[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JPH0551996A - Anchor device used as suspension and installation of concrete panel and suspension and installation method - Google Patents

Anchor device used as suspension and installation of concrete panel and suspension and installation method

Info

Publication number
JPH0551996A
JPH0551996A JP23095191A JP23095191A JPH0551996A JP H0551996 A JPH0551996 A JP H0551996A JP 23095191 A JP23095191 A JP 23095191A JP 23095191 A JP23095191 A JP 23095191A JP H0551996 A JPH0551996 A JP H0551996A
Authority
JP
Japan
Prior art keywords
concrete panel
hole
shaped member
rod
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23095191A
Other languages
Japanese (ja)
Inventor
Yoshikatsu Mizutani
吉克 水谷
Toshiji Endo
利二 遠藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Clion Co Ltd
Original Assignee
Onoda ALC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Onoda ALC Co Ltd filed Critical Onoda ALC Co Ltd
Priority to JP23095191A priority Critical patent/JPH0551996A/en
Publication of JPH0551996A publication Critical patent/JPH0551996A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

PURPOSE:To make it possible to install an anchor device used as suspension and installation in a free position of a concrete panel in accordance with a state of a construction site and, at the same time, to promote anchoring yield strength. CONSTITUTION:In the case of execution, first of all, a longitudinal hole 10 is formed in an upper end surface 9a of a concrete panel 9 and, at the same time, a horizontal hole 13 connected to the longitudinal hole 10 is formed in a wall surface 9b. A suspension member 3 is screwed into an upper end screw section 7 of a bar-shaped member 2, and the bar-shaped member 2 is inserted into the longitudinal hole 10. After that, a cylindrical member 5 is fitted to an anchor bolt 4 to insert it into the horizontal hole 13, and the anchor bolt 4 is screwed into a screw hole 8 on a side of the bar-shaped member 2. Then, a suspension device is hooked to a hook section 11 of the suspension member 3 to pull up the concrete panel 9 up to a specific position of a building skeleton 15, and a panel mounting metal fixture 6 is fastened and fixed with the anchor bolt 4 to mount the concrete panel 9 to the building skeleton 15. After that, the suspension member 3 is removed from the bar-shaped member 2.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建設現場でコンクリー
トパネルを吊り上げて建物躯体に取付けるためのコンク
リートパネルの吊上げ・取付兼用アンカー装置及び吊上
げ・取付方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete panel hoisting / attaching anchor device and a hoisting / attaching method for hoisting and mounting a concrete panel on a building frame at a construction site.

【0002】[0002]

【従来の技術】従来より、建設現場でクレーン等の吊上
げ機械を利用してコンクリートパネルを吊り上げる場
合、コンクリートパネルの上小口面内にアンカーナット
を埋設し、このアンカーナットに吊上げ用のアイボルト
を螺合して、このアイボルトに吊上げ器具を引っ掛けて
コンクリートパネルを吊り上げるようにしている。
2. Description of the Related Art Conventionally, when a concrete panel is hoisted at a construction site by using a hoisting machine such as a crane, an anchor nut is embedded in the upper edge of the concrete panel, and an eye bolt for hoisting is screwed into the anchor nut. At the same time, the eyebolt is hooked with a lifting device to lift the concrete panel.

【0003】この様にして吊り上げられたコンクリート
パネルは、建物躯体にパネル取付金具を介して固定ボル
トにより締付固定された後、吊上げ用のアイボルトをア
ンカーナットから取り外すようにしている。この場合、
パネル取付金具を固定する固定ボルトは、コンクリート
パネルの壁面に埋設されたアンカーナットに締め込まれ
ている。
The concrete panel thus hoisted is tightened and fixed to the building body by a fixing bolt through a panel mounting metal fitting, and then the hoisting eye bolt is removed from the anchor nut. in this case,
The fixing bolts that fix the panel mounting brackets are tightened into anchor nuts embedded in the wall surface of the concrete panel.

【0004】[0004]

【発明が解決しようとする課題】上記従来構成によれ
ば、コンクリートパネルの吊上げ用と取付用にそれぞれ
別々のアンカーナットを設けなければならず、部品点数
が多くなって、コスト高になる欠点がある。しかも、コ
ンクリートパネルの製造時にこれらのアンカーナットを
コンクリート内に埋め込む構成であるので、アンカーナ
ットの位置がパネル製造工場で一律に決められてしま
い、それを建設現場でその場の状況に応じて変更するこ
とは全く不可能で、設計・施工の自由度が小さいという
欠点もある。
According to the above-mentioned conventional structure, it is necessary to provide separate anchor nuts for lifting and mounting the concrete panel, which results in a large number of parts and a high cost. is there. Moreover, since the anchor nuts are embedded in the concrete when manufacturing the concrete panel, the positions of the anchor nuts are uniformly decided at the panel manufacturing plant, and it is changed according to the situation at the construction site. It is completely impossible to do, and there is a drawback that the degree of freedom in design and construction is small.

【0005】そこで、最近、建設現場でアンカーナット
の位置を自由に設定できるようにするため、実開昭61
−161320号公報や特開昭63−156146号公
報に記載されているように、建設現場でコンクリートパ
ネルの任意の位置に穴を形成してその穴内にアンカーナ
ットを固定する方法も考えられている。しかし、この場
合でも、コンクリートパネルの吊上げ用と取付用にそれ
ぞれ別々のアンカーナットを設けなければならないの
で、アンカーナットの取付に手間がかかり、却って施工
能率が悪くなるという欠点がある。
Therefore, recently, in order to make it possible to freely set the position of the anchor nut at the construction site, the actual opening 61
As described in JP-A-161320 and JP-A-63-156146, a method of forming a hole at an arbitrary position of a concrete panel at a construction site and fixing an anchor nut in the hole is also considered. .. However, even in this case, since it is necessary to provide separate anchor nuts for lifting and mounting the concrete panel, it is troublesome to mount the anchor nut, and there is a drawback that the construction efficiency is rather deteriorated.

【0006】本発明はこの様な事情を考慮してなされた
もので、従ってその目的は、建設現場でその場の状況に
応じてアンカー装置をコンクリートパネルの任意の位置
に取付けることができて、設計・施工の自由度を大きく
することができると共に、施工能率も改善できるコンク
リートパネルの吊上げ・取付兼用アンカー装置及び吊上
げ・取付方法を提供することにある。
The present invention has been made in view of the above circumstances, and therefore an object thereof is that an anchor device can be attached to an arbitrary position of a concrete panel at a construction site according to the situation of the site. An object of the present invention is to provide a lifting / attaching anchor device for a concrete panel and a lifting / attaching method capable of increasing the degree of freedom in design / construction and improving the construction efficiency.

【0007】[0007]

【課題を解決するための手段】本発明のコンクリートパ
ネルの吊上げ・取付兼用アンカー装置は、コンクリート
パネルの上小口面に形成された縦穴と、前記コンクリー
トパネルの壁面に前記縦穴に連通するように形成された
横穴とを利用して取付けられるものであって、前記縦穴
内に挿入され上端部にねじ部を有し側面部に前記横穴と
対向するねじ孔を有する棒状部材と、この棒状部材の上
端ねじ部に螺合され上端部に吊上げ用の引掛部を有する
吊上げ部材と、前記横穴内に挿入され前記棒状部材の側
面部のねじ孔に螺合された固定ボルトと、この固定ボル
トの軸部に嵌合されて前記横穴内に挿入された筒状部材
と、前記固定ボルトにより締付固定され前記コンクリー
トパネルを建物躯体に取付けるパネル取付金具とを具備
して成るものである。
A concrete panel hoisting / attaching anchor device of the present invention is formed with a vertical hole formed in an upper fore surface of a concrete panel and a wall surface of the concrete panel so as to communicate with the vertical hole. A rod-shaped member which is inserted into the vertical hole and has a threaded portion at an upper end portion and a side surface portion having a screw hole facing the lateral hole, and an upper end of the rod-shaped member. A lifting member that is screwed into the threaded portion and has a hooking portion for lifting at the upper end, a fixing bolt that is inserted into the lateral hole and that is screwed into a screw hole in the side surface portion of the rod-shaped member, and a shaft portion of this fixing bolt. And a panel mounting metal fitting that is fastened and fixed by the fixing bolts to mount the concrete panel to the building frame. .

【0008】斯かるアンカー装置を利用して建設現場で
コンクリートパネルを吊り上げて建物躯体に取付ける方
法は、前記コンクリートパネルの上小口面に縦穴を形成
する工程と、前記コンクリートパネルの壁面に前記縦穴
に連通する横穴を形成する工程と、前記棒状部材の上端
ねじ部に前記吊上げ部材を螺合して、該棒状部材を前記
縦穴内に挿入する工程と、前記固定ボルトに前記筒状部
材を嵌合して前記横穴内に挿入し、該固定ボルトを前記
棒状部材の側面部のねじ孔に螺合する工程と、前記吊上
げ部材の引掛部に吊上げ器具を引っ掛けて前記コンクリ
ートパネルを前記建物躯体の所定位置まで引き上げる工
程と、前記固定ボルトにより前記パネル取付金具を締付
固定して前記コンクリートパネルを前記建物躯体の所定
位置に取付ける工程と、前記コンクリートパネルの取付
後に前記吊上げ部材を前記棒状部材から取り外す工程と
から成る。
A method of hoisting a concrete panel at a construction site by using such an anchor device and attaching it to a building frame includes a step of forming a vertical hole on the upper fore surface of the concrete panel, and a step of forming the vertical hole on the wall surface of the concrete panel. A step of forming a lateral hole communicating with each other; a step of screwing the lifting member into an upper end screw part of the rod-shaped member to insert the rod-shaped member into the vertical hole; and a fitting of the tubular member to the fixing bolt. Then, the step of inserting the fixing bolt into the screw hole of the side surface portion of the rod-shaped member, and hooking the hoisting device to the hooking portion of the hoisting member to fix the concrete panel to the predetermined shape of the building frame. A process of pulling up to a position and a process of mounting the concrete panel at a predetermined position of the building frame by tightening and fixing the panel mounting bracket with the fixing bolt. If, comprising the lifting member after installation of the concrete panel and a step of removing from the bar-like member.

【0009】[0009]

【作用】本発明によれば、建設現場でその場の状況に応
じてコンクリートパネルの任意の位置に縦穴と横穴をド
リル等で形成すれば、吊上げ・取付兼用アンカー装置を
コンクリートパネルの適当な位置に取付けることができ
て、設計・施工の自由度を大きくすることができる。し
かも、このアンカー装置は、吊上げと取付の双方の機能
を有するので、従来のように吊上げ用と取付用にそれぞ
れ別々のアンカーナットを取付ける場合と比較して、取
付工数もほぼ半分に削減できる。
According to the present invention, if vertical holes and horizontal holes are formed by drills or the like at arbitrary positions on the concrete panel according to the situation at the construction site, the anchoring device for both lifting and mounting can be properly positioned on the concrete panel. It can be attached to, and the degree of freedom in design and construction can be increased. Moreover, since this anchor device has both lifting and mounting functions, the number of mounting steps can be reduced to about half as compared with the conventional case where separate anchor nuts are mounted for lifting and mounting.

【0010】しかも、固定ボルトの軸部に筒状部材を嵌
合して、この筒状部材でコンクリートパネルの吊上げ荷
重を分散して受けることができるので、アンカー耐力が
向上する。更に、筒状部材は固定ボルトの軸部を補強す
る作用もなすので、吊上げ初期におけるアンカー変位が
小さく、上述したアンカー耐力の向上と相俟って、吊上
げ作業の安全性が向上する。その上、筒状部材は固定ボ
ルトのねじ山にコンクリート粉が付着するのを防止する
作用もなすので、固定ボルトを棒状部材のねじ孔に締め
込む作業が容易となるという利点もある。
Moreover, since the tubular member can be fitted to the shaft portion of the fixing bolt and the hoisting load of the concrete panel can be dispersed and received by the tubular member, the anchor proof strength is improved. Further, since the tubular member also acts to reinforce the shaft portion of the fixing bolt, the anchor displacement in the initial stage of lifting is small, and the safety of lifting work is improved in combination with the above-mentioned improvement of anchor proof strength. In addition, the tubular member also serves to prevent concrete powder from adhering to the thread of the fixing bolt, which has the advantage of facilitating the work of tightening the fixing bolt into the screw hole of the rod-shaped member.

【0011】[0011]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。この実施例で使用する吊上げ・取付兼用のアン
カー装置1は、棒状部材2、吊上げ部材3、固定ボルト
4、筒状部材5及びパネル取付金具6とから構成されて
いる。棒状部材2は、例えば鋼管を所定長さに切断して
形成され、その上端部に雌ねじ部7が形成されていると
共に、側面ほぼ中央部にねじ孔8が水平に貫通するよう
に形成されている。この棒状部材2に対応して、軽量気
泡コンクリート製のコンクリートパネル9の上小口面9
aには、縦穴10がドリル等により垂直に形成され、こ
の縦穴10内に棒状部材2が上方から挿入されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. The lifting / mounting anchor device 1 used in this embodiment is composed of a rod-shaped member 2, a lifting member 3, a fixing bolt 4, a tubular member 5 and a panel mounting bracket 6. The rod-shaped member 2 is formed, for example, by cutting a steel pipe into a predetermined length, has an internal threaded portion 7 formed at the upper end thereof, and has a screw hole 8 horizontally penetrating substantially in the center of the side surface thereof. There is. Corresponding to the rod-shaped member 2, the upper edge surface 9 of the concrete panel 9 made of lightweight cellular concrete
A vertical hole 10 is vertically formed in a by a drill or the like, and the rod-shaped member 2 is inserted into the vertical hole 10 from above.

【0012】一方、吊上げ部材3は、例えばアイボルト
により構成され、上端部に吊上げ用の引掛部11を有
し、下端部に雄ねじ部12を有している。そして、この
吊上げ部材3の雄ねじ部12を棒状部材2の上端の雌ね
じ部7に螺合することによって棒状部材2上に吊上げ部
材3を取付けている。
On the other hand, the hoisting member 3 is composed of, for example, an eyebolt, has a hooking portion 11 for hoisting at its upper end, and has a male screw portion 12 at its lower end. Then, the male screw portion 12 of the lifting member 3 is screwed into the female screw portion 7 at the upper end of the rod-shaped member 2 to attach the lifting member 3 onto the rod-shaped member 2.

【0013】また、固定ボルト4は棒状部材2とパネル
取付金具6の双方を固定するものである。この固定ボル
ト4に対応して、コンクリートパネル9の裏側の壁面9
bには、前記縦穴10に連通する横穴13がドリル等に
より水平に形成されている。そして、固定ボルト4の軸
部には、例えば鋼管製の筒状部材5が若干の隙間をもっ
て嵌合され、これら両者が横穴13内に挿入されて固定
ボルト4の先端部が棒状部材2の側面部のねじ孔8に螺
合されている。
Further, the fixing bolt 4 fixes both the rod-shaped member 2 and the panel mounting member 6. Corresponding to the fixing bolt 4, the wall surface 9 on the back side of the concrete panel 9
A horizontal hole 13 communicating with the vertical hole 10 is horizontally formed in b by a drill or the like. Then, a tubular member 5 made of, for example, a steel pipe is fitted to the shaft portion of the fixing bolt 4 with a slight clearance, and both are inserted into the lateral hole 13 so that the tip end portion of the fixing bolt 4 is a side surface of the rod-shaped member 2. It is screwed into the screw hole 8 of the section.

【0014】更に、固定ボルト4の軸部には、予めパネ
ル取付金具たるイナズマプレート6がワッシャ21と共
に組み付けられている。このイナズマプレート6の片側
には、固定ボルト4の軸部を挿通するボルト挿通孔14
が形成されている。一方、図2に示すように、建物躯体
たる鋼製の柱15,16には、通しアングル17が溶接
等により取付けられ、この通しアングル17にコンクリ
ートパネル9がイナズマプレート6により取付けられて
いる。
Further, the lightning plate 6 which is a panel mounting metal fitting is previously attached to the shaft portion of the fixing bolt 4 together with the washer 21. On one side of this lightning plate 6, a bolt insertion hole 14 for inserting the shaft portion of the fixing bolt 4 is inserted.
Are formed. On the other hand, as shown in FIG. 2, a through angle 17 is attached to the steel pillars 15 and 16 which are the building frame by welding or the like, and a concrete panel 9 is attached to the through angle 17 by a lightning plate 6.

【0015】以上のように構成したアンカー装置1は、
吊上げ強度及び取付強度を確保するために、各部分の寸
法を次のように設定している。即ち、棒状部材2の外径
D1は、コンクリートパネル9の厚さTの1/3以下で
1cm以上である(例えば、T=10cm、D1 =2cm)。
そして、棒状部材2の長さL1 は、コンクリートパネル
9の縦幅L2 の例えば1/6以上である(例えば、L1
=20cm、L2 =60cm)。この棒状部材2を挿入する
縦穴10の長さL3 は、L1 /2+L2 /2以上である
(例えばL3 =40cm)。
The anchor device 1 configured as described above is
In order to secure the lifting strength and mounting strength, the dimensions of each part are set as follows. That is, the outer diameter D1 of the rod-shaped member 2 is 1/3 or less of the thickness T of the concrete panel 9 and is 1 cm or more (for example, T = 10 cm, D1 = 2 cm).
The length L1 of the rod member 2 is, for example, 1/6 or more of the vertical width L2 of the concrete panel 9 (for example, L1
= 20 cm, L2 = 60 cm). The length L3 of the vertical hole 10 into which the rod member 2 is inserted is L1 / 2 + L2 / 2 or more (for example, L3 = 40 cm).

【0016】一方、横穴13の内径D2 は棒状部材2の
外径D1 以上で縦穴10の内径D3の2倍未満で且つL1
の1/2未満である(例えば、D2 =3.0cm、D3
=2.2cm)。そして、この横穴13内に挿入する筒状
部材5の外径D4 は、横穴13の内径D2 未満で、棒状
部材2の外径D1 以上である(例えば、D4 =2.8c
m)。更に、筒状部材5の長さL4 は、コンクリートパ
ネル9の壁面から縦穴10までの距離L5 より小さく、
筒状部材5の外径D4 以上である(例えば、L4=3.
0cm、L5 =3.9cm)。
On the other hand, the inner diameter D2 of the lateral hole 13 is equal to or larger than the outer diameter D1 of the rod member 2 and less than twice the inner diameter D3 of the vertical hole 10 and L1.
Is less than 1/2 (for example, D2 = 3.0 cm, D3
= 2.2 cm). The outer diameter D4 of the tubular member 5 inserted into the lateral hole 13 is less than the inner diameter D2 of the lateral hole 13 and is greater than or equal to the outer diameter D1 of the rod member 2 (for example, D4 = 2.8c).
m). Further, the length L4 of the tubular member 5 is smaller than the distance L5 from the wall surface of the concrete panel 9 to the vertical hole 10,
It is not less than the outer diameter D4 of the tubular member 5 (for example, L4 = 3.
0 cm, L5 = 3.9 cm).

【0017】次に、上記構成の吊上げ・取付兼用アンカ
ー装置1を利用して、建設現場でコンクリートパネル9
を吊り上げて柱15,16の通しアングル17に取付け
る方法を説明する。
Next, using the lifting / mounting anchor device 1 having the above-mentioned structure, the concrete panel 9 is constructed at the construction site.
A method of hoisting and attaching to the through angle 17 of the columns 15 and 16 will be described.

【0018】まず、コンクリートパネル9の上小口面9
aの左右両側2箇所に、ドリル等を利用して縦穴10を
垂直に形成する。そして、各縦穴10に対応して、コン
クリートパネル9の壁面9bの左右両側2箇所に、横穴
13を同様にドリル等で形成し、その横穴13を縦穴1
0に連通させる。尚、縦穴10と横穴13の形成順序は
上記と逆であっても良く、要は、縦穴10の位置(固定
ボルト4の位置)がコンクリートパネル9を取付可能な
位置にあれば良い。
First, the upper edge 9 of the concrete panel 9
Vertical holes 10 are vertically formed at two positions on both right and left sides of a by using a drill or the like. Corresponding to each vertical hole 10, horizontal holes 13 are similarly formed by a drill or the like at two locations on both left and right sides of the wall surface 9b of the concrete panel 9, and the horizontal hole 13 is formed into the vertical hole 1
Connect to 0. The order of forming the vertical holes 10 and the horizontal holes 13 may be the reverse of the above, and the point is that the positions of the vertical holes 10 (positions of the fixing bolts 4) are at positions where the concrete panel 9 can be attached.

【0019】そして、吊上げ部材3の雄ねじ部12を棒
状部材2の上端の雌ねじ部7に螺合することによって、
棒状部材2上に吊上げ部材3を取付けて両者を一体化す
る。その上で、棒状部材2を縦穴10内に上方から挿入
する。この後、固定ボルト4の軸部にワッシャ21、イ
ナズマプレート6及び筒状部材5をこの順に嵌合し、こ
の固定ボルト4を筒状部材5と共に横穴13内に挿入し
て、固定ボルト4の先端部を棒状部材2の側面部のねじ
孔8に螺合する。これにより、棒状部材2と固定ボルト
4がそれぞれ縦穴10と横穴13内で固定された状態と
なり、棒状部材24上に螺合された吊上げ部材3を利用
してコンクリートパネル9を吊上げ可能な状態となる。
尚、パネル吊上げ時にはイナズマプレート6は図4に実
線で示すように下方に垂れ下がらせた状態にしておき、
吊上げ後のパネル取付時に図4に二点鎖線で示すように
ほぼ90°横向きに回動させ得るようにしておく。
Then, by screwing the male screw portion 12 of the lifting member 3 into the female screw portion 7 at the upper end of the rod member 2,
The lifting member 3 is attached on the rod-shaped member 2 to integrate them. Then, the rod-shaped member 2 is inserted into the vertical hole 10 from above. After that, the washer 21, the lightning plate 6 and the tubular member 5 are fitted to the shaft portion of the fixing bolt 4 in this order, and the fixing bolt 4 is inserted into the lateral hole 13 together with the tubular member 5 to fix the fixing bolt 4. The tip portion is screwed into the screw hole 8 on the side surface portion of the rod-shaped member 2. As a result, the rod-shaped member 2 and the fixing bolt 4 are fixed in the vertical hole 10 and the horizontal hole 13, respectively, and the concrete panel 9 can be hoisted using the hoisting member 3 screwed onto the rod-shaped member 24. Become.
When the panel is hoisted, the lightning plate 6 is hung downward as shown by the solid line in FIG.
When the panel is attached after the hoisting, it can be turned sideways by approximately 90 ° as shown by the chain double-dashed line in FIG.

【0020】この後、図4に示すように、吊上げ部材3
の引掛部11に吊上げ器具たる吊上げワイヤ18の両端
の係止金具19を引っ掛けた後、クレーン等のフック2
0を吊上げワイヤ18の中央に引っ掛けて引き上げる。
これにより、コンクリートパネル9を柱15,16の所
定位置まで引き上げて通しアングル17に宛がった状態
にする。
Thereafter, as shown in FIG. 4, the lifting member 3
After hooking the locking metal fittings 19 at both ends of the lifting wire 18, which is a lifting device, on the hook portion 11 of the hook 2 of the crane or the like.
0 is hooked on the center of the lifting wire 18 and pulled up.
As a result, the concrete panel 9 is pulled up to the predetermined positions of the pillars 15 and 16 to reach the through angle 17.

【0021】この状態で、イナズマプレート6を通しア
ングル17側にほぼ90°横向きに回動させて通しアン
グル17に掛合させた後、固定ボルト4を完全に締め付
けてイナズマプレート6を固定することによって、コン
クリートパネル9を柱15,16の通しアングル17に
取付ける。この後、吊上げワイヤ18の両端の係止金具
19を吊上げ部材3の引掛部11から外し、更に、吊上
げ部材3を棒状部材2から取り外せば、そのコンクリー
トパネル9についての吊上げ・取付作業が終了する。
In this state, the lightning plate 6 is turned sideways to the side of the through angle 17 by about 90 ° so as to engage with the through angle 17, and then the fixing bolt 4 is completely tightened to fix the lightening plate 6. , The concrete panel 9 is attached to the through angle 17 of the pillars 15, 16. After that, the locking metal fittings 19 at both ends of the hoisting wire 18 are removed from the hook portions 11 of the hoisting member 3, and further the hoisting member 3 is removed from the rod-shaped member 2, whereby the hoisting / attaching work for the concrete panel 9 is completed. ..

【0022】以上説明した本実施例によれば、建設現場
でその場の状況に応じてコンクリートパネル9の任意の
位置に縦穴10と横穴13をドリル等で形成すれば、吊
上げ・取付兼用アンカー装置1をコンクリートパネル9
の適当な位置に取付けることができるので、設計・施工
の自由度を大きくすることができる。しかも、このアン
カー装置1は、吊上げと取付の双方の機能を有するの
で、従来のように吊上げ用と取付用にそれぞれ別々のア
ンカーナットを取付ける場合と比較して、取付工数をほ
ぼ半分に削減できて、施工能率も改善できる。
According to the present embodiment described above, if the vertical hole 10 and the horizontal hole 13 are formed by a drill or the like at an arbitrary position of the concrete panel 9 according to the situation at the construction site, the anchor device for both lifting and mounting can be obtained. 1 for concrete panel 9
Since it can be mounted at an appropriate position, the degree of freedom in design and construction can be increased. Moreover, since this anchor device 1 has both a lifting function and a mounting function, the number of mounting steps can be reduced to about half as compared with the conventional case where separate anchor nuts are used for lifting and mounting. Therefore, the construction efficiency can be improved.

【0023】ところで、本実施例では、固定ボルト4の
軸部に筒状部材5を嵌合しているので、パネル吊上げ時
には、コンクリートパネル9の吊上げ荷重が主として筒
状部材5に受けられることになるが、仮に、筒状部材5
を省いて固定ボルト4の軸部でコンクリートパネル9の
荷重を受けるようにした場合には、アンカー耐力が低下
して、パネル吊上げ時にコンクリートパネル9の横穴1
3の周囲部分にクラックや欠損等が生じるおそれがあ
る。これは、固定ボルト4の軸部が細く荷重が集中し易
い上に、その軸部のねじ山のエッジが横穴13の内周面
に食い込んでしまうためである。この場合、固定ボルト
4の軸部の太さは、それが螺合されるねじ孔8を有する
棒状部材2よりも細くしなければならなず、且つ、棒状
部材2の太さは、縦穴10の形成部分のパネル肉厚(パ
ネル強度)を確保するために、コンクリートパネル9の
厚さTの1/3以下に設定する必要があり、これらの事
情から固定ボルト4の軸部が細くなってしまう。
By the way, in this embodiment, since the tubular member 5 is fitted to the shaft portion of the fixing bolt 4, the hoisting load of the concrete panel 9 is mainly received by the tubular member 5 when hoisting the panel. However, temporarily, the tubular member 5
When the load of the concrete panel 9 is received by the shaft portion of the fixing bolt 4 by omitting the above, the anchor proof strength is lowered, and the horizontal hole 1 of the concrete panel 9 is lifted when the panel is lifted.
There is a possibility that cracks, defects, etc. may occur in the peripheral portion of 3. This is because the shaft portion of the fixing bolt 4 is thin and the load is likely to concentrate, and the edge of the thread of the shaft portion bites into the inner peripheral surface of the lateral hole 13. In this case, the thickness of the shaft portion of the fixing bolt 4 has to be smaller than that of the rod-shaped member 2 having the screw hole 8 into which the bolt is screwed, and the thickness of the rod-shaped member 2 is the vertical hole 10. In order to secure the panel thickness (panel strength) of the formation portion of the concrete panel 9, it is necessary to set it to 1/3 or less of the thickness T of the concrete panel 9, and from these circumstances, the shaft portion of the fixing bolt 4 becomes thin. I will end up.

【0024】この様な事情を考慮して、本実施例では、
固定ボルト4の軸部に筒状部材5を嵌合しているので、
パネル吊上げ時には、コンクリートパネル9の吊上げ荷
重が主として筒状部材5に受けられることになる。この
ため、コンクリートパネル9の吊上げ荷重が比較的太い
筒状部材5の滑らかな外周面に分散されて受けられるよ
うになり、前述したような荷重の集中が起こらなくな
る。これにより、アンカー耐力が向上し、パネル吊上げ
時にコンクリートパネル9の横穴13の周囲部分にクラ
ックや欠損等が生じなくなる。
In consideration of such circumstances, in this embodiment,
Since the tubular member 5 is fitted to the shaft portion of the fixing bolt 4,
When the panel is hoisted, the hoisting load of the concrete panel 9 is mainly received by the tubular member 5. Therefore, the hoisting load of the concrete panel 9 can be dispersed and received by the smooth outer peripheral surface of the relatively thick tubular member 5, and the concentration of the load as described above does not occur. As a result, the anchor proof strength is improved, and cracks or defects do not occur in the peripheral portion of the lateral hole 13 of the concrete panel 9 when the panel is lifted.

【0025】しかも、筒状部材5は固定ボルト4の軸部
を補強する作用もなすので、吊上げ初期におけるアンカ
ー変位が小さく、上述したアンカー耐力の向上と相俟っ
て、吊上げ作業の安全性を向上できる。その上、筒状部
材5は固定ボルト4のねじ山にコンクリート粉が付着す
るのを防止する作用もなすので、固定ボルト4を棒状部
材2のねじ孔8に締め込む作業が容易となるという利点
もある。
Moreover, since the tubular member 5 also acts to reinforce the shaft portion of the fixing bolt 4, the anchor displacement in the initial stage of lifting is small, and in combination with the above-mentioned improvement in anchor proof strength, the safety of lifting work is improved. Can be improved. In addition, the tubular member 5 also serves to prevent concrete powder from adhering to the threads of the fixing bolt 4, so that the work of tightening the fixing bolt 4 into the screw hole 8 of the rod member 2 is facilitated. There is also.

【0026】尚、本実施例では、コンクリートパネル9
を柱15,16の通しアングル17に取付けるパネル取
付金具としてイナズマプレート6を用いたが、他の形状
のパネル取付金具を用いても良く、また、そのパネル取
付金具と通しアングル17とを溶接するようにしても良
い。
In this embodiment, the concrete panel 9 is used.
Although the lightning plate 6 is used as the panel mounting bracket for mounting the column to the through angle 17 of the pillars 15 and 16, panel mounting brackets of other shapes may be used, and the panel mounting bracket and the through angle 17 are welded. You may do it.

【0027】また、本実施例では、吊上げ部材3として
アイボルトを用いたが、フックボルト等の他の形状のも
のを採用しても良い。更に、棒状部材2は必ずしも中空
状に構成する必要はなく、中実丸棒から形成するように
しても良い。
In this embodiment, the eyebolt is used as the lifting member 3, but other shapes such as hook bolts may be used. Furthermore, the rod-shaped member 2 does not necessarily have to be hollow and may be formed of a solid round rod.

【0028】その他、本発明は、軽量気泡コンクリート
パネル以外の他のコンクリートパネルにも適用して実施
できる等、要旨を逸脱しない範囲内で種々の変形が可能
である。
In addition, the present invention can be variously modified without departing from the scope of the invention, such as being applicable to concrete panels other than lightweight cellular concrete panels.

【0029】[0029]

【発明の効果】本発明は、以上の説明から明らかなよう
に、建設現場でその場の状況に応じて吊上げ・取付兼用
アンカー装置をコンクリートパネルの適当な位置に取付
けることができるので、設計・施工の自由度を大きくす
ることができると共に、従来のように吊上げ用と取付用
にそれぞれ別々のアンカーナットを取付ける場合と比較
して、取付工数をほぼ半分に削減できて、施工能率も改
善できる。
As is apparent from the above description, the present invention allows the anchor device for both lifting and mounting at the construction site to be mounted at an appropriate position on the concrete panel according to the situation at the site, so that The degree of freedom in construction can be increased, and the installation man-hour can be reduced to almost half compared with the conventional case where separate anchor nuts for lifting and mounting are installed, and construction efficiency can also be improved. ..

【0030】しかも、固定ボルトの軸部に筒状部材を嵌
合して、この筒状部材でコンクリートパネルの吊上げ荷
重を分散して受けることができるので、アンカー耐力が
向上して、パネル吊上げ時にコンクリートパネルの横穴
の周囲部分にクラックや欠損等が生じなくなる。更に、
筒状部材は固定ボルトの軸部を補強する作用もなすの
で、吊上げ初期におけるアンカー変位が小さく、上述し
たアンカー耐力の向上と相俟って、吊上げ作業の安全性
を向上できる。その上、筒状部材は固定ボルトのねじ山
にコンクリート粉が付着するのを防止する作用もなすの
で、固定ボルトを棒状部材のねじ孔に締め込む作業が容
易となるという利点もある。
Moreover, since the tubular member can be fitted to the shaft portion of the fixing bolt and the hoisting load of the concrete panel can be dispersed and received by this tubular member, the anchor proof strength is improved and the hoisting load of the panel is improved. No cracks or defects will occur around the horizontal holes in the concrete panel. Furthermore,
Since the tubular member also acts to reinforce the shaft portion of the fixing bolt, the anchor displacement in the initial stage of lifting is small, and in combination with the above-mentioned improvement in anchor proof strength, the lifting work safety can be improved. In addition, the tubular member also serves to prevent concrete powder from adhering to the thread of the fixing bolt, which has the advantage of facilitating the work of tightening the fixing bolt into the screw hole of the rod-shaped member.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す要部の縦断側面図FIG. 1 is a vertical sectional side view of an essential part showing an embodiment of the present invention.

【図2】要部を部分的に破断して示す斜視図FIG. 2 is a perspective view showing a main part partially broken away.

【図3】アンカー装置の分解斜視図FIG. 3 is an exploded perspective view of an anchor device.

【図4】コンクリートパネルの吊上げ状態を示す斜視図FIG. 4 is a perspective view showing a concrete panel hoisting state.

【符号の説明】[Explanation of symbols]

1は吊上げ・取付兼用アンカー装置、2は棒状部材、3
は吊上げ部材、4は固定ボルト、5は筒状部材、6はイ
ナズマプレート(パネル取付金具)、7は雌ねじ部、8
はねじ孔、9はコンクリートパネル、9aは上小口面、
9bは壁面、10は縦穴、11は引掛部、12は雄ねじ
部、13は横穴、15及び16は柱(建物躯体)、17
は通しアングル、18は吊上げワイヤ(吊上げ器具)、
19は係止金具である。
1 is an anchor device for both lifting and mounting, 2 is a rod-shaped member, 3
Is a lifting member, 4 is a fixing bolt, 5 is a tubular member, 6 is a lightning plate (panel mounting bracket), 7 is a female screw portion, 8
Is a screw hole, 9 is a concrete panel, 9a is an upper edge surface,
9b is a wall surface, 10 is a vertical hole, 11 is a hook portion, 12 is a male screw portion, 13 is a horizontal hole, 15 and 16 are pillars (building frame), 17
Is a through angle, 18 is a hoisting wire (hoisting equipment),
Reference numeral 19 is a metal fitting.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 コンクリートパネルの上小口面に形成さ
れた縦穴と、前記コンクリートパネルの壁面に前記縦穴
に連通するように形成された横穴とを利用して取付けら
れる吊上げ・取付兼用アンカー装置であって、前記縦穴
内に挿入され上端部にねじ部を有し側面部に前記横穴と
対向するねじ孔を有する棒状部材と、この棒状部材の上
端ねじ部に螺合され上端部に吊上げ用の引掛部を有する
吊上げ部材と、前記横穴内に挿入され前記棒状部材の側
面部のねじ孔に螺合された固定ボルトと、この固定ボル
トの軸部に嵌合されて前記横穴内に挿入された筒状部材
と、前記固定ボルトにより締付固定され前記コンクリー
トパネルを建物躯体に取付けるパネル取付金具とを具備
して成るコンクリートパネルの吊上げ・取付兼用アンカ
ー装置。
1. A lifting / mounting anchor device that is attached using a vertical hole formed on the upper edge of a concrete panel and a horizontal hole formed on a wall surface of the concrete panel so as to communicate with the vertical hole. A rod-shaped member that is inserted into the vertical hole and that has a threaded portion at the upper end and a threaded hole that faces the lateral hole at the side surface, and a hook for lifting at the upper end that is screwed into the upper threaded portion of the rod-shaped member. A lifting member having a portion, a fixing bolt inserted into the lateral hole and screwed into a screw hole of a side surface portion of the rod-shaped member, and a cylinder fitted into the shaft portion of the fixing bolt and inserted into the lateral hole An anchor device for both lifting and mounting of a concrete panel, comprising: a panel-shaped member; and a panel mounting metal fitting that is fixed by tightening with the fixing bolt and that mounts the concrete panel to a building frame.
【請求項2】 上端部にねじ部を有し側面部にねじ孔を
有する棒状部材と、この棒状部材の上端ねじ部に螺合さ
れ上端部に吊上げ用の引掛部を有する吊上げ部材と、前
記棒状部材の側面部のねじ孔に螺合される固定ボルト
と、この固定ボルトの軸部に嵌合される筒状部材と、前
記固定ボルトにより締付固定されるパネル取付金具とを
利用して建設現場でコンクリートパネルを吊り上げて建
物躯体に取付ける方法であって、 前記コンクリートパネルの上小口面に縦穴を形成する工
程と、 前記コンクリートパネルの壁面に前記縦穴に連通する横
穴を形成する工程と、 前記棒状部材の上端ねじ部に前記吊上げ部材を螺合し
て、該棒状部材を前記縦穴内に挿入する工程と、 前記固定ボルトに前記筒状部材を嵌合して前記横穴内に
挿入し、該固定ボルトを前記棒状部材の側面部のねじ孔
に螺合する工程と、 前記吊上げ部材の引掛部に吊上げ器具を引っ掛けて前記
コンクリートパネルを前記建物躯体の所定位置まで引き
上げる工程と、 前記固定ボルトにより前記パネル取付金具を締付固定し
て前記コンクリートパネルを前記建物躯体の所定位置に
取付ける工程と、 前記コンクリートパネルの取付後に前記吊上げ部材を前
記棒状部材から取り外す工程とを行うことを特徴とする
コンクリートパネルの吊上げ・取付方法。
2. A rod-shaped member having a threaded portion at an upper end portion and a threaded hole at a side surface portion; Utilizing a fixing bolt screwed into a screw hole on the side surface of the rod-shaped member, a tubular member fitted to the shaft portion of the fixing bolt, and a panel mounting bracket tightened and fixed by the fixing bolt. A method of lifting a concrete panel at a construction site and attaching it to a building frame, the step of forming a vertical hole in the upper edge face of the concrete panel, and the step of forming a horizontal hole communicating with the vertical hole on the wall surface of the concrete panel, Screwing the lifting member into the upper end screw portion of the rod-shaped member, inserting the rod-shaped member into the vertical hole, and inserting the tubular member into the fixing bolt and inserted into the lateral hole, The fixed bolt A step of screwing into a screw hole of a side surface of the rod-shaped member, a step of hooking a hoisting device to a hooking part of the hoisting member to pull up the concrete panel to a predetermined position of the building frame, and the panel by the fixing bolt. A step of attaching the concrete panel to a predetermined position of the building body by fastening and fixing a mounting bracket, and a step of removing the lifting member from the rod-shaped member after attaching the concrete panel. Lifting and mounting method.
JP23095191A 1991-08-19 1991-08-19 Anchor device used as suspension and installation of concrete panel and suspension and installation method Pending JPH0551996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23095191A JPH0551996A (en) 1991-08-19 1991-08-19 Anchor device used as suspension and installation of concrete panel and suspension and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23095191A JPH0551996A (en) 1991-08-19 1991-08-19 Anchor device used as suspension and installation of concrete panel and suspension and installation method

Publications (1)

Publication Number Publication Date
JPH0551996A true JPH0551996A (en) 1993-03-02

Family

ID=16915877

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23095191A Pending JPH0551996A (en) 1991-08-19 1991-08-19 Anchor device used as suspension and installation of concrete panel and suspension and installation method

Country Status (1)

Country Link
JP (1) JPH0551996A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004225390A (en) * 2003-01-23 2004-08-12 Clion Co Ltd Concrete panel
JP2016188474A (en) * 2015-03-30 2016-11-04 Jfe建材株式会社 Concrete wall panel and dam
ES2938799A1 (en) * 2021-10-08 2023-04-14 Escobar Miguel Gonzalez Construction of light façades from inside the building with a semi-automatic installation and uninstallation system of thermal control modules and illuminated double skin, with watertight fixings and fall-proof safety elements (Machine-translation by Google Translate, not legally binding)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004225390A (en) * 2003-01-23 2004-08-12 Clion Co Ltd Concrete panel
JP2016188474A (en) * 2015-03-30 2016-11-04 Jfe建材株式会社 Concrete wall panel and dam
ES2938799A1 (en) * 2021-10-08 2023-04-14 Escobar Miguel Gonzalez Construction of light façades from inside the building with a semi-automatic installation and uninstallation system of thermal control modules and illuminated double skin, with watertight fixings and fall-proof safety elements (Machine-translation by Google Translate, not legally binding)

Similar Documents

Publication Publication Date Title
JPH0551996A (en) Anchor device used as suspension and installation of concrete panel and suspension and installation method
KR100761558B1 (en) Bracket for establishment the dropping prevention net
JP2004011678A (en) Fixing bolt for lightweight cellular concrete panel
JP2907576B2 (en) Panel lifting method and panel therefor
JP2669254B2 (en) Side wall panel mounting method
CN219509256U (en) Special horizontal safety net fixing snap ring for steel structure
JP2004108080A (en) Lifting tool for panel
CN220131720U (en) Device for hoisting and rapidly supporting and stabilizing concrete prefabricated part
JP2008285832A (en) Anchor metal fitting, autoclaved lightweight concrete panel, method of lifting autoclaved lightweight concrete panel, and method of mounting autoclaved lightweight concrete panel
CN212773411U (en) Novel building external scaffolding is wall even device
CN215595081U (en) Anti-typhoon reinforcing device for container with suspended curtain wall
CN214942413U (en) Bolt shaping piece pre-embedded in concrete
CN218267652U (en) Pipeline supporting and hanging frame capable of saving manpower and reducing occupied space
CN216475848U (en) Pre-buried porous concrete slab who lifts by crane structure
JP2006322208A (en) Fixing method of lightweight cellular concrete panel
JPH0645038Y2 (en) Jig for lifting shutter curtain
JP2567210Y2 (en) Driving formwork
JP2774129B2 (en) Balcony installation structure and method of installation
JPH01111962A (en) Panel hanger and method of mounting panel
JP3028203U (en) Mounting structure for cement removal tool in pile
JP2561999Y2 (en) Underground rope suspension equipment for tunnel construction
JPH08120883A (en) Structure for fitting wall panel
JPH044084Y2 (en)
JP2577046Y2 (en) Hanging bracket for concrete block
JP2004162276A (en) Unit lifting connecting metal fitting