JP7482009B2 - 調達先配分方法およびその装置 - Google Patents
調達先配分方法およびその装置 Download PDFInfo
- Publication number
- JP7482009B2 JP7482009B2 JP2020199929A JP2020199929A JP7482009B2 JP 7482009 B2 JP7482009 B2 JP 7482009B2 JP 2020199929 A JP2020199929 A JP 2020199929A JP 2020199929 A JP2020199929 A JP 2020199929A JP 7482009 B2 JP7482009 B2 JP 7482009B2
- Authority
- JP
- Japan
- Prior art keywords
- priority
- allocation
- constraint
- upper limit
- optimization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title description 9
- 238000005457 optimization Methods 0.000 claims description 93
- 238000004364 calculation method Methods 0.000 claims description 14
- 238000010586 diagram Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 238000013500 data storage Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
配分計算の目的関数の重みづけ優先度に関するもの
H.P. Williams 『数理計画モデルの作成法』産業図書 1995 (ISBN-13 : 978-4782846018)整数計画法で論理条件を扱う方法に関する基礎文献
(1)配分計算の諸元である調達先のデータを格納する調達先格納ステップ。
(2)調達先の登録数を最大値として可変長な階層構造を持つ優先度を格納する優先度格納ステップ。
(3)各優先度に1個以上の調達先が所属するように対応付けた優先度割付を生成する優先度割付生成ステップ。
(4)前記優先度割付を格納する優先度割付格納ステップ。
(5)前記優先度割付を読み出し、各調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、個別上限判定制約として生成する個別上限判定制約生成ステップ。
(6)前記優先度割付を読み出し、各優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、階層上限判定制約として生成する階層上限判定制約生成ステップ。
(7)前記優先度割付を読み出し、直上位階層の優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達した場合に限り、下位階層の優先度に所属する調達先への配分を可能にする数式を、配分制限制約として生成する配分制限制約生成ステップ。
(8)前記個別上限判定制約、前記階層上限判定制約および前記配分制限制約を最適化問題優先度制約として格納する最適化問題優先度制約格納ステップ。
(9)最適化問題目的関数を格納する最適化問題目的関数格納ステップ。
(10)前記最適化問題優先度制約および前記最適化問題目的関数を読み出し、対応する最適化問題を解く最適化実行ステップ。
(11)最適化結果を格納する最適化結果格納ステップ。
(12)最適化結果を表示する最適化結果表示ステップ。
[構成]
図1のブロック図、図2のフローチャートを用いて第1の実施形態について説明する。第1の実施形態は、各構成要素がそれぞれのステップを実行する調達先配分方法である。第1の実施形態は、各ステップを実行する構成要素を備えた調達先配分装置として捉えてもよい。なお、実施形態の態様としては、調達先配分方法及びその装置に加えて、各ステップをコンピュータに実行させる調達先配分プログラムや、当該プログラムを記録した記録媒体も包含するものとする。
(a)各調達先への配分があらかじめ規定された上限値に達していることを示す論理フラグ(個別上限判定)
(b)各階層の優先度に所属する全ての調達先があらかじめ規定された上限値に達していることを示す論理フラグ(階層上限判定)
(c)直上位階層の優先度に所属する全ての調達先が前記上限値に達していなければ下位階層の優先度に所属する調達先は配分されない制御を行う切換え機能(配分制限)
第1の実施形態によって優先度制約を適用した場合と、従来技術により通常制約を適用した場合とに関して、具体的な比較例を用いて説明する。需要は400kWhあり、「優先度0」には風力発電などの調達先A(30円/kWh)、調達先B(45円/kWh)が所属する。「優先度0」よりも優先度の低い「優先度1」には、水力発電などの調達先C(20円/kWh)が所属するものとする。調達先Aの配分PAの範囲を0≦PA≦50kWh、調達先Bの配分PBの範囲を0≦PB≦100kWh、調達先Cの配分PCを0≦PC≦500kWhとする。需要は400kWhなので、PA+PB+PC=400kWhとなる。
以上のような第1の実施形態では、各優先度に1個以上の調達先が所属するように対応付けた優先度割付を生成する優先度割付生成ステップと、各調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、個別上限判定制約として生成する個別上限判定制約生成ステップと、各優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、階層上限判定制約として生成する階層上限判定制約生成ステップと、直上位階層の優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達した場合に限り、下位階層の優先度に所属する調達先への配分を可能にする数式を、配分制限制約として生成する配分制限制約生成ステップと、を含む。
本発明のいくつかの複数の実施形態を説明したが、これらの実施形態は例として提示したものであって、発明の範囲を限定することを意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略や置き換え、変更を行うことができる。これらの実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。
2 優先度DB
3 優先度割付生成部
4 優先度割付DB
5 個別上限判定制約生成部
6 階層上限判定制約生成部
7 配分制限制約生成部
8 最適化問題優先度制約DB
9 最適化問題目的関数DB
10 最適化実行部
11 最適化結果DB
12 最適化結果表示部
13 最適化問題通常制約DB
100 調達先配分装置
