[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP7122527B2 - Display method, program, analysis system and management system - Google Patents

Display method, program, analysis system and management system Download PDF

Info

Publication number
JP7122527B2
JP7122527B2 JP2018123634A JP2018123634A JP7122527B2 JP 7122527 B2 JP7122527 B2 JP 7122527B2 JP 2018123634 A JP2018123634 A JP 2018123634A JP 2018123634 A JP2018123634 A JP 2018123634A JP 7122527 B2 JP7122527 B2 JP 7122527B2
Authority
JP
Japan
Prior art keywords
display
demand
information
unit
displayed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018123634A
Other languages
Japanese (ja)
Other versions
JP2020005425A (en
Inventor
夏貴 明石
知也 十河
好章 松本
浩基 數野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2018123634A priority Critical patent/JP7122527B2/en
Publication of JP2020005425A publication Critical patent/JP2020005425A/en
Application granted granted Critical
Publication of JP7122527B2 publication Critical patent/JP7122527B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本開示は、一般に表示方法、プログラム、分析システム及び管理システムに関し、より詳細には施設で使用された電力量に関する情報を表示する表示方法、プログラム、分析システム及び管理システムに関する。 FIELD OF THE DISCLOSURE The present disclosure relates generally to display methods, programs, analysis systems, and management systems, and more particularly to display methods, programs, analysis systems, and management systems for displaying information regarding the amount of power used in a facility.

従来、各日の各デマンド時限のデマンド値を表示する技術がある(例えば、特許文献1)。 Conventionally, there is a technique for displaying demand values for each demand time period of each day (for example, Patent Document 1).

特許文献1では、電気料金請求期間の最初の日から最後の日まで日単位で、各日及び各デマンド時限のデマンド値が1つの画面であるデマンドカレンダーで表示される。 In Patent Document 1, the demand values of each day and each demand time period are displayed on a single screen, ie, a demand calendar, on a daily basis from the first day to the last day of an electricity billing period.

特開2015-213429号公報JP 2015-213429 A

特許文献1では、複数の日分(例えば、30日分)における各デマンド時限のデマンド値をデマンドカレンダーで表示する必要があるので、1日分に対する各デマンド時限のデマンド値の表示領域は小さくなる。そのため、デマンドカレンダーは大変見づらい状態で表示されるので、利用者がデマンドカレンダーを用いて日(表示対象期間)ごと又は一の日のデマンド時限(表示対象期間)ごとにデマンド値(使用された電力の値)が高い値であるか否かを容易に確認することができない。 In Patent Document 1, it is necessary to display the demand value of each demand time period for a plurality of days (for example, 30 days) on the demand calendar, so the display area for the demand value of each demand time period for one day is small. . For this reason, the demand calendar is displayed in a very difficult-to-read state, so the user can use the demand calendar to calculate the demand value (power consumption) for each day (display target period) or for each demand time period (display target period) of one day. value) is a high value or not.

本開示は上記課題に鑑みてなされ、表示対象期間において使用された電力の値が高い値であるか否かを容易に確認することができる表示方法、プログラム、分析システム及び管理システムを提供することを目的とする。 The present disclosure has been made in view of the above problems, and provides a display method, a program, an analysis system, and a management system that can easily confirm whether the value of power used in the display target period is a high value. With the goal.

本開示の一態様に係る表示方法は、情報端末が有する表示部に情報を表示する表示方法である。前記表示方法は、表示ステップを含む。前記表示ステップは、単位時間以上の時間長さを有する複数の表示対象期間を前記表示部に表示させ、かつ前記複数の表示対象期間のうち使用された電力が目標値を超えた表示対象期間については、他の表示対象期間の表示態様とは異なる表示態様で前記表示部に表示させる。複数の表示対象期間が表示された画面において、所定の操作手順で画面遷移の操作が行われると、前記表示ステップは、前記操作で指定された日における単位時間ごとに使用された電力の大きさを、時系列に並べて前記表示部に表示させる。前記表示ステップは、前記指定された日での前記単位時間ごとに使用された電力の大きさを表示する際に、前記指定された日を含む月において前記単位時間ごとに使用された電力に基づいて得られた標準ロードカーブを、前記表示部にさらに表示させる。 A display method according to an aspect of the present disclosure is a display method for displaying information on a display unit of an information terminal. The display method includes a display step. The displaying step causes the display unit to display a plurality of display target periods having a time length equal to or longer than the unit time, and for display target periods in which power consumption exceeds a target value among the plurality of display target periods. is displayed on the display section in a display mode different from the display mode of other display target periods. When a screen transition operation is performed according to a predetermined operation procedure on a screen on which a plurality of display target periods are displayed, the display step determines the amount of power used per unit time on the day specified by the operation. are arranged in chronological order and displayed on the display unit. In the displaying step, displaying the amount of power used per unit time on the specified day is based on the power used per unit time in a month including the specified day. The standard load curve thus obtained is further displayed on the display section.

本開示の一態様に係るプログラムは、コンピュータに、前記表示方法を、実行させるためのプログラムである。 A program according to an aspect of the present disclosure is a program for causing a computer to execute the display method.

本開示の一態様に係る分析システムは、情報端末が有する表示部に情報を表示する。前記分析システムは、分析部と、表示制御部とを備える。前記分析部は、施設に設けられた回路ごとに使用される電力が目標値を超えたか否かを分析する。前記表示制御部は、単位時間以上の時間長さを有する複数の表示対象期間を前記表示部に表示させ、かつ前記複数の表示対象期間のうち、使用された電力が目標値を超えた回路が存在する表示対象期間については、他の表示対象期間の表示態様とは異なる表示態様で前記表示部に表示させる。複数の表示対象期間が表示された画面において、所定の操作手順で画面遷移の操作が行われると、前記表示制御部は、前記操作で指定された日における単位時間ごとに使用された電力の大きさを、時系列に並べて前記表示部に表示させる。前記表示制御部は、前記指定された日での前記単位時間ごとに使用された電力の大きさを表示する際に、前記指定された日を含む月において前記単位時間ごとに使用された電力に基づいて得られた標準ロードカーブを、前記表示部にさらに表示させる。 An analysis system according to an aspect of the present disclosure displays information on a display included in an information terminal. The analysis system includes an analysis section and a display control section. The analysis unit analyzes whether or not the power used for each circuit provided in the facility exceeds a target value. The display control unit causes the display unit to display a plurality of display target periods having a time length equal to or longer than the unit time, and among the plurality of display target periods, a circuit whose power consumption exceeds a target value The existing display target period is displayed on the display section in a display mode different from the display mode of other display target periods. When a screen transition operation is performed according to a predetermined operation procedure on a screen displaying a plurality of display target periods, the display control unit determines the amount of power used per unit time on the day specified by the operation. are arranged in chronological order and displayed on the display unit. The display control unit, when displaying the amount of power used per unit time on the specified day, displays the amount of power used per unit time in a month including the specified day. The standard load curve obtained based on this is further displayed on the display unit.

本開示の一態様に係る管理システムは、前記分析システムと、施設で使用される電力を計測する計測システムと、を備える。 A management system according to an aspect of the present disclosure includes the analysis system and a measurement system that measures power used in a facility.

本開示によると、表示対象期間において使用された電力の値が高い値であるか否かを容易に確認することができる。 According to the present disclosure, it is possible to easily confirm whether or not the value of power used in the display target period is a high value.

図1は、本開示の一実施形態に係る分析システムの構成を示すブロック図である。FIG. 1 is a block diagram showing the configuration of an analysis system according to one embodiment of the present disclosure. 図2は、同上の表示システムを含むシステムの構成図である。FIG. 2 is a configuration diagram of a system including the same display system. 図3は、同上の表示システムが表示するカレンダ画面の一例を示す図である。FIG. 3 is a diagram showing an example of a calendar screen displayed by the same display system. 図4は、同上の表示システムが表示する時限選択画面の一例を示す図である。FIG. 4 is a diagram showing an example of a time limit selection screen displayed by the same display system. 図5は、同上の表示システムが表示する動的分析画面の一例を示す図である。FIG. 5 is a diagram showing an example of a dynamic analysis screen displayed by the same display system. 図6は、同上の表示システムが表示する静的分析画面の一例を示す図である。FIG. 6 is a diagram showing an example of a static analysis screen displayed by the same display system. 図7は、同上の表示システムが表示する動的分析画面の変形例を示す図である。FIG. 7 is a diagram showing a modification of the dynamic analysis screen displayed by the same display system.

以下に説明する実施形態及び変形例は、本開示の一例に過ぎず、本開示は、実施形態及び変形例に限定されない。実施形態及び変形例以外であっても、本開示に係る技術的思想を逸脱しない範囲であれば、設計等に応じて種々の変更が可能である。 The embodiments and modifications described below are merely examples of the present disclosure, and the present disclosure is not limited to the embodiments and modifications. Other than the embodiments and modifications, various modifications can be made according to the design and the like within the scope of the technical idea of the present disclosure.

(実施形態)
以下、本実施形態に係る表示方法、プログラム、分析システム及び管理システムについて、図1~図6を用いて説明する。
(embodiment)
A display method, a program, an analysis system, and a management system according to the present embodiment will be described below with reference to FIGS. 1 to 6. FIG.

(1)概要
本実施形態では、施設で計測された電力を分析して、分析結果を表示する機能を、基本的な機能として有する分析システム10、及び管理システム1000について説明する。
(1) Overview In this embodiment, an analysis system 10 and a management system 1000 having a function of analyzing power measured in a facility and displaying the analysis result as a basic function will be described.

本実施形態において、管理システム1000は、図2に示すように、分析システム10としての分析装置1と、計測システム20とを含む。 In this embodiment, the management system 1000 includes an analysis device 1 as the analysis system 10 and a measurement system 20, as shown in FIG.

本実施形態においては、コンピュータシステムが備える分析システム10は、図1、図2に示すように、施設5が使用する電力を分析して、情報端末3に表示するコンテンツを作成する分析装置1にて構成される。ここでいう「施設」は、電力の供給を受けるビル等の施設を意味しており、電力会社等の電気事業者から電力の供給を受ける施設だけでなく、太陽光発電設備等の発電設備から電力の供給を受ける施設も含む。 In the present embodiment, the analysis system 10 provided in the computer system analyzes the power used by the facility 5 and creates content to be displayed on the information terminal 3, as shown in FIGS. consists of “Facilities” here means facilities such as buildings that receive power supply, and not only facilities that receive power supply from electric power companies such as electric power companies, Includes facilities that receive power supply.

施設5に設けられた計測システム20は、施設5における電力の使用データ(使用電力量)を取得する。具体的には、計測システム20は、施設5における複数の分岐回路について、使用電力量を使用データとして取得する。施設5における複数の分岐回路の各々には負荷機器50が接続されている。負荷機器50は、例えば施設5に設けられた機器であり、電力を使用する電気機器である。負荷機器50は、例えば照明器具50a~50c、空調機器50d~50f等である。 A measurement system 20 provided in the facility 5 acquires power usage data (amount of power used) in the facility 5 . Specifically, the measurement system 20 acquires power consumption as usage data for a plurality of branch circuits in the facility 5 . A load device 50 is connected to each of the plurality of branch circuits in the facility 5 . The load device 50 is, for example, a device provided in the facility 5 and an electrical device that uses power. The load devices 50 are, for example, lighting fixtures 50a to 50c, air conditioners 50d to 50f, and the like.

蓄積サーバ2は、計測システム20にネットワーク4を介して接続される。蓄積サーバ2は、計測システム20が計測した複数の分岐回路に対する計測値を分岐回路ごとに時系列に記憶している。 The storage server 2 is connected to the measurement system 20 via the network 4 . The storage server 2 stores measured values for a plurality of branch circuits measured by the measurement system 20 in chronological order for each branch circuit.

分析装置1は、図2に示すように、施設5に設けられた蓄積サーバ2にネットワーク4を介して接続される。また、分析装置1は、図2に示すように、表示部31を備える情報端末3にネットワーク4を介して接続される。 The analysis device 1 is connected via a network 4 to a storage server 2 provided in a facility 5, as shown in FIG. In addition, as shown in FIG. 2, the analysis device 1 is connected to an information terminal 3 having a display section 31 via a network 4 .

情報端末3は、分析システム10(分析装置1)で出力された情報(コンテンツ)を表示部31に表示する。これにより、情報端末3は、分析システム10で作成された情報(コンテンツ)を、情報端末3の所有者に対して提示することが可能となる。ここで、所有者は、例えば、施設5の管理者である。 The information terminal 3 displays information (content) output by the analysis system 10 (analysis device 1) on the display unit 31. FIG. This enables the information terminal 3 to present the information (content) created by the analysis system 10 to the owner of the information terminal 3 . Here, the owner is, for example, the manager of facility 5 .

(2)構成
次に、本実施形態に係る分析システム10、計測システム20、蓄積サーバ2及び情報端末3の構成について説明する。
(2) Configuration Next, configurations of the analysis system 10, the measurement system 20, the storage server 2, and the information terminal 3 according to this embodiment will be described.

(2.1)計測システム
まず、本実施形態の計測システム20の構成について説明する。
(2.1) Measurement system First, the configuration of the measurement system 20 of this embodiment will be described.

計測システム20は、図2に示すように、複数のコントローラ21と、電流センサ22~28とを備えている。また、施設5には、系統電源9に電気的に接続される受変電設備61(キュービクル)が設けられている。なお、複数のコントローラ21を個別に表す必要がある場合には、コントローラ21a~21cと記載する。 The measurement system 20 includes a plurality of controllers 21 and current sensors 22 to 28, as shown in FIG. Further, the facility 5 is provided with a power receiving and transforming facility 61 (cubicle) electrically connected to the system power source 9 . When the plurality of controllers 21 need to be represented individually, they are described as controllers 21a to 21c.

複数のコントローラ21は、少なくとも1つの電流センサに電気的に接続されている。具体的には、コントローラ21aは、電流センサ22に電気的に接続されている。コントローラ21bは、電流センサ23~25に電気的に接続されている。コントローラ21cは、電流センサ26~28に電気的に接続されている。電流センサ22は、受変電設備61の一次側に設けられ、幹線を流れる電流の値を計測する。電流センサ23~29は、複数の分岐ブレーカ62に対応して設けられ、複数の分岐回路に流れる電流の値をそれぞれ計測する。ここでいう「分岐回路」は、受変電設備61及び複数の分岐ブレーカ62にて幹線から分岐された各回路を意味する。分岐回路には、分岐ブレーカ62に接続される配線、照明器具や調理家電等の負荷機器50、コンセント(アウトレット)、壁スイッチ等を含んでいる。なお、複数の分岐ブレーカ62を個別に表す必要がある場合には、分岐ブレーカ62a~62fと記載する。例えば、分岐ブレーカ62cで分岐された分岐回路は、分岐ブレーカ62cと照明器具50a,50bとを含む回路である。また、受変電設備61で分岐された分岐回路は、受変電設備61と分岐ブレーカ62a,62bの各々で分岐された分岐回路とを含む回路である。 A plurality of controllers 21 are electrically connected to at least one current sensor. Specifically, the controller 21 a is electrically connected to the current sensor 22 . The controller 21b is electrically connected to the current sensors 23-25. The controller 21c is electrically connected to the current sensors 26-28. The current sensor 22 is provided on the primary side of the power receiving and transforming equipment 61 and measures the value of the current flowing through the main line. The current sensors 23 to 29 are provided corresponding to the plurality of branch breakers 62, and measure the values of currents flowing through the plurality of branch circuits. The “branch circuit” here means each circuit branched from the main line by the power receiving and transforming equipment 61 and the plurality of branch breakers 62 . The branch circuit includes wiring connected to the branch breaker 62, load devices 50 such as lighting fixtures and cooking appliances, outlets, wall switches, and the like. When the plurality of branch breakers 62 need to be indicated individually, they are described as branch breakers 62a to 62f. For example, the branch circuit branched by the branch breaker 62c is a circuit including the branch breaker 62c and the lighting fixtures 50a and 50b. Also, the branch circuit branched by the power receiving and transforming equipment 61 is a circuit including the power receiving and transforming equipment 61 and the branch circuits branched by each of the branch breakers 62a and 62b.

複数のコントローラ21の各々は、電気的に接続された1つ以上の電流センサの出力を用いて、複数の負荷機器50及び受変電設備61の各々について、使用電力と使用電力量(電力量)との少なくとも一方を計測する。複数のコントローラ21の各々は、計測された計測値を、施設5に設けられたルータ7を介して蓄積サーバ2へ送信する。例えば、コントローラ21aは、受変電設備61で分岐される分岐回路で使用される電力量を計測する。コントローラ21bは、複数の負荷機器50(照明器具50a~50c)の各々で使用される電力量の値を、負荷機器50ごとに計測する。コントローラ21cは、複数の負荷機器50(空調機器50d~50f)の各々で使用される電力量の値を、負荷機器50ごとに計測する。 Each of the plurality of controllers 21 uses the output of one or more electrically connected current sensors to determine the power consumption and power consumption (power consumption) for each of the plurality of load devices 50 and the power receiving and transforming equipment 61. and at least one of Each of the multiple controllers 21 transmits the measured value to the storage server 2 via the router 7 provided in the facility 5 . For example, the controller 21 a measures the amount of power used in the branch circuit branched by the power receiving and transforming equipment 61 . The controller 21b measures the value of the amount of electric power used by each of the plurality of load devices 50 (lighting fixtures 50a to 50c) for each load device 50. FIG. The controller 21c measures the amount of power used by each of the load devices 50 (air conditioners 50d to 50f).

上述したように、計測システム20の計測値は、複数のコントローラ21で計測される使用電力と使用電力量との少なくとも一方を含んでいる。つまり、計測値は、瞬時電力を表す使用電力であってもよいし、あるいは一定時間における電力の使用量(消費量)を表す使用電力量であってもよい。また、計測値は、使用電力と使用電力量との両方であってもよい。本実施形態では一例として、計測値は、使用電力を一定時間(例えば正時から30分間隔)で積算した使用電力量である。 As described above, the measurement value of the measurement system 20 includes at least one of the power consumption and the power consumption measured by the plurality of controllers 21 . In other words, the measured value may be used power representing instantaneous power, or may be used power amount representing the amount of power used (consumed amount) in a certain period of time. Also, the measured value may be both the power consumption and the power consumption. In this embodiment, as an example, the measured value is the power consumption obtained by integrating the power consumption for a certain period of time (for example, every 30 minutes from the hour).

コントローラ21は、計測対象である設備(受変電設備61又は負荷機器50)の計測値と、計測対象である受変電設備61又は負荷機器50を識別する回路IDとを対応付けて、ルータ7を介して蓄積サーバ2に送信する。回路IDとは、コントローラによって電力量の計測が可能な回路に割り当てられた識別子である。例えば、図2に示す照明器具50aには、回路IDとして“2-1”が割り当てられている。また、図2に示す空調機器50dには、回路IDとして“3-3”が割り当てられている。 The controller 21 associates the measured value of the facility (the power receiving and transforming facility 61 or the load device 50) to be measured with the circuit ID that identifies the power receiving and transforming facility 61 or the load device 50 to be measured, and controls the router 7. to the storage server 2 via the A circuit ID is an identifier assigned to a circuit whose power consumption can be measured by the controller. For example, the lighting fixture 50a shown in FIG. 2 is assigned a circuit ID of "2-1". Further, "3-3" is assigned as the circuit ID to the air conditioner 50d shown in FIG.

(2.2)蓄積サーバ
蓄積サーバ2は、計測システム20が計測した計測値(例えば使用電力量)を記憶する。つまり、蓄積サーバ2は、ROM(Read Only Memory)、RAM(Random Access Memory)、またはEEPROM(Electrically Erasable Programmable Read Only Memory)等から選択されるデバイスを有している。このデバイスに、計測システム20が計測した計測値が時系列に記憶される。
(2.2) Storage Server The storage server 2 stores measured values (for example, power consumption) measured by the measurement system 20 . That is, the storage server 2 has a device selected from ROM (Read Only Memory), RAM (Random Access Memory), EEPROM (Electrically Erasable Programmable Read Only Memory), and the like. The measured values measured by the measurement system 20 are stored in this device in chronological order.

蓄積サーバ2は、回路IDごとに、つまり計測対象の設備ごとに、計測された計測値を時系列に記憶する。 The storage server 2 stores measured values in chronological order for each circuit ID, that is, for each facility to be measured.

蓄積サーバ2は、計測対象である複数の設備(受変電設備61及び複数の負荷機器50)の名称と、複数の回路IDとを一対一に対応付けて記憶している。例えば、図2に示す照明器具50aの回路ID“2-1”には、名称“事務所 電灯”が対応付けられている。また、図2に示す空調機器50dの回路ID“3-3”には、名称“3F 動力”が対応付けられている。 The storage server 2 stores the names of the plurality of equipment (the power receiving and transforming equipment 61 and the plurality of load devices 50) to be measured in a one-to-one correspondence with the plurality of circuit IDs. For example, the circuit ID "2-1" of the lighting fixture 50a shown in FIG. 2 is associated with the name "office light". Further, the circuit ID "3-3" of the air conditioner 50d shown in FIG. 2 is associated with the name "3F power".

(2.3)分析システム
次に、本実施形態の分析システム10の構成について説明する。
(2.3) Analysis System Next, the configuration of the analysis system 10 of this embodiment will be described.

分析システム10は、上述したように、本実施形態では分析装置1にて構成されている。分析装置1は、情報端末3及び蓄積サーバ2にネットワーク4を介して接続される。 The analysis system 10 is configured by the analysis device 1 in this embodiment, as described above. The analysis device 1 is connected to the information terminal 3 and the storage server 2 via the network 4 .

分析装置1は、図1に示すように、処理部11と、通信部12と、記憶部13とを備える。分析装置1は、CPU(Central Processing Unit)及びメモリを有している。CPUがメモリに格納されているプログラムを実行することにより、処理部11の機能を実現する。プログラムは、ここではインターネット等の電気通信回線を通じて、あるいはメモリカード等の記録媒体に記録されて提供されるが、コンピュータのメモリに予め記録されていてもよい。 The analysis device 1 includes a processing unit 11, a communication unit 12, and a storage unit 13, as shown in FIG. The analyzer 1 has a CPU (Central Processing Unit) and a memory. The functions of the processing unit 11 are realized by the CPU executing programs stored in the memory. Although the program is provided here by being recorded in a recording medium such as a memory card or the like through an electric communication line such as the Internet, it may be recorded in advance in the memory of the computer.

通信部12は、ネットワーク4に接続されることで、分析装置1と情報端末3との間、及び分析装置1と蓄積サーバ2との間の通信を可能にする。 The communication unit 12 enables communication between the analysis device 1 and the information terminal 3 and between the analysis device 1 and the storage server 2 by being connected to the network 4 .

記憶部13は、ROM、RAM、又はEEPROM等から選択されるデバイスで構成される。記憶部13は、電気事業者との間で予め定められた契約電力量(閾値)を予め記憶している。さらに、記憶部13は、処理部11が行う電力量情報の分析による分析結果を記憶する。 The storage unit 13 is configured by a device selected from ROM, RAM, EEPROM, or the like. The storage unit 13 stores in advance a contract power amount (threshold value) determined in advance with the electric power company. Further, the storage unit 13 stores analysis results of the analysis of the power amount information performed by the processing unit 11 .

処理部11は、図1に示すように、取得部100、分析部101及び表示制御部102を有している。 The processing unit 11 has an acquisition unit 100, an analysis unit 101, and a display control unit 102, as shown in FIG.

取得部100は、計測システム20が施設5における複数の計測点でそれぞれ計測された複数の設備の電力量に関連する電力量情報を、蓄積サーバ2から取得する。具体的には、取得部100は、電流センサ22~28で計測された複数の設備(受変電設備61及び負荷機器50)の使用電力量と、計測された日時とを含む電力量情報を、蓄積サーバ2から取得する。取得部100は、取得した電力量情報を、設備ごとに記憶部13に時系列に記憶する。 The acquisition unit 100 acquires, from the storage server 2 , power amount information related to power amounts of a plurality of facilities measured at a plurality of measurement points in the facility 5 by the measurement system 20 . Specifically, the acquisition unit 100 acquires power amount information including the amount of power used by a plurality of facilities (the power receiving and transforming facility 61 and the load device 50) measured by the current sensors 22 to 28 and the date and time of measurement, Acquired from the storage server 2 . The acquisition unit 100 stores the acquired power amount information in the storage unit 13 in chronological order for each piece of equipment.

分析部101は、日ごと及びデマンド時限(30分単位)ごとに受変電設備61に対するデマンド値を求める。ここで、デマンド値は、デマンド時限における平均使用電力量であって、デマンド時限において使用(消費)された電力量(電力の大きさ)を反映する情報である。受変電設備61が受電した電力は施設5で使用(消費)されるので、分析部101は、受変電設備61が受電した電力量(受電電力量)を基に、施設5で使用される平均使用電力量としてのデマンド値を求めることができる。なお、本実施形態では、デマンド時限が、本開示の単位時間に相当する。 The analysis unit 101 obtains a demand value for the power receiving and transforming equipment 61 for each day and each demand time period (30 minutes unit). Here, the demand value is the average amount of power used in the demand time period, and is information reflecting the power amount (magnitude of power) used (consumed) in the demand time period. Since the power received by the power receiving and transforming equipment 61 is used (consumed) in the facility 5, the analysis unit 101 calculates the average A demand value as the amount of power used can be obtained. Note that, in the present embodiment, the demand time limit corresponds to the unit time of the present disclosure.

分析部101は、求めた受変電設備61に対するデマンド値と、デマンドフラグとを対応付けた情報であるデマンド情報を記憶部13に時系列に記憶する。デマンドフラグとは、対応するデマンド値が高デマンドであるか否かを表す情報である。本実施形態では、記憶部13が記憶する閾値に対する所定の割合である目標値をデマンド値が超える場合には高デマンドであることを表すデマンドフラグが、デマンド値に対応付けられる。デマンド値が目標値を超えない場合には高デマンドではないことを表すデマンドフラグが、デマンド値に対応付けられる。以下、目標値を超えたデマンド値を高デマンド値という。 The analysis unit 101 stores, in the storage unit 13, demand information, which is information in which the obtained demand value for the power receiving and transforming equipment 61 and the demand flag are associated with each other, in the storage unit 13 in chronological order. A demand flag is information indicating whether or not the corresponding demand value is high demand. In this embodiment, when the demand value exceeds the target value, which is a predetermined ratio to the threshold value stored in the storage unit 13, a demand flag indicating high demand is associated with the demand value. A demand flag indicating that the demand is not high when the demand value does not exceed the target value is associated with the demand value. A demand value exceeding the target value is hereinafter referred to as a high demand value.

分析部101は、同一の年月において求められた複数の高デマンド値のうち最高値から所定数の高デマンド値(例えば、上位10個のデマンド値)を含むデマンド情報に、複数の高デマンド値のうち上位の高デマンド値であることを表す上位フラグを含めて、記憶部13に記憶する。他のデマンド値(目標値を超えないデマンド値、及び複数の高デマンド値のうち上位の高デマンド値でない残りの高デマンド値)を含むデマンド情報に、上位の高デマンド値でないことを表す上位フラグを含めて、記憶部13に記憶する。つまり、デマンド情報は、受変電設備61に対するデマンド値、デマンドフラグ及び上位フラグが含まれる。 The analysis unit 101 adds a plurality of high demand values to demand information including a predetermined number of high demand values (for example, top 10 demand values) from the highest value among a plurality of high demand values obtained in the same year and month. are stored in the storage unit 13, including the high-order flag indicating that the high-demand value is the high-order value. Demand information containing other demand values (demand values that do not exceed the target value and remaining high demand values that are not higher demand values among a plurality of high demand values) has a higher flag indicating that it is not a higher high demand value are stored in the storage unit 13. That is, the demand information includes a demand value, a demand flag, and an upper flag for the power receiving and transforming equipment 61 .

分析部101は、高デマンド値が得られたデマンド時限、言い換えると高デマンドが発生しているデマンド時限の発生年月日及び発生時間帯を記憶部13に記憶する。 The analysis unit 101 stores in the storage unit 13 the demand time period for which a high demand value was obtained, in other words, the date and time period of occurrence of the demand time period during which high demand is occurring.

分析部101は、電力の計測が行われた月(計測月)ごとに、高デマンドが発生している発生時間帯を基に、高デマンドが発生しやすい期間を抽出する。具体的には、分析部101は、高デマンドの発生が集中している期間(月別高デマンド発生時間帯)を抽出し、月別高デマンド発生時間帯と計測月とを対応付けて、記憶部13に記憶する。 The analysis unit 101 extracts a period during which high demand is likely to occur based on the occurrence time zone in which high demand occurs for each month (measurement month) in which power measurement is performed. Specifically, the analysis unit 101 extracts a period in which the occurrence of high demand is concentrated (monthly high demand occurrence time zone), associates the monthly high demand occurrence time zone with the measurement month, and stores the data in the storage unit 13. memorize to

分析部101は、計測月において、設備(電力が計測された回路)ごとに、各デマンド時限における最大値、最小値、平均値、第1四分位、第2四分位(最大値と最小値との間の中央値)、第3四分位を求める。ここで、第1四分位は、最小値と第2四分位との間の中央値であり、第3四分位は、最大値と第2四分位との間の中央値である。分析部101は、求めた各値を、計測月ごと及び設備ごとに、記憶部13に記憶する。 The analysis unit 101 calculates the maximum value, minimum value, average value, first quartile, second quartile (maximum and minimum (median between values), determine the 3rd quartile. where the first quartile is the median between the minimum and second quartile and the third quartile is the median between maximum and second quartile . The analysis unit 101 stores the obtained values in the storage unit 13 for each measurement month and each facility.

分析部101は、さらに、日ごと及びデマンド時限ごとに受変電設備61を除く各設備(回路)のデマンド値(以下、設備側デマンド値という)を求める。 The analysis unit 101 further obtains a demand value of each facility (circuit) except for the power receiving and transforming facility 61 (hereinafter referred to as a facility-side demand value) for each day and each demand time period.

分析部101は、計測日ごとに、各設備について、月別高デマンド発生時間帯において設備側デマンド値が第3四分位を超える超過回数に基づく出現率、設備側デマンド値が中央値から超えた逸脱量に基づく超過量平均及び最大超過量を求める。具体的は、分析部101は、計測日ごと及び設備ごとに、月別高デマンド発生時間帯に含まれるデマンド時限の個数に対する超過回数の割合(%)を算出することで、出現率を求める。分析部101は、計測日ごと及び設備ごとに、逸脱量の合計値を月別高デマンド発生時間帯に含まれるデマンド時限の個数で除算することで、超過量平均を求める。分析部101は、計測日ごと及び設備ごとに、月別高デマンド発生時間帯における1又は複数の逸脱量のうち最大の逸脱量を最大超過量として求める。分析部101は、求めた出現率、超過量平均及び最大超過量を、計測日及び設備に対応付けて記憶部13に記憶する。 For each measurement day, the analysis unit 101 determines the appearance rate based on the number of times that the facility-side demand value exceeds the third quartile in the monthly high-demand generation time period, and the facility-side demand value exceeds the median value. Determine the average excess amount and the maximum excess amount based on the amount of deviation. Specifically, the analysis unit 101 obtains the appearance rate by calculating the ratio (%) of the number of excess times to the number of demand time periods included in the monthly high demand generation time period for each measurement day and each facility. The analysis unit 101 obtains an excess amount average by dividing the total deviation amount by the number of demand time periods included in the monthly high demand generation time period for each measurement day and each facility. The analysis unit 101 obtains, for each measurement day and for each piece of equipment, the maximum amount of deviation from among one or more deviation amounts in the high-demand generation time period of each month as the maximum excess amount. The analysis unit 101 stores the obtained appearance rate, average excess amount, and maximum excess amount in the storage unit 13 in association with the date of measurement and the facility.

分析部101は、計測日ごとに各設備について求めた出現率、超過量平均及び最大超過量を基に、月別高デマンド発生時間帯において高デマンド発生の要因となる設備(回路)を所定数分抽出する。分析部101は、同一計測日において、出現率を第1ソートキー、超過量平均を第2ソートキー及び最大超過量を第3ソートキーとして、複数の設備を降順にソートし、例えば、上位5つの設備を抽出する。分析部101は、抽出した設備の情報(例えば、回路ID)をソート結果の順序で、対応する回路名称、出現率、超過量平均及び最大超過量とともに記憶部13に記憶する。本実施形態では、出現率を第1ソートキー、超過量平均を第2ソートキー及び最大超過量を第3ソートキーとして抽出された上位5つの回路ID、各々に対応する回路名称、出現率、超過量平均及び最大超過量を含む情報を日別ランキング情報という。 Based on the occurrence rate, average excess amount, and maximum excess amount obtained for each facility for each measurement day, the analysis unit 101 identifies a predetermined number of facilities (circuits) that cause high demand in the high demand generation time period by month. Extract. On the same measurement date, the analysis unit 101 sorts the plurality of facilities in descending order using the appearance rate as the first sort key, the excess amount average as the second sort key, and the maximum excess amount as the third sort key. Extract. The analysis unit 101 stores the extracted equipment information (for example, circuit ID) in the order of the sort results in the storage unit 13 together with the corresponding circuit name, appearance rate, average excess amount, and maximum excess amount. In this embodiment, the top five circuit IDs extracted with the appearance rate as the first sort key, the excess amount average as the second sort key, and the maximum excess amount as the third sort key, the circuit name corresponding to each, the appearance rate, and the excess amount average and the information including the maximum excess amount is called daily ranking information.

分析部101は、各計測月において、複数の設備の各々の設備側デマンド値の合計(月別デマンド値)を算出する。分析部101は、計測月ごとに、複数の設備の各々の月別デマンド値の合計値(月別合計値)を算出する。分析部101は、計測月ごとに、複数の設備の各々について月別合計値に対する月別デマンド値の割合(月別デマンド割合)を算出する。分析部101は、複数の設備のうち、月別デマンド割合が大きい上位所定数(例えば5つ)の設備を抽出する。分析部101は、月別デマンド割合が大きい上位所定数(例えば5つ)の設備の月別デマンド値の合計値(第1合計値)を算出する。分析部101は、月別合計値から第1合計値を減算して、月別残デマンド値を算出する。分析部101は、月別デマンド割合が大きい上位所定数(例えば5つ)の設備の月別デマンド割合の合計値(第2合計値)を算出する。分析部101は、月別デマンド割合から第2合計値を減算して、月別残デマンド割合を算出する。分析部101は、月別合計値、月別残デマンド値及び月別残デマンド割合の他、抽出した設備の情報(例えば、回路ID)を割合の大きい順序で、対応する回路名称、月別デマンド値及び月別デマンド割合とともに記憶部13に記憶する。本実施形態では、月別合計値に対する月別デマンド値の割合が多い上位所定数(5つ)の設備の回路IDと、各々に対応する回路名称、月別デマンド値及び月別デマンド割合と、月別合計値と、月別残デマンド値と、月別残デマンド割合とを含む情報を月別ランキング情報という。 The analysis unit 101 calculates the sum of facility-side demand values (monthly demand values) for each of the plurality of facilities in each measurement month. The analysis unit 101 calculates the total value (monthly total value) of the monthly demand values of each of the plurality of facilities for each measurement month. The analysis unit 101 calculates the ratio of the monthly demand value to the monthly total value (monthly demand ratio) for each of the plurality of facilities for each measurement month. The analysis unit 101 extracts a predetermined number (for example, 5) of facilities having a high monthly demand ratio among the plurality of facilities. The analysis unit 101 calculates the total value (first total value) of the monthly demand values of a predetermined number (for example, 5) of facilities with the highest monthly demand ratios. The analysis unit 101 subtracts the first total value from the monthly total value to calculate the monthly remaining demand value. The analysis unit 101 calculates the total value (second total value) of the monthly demand ratios of a predetermined number (for example, five) of facilities with the highest monthly demand ratios. The analysis unit 101 subtracts the second total value from the monthly demand ratio to calculate the monthly remaining demand ratio. In addition to the monthly total value, the monthly remaining demand value, and the monthly remaining demand ratio, the analysis unit 101 extracts the extracted equipment information (for example, the circuit ID) in descending order of the ratio, the corresponding circuit name, the monthly demand value, and the monthly demand value. It is stored in the storage unit 13 together with the ratio. In the present embodiment, the circuit IDs of the predetermined number (five) of facilities with the highest ratio of monthly demand values to the monthly total value, the circuit names corresponding to each, the monthly demand value and the monthly demand ratio, and the monthly total value , the information including the monthly remaining demand value and the monthly remaining demand ratio is referred to as monthly ranking information.

分析部101は、計測月ごとに、受変電設備61に対するデマンド値が高デマンドである各デマンド時限において受変電設備61が受電する電力量(受電電力量)のデータを取得する。分析部101は、取得した複数の受電電力量のデータを用いて、受電電力量が多い上位所定数(ここでは、3つ)の受電電力量の値を抽出する。言い換えると、分析部101は、施設5において使用される電力量が多い上位所定数の電力量の値を抽出する。以下、抽出された3つの受電電力量の値を第1~第3受電電力量という。ここで、3つの受電電力量のデータのうち最も多い受電電力量を第1受電電力量とし、次に多い受電電力量を第2受電電力量とし、3番目に多い受電電力量を第3受電電力量とする。また、第1受電電力量に応じたデマンド時限を第1デマンド時限と、第2受電電力量データに応じたデマンド時限を第2デマンド時限と、第3受電電力量に応じたデマンド時限を第3デマンド時限と、それぞれいう。 For each measurement month, the analysis unit 101 acquires data on the amount of power received by the power receiving and transforming facility 61 (received power amount) in each demand time period when the demand value for the power receiving and transforming facility 61 is high. The analysis unit 101 extracts a predetermined number (here, three) of the received power amounts with the highest received power amounts using the acquired data of the received power amounts. In other words, the analysis unit 101 extracts a predetermined number of high power energy values that are used in a large amount in the facility 5 . Hereinafter, the values of the three extracted received power amounts are referred to as first to third received power amounts. Here, among the data of the three received power amounts, the largest received power amount is designated as the first received power amount, the next largest received power amount is designated as the second received power amount, and the third largest received power amount is designated as the third received power amount. Electric energy. Further, the demand time limit corresponding to the first received power amount is the first demand time limit, the demand time limit corresponding to the second received power amount data is the second demand time limit, and the demand time limit according to the third received power amount is the third demand time limit. These are called demand time limits.

分析部101は、第1~第3デマンド時限のそれぞれにおいて、複数の設備の各々の設備側デマンド値(個別デマンド値)を記憶部13から取得する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、個別デマンド値の合計値(個別合計値)を算出する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、複数の設備の各々について個別合計値に対する個別デマンド値の割合(個別デマンド割合)を算出する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、複数の設備のうち個別デマンド割合が大きい上位所定数(例えば5つ)の設備を抽出する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、個別デマンド割合が大きい上位所定数(例えば5つ)の設備の個別デマンド値の合計値(第3合計値)を算出する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、個別合計値から第3合計値を減算して個別残デマンド値を算出する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、個別デマンド割合が大きい上位所定数(例えば5つ)の設備の個別デマンド割合の合計値(第4合計値)を算出する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、個別デマンド割合から第4合計値を減算して個別残デマンド割合を算出する。 The analysis unit 101 acquires the facility-side demand value (individual demand value) of each of the plurality of facilities from the storage unit 13 in each of the first to third demand time periods. The analysis unit 101 calculates the total value (individual total value) of the individual demand values in each of the first to third demand time periods. The analysis unit 101 calculates the ratio of the individual demand value to the individual total value (individual demand ratio) for each of the plurality of facilities in each of the first to third demand time periods. The analysis unit 101 extracts a predetermined number (for example, 5) of facilities with a high individual demand ratio among the plurality of facilities in each of the first to third demand time periods. The analysis unit 101 calculates the total value (third total value) of the individual demand values of the predetermined number (for example, 5) of facilities with the highest individual demand ratios in each of the first to third demand time periods. The analysis unit 101 calculates the individual remaining demand value by subtracting the third total value from the individual total value in each of the first to third demand time periods. The analysis unit 101 calculates the total value (fourth total value) of the individual demand ratios of a predetermined number (for example, five) of facilities with the highest individual demand ratios in each of the first to third demand time periods. The analysis unit 101 calculates the individual remaining demand ratio by subtracting the fourth total value from the individual demand ratio in each of the first to third demand time periods.

分析部101は、第1~第3デマンド時限のそれぞれに一対一に対応する複数(ここでは、3つ)の個別ランキング情報を記憶部13に記憶する。個別ランキング情報は、対応するデマンド時限に応じた時間帯、当該デマンド時限での受電電力量の値、個別合計値、個別残デマンド値及び個別残デマンド割合の他、当該デマンド時限において抽出した設備の情報(例えば、回路ID)、個別デマンド値及び個別デマンド割合を含む。ここで、個別ランキング情報が記憶部13に記憶される際には、当該デマンド時限において抽出した設備の情報(例えば、回路ID)の個別デマンド割合が大きい順序で、記憶部13に記憶される。 The analysis unit 101 stores, in the storage unit 13, a plurality (here, three) of individual ranking information corresponding to each of the first to third demand time periods on a one-to-one basis. The individual ranking information includes the time zone corresponding to the corresponding demand time period, the value of the received power amount in the relevant demand time period, the individual total value, the individual remaining demand value and the individual remaining demand ratio, as well as the number of facilities extracted in the relevant demand time period. Includes information (eg circuit ID), individual demand value and individual demand percentage. Here, when the individual ranking information is stored in the storage unit 13, it is stored in the storage unit 13 in descending order of the individual demand ratio of the facility information (for example, circuit ID) extracted in the demand time period.

分析部101は、同一日に対応する日別ランキング情報と個別ランキング情報との双方に、1つ以上の同一の回路IDに含まれている場合には、双方の含まれる1つ以上の回路IDを含む関連情報を生成し、対応する日に対応付けて記憶部13に記憶する。 If one or more circuit IDs are included in both the daily ranking information and the individual ranking information corresponding to the same day, the analysis unit 101 detects the one or more circuit IDs included in both. is generated and stored in the storage unit 13 in association with the corresponding date.

表示制御部102は、情報端末3からの要求に応じた画面を作成し、情報端末3の表示部31に表示する。 The display control unit 102 creates a screen according to the request from the information terminal 3 and displays it on the display unit 31 of the information terminal 3 .

表示制御部102は、情報端末3からの要求に応じて、計測が開始されてから現在までの期間における日別のデマンドに関するカレンダ画面200(コンテンツ)を作成し、表示部31に表示する。 In response to a request from the information terminal 3 , the display control unit 102 creates a calendar screen 200 (content) relating to daily demand during the period from the start of measurement to the present, and displays it on the display unit 31 .

表示制御部102は、情報端末3からの要求に応じて、指定された月における日別かつデマンド時限別のデマンドに関する時限選択画面300(コンテンツ)を作成し、表示部31に表示する。 In response to a request from the information terminal 3 , the display control unit 102 creates a time period selection screen 300 (content) regarding demands for each day and demand time period in the specified month, and displays it on the display unit 31 .

表示制御部102は、情報端末3からの要求に応じて、指定された日における特定の設備(回路)のデマンド時限ごとに使用(消費)される使用電力に関する動的分析画面400(コンテンツ)を作成し、表示部31に表示する。 In response to a request from the information terminal 3, the display control unit 102 displays a dynamic analysis screen 400 (content) related to the power used (consumed) for each demand time period of a specific facility (circuit) on a specified day. created and displayed on the display unit 31 .

表示制御部102は、情報端末3からの要求に応じて、特定の月における各設備の使用電力に関する静的分析画面500(コンテンツ)を作成し、表示部31に表示する。 In response to a request from the information terminal 3 , the display control unit 102 creates a static analysis screen 500 (content) regarding the power consumption of each piece of equipment in a specific month, and displays it on the display unit 31 .

表示制御部102は、作成した画面を情報端末3に送信し、表示部31に表示させる。 The display control unit 102 transmits the created screen to the information terminal 3 and causes the display unit 31 to display it.

(2.4)情報端末
次に、本実施形態の情報端末3の構成について説明する。
(2.4) Information Terminal Next, the configuration of the information terminal 3 of this embodiment will be described.

情報端末3は、一例として表示部31を備えるスマートフォンである。情報端末3は、図3に示すように、表示部31の他、処理部32と、通信部33と、入力部34と、記憶部35とを備える。情報端末3は、CPU及びメモリを有しており、CPUがメモリに格納されているプログラムを実行することにより、コンピュータを処理部32として機能させる。プログラムは、ここではインターネット等の電気通信回線を通じて、あるいはメモリカード等の記録媒体に記録されて提供されるが、コンピュータのメモリに予め記録されていてもよい。 The information terminal 3 is a smart phone provided with the display part 31 as an example. The information terminal 3 includes a display unit 31, a processing unit 32, a communication unit 33, an input unit 34, and a storage unit 35, as shown in FIG. The information terminal 3 has a CPU and memory, and the CPU causes the computer to function as the processing unit 32 by executing a program stored in the memory. Although the program is provided here by being recorded in a recording medium such as a memory card or the like through an electric communication line such as the Internet, it may be recorded in advance in the memory of the computer.

表示部31は、例えば液晶ディスプレイや有機EL(electroluminescence)ディスプレイのような薄型のディスプレイ装置である。 The display unit 31 is a thin display device such as a liquid crystal display or an organic EL (electroluminescence) display.

処理部32は、表示部31を制御することにより、分析装置1の表示制御部102が作成した画面を表示部31に表示する機能を持つ。つまり、情報端末3は、専用のアプリケーションソフトをインストールし、このアプリケーションソフトを起動することにより、表示部31を制御するための処理部32としての機能を実現する。 The processing unit 32 has a function of displaying a screen created by the display control unit 102 of the analyzer 1 on the display unit 31 by controlling the display unit 31 . In other words, the information terminal 3 implements the function of the processing unit 32 for controlling the display unit 31 by installing dedicated application software and activating this application software.

通信部33は、ネットワーク4に接続されることで、情報端末3と分析装置1(分析システム10)との間の通信を可能にする。ここでは、情報端末3はスマートフォンであるから、通信部33は、通信事業者が提供する携帯電話網(キャリア網)を介して、例えばインターネットからなるネットワーク4に接続される。携帯電話網には、例えば3G(第3世代)回線、LTE(Long Term Evolution)回線等がある。なお、通信部33は、公衆無線LAN(Local Area Network)を介してネットワーク4に接続されてもよい。 The communication unit 33 is connected to the network 4 to enable communication between the information terminal 3 and the analysis device 1 (analysis system 10). Here, since the information terminal 3 is a smart phone, the communication unit 33 is connected to the network 4 such as the Internet via a mobile phone network (carrier network) provided by a telecommunications carrier. Mobile phone networks include, for example, 3G (third generation) lines and LTE (Long Term Evolution) lines. Note that the communication unit 33 may be connected to the network 4 via a public wireless LAN (Local Area Network).

入力部34は、情報端末3の所有者の操作を受け付ける機能を有している。本実施形態では、情報端末3はタッチパネルディスプレイを搭載したスマートフォンであり、タッチパネルディスプレイが表示部31及び入力部34として機能する。そのため、以下の説明では、表示部31に表示される画面上のボタンに対する種々のタッチ操作を、「タップ」等と表現する。ただし、入力部34は、タッチパネルディスプレイに限らず、例えばキーボードやポインティングデバイス、メカニカルなスイッチ等であってもよい。 The input unit 34 has a function of receiving an operation by the owner of the information terminal 3 . In this embodiment, the information terminal 3 is a smart phone equipped with a touch panel display, and the touch panel display functions as the display section 31 and the input section 34 . Therefore, in the following description, various touch operations on buttons on the screen displayed on the display unit 31 are expressed as "tap" or the like. However, the input unit 34 is not limited to a touch panel display, and may be, for example, a keyboard, pointing device, mechanical switch, or the like.

記憶部35は、例えばフラッシュメモリ等の電気的に書換可能な不揮発性の半導体メモリで構成される。 The storage unit 35 is composed of an electrically rewritable non-volatile semiconductor memory such as a flash memory.

情報端末3は、上記構成により分析装置1で作成された画面(コンテンツ)を表示することができる。 The information terminal 3 can display a screen (content) created by the analysis device 1 with the above configuration.

なお、情報端末3がスマートフォンで構成されることは一例である。情報端末3は、携帯電話機、パーソナルコンピュータ等で構成されてもよい。 In addition, it is an example that the information terminal 3 is configured by a smart phone. The information terminal 3 may be composed of a mobile phone, a personal computer, or the like.

(3)動作説明
以下、本実施形態に係る分析システム10の動作について説明する。
(3) Description of Operation The operation of the analysis system 10 according to this embodiment will be described below.

本実施形態に係るプログラムは、情報端末3の表示部31に、計測システム20が計測した施設5における使用電力量に関する情報を表示するためのプログラムである。つまり、本実施形態に係るプログラムは、分析装置1のコンピュータを、取得部100、分析部101及び表示制御部102として機能させるためのプログラムである。 A program according to the present embodiment is a program for displaying, on the display unit 31 of the information terminal 3, information regarding the power consumption in the facility 5 measured by the measurement system 20. FIG. That is, the program according to the present embodiment is a program for causing the computer of the analysis device 1 to function as the acquisition unit 100, the analysis unit 101, and the display control unit 102. FIG.

取得部100は、電流センサ22~28で計測された複数の設備(受変電設備61及び負荷機器50)の使用電力量のデータと、計測された日時とを含む電力量情報を、蓄積サーバ2から取得し、記憶部13に記憶する。 The acquisition unit 100 acquires power amount information including the data of the power consumption of a plurality of facilities (the power receiving and transforming facility 61 and the load device 50) measured by the current sensors 22 to 28 and the date and time of measurement, to the storage server 2. , and stored in the storage unit 13 .

分析部101は、日ごと及びデマンド時限(30分単位)ごとの受変電設備61に対するデマンド情報を生成し、生成したデマンド情報を記憶部13に時系列に記憶する。ここで、デマンド情報には、上述したように、デマンド値、デマンドフラグ及び上位フラグが含まれている。 The analysis unit 101 generates demand information for the power receiving and transforming equipment 61 for each day and each demand time period (in 30-minute units), and stores the generated demand information in the storage unit 13 in chronological order. Here, the demand information includes the demand value, the demand flag and the upper flag as described above.

分析部101は、高デマンドが発生しているデマンド時限の発生年月日及び発生時間帯を記憶部13に記憶する。 The analysis unit 101 stores in the storage unit 13 the date of occurrence and the time period of occurrence of the demand time period in which high demand is occurring.

分析部101は、計測月ごとに、高デマンドが発生している発生時間帯を基に、月別高デマンド発生時間帯を抽出し、月別高デマンド発生時間帯と測定月とを対応付けて、記憶部13に記憶する。 For each measurement month, the analysis unit 101 extracts a monthly high-demand occurrence time zone based on the high-demand occurrence time zone, associates the monthly high-demand occurrence time zone with the measurement month, and stores them. Store in section 13 .

分析部101は、計測月において、設備ごとに、各デマンド時限における最大値、最小値、平均値、第1四分位、第2四分位(最大値と最小値との間の中央値)、第3四分位を求めて、求めた各値を、計測月ごと及び設備ごとに、記憶部13に記憶する。 The analysis unit 101 calculates the maximum value, the minimum value, the average value, the first quartile, the second quartile (the median value between the maximum value and the minimum value) in each demand time period for each facility in the measurement month. , and the third quartile are stored in the storage unit 13 for each measurement month and for each facility.

分析部101は、計測日ごとに、各設備について、月別高デマンド発生時間帯における出現率、超過量平均及び最大超過量を求める。分析部101は、求めた出現率、超過量平均及び最大超過量を、計測日及び設備に対応付けて記憶部13に記憶する。 For each measurement day, the analysis unit 101 obtains the appearance rate, the average excess amount, and the maximum excess amount in the high demand generation time period by month for each facility. The analysis unit 101 stores the obtained appearance rate, average excess amount, and maximum excess amount in the storage unit 13 in association with the date of measurement and the facility.

分析部101は、計測日ごとに各設備について求めた出現率、超過量平均及び最大超過量を基に、月別高デマンド発生時間帯において高デマンド発生の要因となる設備(回路)を所定数分抽出する。分析部101は、日別ランキング情報を生成し、生成した日別ランキングを記憶部13に記憶する。 Based on the occurrence rate, average excess amount, and maximum excess amount obtained for each facility for each measurement day, the analysis unit 101 identifies a predetermined number of facilities (circuits) that cause high demand in the high demand generation time period by month. Extract. The analysis unit 101 generates daily ranking information and stores the generated daily ranking in the storage unit 13 .

分析部101は、各計測月において、複数の設備の各々の月別デマンド値を算出する。分析部101は、計測月ごとに、月別合計値を算出する。分析部101は、計測月ごとに、複数の設備の各々について月別デマンド割合を算出する。分析部101は、算出した各月別デマンド値、月別合計値及び月別デマンド割合を基に、月別ランキング情報を生成し、生成した月別ランキング情報を記憶部13に記憶する。 The analysis unit 101 calculates a monthly demand value for each of the plurality of facilities in each measurement month. The analysis unit 101 calculates a monthly total value for each measurement month. The analysis unit 101 calculates a monthly demand ratio for each of the plurality of facilities for each measurement month. The analysis unit 101 generates monthly ranking information based on the calculated monthly demand value, monthly total value, and monthly demand ratio, and stores the generated monthly ranking information in the storage unit 13 .

分析部101は、第1~第3デマンド時限のそれぞれにおいて、複数の設備の各々の個別デマンド値を記憶部13から取得する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、個別合計値を算出する。分析部101は、第1~第3デマンド時限のそれぞれにおいて、複数の設備の各々について個別デマンド割合を算出する。分析部101は、第1~第3デマンド時限のそれぞれに対して、対応するデマンド時限の個別デマンド値、個別合計値及び個別デマンド割合を基に、個別ランキング情報を生成し、生成した個別ランキング情報を記憶部13に記憶する。 The analysis unit 101 acquires from the storage unit 13 individual demand values for each of the plurality of facilities in each of the first to third demand time periods. The analysis unit 101 calculates individual total values in each of the first to third demand time periods. The analysis unit 101 calculates the individual demand ratio for each of the plurality of facilities in each of the first to third demand time periods. For each of the first to third demand time periods, the analysis unit 101 generates individual ranking information based on the individual demand value, individual total value, and individual demand ratio of the corresponding demand time period, and generates individual ranking information. is stored in the storage unit 13 .

分析部101は、日別ランキング情報と、個別ランキング情報とにおいて、同一日に1つ以上の同一の回路IDに含まれている場合には関連情報を生成し、記憶部13に記憶する。 In the daily ranking information and the individual ranking information, the analysis unit 101 generates related information and stores it in the storage unit 13 when the circuit ID is included in one or more same circuit IDs on the same day.

表示制御部102は、情報端末3からの要求に応じて、カレンダ画面200(図3参照)を作成し、表示部31に表示する。具体的には、表示制御部102は、時系列に記憶部13で記憶されているデマンド情報を月単位にグループ化する。表示制御部102は、各月の複数の日の各々について、当該日に対応する複数のデマンド情報に基づいて当該日の表示態様を決定する。ここでは、表示制御部102は、表示態様として表示色を決定する。例えば、デマンド値が高デマンドであることを表しているデマンドフラグを含む1つ以上のデマンド情報が存在する場合には、当該1つ以上のデマンド情報に対応する日(高デマンド日)の表示色を黄色に決定する。デマンド値が高デマンドであることを表しているデマンドフラグを含むデマンド情報が全く存在しない日の表示色は白色に決定する。つまり、高デマンドが発生している日と、発生していない日とで表示色を変更する。表示制御部102は、月単位で日ごとに決定された表示色を含むカレンダ画面200を生成する。 The display control unit 102 creates a calendar screen 200 (see FIG. 3) in response to a request from the information terminal 3 and displays it on the display unit 31 . Specifically, the display control unit 102 groups the demand information stored in the storage unit 13 in chronological order by month. The display control unit 102 determines a display mode for each of a plurality of days in each month based on a plurality of pieces of demand information corresponding to the day. Here, the display control unit 102 determines the display color as the display mode. For example, when there is one or more demand information containing a demand flag indicating that the demand value is high demand, the display color of the day (high demand day) corresponding to the one or more demand information to yellow. The display color of a day on which there is no demand information including a demand flag indicating that the demand value is high is determined to be white. In other words, the display color is changed between days when high demand is occurring and days when high demand is not occurring. The display control unit 102 generates a calendar screen 200 including display colors determined for each day on a monthly basis.

表示制御部102は、情報端末3からの要求に応じて、指定された月に対する時限選択画面300(図4参照)を作成し、表示部31に表示する。具体的には、表示制御部102は、指定された月で計測された電力に応じたデマンド情報を日単位にグループ化する。表示制御部102は、各日のデマンド時限の各々について、当該デマンド時限に対応するデマンド情報に基づいて当該デマンド時限の表示態様を決定する。ここでは、表示制御部102は、デマンド時限の表示態様として表示色を決定する。例えば、表示制御部102は、デマンド値が高デマンドであることを表しているデマンドフラグ及び上位の高デマンドであることを表す上位フラグを含むデマンド情報に対するデマンド時限については、表示色を橙色に決定する。表示制御部102は、デマンド値が高デマンドであることを表しているデマンドフラグ及び上位の高デマンドでないことを表す上位フラグを含むデマンド情報に対するデマンド時限については、表示色を黄色に決定する。表示制御部102は、デマンド値が高デマンドでないことを表しているデマンドフラグ及び上位の高デマンドでないことを表す上位フラグを含むデマンド情報に対するデマンド時限については、表示色を白色に決定する。つまり、表示制御部102は、高デマンドが発生しているデマンド時限と、発生していないデマンド時限とで表示色を変更する。表示制御部102は、さらには、高デマンドで発生しているデマンド時限については上位の高デマンドであるデマンド時限と、上位の高デマンドではないデマンド時限とで表示色を変更する。 The display control unit 102 creates a time period selection screen 300 (see FIG. 4) for the specified month in response to a request from the information terminal 3 and displays it on the display unit 31 . Specifically, the display control unit 102 groups the demand information according to the power measured in the designated month by day. The display control unit 102 determines the display mode of each demand time period for each day based on the demand information corresponding to the demand time period. Here, the display control unit 102 determines the display color as the display mode of the demand time period. For example, the display control unit 102 determines the display color to be orange for the demand time limit for the demand information including the demand flag indicating that the demand value is high demand and the high-order flag indicating that the demand value is high-ranking. do. The display control unit 102 sets the display color to yellow for the demand time limit for the demand information including the demand flag indicating that the demand value is high demand and the high-order flag indicating that the demand value is not high-ranking demand. The display control unit 102 sets the display color to white for the demand time limit for the demand information including the demand flag indicating that the demand value is not high demand and the high-order flag indicating that the demand value is not high-ranking demand. In other words, the display control unit 102 changes the display color between the demand time period in which high demand is occurring and the demand time period in which high demand is not occurring. Further, the display control unit 102 changes the display color of the demand time period generated with high demand between the demand time period with higher demand and the demand time period with higher demand without high demand.

時限選択画面300では、後述するように指定された月に含まれる日を横軸とし、1日におけるデマンド時限(デマンド時限の開始時刻)を縦軸とするマトリックス形式で表示される。表示制御部102は、高デマンドが発生している日とデマンド時限とが交差する領域(表示色が橙色又は黄色の表示領域)については、リンクボタンとして表示するように決定する。言い換えると、複数の日と前記複数のデマンド時限との組み合わせのうち、使用(消費)された電力が目標値を超えた時間帯に応じた日とデマンド時限との組み合わせに相当するマトリックス上の位置における表示態様は、リンクボタンとなっている。ここで、リンクボタンは、高デマンドが発生しているデマンド時限を含む期間(高デマンド発生している日)における電力の使用の詳細表示のための画面へ遷移するためのボタンである。 The time period selection screen 300 is displayed in a matrix format with the horizontal axis representing days included in a specified month and the vertical axis representing demand time periods (starting times of demand time periods) in a given month, as will be described later. The display control unit 102 determines to display a link button for an area (display area with orange or yellow display color) where the day on which high demand occurs and the demand time period intersect. In other words, among the combinations of the plurality of days and the plurality of demand time periods, the position on the matrix corresponding to the combination of the day and the demand time period according to the time zone in which the power used (consumed) exceeds the target value. The display mode in is a link button. Here, the link button is a button for transitioning to a screen for detailed display of power usage during a period including a demand time period when high demand is occurring (a day when high demand is occurring).

さらに、表示制御部102は、高デマンドが発生している日及びデマンド時限の表示態様としての表示色を緑色に決定する。表示制御部102は、デマンドが発生していない日及びデマンド時限の表示色を白色に決定する。表示制御部102は、指定された日のデマンド時限ごとに決定されたデマンド時限の表示色、及びリンクボタンとしの表示の有無を含む時限選択画面300を生成する。 Furthermore, the display control unit 102 determines green as the display color for the display mode of the day on which high demand is occurring and the demand period. The display control unit 102 determines white as the display color of the day when no demand is generated and the demand period. The display control unit 102 generates a time period selection screen 300 including the display color of the demand time period determined for each demand time period of the designated day and the presence or absence of display as a link button.

表示制御部102は、情報端末3からの要求に応じて、時限選択画面300で表示された月において指定された日に対する動的分析画面400を作成し、表示部31に表示する。具体的には、表示制御部102は、時限選択画面300で表示された月に対応する月別高デマンド発生時間帯、日別ランキング情報を記憶部13から取得する。表示制御部102は、受変電設備61に対する電力量情報であって指定された日に対応するすべての電力量情報を記憶部13から取得する。表示制御部102は、日別ランキング情報に含まれる複数の設備のうちソート処理により最上位となった設備(最上位設備)に対して算出されたデマンド時限ごとの平均値を取得する。表示制御部102は、最上位設備に対する電力量情報であって指定された日に対応するすべての電力量情報を記憶部13から取得する。表示制御部102は、指定された日に対応する関連情報が記憶部13に存在する場合には、当該関連情報を記憶部13から取得する。 In response to a request from the information terminal 3 , the display control unit 102 creates the dynamic analysis screen 400 for the specified day in the month displayed on the time limit selection screen 300 and displays it on the display unit 31 . Specifically, the display control unit 102 acquires from the storage unit 13 the monthly high-demand occurrence time zone and the daily ranking information corresponding to the month displayed on the time period selection screen 300 . The display control unit 102 acquires from the storage unit 13 all the power amount information corresponding to the specified day, which is the power amount information for the power receiving and transforming equipment 61 . The display control unit 102 acquires the average value for each demand time period calculated for the facility (highest-ranked facility) ranked highest by the sorting process among the plurality of facilities included in the daily ranking information. The display control unit 102 acquires from the storage unit 13 all the power amount information corresponding to the specified day, which is the power amount information for the highest-level facility. The display control unit 102 acquires the related information from the storage unit 13 when the related information corresponding to the specified date exists in the storage unit 13 .

表示制御部102は、取得した最上位設備の電力量情報を基に得られる設備側デマンド値をデマンド時限ごとの棒グラフとして表す情報を第1グラフ情報として生成する。表示制御部102は、取得した最上位設備の平均値を基に指定された日での折れ線グラフ(標準ロードカーブ)を表す情報を第2グラフ情報として生成する。表示制御部102は、取得した受変電設備61の電力量情報を基に指定された日での折れ線グラフを表す情報を第3グラフ情報として生成する。表示制御部102は、指定された日のうち月別高デマンド発生時間帯に相当する時間帯の表示色を黄色に決定する。表示制御部102は、第1グラフ情報で表されるグラフの表示色を青色、第2グラフ情報で表されるグラフの表示色を赤色、第3グラフ情報で表されるグラフの表示色を黒色に、それぞれ決定する。 The display control unit 102 generates, as first graph information, information representing the facility-side demand value obtained based on the acquired power amount information of the highest-level facility as a bar graph for each demand time period. The display control unit 102 generates, as second graph information, information representing a line graph (standard load curve) for a specified day based on the obtained average value of the highest-level equipment. The display control unit 102 generates, as third graph information, information representing a line graph for the specified date based on the acquired power amount information of the power receiving and transforming equipment 61 . The display control unit 102 determines yellow as the display color for the time period corresponding to the monthly high demand generation time period on the specified day. The display control unit 102 sets the display color of the graph represented by the first graph information to blue, the display color of the graph represented by the second graph information to red, and the graph represented by the third graph information to black. , respectively.

表示制御部102は、日別ランキング情報に含まれる各設備の表示色を決定する。具体的には、表示制御部102は、関連情報を取得した場合には、当該関連情報に含まれる回路IDに対応する設備の表示色は赤色に、関連情報に含まれない回路IDの設備についての表示色は白色に決定する。なお、関連情報を取得していない場合には、表示制御部102は、日別ランキング情報に含まれる各設備の表示色は白色に決定する。さらに、表示制御部102は、日別ランキング情報に応じた日に対応する関連情報が記憶部13に存在し、かつ当該関連情報に含まれる回路IDに対する設備をリンクボタンとして表示するように決定する。 The display control unit 102 determines the display color of each facility included in the daily ranking information. Specifically, when the related information is acquired, the display control unit 102 sets the display color of the facility corresponding to the circuit ID included in the related information to red, and the display color of the facility corresponding to the circuit ID not included in the related information to red. is determined to be white. Note that when the related information is not acquired, the display control unit 102 determines that the display color of each facility included in the daily ranking information is white. Further, the display control unit 102 determines that the related information corresponding to the day corresponding to the daily ranking information exists in the storage unit 13, and the facility corresponding to the circuit ID included in the related information is displayed as a link button. .

表示制御部102は、第1~第3グラフ情報、日別ランキング情報、月別高デマンド発生時間帯、決定した各表示色、及びリンクボタンとしての表示の有無を含む動的分析画面400(図5参照)を生成する。 The display control unit 102 displays a dynamic analysis screen 400 (see FIG. 5 ).

表示制御部102は、情報端末3からの要求に応じて、静的分析画面500(図6参照)を作成し、表示部31に表示する。具体的には、表示制御部102は、指定された月に対応する月別ランキング情報を記憶部13から取得する。表示制御部102は、指定された月に対応しかつ受電電力量が多い上位所定数(例えば3)の日のそれぞれの個別ランキング情報を取得する。表示制御部102は、月別ランキング情報を基に、月別ランキング情報に各設備の月別デマンド割合を円グラフとして表す情報を第4グラフ情報として生成する。表示制御部102は、各個別ランキング情報を基に、各設備の個別デマンド割合を円グラフとして表す情報を第5グラフ情報~第7グラフ情報として生成する。第5グラフ情報で表される円グラフは、第1デマンド時限における各設備の個別デマンド割合を表す。第6グラフ情報で表される円グラフは、第2デマンド時限における各設備の個別デマンド割合を表す。第7グラフ情報で表される円グラフは、第3デマンド時限における各設備の個別デマンド割合を表す。 The display control unit 102 creates a static analysis screen 500 (see FIG. 6) in response to a request from the information terminal 3 and displays it on the display unit 31 . Specifically, the display control unit 102 acquires the monthly ranking information corresponding to the designated month from the storage unit 13 . The display control unit 102 acquires the individual ranking information for each of the predetermined number (for example, 3) of the days corresponding to the specified month and having the highest received power amount. Based on the monthly ranking information, the display control unit 102 generates, as fourth graph information, information representing the monthly demand ratio of each facility in the monthly ranking information as a pie chart. Based on the individual ranking information, the display control unit 102 generates information representing the individual demand ratio of each facility as a pie chart as fifth to seventh graph information. A pie chart represented by the fifth graph information represents the individual demand ratio of each facility in the first demand time period. A pie chart represented by the sixth graph information represents the individual demand ratio of each facility in the second demand time period. A pie chart represented by the seventh graph information represents the individual demand ratio of each facility in the third demand time period.

表示制御部102は、第4グラフ情報で表される円グラフにおいて、月別デマンド割合が最も大きい設備の表示色を水色、2番目に大きい設備の表示色を黒色、3番目に大きい設備の表示色を黄色、4番目に大きい設備の表示色を橙色、5番目に大きい設備の表示色を青色に、それぞれ決定する。表示制御部102は、第4グラフ情報で表される円グラフにおける残りの割合については表示色を赤色に決定する。 In the pie chart represented by the fourth graph information, the display control unit 102 sets the display color of the equipment with the highest monthly demand ratio to light blue, the display color of the equipment with the second highest ratio to black, and the display color of the equipment with the third highest ratio. is set to yellow, the display color of the fourth largest facility is set to orange, and the display color of the fifth largest facility is set to blue. The display control unit 102 determines red as the display color for the remaining ratio in the pie chart represented by the fourth graph information.

表示制御部102は、月別合計値に対する月別デマンド値の割合が多い上位所定数(5つ)の設備の回路IDと、各々に対応する回路名称、月別デマンド値及び月別デマンド割合と、月別残デマンド値と、月別残デマンド割合とを含み、各設備の順位を含むテーブルを表す情報を第1テーブル情報として生成する。第1テーブル情報が表すテーブルは、月別合計値に対する月別デマンド値の割合が多い上位所定数(5つ)の設備と、その他の設備との計6つの順位を含む。第6番目は、その他の設備として、月別残デマンド値と、月別残デマンド割合が対応付けられる。表示制御部102は、第1テーブル情報で表されるテーブルにおいて、各設備の順位の表示色を、第1位から第6位の順に水色、黒色、黄色、橙色、青色及び赤色に決定する。 The display control unit 102 displays the circuit IDs of the predetermined number (five) of facilities with the highest ratio of monthly demand values to the monthly total value, the circuit names corresponding to each, the monthly demand values and monthly demand ratios, and the monthly remaining demand values. Information representing a table containing values and remaining demand ratios by month and containing the order of each facility is generated as first table information. The table represented by the first table information includes a total of 6 ranks, ie, a predetermined number (five) of high-ranking facilities with a high ratio of monthly demand values to monthly total values, and other facilities. Sixth, as other facilities, monthly remaining demand values and monthly remaining demand ratios are associated. In the table represented by the first table information, the display control unit 102 determines the display colors of the order of each facility to be light blue, black, yellow, orange, blue, and red in order from first to sixth.

表示制御部102は、第5グラフ情報~第7グラフ情報の各々で表される円グラフについても、上位の設備から5番目までの設備の表示色を順に、水色、黒色、黄色、橙色及び青色に決定する。表示制御部102は、第5グラフ情報~第7グラフ情報の各々で表される円グラフにおける残りの割合については表示色を赤色に決定する。 For the pie charts represented by the fifth to seventh graph information, the display control unit 102 sets the display colors of the facilities from the top to the fifth in order of light blue, black, yellow, orange, and blue. to decide. The display control unit 102 determines red as the display color for the remaining proportions of the pie charts represented by the fifth to seventh graph information.

表示制御部102は、第1~第3デマンド時限の各々について、各設備の順位を含むテーブルを表す第2テーブル情報~第4テーブル情報を生成する。具体的には、表示制御部102は、個別ランキング情報に基づいて、個別デマンド値の割合が多い上位所定数(5つ)の設備の回路ID及び各々に対応する個別デマンド値及び個別デマンド割合と、個別残デマンド値と、個別残デマンド割合とを含み、各設備の順位を表すテーブルのテーブル情報(第2~第4テーブル情報)を生成する。第2テーブル情報は第1デマンド時限に対応し、第3テーブル情報は第2デマンド時限に対応し、第4テーブル情報は第3デマンド時限に、それぞれ対応する。第2~第4テーブル情報の各々が表すテーブルは、個別合計値に対する個別デマンド値の割合が多い上位所定数(5つ)の設備と、その他の設備との計6つの順位を含む。第6番目は、その他の設備として、個別残デマンド値と、個別マンド割合が対応付けられる。表示制御部102は、第2~第4テーブル情報の各々で表されるテーブルにおいて、各設備の順位の表示色を、第1位から第6位の順に水色、黒色、黄色、橙色、青色及び赤色に決定する。 The display control unit 102 generates second table information to fourth table information representing a table including the ranking of each facility for each of the first to third demand time periods. Specifically, based on the individual ranking information, the display control unit 102 sets the circuit IDs of the predetermined number (five) of facilities with the highest individual demand value ratios, and the individual demand values and individual demand ratios corresponding to each of them. , the individual remaining demand value and the individual remaining demand ratio, and table information (second to fourth table information) of the table indicating the ranking of each facility is generated. The second table information corresponds to the first demand time period, the third table information corresponds to the second demand time period, and the fourth table information corresponds to the third demand time period. Each of the tables represented by the second to fourth table information includes a predetermined number (five) of high-ranking facilities with a high proportion of the individual demand value to the individual total value, and other facilities for a total of six ranks. Sixth, as other facilities, individual remaining demand values and individual mand ratios are associated. The display control unit 102 sets the display color of the order of each facility in the table represented by each of the second to fourth table information to light blue, black, yellow, orange, blue, and so on in order from first to sixth. Decide on red.

表示制御部102は、個別ランキング情報に含まれる各設備の設備ID、設備IDの各々に対応する個別デマンド値及び個別デマンド割合の表示色を決定する。具体的には、表示制御部102は、個別ランキング情報に応じた日に対応する関連情報が記憶部13に存在する場合には、当該関連情報に含まれる回路ID、当該設備IDに対応する個別デマンド値及び個別デマンド割合の表示色は赤色に決定する。表示制御部102は、関連情報に含まれない回路ID、当該設備IDに対応する個別デマンド値及び個別デマンド割合の表示色は白色に決定する。なお、個別ランキング情報に応じた日に対応する関連情報が存在しない場合には、表示制御部102は、日別ランキング情報に含まれる各設備の表示色は白色に決定する。さらに、表示制御部102は、個別ランキング情報に応じた日に対応する関連情報が記憶部13に存在し、かつ当該関連情報に含まれる回路IDをリンクボタンとして表示するように決定する。 The display control unit 102 determines the display color of the equipment ID of each equipment included in the individual ranking information, the individual demand value corresponding to each of the equipment IDs, and the individual demand ratio. Specifically, when the relevant information corresponding to the day corresponding to the individual ranking information exists in the storage unit 13, the display control unit 102 controls the circuit ID included in the relevant information and the individual ranking information corresponding to the facility ID. The display color of the demand value and the individual demand ratio is determined to be red. The display control unit 102 determines white as the display color of the individual demand value and the individual demand ratio corresponding to the circuit ID, which is not included in the related information, and the equipment ID. Note that when there is no related information corresponding to the day according to the individual ranking information, the display control unit 102 determines that the display color of each facility included in the daily ranking information is white. Further, the display control unit 102 determines that related information corresponding to the day corresponding to the individual ranking information exists in the storage unit 13 and the circuit ID included in the related information is displayed as a link button.

表示制御部102は、第4~第7グラフ情報、第1~第4テーブル情報、決定した各表示色、及びリンクボタンとしての表示の有無を含む静的分析画面500(図6参照)を生成する。 The display control unit 102 generates a static analysis screen 500 (see FIG. 6) including fourth to seventh graph information, first to fourth table information, determined display colors, and presence or absence of display as link buttons. do.

表示制御部102は、情報端末3からの要求に応じて生成した画面を、通信部12を介して情報端末3に送信して、情報端末3の表示部31に表示させる。 The display control unit 102 transmits a screen generated in response to a request from the information terminal 3 to the information terminal 3 via the communication unit 12 and causes the display unit 31 of the information terminal 3 to display the screen.

(4)画面
ここでは、表示部31で表示される各画面について説明する。
(4) Screen Here, each screen displayed on the display unit 31 will be described.

(4.1)カレンダ画面200
まず、カレンダ画面200について説明する。なお、図3の参照符号及び領域を囲む一点鎖線は、説明のために記載しているのみであり、実際の画面には表示されない。以下、図4~図7においても同様である。
(4.1) Calendar screen 200
First, the calendar screen 200 will be described. Note that the reference numerals in FIG. 3 and the dashed-dotted lines surrounding the areas are only described for explanation, and are not actually displayed on the screen. The same applies to FIGS. 4 to 7 below.

本実施形態のカレンダ画面200は、図3に示すように、カレンダ表示領域201及び一括ボタン表示領域202を含んでいる。 The calendar screen 200 of this embodiment includes a calendar display area 201 and a batch button display area 202, as shown in FIG.

カレンダ表示領域201には、計測が開始されてから現在までの期間における日ごとの分析結果が、1ヶ月を一グループとしてグループ単位に表示される。図3では、2017年4月~2018年1月までの日ごとの分析結果が1ヶ月を一グループとしてグループ単位に表示される。分析結果として高デマンドが発生している日に対して、他の日(高デマンドが発生していない日)とは異なる表示態様で表示されている。例えば、上述したように、高デマンドが発生している日に対しては表示色を黄色として、発生していない日に対しては表示色を白色として、日ごとの分析結果は表示される。図3では、2017年08月では、1,4,7~9,21~25,28,29日では分析結果として高デマンドが発生していることを表している。2017年08月の他の日では分析結果として高デマンドが発生していないことを表している。 In the calendar display area 201, the analysis results for each day from the start of measurement to the present are displayed in group units, with one month as one group. In FIG. 3, the analysis results for each day from April 2017 to January 2018 are displayed in group units with one month as one group. As a result of the analysis, days with high demand are displayed in a different display manner from other days (days without high demand). For example, as described above, the day-by-day analysis results are displayed in yellow for days on which high demand occurs, and in white for days on which high demand does not occur. In FIG. 3, in August 2017, the analysis result shows that high demand occurs on 1st, 4th, 7th to 9th, 21st to 25th, 28th and 29th. On other days in August 2017, the analysis result shows that high demand does not occur.

カレンダ表示領域201では、表示された月ごとに、分析ボタン211及び結果ボタン212が表示される。 In the calendar display area 201, an analysis button 211 and a result button 212 are displayed for each displayed month.

分析ボタン211は、対応する月に対して分析を行うことを要求する場合に、利用者がタップするボタンである。分析ボタン211が利用者によってタップされると、対応する月における分析を要求する情報であって、対応する月を含む月別分析要求情報が、情報端末3の通信部33を介して分析装置1に送信される。分析装置1では、月別分析要求情報が受信されると、分析部101は、当該月別分析要求情報に含まれる月に対する分析を行う。分析部101が行う分析については、“(2-3)分析システム”及び“(3)動作説明”で説明しているので、ここでの説明は省略する。なお、ここで用いる分析では、分析要求情報に含まれる月において計測された電力量情報を用いる。 The analysis button 211 is a button tapped by the user when requesting analysis for the corresponding month. When the analysis button 211 is tapped by the user, monthly analysis request information including the corresponding month, which is information requesting analysis in the corresponding month, is sent to the analysis device 1 via the communication unit 33 of the information terminal 3. sent. In the analysis device 1, when the monthly analysis request information is received, the analysis unit 101 analyzes the month included in the monthly analysis request information. Since the analysis performed by the analysis unit 101 has been described in "(2-3) Analysis system" and "(3) Description of operation", description thereof will be omitted here. In addition, in the analysis used here, the power amount information measured in the month included in the analysis request information is used.

結果ボタン212は、対応する月に対する時限選択画面300に画面を遷移する際に、利用者がタップするボタンである。結果ボタン212が利用者によってタップされると、対応する月における分析を要求する情報であって、対応する月を含む時限選択要求情報が、情報端末3の通信部33を介して分析装置1に送信される。分析装置1では、時限選択要求情報が受信されると、表示制御部102は、当該時限選択要求情報に含まれる月に対する時限選択画面300を生成し、表示部31に表示させる。 The result button 212 is a button that the user taps when transitioning the screen to the time limit selection screen 300 for the corresponding month. When the result button 212 is tapped by the user, time period selection request information including the corresponding month, which is information requesting analysis in the corresponding month, is sent to the analysis apparatus 1 via the communication unit 33 of the information terminal 3. sent. In the analysis apparatus 1 , when the time period selection request information is received, the display control unit 102 generates the time period selection screen 300 for the month included in the time period selection request information, and causes the display unit 31 to display it.

一括ボタン表示領域202には、一括分析ボタン220が表示される。一括分析ボタン220は、計測が開始されてから現在までの期間におけるすべての日(すべての計測日)に対して分析を行うことを要求する場合に、利用者がタップするボタンである。一括分析ボタン220が利用者によってタップされると、すべての計測日における分析を要求する情報であって、一括分析要求情報が、情報端末3の通信部33を介して分析装置1に送信される。分析装置1では、一括分析要求情報が受信されると、分析部101は、すべての計測日における分析を行う。分析部101が行う分析については、“(2-3)分析システム”及び“(3)動作説明”で説明しているので、ここでの説明は省略する。 A collective analysis button 220 is displayed in the collective button display area 202 . The collective analysis button 220 is a button that the user taps when requesting analysis for all days (all measurement days) in the period from the start of measurement to the present. When the batch analysis button 220 is tapped by the user, batch analysis request information, which is information requesting analysis on all measurement days, is transmitted to the analysis device 1 via the communication unit 33 of the information terminal 3. . In the analysis device 1, when the batch analysis request information is received, the analysis unit 101 performs analysis on all measurement days. Since the analysis performed by the analysis unit 101 has been described in "(2-3) Analysis system" and "(3) Description of operation", description thereof will be omitted here.

なお、分析ボタン211について、対応する月の分析が未だ行われていない場合、又は分析が行われた後に新たな電力量情報が取得され分析結果が最新でない場合においては、表示態様としての表示色を、他の場合とは異なる表示色としてもよい。また、一括分析ボタン220について、計測された複数の月(計測月)のうち少なくとも1つの計測月において分析が未だ行われていない場合においては、表示態様としての表示色を、他の場合とは異なる表示色としてもよい。分析が行われた後に新たな電力量情報が取得され分析結果が最新でない場合においても、一括分析ボタン220について、表示態様としての表示色を、他の場合とは異なる表示色としてもよい。例えば、分析装置1は、計測月の各々に対して分析が行われた否かを表す分析フラグを、計測月ごとに一対一に対応するように記憶している。分析部101は、分析が行われると、対応する計測月の分析フラグを分析が行われていないことを表す情報から分析が行われたことを表す情報に変更する。分析部101は、分析フラグが分析が行われたことを表している場合に、対応する月において計測された新たな電力量情報が取得されると、分析フラグを分析が行われたことを表す情報から分析が行われていないことを表す情報に変更する。 Regarding the analysis button 211, when the analysis for the corresponding month has not yet been performed, or when new power amount information is acquired after the analysis has been performed and the analysis result is not the latest, the display color as the display mode may be displayed in a color different from that in other cases. In addition, regarding the batch analysis button 220, when analysis has not yet been performed in at least one measurement month out of a plurality of months (measurement months), the display color as a display mode is changed to Different display colors may be used. Even when new power amount information is acquired after the analysis is performed and the analysis result is not the latest, the display color of the batch analysis button 220 as a display mode may be a display color different from other cases. For example, the analysis device 1 stores analysis flags indicating whether or not analysis has been performed for each measurement month in a one-to-one correspondence with each measurement month. When the analysis is performed, the analysis unit 101 changes the analysis flag of the corresponding measurement month from information indicating that the analysis has not been performed to information indicating that the analysis has been performed. When the analysis flag indicates that the analysis has been performed, the analysis unit 101 sets the analysis flag to indicate that the analysis has been performed when new power amount information measured in the corresponding month is acquired. Change information to information that indicates no analysis has been performed.

(4.2)時限選択画面300
カレンダ画面200において、利用者が所望する月に対応する結果ボタン212をタップした場合、所望する月(指定月)の時限選択画面300へと遷移する。
(4.2) Time limit selection screen 300
When the user taps the result button 212 corresponding to the desired month on the calendar screen 200, the screen transitions to the time period selection screen 300 of the desired month (designated month).

本実施形態の時限選択画面300は、図4に示すように、時限表示領域301、ボタン表示領域302及びスクロールバー303を含んでいる。 The time limit selection screen 300 of this embodiment includes a time limit display area 301, a button display area 302, and a scroll bar 303, as shown in FIG.

時限表示領域301には、タップされた結果ボタン212に対応する月(指定された月)に係る第1月情報310及び時限テーブル311が表示される。 In the time limit display area 301, first month information 310 and a time limit table 311 relating to the month (specified month) corresponding to the tapped result button 212 are displayed.

第1月情報310は、指定された年及び月を含む。図4では、第1月情報310として“2017年08月”が表示される。 First month information 310 includes the specified year and month. In FIG. 4, “August 2017” is displayed as the first month information 310 .

時限テーブル311は、縦軸をデマンド時限とし、横軸を日としたテーブルである。縦軸では、1日における各デマンド時限の開始時刻が表示される。指定された月を表示対象期間とした場合、当該表示対象期間は、日を表す日情報と、デマンド時限(時間)を表す時間情報との組み合わせである。時限選択画面300では、時限テーブル311として日情報と時間情報とをマトリックス形式で表示する。 The time limit table 311 is a table with the demand time limit on the vertical axis and the day on the horizontal axis. The vertical axis shows the start time of each demand time period in one day. When the specified month is set as the display target period, the display target period is a combination of day information representing a day and time information representing a demand time limit (time). The time limit selection screen 300 displays day information and time information as a time limit table 311 in a matrix format.

時限表示領域301の時限テーブル311では、日とデマンド時限との交点であるマス目に対して、当該日の当該デマンド時限で計測された電力量情報の分析結果が表示される。時限テーブル311の各マス目には、対応する分析結果に応じた表示色が表示される。具体的には、高デマンドが発生している日及びデマンド時限に対応するマス目の表示色と、高デマンドが発生していない日及びデマンド時限に対応するマス目の表示色とは異なる。さらに、高デマンドのうち上位所定数に含まれる高デマンドが発生している日及びデマンド時限に対応する複数のマス目の表示色は、高デマンドのうち上位所定数に含まれない高デマンドが発生している日及びデマンド時限に対応する複数のマス目の表示色とは異なる。例えば、2017年08月7日において、09:00から14:30までの時間帯、及び15:30~16:00までの時間帯では高デマンドが発生しているが、同日の他の時間帯では高デマンドは発生していない。さらに、例えば、2017年08月7日の開始時刻を09:00とするデマンド時限と、同日の開始時刻を09:00とするデマンド時限とでは、双方とも高デマンドが発生しているが、前者は上位所定数に含まれる高デマンドであるが、後者は上位所定数に含まれない高デマンドである。 In the time limit table 311 of the time limit display area 301, the analysis result of the electric energy information measured in the corresponding demand time limit of the current day is displayed in the squares that are the intersections of the day and the demand time limit. Each square of the time limit table 311 is displayed in a display color corresponding to the corresponding analysis result. Specifically, the display color of the squares corresponding to the days and demand time periods when high demand is occurring differs from the display color of the squares corresponding to the days and demand time periods when high demand is not occurring. Furthermore, the display color of the plurality of squares corresponding to the day and the demand time period on which the high demand that is included in the predetermined number of high demands occurs is the high demand that is not included in the predetermined number of high demands. It is different from the display color of a plurality of squares corresponding to the day and the demand time limit. For example, on August 7, 2017, high demand occurred in the time zone from 09:00 to 14:30 and in the time zone from 15:30 to 16:00, but other time zones on the same day There is no high demand. Furthermore, for example, a demand time limit with a start time of 09:00 on August 7, 2017 and a demand time limit with a start time of 09:00 on the same day both generate high demand, but the former is a high demand that is included in the upper predetermined number, but the latter is a high demand that is not included in the upper predetermined number.

さらに、時限テーブル311では、高デマンドが発生している日及びデマンド時限に対する表示色は、他の日及びデマンド時限の表示色とは異なる。図4では、2017年08月1,4,7~9,21~25,28,29日では、これらの日の表示色が他の日の表示色とは異なっているため、これらの日において高デマンドが発生していることが分かる。さらに、2017年08月では、09:00~14:30,15:30~16:30の時間帯において、高デマンドが発生している。 Furthermore, in the time limit table 311, the display color for a day with high demand and a demand time limit is different from the display color for other days and demand time limits. In FIG. 4, on August 1, 4, 7 to 9, 21 to 25, 28, and 29, 2017, the display colors of these days are different from the display colors of other days. It can be seen that high demand is occurring. Furthermore, in August 2017, high demand occurred in the time slots from 09:00 to 14:30 and from 15:30 to 16:30.

また、時限テーブル311では、高デマンドが発生している日及びデマンド時限に対するマス目については、当該マス目に対応する日の動的分析画面400に遷移するためのリンクボタンとして表示される。 Further, in the time limit table 311, the grids corresponding to the days with high demand and the demand time limits are displayed as link buttons for transitioning to the dynamic analysis screen 400 of the day corresponding to the grids.

ボタン表示領域302にでは、画面遷移ボタン320が表示される。画面遷移ボタン320は、カレンダ画面200に画面を遷移する際に、利用者がタップするボタンである。画面遷移ボタン320が利用者によってタップされると、カレンダ画面200を要求するカレンダ画面要求情報が、情報端末3の通信部33を介して分析装置1に送信される。分析装置1でカレンダ画面要求情報が受信されると、表示制御部102は、カレンダ画面200を表示部31に表示させる。 A screen transition button 320 is displayed in the button display area 302 . The screen transition button 320 is a button that the user taps when transitioning the screen to the calendar screen 200 . When the screen transition button 320 is tapped by the user, calendar screen request information requesting the calendar screen 200 is transmitted to the analysis device 1 via the communication unit 33 of the information terminal 3 . When the calendar screen request information is received by the analyzer 1 , the display control unit 102 causes the display unit 31 to display the calendar screen 200 .

スクロールバー303は、時限テーブル311の表示領域を上下に移動させる際に利用者によって操作される。これにより、利用者は、表示部31に収まりきらない時限テーブル311の一部の領域についても確認することができる。 The scroll bar 303 is operated by the user when moving the display area of the time limit table 311 up and down. As a result, the user can also check a partial area of the time limit table 311 that does not fit on the display unit 31 .

なお、時限選択画面300において、スクロールバー303は必須の画面構成要素ではない。スクロールバー303は、時限選択画面300において表示されていなくてもよい。例えば、表示部31がタッチパネル機能を有している場合には、フリック操作により時限テーブル311の表示領域を上下に移動させる。 Note that the scroll bar 303 is not an essential screen component in the time limit selection screen 300 . The scroll bar 303 does not have to be displayed on the time period selection screen 300 . For example, when the display unit 31 has a touch panel function, the display area of the time limit table 311 is moved up and down by a flick operation.

なお、情報端末3がポインティングデバイス(例えば、マウス)を有する場合、ポインティングデバイスの操作によって時限テーブル311において指定されたマス目の縦横方向の各マス目の表示色を変更してもよい。例えば、指定されたマス目の縦横方向の各マス目の現在の表示色に他の表示色を重畳してもよい。これにより、利用者は、指定されたマス目の縦横方向をみることで、自身が指定したマス目の日及びデマンド時限を容易に確認することができる。さらに、指定されたマス目がリンクボタンである場合には、ポインティングデバイスによる画面上の操作位置を表す表示形状を変更してもよい。例えば、指定されたマス目がリンクボタンでない場合にはポインティングデバイスによる画面上の操作位置を表す表示形状を矢印とし、指定されたマス目がリンクボタンである場合にはポインティングデバイスによる画面上の操作位置を表す表示形状を指の形状とする。 If the information terminal 3 has a pointing device (for example, a mouse), the display color of each square in the vertical and horizontal directions specified in the time limit table 311 may be changed by operating the pointing device. For example, another display color may be superimposed on the current display color of each square in the vertical and horizontal directions of the specified square. Thereby, the user can easily confirm the date and the demand time limit of the squares specified by the user by looking at the specified squares in the vertical and horizontal directions. Furthermore, when the specified grid is a link button, the display shape representing the operation position on the screen by the pointing device may be changed. For example, if the specified square is not a link button, the display shape representing the operation position on the screen with the pointing device is an arrow, and if the specified square is a link button, the operation on the screen with the pointing device is performed. The display shape representing the position is assumed to be the shape of a finger.

(4.3)動的分析画面400
時限選択画面300が表示部31に表示されている場合に利用者が所望する日及にデマンド時限に対応するマス目(リンクボタン)をタップした場合、所望する日及にデマンド時限の動的分析画面400へと遷移する。
(4.3) Dynamic analysis screen 400
When the time period selection screen 300 is displayed on the display unit 31 and the user taps the grid (link button) corresponding to the desired date and demand time period, dynamic analysis of the desired date and demand time period is performed. Transition to screen 400 .

本実施形態の動的分析画面400は、図5に示すように、第1タブ410、第2タブ411及び動的用第1表示領域401及び動的用第2表示領域402を含む。 The dynamic analysis screen 400 of this embodiment includes a first tab 410, a second tab 411, a dynamic first display area 401, and a dynamic second display area 402, as shown in FIG.

第1タブ410には静的分析との名称が、第2タブ411には動的分析との名称が、それぞれ表示されている。第1タブ410及び第2タブ411は、分析結果の表示内容を選択するためのボタンとしての機能を有している。第1タブ410及び第2タブ411において選択されたタブと選択されていないタブとで、表示色が異なる。図5では、第2タブ411が選択され、第1タブ410が選択されていない状態、つまり動的分析の結果が表示されている状態を表している。 The first tab 410 displays the name "static analysis", and the second tab 411 displays the name "dynamic analysis". The first tab 410 and the second tab 411 have functions as buttons for selecting display contents of analysis results. The selected tab and the unselected tab in the first tab 410 and the second tab 411 are displayed in different colors. FIG. 5 shows a state in which the second tab 411 is selected and the first tab 410 is not selected, that is, the dynamic analysis results are displayed.

動的用第1表示領域401では、第1画面遷移ボタン412及び第2画面遷移ボタン413が表示される。 In the dynamic first display area 401, a first screen transition button 412 and a second screen transition button 413 are displayed.

第1画面遷移ボタン412は、カレンダ画面200に画面を遷移する際に、利用者がタップするボタンである。第1画面遷移ボタン412が利用者によってタップされると、カレンダ画面要求情報が、情報端末3の通信部33を介して分析装置1に送信される。分析装置1でカレンダ画面要求情報が受信されると、表示制御部102は、カレンダ画面200を表示部31に表示させる。 The first screen transition button 412 is a button that the user taps to transition the screen to the calendar screen 200 . When the first screen transition button 412 is tapped by the user, calendar screen request information is transmitted to the analysis device 1 via the communication unit 33 of the information terminal 3 . When the calendar screen request information is received by the analyzer 1 , the display control unit 102 causes the display unit 31 to display the calendar screen 200 .

第2画面遷移ボタン413は、時限選択画面300に画面を遷移する際に、利用者がタップするボタンである。第2画面遷移ボタン413が利用者によってタップされると、時限選択画面300を要求する時限選択画面要求情報が、情報端末3の通信部33を介して分析装置1に送信される。分析装置1で時限選択画面要求情報が受信されると、表示制御部102は、時限選択画面300を表示部31に表示させる。 The second screen transition button 413 is a button that the user taps when transitioning the screen to the time limit selection screen 300 . When the second screen transition button 413 is tapped by the user, time period selection screen request information requesting the time period selection screen 300 is transmitted to the analysis apparatus 1 via the communication unit 33 of the information terminal 3 . When the analysis apparatus 1 receives the time period selection screen request information, the display control unit 102 causes the display unit 31 to display the time period selection screen 300 .

動的用第1表示領域401は、分析対象日表示領域414及びグラフ表示領域415を含む。 The dynamic first display area 401 includes an analysis target date display area 414 and a graph display area 415 .

分析対象日表示領域414には、時限選択画面300が表示部31に表示されている場合に利用者が指定した日を表す日付表示情報が表示される。本実施形態では、分析対象日表示領域414には、分析対象日として、利用者が指定した日を含む年月日、及び曜日が表示される。図5では、分析対象日表示領域414には、分析対象日として、“2017年08月07日(月)”が表示される。 The analysis target date display area 414 displays date display information representing the date specified by the user when the time period selection screen 300 is displayed on the display unit 31 . In this embodiment, the analysis target date display area 414 displays the date including the date specified by the user and the day of the week as the analysis target date. In FIG. 5, the analysis target date display area 414 displays “August 07, 2017 (Monday)” as the analysis target date.

グラフ表示領域415には、利用者が指定した日を含む月に対応する月別高デマンド発生時間帯416、第1グラフ情報が表す棒グラフ417、第2グラフ情報が表す標準ロードカーブ418及び第3グラフ情報が表す折れ線グラフ419が表示される。ここで、棒グラフ417は、最上位設備のデマンド時限ごとの設備側デマンド値を表すグラフである。折れ線グラフ419は、指定された日における受変電設備61が使用した(受電した)電力量の変化を表すグラフである。棒グラフ417、標準ロードカーブ418及び折れ線グラフ419は、縦軸を電力量、横軸を時刻として表示される。月別高デマンド発生時間帯416、棒グラフ417、標準ロードカーブ418及び折れ線グラフ419のそれぞれは、表示制御部102が決定した表示色で表示される。 In the graph display area 415, a monthly high demand occurrence time zone 416 corresponding to the month including the day specified by the user, a bar graph 417 represented by the first graph information, a standard load curve 418 represented by the second graph information, and a third graph A line graph 419 representing the information is displayed. Here, the bar graph 417 is a graph representing the facility-side demand value for each demand time period of the highest-level facility. The line graph 419 is a graph representing changes in the amount of power used (received) by the power receiving and transforming equipment 61 on a specified day. The bar graph 417, the standard load curve 418, and the line graph 419 are displayed with the power consumption on the vertical axis and the time on the horizontal axis. Each of the monthly high demand occurrence time zone 416 , the bar graph 417 , the standard load curve 418 and the line graph 419 is displayed in the display color determined by the display control unit 102 .

動的用第2表示領域402では、見出し情報450及びランキングテーブル451が表示される。動的用第2表示領域402では、利用者が指定した日での月別高デマンド発生時間帯416において、高デマンドである上位所定数(ここでは5つの)回路(設備)に関する情報が表示される。 Heading information 450 and a ranking table 451 are displayed in the dynamic second display area 402 . In the dynamic second display area 402, information about a predetermined number (five in this case) of high-demand circuits (facilities) is displayed in a monthly high-demand generation time zone 416 on a day specified by the user. .

見出し情報450は、ランキングテーブル451が月別高デマンド発生時間帯416における高デマンドである上位所定数回路についてのランキングであることを表す情報である。 The headline information 450 is information indicating that the ranking table 451 is the ranking of a predetermined number of high-demand circuits in the high-demand generation time zone 416 by month.

ランキングテーブル451は、順位を表す番号(No.)452、回路名称453、出現率454、超過量平均455及び最大超過量456を含む。ランキングテーブル451は、利用者が指定した日に対応する日別ランキング情報に含まれる所定数の回路(設備)の情報(回路ID及び回路名称)、出現率、超過量平均及び最大超過量からなる組がソートされた結果の順に表示される。図5に示すランキングテーブル451では、回路ID及び当該回路IDに対応する回路名称の組み合わせが回路名称453として表示される。ランキングテーブル451におけるNo.1~5の出現率454、超過量平均455及び最大超過量456は、利用者が指定した日に対応する日別ランキング情報に含まれる出現率、超過量平均及び最大超過量に、それぞれ対応する。ランキングテーブル451において、回路名称(回路)が表示される際に、利用者が指定した日に対応する関連情報が記憶部13に記憶され、かつ関連情報に含まれる回路IDに応じた回路名称は、リンクボタンとして表示される。 The ranking table 451 includes a number (No.) 452 representing a ranking, a circuit name 453, an appearance rate 454, an excess amount average 455, and a maximum excess amount 456. FIG. The ranking table 451 consists of the information (circuit ID and circuit name) of a predetermined number of circuits (equipment) included in the daily ranking information corresponding to the day specified by the user, the appearance rate, the average amount of excess, and the maximum amount of excess. The tuples are displayed in the sorted order of the results. In the ranking table 451 shown in FIG. 5, a combination of a circuit ID and a circuit name corresponding to the circuit ID is displayed as a circuit name 453 . No. in the ranking table 451. The appearance rate 454, average excess amount 455, and maximum excess amount 456 of 1 to 5 correspond to the appearance rate, average excess amount, and maximum excess amount included in the daily ranking information corresponding to the day specified by the user, respectively. . When the circuit name (circuit) is displayed in the ranking table 451, the related information corresponding to the date specified by the user is stored in the storage unit 13, and the circuit name corresponding to the circuit ID included in the related information is , displayed as a link button.

ランキングテーブル451は、複数の回路名称に対してそれぞれに対応する複数のグラフ表示ボタン457を含む。グラフ表示ボタン457は、グラフ表示領域415において表示される棒グラフ417及び標準ロードカーブ418を、グラフ表示ボタン457に対応する棒グラフ及び標準ロードカーブに変更する際に、利用者によってタップされるボタンである。 The ranking table 451 includes a plurality of graph display buttons 457 respectively corresponding to a plurality of circuit names. The graph display button 457 is a button tapped by the user when changing the bar graph 417 and standard load curve 418 displayed in the graph display area 415 to the bar graph and standard load curve corresponding to the graph display button 457. .

ランキングテーブル451において回路名称がリンクボタンとして表示される場合、当該回路名称に対応する“No.”、“出現率”、“超過量平均”、“最大超過量”及び“グラフ表示ボタン457”は、表示制御部102が決定した表示色(ここでは、赤色)で表示される。 When a circuit name is displayed as a link button in the ranking table 451, "No.", "appearance rate", "average excess amount", "maximum excess amount" and "graph display button 457" corresponding to the circuit name are , is displayed in a display color (here, red) determined by the display control unit 102 .

時限選択画面300から動的分析画面400へと遷移した場合には、棒グラフ417及び標準ロードカーブ418は、ランキングテーブル451で表示される最上位(No.1)の回路名称に対応するグラフである。利用者がランキングテーブル451においてNo.2の回路名称に対応するグラフ表示ボタン457をタップすると、グラフ表示領域415において表示される棒グラフ417及び標準ロードカーブ418は、No.2の回路名称に対応するグラフへと変更される。例えば、図5では、最上位(No.1)の回路名称として“3-3 3F 動力”が表示され、2番目(No.2)回路名称として“3-2 2F 動力”が表示されている。回路名称“3-2 2F 動力”のグラフ表示ボタン457がタップされると、グラフ表示領域415では、回路名称“3-2 2F 動力”についての棒グラフ及び標準ロードカーブが表示される。 When the time limit selection screen 300 transitions to the dynamic analysis screen 400, the bar graph 417 and the standard load curve 418 are graphs corresponding to the highest (No. 1) circuit name displayed in the ranking table 451. . If the user is No. in the ranking table 451 . When the graph display button 457 corresponding to the circuit name of No. 2 is tapped, the bar graph 417 and the standard load curve 418 displayed in the graph display area 415 are changed to No.2. 2 to correspond to the circuit name. For example, in FIG. 5, "3-3 3F power" is displayed as the top (No. 1) circuit name, and "3-2 2F power" is displayed as the second (No. 2) circuit name. . When the graph display button 457 for the circuit name "3-2 2F power" is tapped, the bar graph and standard load curve for the circuit name "3-2 2F power" are displayed in the graph display area 415. FIG.

(4.4)静的分析画面500
動的分析画面400が表示部31に表示されている場合に利用者が第1タブ410又はランキングテーブル451でリンクボタンとして表示された回路名称をタップした場合、動的分析画面400で表示された日を含む月の分析結果である動的分析画面400へと遷移する。
(4.4) Static analysis screen 500
When the dynamic analysis screen 400 is displayed on the display unit 31 and the user taps the circuit name displayed as a link button in the first tab 410 or the ranking table 451, the dynamic analysis screen 400 displayed A transition is made to the dynamic analysis screen 400, which is the analysis result of the month including the day.

本実施形態の静的分析画面500は、図6に示すように、第1タブ510及び第2タブ511、静的用第1示領域501及び静的用第2表示領域502を含む。 The static analysis screen 500 of this embodiment includes a first tab 510 and a second tab 511, a static first display area 501 and a static second display area 502, as shown in FIG.

第1タブ510には静的分析との名称が、第2タブ511には動的分析との名称が、それぞれ表示されている。第1タブ510及び第2タブ511は、分析結果の表示内容を選択するためのボタンとしての機能を有している。第1タブ510及び第2タブ511において選択されたタブと選択されていないタブとで、表示色が異なる。図6では、第1タブ510が選択され、第2タブ511が選択されていない状態、つまり静的分析の結果が表示されている状態を表している。 The first tab 510 displays the name "static analysis", and the second tab 511 displays the name "dynamic analysis". The first tab 510 and the second tab 511 have functions as buttons for selecting display contents of analysis results. The selected tab and the unselected tab in the first tab 510 and the second tab 511 are displayed in different colors. FIG. 6 shows a state in which the first tab 510 is selected and the second tab 511 is not selected, that is, the static analysis results are displayed.

静的用第1示領域501では、第1タブ510、第2タブ511及び画面遷移ボタン512が表示される。 In the static first display area 501, a first tab 510, a second tab 511, and a screen transition button 512 are displayed.

画面遷移ボタン512は、カレンダ画面200に画面を遷移する際に、利用者がタップするボタンである。画面遷移ボタン512が利用者によってタップされると、カレンダ画面要求情報が、情報端末3の通信部33を介して分析装置1に送信される。分析装置1でカレンダ画面要求情報が受信されると、表示制御部102は、カレンダ画面200を表示部31に表示させる。 The screen transition button 512 is a button that the user taps when transitioning the screen to the calendar screen 200 . When the screen transition button 512 is tapped by the user, calendar screen request information is transmitted to the analysis device 1 via the communication unit 33 of the information terminal 3 . When the calendar screen request information is received by the analyzer 1 , the display control unit 102 causes the display unit 31 to display the calendar screen 200 .

静的用第1示領域501は、メッセージ表示領域513及びグラフ表示領域514を含む。 The static first display area 501 includes a message display area 513 and a graph display area 514 .

メッセージ表示領域513には、時限選択画面300で利用者が指定した日を含む月(表示対象月)に関する第2月情報、つまりにカレンダ画面200で利用者が指定した月に関する第2月情報を含むメッセージが表示される。本実施形態では、第2月情報は、“2017/08/01~2017/08/31”を表している。要は、動的分析画面400で表示された日を含む月の期間が第2月情報として表示される。 In the message display area 513, the second month information about the month (display target month) including the day specified by the user on the time period selection screen 300, that is, the second month information about the month specified by the user on the calendar screen 200 is displayed. A message containing In this embodiment, the second month information represents "2017/08/01 to 2017/08/31". In short, the period of the month including the day displayed on the dynamic analysis screen 400 is displayed as the second month information.

グラフ表示領域514には、第4グラフ情報が表す円グラフ515、及び表示対象月に応じた月別ランキングテーブル516が表示される。 In the graph display area 514, a pie chart 515 represented by the fourth graph information and a monthly ranking table 516 corresponding to the month to be displayed are displayed.

月別ランキングテーブル516は、表示対象月における月別デマンド値の割合が多い上位所定数(5つ)の回路に関する情報及び残りの回路に関して1つにまとめた情報を含む。具体的には、月別ランキングテーブル516は、順位を表す番号(No.)517、回路名称518、デマンド合計値519及び割合520を含む。月別ランキングテーブル516では、第1テーブル情報に含まれる所定数の回路(設備)の情報(回路ID及び回路名称)、月別デマンド値及び月別デマンド割合からなる組がソートされた結果の順に番号517としてNo.1~5が表示される。図6では、回路ID及び当該回路IDに対応する回路名称の組み合わせが月別ランキングテーブル516における回路名称518として表示される。ここで、月別ランキングテーブル516におけるNo.1~5のデマンド合計値519は月別ランキング情報に含まれる月別デマンド値に、No.1~5の割合520は月別デマンド割合に、それぞれ対応する。 The monthly ranking table 516 includes information on the top predetermined number (five) of circuits with the highest ratio of monthly demand values in the month to be displayed and information on the remaining circuits combined into one. Specifically, the monthly ranking table 516 includes a number (No.) 517 representing the order, a circuit name 518, a total demand value 519 and a ratio 520. FIG. In the monthly ranking table 516, a number 517 is assigned in the order of the results obtained by sorting a set of a predetermined number of circuit (equipment) information (circuit IDs and circuit names), monthly demand values, and monthly demand ratios included in the first table information. No. 1 to 5 are displayed. In FIG. 6 , combinations of circuit IDs and circuit names corresponding to the circuit IDs are displayed as circuit names 518 in the monthly ranking table 516 . Here, No. in the monthly ranking table 516. The demand total value 519 of 1 to 5 is the monthly demand value included in the monthly ranking information. The ratios 520 of 1 to 5 correspond to monthly demand ratios, respectively.

月別ランキングテーブル516では、No.6が、残りの回路に関して1つにまとめた情報に対応する番号517として表示される。No.6の回路名称518として“その他回路の合計”“が表示される。さらに、No.6のデマンド合計値519として第1テーブル情報に含まれる月別残デマンド値が、No.6の割合520として月別ランキング情報に含まれる月別残デマンド割合が、それぞれ表示される。月別ランキングテーブル516では、No.1~6のデマンド合計値の合計として月別ランキング情報に含まれる月別合計値が、割合の合計として100%が、それぞれ月別ランキングテーブル516の最下部に表示される。 In the monthly ranking table 516, No. 6 is displayed as number 517 corresponding to the grouped information about the rest of the circuit. No. "Total of other circuits" is displayed as the circuit name 518 of No. 6. Further, the monthly remaining demand value included in the first table information as the total demand value 519 of No. 6 is displayed as the ratio 520 of No. 6 by month. The monthly remaining demand ratios included in the ranking information are displayed respectively.In the monthly ranking table 516, the monthly total value included in the monthly ranking information as the total of the demand total values of Nos. 1 to 6 is 100 as the total ratio. % are displayed at the bottom of the monthly ranking table 516 respectively.

グラフ表示領域514では、円グラフ515は、表示制御部102で決定された各表示色で表示される。さらに、月別ランキングテーブル516では、No.1~6が、表示制御部102で決定された各表示色で表示される。また、円グラフ515の中心には、月別ランキング情報に含まれる月別合計値が表示される。 In the graph display area 514 , the pie chart 515 is displayed in each display color determined by the display control unit 102 . Furthermore, in the monthly ranking table 516, No. 1 to 6 are displayed in each display color determined by the display control unit 102 . Also, in the center of the pie chart 515, the monthly total value included in the monthly ranking information is displayed.

静的用第2表示領域502では、見出し情報550が表示される。見出し情報550は、受電電力量が多いデマンド時限において、高デマンドである上位所定数回路についてのランキングであることを表す情報である。 Heading information 550 is displayed in the second static display area 502 . Heading information 550 is information indicating the ranking of a predetermined number of high-demand circuits in a demand time period with a large amount of received electric power.

静的用第2表示領域502では、表示対象月おける第1~第3デマンド時限のそれぞれにおいて、高デマンドである回路に関する情報が表示される。 In the static second display area 502, information about circuits with high demand is displayed in each of the first to third demand periods in the month to be displayed.

静的用第2表示領域502は、第1個別表示領域551、第2個別表示領域552及び第3個別表示領域553を含む。 The static second display area 502 includes a first individual display area 551 , a second individual display area 552 and a third individual display area 553 .

第1個別表示領域551には、第1デマンド時限において、高デマンドである回路に関する情報が表示される。 In the first individual display area 551, information about a circuit with high demand is displayed in the first demand time period.

第1個別表示領域551は、第1表示領域561を含む。第1表示領域561には、第1デマンド時限に対応する個別ランキング情報に含まれる第1デマンド時限に応じた時間帯、受電電力量の値を表す情報含むメッセージが表示される。第1デマンド時限に応じた時間帯として“2017/08/09 15:30-16:00”が、受電電力量の値を表す情報として“受電電力量:41.05kW”が含まれるメッセージが、第1表示領域561に表示される。 First individual display area 551 includes first display area 561 . In the first display area 561, a message including information indicating the value of the received power amount and the time zone corresponding to the first demand time period included in the individual ranking information corresponding to the first demand time period is displayed. A message containing "2017/08/09 15:30-16:00" as the time period corresponding to the first demand time period and "Received power amount: 41.05 kW" as information representing the value of the received power amount, It is displayed in the first display area 561 .

第1個別表示領域551には、第5グラフ情報で表される円グラフ562が、第2デマンド時限に対応する第2テーブル情報で表されるテーブルとして第1個別ランキングテーブル563が、それぞれ表示される。 In the first individual display area 551, a pie chart 562 represented by the fifth graph information is displayed, and a first individual ranking table 563 is displayed as a table represented by the second table information corresponding to the second demand time period. be.

第1個別ランキングテーブル563は、第1デマンド時限において個別デマンド値の割合が多い上位所定数(5つ)の回路に関する情報及び残りの回路に関して1つにまとめた情報を含む。具体的には、第1個別ランキングテーブル563は、順位を表す番号(No.)、回路名称、デマンド値及び割合を含む。第1個別ランキングテーブル563では、第2テーブル情報に含まれる所定数の回路(設備)の情報(回路ID)、個別デマンド値及び個別デマンド割合からなる組がソートされた結果の順にNo.1~5に表示される。図6では、回路ID及び当該回路IDに対応する回路名称の組み合わせが第1個別ランキングテーブル563における回路名称として表示される。ここで、第1個別ランキングテーブル563におけるNo.1~5のデマンド値は第1デマンド時限に対応する個別ランキング情報に含まれる個別デマンド値に、No.1~5の割合は個別デマンド割合に、それぞれ対応する。 The first individual ranking table 563 includes information on the top predetermined number (five) of circuits with the highest ratio of individual demand values in the first demand time period and information on the remaining circuits combined into one. Specifically, the first individual ranking table 563 includes numbers (No.) indicating ranking, circuit names, demand values, and ratios. In the first individual ranking table 563, sets of information (circuit ID) of a predetermined number of circuits (equipment), individual demand values, and individual demand ratios included in the second table information are sorted, and No. 1 is sorted. 1 to 5 are displayed. In FIG. 6 , combinations of circuit IDs and circuit names corresponding to the circuit IDs are displayed as circuit names in the first individual ranking table 563 . Here, No. in the first individual ranking table 563. Demand values 1 to 5 are the individual demand values included in the individual ranking information corresponding to the first demand time period. The ratios of 1 to 5 correspond to individual demand ratios, respectively.

第1個別ランキングテーブル563では、No.6として、残りの回路に関して1つにまとめた情報が表示される。No.6の回路名称として“その他回路の合計”“が表示される。さらに、No.6のデマンド値として第2テーブル情報に含まれる個別残デマンド値が、No.6の割合として第2テーブル情報に含まれる個別残デマンド割合が、それぞれ表示される。 In the first individual ranking table 563, No. At 6, consolidated information about the remaining circuits is displayed. No. "Total of other circuits" is displayed as the circuit name of No. 6. Further, the individual remaining demand value included in the second table information as the demand value of No. 6 is displayed in the second table information as the ratio of No. 6. The included individual remaining demand ratios are displayed respectively.

第1個別ランキングテーブル563において、回路IDが表示される際に、利用者が指定した日に対応する関連情報が記憶部13に記憶され、かつ当該回路IDが関連情報に含まれる場合には、当該回路IDはリンクボタンとして表示される。第1個別ランキングテーブル563において回路IDがリンクボタンとして表示される場合、当該回路IDの他、当該回路名称に対応する“No.”、“デマンド値”及び“割合”は、表示制御部102が決定した表示色(ここでは、赤色)で表示される。 When the circuit ID is displayed in the first individual ranking table 563, if the related information corresponding to the date specified by the user is stored in the storage unit 13 and the circuit ID is included in the related information, The circuit ID is displayed as a link button. When the circuit ID is displayed as a link button in the first individual ranking table 563, the display control unit 102 displays "No." It is displayed in the determined display color (here, red).

円グラフ562は、表示制御部102で決定された各表示色で表示される。さらに、第1個別ランキングテーブル563では、No.1~6が、表示制御部102で決定された各表示色で表示される。 The pie chart 562 is displayed in each display color determined by the display control unit 102 . Furthermore, in the first individual ranking table 563, No. 1 to 6 are displayed in each display color determined by the display control unit 102 .

第2個別表示領域552には、第2デマンド時限において、高デマンドである回路に関する情報が表示される。 In the second individual display area 552, information about the high demand circuit is displayed in the second demand time period.

第2個別表示領域552は、第2表示領域571を含む。第2表示領域571には、第2デマンド時限に対応する個別ランキング情報に含まれる第2デマンド時限に応じた時間帯、受電電力量の値を表す情報を含むメッセージが表示される。第2デマンド時限に応じた時間帯として“2017/08/09 16:00-16:30”が、受電電力量の値を表す情報として“受電電力量:40.19kW”が含まれるメッセージが、第2表示領域571に表示される。 Second individual display area 552 includes second display area 571 . The second display area 571 displays a message including information indicating the value of the received power amount and the time period corresponding to the second demand time period included in the individual ranking information corresponding to the second demand time period. A message containing "2017/08/09 16:00-16:30" as the time period corresponding to the second demand time period and "Received power amount: 40.19 kW" as information representing the value of the received power amount, It is displayed in the second display area 571 .

第2個別表示領域552には、第6グラフ情報で表される円グラフ572が、第2デマンド時限に対応する第3テーブル情報で表されるテーブルとして第2個別ランキングテーブル573が、それぞれ表示される。 In the second individual display area 552, a pie chart 572 represented by the sixth graph information and a second individual ranking table 573 as a table represented by the third table information corresponding to the second demand time period are displayed. be.

第2個別ランキングテーブル573は、第2デマンド時限において個別デマンド値の割合が多い上位所定数(5つ)の回路に関する情報及び残りの回路に関して1つにまとめた情報を含む。具体的には、第2個別ランキングテーブル573は、第1個別ランキングテーブル563と同様に、順位を表す番号(No.)、回路名称、デマンド値及び割合を含む。第2個別ランキングテーブル573では、第3テーブル情報に含まれる所定数の回路(設備)の情報(回路ID)、個別デマンド値及び個別デマンド割合からなる組がソートされた結果の順にNo.1~5に表示される。 The second individual ranking table 573 includes information on the top predetermined number (five) of circuits with the highest ratio of individual demand values in the second demand time period and information on the remaining circuits combined into one. Specifically, like the first individual ranking table 563, the second individual ranking table 573 includes the number (No.) indicating the order, the circuit name, the demand value, and the ratio. In the second individual ranking table 573, the sets of information (circuit ID) of a predetermined number of circuits (equipment) included in the third table information, individual demand values, and individual demand ratios are sorted, and the results are sorted. 1 to 5 are displayed.

第2個別ランキングテーブル573では、No.6として、残りの回路に関して1つにまとめた情報が表示される。No.6の回路名称として“その他回路の合計”“が表示される。さらに、No.6のデマンド値として第3テーブル情報に含まれる個別残デマンド値が、No.6の割合として第3テーブル情報に含まれる個別残デマンド割合が、それぞれ表示される。 In the second individual ranking table 573, No. At 6, consolidated information about the remaining circuits is displayed. No. "Total of other circuits" is displayed as the circuit name of No. 6. Further, the individual remaining demand value included in the third table information as the demand value of No. 6 is displayed in the third table information as the ratio of No. 6. The included individual remaining demand ratios are displayed respectively.

第2個別ランキングテーブル573において、回路IDが表示される際に、利用者が指定した日に対応する関連情報が記憶部13に記憶され、かつ当該回路IDが関連情報に含まれる場合には、当該回路IDはリンクボタンとして表示される。第2個別ランキングテーブル573において回路IDがリンクボタンとして表示される場合、当該回路IDの他、当該回路名称に対応する“No.”、“デマンド値”及び“割合”は、表示制御部102が決定した表示色(ここでは、赤色)で表示される。 When the circuit ID is displayed in the second individual ranking table 573, if the related information corresponding to the date specified by the user is stored in the storage unit 13 and the circuit ID is included in the related information, The circuit ID is displayed as a link button. When the circuit ID is displayed as a link button in the second individual ranking table 573, the display control unit 102 displays "No." It is displayed in the determined display color (here, red).

円グラフ572は、表示制御部102で決定された各表示色で表示される。さらに、第2個別ランキングテーブル573では、No.1~6が、表示制御部102で決定された各表示色で表示される。 The pie chart 572 is displayed in each display color determined by the display control unit 102 . Furthermore, in the second individual ranking table 573, No. 1 to 6 are displayed in each display color determined by the display control unit 102 .

第3個別表示領域553には、第3デマンド時限において、高デマンドである回路に関する情報が表示される。 In the third individual display area 553, information regarding a circuit with high demand is displayed in the third demand time period.

第3個別表示領域553は、第3表示領域581を含む。第3表示領域581には、第3デマンド時限に対応する個別ランキング情報に含まれる第3デマンド時限に応じた時間帯、受電電力量の値を表す情報を含むメッセージが表示される。第3デマンド時限に応じた時間帯として“2017/08/22 14:30-15:00”が、受電電力量の値を表す情報として“受電電力量:39.10kW”が含まれるメッセージが、第3表示領域581に表示される。 Third individual display area 553 includes third display area 581 . The third display area 581 displays a message including information indicating the value of the received power amount and the time zone corresponding to the third demand time period included in the individual ranking information corresponding to the third demand time period. A message containing "2017/08/22 14:30-15:00" as the time period corresponding to the third demand time period and "Received power amount: 39.10 kW" as information representing the value of the received power amount, It is displayed in the third display area 581 .

第3個別表示領域553には、第7グラフ情報で表される円グラフ582が、第3デマンド時限に対応する第4テーブル情報で表されるテーブルとして第3個別ランキングテーブル583が、それぞれ表示される。 In the third individual display area 553, a pie chart 582 represented by the seventh graph information and a third individual ranking table 583 as a table represented by the fourth table information corresponding to the third demand time period are displayed. be.

第3個別ランキングテーブル583は、第3デマンド時限において個別デマンド値の割合が多い上位所定数(5つ)の回路に関する情報及び残りの回路に関して1つにまとめた情報を含む。具体的には、第3個別ランキングテーブル583は、第1個別ランキングテーブル563と同様に、順位を表す番号(No.)、回路名称、デマンド値及び割合を含む。第3個別ランキングテーブル583では、第4テーブル情報に含まれる所定数の回路(設備)の情報(回路ID)、個別デマンド値及び個別デマンド割合からなる組がソートされた結果の順にNo.1~5に表示される。 The third individual ranking table 583 includes information on the top predetermined number (five) of circuits with the highest ratio of individual demand values in the third demand time period and information on the remaining circuits combined into one. Specifically, like the first individual ranking table 563, the third individual ranking table 583 includes numbers (No.) indicating ranking, circuit names, demand values, and ratios. In the third individual ranking table 583, the sets of information (circuit ID) of a predetermined number of circuits (equipment) included in the fourth table information, individual demand values, and individual demand ratios are sorted, and No. 1 is sorted. 1 to 5 are displayed.

第3個別ランキングテーブル583では、No.6として、残りの回路に関して1つにまとめた情報が表示される。No.6の回路名称として“その他回路の合計”“が表示される。さらに、No.6のデマンド値として第4テーブル情報に含まれる個別残デマンド値が、No.6の割合として第4テーブル情報に含まれる個別残デマンド割合が、それぞれ表示される。 In the third individual ranking table 583, No. At 6, consolidated information about the remaining circuits is displayed. No. "Total of other circuits" is displayed as the circuit name of No. 6. Further, the individual remaining demand value included in the fourth table information as the demand value of No. 6 is displayed in the fourth table information as the ratio of No. 6. The included individual remaining demand ratios are displayed respectively.

第3個別ランキングテーブル583において、回路IDが表示される際に、利用者が指定した日に対応する関連情報が記憶部13に記憶され、かつ当該回路IDが関連情報に含まれる場合には、当該回路IDはリンクボタンとして表示される。第3個別ランキングテーブル583において回路IDがリンクボタンとして表示される場合、当該回路IDの他、当該回路名称に対応する“No.”、“デマンド値”及び“割合”は、表示制御部102が決定した表示色(ここでは、赤色)で表示される。 When the circuit ID is displayed in the third individual ranking table 583, if the related information corresponding to the date specified by the user is stored in the storage unit 13 and the circuit ID is included in the related information, The circuit ID is displayed as a link button. When the circuit ID is displayed as a link button in the third individual ranking table 583, the display control unit 102 displays "No." It is displayed in the determined display color (here, red).

円グラフ582は、表示制御部102で決定された各表示色で表示される。さらに、第3個別ランキングテーブル583では、No.1~6が、表示制御部102で決定された各表示色で表示される。 The pie chart 582 is displayed in each display color determined by the display control unit 102 . Furthermore, in the third individual ranking table 583, No. 1 to 6 are displayed in each display color determined by the display control unit 102 .

ここで、第1デマンド時限~第3デマンド時限は、受変電設備61に対するデマンド値が高デマンドである複数のデマンド時限のうち第1受電電力量~第3受電電力量のそれぞれに対応している。つまり、第1個別表示領域551、第2個別表示領域552及び第3個別表示領域553では、目標値を超えた期間(デマンド時限)において電力を使用(消費)した回路(設備)の内訳が表示される。言い換えると、第1個別表示領域551、第2個別表示領域552及び第3個別表示領域553では、目標値を超えた期間(デマンド時限)において使用された電力の電力情報の内訳が表示される。 Here, the first to third demand time periods correspond to the first to third received power amounts among the plurality of demand time periods in which the demand value for the power receiving and transforming equipment 61 is high. . That is, in the first individual display area 551, the second individual display area 552, and the third individual display area 553, the breakdown of the circuits (equipment) that used (consumed) power during the period (demand time limit) exceeding the target value is displayed. be done. In other words, in the first individual display area 551, the second individual display area 552, and the third individual display area 553, the breakdown of the power information of the power used during the period (demand time limit) exceeding the target value is displayed.

(5)変形例
以下に、変形例について列記する。なお、以下に説明する変形例は、上記実施形態と適宜組み合わせて適用可能である。
(5) Modifications Modifications are listed below. It should be noted that the modified examples described below can be applied in appropriate combination with the above-described embodiment.

上記実施形態において、動的分析画面400のグラフ表示領域415では、月別高デマンド発生時間帯416、棒グラフ417、標準ロードカーブ418及び折れ線グラフ419が表示される。ここで、利用者の操作に応じて折れ線グラフ419の表示及び非表示を切り替えてもよい。利用者が、グラフ表示領域415をタップすることで、折れ線グラフ419の表示及び非表示を切り替える。例えば、図5に示すように、折れ線グラフ419がグラフ表示領域415に表示されている場合に、利用者がグラフ表示領域415をタップする。このとき、グラフ表示領域415では、図7に示すように、折れ線グラフ419が非表示になり、月別高デマンド発生時間帯416、棒グラフ417及び標準ロードカーブ418のみが表示される。このとき、受変電設備61の受電電力量の変化を表す折れ線グラフ419が表示されなくなるので、月別高デマンド発生時間帯416、棒グラフ417及び標準ロードカーブ418を拡大して表示することが可能となる。月別高デマンド発生時間帯416、棒グラフ417及び標準ロードカーブ418を拡大表示することで、棒グラフ417及び標準ロードカーブ418の変化の詳細を確認することができる。さらに、図7の表示状態において、利用者がグラフ表示領域415をタップすると、図5の表示に戻る。 In the above embodiment, the graph display area 415 of the dynamic analysis screen 400 displays a monthly high demand occurrence time zone 416 , a bar graph 417 , a standard load curve 418 and a line graph 419 . Here, display and non-display of the line graph 419 may be switched according to the user's operation. The user switches display and non-display of the line graph 419 by tapping the graph display area 415 . For example, as shown in FIG. 5, the user taps the graph display area 415 when the line graph 419 is displayed in the graph display area 415 . At this time, in the graph display area 415, as shown in FIG. 7, the line graph 419 is hidden, and only the monthly high demand generation time zone 416, the bar graph 417 and the standard load curve 418 are displayed. At this time, since the line graph 419 representing the change in the amount of power received by the power receiving and transforming equipment 61 is no longer displayed, it is possible to enlarge and display the monthly high demand generation time zone 416, the bar graph 417, and the standard load curve 418. . Details of changes in the bar graph 417 and the standard load curve 418 can be confirmed by enlarging the monthly high demand occurrence time zone 416 , the bar graph 417 and the standard load curve 418 . Furthermore, when the user taps the graph display area 415 in the display state of FIG. 7, the display returns to that of FIG.

上記実施形態において、分析部101による分析が未実施である月が存在する場合、計測された計測値のデータが少ないため分析部101による分析ができない月が存在する場合、及び分析部101による分析が不要である月が存在する場合がある。分析装置1は、カレンダ画面200において、これらの場合が判別できる表示色で、対称となる月を表示部31に表示してもよい。 In the above embodiment, when there is a month in which the analysis by the analysis unit 101 has not been performed, when there is a month in which the analysis by the analysis unit 101 cannot be performed due to insufficient data of measured values, and when there is an analysis by the analysis unit 101 There may be months when is not needed. In the calendar screen 200, the analyzer 1 may display the symmetrical month on the display unit 31 in a display color that can distinguish between these cases.

上記実施形態において、高デマンドが発生している所定の期間(デマンド時限又は日)と高デマンドが発生していない所定の期間の表示態様を表示色で異ならせる構成としたが、この構成に限定されない。高デマンドが発生している所定の期間(デマンド時限又は日)と高デマンドが発生していない所定の期間の表示態様を、文字、図形等で異ならせてもよい。 In the above embodiment, the display mode of the predetermined period of high demand (demand period or day) and the predetermined period of no high demand are displayed in different colors. not. The display mode of a predetermined period of high demand (demand period or day) and a predetermined period of non-high demand may be different using characters, graphics, or the like.

上記実施形態では、表示制御部102は、情報端末3の表示部31に表示する各画面を作成する構成としたが、この構成に限定されない。表示制御部102は、情報端末3に所望の表示画面を表示させるための画面情報を作成してもよい。例えば、情報端末3が表示画面を表示するためのアプリケーションを有していれば、画面情報はアプリケーションと共同して表示画面を表示するためのデータであってもよい。また例えば、情報端末3のアプリケーションが表示画面の画像データの全てを有していれば、画面情報は、画像データにより表示画面を構成するためのデータであってもよい。あるいは、情報端末3のアプリケーションが表示画面の画像データの一部を有していれば、画面情報は、画像データの残りの部分であってもよい。 In the above embodiment, the display control unit 102 is configured to create each screen to be displayed on the display unit 31 of the information terminal 3, but the configuration is not limited to this. The display control unit 102 may create screen information for displaying a desired display screen on the information terminal 3 . For example, if the information terminal 3 has an application for displaying a display screen, the screen information may be data for displaying the display screen in cooperation with the application. Further, for example, if the application of the information terminal 3 has all the image data of the display screen, the screen information may be data for forming the display screen from the image data. Alternatively, if the application of the information terminal 3 has part of the image data of the display screen, the screen information may be the remaining part of the image data.

上記実施形態において、第1グラフ情報は、棒グラフを表すとしたが、折れ線グラブを表す情報であってもよい。この場合、動的分析画面400のグラフ表示領域415で表示される回路(設備)に関するグラフは折れ線グラフとなる。 Although the first graph information represents a bar graph in the above embodiment, it may be information representing a line graph. In this case, the graph related to the circuit (equipment) displayed in the graph display area 415 of the dynamic analysis screen 400 is a line graph.

上記実施形態において、動的分析画面400のグラフ表示領域415には、複数の回路(設備)のうち1つの回路に対応する棒グラフ及び標準ロードカーブが表示される構成としたが、この構成に限定されない。動的分析画面400のグラフ表示領域415には、2つ以上の回路の各デマンド時限の設備側デマンド値の合計に対応する棒グラフ、及び当該2つ以上の回路で使用(消費)された電力量の合計から得られる標準ロードカーブが表示されてもよい。 In the above embodiment, the graph display area 415 of the dynamic analysis screen 400 is configured to display a bar graph and a standard load curve corresponding to one of a plurality of circuits (equipment), but the configuration is limited to this configuration. not. In the graph display area 415 of the dynamic analysis screen 400, a bar graph corresponding to the sum of the facility-side demand values for each demand time period of two or more circuits, and the amount of electric power used (consumed) in the two or more circuits. A standard load curve resulting from the sum of may be displayed.

上記実施形態では、施設5には複数のコントローラ21が設けられる構成としたが、この構成に限定されない。1つのコントローラ21が、施設5に設けられてもよい。つまり、施設5には、1つ以上のコントローラ21が設けられていればよい。 In the above embodiment, the facility 5 is configured to have a plurality of controllers 21, but the configuration is not limited to this. One controller 21 may be provided at facility 5 . That is, the facility 5 may be provided with one or more controllers 21 .

上記実施形態では、分析装置1と蓄積サーバ2とは個別の装置とする構成としたが、この構成に限定されない。分析装置1と蓄積サーバ2とを1つの装置として構成してもよい。 In the above embodiment, the analysis device 1 and the storage server 2 are configured as separate devices, but the configuration is not limited to this. The analysis device 1 and the storage server 2 may be configured as one device.

上記実施形態は、本開示の様々な実施形態の一つに過ぎない。上記実施形態は、本開示の目的を達成できれば、設計等に応じて種々の変更が可能である。また、分析システム10(分析装置1)及び管理システム1000と同様の機能は、表示方法、コンピュータプログラム、又はプログラムを記録した記録媒体等で具現化されてもよい。一態様に係る分析システム10の表示方法は、情報端末3が有する表示部31に情報を表示する表示方法である。表示方法は、表示ステップを有する。表示ステップは、単位時間以上の時間長さを有する複数の表示対象期間を表示部31に表示させ、かつ 複数の表示対象期間のうち使用(消費)された電力が目標値を超えた表示対象期間については、他の表示対象期間の表示態様とは異なる表示態様で表示部31に表示させる。一態様に係るプログラムは、コンピュータシステムを、上述した表示方法又は表示システムとして機能させるためのプログラムである。 The above embodiment is but one of the various embodiments of the present disclosure. The above-described embodiment can be modified in various ways according to design and the like, as long as the object of the present disclosure can be achieved. Also, functions similar to those of the analysis system 10 (analysis device 1) and the management system 1000 may be embodied by a display method, a computer program, a recording medium recording the program, or the like. A display method of the analysis system 10 according to one aspect is a display method of displaying information on the display unit 31 of the information terminal 3 . The display method has a display step. The display step displays a plurality of display target periods having a time length equal to or longer than the unit time on the display unit 31, and the display target period in which the power used (consumed) exceeds the target value among the plurality of display target periods. is displayed on the display unit 31 in a display manner different from the display manners of the other display target periods. A program according to one aspect is a program for causing a computer system to function as the display method or display system described above.

本開示における分析システム10(分析装置1)、管理システム1000又は表示方法の実行主体は、コンピュータシステムを含んでいる。コンピュータシステムは、ハードウェアとしてのプロセッサ及びメモリを有する。コンピュータシステムのメモリに記録されたプログラムをプロセッサが実行することによって、本開示における分析システム10、管理システム1000又は表示方法の実行主体としての機能が実現される。プログラムは、コンピュータシステムのメモリに予め記録されていてもよいが、電気通信回線を通じて提供されてもよい。また、プログラムは、コンピュータシステムで読み取り可能なメモリカード、光学ディスク、ハードディスクドライブ等の非一時的な記録媒体に記録されて提供されてもよい。コンピュータシステムのプロセッサは、半導体集積回路(IC)又は大規模集積回路(LSI)を含む1又は複数の電子回路で構成される。複数の電子回路は、1つのチップに集約されていてもよいし、複数のチップに分散して設けられていてもよい。複数のチップは、1つの装置に集約されていてもよいし、複数の装置に分散して設けられていてもよい。 The analysis system 10 (analysis apparatus 1), management system 1000, or execution subject of the display method in the present disclosure includes a computer system. A computer system has a processor and memory as hardware. The processor executes the program recorded in the memory of the computer system, thereby realizing the function of the analysis system 10, the management system 1000, or the display method according to the present disclosure. The program may be prerecorded in the memory of the computer system, or may be provided through an electric communication line. Also, the program may be provided by being recorded on a non-temporary recording medium such as a computer system-readable memory card, optical disk, hard disk drive, or the like. A processor in a computer system is made up of one or more electronic circuits, including semiconductor integrated circuits (ICs) or large scale integrated circuits (LSIs). A plurality of electronic circuits may be integrated into one chip, or may be distributed over a plurality of chips. A plurality of chips may be integrated in one device, or may be distributed in a plurality of devices.

コンピュータシステムである分析システム10(分析装置1)は、1又は複数のコンピュータで構成されるシステムであってもよい。例えば、分析システム10の少なくとも一部の機能は、クラウド(クラウドコンピューティング)によって実現されてもよい。 The analysis system 10 (analyzer 1), which is a computer system, may be a system composed of one or more computers. For example, at least some functions of the analysis system 10 may be realized by the cloud (cloud computing).

(まとめ)
以上説明したように、第1の態様の表示方法は、情報端末(3)が有する表示部(31)に情報を表示する表示方法である。表示方法は、表示ステップを含む。表示ステップは、単位時間以上の時間長さを有する複数の表示対象期間を表示部(31)に表示させ、かつ複数の表示対象期間のうち使用された電力が目標値を超えた表示対象期間については、他の表示対象期間の表示態様とは異なる表示態様で表示部(31)に表示させる。
(summary)
As described above, the display method of the first aspect is a display method for displaying information on the display section (31) of the information terminal (3). The display method includes a display step. The displaying step causes the display unit (31) to display a plurality of display target periods having a time length equal to or longer than the unit time, and for display target periods in which the power consumption exceeds the target value among the plurality of display target periods. is displayed on the display unit (31) in a display mode different from the display mode of other display target periods.

この表示方法によると、表示対象期間において使用された電力が目標値を超えた場合の表示態様と、超えていない場合の表示態様とは異なっている。そのため、表示対象期間において使用された電力の値が高い値であるか否かを容易に確認することができる。 According to this display method, the display mode when the power used in the display target period exceeds the target value differs from the display mode when it does not. Therefore, it is possible to easily confirm whether or not the value of the power used in the display target period is a high value.

第2の態様の表示方法では、第1の態様において、表示ステップは、複数の表示対象期間を表示部(31)に表示させる際に、複数の表示対象期間のそれぞれにおいて使用された電力の大きさを反映する情報は表示内容に含まない。 In the display method of the second aspect, in the first aspect, the displaying step includes, when causing the display unit (31) to display the plurality of display target periods, the amount of power used in each of the plurality of display target periods. The display content does not include information that reflects the

この表示方法によると、複数の表示対象期間のそれぞれにおいて使用された電力の大きさを反映する情報は表示内容に含まないので、使用された電力の大きさを確認することなく、表示対象期間での使用された電力の値が高い値であるか否かを容易に確認することができる。 According to this display method, information reflecting the amount of power used in each of a plurality of display periods is not included in the display content. It is possible to easily check whether the used power value of is a high value or not.

第3の態様の表示方法では、第1又は第2の態様において、表示対象期間は、日単位である。 In the display method of the third aspect, in the first or second aspect, the display target period is in units of days.

この表示方法によると、使用された電力の値が高い値であるか否かを日単位で確認することができる。 According to this display method, it is possible to confirm whether or not the power consumption value is high on a daily basis.

第4の態様の表示方法では、第1又は第2の態様において、表示対象期間は、複数の日のそれぞれを表す複数の日情報と、複数の時間のそれぞれを表す複数の時間情報との組み合わせである。表示ステップは、複数の日情報と複数の時間情報とを表示部(31)にマトリックス表示させ、使用された電力が目標値を超えた時間帯については、他の時間帯の表示態様とは異なる表示態様で表示部(31)に表示させる。 In the display method of the fourth aspect, in the first or second aspect, the display target period is a combination of a plurality of day information representing each of a plurality of days and a plurality of time information representing each of a plurality of hours. is. The display step displays a plurality of pieces of day information and a plurality of pieces of time information in a matrix on the display unit (31), and the time period in which the power consumption exceeds the target value is displayed in a manner different from that of other time periods. It is displayed on the display unit (31) in the display mode.

この表示方法によると、使用された電力の値が高い値であるか否かを、各日において時間単位で確認することができる。 According to this display method, it is possible to confirm whether or not the value of the power used is high on an hourly basis for each day.

第5の態様の表示方法では、第4の態様において、複数の日情報と複数の時間情報とがマトリックス表示される際に、複数の日情報と複数の時間情報との組み合わせのうち、使用された電力が目標値を超えた時間帯に応じた日情報と時間情報との組み合わせに相当するマトリックス上の位置における表示態様は、リンクボタンとなっている。当該リンクボタンは、当該日情報が表す日における電力の使用の詳細表示のための画面へ遷移するためのボタンである。 In the display method of the fifth aspect, in the fourth aspect, when the plurality of date information and the plurality of time information are displayed in a matrix, the combination of the plurality of date information and the plurality of time information is used. A link button is displayed at a position on the matrix corresponding to the combination of the date information and the time information corresponding to the time zone in which the electric power supplied exceeds the target value. The link button is a button for transitioning to a screen for detailed display of power usage on the day represented by the day information.

この表示方法によると、使用された電力の値が高い値である時間帯を含む日で使用された電力の詳細を確認することができる。 According to this display method, it is possible to check the details of the power used in a day that includes a time period in which the value of the power used is high.

第6の態様における表示方法では、第1~第5の態様において、複数の表示対象期間が表示された画面において、所定の操作手順で画面遷移の操作が行われると、表示ステップは、操作で指定された日における単位時間ごとに使用された電力の大きさを、時系列に並べて表示部(31)に表示させる。 In the display method according to the sixth aspect, in the first to fifth aspects, when a screen transition operation is performed according to a predetermined operation procedure on a screen displaying a plurality of display target periods, the display step is performed by an operation. The amount of power used per unit time on a specified day is arranged in chronological order and displayed on a display section (31).

この表示方法によると、単位時間ごとに使用された電力の大きさの推移を確認することができる。 According to this display method, it is possible to confirm the transition of the amount of power used per unit time.

第7の態様における表示方法では、第6の態様において、表示ステップは、指定された日での単位時間ごとに使用された電力の大きさを表示する際に、指定された日を含む月において単位時間ごとに使用された電力に基づいて得られた標準ロードカーブ(418)を、表示部(31)にさらに表示させる。 In the display method according to the seventh aspect, in the sixth aspect, the displaying step includes, in displaying the amount of power used per unit time on the specified day, in the month including the specified day: A standard load curve (418) obtained based on the power used per unit time is also displayed on the display (31).

この表示方法によると、単位時間ごとに使用された電力と標準ロードカーブ(418)とを比較することができるので、単位時間ごとに使用された電力の量が多いが否かを利用者は判断することができる。 According to this display method, the power used per unit time can be compared with the standard load curve (418), so that the user can determine whether the amount of power used per unit time is large. can do.

第8の態様の表示方法では、第7の態様において、操作手順で指定された日での単位時間ごとに使用された電力の大きさ、及び標準ロードカーブ(418)は、電力を使用する回路ごとに得られる。 In the display method of the eighth aspect, in the seventh aspect, the amount of power used per unit time on the day specified in the operating procedure and the standard load curve (418) are the circuits that use the power. obtained for each

この表示方法によると、各回路について、単位時間ごとに使用された電力の量が多いが否かを利用者は判断することができる。 According to this display method, the user can judge whether or not the amount of power used per unit time is large for each circuit.

第9の態様の表示方法では、第1~第8のいずれかの態様において、表示ステップは、所定の期間内において使用された電力量に基づいた複数の回路のランキングを、表示部(31)にさらに表示させる。 In the display method of the ninth aspect, in any one of the first to eighth aspects, the display step displays the ranking of the plurality of circuits based on the amount of power used within the predetermined period on the display unit (31). to display more.

この表示方法によると、所定の期間において電力を多く使用する回路を利用者が知ることができる。 According to this display method, the user can know the circuits that use a lot of power in a predetermined period.

第10の態様の表示方法では、第9の態様において、所定の期間は、前記単位時間ごとのデマンド値に基づいて定められる期間である。 In the display method of the tenth aspect, in the ninth aspect, the predetermined period is a period determined based on the demand value for each unit time.

この表示方法によると、例えば所定の期間が高デマンドが発生しやすい期間である場合には、当該所定の期間において電力を多く使用する回路、つまり高デマンドの発生の原因となる回路を利用者が知ることができる。 According to this display method, for example, when a predetermined period is a period in which high demand is likely to occur, the user can select a circuit that uses a large amount of power during the predetermined period, that is, a circuit that causes high demand. can know.

第11の態様の表示方法では、第9の態様において、表示ステップは、所定の期間としての第1期間に含まれ、目標値を超える第2期間において使用された電力の電力情報の内訳を、表示部(31)にさらに表示させる。 In the display method of the eleventh aspect, in the ninth aspect, the displaying step includes displaying the breakdown of the power information of the power used in the second period that is included in the first period as the predetermined period and exceeds the target value, It is further displayed on the display unit (31).

この表示方法によると、第2期間において使用された電力の電力情報を確認することで、第2期間において電力を多く使用する回路を利用者が知ることができる。 According to this display method, by confirming the power information of the power used in the second period, the user can know the circuits that use a lot of power in the second period.

第12の態様のプログラムは、コンピュータに、第1~第11のいずれかの態様の表示方法を、実行させるためのプログラムである。 A program according to a twelfth aspect is a program for causing a computer to execute the display method according to any one of the first to eleventh aspects.

このプログラムによると、表示対象期間において使用された電力の値が高い値であるか否かを容易に確認することができる。 According to this program, it is possible to easily confirm whether or not the value of power used in the display target period is a high value.

第13の態様の分析システム(10)は、情報端末が有する表示部に情報を表示する。分析システム(10)は、分析部(101)と表示制御部(102)とを備える。分析部(101)は、施設(5)に設けられた回路(負荷機器50)ごとに使用される電力が目標値を超えたか否かを分析する。表示制御部(102)は、単位時間以上の時間長さを有する複数の表示対象期間を表示部(31)に表示させ、かつ複数の表示対象期間のうち、使用された電力が目標値を超えた回路が存在する表示対象期間については、他の表示対象期間の表示態様とは異なる表示態様で表示部(31)に表示させる。 The analysis system (10) of the thirteenth aspect displays information on the display section of the information terminal. The analysis system (10) comprises an analysis section (101) and a display control section (102). An analysis unit (101) analyzes whether or not the power used for each circuit (load device 50) provided in a facility (5) has exceeded a target value. A display control unit (102) causes a display unit (31) to display a plurality of display target periods having a time length equal to or longer than the unit time, and a display control unit (102) controls the power consumption of the plurality of display target periods to exceed a target value. The display target period in which the circuit is present is displayed on the display unit (31) in a display mode different from the display mode of the other display target periods.

この構成によると、表示対象期間において使用された電力の値が高い値であるか否かを容易に確認することができる。 According to this configuration, it is possible to easily confirm whether or not the value of the power used in the display target period is a high value.

第14の態様の管理システム(6)は、第13の態様の分析システム(10)と、施設(5)で使用される電力を計測する計測システム(20)と、を備える。 The management system (6) of the fourteenth aspect comprises the analysis system (10) of the thirteenth aspect and a metering system (20) for metering power used in the facility (5).

この構成によると、表示対象期間において使用された電力の値が高い値であるか否かを容易に確認することができる。 According to this configuration, it is possible to easily confirm whether or not the value of the power used in the display target period is a high value.

1 分析装置
3 情報端末
10 分析システム
20 計測システム
50 負荷機器(回路)
101 分析部
102 表示制御部
418 標準ロードカーブ
1000 管理システム
1 analysis device 3 information terminal 10 analysis system 20 measurement system 50 load device (circuit)
101 analysis unit 102 display control unit 418 standard road curve 1000 management system

Claims (12)

情報端末が有する表示部に情報を表示する表示方法であって、
単位時間以上の時間長さを有する複数の表示対象期間を前記表示部に表示させ、かつ前記複数の表示対象期間のうち使用された電力が目標値を超えた表示対象期間については、他の表示対象期間の表示態様とは異なる表示態様で前記表示部に表示させる表示ステップを含み、
複数の表示対象期間が表示された画面において、所定の操作手順で画面遷移の操作が行われると、前記表示ステップは、前記操作で指定された日における単位時間ごとに使用された電力の大きさを、時系列に並べて前記表示部に表示させ、
前記表示ステップは、前記指定された日での前記単位時間ごとに使用された電力の大きさを表示する際に、前記指定された日を含む月において前記単位時間ごとに使用された電力に基づいて得られた標準ロードカーブを、前記表示部にさらに表示させる、
表示方法。
A display method for displaying information on a display unit of an information terminal,
A plurality of display target periods having a time length equal to or longer than the unit time are displayed on the display unit, and a display target period in which the power consumption exceeds a target value among the plurality of display target periods is displayed by another display. Including a display step of causing the display unit to display in a display mode different from the display mode of the target period,
When a screen transition operation is performed according to a predetermined operation procedure on a screen on which a plurality of display target periods are displayed, the display step determines the amount of power used per unit time on the day specified by the operation. are arranged in chronological order and displayed on the display unit,
In the displaying step, displaying the amount of power used per unit time on the specified day is based on the power used per unit time in a month including the specified day. further display the standard load curve obtained by
Display method.
前記表示ステップは、前記複数の表示対象期間を前記表示部に表示させる際に、前記複数の表示対象期間のそれぞれにおいて使用された電力の大きさを表すデマンド値は表示内容に含まない、
請求項1に記載の表示方法。
In the display step, when displaying the plurality of display target periods on the display unit, the display content does not include a demand value representing the magnitude of power used in each of the plurality of display target periods.
The display method according to claim 1.
前記表示対象期間は、日単位である、
請求項1又は2に記載の表示方法。
The display target period is in units of days,
The display method according to claim 1 or 2.
前記表示対象期間は、複数の日のそれぞれを表す複数の日情報と、複数の時間のそれぞれを表す複数の時間情報との組み合わせであり、
前記表示ステップは、前記複数の日情報と前記複数の時間情報とを前記表示部にマトリックス表示させ、使用された電力が前記目標値を超えた時間帯については、他の時間帯の表示態様とは異なる表示態様で前記表示部に表示させる、
請求項1又は2に記載の表示方法。
The display target period is a combination of a plurality of day information representing each of a plurality of days and a plurality of time information representing each of a plurality of times,
In the displaying step, the plurality of day information and the plurality of time information are displayed in a matrix on the display unit, and the time period in which the power consumption exceeds the target value is displayed in a manner different from other time periods. is displayed on the display unit in a different display mode,
The display method according to claim 1 or 2.
前記複数の日情報と前記複数の時間情報とがマトリックス表示される際に、前記複数の日情報と前記複数の時間情報との組み合わせのうち、使用された電力が前記目標値を超えた時間帯に応じた日情報と時間情報との組み合わせに相当するマトリックス上の位置における表示態様は、当該日情報が表す日における電力の使用の詳細表示のための画面へ遷移するためのリンクボタンとなっている、
請求項4に記載の表示方法。
When the plurality of day information and the plurality of time information are displayed in a matrix, the time zone in which the power consumption exceeds the target value among the combinations of the plurality of day information and the plurality of time information The display mode at the position on the matrix corresponding to the combination of the day information and the time information according to the day is a link button for transitioning to the screen for displaying the details of the power usage on the day represented by the day information. there is
The display method according to claim 4.
前記操作手順で指定された日での前記単位時間ごとに使用された電力の大きさ、及び前記標準ロードカーブは、電力を使用する回路ごとに得られる、The amount of power used per unit time on the day specified in the operation procedure and the standard load curve are obtained for each circuit that uses power,
請求項1~5のいずれか一項に記載の表示方法。The display method according to any one of claims 1 to 5.
前記表示ステップは、所定の期間内において使用された電力量に基づいた複数の回路のランキングを、前記表示部にさらに表示させる、The display step further causes the display unit to display a ranking of the plurality of circuits based on the amount of power used within a predetermined period of time.
請求項1~6のいずれか一項に記載の表示方法。The display method according to any one of claims 1 to 6.
前記所定の期間は、前記単位時間ごとのデマンド値に基づいて定められる期間である、The predetermined period is a period determined based on the demand value for each unit time,
請求項7に記載の表示方法。The display method according to claim 7.
前記表示ステップは、前記所定の期間としての第1期間に含まれ、前記目標値を超える第2期間において使用された電力の電力情報の内訳を、前記表示部にさらに表示させる、The display step causes the display unit to further display a breakdown of power information of power used in a second period that is included in the first period as the predetermined period and exceeds the target value.
請求項7に記載の表示方法。The display method according to claim 7.
コンピュータに、to the computer,
請求項1~9のいずれか一項に記載の表示方法を、The display method according to any one of claims 1 to 9,
実行させるためのプログラム。program to run.
情報端末が有する表示部に情報を表示する分析システムであって、An analysis system that displays information on a display unit of an information terminal,
施設に設けられた回路ごとに使用される電力が目標値を超えたか否かを分析する分析部と、an analysis unit that analyzes whether the power used for each circuit provided in the facility exceeds a target value;
単位時間以上の時間長さを有する複数の表示対象期間を前記表示部に表示させ、かつ前記複数の表示対象期間のうち、使用された電力が目標値を超えた回路が存在する表示対象期間については、他の表示対象期間の表示態様とは異なる表示態様で前記表示部に表示させる表示制御部と、を備え、Displaying a plurality of display target periods having a time length equal to or longer than the unit time on the display unit, and regarding the display target period in which there is a circuit whose power consumption exceeds a target value among the plurality of display target periods comprises a display control unit that causes the display unit to display in a display mode different from the display mode of another display target period,
複数の表示対象期間が表示された画面において、所定の操作手順で画面遷移の操作が行われると、前記表示制御部は、前記操作で指定された日における単位時間ごとに使用された電力の大きさを、時系列に並べて前記表示部に表示させ、When a screen transition operation is performed according to a predetermined operation procedure on a screen displaying a plurality of display target periods, the display control unit determines the amount of power used per unit time on the day specified by the operation. are arranged in chronological order and displayed on the display unit,
前記表示制御部は、前記指定された日での前記単位時間ごとに使用された電力の大きさを表示する際に、前記指定された日を含む月において前記単位時間ごとに使用された電力に基づいて得られた標準ロードカーブを、前記表示部にさらに表示させる、The display control unit, when displaying the amount of power used per unit time on the specified day, displays the amount of power used per unit time in a month including the specified day. further display the standard load curve obtained based on the display unit;
分析システム。analysis system.
請求項11に記載の分析システムと、an analysis system according to claim 11;
施設で使用される電力を計測する計測システムと、を備える、a metering system for metering power used in the facility;
管理システム。management system.
JP2018123634A 2018-06-28 2018-06-28 Display method, program, analysis system and management system Active JP7122527B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018123634A JP7122527B2 (en) 2018-06-28 2018-06-28 Display method, program, analysis system and management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018123634A JP7122527B2 (en) 2018-06-28 2018-06-28 Display method, program, analysis system and management system

Publications (2)

Publication Number Publication Date
JP2020005425A JP2020005425A (en) 2020-01-09
JP7122527B2 true JP7122527B2 (en) 2022-08-22

Family

ID=69100748

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018123634A Active JP7122527B2 (en) 2018-06-28 2018-06-28 Display method, program, analysis system and management system

Country Status (1)

Country Link
JP (1) JP7122527B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011129067A (en) 2009-12-21 2011-06-30 Panasonic Electric Works Co Ltd Energy saving diagnostic system
JP2013153567A (en) 2012-01-24 2013-08-08 Panasonic Corp Energy management apparatus and program
JP2014147218A (en) 2013-01-29 2014-08-14 Sharp Corp Power monitoring system
WO2015128907A1 (en) 2014-02-27 2015-09-03 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ Control method, information provision method and program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011129067A (en) 2009-12-21 2011-06-30 Panasonic Electric Works Co Ltd Energy saving diagnostic system
JP2013153567A (en) 2012-01-24 2013-08-08 Panasonic Corp Energy management apparatus and program
JP2014147218A (en) 2013-01-29 2014-08-14 Sharp Corp Power monitoring system
WO2015128907A1 (en) 2014-02-27 2015-09-03 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ Control method, information provision method and program

Also Published As

Publication number Publication date
JP2020005425A (en) 2020-01-09

Similar Documents

Publication Publication Date Title
US10090704B2 (en) Display device and display method of electric power system information
US20140282172A1 (en) System and method for graphically displaying energy consumption and savings
Overbye et al. Electric power control center visualization using geographic data views
JP2006349483A (en) Electric power consumption monitoring system
US20160172906A1 (en) Energy management system, display device, display method, and program
JP2008146116A (en) System for simulation of electricity rate
US20140114489A1 (en) Sustainable energy efficiency management system
JP7122527B2 (en) Display method, program, analysis system and management system
JP7038314B2 (en) Display control method, display control program, and display control system
JP6876953B2 (en) Information presentation method, program, and information presentation system
JP2017191522A (en) Electricity charge estimate system, electricity charge estimate method, and program
JP5422612B2 (en) Power saving information providing apparatus, method, system, and program
JP2020035110A (en) Display method, program and display control system
US20150242783A1 (en) Method for controlling information device, method for providing information, and computer-readable recording medium
EP4365814A1 (en) Information processing device, and program
JP6757907B2 (en) Display method, program and display system
WO2020110633A1 (en) Information processing device, information processing method, and program
JP2012018618A (en) Energy saving policy support system
JP6757908B2 (en) Setting method, setting system and setting program
US20080180413A1 (en) Method, system, and program product for controlling grid lines in a user interface
JP7445929B2 (en) Information distribution system, information distribution method and program
JP2011010470A (en) Usage energy management device
JP7466327B2 (en) Design Support System
JP2018121477A (en) Display method, program and display system
JP7496695B2 (en) Design Support System

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220125

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220328

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220607

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220701

R151 Written notification of patent or utility model registration

Ref document number: 7122527

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151