JP6343046B1 - Repair method for the base of a column in a handrail - Google Patents
Repair method for the base of a column in a handrail Download PDFInfo
- Publication number
- JP6343046B1 JP6343046B1 JP2017021941A JP2017021941A JP6343046B1 JP 6343046 B1 JP6343046 B1 JP 6343046B1 JP 2017021941 A JP2017021941 A JP 2017021941A JP 2017021941 A JP2017021941 A JP 2017021941A JP 6343046 B1 JP6343046 B1 JP 6343046B1
- Authority
- JP
- Japan
- Prior art keywords
- filler
- fixed
- fixed column
- column
- lower opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 230000008439 repair process Effects 0.000 title claims abstract description 20
- 239000000945 filler Substances 0.000 claims abstract description 104
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 46
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 19
- 239000003822 epoxy resin Substances 0.000 claims abstract description 9
- 229920000647 polyepoxide Polymers 0.000 claims abstract description 9
- 238000009423 ventilation Methods 0.000 claims description 14
- 230000002265 prevention Effects 0.000 claims description 12
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims description 10
- 230000035699 permeability Effects 0.000 claims description 5
- 239000000377 silicon dioxide Substances 0.000 claims description 5
- 150000001412 amines Chemical class 0.000 claims description 3
- 238000007599 discharging Methods 0.000 claims description 2
- 238000002156 mixing Methods 0.000 claims description 2
- 239000000463 material Substances 0.000 abstract description 15
- 239000000203 mixture Substances 0.000 abstract description 6
- 230000020169 heat generation Effects 0.000 abstract description 4
- 239000011347 resin Substances 0.000 description 12
- 229920005989 resin Polymers 0.000 description 12
- 239000011162 core material Substances 0.000 description 10
- 230000005484 gravity Effects 0.000 description 7
- 230000008569 process Effects 0.000 description 4
- 238000010521 absorption reaction Methods 0.000 description 3
- 238000009833 condensation Methods 0.000 description 3
- 230000005494 condensation Effects 0.000 description 3
- 230000006866 deterioration Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- UQSXHKLRYXJYBZ-UHFFFAOYSA-N Iron oxide Chemical compound [Fe]=O UQSXHKLRYXJYBZ-UHFFFAOYSA-N 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910044991 metal oxide Inorganic materials 0.000 description 2
- 150000004706 metal oxides Chemical class 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 239000004848 polyfunctional curative Substances 0.000 description 2
- 239000004593 Epoxy Substances 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- BRPQOXSCLDDYGP-UHFFFAOYSA-N calcium oxide Chemical compound [O-2].[Ca+2] BRPQOXSCLDDYGP-UHFFFAOYSA-N 0.000 description 1
- 239000000292 calcium oxide Substances 0.000 description 1
- ODINCKMPIJJUCX-UHFFFAOYSA-N calcium oxide Inorganic materials [Ca]=O ODINCKMPIJJUCX-UHFFFAOYSA-N 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000395 magnesium oxide Substances 0.000 description 1
- CPLXHLVBOLITMK-UHFFFAOYSA-N magnesium oxide Inorganic materials [Mg]=O CPLXHLVBOLITMK-UHFFFAOYSA-N 0.000 description 1
- AXZKOIWUVFPNLO-UHFFFAOYSA-N magnesium;oxygen(2-) Chemical compound [O-2].[Mg+2] AXZKOIWUVFPNLO-UHFFFAOYSA-N 0.000 description 1
- TWNQGVIAIRXVLR-UHFFFAOYSA-N oxo(oxoalumanyloxy)alumane Chemical compound O=[Al]O[Al]=O TWNQGVIAIRXVLR-UHFFFAOYSA-N 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- CHWRSCGUEQEHOH-UHFFFAOYSA-N potassium oxide Chemical compound [O-2].[K+].[K+] CHWRSCGUEQEHOH-UHFFFAOYSA-N 0.000 description 1
- 229910001950 potassium oxide Inorganic materials 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- KKCBUQHMOMHUOY-UHFFFAOYSA-N sodium oxide Chemical compound [O-2].[Na+].[Na+] KKCBUQHMOMHUOY-UHFFFAOYSA-N 0.000 description 1
- 229910001948 sodium oxide Inorganic materials 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
【課題】別途吸水ポンプを用いることなく固定支柱内の滞留水を外部に排出でき、固定支柱の根元部分を補修する充填材によって大きな発熱を伴うことなく補修を行うことができ、しかも作業性の優れた補修工法を提供する。
【解決手段】下部が躯体1内に埋設された筒状の固定支柱10のうち、躯体1近傍の低い位置に対して下開孔31が形成される。エポキシ樹脂と硬化剤と骨材とを混合した充填材Cが、下開孔31を通してかつ該下開孔31付近の高さ位置から流下されつつ固定支柱10内に供給される。充填材Cと固定支柱10内に存在する滞留水Bとが置換されつつ、滞留水Bが下開孔31から排出される。充填材Cは、下開孔31の下端位置まで充填される。所定時間後、固定支柱10内の充填材Dの上面が下開孔31の下端位置よりも沈下しているとき、固定支柱10内に充填材Cを追加的に充填する。
【選択図】 図4[PROBLEMS] To discharge stagnant water in a fixed column without using a separate water pump, and to repair the base portion of the fixed column without significant heat generation by using a filler for repairing the base of the fixed column. Provide an excellent repair method.
A lower opening 31 is formed at a lower position in the vicinity of the casing 1 of a cylindrical fixed column 10 having a lower portion embedded in the casing 1. The filler C, which is a mixture of an epoxy resin, a curing agent, and an aggregate, is supplied into the fixed support 10 while flowing down from the height of the lower opening 31 and through the lower opening 31. The staying water B is discharged from the lower opening 31 while the filling material C and the staying water B existing in the fixed column 10 are replaced. The filler C is filled up to the lower end position of the lower opening 31. After a predetermined time, when the upper surface of the filler D in the fixed column 10 is sinking below the lower end position of the lower opening 31, the filler C is additionally filled in the fixed column 10.