Claims (4)
- 配分計算の諸元である調達先のデータを格納する調達先格納ステップと、
調達先の登録数を最大値として可変長な階層構造を持つ優先度を格納する優先度格納ステップと、
各優先度に1個以上の調達先が所属するように対応付けた優先度割付を生成する優先度割付生成ステップと、
前記優先度割付を格納する優先度割付格納ステップと、
前記優先度割付を読み出し、各調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、個別上限判定制約として生成する個別上限判定制約生成ステップと、
前記優先度割付を読み出し、各優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、階層上限判定制約として生成する階層上限判定制約生成ステップと、
前記優先度割付を読み出し、直上位階層の優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達した場合に限り、下位階層の優先度に所属する調達先への配分を可能にする数式を、配分制限制約として生成する配分制限制約生成ステップと、
前記個別上限判定制約、前記階層上限判定制約および前記配分制限制約を、最適化問題優先度制約として格納する最適化問題優先度制約格納ステップと、
最適化問題目的関数を格納する最適化問題目的関数格納ステップと、
前記最適化問題優先度制約および前記最適化問題目的関数を読み出し、対応する最適化問題を解く最適化実行ステップと、
最適化結果を格納する最適化結果格納ステップと、
最適化結果を表示する最適化結果表示ステップと、をコンピュータが実行する調達先配分方法。 - 配分計算の諸元である調達先のデータを格納する調達先格納部と、
調達先の登録数を最大値として可変長な階層構造を持つ優先度を格納する優先度格納部と、
各優先度に1個以上の調達先が所属するように対応付けた優先度割付を生成する優先度割付生成部と、
前記優先度割付を読み出し、各調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、個別上限判定制約として生成する個別上限判定制約生成部と、
前記優先度割付を読み出し、各優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達したと判定する数式を、階層上限判定制約として生成する階層上限判定制約生成部と、
前記優先度割付を読み出し、直上位階層の優先度に所属する全ての調達先への配分が、あらかじめ規定された上限値に達した場合に限り、下位階層の優先度に所属する調達先への配分を可能にする数式を、配分制限制約として生成する配分制限制約生成部と、
最適化問題目的関数を格納する最適化問題目的関数格納部と、
前記個別上限判定制約、前記階層上限判定制約および前記配分制限制約を最適化問題優先度制約として読み出し、且つ前記最適化問題目的関数を読み出して、対応する最適化問題を解く最適化実行部と、
最適化結果を格納する最適化結果格納部と、
最適化結果を表示する最適化結果表示部と、
を備えた調達先配分装置。 - 前記優先度割付を格納するための優先度割付データベースを備えた請求項2に記載の調達先配分装置。
- 前記最適化問題優先度制約を格納するための最適化問題優先度制約データベースを備えた請求項2又は3に記載の調達先配分装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020199929A JP7482009B2 (ja) | 2020-12-01 | 2020-12-01 | 調達先配分方法およびその装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020199929A JP7482009B2 (ja) | 2020-12-01 | 2020-12-01 | 調達先配分方法およびその装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2022087764A JP2022087764A (ja) | 2022-06-13 |
JP7482009B2 true JP7482009B2 (ja) | 2024-05-13 |
Family
ID=81975707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020199929A Active JP7482009B2 (ja) | 2020-12-01 | 2020-12-01 | 調達先配分方法およびその装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7482009B2 (ja) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011067992A1 (ja) | 2009-12-02 | 2011-06-09 | コニカミノルタホールディングス株式会社 | 売電管理システム |
JP2013194976A (ja) | 2012-03-19 | 2013-09-30 | Fujitsu Ltd | スケジューリング装置、スケジューリング方法およびスケジューリングプログラム |
JP2015119575A (ja) | 2013-12-19 | 2015-06-25 | 大和ハウス工業株式会社 | エネルギー管理システム及びエネルギー管理方法 |
JP2016033817A (ja) | 2014-07-28 | 2016-03-10 | 国立研究開発法人宇宙航空研究開発機構 | 電力制御システム、方法、及び、情報伝達能力制御システム、方法 |
WO2018070419A1 (ja) | 2016-10-13 | 2018-04-19 | 日本電気株式会社 | 自動交渉システム、自動交渉方法および自動交渉プログラム |
JP2018142239A (ja) | 2017-02-28 | 2018-09-13 | 株式会社東芝 | エネルギー管理装置、運転計画作成方法及びコンピュータプログラム |
-
2020
- 2020-12-01 JP JP2020199929A patent/JP7482009B2/ja active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011067992A1 (ja) | 2009-12-02 | 2011-06-09 | コニカミノルタホールディングス株式会社 | 売電管理システム |
JP2013194976A (ja) | 2012-03-19 | 2013-09-30 | Fujitsu Ltd | スケジューリング装置、スケジューリング方法およびスケジューリングプログラム |
JP2015119575A (ja) | 2013-12-19 | 2015-06-25 | 大和ハウス工業株式会社 | エネルギー管理システム及びエネルギー管理方法 |
JP2016033817A (ja) | 2014-07-28 | 2016-03-10 | 国立研究開発法人宇宙航空研究開発機構 | 電力制御システム、方法、及び、情報伝達能力制御システム、方法 |
WO2018070419A1 (ja) | 2016-10-13 | 2018-04-19 | 日本電気株式会社 | 自動交渉システム、自動交渉方法および自動交渉プログラム |
JP2018142239A (ja) | 2017-02-28 | 2018-09-13 | 株式会社東芝 | エネルギー管理装置、運転計画作成方法及びコンピュータプログラム |
Also Published As
Publication number | Publication date |
---|---|
JP2022087764A (ja) | 2022-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bertsimas et al. | Adaptive robust optimization for the security constrained unit commitment problem | |
Ni et al. | Optimal integrated generation bidding and scheduling with risk management under a deregulated power market | |
Abdollahi et al. | Investigation of economic and environmental-driven demand response measures incorporating UC | |
Mengelkamp et al. | Intelligent agent strategies for residential customers in local electricity markets | |
Silva et al. | Application of mechanism design to electric power markets (republished) | |
Meng et al. | Distributionally Robust Scheduling for Benefit Allocation in Regional Integrated Energy System with Multiple Stakeholders | |
CN111242702B (zh) | 一种考虑系统峰谷差最小的电网峰谷分时电价的制定方法 | |
JP4566980B2 (ja) | 供給計画策定システム、供給計画策定プログラム及び供給計画策定方法 | |
Maenhoudt et al. | Strategic offering to maximize day-ahead profit by hedging against an infeasible market clearing result | |
Maria et al. | Linear physical programming for production planning optimization | |
JP2022015383A (ja) | 発電と送電の最適組合せの決定方法及び支援システム | |
JP7482009B2 (ja) | 調達先配分方法およびその装置 | |
Silva et al. | Application of mechanism design to electric power markets | |
JP7558816B2 (ja) | 調達先配分方法およびその装置 | |
Shivaie et al. | MULTI OBJECTIVE TRANSMISSION EXPANSION PLANNING USING FUZZY–GENETIC ALGORITHM | |
Ventosa et al. | Modelling profit maximisation in deregulated power markets by equilibrium constraints | |
CN114139838B (zh) | 电力设备检修计划优化方法及装置 | |
Unni et al. | Fuzzy incorporated Black–Litterman model for renewable energy portfolio optimization | |
JP7048797B1 (ja) | 管理装置、管理方法、および管理プログラム | |
Knežević et al. | Applying agent-based modeling to electricity market simulation | |
Oggioni et al. | Introduction of CO2 emission certificates in a simplified model of the Benelux electricity network with small and industrial consumers | |
Labrik | Integration of energy management and production planning: Application to steelmaking industry | |
Chandley et al. | Electricity Market Reform: APPA’s Journey Down the Wrong Path | |
Katris et al. | The Potential Impacts of Brexit on Energy Efficient Scotland Funding | |
이종헌 | Optimizing Microgrid Operation Plan under Islanding Uncertainty |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230307 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240111 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240227 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240308 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240402 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240426 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7482009 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |