鉄筋据付、コンクリート打設等を行
い2階の外壁Tの構築体を構築する。2階の外壁型枠1
2を3階へ迫り上げる。2階の外壁Tにアンカーボルト
6を埋め込んでおく。(図9) (5) 2階の外壁Tにガイドレール8を取り付け、1
階、2階のガイドレール8を足掛りとして足場1を1階
分自動昇降装置2により上昇させる。(図10) (6) 3階の外壁Tの構造体を構築する。4階へ外壁
型枠12を迫り上げる。(図11) (7) 3階の外壁Tにガイドレール8を取り付け、2
階、3階のガイドレール8を足掛りとして足場1を1階
分自動昇降装置2により上昇させる。(図12) (8) 以下、図13、図14、図15と同じ作業を繰
り返し、順次上段の構造体を構築し、且つ足場1を昇降
装置2により自動上昇させる。(2) An automatic elevating scaffold (hereinafter, referred to as a scaffold) 1 is installed vertically on the ground, an outer wall formwork 12 on the first floor for constructing a first-floor structure is removed, and the second floor is approached by the elevating device 2. increase. (Fig. 8) (3) Lift the guide rail 8 using the scaffold 1,
It is connected to the bracket 7 of the anchor bolt 6 for rail mounting embedded in the outer wall T of the first floor in advance and attached to the outer wall T of the first floor. (Fig. 8) (4) Formwork installation, rebar installation, concrete casting, etc. are performed to construct a building of the outer wall T on the second floor. Exterior wall formwork 1 on the second floor
2 rises to the 3rd floor. An anchor bolt 6 is embedded in the outer wall T of the second floor. (Fig. 9) (5) Attach the guide rail 8 to the outer wall T on the second floor.
The scaffold 1 is raised by the automatic elevator 2 for one floor, using the guide rails 8 on the first and second floors as a foothold. (FIG. 10) (6) The structure of the outer wall T on the third floor is constructed. The outer wall formwork 12 rises to the fourth floor. (FIG. 11) (7) Attach the guide rail 8 to the outer wall T on the third floor.
Using the guide rails 8 on the third and third floors as a foothold, the scaffold 1 is raised by the automatic elevator 2 for one floor. (FIG. 12) (8) Hereinafter, the same operations as in FIG. 13, FIG. 14, and FIG. 15 are repeated to sequentially build the upper structure, and the scaffold 1 is automatically raised by the lifting device 2.
【0016】(9) 全層の構造体を構築した後に、足
場1をレール8をガイドとして上昇、下降させて外壁T
の仕上工事(外壁コンクリートの補修、ペンキ塗り、タ
イル貼り等の外壁工)を行う。ガイドレール8は外壁工
事完了まで取り付けておく。 (10) 外壁工事が完了した後、足場1に人が乗り、
最上階のレール8を外壁Tより外し、足場1に設置した
ウインチ等の荷降ろし装置で地上に降ろす。(9) After constructing the structure of all layers, the scaffold 1 is raised and lowered by using the rail 8 as a guide, so that the outer wall T
Finishing work (outside wall work such as repair of exterior wall concrete, painting, and tiling). The guide rail 8 is installed until the outer wall construction is completed. (10) After the outer wall construction is completed, a person gets on Scaffold 1,
The rail 8 on the top floor is removed from the outer wall T, and the rail 8 is lowered to the ground by a loading / unloading device such as a winch installed on the scaffold 1.
【0017】(11) 足場1を1層分下へ自動下降さ
せ1層分のレール8を外す。(11) The scaffold 1 is automatically lowered by one layer to remove the rail 8 for one layer.
【0018】(12) これを順次繰り返しながらレー
ル8を取り外すと同時に足場1を地上階まで降ろす。(12) The rails 8 are removed while sequentially repeating the steps, and the scaffold 1 is lowered to the ground floor.
【0019】(13) 地上階まで降ろした足場1は、
地上で水平に寝かせ解体して場外に搬出する。(13) The scaffold 1 lowered to the ground floor is
Lay it horizontally on the ground and dismantle it and carry it out of the venue.
【0020】また、足場1に外壁型枠12を取付け固定
し足場1と型枠12を同時に上段へ上昇させることが出
来る。図16ないし図18にそのための型枠付ユニット
足場1Aを示す。Further, the outer wall form 12 is attached and fixed to the scaffold 1, and the scaffold 1 and the form 12 can be simultaneously raised to the upper stage. FIGS. 16 to 18 show a unit scaffold 1A with a formwork for that purpose.
【0021】型枠12は足場1の上部1階分の高さに取
り付ける。最上階の構造体の構築後、不要となった外壁
型枠12を取り外し足場1は仕上工事専用に使われる。The formwork 12 is mounted at the height of one floor above the scaffold 1. After constructing the structure on the top floor, the unnecessary outer wall formwork 12 is removed, and the scaffold 1 is used exclusively for finishing work.
【0022】型枠付ユニット足場1Aの自動昇降手順を
図19ないし図26に示すが、先に説明した足場ユニッ
ト1の昇降手順と実質上同じであり詳細な説明は省略す
る。ガイドレールの長さを短くし、足場ユニットとレー
ルを交互に上昇・下降する方法も可能である。FIGS. 19 to 26 show the procedure for automatically lifting and lowering the unit scaffold 1A with a formwork. However, the procedure for lifting and lowering the scaffold unit 1 is substantially the same as that described above, and a detailed description thereof will be omitted. A method is also possible in which the length of the guide rail is shortened and the scaffold unit and the rail are alternately moved up and down.
【0023】[0023]
【発明の効果】本発明によれば、足場は自動的に昇降
し、高所での足場の組立及びばらし(解体)の危険な作
業をなくして、省力となり、且つ、足場の稼働率を上げ
て足場コストを低減することができる。本発明の足場
は、現場にて型枠の組立、鉄筋の組立、コンクリート打
設を行う現場打ち鉄筋コンクリート工事を行う足場とし
て、また構造躯体ができ上がった後の外壁の仕上工事用
の足場に威力を発揮する。また、鉄筋コンクリート建物
でも階数が10階以上の高層、超高層の建物の足場に適
している。すなわち、高層になる程枠組足場の組立、解
体の危険度は増し作業が不能となる場合もある。According to the present invention, the scaffold moves up and down automatically, eliminating dangerous work of assembling and disassembling (disassembling) the scaffold at a high place, saving labor and increasing the operating rate of the scaffold. The scaffold cost can be reduced. The scaffold of the present invention is useful as a scaffold for performing cast-in-place reinforced concrete construction for assembling formwork, assembling rebar, and placing concrete on site, and for scaffolding for finishing external walls after a structural frame is completed. Demonstrate. It is also suitable as a scaffold for high-rise or super-high-rise buildings with ten or more floors in reinforced concrete buildings. That is, the risk of assembling and disassembling the framework scaffold increases as the height increases, and the work may become impossible.
【図1】足場ユニットの斜視図。FIG. 1 is a perspective view of a scaffold unit.
【図2】足場ユニットの正面図。FIG. 2 is a front view of the scaffold unit.
【図3】足場ユニットの側面図。FIG. 3 is a side view of the scaffold unit.
【図4】足場ユニットの平面図。FIG. 4 is a plan view of the scaffold unit.
【図5】レールブラケットの平面図。FIG. 5 is a plan view of a rail bracket.
【図6】レールブラケットの側面図。FIG. 6 is a side view of the rail bracket.
【図7】昇降装置の正面図。FIG. 7 is a front view of the lifting device.
【図8】足場の上昇行程を示す第1行程図。FIG. 8 is a first stroke diagram showing a climbing process of the scaffold.
【図9】足場の上昇行程を示す第2行程図。FIG. 9 is a second stroke diagram showing a climbing stroke of the scaffold.
【図10】足場の上昇行程を示す第3行程図。FIG. 10 is a third stroke diagram showing a climbing process of the scaffold.
【図11】足場の上昇行程を示す第4行程図。FIG. 11 is a fourth stroke diagram showing a climbing process of the scaffold.
【図12】足場の上昇行程を示す第5行程図。FIG. 12 is a fifth stroke diagram showing a climbing stroke of the scaffold.
【図13】足場の上昇行程を示す第6行程図。FIG. 13 is a sixth stroke diagram showing a climbing process of the scaffold.
【図14】足場の上昇行程を示す第7行程図。FIG. 14 is a seventh stroke diagram showing a climbing process of the scaffold.
【図15】足場の上昇行程を示す第8行程図。FIG. 15 is an eighth stroke diagram showing a climbing process of the scaffold.
【図16】型枠付足場ユニットの正面図。FIG. 16 is a front view of a scaffold unit with a formwork.
【図17】型枠付足場ユニットの側面図。FIG. 17 is a side view of a scaffold unit with a formwork.
【図18】型枠付足場ユニットの平面図。FIG. 18 is a plan view of a scaffold unit with a formwork.
【図19】型枠付足場の上昇行程を示す第1行程図。FIG. 19 is a first stroke diagram showing a rising stroke of the scaffold with a formwork.
【図20】型枠付足場の上昇行程を示す第2行程図。FIG. 20 is a second stroke diagram showing a rising stroke of the scaffold with a formwork.
【図21】型枠付足場の上昇行程を示す同第3行程図。FIG. 21 is a third stroke diagram showing a rising stroke of the scaffold with a formwork.
【図22】型枠付足場の上昇行程を示す同第4行程図。FIG. 22 is a fourth stroke diagram showing a rising stroke of the scaffold with a formwork.
【図23】型枠付足場の上昇行程を示す同第5行程図。FIG. 23 is a fifth stroke diagram showing a rising stroke of the scaffold with a formwork.
【図24】型枠付足場の上昇行程を示す同第6行程図。FIG. 24 is a sixth stroke diagram showing a rising stroke of the scaffold with a formwork.
【図25】型枠付足場の上昇行程を示す同第7行程図。FIG. 25 is a seventh stroke diagram showing a rising stroke of the scaffold with a formwork.
【図26】型枠付足場の上昇行程を示す同第8行程図。FIG. 26 is an eighth stroke diagram showing a rising stroke of the scaffold with a formwork.
【図27】従来の枠組足場を構成する枠組足場ユニット
の正面図。FIG. 27 is a front view of a framework scaffold unit constituting a conventional framework scaffold.
【図28】従来の枠組足場の正面図。FIG. 28 is a front view of a conventional framework scaffold.
1・・・足場 2・・・昇降装置 3・・・扉 4・・・タラップ 5・・・開口蓋 6・・・アンカボルト 7・・・ブラケット 8・・・レール 9A、9B・・・ラチェットユニット 10・・・ラチェット爪 11A、11B・・・油圧シリンダ 12・・・外壁型枠 DESCRIPTION OF SYMBOLS 1 ... Scaffold 2 ... Elevating device 3 ... Door 4 ... Trap 5 ... Opening lid 6 ... Anchor bolt 7 ... Bracket 8 ... Rail 9A, 9B ... Ratchet Unit 10: Ratchet claw 11A, 11B: Hydraulic cylinder 12: Outer wall form
Claims (5)
のユニットに自動昇降装置を取り付け、且つ枠組ユニッ
トと自動昇降装置の荷重を支持して上下動をガイドする
壁面に取り付けられるガイドレールより構成して成るこ
とを特徴とする壁工事用の作業足場。An automatic elevating device is mounted on a frame unit in which a plurality of frames having a plurality of working floors are arranged in a row, and a guide rail mounted on a wall for guiding the vertical movement while supporting the load of the frame unit and the automatic elevating device. A work scaffold for wall work, characterized by comprising.