[Selection] Figure 4
Description
本発明は、墜落防止手すりにおける支柱根元補修工法に関するものである。 The present invention relates to a column base repair method for a fall-preventing handrail.
ベランダやバルコニ等の躯体に固定される墜落防止手すりは、下部が躯体内に埋設された固定支柱に対して、笠木や格子材等によって構成される囲い部材が取付けられた構造とされる。固定支柱のうち躯体内に埋設された部分は、通常は筒状とされることから、長期の使用に伴う固定支柱内部への水の浸入により、固定支柱を劣化させる原因となる。固定支柱は、墜落防止手すりの強度を確保する重要部材となることから、劣化が大きく進行しないうちに補強することが望まれる。 A fall-preventing handrail fixed to a housing such as a veranda or a balconi has a structure in which an enclosure member composed of a headboard, a lattice material, or the like is attached to a fixed support whose lower portion is embedded in the housing. The portion of the fixed column that is embedded in the housing is usually cylindrical, and this may cause deterioration of the fixed column due to water intrusion into the fixed column during long-term use. Since the fixed support becomes an important member for ensuring the strength of the fall-preventing handrail, it is desired to reinforce it before the deterioration progresses greatly.
特許文献1には、墜落防止手すりにおける中空の固定支柱の補修のため、下部が躯体内に埋設された固定支柱のうち低い位置に対して穴を形成して、この穴から固定支柱の下部に滞留している水を吸引ポンプにより抜き取った後に、硬化性樹脂を、上記穴から注入して固定支柱内の下部に充填することが開示されている。
In
特許文献2には、中空の固定支柱の補修のため、下部が躯体内に埋設された固定支柱のうち低い位置に対して穴を形成して、硬化性樹脂を、上記穴を通して固定支柱の底壁付近にまで深く挿入したチューブを介して、固定支柱の底壁付近から供給することにより、硬化性樹脂と固定支柱の底部に滞留していた滞留水とを置換しつつ、固定支柱の下部に硬化性樹脂を充填するものが開示されている。
In
前述した各特許文献に記載のものでは、固定支柱の下部内に充填される充填材が硬化性樹脂(エポキシ樹脂)であることから、固定支柱の滞留水との置換によって劣化の進行を弱めるということは期待できるものの、固定支柱の下部つまり根元を補強するという点は期待できない。また、充填材として硬化性樹脂を用いることは、硬化に際しての発熱量が大きくなって固定支柱の膨張を招き、これを取り巻く躯体の損傷の要因ともなり、好ましくないものとなる。 In the thing described in each patent document mentioned above, since the filler filled in the lower part of a fixed support | pillar is curable resin (epoxy resin), it is said that the progress of deterioration will be weakened by substitution with the stagnant water of a fixed support | pillar. Although it can be expected, it cannot be expected to reinforce the lower part of the fixed column, that is, the base. Also, the use of a curable resin as a filler is not preferable because the amount of heat generated at the time of curing increases and the fixed support column expands, causing damage to the casing surrounding it.
さらに、特許文献2に記載のものでは、特許文献1のものに比して、吸水ポンプによる滞留水の排出を行わなくてもよいという利点を有する反面、充填材として用いられる硬化性樹脂(エポキシ樹脂)の比重は水の比重と大きな差がないため、滞留水との置換がスムーズに行われにくいものとなる。このため、硬化性樹脂の充填を相当にゆっくりと行う必要があり、作業性の悪いものとなる。なお、充填材を急速に充填すると、空気や滞留水の一部を巻き込む可能性が高くなってしまい、空気や滞留水の一部を巻き込み膨張した状態で硬化性樹脂が硬化すると、その分強度が低下してしまうことになり、また、膨張した硬化性樹脂により固定支柱の穴が塞されることにも繋がる。
Further, the one described in
以上に加えて、固定支柱の穴に通したチューブを利用して充填材を固定支柱の底壁付近から充填する場合には、充填材の充填状況を目視できないため、固定支柱の穴から多くの充填材を溢れさせていた。また、充填材を所定高さまで充填した後にチューブを引き抜く際に、チューブが引き抜かれた部分が空所となることから、この空所分の充填材をさらに充填しつつチューブの引き抜き作業を慎重に行う必要があることから、作業性が悪いものとなる。 In addition to the above, when filling the filler from the vicinity of the bottom wall of the fixed column using a tube passed through the hole of the fixed column, the filling condition of the filler cannot be visually observed. Filling material was overflowing. Also, when pulling out the tube after filling the filler to the specified height, the portion where the tube is pulled out becomes a space, so carefully pull out the tube while filling the space with the filler. Since it is necessary to do this, workability is poor.
本発明は以上のような事情を勘案してなされたもので、その目的は、別途吸水ポンプを用いることなく固定支柱内の滞留水を外部に排出でき、大きな発熱を伴わないようにしつつ固定支柱の根元部分の補強を十分に行うことができ、しかも作業性の優れた墜落防止手すりにおける支柱根元補修工法を提供することにある。 The present invention has been made in view of the above circumstances, and its purpose is to allow the staying water in the fixed strut to be discharged to the outside without using a separate water absorption pump, and to prevent the generation of large heat generation. An object of the present invention is to provide a column base repair method for a fall-preventing handrail that can sufficiently reinforce the base portion of the rail and has excellent workability.
前記目的を達成するため、本発明にあっては次のような解決手法を採択してある。すなわち、
筒状とされた固定支柱の下部が躯体内に埋設されてなる墜落防止手すりにおける支柱根元補修工法であって、
前記固定支柱のうち前記躯体の近傍となる低い位置に対して下開孔を形成する第1工程と、
エポキシ樹脂を主成分とする主剤と硬化剤と骨材とを混合して、流動性を有する充填材を得る第2工程と、
前記第2工程で得られた充填材を、前記下開孔を通してかつ該下開孔付近の高さ位置から流下させつつ前記固定支柱内に供給することにより、前記固定支柱内に存在する滞留水を該充填材で置換させつつ該下開孔から排出させて、該充填材を該下開孔の下端位置まで充填する第3工程と、
前記第3工程の後に、前記固定支柱内に充填された前記充填材を所定時間以上養生する第4工程と、
前記第4工程での養生中に、前記固定支柱内に充填された前記充填材の上面が前記下開孔の下端位置よりも沈降したか否かを確認する第5工程と、
前記固定支柱内に充填された前記充填材の上面が前記下開孔の下端位置よりも沈降したことが前記第5工程で確認されたときに、前記第2工程で得られた充填材を、前記下開孔を通して該下開孔の下端位置まで追加的に充填する第6工程と、
前記第5工程または前記第6工程の後に、通気性を有すると共に前記固定支柱内の水を排水可能な排水通気キャップで前記下開孔を施蓋する第7工程と、
前記固定支柱の上部に対して上開孔を形成して、該上開孔と前記下開孔とを通して前記固定支柱内を外気が循環可能に設定する第8工程と、
前記上開孔を、通気性を有すると共に前記固定支柱内への水の浸入を防止する防水通気キャップで施蓋する第9工程と、
を備え、
前記第3工程での前記充填材の充填を、充填用ノズルの先端を前記下開孔に浅く挿入した状態でもって、該充填材の充填状況を該下開孔を通して確認しつつ行う、
ようにしてある。
In order to achieve the above object, the following solution is adopted in the present invention. That is,
It is a column base repair method in a fall prevention handrail in which the lower part of the fixed column made cylindrical is embedded in the housing,
A first step of forming a lower hole for a low position in the vicinity of the housing of the fixed support;
A second step of mixing a main agent mainly composed of an epoxy resin, a curing agent, and an aggregate to obtain a filler having fluidity;
By supplying the filler obtained in the second step into the fixed strut while flowing down from the height position near the lower opening through the lower opening, the stagnant water present in the fixed strut A third step of discharging from the lower aperture while replacing the filler with the filler, and filling the filler to the lower end position of the lower aperture;
After the third step, a fourth step of curing the filler filled in the fixed support column for a predetermined time or more,
During the curing in the fourth step, a fifth step of confirming whether the upper surface of the filler filled in the fixed strut has settled below the lower end position of the lower aperture,
When it is confirmed in the fifth step that the upper surface of the filler filled in the fixed strut has settled below the lower end position of the lower aperture, the filler obtained in the second step, A sixth step of additionally filling through the lower aperture to the lower end position of the lower aperture;
After the fifth step or the sixth step, a seventh step of covering the lower opening with a drainage ventilation cap that has air permeability and can drain the water in the fixed support column;
An eighth step of forming an upper opening with respect to the upper portion of the fixed column and setting the outside air to be circulated through the fixed column through the upper hole and the lower hole;
A ninth step of covering the upper opening with a waterproof ventilation cap that has air permeability and prevents water from entering the fixed support; and
With
The filling of the filler in the third step is performed while confirming the filling state of the filler through the lower opening with the tip of the filling nozzle being inserted shallowly into the lower opening.
It is like that.
上記解決手法によれば、充填材と滞留水との置換によって滞留水を下開孔から外部に排出するので、滞留水を排水するための吸水ポンプを別途用いる必要のないものとなる。また、充填材は、骨材を含むことから比重が大きいものとなり、このため、下開孔の高さ付近から充填材を充填しても、すみやかに下方へと移動して、空気や滞留水の一部を巻き込むことなく固定支柱の底壁に徐々に堆積させて、最終的に下開孔の下端位置までスムーズに充填材を充填することができる。また、上記解決手法では、下開孔から充填材の充填状況を目視することでき、下開孔から溢れ出る充填材の量を極力少なくすることができ、加えて、固定支柱の穴に通したチューブを利用して固定支柱の底壁付近から充填材を充填する場合に比して、チューブの引き抜きの際に形成される空所の問題ということを考慮する必要がないので、作業性向上の点で好ましいものとなる。さらに、上記解決手法では、充填材が骨材を含む分、充填材が硬化する際に発生する熱量を低減して、固定支柱の膨張を防止あるいは抑制することができ(熱害防止)、さらに躯体損傷の防止にも繋がる。さらに又、充填材が骨材を有することから、充填材の硬化後において固定支柱の根元の強度が高まり、補強効果も期待できる。以上に加えて、充填材が、流動性を有する状態のときに躯体のひび割れ部分等に浸入して、固定支柱内の充填材の上面高さが低下してしまうこともあるが、固定支柱内に充填材を追加的に充填することにより、硬化した状態において充填材を下開孔の下端位置にまで確実に充填しておくことができる(補修後の固定支柱内での結露水や雨水等の滞留防止)。 According to the above solution, the staying water is discharged to the outside through the replacement of the filler and the staying water, so that it is not necessary to separately use a water absorption pump for draining the staying water. In addition, since the filler contains aggregate, it has a large specific gravity. For this reason, even if the filler is filled from the vicinity of the height of the lower opening, the filler quickly moves downward, so that air and stagnant water are present. Can be gradually deposited on the bottom wall of the fixed strut without being partly wound, and finally the filler can be smoothly filled up to the lower end position of the lower opening. Further, in the above solution method, the filling state of the filler can be visually observed from the lower opening, the amount of the filler overflowing from the lower opening can be reduced as much as possible, and in addition, the filler is passed through the hole of the fixed column. Compared to filling the filler from the bottom wall of the fixed column using a tube, there is no need to consider the problem of voids formed when the tube is pulled out. This is preferable in terms. Furthermore, in the above-described solution method, the amount of heat generated when the filler is cured can be reduced by the amount of the filler including the aggregate, thereby preventing or suppressing the expansion of the fixed strut (heat damage prevention). It also leads to the prevention of the body damage. Furthermore, since the filler has an aggregate, the strength of the base of the fixed column is increased after the filler is cured, and a reinforcing effect can be expected. In addition to the above, when the filler is in a fluid state, it may enter the cracked portion of the housing and the top surface height of the filler in the fixed column may decrease. By additionally filling the filler, it is possible to reliably fill the filler to the lower end position of the lower opening in the cured state (condensation water, rainwater, etc. in the fixed column after repair) Prevention).
また、前記支柱根元補修工法について、前記第5工程または前記第6工程の後に、通気性を有すると共に前記固定支柱内の水を排水可能な排水通気キャップで前記下開孔を施蓋する第7工程を備えていることから、下開孔を通して雨水が固定支柱内に浸入してしまう事態を防止しつつ、結露等によって固定支柱内に発生した水を下開孔を通して外部に排出することができる。 Moreover, about the said support | pillar root repair method, after the said 5th process or the said 6th process, it is the 7th which covers the said lower opening with the drainage ventilation cap which has air permeability and can drain the water in the said fixed support | pillar. Since it is equipped with a process , it is possible to discharge the water generated in the fixed column due to condensation or the like through the lower hole while preventing rainwater from entering the fixed column through the lower hole. .
さらに、前記支柱根元補修工法について、前記固定支柱の上部に対して上開孔を形成して、該上開孔と前記下開孔とを通して前記固定支柱内を外気が循環可能に設定する第8工程を備えていることから、固定支柱内において上下の貫通孔を通して外気が循環されることにより固定支柱内が極力乾燥状態に保持されて、内部からの腐食を防止あるいは抑制する上で好ましいものとなる。 Furthermore , in the base repair method, an upper opening is formed in the upper part of the fixed support, and the inside of the fixed support is set to be circulated through the upper opening and the lower opening. from that it comprises a step, by the fixed post is held in the utmost dry state by outside air is circulated through the upper and lower through-holes in a fixed post, and preferred on preventing or inhibiting corrosion from the inside Become.
さらに又、前記支柱根元補修工法について、前記上開孔を、通気性を有すると共に前記固定支柱内への水の浸入を防止する防水通気キャップで施蓋する第9工程を備えていることから、上開孔を通して雨水が固定支柱内に浸入してしまう事態を防止する上で好ましいものとなる。
以上に加えて、前記第3工程での前記充填材の充填を、充填用ノズルの先端を前記下開孔に浅く挿入した状態でもって、該充填材の充填状況を該下開孔を通して確認しつつ行うことから、下開孔から溢れ出る充填材の量を極力少なくすることができる。
Still further, for the strut root repair method, the on opening, from the fact that e Bei a ninth step of lidding waterproof breathable caps to prevent the ingress of water into the fixed within strut with an air-permeable, This is preferable in preventing a situation where rainwater enters the fixed support through the upper opening.
In addition to the above, the filling of the filling material in the third step is confirmed through the lower opening with the filling nozzle being inserted with the tip of the filling nozzle shallowly into the lower opening. Therefore, the amount of the filler overflowing from the lower opening can be reduced as much as possible.
前記解決手法を前提とした好ましい態様は、次のとおりである。
前記支柱根元補修工法について、前記硬化剤が、アミン系を主成分とし、
前記骨材が、シリカを主成分としている、
ようにすることができる。この場合、充填材として、入手容易な汎用品を用いた成分構成とすることができる。
A preferred mode based on the above solution is as follows.
For the strut base repair method, the curing agent is mainly amine-based,
The aggregate is mainly composed of silica,
Can be. In this case, it can be set as the component structure using an easily available general purpose product as a filler.
本発明によれば、別途吸水ポンプを用いることなく固定支柱内の滞留水を外部に排出でき、且つ充填材注入の作業性に優れたものとなり、また、補修に用いた充填材により固定支柱の根元部分の大きな発熱や膨張を伴わず、さらには補強効果を得ることができるものとなる。 According to the present invention, it is possible to discharge the stagnant water in the fixed column without using a separate water pump, and the workability of filling the filler is excellent, and the fixed column is fixed by the filler used for repair. The base portion is not accompanied by large heat generation and expansion, and a reinforcing effect can be obtained.
図1において、バルコニ等の躯体1に、墜落防止手すりAが設置されている。この墜落防止手すりAは、躯体1に下部が埋設された複数本の固定支柱10と、固定支柱10に取付けられた囲い部材20とを有する。囲い部材20は、隣合う固定支柱10に配設されるもので、本実施形態では、笠木21および格子材22とで構成されている。笠木21は、隣合う固定支柱10の上端部に架渡されると共に、固定具によって固定支柱10に固定されている。また、格子材22は、笠木21の下方位置において、隣合う固定支柱10の間に配設されると共に、固定具によって固定支柱10に固定されている。なお、本実施の形態では、囲い部材20に格子材22が用いられているが、格子材22の代わりにパネル材が用いられ、あるいは格子材とパネル材とが併用されていてもよい。また、囲い部材20としては、笠木21と格子材22等とを一体的に形成したものであってもよい。
In FIG. 1, a fall-preventing handrail A is installed on a
図2に示すように、固定支柱10は、芯材11と支柱本体12とによって構成されている。芯材11は、鉄系金属によって筒状に形成されている(本実施形態では断面略四角形状の角筒)。支柱本体12は、アルミニウム系金属によって筒状(本実施形態では、芯材11の形状に対応して断面略四角形状の角筒)に形成されている。
As shown in FIG. 2, the fixed
本実施形態では、芯材11の上端部が、支柱本体12内における上下方向略中央部の位置に達しており、芯材11の下部が、躯体1の取付孔1a内に深く挿入されている。これに対して、支柱本体12は、その下部が若干取付孔1a内に挿入されているが、その下端が芯材11の下端よりも上方に位置している。なお、支柱本体12内の上端部まで芯材11の上端部が達する等、芯材11と支柱本体12の長さの関係は特に問わないものである。また、芯材11及び支柱本体12は、取付孔1a内に充填されたモルタル2等によって躯体1と一体化されている。
In the present embodiment, the upper end portion of the
次に、本発明方法を用いて固定支柱10を補修する手法について、図2以下を参照しつつ説明する。なお、本発明による補修対象部位が、図1において符号αで示される。また、固定支柱10の補修に際しては、実施形態では、囲い部材20を固定支柱10に取付けたまま行うようにしてある。さらに、図2に示すように、補修前における固定支柱10内の底部には、長年の使用によって雨水が浸入して、滞留水Bが存在しているものとする。
Next, a method for repairing the fixed
まず、固定支柱10のうち躯体1近傍の低い位置に対して、ドリル加工等によって下開孔31が形成される。下開孔31が形成された直後の状態が図3に示される。このように、下開孔31は、固定支柱10の側面(格子材22側)に形成されることが好ましい。
First, a
この後、図4に示すように、下開孔31を通して、例えば手動式の充填用ノズル41によって、充填材が固定支柱10内に注入される。充填用ノズル41から吐出された充填材が符号Cで示され、固定支柱10内で流下(落下)する充填材Cが一点鎖線の矢印で示され、固定支柱10内に堆積された充填材が符号Dで示される。充填材Cは、後述するが、エポキシ樹脂を主成分とする主剤と硬化剤と骨材との混合物とされて、十分な流動性を有すると共に、骨材を含有することから比重が従来の硬化性樹脂(エポキシ樹脂)の比重に比して十分に大きくなっている。
Thereafter, as shown in FIG. 4, the filler is injected into the fixed
充填材Cは、固定支柱10内に充填される直前に用意するのが好ましい。すなわち、エポキシ樹脂を主成分とする主剤と硬化剤とが混合され、この混合物にさらに骨材が混合されて充填材Cが得られ、この充填材Cが充填用ノズル41に充填される。なお、充填材Cについては後述する。
The filler C is preferably prepared immediately before being filled into the fixed
充填材Cを固定支柱10内に注入する際には、充填用ノズル41の先端41aを下開孔31内に浅く挿入した状態で行われる。このとき。充填用ノズル41の先端41aの高さ位置は、下開孔31の下端位置と同じかそれよりも高い位置に維持される。
When injecting the filler C into the fixed
充填用ノズル41から吐出された充填材Cは、滞留水Bを通して固定支柱10の底壁上に徐々に堆積されていく。固定支柱10内への充填材Cの充填の進行に伴って、固定支柱10内の滞留水Bの水面が徐々に上昇されて、やがて、下開孔31から外部へ排出され始める。充填用ノズル41からの充填材Cの充填状況と、下開孔31を通しての滞留水Bの排出状況とが、下開孔31から目視によって容易に確認することができる。
The filler C discharged from the filling
充填材Cの供給は、固定支柱10内に充填された充填材Dの上面が、下開孔31の下端位置に達するまで行われる。充填材Dが下開孔31の下端位置まで充填された状態が、図5に示される。滞留水Bは、その全量が下開孔31を通して外部へ排出された状態とされる。充填材Cを固定支柱10内に供給する際に、充填材Cの比重が大きいことから、空気や滞留水の一部を巻き込むことなく、滞留水Bとの置換がスムーズに行われる。また、下開孔31から充填材Dの充填状況を目視することでき、下開孔31から溢れ出る充填材の量を極力少なくすることができる。
The supply of the filler C is performed until the upper surface of the filler D filled in the fixed
充填材Dの充填が完了した図5の状態で、所定時間以上(本実施形態では24時間以上)養生される。この養生後は、充填材Dが十分に硬化された状態となる。この養生を行っている間、固定支柱10内に充填された充填材Dは、流動性を有する状態のときに、躯体1のひび割れ等の部分に浸入して、その上面高さ位置が、下開孔31の下端位置よりも低くなる場合がある。そのため、養生中において、固定支柱10内に充填された充填材Dの上面が下開孔31の下端位置よりも沈降したか否かを確認する。例えば、最初に充填材Dの充填が完了してから数時間後に、充填材D上面の沈降の有無を確認する。そして、充填材Dの上面の沈下が確認された場合は、充填材Dの高さ低下分だけ、充填用ノズル41から、下開孔31を通して固定支柱10内に充填材Cが充填(補充)されて、充填材Dの上面が下開孔31の下端位置とされる。
In the state of FIG. 5 in which the filling of the filler D is completed, curing is performed for a predetermined time or longer (24 hours or longer in the present embodiment). After this curing, the filler D is sufficiently cured. During this curing, the filler D filled in the fixed
充填材Dが硬化した状態で、図5に示すように、固定支柱10の上部に上開孔32が例えばドリル加工等によって形成される。このように、上開孔32は、固定支柱10の側面(格子材22側)に形成されることが好ましい。この後、図6に示すように、下開孔31に対して排水通気キャップ33が取付けられ、上開孔32に対して防水通気キャップ34が取付けられる。また、下開孔31に対する排水通気キャップ33の取付けは、固定支柱10内に充填された充填材Dの上面が下開孔31の下端位置よりも沈降したか否かを確認し、充填材Dの上面の沈降が認められない状態であれば、適宜のタイミングで行うことができる。
In the state where the filler D is cured, as shown in FIG. 5, the
排水通気キャップ33および防水通気キャップ34は、例えば略L字状とされた短尺の合成樹脂製のパイプ材を利用して形成されて、その一端側の開口部が各貫通孔31、32に嵌合、係止され、その他端側の開口部が下向き状態とされる。排水通気キャップ33および防水通気キャップ34が取付けられた図6の状態が、固定支柱10の根元の補強が完了した状態となる。実施形態では、各貫通孔31、32は互いに同一径とされて、各通気キャップ33、34は共通のものが用いられている。
The drain ventilation cap 33 and the
各通気キャップ33、34によって、固定支柱10内に雨水が浸入することが防止される。固定支柱10内において上下の貫通孔31、32を通して外気が循環されることから、固定支柱10内が極力乾燥状態に保持されて、内部からの腐食が防止あるいは抑制される。固定支柱10内において結露等によって水が発生しても、固定支柱10内の水は、下開孔31から排水通気キャップ33を通して外部に排出される。
The ventilation caps 33 and 34 prevent rainwater from entering the fixed
充填材Cが骨材を含むことから、固定支柱10の根元の補強効果も得られることになる。また、充填材Cが骨材を含むことから、その分固定支柱10内の充填材Dが硬化していく過程における発熱を抑制することができる(固定支柱10の膨張防止あるいは抑制)。
Since the filler C contains aggregate, the reinforcing effect of the base of the fixed
さらに、充填材Cは、従来の硬化性樹脂(エポキシ樹脂)に比して比重が大きくなる骨材を含むことから、下開孔31の高さ付近から固定支柱10内に充填されたときに、すみやかに(スムーズ)に固定支柱10の底壁へ向けて移動して、空気や滞留水Bの一部を巻き込むことなく、滞留水Bとの置換が確実に行われることになる。
Furthermore, since the filler C includes an aggregate having a specific gravity larger than that of a conventional curable resin (epoxy resin), when the filler C is filled into the fixed
さらに又、上述の支柱根元補修工法では、固定支柱10内に奥深くチューブを差し込んで固定支柱10の底壁付近から充填材を充填していく手法に比して、充填材の充填作業も容易となる。すなわち、下開孔31に通したチューブを利用して充填材を固定支柱10の底壁付近から充填する場合には、充填材を所定高さまで充填した後にチューブを引き抜く際に、チューブが引き抜かれた部分が空所となることから、この空所分の充填材をさらに充填しつつチューブの引き抜き作業を慎重に行う必要があるが、本発明ではこのような作業が不要となり、固定支柱10の下開孔31から多くの充填材Dが溢れ出ることもないので、充填材Cの充填作業や作業後の後始末も容易となる。勿論、滞留水Bを除去するための吸引ポンプのような大型の機器も必要としない。
Furthermore, in the above-mentioned column base repair method, the filling material can be filled more easily than the method of inserting the tube deeply into the fixed
なお、上開孔32を形成する時期は適宜選択することができ、例えば、固定支柱10内に充填された充填材Dの養生を行っている期間に上開孔32を形成したり(養生期間の有効利用)、下開孔31を形成する直前または直後に上開孔32を形成することもできる(孔あけ作業を2箇所まとめて行うことによる作業効率の向上)。
The timing for forming the
ここで、充填材Cは、エポキシ樹脂を主成分とする主剤と、アミン系を主成分とする硬化剤と、シリカを主成分とする骨材との混合物とされる。主剤と硬化剤との割合は、重量比で、例えば主剤2に対して硬化剤1とすることができる。また、骨材としては、シリカを主成分として、このシリカに対して複数種の金属酸化物を混合したものを用いることができる。複数種の金属酸化物として、例えば、酸化アルミ、酸化鉄、酸化カルシウム、酸化マグネシウム、酸化ナトリウム及び酸化カリウムの混合物を用いている。このような骨材は微粉末状とされている(例えば粒径が0.01μm〜0.03μm)。主剤と硬化剤との混合物と骨材との割合は、重量比で、例えば、主剤と硬化剤との合計1に対して骨材1とすることができる。
Here, the filler C is a mixture of a main agent mainly composed of an epoxy resin, a curing agent mainly composed of an amine, and an aggregate mainly composed of silica. The ratio of the main agent and the curing agent can be, for example, the curing
充填材Cに占める骨材の割合は、比重を大きくするという観点から、重量比で30%以上、好ましくは40%以上とするのが好ましい。また、骨材の割合が多くなり過ぎると十分な流動性が得られにくいことから、充填材Cに占める骨材の割合は、重量比で70%以下、好ましくは60%以下とするのが好ましい。 From the viewpoint of increasing the specific gravity, the ratio of the aggregate to the filler C is preferably 30% or more, and preferably 40% or more by weight. Moreover, since it is difficult to obtain sufficient fluidity when the proportion of the aggregate is too large, the proportion of the aggregate in the filler C is preferably 70% or less, and preferably 60% or less in weight ratio. .
以上実施形態について説明したが、本発明は実施形態に限らず、特許請求の範囲に記載された範囲で適宜変更することができる。 Although the embodiment has been described above, the present invention is not limited to the embodiment, and can be appropriately changed within the scope described in the claims.
本発明は、ベランダ、階段、廊下、屋上等に設置された墜落防止手すりの固定支柱の補修に利用することができる。 INDUSTRIAL APPLICATION This invention can be utilized for repair of the fixed support | pillar of the fall prevention handrail installed in the veranda, the staircase, the corridor, the rooftop.
A:墜落防止手すり
B:滞留水
C:充填材
D:固定支柱内に堆積する充填材
1:躯体
1a:取付孔
2:モルタル
10:固定支柱
11:芯材
12:支柱本体
20:囲い部材
21:笠木
22:格子材
31:下開孔
32:上開孔
33:排水通気キャップ(下側)
34:防水通気キャップ(上側)
41:充填用ノズル
41a:充填用ノズルの先端
A: Falling handrail B: Stagnant water C: Filler D: Filler deposited in fixed column 1:
34: Waterproof ventilation cap (upper side)
41: Filling
Claims (2)
前記固定支柱のうち前記躯体の近傍となる低い位置に対して下開孔を形成する第1工程と、
エポキシ樹脂を主成分とする主剤と硬化剤と骨材とを混合して、流動性を有する充填材を得る第2工程と、
前記第2工程で得られた充填材を、前記下開孔を通してかつ該下開孔付近の高さ位置から流下させつつ前記固定支柱内に供給することにより、前記固定支柱内に存在する滞留水を該充填材で置換させつつ該下開孔から排出させて、該充填材を該下開孔の下端位置まで充填する第3工程と、
前記第3工程の後に、前記固定支柱内に充填された前記充填材を所定時間以上養生する第4工程と、
前記第4工程での養生中に、前記固定支柱内に充填された前記充填材の上面が前記下開孔の下端位置よりも沈降したか否かを確認する第5工程と、
前記固定支柱内に充填された前記充填材の上面が前記下開孔の下端位置よりも沈降したことが前記第5工程で確認されたときに、前記第2工程で得られた充填材を、前記下開孔を通して該下開孔の下端位置まで追加的に充填する第6工程と、
前記第5工程または前記第6工程の後に、通気性を有すると共に前記固定支柱内の水を排水可能な排水通気キャップで前記下開孔を施蓋する第7工程と、
前記固定支柱の上部に対して上開孔を形成して、該上開孔と前記下開孔とを通して前記固定支柱内を外気が循環可能に設定する第8工程と、
前記上開孔を、通気性を有すると共に前記固定支柱内への水の浸入を防止する防水通気キャップで施蓋する第9工程と、
を備え、
前記第3工程での前記充填材の充填を、充填用ノズルの先端を前記下開孔に浅く挿入した状態でもって、該充填材の充填状況を該下開孔を通して確認しつつ行う、
ことを特徴とする墜落防止手すりにおける支柱根元補修工法。 It is a column base repair method in a fall prevention handrail in which the lower part of the fixed column made cylindrical is embedded in the housing,
A first step of forming a lower hole for a low position in the vicinity of the housing of the fixed support;
A second step of mixing a main agent mainly composed of an epoxy resin, a curing agent, and an aggregate to obtain a filler having fluidity;
By supplying the filler obtained in the second step into the fixed strut while flowing down from the height position near the lower opening through the lower opening, the stagnant water present in the fixed strut A third step of discharging from the lower aperture while replacing the filler with the filler, and filling the filler to the lower end position of the lower aperture;
After the third step, a fourth step of curing the filler filled in the fixed support column for a predetermined time or more,
During the curing in the fourth step, a fifth step of confirming whether the upper surface of the filler filled in the fixed strut has settled below the lower end position of the lower aperture,
When it is confirmed in the fifth step that the upper surface of the filler filled in the fixed strut has settled below the lower end position of the lower aperture, the filler obtained in the second step, A sixth step of additionally filling through the lower aperture to the lower end position of the lower aperture;
After the fifth step or the sixth step, a seventh step of covering the lower opening with a drainage ventilation cap that has air permeability and can drain the water in the fixed support column;
An eighth step of forming an upper opening with respect to the upper portion of the fixed column and setting the outside air to be circulated through the fixed column through the upper hole and the lower hole;
A ninth step of covering the upper opening with a waterproof ventilation cap that has air permeability and prevents water from entering the fixed support; and
With
The filling of the filler in the third step is performed while confirming the filling state of the filler through the lower opening with the tip of the filling nozzle being inserted shallowly into the lower opening.
A pillar base repair method for fall prevention handrails.
前記骨材が、シリカを主成分としている、
ことを特徴とする請求項1に記載の墜落防止手すりにおける支柱根元補修工法。
The curing agent has an amine as a main component,
The aggregate is mainly composed of silica,
The support | pillar root repair method in the fall prevention handrail of Claim 1 characterized by the above-mentioned.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017021941A JP6343046B1 (en) | 2017-02-09 | 2017-02-09 | Repair method for the base of a column in a handrail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017021941A JP6343046B1 (en) | 2017-02-09 | 2017-02-09 | Repair method for the base of a column in a handrail |
Publications (2)
Publication Number | Publication Date |
---|---|
JP6343046B1 true JP6343046B1 (en) | 2018-06-13 |
JP2018127832A JP2018127832A (en) | 2018-08-16 |
Family
ID=62556021
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017021941A Active JP6343046B1 (en) | 2017-02-09 | 2017-02-09 | Repair method for the base of a column in a handrail |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6343046B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395796A (en) * | 2020-04-09 | 2020-07-10 | 杭州摩亚机械科技有限公司 | Nail hole repair equipment |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09291510A (en) * | 1996-04-26 | 1997-11-11 | Takeshi Watanabe | Reinforcing method for reinforced concrete pillar |
JPH10182796A (en) * | 1996-08-26 | 1998-07-07 | Kenichi Yasuda | Epoxy resin composition |
JPH11131807A (en) * | 1997-10-31 | 1999-05-18 | Toda Constr Co Ltd | Concrete packing method and system for controlling the same |
JP2001240632A (en) * | 2000-02-25 | 2001-09-04 | Mitsui Chemicals Inc | Curable resin composition |
JP2004150134A (en) * | 2002-10-30 | 2004-05-27 | Taiheiyo Material Kk | Repair method and construction method |
JP2005213740A (en) * | 2004-01-27 | 2005-08-11 | Sogo Housing Service Kk | Method for repairing post |
JP2006316585A (en) * | 2005-05-16 | 2006-11-24 | Kenichi Yasuda | Anticorrosive reinforcing method of steel pipe column |
JP2007262697A (en) * | 2006-03-28 | 2007-10-11 | Naka Ind Ltd | Rainwater entry preventive cap in strut hole |
JP2009270401A (en) * | 2008-05-12 | 2009-11-19 | Konishi Co Ltd | Reinforcing method of metallic hollow column |
JP2010133166A (en) * | 2008-12-05 | 2010-06-17 | Sanwa Alum Kogyo Kk | Method for repairing metal hollow support |
JP2012233036A (en) * | 2011-04-28 | 2012-11-29 | Mitsubishi Rayon Co Ltd | Resin mortar composition |
JP2014095177A (en) * | 2012-11-07 | 2014-05-22 | Tajima Roofing Inc | Cap for column hole and repairing method for column |
JP2016041639A (en) * | 2014-08-19 | 2016-03-31 | 日米レジン株式会社 | Resin mortar |
-
2017
- 2017-02-09 JP JP2017021941A patent/JP6343046B1/en active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09291510A (en) * | 1996-04-26 | 1997-11-11 | Takeshi Watanabe | Reinforcing method for reinforced concrete pillar |
JPH10182796A (en) * | 1996-08-26 | 1998-07-07 | Kenichi Yasuda | Epoxy resin composition |
JPH11131807A (en) * | 1997-10-31 | 1999-05-18 | Toda Constr Co Ltd | Concrete packing method and system for controlling the same |
JP2001240632A (en) * | 2000-02-25 | 2001-09-04 | Mitsui Chemicals Inc | Curable resin composition |
JP2004150134A (en) * | 2002-10-30 | 2004-05-27 | Taiheiyo Material Kk | Repair method and construction method |
JP2005213740A (en) * | 2004-01-27 | 2005-08-11 | Sogo Housing Service Kk | Method for repairing post |
JP2006316585A (en) * | 2005-05-16 | 2006-11-24 | Kenichi Yasuda | Anticorrosive reinforcing method of steel pipe column |
JP2007262697A (en) * | 2006-03-28 | 2007-10-11 | Naka Ind Ltd | Rainwater entry preventive cap in strut hole |
JP2009270401A (en) * | 2008-05-12 | 2009-11-19 | Konishi Co Ltd | Reinforcing method of metallic hollow column |
JP2010133166A (en) * | 2008-12-05 | 2010-06-17 | Sanwa Alum Kogyo Kk | Method for repairing metal hollow support |
JP2012233036A (en) * | 2011-04-28 | 2012-11-29 | Mitsubishi Rayon Co Ltd | Resin mortar composition |
JP2014095177A (en) * | 2012-11-07 | 2014-05-22 | Tajima Roofing Inc | Cap for column hole and repairing method for column |
JP2016041639A (en) * | 2014-08-19 | 2016-03-31 | 日米レジン株式会社 | Resin mortar |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395796A (en) * | 2020-04-09 | 2020-07-10 | 杭州摩亚机械科技有限公司 | Nail hole repair equipment |
Also Published As
Publication number | Publication date |
---|---|
JP2018127832A (en) | 2018-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6343046B1 (en) | Repair method for the base of a column in a handrail | |
JP4811684B2 (en) | Repair method for metal hollow struts | |
KR102033453B1 (en) | Method for Construction Threshold of Gate for Elevator Cabin | |
KR101654332B1 (en) | Maintenance apparatus for Brick wall and maintenance method of brick wall using the same | |
CN207846904U (en) | A kind of concrete prefabricated stairs of accurate positioning | |
CN106232917B (en) | Cable anchor mechanism for horizontal joint and the cable anchorage method for horizontal joint | |
JP6341027B2 (en) | Floor slab widening method | |
JP5130565B2 (en) | Reinforcing method for metal hollow struts | |
JP2006316585A (en) | Anticorrosive reinforcing method of steel pipe column | |
CN208280577U (en) | A kind of adjustable built-in fitting | |
KR101766453B1 (en) | Lightning Rod For Thunderbolt Prevention | |
CN110700679B (en) | Secondary pouring method for tower foot of communication iron tower | |
JP3743721B2 (en) | Repair method of prop | |
JP4180899B2 (en) | Replacement of corrosion-deteriorated handrails by reusing existing driving anchor material and its construction method | |
JP4926866B2 (en) | Rehabilitation method and reinforcement structure of aging mortar spray slope and slope stabilization method | |
JP2008121423A (en) | Slope stabilizing method for suppressing sediment outflow and surface layer sediment outflow suppressing member used for the same | |
JP5626767B2 (en) | Processing method for upper end of PC tendon | |
CN108661031B (en) | Damaged grouting repair method for rod piece in guide pipe frame splashing area | |
JP6564623B2 (en) | Reinforcing method and structure of reinforced concrete structure | |
CN218117184U (en) | Wall connecting piece and wall surface connecting and mounting structure | |
CN211037899U (en) | Concrete placement for building faces limit protector | |
KR101035568B1 (en) | Construction method of anchor and casing for the same | |
JP3506379B2 (en) | Mounting method and mounting device for protective fence for concrete buildings | |
WO2019164407A1 (en) | Perforated mast mount | |
JP3173928U (en) | Reaction force structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180406 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180515 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180517 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6343046 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |