JPH0291232A - Sliver ending machine of ring spinning frame - Google Patents
Sliver ending machine of ring spinning frameInfo
- Publication number
- JPH0291232A JPH0291232A JP23854988A JP23854988A JPH0291232A JP H0291232 A JPH0291232 A JP H0291232A JP 23854988 A JP23854988 A JP 23854988A JP 23854988 A JP23854988 A JP 23854988A JP H0291232 A JPH0291232 A JP H0291232A
- Authority
- JP
- Japan
- Prior art keywords
- yarn
- spun
- bobbin
- machine
- roving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007378 ring spinning Methods 0.000 title claims abstract description 23
- 238000009987 spinning Methods 0.000 claims description 11
- BQCADISMDOOEFD-UHFFFAOYSA-N Silver Chemical compound [Ag] BQCADISMDOOEFD-UHFFFAOYSA-N 0.000 abstract 2
- 229910052709 silver Inorganic materials 0.000 abstract 2
- 239000004332 silver Substances 0.000 abstract 2
- 238000004804 winding Methods 0.000 description 5
- 239000000470 constituent Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000006116 polymerization reaction Methods 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H15/00—Piecing arrangements ; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing
- D01H15/013—Carriages travelling along the machines
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
Description
【発明の詳細な説明】
産業上の利用分野
この発明はリング精紡機のスピンドル列に沿って間欠移
動し、各スピンドル位置において紡出中の小玉ボビンの
組糸を予め準備した満ボビンの粗糸に篠継ぎするように
したリング精紡機の篠継機に関するものである。DETAILED DESCRIPTION OF THE INVENTION Field of Industrial Application This invention moves intermittently along the spindle row of a ring spinning frame, and at each spindle position, the roving yarn of the full bobbin is prepared in advance for the yarn of the small bobbin being spun. The present invention relates to a splicing machine for a ring spinning machine that is designed to splice.
従来の技術
従来4この種の篠継機としては特開昭62−53425
号公報に示されているようにクリールの前列の篠巻ボビ
ンが小玉ボビンになったときに機台の一端側から他端側
に向けて間欠移動し、複数の小玉ボビンの組糸を予め準
備した満ボビンの組糸に篠継ぎしていくものや、特開昭
63−57478号公報に示されているようにクリール
前後2列の篠巻ボビンの1つおきのものが小玉ボビンに
なったときに機台の一端側から他端側に向けて間欠移動
し1前後2個の粗糸を予め予備レールに準備した満ボビ
ンの組糸に篠継ぎしていくものが知られている。上記篠
継機による篠継作業はその作業中に管糸が満玉になるの
を防ぐ為に管糸が5分玉又は6分玉程度になる前に開始
し、管糸が満玉になる前に総ての作業を終了するように
管理している。上記篠継機による篠継ぎはドラフト部に
引き込まれている粗糸端に満ボビンの粗糸端を重ねて継
ぐ追継方法にて行っており、この方法では篠継ぎ部分が
粗糸の重なりによって太くなるのでその篠継ぎ部分の紡
出糸が太くなり、その結果篠継ぎ部分の紡出糸のバルー
ニングが異常に大きくなり、紡出糸がリング精紡機のス
ネルワイヤーに取付けられているスラブキャッチャ−に
糸が引っ掛かり、糸切れを発生することになる。その為
、従来は上記篠継時の糸切れを防ぐ為に、リング精紡機
のスピンドルの回転数を低下させて紡出糸のバルーニン
グが大きくならないようにしたり、紡出糸がスラブキャ
ッチャ−に引っ掛かりにくくする為に篠継機が篠継ぎ作
業するタイミングを管糸の巻玉が5分玉程度に大きくな
ってアンチノードリングがスネルワイヤーに成程度近づ
いた時点で行うように工夫しているのが実情である。Conventional technology Conventional 4 This type of Shino joint machine is disclosed in Japanese Patent Application Laid-Open No. 62-53425.
As shown in the publication, when the Shinomaki bobbin in the front row of the creel becomes a small bobbin, the machine table moves intermittently from one end side to the other end to prepare threads for multiple small bobbins in advance. As shown in Japanese Unexamined Patent Publication No. 63-57478, every other Shinomaki bobbin in two rows at the front and back of the creel became a small bobbin. It is known that the machine moves intermittently from one end to the other end of the machine and splices two roving threads, one front and one back, onto a full bobbin braid prepared in advance on a spare rail. In order to prevent the pipe yarn from becoming full during the work, the Shino-joining work using the above-mentioned Shino-jointing machine starts before the pipe yarn reaches a 5-minute or 6-minute ball, and the pipe yarn becomes full. I manage to finish all the work beforehand. Shino splicing using the above-mentioned Shino splicing machine is performed by overlapping the roving end of a full bobbin on the roving end drawn into the draft section. As the spun yarn becomes thicker, the spun yarn at the spliced part becomes thicker, and as a result, the ballooning of the spun yarn at the spun joint part becomes abnormally large. The thread will get caught and breakage will occur. Therefore, conventionally, in order to prevent yarn breakage during the above-mentioned splicing, the rotation speed of the spindle of the ring spinning machine was lowered to prevent the ballooning of the spun yarn from increasing, or to prevent the spun yarn from getting caught in the slab catcher. In order to make it more difficult, we have devised the timing for the Shino-joining machine to perform the Shino-joining work when the winding bobbin of the pipe yarn has grown to about a 5-minute bobbin size and the anti-node ring has approached the size of the Snell wire. This is the reality.
発明が解決しようとする課題
り記のように篠継機によって篠継ぎする際、篠継ぎ部分
の糸切れを防ぐ為にスピンドルの回転数を低下させるこ
とは、リング精紡機の生産性が低下する大きな問題点が
あり、また管糸の巻玉が大きくなってから篠継ぎ作業を
開始するようにすることは、篠継ぎを開始してから管糸
が満玉になる迄の時間が短くなり、その結果リング精紡
機のスピンドル数が多いと篠継ぎを完了する前に管糸が
満玉になることになるので最近の900錘以上のロング
精紡機には対応できない問題点がある。そこで1本発明
の課題は上記問題点を解決し、篠継ぎの際の篠継ぎ部分
の糸切れをリング精紡機のスピンドルの回転数を低くす
ることなく防止でき、しかもロングのリング精紡機にも
充分に対応し得る精紡機の篠継機を提供することにある
。Problems to be Solved by the Invention When splicing with a splicing machine, reducing the rotational speed of the spindle in order to prevent thread breakage at the spliced part reduces the productivity of the ring spinning machine. There is a big problem, and starting the Shino-joining work after the number of rolled balls of yarn becomes large shortens the time from the start of Shino-joining to the time when the yarn becomes full. As a result, if the ring spinning machine has a large number of spindles, the pipe yarn will become full before the splicing is completed, which is a problem that cannot be handled by recent long spinning machines with over 900 spindles. Therefore, one object of the present invention is to solve the above-mentioned problems, to prevent yarn breakage at the spliced part during splicing without lowering the rotational speed of the spindle of a ring spinning machine, and to be able to also be applied to a long ring spinning machine. It is an object of the present invention to provide a spinning machine for a spinning machine that can be fully used.
課題を解決するための手段
本発明は上記課題を解決する為に、リング精紡機の篠継
機において、作動位置において紡出糸のバルーニングが
大きくなってもその紡出糸をスラブキャッチャ−の下側
に導くように案内可能な糸案内部材と、その糸案内部材
を粗糸の篠継ぎ部分が紡出される間待機位置から作動位
置に移動可能な移動装置を備え゛て成ることを特徴とし
ている。Means for Solving the Problems In order to solve the above-mentioned problems, the present invention aims to prevent the spun yarn from falling under the slab catcher even if the ballooning of the spun yarn becomes large in the operating position in the spun splicing machine of the ring spinning machine. It is characterized by comprising a yarn guide member that can be guided to the side, and a moving device that can move the yarn guide member from a standby position to an operating position while the spliced portion of the roving is being spun. .
作用
篠継機が各スピンドル位置において篠継作業を行うとき
、組糸の篠継ぎ部分が紡出されて管糸に巻取られる開光
案内部材が移動位置によって待機位置から作動位置に移
動される。組糸の篠継ぎ部分が紡出されるとバルーニン
グが大きくなるが、紡出糸は糸案内部材によってリング
精紡機のスラブキャッチャ−に引っ掛からないように案
内されるので、紡出糸がスラブキャッチャ−の下側に導
くように管糸に巻取られ、紡出糸のバルーニングが大き
くなっても糸切れの発生を防止できる。Operation When the splicing machine performs splicing work at each spindle position, the opening guide member, which spins the spliced portion of the braided yarn and winds it into a pipe yarn, is moved from the standby position to the operating position by the movement position. Ballooning increases when the spun joint part of the braided yarn is spun, but the spun yarn is guided by the yarn guide member so that it does not get caught in the slab catcher of the ring spinning machine, so the spun yarn does not get caught in the slab catcher of the ring spinning machine. It is wound around the tube yarn so as to guide it downward, and even if the ballooning of the spun yarn becomes large, the occurrence of yarn breakage can be prevented.
実施例
第6図は一般的なリング精紡機1と、そのリング精紡機
1での篠継ぎ、篠交換を行う篠継機2を示している。先
ず、リング精紡機1において、3は機台、4はスピンド
ルレール、5はスピンドルで、管糸(ボビン)6が挿着
されている。また7はリングレール、8はツセパレータ
、9はアンチノードリング、10はドラフト部、11は
トランペット、12はラペットアングルである。このラ
ペトアングル12には第3図〜第5図に示すように周知
のラペット13が取着され、そのラペット13にスネル
ワイヤー15が止着されている。」ユ記うペトアングル
12はリングレール7の昇降範囲が上昇するに伴って即
ち管糸6の巻玉が大きくなるに伴って上昇し、アンチノ
ードリング9とスネルワイヤー15との間隔を所定大き
さ以上に維持するようにしである。また上記スネルワイ
ヤー15には周知のスラブキャッチャ−16が一体に設
けられ、風綿等の混入によるスラブの発生によって紡出
糸のバルーニングが大きくなったときに、その紡出糸を
スラブキャッチャ−16に引っ掛けて強制的に切断し、
バルーニングの大きくなった紡出糸が隣の紡出糸と干渉
して共切れするのを防ぐようにしである。また、18は
クリールを示し、これにおいて、19はクリールピラー
、21はクリールピラー19に固着された支持腕、22
は支持腕21に止着された吊下杆、23は吊下杆22に
止着された前側レール、24はクリールピラー19に止
着された後側レールである。これら前。Embodiment FIG. 6 shows a general ring spinning frame 1 and a chain linking machine 2 that performs chain linking and chain replacement in the ring spinning machine 1. First, in a ring spinning machine 1, 3 is a frame, 4 is a spindle rail, and 5 is a spindle, into which a bobbin 6 is inserted. Further, 7 is a ring rail, 8 is a tube separator, 9 is an anti-node ring, 10 is a draft portion, 11 is a trumpet, and 12 is a lappet angle. A well-known lappet 13 is attached to the lappet angle 12, as shown in FIGS. 3 to 5, and a snell wire 15 is fixed to the lappet 13. The pet angle 12 rises as the lifting range of the ring rail 7 rises, that is, as the winding of the tube yarn 6 becomes larger, and adjusts the distance between the antinode ring 9 and the Snell wire 15 to a predetermined size. I try to keep it above that. Further, a well-known slab catcher 16 is integrally provided with the Snell wire 15, and when the ballooning of the spun yarn becomes large due to the generation of slabs due to the inclusion of fluff, etc., the spun yarn is caught by the slab catcher 16. hooked on and forcibly disconnected,
This is to prevent a spun yarn with increased ballooning from interfering with an adjacent spun yarn and breaking them together. Further, 18 indicates a creel, in which 19 is a creel pillar, 21 is a support arm fixed to the creel pillar 19, and 22 is a creel.
23 is a front rail fixed to the suspension rod 22, and 24 is a rear rail fixed to the creel pillar 19. Before these.
後レール23.24には多数の前、後列ボビンハンガー
25.26が夫々着脱自在に支承され、前列ボビンハン
ガー25には小玉ボビン27が吊下され、後列ボビンハ
ンガー26には中玉ボビン28が吊下されている。29
は前、後レール23゜24上に移動自在に載置されてい
る篠入換機で、特公昭60−14848号公報に示され
ているように前、後列ボビンハンガー25.26を一対
ずつ入換え得るようにしである。30は支持腕21の先
端に止着された予備レールで、ボビンキャリッジ31が
移動自在に支持されている。このボビンキャリッジ31
は多数の予備ボビンハンガー32を備え、それらの予備
ボビンハンガー32に満ボビン33が吊下されている。A large number of front and rear row bobbin hangers 25 and 26 are removably supported on the rear rail 23 and 24, respectively, a small bobbin 27 is suspended from the front row bobbin hanger 25, and a medium bobbin 28 is suspended from the rear row bobbin hanger 26. It is suspended. 29
This is a Shino shunter that is movably mounted on the front and rear rails 23 and 24, and a pair of front and rear row bobbin hangers 25 and 26 are inserted as shown in Japanese Patent Publication No. 14848/1983. It is made so that it can be replaced. Reference numeral 30 denotes a spare rail fixed to the tip of the support arm 21, on which the bobbin carriage 31 is movably supported. This bobbin carriage 31
is equipped with a large number of spare bobbin hangers 32, and full bobbins 33 are suspended from these spare bobbin hangers 32.
これらの満ボビン33は前列ボビンハンガー25と対向
するように位置決めされている。These full bobbins 33 are positioned to face the front row bobbin hanger 25.
次に上記篠継機2において、35は本体、36は本体3
5の下部に設けられた車輪、37は本体35の機台側の
正面に設けられたガイドローラで、スピンドルレール4
に止着したガイドレール38に嵌合されている。39は
本体35に装設されている篠継装置、40は同じく篠交
換装置を示すが、これらの装置39.40については特
開昭62−53426号公報に詳述されているので、次
に概要のみ説明する。篠継装置39において、41は予
備ボビンハンガー32に吊下されている6個の満ボビン
33を同時に回転自在に支持する為の支持ヘッドで、後
述の篠交換袋[40の一方の交換ヘッドを兼用している
。この支持ヘッド41は上下、前後動可能な支持バー4
2とその支持バー42の上面に満ボビンに対応させて回
転可能に設けた6個のベツグ43を備えている。44は
満ボビン33の外周から粗糸端を吸引して引出す為の口
出機構で、上下揺動可能な吸引管46と吸引管46に満
ボビン33と対応するように止着されている6本の吸引
ノズル47とを備えている。48は口出しされた満ボビ
ン33の粗糸端を受取った後その粗糸端を小玉ボビン2
7から引出されたトランペット11に導入されている粗
糸27aに篠継ぎする為の篠継機構で1回動かつ前後動
可能に支持されている篠継バー49と、その篠継バー4
9に設けられている6個の篠継ヘッド50を備えている
。その篠継ヘッド50は先端部に満ボビン33の粗糸端
を把持するレバー(図示省略)と小玉ボビン27の粗糸
27aを把持して切断する為のレバー(図示省略)を備
えている。51は篠継ぎした或いは篠継ぎする満ボビン
33の粗糸33aをロービングガイド20に引っ掛ける
為の篠掛はバーで、上下、前後、左右方向へ移動可能に
しである。Next, in the above-mentioned Shinotsugi machine 2, 35 is the main body, and 36 is the main body 3.
5 is a wheel provided at the bottom of the spindle rail 4, and 37 is a guide roller provided on the front side of the machine base of the main body 35.
It is fitted into a guide rail 38 fixed to. Reference numeral 39 denotes a shino connection device installed in the main body 35, and 40 similarly represents a shino exchange device.These devices 39 and 40 are detailed in Japanese Patent Application Laid-Open No. 62-53426, so they will be explained next. Only the outline will be explained. In the Shino joint device 39, reference numeral 41 denotes a support head for rotatably supporting six full bobbins 33 suspended from the spare bobbin hanger 32. It is used for both purposes. This support head 41 is a support bar 4 that can move up and down and back and forth.
2 and its support bar 42 are provided with six bets 43 rotatably provided on the upper surface thereof in correspondence with full bobbins. Reference numeral 44 denotes a feed mechanism for suctioning and pulling out the roving end from the outer periphery of the full bobbin 33, and a suction pipe 46 that can swing up and down and a suction pipe 46 fixed to the suction pipe 46 so as to correspond to the full bobbin 33. A book suction nozzle 47 is provided. 48 receives the roving end of the full bobbin 33 that has been taken out, and transfers the roving end to the small bobbin 2.
A sash joint bar 49 supported so as to be movable one turn and back and forth by a sash joint mechanism for splicing the roving yarn 27a introduced into the trumpet 11 pulled out from the trumpet 11 from the trumpet 11, and the sash joint bar 4
9 are provided with six Shinotsugi heads 50. The shinotsugi head 50 is equipped at its tip with a lever (not shown) for gripping the roving end of the full bobbin 33 and a lever (not shown) for gripping and cutting the roving 27a of the small bobbin 27. Reference numeral 51 denotes a bar for hooking the roving yarn 33a of the full bobbin 33 that has been spliced or to be spliced onto the roving guide 20, and is movable in the vertical, longitudinal, and horizontal directions.
次に、上記篠交換装置40において、52.53は一対
の交換ヘッドで、一方の交換ヘッド52は上記支持ヘッ
ド41によって構成され、他方の交換ヘッド53はその
支持ヘッド41と略同様に構成されている。Next, in the Shino exchange device 40, reference numerals 52 and 53 denote a pair of exchange heads, one exchange head 52 is constituted by the support head 41, and the other exchange head 53 is constructed in substantially the same manner as the support head 41. ing.
更に、上記篠継機2において、54は上記本体35に新
たに装設した糸案内装置で、粗糸継ぎ部分が紡出されて
管糸6に巻取られる間、紡出糸のバルーニングが大きく
なってもその紡出糸がスラブキャッチャ−16に引っ掛
からないように紡出糸を案内するように構成しであるに
の糸案内装置54は第1図〜第5図に示すように構成さ
れている。この糸案内装置54において、55は糸案内
部材として例示する樹脂性の糸案内用で、第4図、第5
図に示す作動位置ではスラブキャッチャ−16の先端部
上に載って従動され、紡出糸のバルーニングが大きくな
ってもその紡出糸をスラブキャッチャ−16の先端部よ
り下側へ円滑に案内して紡出糸がスラブキャッチャ−1
6に引っ掛からないように形成しである。56は上記糸
案内用55を組糸の篠継ぎ部分が紡出されて管糸6に巻
取られる間第3図に実線で示す待機位置から第3図に仮
想線で示す作動位置に移動可能な移動装置である。この
移動装置56において、57は第1図第2図に示すよう
に本体35の枠材35aに固着されている一対の軸受、
58は軸受57によって回動自在に支承されている支持
杆、59は支持杆58に止着されている支持アームで、
上記吸引ノズル47と対応するように6個設けである。Furthermore, in the above-mentioned Shino splicing machine 2, 54 is a yarn guide device newly installed in the main body 35, which prevents large ballooning of the spun yarn while the roving spliced portion is spun and wound around the pipe yarn 6. The yarn guide device 54 is configured to guide the spun yarn so that it does not get caught in the slab catcher 16 even if the yarn is caught in the slab catcher 16. There is. In this thread guide device 54, reference numeral 55 denotes a resin thread guide exemplified as a thread guide member;
In the operating position shown in the figure, it rests on the tip of the slab catcher 16 and is driven, and even if the ballooning of the spun yarn becomes large, the spun yarn is smoothly guided below the tip of the slab catcher 16. The spun yarn is slab catcher 1.
It is formed so that it does not get caught on the 6. 56 is capable of moving the yarn guide 55 from a standby position shown by a solid line in FIG. 3 to an operating position shown by a phantom line in FIG. It is a mobile device. In this moving device 56, 57 is a pair of bearings fixed to the frame member 35a of the main body 35 as shown in FIGS.
58 is a support rod rotatably supported by a bearing 57; 59 is a support arm fixed to the support rod 58;
Six nozzles are provided to correspond to the suction nozzles 47 described above.
60は第3図〜第5図に示すように支持アーム59の先
端にシリンダ本体60aを止着されている工アシリンダ
で、ピストンロッド60bをばね60Cによって戻す単
動形のものを示しであるが、複動シリンダで構成しても
良い、上記ピストンロッド60bに上記糸案内用55が
止着されている。As shown in FIGS. 3 to 5, 60 is a working cylinder in which a cylinder body 60a is fixed to the tip of a support arm 59, and is a single-acting type in which the piston rod 60b is returned by a spring 60C. The thread guide 55 is fixedly attached to the piston rod 60b, which may be composed of a double-acting cylinder.
61はシリンダ本体58aに止着されている配管継手、
61Aは配管継手61に連結されているエア給排管で、
一端部は図示しないエア供給源に切換弁を介して連結さ
れている。また、62は第1図、第2図に示すように支
持杆58の一端部に止着されているレバー、63はレバ
ー62を揺動させる為の複動形のエアシリンダで、シリ
ンダ本体63aの端部は本体35に止着されたブラケッ
ト64に、ピストンロッド63bの先端部はレバー62
に夫々ピン連結されている。このエアシリンダ63はピ
ストンロッド63bが突出側へ移動されると糸案内用5
5を第3図に実線で示す下向き状態の待機位置に移動さ
せ、ピストンロッド63bを没入側へ移動させると糸案
内用59を第3図に仮想線で示す斜上向き状態の待機位
置に移動させ、またピストンロッド63bを自由状態に
すると糸案内用59の自重落下を許容するようにしであ
る。上記エアシリンダ60.63は篠継ぎ完了に先立っ
て作動して糸案内用55をスラブキャッチャ−16上に
載せ、篠継ぎ部分が紡出完了した後に逆に作動して糸案
内用55を元に戻すように篠継作業に関連して作動する
ようにしである。61 is a piping joint fixed to the cylinder body 58a;
61A is an air supply/discharge pipe connected to the piping joint 61;
One end is connected to an air supply source (not shown) via a switching valve. Further, 62 is a lever fixed to one end of the support rod 58 as shown in FIGS. 1 and 2, and 63 is a double-acting air cylinder for swinging the lever 62, and the cylinder body 63a The end of the piston rod 63b is connected to a bracket 64 fixed to the main body 35, and the tip of the piston rod 63b is connected to a lever 62.
are connected to each other by pins. When the piston rod 63b is moved to the projecting side, the air cylinder 63
5 to the downward waiting position shown by the solid line in FIG. 3, and moving the piston rod 63b to the retracted side, the thread guide 59 is moved to the diagonally upward waiting position shown by the imaginary line in FIG. Furthermore, when the piston rod 63b is set in a free state, the thread guide 59 is allowed to fall under its own weight. The air cylinders 60 and 63 operate prior to the completion of the splicing to place the yarn guide 55 on the slab catcher 16, and operate in reverse to place the yarn guide 55 on the slab catcher 16 after the splicing is completed. It is intended to be operated in conjunction with Shinotsugu work to return it.
次に、上記篠継機2の作動について説明する。Next, the operation of the above-mentioned Shino connecting machine 2 will be explained.
先ず前列ボビンハンガー25に吊下されているボビンが
小ボビン27になると、管糸6の巻量が5〜6分玉程度
(この巻量はスピンドル5の数即ちそのリング精紡機で
篠継作業に要する時間の長短で変わる)より前にあるこ
とを確認した後、篠継機2がスピン用5列に沿って機台
3の一端側から他端側へ向けて移動され、最初の篠継作
業位置即ち篠継ヘッド50が篠継ぎすべき小玉ボビン2
7の粗糸27aと対向する位置で位置決め停止される。First, when the bobbin suspended from the front row bobbin hanger 25 becomes the small bobbin 27, the winding amount of the tube yarn 6 is about 5 to 6 minutes (this winding amount is the number of spindles 5, that is, the ring spinning machine is used for spinning work). After confirming that the machine is in front of the machine (which varies depending on the length of time required for Working position, that is, the small bobbin 2 to be spliced by the splicing head 50
It is positioned and stopped at a position facing No. 7 roving 27a.
次に、篠継装置39の支持ヘッド41が第6図の矢印の
ように上下動して満ボビン33を予備ボビンハンガー3
2からペッグ43上に取外し、また口出しノズル47が
矢印のように上昇されてその吸引口がペッグ43上の満
ボビン33の外周面付近でかつ満ボビン33の粗糸端の
高さに位置され、吸引口に吸引力を作用させる。その状
態で満ボビン33が巻戻し側へ回転され、満ボビン33
の組糸端が吸引ノズル47に吸引保持される。Next, the support head 41 of the connecting device 39 moves up and down as shown by the arrow in FIG.
2 onto the peg 43, and the outlet nozzle 47 is raised as shown by the arrow so that its suction port is located near the outer peripheral surface of the full bobbin 33 on the peg 43 and at the height of the roving end of the full bobbin 33. , apply suction force to the suction port. In this state, the full bobbin 33 is rotated to the unwinding side, and the full bobbin 33
The end of the braided thread is suctioned and held by the suction nozzle 47.
その後吸引ノズル47が元位置に下降して満ボビン33
の組糸を引き下げ、その粗糸端を篠継ヘッド50の先端
部に導く。次に、篠継ヘッド50が上記粗糸を把持した
後上方へ揺動して吸引ノズル47との間の粗糸を筆先状
に切断し、その後篠継ヘッド50が前進してその組糸を
上記トランペット11へ導入されている粗糸27aに重
合させ、同時に上記組糸の把持を解決すると共に粗糸2
7aを把持してその粗糸27aを切断する。その結果、
満ボビン33の粗糸の切断端は小玉ボビン27の組糸の
切断端と重なった状態でトランペット11からドラフト
部10に誘導されて篠継ぎされ、その後篠継ヘッド50
が元に戻される。その後篠掛はレバー51が矢印のよう
に上下動されて篠継ぎされた満ボビン33の組糸を上方
へ持上げてロービングガイド20に引っ掛け、また上記
支持ヘッド43が上昇して満ボビン33を上方へ待避さ
せる。その状態で篠交換装置40の交換ヘッドが移動し
て小玉ボビン27を前列ボビンハンガー25から取外し
た後元に戻り、その後上記支持ヘッド43(交換ヘッド
52)が移動して満ボビン33を前列ボビンハンガー2
5に挿着し、また交換ヘッド53が移動して小玉ボビン
27を予備ボビンハンガー32に挿着し、その後面交換
ヘッド52.53が元に戻る。After that, the suction nozzle 47 descends to its original position and the full bobbin 33
The braided yarn is pulled down, and the roving end is guided to the tip of the sashimi head 50. Next, the Shinotsugi head 50 grips the roving and swings upward to cut the roving between it and the suction nozzle 47 into a brush tip shape, and then the Shinotsugi head 50 moves forward to separate the braided yarn. The roving yarn 27a introduced into the trumpet 11 is polymerized, and at the same time, the gripping of the braided yarn is solved and the roving yarn 27a is polymerized.
7a and cut the roving 27a. the result,
The cut end of the roving yarn of the full bobbin 33 overlaps the cut end of the braided yarn of the small bobbin 27 and is guided from the trumpet 11 to the draft section 10 and is then spliced.
is restored. After that, the lever 51 is moved up and down as shown by the arrow to lift the braided yarn of the full bobbin 33 upwards and hook it onto the roving guide 20, and the support head 43 rises to move the full bobbin 33 upward. Evacuate to. In this state, the exchange head of the Shino exchange device 40 moves to remove the small bobbin 27 from the front row bobbin hanger 25 and returns to its original position, and then the support head 43 (exchange head 52) moves to transfer the full bobbin 33 to the front row bobbin. hanger 2
5, the exchange head 53 moves again to insert the small bobbin 27 into the spare bobbin hanger 32, and then the exchange heads 52 and 53 return to their original positions.
一方、上記満ボビン33の組糸が小玉ボビン27の粗糸
27aに粗糸継ぎされる前に、糸案内装置54のエアシ
リンダ63のピストンロッド63bが突出し、支持杆5
8を回動させて各エアシリンダ60と糸案内用55を持
上位置に上昇させ、その状態でエアシリンダ60のピス
トンロッド60bが突出し、糸案内用59を対応するス
ラブキャッチャ−16の上方に位置させ、然る後エアシ
リンダ63のピストンロッド63bを自由状態して糸案
内用55を第5図に示すようにスラブキャッチャー16
の先端部に落下させて作動位置に作動させる。従って、
糸案内用55はスラブキャッチャ−16上に載った状態
でそのスラブキャッチャ−16と共に一体的に上昇され
る。上記のように糸案内用55がスラブキャッチャ−1
6上に載せられた状態で、上記篠継作業によって篠継ぎ
された粗糸の篠継ぎ部分がドラフト部10から紡出され
る。粗糸の篠継ぎ部分は2本の粗糸の重合によって5〜
7a1程度の長さに戻って太くなっているので、篠継ぎ
部分の紡出糸は例えば30倍程度のドラフトのとき1.
5m〜2.1m程度の長さに亘って太くなり、その部分
の紡出糸のバルーニングが大きくなる。このように紡出
糸のバルーニングが大きくなると、第5図から明らかな
ように紡出糸はスラブキャッチャ−16の先端に引っ掛
かろうとする。ところが本実施例では上記のようにスラ
ブキャッチャ−16上に糸案内用55が載っているので
、紡出糸のバルーニングが大きくなっても紡出糸がその
都度第5図に示すように糸案内用55の下面によってス
ラブキャッチャ−16の下側へ案内され、紡出糸がスラ
ブキャッチャ−16に引っ掛かることがなくなり、紡出
糸のスラブキャッチャ−16による切断が粗糸される。On the other hand, before the braided yarn of the full bobbin 33 is spliced to the roving yarn 27a of the small bobbin 27, the piston rod 63b of the air cylinder 63 of the yarn guide device 54 protrudes, and the support rod 5
8 to raise each air cylinder 60 and yarn guide 55 to the lifting position, and in that state, the piston rod 60b of the air cylinder 60 protrudes, and the yarn guide 59 is moved above the corresponding slab catcher 16. After that, the piston rod 63b of the air cylinder 63 is placed in a free state, and the thread guide 55 is moved to the slab catcher 16 as shown in FIG.
drop it onto the tip of the device and move it to the operating position. Therefore,
The thread guide 55 is placed on the slab catcher 16 and is raised together with the slab catcher 16. As mentioned above, the thread guide 55 is the slab catcher 1.
6, the spliced portion of the roving spliced by the splicing operation described above is spun out from the draft section 10. The woven seam part of the roving is formed by the polymerization of two rovings.
Since it has returned to a length of about 7a1 and has become thicker, the spun yarn at the shinosetsugi part will be 1.1 when the draft is about 30 times, for example.
The yarn becomes thicker over a length of approximately 5 m to 2.1 m, and ballooning of the spun yarn becomes large in that portion. When the ballooning of the spun yarn increases in this manner, the spun yarn tends to be caught at the tip of the slab catcher 16, as is clear from FIG. However, in this embodiment, since the yarn guide 55 is placed on the slab catcher 16 as described above, even if the ballooning of the spun yarn becomes large, the spun yarn is guided as shown in FIG. The spun yarn is guided to the lower side of the slab catcher 16 by the lower surface of the shaft 55, so that the spun yarn is not caught by the slab catcher 16, and the spun yarn is cut by the slab catcher 16 as a roving.
上記粗糸の篠継ぎ部分が管糸6に巻取られる時間は長く
ても6〜8秒程度(スピンドル5の回転数が速くなると
短くなる)であり、少なくともこの時間だけ糸案内用5
5をスラブキャッチャ−16上に載せておく。上記粗糸
の篠継ぎ部分が管糸6に完全に巻取られた後(上記時間
経過後)上記エアシリンダ63のピストンロッド63b
が再び没入して糸案内用55をスラブキャッチャ−16
上から持上げ、その後エアシリンダ60のピストンロッ
ド60bが投入した後エアシリンダ63のピストンロッ
ド63bが突出して糸案内用55を下向きの待機位置に
復帰させる。上記した一連の作業を終了した後、篠継機
2が再びスピンドル5に沿って移動し、次の篠継ぎ作業
位置に停止して上記−連の作業を繰り返し、以後上記作
動を繰り返すことによってリング°精紡機の篠継ぎ、篠
交換を完了する。The time it takes for the spliced portion of the roving to be wound around the pipe yarn 6 is about 6 to 8 seconds at most (the faster the rotation speed of the spindle 5 is, the shorter it is).
5 is placed on the slab catcher 16. After the spliced portion of the roving has been completely wound around the pipe thread 6 (after the above-mentioned time has elapsed), the piston rod 63b of the air cylinder 63
re-immerses the yarn guide 55 into the slab catcher 16.
After lifting from above, the piston rod 60b of the air cylinder 60 is inserted, and the piston rod 63b of the air cylinder 63 protrudes to return the thread guide 55 to the downward waiting position. After completing the series of operations described above, the shin joint machine 2 moves along the spindle 5 again, stops at the next shin joint work position, repeats the above series of operations, and thereafter repeats the above operations to create a ring. °Complete the splicing and replacement of spinning machines.
第7図〜第9図は糸案内装置の異なる実施例を示してい
る。図面に示す糸案内装置54 eの移動装置56eに
おいて、70は本体35eの枠材35be、35ce間
に架設した前後方向のガイドロッドで、複数配設され、
これらのガイドロッド70に可動枠71が移動自在に支
持されている。7 to 9 show different embodiments of the thread guide device. In the moving device 56e of the thread guide device 54e shown in the drawing, reference numeral 70 denotes a longitudinal guide rod installed between the frame members 35be and 35ce of the main body 35e, and a plurality of guide rods are provided.
A movable frame 71 is movably supported by these guide rods 70.
上記可動枠71の端部は図示しないエアシリンダによっ
て前後揺動される揺動レバー72にピンと長孔を介して
連結され、所定量前後動されるようにしである。73.
74は一対の支持杆で、枠材35ce、35deによっ
て回動自在かつ軸方向摺動自在に支承され、後端部は夫
々上記可動枠71に回動自在に連結されている。支持杆
73,74は篠継ぎするスピンドル5eに対応して複数
対又は一対設けられ、夫々スネルワイヤー15eの僅か
下方位置の両側に向けて前後動可能に位置されている。The end of the movable frame 71 is connected via a pin and an elongated hole to a swinging lever 72 that swings back and forth by an air cylinder (not shown), so that it can be moved back and forth by a predetermined amount. 73.
A pair of support rods 74 are rotatably and axially slidably supported by frame members 35ce and 35de, and their rear ends are rotatably connected to the movable frame 71, respectively. A plurality of pairs or one pair of support rods 73 and 74 are provided corresponding to the spindles 5e to be spliced, and are respectively positioned so as to be movable back and forth toward both sides of a position slightly below the Snell wire 15e.
支持杆73.74の前端部には夫々略半円弧状のリング
要素75.76の中間部が固着され、これらのリング要
素75.76が互いに向き合うように横向きに回動され
ると両リング要素75.76が完全リング状に連結され
て糸案内部材として例示する糸案内リング55eを構成
するようにしである。糸案内リング55eの内径の大き
さは、第8図、第9図に示す状態で、紡出糸のバルーニ
ングが大きくなっても、その紡出糸をスラブキャッチャ
−16eの下方で旋回するように案内する大きさに設定
されている。78.79は枠材35ce、35de間に
おいて支持杆73゜74に滑りキーを介して一体回動す
るように嵌合させた回動筒で、夫々レバー80.81が
固着されている。夫々のレバー80.81は図示しない
エアシリンダによって往復動される作動バー82゜83
にピンと長孔を介して連結され1作動バー82.83に
よって互いに逆方向へ90度回動されてリング要素75
.76を第9図に仮想線で示す上向き状態と実線で示す
横向き状態に回動させ得るようにしである。The intermediate portions of ring elements 75, 76 each having a semicircular arc shape are fixed to the front ends of the support rods 73, 74, and when these ring elements 75, 76 are rotated laterally so as to face each other, both ring elements 75 and 76 are connected in a complete ring shape to constitute a thread guide ring 55e, which is illustrated as a thread guide member. The inner diameter of the yarn guide ring 55e is set such that even if the ballooning of the spun yarn becomes large in the state shown in FIGS. 8 and 9, the spun yarn can be rotated below the slab catcher 16e. The size is set to guide you. Reference numerals 78 and 79 denote rotary cylinders which are fitted between the frame members 35ce and 35de so as to rotate integrally with the support rods 73 and 74 via sliding keys, and levers 80 and 81 are respectively fixed thereto. Each lever 80, 81 is operated by an operating bar 82, 83 that is reciprocated by an air cylinder (not shown).
The ring element 75 is connected to the ring element 75 through a pin and an elongated hole and is rotated 90 degrees in opposite directions by one operating bar 82 and 83.
.. 76 can be rotated between an upward position shown in phantom lines in FIG. 9 and a sideways position shown in solid lines.
上記構成のものにあっては、待機状態においては、可動
枠71が後退端に位置され、リング要素75.76は上
向き状態で本体35e内に収納されでいる。そして管糸
6eの巻量が6分玉程度以下であることを確認して篠継
作業を開始し、その各篠継ぎの際には、組糸の篠継ぎ部
分が紡出される前に先ず可動枠71を前進させてリング
要素75.76をスネルワイヤー15eの下方の両側に
移動させ、その後一方の作動バニ82が移動し、一方の
支持杆73を略90度回動させてリング要素75を横向
きにし、その後他方の作動バー83が移動し、他方の支
持杆74を略90度回動させてリング要素76を横向き
にし、その結果面リング要素75.76が作動位置に移
動され0両者の両端部が互いに重合して糸案内リング5
5eを構成する。その状態で組糸の篠継ぎ部分が紡出さ
れて紡出糸のバルーニングが大きくなるが、その紡出糸
がスネルワイヤー15eの僅か下方において糸案内リン
グ55eによって案内され、スラブキャッチャ−16e
よりも下方で旋回される。従って、粗糸の篠継ぎ部分が
スラブキャッチャ−168に引っ掛かって糸切れするこ
とがなくなる。上記糸案内リング55eのリング要素7
5.76は篠継ぎ部分の紡出が完了後上記の逆の動作に
よって元の待機位置に戻される。In the above configuration, in the standby state, the movable frame 71 is located at the rearward end, and the ring elements 75, 76 are housed in the main body 35e in an upward position. After confirming that the amount of winding of the yarn 6e is about 6 minutes or less, we start the splicing work, and at the time of each splicing, the spliced part of the braided yarn is first movable before being spun. The frame 71 is advanced to move the ring elements 75 and 76 to both sides below the Snell wire 15e, and then one of the actuating vanes 82 is moved and one of the support rods 73 is rotated approximately 90 degrees to move the ring elements 75. laterally, the other actuating bar 83 is moved and the other support rod 74 is rotated approximately 90 degrees to bring the ring element 76 sideways, so that the face ring elements 75, 76 are moved into the actuating position and both Both ends overlap each other to form a thread guide ring 5.
Configure 5e. In this state, the spun joint part of the braided yarn is spun out and the ballooning of the spun yarn increases, but the spun yarn is guided by the yarn guide ring 55e slightly below the snell wire 15e, and the slub catcher 16e
It is rotated below. Therefore, the spliced portion of the roving is prevented from being caught by the slab catcher 168 and broken. Ring element 7 of the thread guide ring 55e
5.76 is returned to the original standby position by the above-mentioned reverse operation after the spinning of the spliced portion is completed.
なお上記実施例と同−若しくは均等構成部分については
対応する部分の符号と同じ符号にアルファベットのeを
付して重複説明を省略する。It should be noted that the same or equivalent constituent parts as those of the above embodiment will be denoted by the same reference numerals as those of the corresponding parts with the alphabet e added thereto, and redundant explanation will be omitted.
本願にあっては、種々の形式の篠継機に実施でき、例え
ば本願出願人が先に出願した特願昭62−175943
号明細書及び図面に示されているようにクリールの一端
から他端に向けて1つおきの前後一対の小玉ボビンの粗
糸を篠継ぎするものにも同様に実施でき、また篠交換を
行なった後に篠継ぎするものにも実施できる。The present application can be applied to various types of Shino joint machines, for example, in Japanese Patent Application No. 175943/1988, which was previously filed by the applicant of the present application.
As shown in the specification and drawings, the same method can be used to join the roving threads of every other pair of front and rear small bobbins from one end of the creel to the other end, and the threads can also be replaced. It can also be applied to items that are to be joined later.
発明の効果
以上のように本発明にあっては、篠継ぎ部分が紡出され
て管糸に巻取られる間、紡出糸のバルーニングが大きく
なってもその紡出糸を糸案内部材によってリング精紡機
のスラブキャッチャ−の下側に導くように案内するので
、篠継ぎ部分がスラブキャッチャ−に引っ掛かって糸切
れするのを防止でき、篠継ぎ作業を確実に効率良〈実施
できる。Effects of the Invention As described above, in the present invention, even if the ballooning of the spun yarn becomes large while the spun joint portion is spun and wound into a pipe yarn, the spun yarn is not ringed by the yarn guide member. Since the thread is guided to the underside of the slab catcher of the spinning machine, it is possible to prevent the spliced part from getting caught in the slab catcher and break the yarn, and the splicing work can be carried out reliably and efficiently.
また篠継ぎの際にリング精紡機のスピンドルの回転数を
低下させる必要がなくなり、リング精紡機の生産性を維
持でき、しかも篠継ぎ作業を管糸の巻玉が小さいときで
も行うことができ、ロングの精紡機での篠継ぎ作業にも
充分に対応できる効果がある。In addition, there is no need to reduce the rotational speed of the spindle of the ring spinning machine when splicing, and the productivity of the ring spinning machine can be maintained, and the splicing work can be performed even when the bobbin is small. It is effective enough to handle the splicing work on long spinning machines.
図面は本願の実施例を示すもので、第1図は主要部を断
面として示す側面図、第2図は第1図の篠継機をリング
精紡機側から見た正面図、第3図は主要部の側面図、第
4図は第3図の作動状態を示す平面図、第5図は作動状
態を示す第3図の■−v線位置での断面図、第6図は精
紡機と篠継機の概要を示す説明図、第7図は本願の異な
る実施例を示す側面図、第8図は第7図の平面図、第9
図は第8図の■−■線断面図である。
1・・・リング精紡機、 2・・・篠継機、 5・・・
スピンドル、 27・・・小玉ボビン、 33・・・満
ボビン、6・・・管糸、 16・・・スラブキャッチ
ャ−55・・・糸案内部材、 56・・・移動装置39
図The drawings show an embodiment of the present application, and Fig. 1 is a side view showing the main part as a cross section, Fig. 2 is a front view of the Shino linkage machine shown in Fig. 1, seen from the ring spinning machine side, and Fig. 3 is a side view showing the main part as a cross section. A side view of the main parts, Figure 4 is a plan view showing the operating state in Figure 3, Figure 5 is a sectional view taken along line ■-v in Figure 3 showing the operating state, and Figure 6 is a spinning machine. An explanatory diagram showing an overview of the Shino Tsugi machine, Fig. 7 is a side view showing a different embodiment of the present application, Fig. 8 is a plan view of Fig. 7, and Fig. 9 is a side view showing a different embodiment of the present application.
The figure is a sectional view taken along the line ■--■ in FIG. 1...Ring spinning machine, 2...Shinotsugi machine, 5...
Spindle, 27... Small bobbin, 33... Full bobbin, 6... Tube thread, 16... Slab catcher 55... Thread guide member, 56... Moving device 39
figure
Claims (1)
ドルに沿って間欠移動し、各スピンドル位置において紡
出中の小玉ボビンの粗糸を予め準備した満ボビンの粗糸
に篠継ぎするようにしたリング精紡機の篠継機において
、作動位置において紡出糸のバルーニングが大きくなっ
てもその紡出糸をスラブキャッチャーの下側に導くよう
に案内可能な糸案内部材と、その糸案内部材を粗糸の篠
継ぎ部分が紡出される間待機位置から作動位置に移動可
能な移動装置を備えて成ることを特徴とするリング精紡
機の篠継機。1. A ring spinning machine that moves intermittently along the spindle of a ring spinning machine equipped with a slab catcher and splices the roving from a small bobbin being spun to the roving from a full bobbin prepared in advance at each spindle position. In a spinning machine of a spinning machine, there is a yarn guide member that can guide the spun yarn to the lower side of the slab catcher even if the ballooning of the spun yarn becomes large in the operating position, and a yarn guide member that can guide the spun yarn to the bottom of the roving yarn. A splicing machine for a ring spinning machine, comprising a moving device that can move from a standby position to an operating position while a spliced part is being spun.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP23854988A JPH0742628B2 (en) | 1988-09-22 | 1988-09-22 | Ring spinning machine Shinoda successor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP23854988A JPH0742628B2 (en) | 1988-09-22 | 1988-09-22 | Ring spinning machine Shinoda successor |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0291232A true JPH0291232A (en) | 1990-03-30 |
JPH0742628B2 JPH0742628B2 (en) | 1995-05-10 |
Family
ID=17031897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP23854988A Expired - Lifetime JPH0742628B2 (en) | 1988-09-22 | 1988-09-22 | Ring spinning machine Shinoda successor |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0742628B2 (en) |
-
1988
- 1988-09-22 JP JP23854988A patent/JPH0742628B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0742628B2 (en) | 1995-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3084075B2 (en) | Apparatus for doffing bobbins and inserting tubes in spinning or twisting machines | |
US5490375A (en) | Method of respinning using ancillary yarn | |
JPH0291232A (en) | Sliver ending machine of ring spinning frame | |
JPH0742030A (en) | Roving change method in fine spinning machine and device thereof | |
JPH03505240A (en) | A method of operating a spinning machine and a service robot for carrying out the method | |
JP3114911B2 (en) | Cutting method of tail thread in simultaneous re-exchange of spinning machines | |
JPH0340823A (en) | Simultaneously doffing automatic doffer | |
JPH0742045B2 (en) | Spinning machine roving change method | |
JP2503881Y2 (en) | Shino exchange | |
CN115369530B (en) | Device for winding joint yarn onto bobbin | |
JPH08268646A (en) | Roving leading method and device for roving changer | |
JPH0274636A (en) | Tail yarn holding apparatus of fine spinning frame or such | |
JPH042830A (en) | Ending of sliver and sliver ending head used therefor | |
JP2546359B2 (en) | How to replace the spinning machine | |
JPS62162034A (en) | Sliver exchanging machine | |
JPH086045Y2 (en) | Rover replacement device | |
JPH08100335A (en) | Simultaneous cop-change of fine spinning frame | |
JPH0754303Y2 (en) | Device to prevent spun yarn from catching snail wire on slab catcher | |
JPH01192837A (en) | Sliver-cutting device for sliver exchanger | |
JPH0524247B2 (en) | ||
JPH06316824A (en) | Pick finding of slubbing in slubbing changing machine and apparatus for pick finding of slubbing | |
JPH0545509B2 (en) | ||
JPS62268829A (en) | Device for removing remaining yarn from silver doffer | |
JPS6253426A (en) | Method of exchanging sliver in fine spinning frame | |
JPH07138827A (en) | Apparatus for treating sliver ending miss in sliver ending machine |