の出来る高さを一層分とし上に複数層の床を構成し横方
向に複数列並べた格子状枠組であることを特徴とする請
求項1に記載の壁工事用の作業足場。2. The frame unit is a lattice-shaped frame in which a worker can stand on the floor and work at a height by one layer, a plurality of floors are formed on the floor, and a plurality of rows are arranged in a horizontal direction. The work scaffold for wall construction according to claim 1.
たことを特徴とする請求項2に記載の壁工事用の作業足
場。3. The work scaffold according to claim 2, wherein doors for passages are provided on both sides of the lattice frame.
ユニットを備え各ラチェットユニットのラチェット爪が
ガイドレールに形成した角穴に交互に入り込む油圧昇降
方式のものであることを特徴とする請求項1に記載の壁
工事用の作業足場。4. The automatic lifting device according to claim 1, wherein the automatic lifting device comprises a pair of upper and lower ratchet units, and a hydraulic lifting system in which ratchet claws of each ratchet unit alternately enter square holes formed in the guide rail. Work scaffolding for wall construction as described in.
り付け固定して成ることを特徴とする請求項1に記載の
壁工事用の作業足場。5. The work scaffold for wall work according to claim 1, wherein a formwork is attached and fixed to a framework unit constituting the scaffold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10129997A JP3179045B2 (en) | 1997-04-18 | 1997-04-18 | Wall construction method with work scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10129997A JP3179045B2 (en) | 1997-04-18 | 1997-04-18 | Wall construction method with work scaffold |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10292618A true JPH10292618A (en) | 1998-11-04 |
JP3179045B2 JP3179045B2 (en) | 2001-06-25 |
Family
ID=14296950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10129997A Expired - Fee Related JP3179045B2 (en) | 1997-04-18 | 1997-04-18 | Wall construction method with work scaffold |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3179045B2 (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011032067A (en) * | 2009-08-04 | 2011-02-17 | Nihon Bisoh Co Ltd | Mounting bracket for temporary guide rail |
JP2012082682A (en) * | 2010-10-14 | 2012-04-26 | Consolswc Co Ltd | Building work cage having extended function |
KR20160089058A (en) * | 2015-01-18 | 2016-07-27 | 정용주 | Method Of Electric Powered Multistage Work Platform |
JP2017053088A (en) * | 2015-09-07 | 2017-03-16 | 株式会社大林組 | Lifting device for platform, and construction method of structure |
JP2017101506A (en) * | 2015-12-04 | 2017-06-08 | 株式会社新成工業 | Door panel for suspending scaffold lateral wall, suspending scaffold lateral wall and suspending scaffold with lateral wall |
CN107090968A (en) * | 2017-04-17 | 2017-08-25 | 甘肃第六建设集团股份有限公司 | Integrated form attached lifting scaffold and its elevating method |
CN110005185A (en) * | 2019-05-05 | 2019-07-12 | 上海建工一建集团有限公司 | A kind of single load bearing converting system and construction method |
JP2020033791A (en) * | 2018-08-31 | 2020-03-05 | 株式会社タカミヤ | Mobile elevation type scaffold |
CN114704068A (en) * | 2022-06-07 | 2022-07-05 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
CN115142658A (en) * | 2022-08-17 | 2022-10-04 | 中建七局第二建筑有限公司 | Combined attached lifting scaffold system |
CN115142662A (en) * | 2022-08-17 | 2022-10-04 | 中建七局第二建筑有限公司 | Installation and construction method of attached lifting scaffold |
WO2022252829A1 (en) * | 2021-05-31 | 2022-12-08 | 上海建工二建集团有限公司 | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building |
-
1997
- 1997-04-18 JP JP10129997A patent/JP3179045B2/en not_active Expired - Fee Related
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011032067A (en) * | 2009-08-04 | 2011-02-17 | Nihon Bisoh Co Ltd | Mounting bracket for temporary guide rail |
JP2012082682A (en) * | 2010-10-14 | 2012-04-26 | Consolswc Co Ltd | Building work cage having extended function |
CN102454302A (en) * | 2010-10-14 | 2012-05-16 | 康索斯韦克有限公司 | Cage for construction work with extendable function |
KR20160089058A (en) * | 2015-01-18 | 2016-07-27 | 정용주 | Method Of Electric Powered Multistage Work Platform |
JP2017053088A (en) * | 2015-09-07 | 2017-03-16 | 株式会社大林組 | Lifting device for platform, and construction method of structure |
JP2017101506A (en) * | 2015-12-04 | 2017-06-08 | 株式会社新成工業 | Door panel for suspending scaffold lateral wall, suspending scaffold lateral wall and suspending scaffold with lateral wall |
CN107090968A (en) * | 2017-04-17 | 2017-08-25 | 甘肃第六建设集团股份有限公司 | Integrated form attached lifting scaffold and its elevating method |
CN107090968B (en) * | 2017-04-17 | 2021-02-26 | 甘肃第六建设集团股份有限公司 | Lifting method of integrated attached lifting scaffold |
JP2020033791A (en) * | 2018-08-31 | 2020-03-05 | 株式会社タカミヤ | Mobile elevation type scaffold |
CN110005185A (en) * | 2019-05-05 | 2019-07-12 | 上海建工一建集团有限公司 | A kind of single load bearing converting system and construction method |
WO2022252829A1 (en) * | 2021-05-31 | 2022-12-08 | 上海建工二建集团有限公司 | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building |
CN114704068A (en) * | 2022-06-07 | 2022-07-05 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
CN114704068B (en) * | 2022-06-07 | 2022-08-19 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
CN115142658A (en) * | 2022-08-17 | 2022-10-04 | 中建七局第二建筑有限公司 | Combined attached lifting scaffold system |
CN115142662A (en) * | 2022-08-17 | 2022-10-04 | 中建七局第二建筑有限公司 | Installation and construction method of attached lifting scaffold |
CN115142662B (en) * | 2022-08-17 | 2023-08-11 | 中建七局第二建筑有限公司 | Installation construction method of attached lifting scaffold |
CN115142658B (en) * | 2022-08-17 | 2024-03-15 | 中建七局第二建筑有限公司 | Combined attached lifting scaffold system |
Also Published As
Publication number | Publication date |
---|---|
JP3179045B2 (en) | 2001-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6557817B2 (en) | Wall climbing form hoist | |
CN108625483B (en) | Equipment for jacking construction of assembled additional elevator shaft structure | |
JP3179045B2 (en) | Wall construction method with work scaffold | |
AU2019316713B2 (en) | Method of erecting a multi-storey structure and facade | |
KR20220154087A (en) | construction method | |
WO2019241257A1 (en) | Concrete forming system | |
JP3196043B2 (en) | Construction method of stairs and staircase, construction method of stairs, and stair members | |
CN104929353A (en) | Detachable stepwise automatic climbing operating platform for elevator shafts | |
JP4027170B2 (en) | External scaffold device and construction method of external scaffold device | |
JP2001098559A (en) | Total lift-up form device | |
JP2004044298A (en) | Built-up scaffolding and method of building up the same | |
JP2874576B2 (en) | Moving scaffold for retaining wall construction | |
JP4011722B2 (en) | Hanging stairs | |
JPH09296610A (en) | Outside curing unit | |
KR101219466B1 (en) | Method for constructing framework and outer window simultaneously | |
CN116335398B (en) | Multilayer rapid construction method | |
CN116181041B (en) | Building machine of multilayer quick construction | |
JP4037735B2 (en) | Elevator construction method | |
RU2276244C2 (en) | Movable form with mechanized set for floor structure erection | |
JPH08270205A (en) | Lifting device of prefabricated scaffold and assembling and disassembling work thereof | |
JP3961369B2 (en) | Boarding / exiting stage and construction method in slip form method | |
JP3439545B2 (en) | Construction method of multi-story parking lot | |
KR200432806Y1 (en) | Gangform for Opened Structure Construction | |
JPH0776914A (en) | Hanging-down construction method of steel stairs | |
JPH08303006A (en) | Building and scrapping construction method for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |