JPH01122672A - Method for providing stud bolts - Google Patents
Method for providing stud boltsInfo
- Publication number
- JPH01122672A JPH01122672A JP27931887A JP27931887A JPH01122672A JP H01122672 A JPH01122672 A JP H01122672A JP 27931887 A JP27931887 A JP 27931887A JP 27931887 A JP27931887 A JP 27931887A JP H01122672 A JPH01122672 A JP H01122672A
- Authority
- JP
- Japan
- Prior art keywords
- stud
- bolts
- jig
- driving
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 17
- 238000009434 installation Methods 0.000 claims 1
- 238000003466 welding Methods 0.000 abstract description 10
- 239000000463 material Substances 0.000 abstract description 3
- 230000008021 deposition Effects 0.000 abstract 5
- 239000010953 base metal Substances 0.000 abstract 1
- 229920000915 polyvinyl chloride Polymers 0.000 abstract 1
- 239000004800 polyvinyl chloride Substances 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000010276 construction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- NIXOWILDQLNWCW-UHFFFAOYSA-N acrylic acid group Chemical group C(C=C)(=O)O NIXOWILDQLNWCW-UHFFFAOYSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、特に水中にある鋼管杭その他の構造物等に対
し、複数のスタッドボルトを所定の位置に精度よく打設
することができるスタッドボルトの打設方法に関するも
のである。[Detailed Description of the Invention] [Industrial Application Field] The present invention provides a stud that can drive a plurality of stud bolts into predetermined positions with high accuracy, particularly for underwater steel pipe piles and other structures. This relates to a bolt driving method.
従来、鋼管杭の補修に複数のスタッドボルトを用いる場
合には、第8図に示すように、鋼管杭2に矢印Mのごと
くマーキングして打設位置を示し、この位置に第9図に
示すごとき先端部IAの接触面積を広くして安定性を良
くしたスタッド銃1を鋼管杭2に押しつけて打設してい
た。Conventionally, when using a plurality of stud bolts for repairing a steel pipe pile, as shown in Fig. 8, the steel pipe pile 2 is marked like an arrow M to indicate the driving position, and the bolt is placed at this position as shown in Fig. 9. The stud gun 1, which has improved stability by increasing the contact area of the tip IA, was pressed against the steel pipe pile 2 to drive the stud.
しかしながら、このような鋼管杭2の補修では、複数の
スタッドボルト3の位置が多少ずれても問題はなかった
が、近年、防舷材の取付は架台をスタッドボルト3によ
って水中の構造体に取付けるという作業が発生し、複数
のスタッドボルト3のそれぞれの打設精度を高める必要
がでてきた。However, in the repair of such steel pipe piles 2, there is no problem even if the positions of the multiple stud bolts 3 are slightly shifted, but in recent years, when installing fenders, it is necessary to attach the frame to the underwater structure using the stud bolts 3. As a result, it became necessary to improve the driving accuracy of each of the plurality of stud bolts 3.
即ち、上記防舷材の取付は架台は、陸上にてあらかじめ
製造される際、構造体に取付けるためのスタッドボルト
用のボルト穴がすでに決められた所定位置に複数個穿設
されており、この防舷材が取付けられる構造体に対し複
数のスタッドボルトを正確な位置に打設することが絶対
に必要である。In other words, when installing the above-mentioned fender, when the frame is manufactured in advance on land, multiple bolt holes for stud bolts for attaching it to the structure are already drilled at predetermined positions. It is absolutely necessary to drive a plurality of stud bolts into the structure to which the fender is attached in precise locations.
なお、上記のごときスタッドボルト3の打設を、水中に
ある鋼管杭2等の水中構造体に対して打設施工するため
の水中用のスタッド銃1による打設方法は、水中におけ
るスタッド熔接方法に関する特開昭60−221180
の発明においても公知である。Note that the method of driving the stud bolt 3 as described above using the underwater stud gun 1 for driving the underwater structure such as the steel pipe pile 2 in the water is an underwater stud welding method. Japanese Patent Application Publication No. 60-221180
This invention is also known in the art.
本発明は、前記の必要性に応えるためになされたもので
あり、特に水中にある構造物等に対し、複数のスタッド
ボルトを所定の位置に精度よく、しかもその作業能率を
あげながら打設することができるスタッドボルトの打設
方法を提供することを目的としたものである。The present invention has been made in response to the above-mentioned need, and is a method for driving a plurality of stud bolts into predetermined positions with high accuracy, particularly for underwater structures, while increasing work efficiency. The purpose of this invention is to provide a method for driving stud bolts that can be used to drive stud bolts.
上記の目的を達成するための本発明のスタッドボルトの
打設方法は、構造体に対し複数のスタッドボルトを打設
する際に、これらの打設されるスタッドボルトの所定打
設位置に対応した穴を配設したスタッド打設治具を、そ
の構造体にブラケット等適宜な手段により当接の上、上
記の各人に挿着した塩ビ管等のパイプ内にスタッド銃の
銃身を挿入して、それぞれのスタッドボルトの打設を行
なうことを特徴としたものである。In order to achieve the above object, the stud bolt driving method of the present invention is such that, when driving a plurality of stud bolts into a structure, the stud bolt driving method corresponds to the predetermined driving position of these stud bolts to be driven. The stud setting jig with holes is brought into contact with the structure using an appropriate means such as a bracket, and then the barrel of the stud gun is inserted into the PVC pipe or other pipe inserted into each of the above persons. , each stud bolt is driven.
上記の打設方法によりスタッドボルトを構造体に打設す
れば、各スタッドボルトは所定の打設位置に治具を介し
てそれぞれ正確に打設されることになり、例えば水中の
構造体に対して、防舷材を取付ける際のスタッドボルト
打設作業を容易に、かつ正確に遂行でき、その作業能率
を高めることができる。If stud bolts are driven into a structure using the above-mentioned driving method, each stud bolt will be accurately driven into a predetermined driving position using a jig. Therefore, the stud bolt driving work when installing the fender can be easily and accurately performed, and the work efficiency can be improved.
以下図面を参照して本発明の詳細な説明するが、第1図
は本発明のスタッドボルトの打設方法を適用するスタッ
ド打設状態を示す要部側断面図、第2図は第1図のスタ
ッド打設治具の正面図、第3図は第2図の側面図、第4
図、第5図、第6図及び第7図は本発明のスタッド施工
要領の説明図である。The present invention will be described in detail below with reference to the drawings. FIG. 1 is a sectional side view of the main part showing a stud driving state to which the stud bolt driving method of the present invention is applied, and FIG. Figure 3 is a front view of the stud setting jig, Figure 3 is a side view of Figure 2, and Figure 4 is a side view of the stud setting jig.
5, 6, and 7 are explanatory diagrams of the stud construction procedure of the present invention.
まず、この実施例は船舶が接岸する岸壁側の第1図に示
す水中の構造体5に対し、図示されていない防舷材の架
台をスタッドボルト3により取付ける際の複数のスタッ
ドボルト3の打設方法を示しており、この場合、防舷材
の架台には複数のボルト穴が穿設されている。First, in this embodiment, a plurality of stud bolts 3 are struck when a fender frame (not shown) is attached to an underwater structure 5 shown in FIG. 1 on the quay side where a ship berths. In this case, a plurality of bolt holes are drilled in the fender frame.
そこで、本発明では上記のごとくスタッドボルト3の所
定打設位置に対応した穴6Aを配設した第2図及び第3
図のごときスタッド打設治具6をその構造体5に対し、
第5図に示すようなブラケット7等の適宜な手段により
取付けの上、上記各穴6A内に挿着したパイプ、例えば
塩ビ管9内に、スタッド銃1の細身に形成された銃身を
挿入して、銃身でくわえこんだスタッドボルト3を構造
体5に対して打設するものであり、そのスタッド銃1は
第9図の従来例に示すスタッド銃1の先端IAの接触面
積を小さくしたものを使用し、公知のごとき方法でボル
ト3の溶接施工による打設を行なうものである。Therefore, in the present invention, as described above, the holes 6A corresponding to the predetermined driving positions of the stud bolts 3 are arranged.
A stud setting jig 6 as shown in the figure is attached to the structure 5.
After mounting with appropriate means such as a bracket 7 as shown in FIG. 5, the slender barrel of the stud gun 1 is inserted into a pipe, such as a PVC pipe 9, inserted into each hole 6A. The stud bolt 3 held by the gun barrel is driven into the structure 5, and the stud gun 1 has a smaller contact area at the tip IA of the stud gun 1 shown in the conventional example shown in FIG. The bolts 3 are welded and installed using a known method.
次に、本発明のスタッドボルト3の打設方法によるスタ
ッド溶接施工要領を説明すると、まず、第4図の斜視図
に示すごとく、構造体5のスタッド打設の溶着面をエア
サングー10等によりみがきだしの後、第5図の正面図
のごときスタッド打設治具6をブラケット7を介してボ
ルト締め等によりその構造体5に取付ける。Next, to explain the procedure for stud welding according to the stud bolt 3 driving method of the present invention, first, as shown in the perspective view of FIG. After drilling, a stud setting jig 6 as shown in the front view of FIG. 5 is attached to the structure 5 via a bracket 7 by bolting or the like.
そこで、第6図の側断面図に示すごとく、スタッド打設
治具6の各人6Aに挿着した塩ビ管9内に、スタッドボ
ルト3をくわえこんだスタッド銃1の銃身を挿入して、
スタッドボルト3の先端に取付けたアークシールド材を
母材である構造体5の溶着面に接触させながら、パイロ
ットアークによりガスを発生させ、更に電流を強めた溶
接アークにより、スタッド先端と上記溶着面の一部を溶
かし、スタッドボルト3の先端を溶着面に押込んだ後、
電流が遮断されて溶解部が冷却して固まり、溶着が完了
することになる。Therefore, as shown in the side cross-sectional view of FIG. 6, the barrel of the stud gun 1 with the stud bolt 3 held in its mouth is inserted into the PVC pipe 9 inserted into each member 6A of the stud setting jig 6.
While the arc shielding material attached to the tip of the stud bolt 3 is brought into contact with the welding surface of the structure 5, which is the base material, a pilot arc generates gas, and a welding arc with a stronger current is used to separate the stud tip and the welding surface. After melting a part of and pushing the tip of stud bolt 3 into the welding surface,
The current is cut off, the melted part cools and solidifies, and welding is completed.
次に、第7図の側断面図に示すアクリル板等に多数の穴
8Aを設けた修正用治具8を使用してスタッドボルト3
の倒れを修正してスタッド溶接施工を完了する。Next, the stud bolt 3 is fixed using a correction jig 8 in which a large number of holes 8A are formed in an acrylic plate or the like as shown in the side sectional view of FIG.
Correct the collapse and complete the stud welding work.
上記により施工された複数のスタッドボルト3を介して
防舷材の取付用の架台を構造体5に対して容易に、かつ
正確に取付けることができる。The frame for attaching the fender can be easily and accurately attached to the structure 5 via the plurality of stud bolts 3 constructed as described above.
以上に説明したごとく、本発明のスタッドボルトの施工
方法を採用すれば、各スタッドボルトが所定の打設位置
にスタッド打設治具を介して正確に打設できるので、例
えば水中の岸壁側の構造体に防舷材を取付ける作業を容
易に、かつ正確に行なうことができるという効果がある
。As explained above, if the stud bolt construction method of the present invention is adopted, each stud bolt can be accurately driven into a predetermined driving position via a stud driving jig, so that, for example, on the side of a quay underwater. This has the effect that the work of attaching the fender to the structure can be done easily and accurately.
なお、本発明の施工方法は、陸上の構造物に対するスタ
ッドボルトの打設時に有効に適用できるのは勿論である
が、水中におけるスタッドボルトの打設時には特に有効
に適用できる。The construction method of the present invention can of course be effectively applied when driving stud bolts into structures on land, but can be particularly effectively applied when driving stud bolts underwater.
第1図は本発明のスタッドボルトの打設方法を適用する
スタッド打設状態を示す要部側断面図、第2図は第1図
のスタッド打設治具の正面図、第3図は第2図の側面図
、第4図、第5図、第6図及び第7図は本発明のスタッ
ド施工要領の説明図であり、第8図は従来方法により鋼
管杭にスタッドボルトを打設した状態を示す斜視図であ
り、第9図は従来のスタッド銃の一部断面で示す側面図
である。
1・・・スタッド銃、3・・・スタッドボルト、5・・
・構造体、6・・・スタッド打設治具、6A・・・穴、
9・・・塩ビ管。
代理人 弁理士 小 川 信 −Fig. 1 is a sectional side view of a main part showing a stud driving state to which the stud bolt driving method of the present invention is applied, Fig. 2 is a front view of the stud driving jig shown in Fig. 1, and Fig. 3 is a The side view of Fig. 2, Fig. 4, Fig. 5, Fig. 6, and Fig. 7 are explanatory diagrams of the stud construction procedure of the present invention, and Fig. 8 shows a case where a stud bolt is driven into a steel pipe pile by the conventional method. FIG. 9 is a perspective view showing the state, and FIG. 9 is a partially sectional side view of a conventional stud gun. 1... Stud gun, 3... Stud bolt, 5...
・Structure, 6... Stud driving jig, 6A... Hole,
9...PVC pipe. Agent Patent Attorney Nobuo Ogawa −
Claims (1)
れらスタットボルトの所定打設位置に対応した穴を配設
したスタット打設治具を、該構造体に当接の上上記各穴
に挿着したパイプ内にスタッド銃の銃身を挿入してスタ
ッドボルトの打設を行なうスタッドボルトの打設方法。When driving multiple stud bolts into a structure, a stud driving jig with holes corresponding to the predetermined driving positions of these stud bolts is placed in contact with the structure and inserted into each of the holes. A stud bolt installation method that involves inserting the barrel of a stud gun into the inserted pipe and driving the stud bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27931887A JPH01122672A (en) | 1987-11-06 | 1987-11-06 | Method for providing stud bolts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27931887A JPH01122672A (en) | 1987-11-06 | 1987-11-06 | Method for providing stud bolts |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH01122672A true JPH01122672A (en) | 1989-05-15 |
Family
ID=17609500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP27931887A Pending JPH01122672A (en) | 1987-11-06 | 1987-11-06 | Method for providing stud bolts |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH01122672A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2985106A3 (en) * | 2014-08-13 | 2016-05-11 | Silicon Holding B.V. | An anchoring assembly for anchoring a liner of a cured lining material and the use of the anchoring assembly |
NL2013327B1 (en) * | 2014-08-13 | 2016-09-22 | Silicon Holding B V | An anchoring assembly for anchoring a liner of a cured lining material, a ferrule suitable for use with the anchoring assembly, an anchoring mounting assembly further comprising a ferrule holder and the use of the anchoring assembly. |
JP2018035562A (en) * | 2016-08-31 | 2018-03-08 | 日新製鋼株式会社 | Steel member |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5024710B1 (en) * | 1969-05-15 | 1975-08-18 | ||
JPS6195782A (en) * | 1984-10-16 | 1986-05-14 | Kobe Steel Ltd | Stud welding method |
JPS6149678B2 (en) * | 1977-09-12 | 1986-10-30 | Sony Corp |
-
1987
- 1987-11-06 JP JP27931887A patent/JPH01122672A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5024710B1 (en) * | 1969-05-15 | 1975-08-18 | ||
JPS6149678B2 (en) * | 1977-09-12 | 1986-10-30 | Sony Corp | |
JPS6195782A (en) * | 1984-10-16 | 1986-05-14 | Kobe Steel Ltd | Stud welding method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2985106A3 (en) * | 2014-08-13 | 2016-05-11 | Silicon Holding B.V. | An anchoring assembly for anchoring a liner of a cured lining material and the use of the anchoring assembly |
NL2013327B1 (en) * | 2014-08-13 | 2016-09-22 | Silicon Holding B V | An anchoring assembly for anchoring a liner of a cured lining material, a ferrule suitable for use with the anchoring assembly, an anchoring mounting assembly further comprising a ferrule holder and the use of the anchoring assembly. |
US10190314B2 (en) | 2014-08-13 | 2019-01-29 | Silicon Holding B.V. | Anchoring assembly for anchoring a liner of a cured lining material, a ferrule suitable for use with the anchoring assembly, an anchoring mounting assembly further comprising a ferrule holder and the use of the anchoring assembly |
US10961712B2 (en) | 2014-08-13 | 2021-03-30 | Silicon Holding B.V. | Anchoring assembly for anchoring a liner of a cured lining material, a ferrule suitable for use with the anchoring assembly, an anchoring mounting assembly further comprising a ferrule holder and the use of the anchoring assembly |
USD947009S1 (en) | 2014-08-13 | 2022-03-29 | Silicon Holding B.V. | Ferrule |
US11428007B2 (en) | 2014-08-13 | 2022-08-30 | Silicon Holding B.V. | Anchoring assembly for anchoring a liner of a cured lining material, a ferrule suitable for use with the anchoring assembly, an anchoring mounting assembly further comprising a ferrule holder and the use of the anchoring assembly |
US12037789B2 (en) | 2014-08-13 | 2024-07-16 | Silicon Holding B.V. | Anchoring assembly for anchoring a liner of a cured lining material, a ferrule suitable for use with the anchoring assembly, an anchoring mounting assembly further comprising a ferrule holder and the use of the anchoring assembly |
JP2018035562A (en) * | 2016-08-31 | 2018-03-08 | 日新製鋼株式会社 | Steel member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100593372B1 (en) | Method of joining structural members by friction plug welding | |
US7005607B2 (en) | Welding method, welding device, welded joint, and welded structure | |
US3769489A (en) | Welding of tubes to tube plates | |
JPH01122672A (en) | Method for providing stud bolts | |
JP5642988B2 (en) | Detachable guide jig and steel pipe pile construction method using the same | |
JPH0724595A (en) | Method and jig for tack welding of stainless steel steel pipe | |
JPS61135477A (en) | Backing jig for welding | |
JP2000226938A (en) | Earthquake resistance repair method for existing building | |
JPH0216866Y2 (en) | ||
JP2007021562A (en) | Lining step welding method for construction steel frame structure | |
JPH0825049A (en) | Method for welding all position of pipe line fixing tube | |
JP2517918Y2 (en) | Rock bolt for civil engineering | |
JP2950404B2 (en) | Anti-rolling device for shield machine | |
CN114871543A (en) | Stud butt-welding device and method for marine outfitting | |
JP2596214Y2 (en) | Gravity welder holder | |
JP2005016243A (en) | Mounting structure of underlayer steel member for mounting alc panel | |
JPH0740050A (en) | Tig welding method for galvanized steel sheet | |
JPH05200549A (en) | Welding method for steel-frame square pillar groove part by welding robot | |
JP2002361474A (en) | Welding method | |
JPH0429470B2 (en) | ||
JPS60152381A (en) | Method for welding perforated parts to joined sheet metal parts | |
JPH0726402U (en) | Balcony handrail fixture | |
JPH0644543Y2 (en) | Nut welding jig | |
JP2001300773A (en) | Metallic plate supporting device | |
JPS569076A (en) | Flux spraying method of submerged arc welding |