[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP4272461B2 - Equipment remote monitoring system and report generation method in equipment remote monitoring system - Google Patents

Equipment remote monitoring system and report generation method in equipment remote monitoring system Download PDF

Info

Publication number
JP4272461B2
JP4272461B2 JP2003102387A JP2003102387A JP4272461B2 JP 4272461 B2 JP4272461 B2 JP 4272461B2 JP 2003102387 A JP2003102387 A JP 2003102387A JP 2003102387 A JP2003102387 A JP 2003102387A JP 4272461 B2 JP4272461 B2 JP 4272461B2
Authority
JP
Japan
Prior art keywords
operation data
inspection time
remote monitoring
equipment
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003102387A
Other languages
Japanese (ja)
Other versions
JP2004310390A (en
Inventor
智也 谷井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2003102387A priority Critical patent/JP4272461B2/en
Publication of JP2004310390A publication Critical patent/JP2004310390A/en
Application granted granted Critical
Publication of JP4272461B2 publication Critical patent/JP4272461B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、センタから遠隔地に設置された冷凍、空調等の設備の運転状態を監視する設備運転データ収集装置と、センタに設置され、設備運転データ収集装置から送られてくる設備の運転データに基づきレポートを生成する遠隔監視装置とを有する設備遠隔監視システム、特にレポートを生成する際に用いる運転データの取り扱いの改良に関する。
【0002】
【従来の技術】
図3は、冷凍、空調等の設備の運転状態を監視する設備遠隔監視システムの一般的な全体構成図である。図3において、センタ10には、遠隔地に設置された設備1の運転状態を監視すると共に設備の運転データに基づき日報を生成する遠隔監視装置11が設置されている。一方、設備1が設置されている遠隔地(以下、「ローカル」という)20には、設備1の1乃至複数の部位に取り付けたセンサ2によって温度・圧力などを検出し、これらの検出されたデータをADコンバータ3を介して収集する遠隔監視機能付きデータ収集装置(以下「設備運転データ収集装置」という)4が設置されている。設備運転データ収集装置4が収集する温度等のデータを総称して運転データということにすると、運転データは、モデム5、公衆回線網6、モデム12を介して遠隔監視装置11へ送られる。遠隔監視装置11は、送られてきた運転データに基づき日報を生成し、これをモデム13、公衆回線網6、モデム7を介して設備1と同じローカル20に設置されたパーソナルコンピュータ(PC)8へ電子メールを利用するなどして送信する。なお、遠隔監視装置11は、通常、契約により複数箇所のローカルに設置の設備運転データ収集装置4及びPC8と接続されるが、各ローカル20に配設する装置の基本構成は、設備1の設置数に関わらず同様であるために図3には1カ所のローカル20のみ図示した。
【0003】
ここで、運転データを収集してから日報がPC8へ送られるまでに行われる従来の処理の流れについて説明する。
【0004】
ローカル20において、設備運転データ収集装置4は、センサ2により検出された運転データを、例えば1分毎のように定期的に収集し内部に蓄積する。遠隔監視装置11は、設備運転データ収集装置4が収集した運転データを、例えば1時間毎のように定期的に収集し内部に蓄積する。遠隔監視装置11は、このように各設備の運転データの収集、蓄積処理を定期的に繰り返し行う。そして、予め決められた期間、この場合は日報を生成するので1日という単位のデータ収集期間において運転データを収集すると、遠隔監視装置11は、蓄積した運転データに基づき平均処理等のデータ処理を施して設備単位あるいはローカル単位に日報を自動生成する。そして、生成した日報を上記の通りPC8へ送信する。
【0005】
【発明が解決しようとする課題】
しかしながら、従来においては、設備運転データ収集装置によりデータ収集期間内において定期的に収集された運転データ全てがローカルからセンタに対して定期的に送信されることになるため、公衆回線を介してデータ送信を行うときの通信コストの高騰を招く。更に、遠隔監視装置は、各ローカルから送信されてくる運転データを日報を生成するまでの間、蓄積しなければならないため、センタに膨大なデータ記憶手段を設けなければならなかった。これらの問題は、監視対象とする設備の増加に伴いより顕著になる。
【0006】
本発明は以上のような問題を解決するためになされたものであり、その目的は、設備の運転データに基づく日報等のレポートをより好適に生成することのできる設備遠隔監視システムにおけるレポート生成方法を提供することにある。
【0007】
【課題を解決するための手段】
以上のような目的を達成するために、本発明に係る設備遠隔監視システムにおけるレポート生成方法は、センタに設置された遠隔監視装置と、前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置とを有する設備遠隔監視システムにおけるレポート生成方法において、前記設備運転データ収集装置は、収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信ステップと、予め設定された点検時刻に設備が運転されていないときには、設備運転中の期間を検出し、その検出した期間のうち予め設定された点検時刻に最も近い期間における中央点を点検時刻として設定する点検時刻設定ステップと、を含み、前記運転データ送信ステップは、前記点検時刻設定ステップにより点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信するものである。
【0008】
また、本発明に係る設備遠隔監視システムにおけるレポート生成方法は、センタに設置された遠隔監視装置と、前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置とを有する設備遠隔監視システムにおけるレポート生成方法において、前記設備運転データ収集装置は、収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信ステップと、予め設定された点検時刻に設備が運転されていないときには、予め設定された運転中検索対象期間において設備運転中の期間を検出し、その検出した期間内における中央点を点検時刻として設定する点検時刻設定ステップと、を含み、前記運転データ送信ステップは、前記点検時刻設定ステップにより点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信するものである。
【0009】
本発明に係る設備遠隔監視システムは、センタに設置された遠隔監視装置と、前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置とを有する設備遠隔監視システムにおいて、前記設備運転データ収集装置は、収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信手段と、予め設定された点検時刻に設備が運転されていないときには、設備運転中の期間を検出し、その検出した期間のうち予め設定された点検時刻に最も近い期間における中央点を点検時刻として設定する点検時刻設定手段と、を有し、前記運転データ送信手段は、前記点検時刻設定手段により点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信するものである。
【0010】
また、本発明に係る設備遠隔監視システムは、センタに設置された遠隔監視装置と、前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置と、を有する設備遠隔監視システムにおいて、前記設備運転データ収集装置は、収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信手段と、予め設定された点検時刻に設備が運転されていないときには、予め設定された運転中検索対象期間において設備運転中の期間を検出し、その検出した期間内における中央点を点検時刻として設定する点検時刻設定手段と、を有し、前記運転データ送信手段は、前記点検時刻設定手段により点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信するものである
【0011】
【発明の実施の形態】
以下、図面に基づいて、本発明の好適な実施の形態について説明する。なお、本実施の形態における設備遠隔監視システムの全体構成は、従来と同じでよいため図3をそのまま用いることにする。本実施の形態は、設備運転データ収集装置4の機能構成と、設備運転データ収集装置4との通信回数、送られてくる運転データの構成の相違に伴う遠隔監視装置11における日報生成処理の内容が異なる。
【0012】
図1は、本実施の形態における設備運転データ収集装置4のブロック構成図である。本実施の形態における設備運転データ収集装置4は、データ収集部41、データ保持部42、データ管理部43及びデータ送信部44を有している。データ収集部41は、設備1に取り付けたセンサ2により検出された温度・圧力等の運転データを、ADコンバータ3を介して収集し、データ保持部42に蓄積していく。データ管理部43は、データ保持部42に蓄積された運転データをデータ送信部44に送信させるが、本実施の形態においては、予め設定された点検時刻における運転データのみをセンタ10へ送信するようにしたことを特徴の1つとしている。更に、予め設定された点検時刻に設備が運転されていないときには、予め決められた規則に従い特定した設備運転中の時刻を点検時刻として設定し、その設定した点検時刻における運転データのみをセンタ10へ送信するようにしたことを他の特徴としている。
【0013】
前述したように、本実施の形態では、遠隔監視装置11に日報を生成させる前に点検時刻を予め設定しておく必要がある。従来における日報生成処理は、設備運転データ収集装置4により収集された運転データ全てがセンタ10へ送信され、センタ10では、送られてきた時系列の運転データに基づき平均値を求めたりしているが、設備1の運転状態を知るためのデータとしては、ある時点において実測した運転データあるいは運転データの遷移をもって設備日報として扱っている。つまり、設備1の運転状態の監視という観点からすると、時々刻々と変化する実測値の平均値は、実際にはあまり意味を持たない。そこで、収集した運転データ全てをセンタ10に送信し、センタ10において日報に載せる運転データを抽出させるのではなく、本実施の形態では、日報の生成に必要な運転データの抽出をローカル20において実施させるようにした。すなわち、日報に載せる運転データのみをセンタ10へ送信するようにすることでデータ送信量を削減するようにした。これにより、公衆回線網6を介してデータ送信を行う場合、通信コストの削減を図ることができる。また、センタ10においては、日報に掲載する必要最小限の運転データのみが送られてくるので、日報を生成するまでに蓄積しておくデータ量を大幅に削減することができ、また、送られてきた運転データの中から日報生成に用いる運転データを抽出する必要もないので、より簡単な処理で日報を生成することができる。
【0014】
このように、本実施の形態においては、運転データの収集時刻を指定することでセンタ10へ送信する運転データを特定しているが、この送信する運転データを収集する時刻を点検時刻と称している。点検時刻及びデータ収集期間(日報の場合は「1日」)における点検時刻の設定数は、監視対象の設備1の種別や諸元、特性あるいは運用等によって任意に設定することができる。更に、センタ10における処理能力やシステム全体の設備1の数等を参照にして設定すればよいが、基本的には1日に1回乃至4回の点検時刻を設定することが望ましい。なお、本実施の形態では、データ管理部43が点検時刻の設定処理を行い、設定された内容を内部に保持することにしている。
【0015】
次に、運転データを収集してから日報がPC8へ送られるまでに行われる本実施の形態における処理の流れについて説明する。
【0016】
ローカル20において、設備運転データ収集装置4のデータ収集部41は、センサ2により検出された運転データを収集し内部に蓄積する。本実施の形態の場合、点検時刻は予め特定されているので、最小限点検時刻の運転データをデータ保持部42に蓄積すればよい。点検時刻において収集された運転データは、センタ10へ送信されるが、複数の点検時刻が設定された場合、通信効率やコストを考慮すると、1日の最後の点検時刻における運転データ収集後に1日分の運転データをまとめて送信することが望ましい。上記の設備運転データ収集装置4における処理は、点検時刻を予め設定しておくことで自動的に実行させることができる。
【0017】
遠隔監視装置11は、設備運転データ収集装置4から送信されてくる運転データを内部にいったん保持するが、各ローカル20からは点検時刻の運転データのみが送られてくるので、データ記憶量は従来に比べて大幅に削減される。そして、運転データに基づいて特別なデータ加工や編集を行うことなく日報を生成し、これをモデム13、公衆回線網6、モデム7を介して設備1と同じローカル20に設置されたPC8へ電子メールを利用するなどして送信する。
【0018】
本実施の形態によれば、以上のように点検時刻を予め設定することで日報の作成に用いる運転データを設備運転データ収集装置4において特定して送信するようにしたので、センタ10へ送信するデータ量を削減することができる。これにより、公衆回線網6を介したときの通信コストの削減を図ることができる。また、センタ10における日報生成処理では、運転データの記憶量を削減することができ、また、日報の生成に用いる運転データを送られてきた運転データの中から抽出する必要がなく日報生成処理を効率的に行うことができる。
【0019】
ところで、上記説明においては、点検時刻において設備1が運転中であることを前提に説明した。しかしながら、何らかの原因により点検時刻に設備1が停止している場合もあり得る。もし、運転中でなければ、そのときに収集した運転データは有効でないため、この運転データに基づく日報は何の意味もなさない。
【0020】
そこで、本実施の形態では、このような場合、以下のように処理する。
【0021】
すなわち、データ管理部43は、設備1への電力供給若しくは電力消費等を監視することで設備1の運転中か否かという運転状況を常時監視している。図2は、設備の運転状況を示した図である。図2(a)に示したように、予め設定した点検時刻Tにおいて設備1が運転中であるときには、前述したように、その時点における運転データをセンタ10へ送信すればよい。ここで、もし、図2(b)に例示したように、点検時刻Tにおいて設備1が運転中でなかったときのことを考慮して次のように処理する。まず、点検時刻Tを設定すると、これに応じて運転中検索対象期間という期間も併せて設定する。本実施の形態では、点検時刻を中心とした前後10分、合計20分間を運転中検索対象期間と設定する。運転中検索対象期間は、監視対象とする設備1の運転特性、生成するレポートの種類(ここでの例では日報)等によって適切な期間を設定すればよい。
【0022】
点検時刻Tにおいて設備1が運転中でなかったとき、データ管理部43は、運転中検索対象期間において運転中である時を検出し、その運転中であるときのある時点を点検時刻と設定する。図2(b)のように、運転中である期間があるときは、その運転中であった期間における中央点を点検時刻T’と設定する。また、図2(b)のta,tbのように運転中であった期間が複数存在する場合には、点検時刻Tに近い方を採用する。このように、設備1が予め設定した点検時刻Tに運転されていなかったときには、前述したような予め決められた規則に従い点検時刻をTからT’に変更する。
【0023】
なお、上記においては、点検時刻において設備1が運転中であることを前提に点検時刻の時の運転データを最小限収集し保持すればよいと説明したが、図2(b)に例示したように、点検時刻Tより過去の時刻T’の運転データをセンタ10に送信するためには、少なくとも運転中検索対象期間は定期的に運転データを収集しておく必要がある。
【0024】
本実施の形態によれば、ローカル側において点検時刻を予め設定し、また、設備1の停止を考慮して予め設定した点検時刻を変更することができる。
【0025】
なお、本実施の形態では、日報を生成する場合を例にして説明したが、生成するレポートとして日報に限定する必要はなく、週報、月報、更には異なる種類のレポートであってもよい。更に、各ローカル20は、レポートを生成するために運転データを収集しセンタ10へ送信するようにしたが、他の目的でセンタ10に運転データを収集させる場合にも上記説明した方法は、適用可能であり、上記と同様にデータ通信量の削減等の効果を奏することができる。
【0026】
【発明の効果】
本発明によれば、点検時刻を予め設定することでレポート生成に用いる運転データを設備運転データ収集装置側において特定して送信するようにしたので、運転データを遠隔監視装置へ送信するデータ量を削減することができる。これにより、公衆回線を介してデータを送信する場合には通信コストの削減を図ることができる。
【0027】
また、センタにおける日報生成処理では、運転データの記憶量を削減することができ、また、設備運転データ収集装置からは、レポートの生成に必要な運転データのみが送られてくるので、送られてきた運転データの中から該当する運転データを抽出する必要がなく日報生成処理を効率的に行うことができる。
【図面の簡単な説明】
【図1】 本実施の形態における設備運転データ収集装置のブロック構成図である。
【図2】 本実施の形態において点検時刻の設定方法を説明するために用いる図である。
【図3】 設備遠隔監視システムの一般的な全体構成図である。
【符号の説明】
1 設備、2 センサ、3 ADコンバータ、4 遠隔監視機能付きデータ収集装置(設備運転データ収集装置)、5,7,12,13 モデム、6 公衆回線網、8 PC、10 センタ、11 遠隔監視装置、41 データ収集部、42 データ保持部、43 データ管理部、44 データ送信部。
[0001]
BACKGROUND OF THE INVENTION
The present invention includes an equipment operation data collection device that monitors the operation state of equipment such as refrigeration and air conditioning installed remotely from the center, and equipment operation data that is installed in the center and sent from the equipment operation data collection device. The present invention relates to a facility remote monitoring system having a remote monitoring device for generating a report based on the above, and more particularly to improvement of handling of operation data used when generating a report.
[0002]
[Prior art]
FIG. 3 is a general general configuration diagram of an equipment remote monitoring system that monitors the operating state of equipment such as refrigeration and air conditioning. In FIG. 3, the center 10 is provided with a remote monitoring device 11 that monitors the operating state of the facility 1 installed at a remote place and generates a daily report based on the operation data of the facility. On the other hand, in the remote area 20 where the equipment 1 is installed (hereinafter referred to as “local”), the temperature and pressure are detected by the sensors 2 attached to one or more parts of the equipment 1, and these are detected. A data collection device with a remote monitoring function (hereinafter referred to as “equipment operation data collection device”) 4 for collecting data via the AD converter 3 is installed. When data such as temperature collected by the facility operation data collection device 4 is collectively referred to as operation data, the operation data is sent to the remote monitoring device 11 via the modem 5, the public line network 6, and the modem 12. The remote monitoring device 11 generates a daily report based on the operation data sent, and the personal report (PC) 8 installed in the same local 20 as the equipment 1 through the modem 13, the public line network 6, and the modem 7. Send to e-mail. The remote monitoring device 11 is normally connected to a plurality of locally installed facility operation data collection devices 4 and PCs 8 by contract, but the basic configuration of the device disposed in each local 20 is the installation of the facility 1. Since it is the same regardless of the number, only one local 20 is shown in FIG.
[0003]
Here, the flow of the conventional process performed after collecting operation data until a daily report is sent to PC8 is demonstrated.
[0004]
In the local 20, the facility operation data collection device 4 periodically collects operation data detected by the sensor 2, for example, every minute, and stores it inside. The remote monitoring device 11 periodically collects the operation data collected by the facility operation data collection device 4 and stores it inside, for example, every hour. In this way, the remote monitoring device 11 periodically collects and accumulates the operation data of each facility. When the operation data is collected in a predetermined period, in this case, a daily report is generated in this case, the remote monitoring device 11 performs data processing such as average processing based on the accumulated operation data. To automatically generate daily reports for equipment or local units. Then, the generated daily report is transmitted to the PC 8 as described above.
[0005]
[Problems to be solved by the invention]
However, conventionally, all the operation data periodically collected within the data collection period by the equipment operation data collection device is periodically transmitted from the local to the center. This causes a rise in communication costs when performing transmission. Furthermore, since the remote monitoring device must accumulate the operation data transmitted from each local until the daily report is generated, it has been necessary to provide a huge data storage means in the center. These problems become more conspicuous as the number of facilities to be monitored increases.
[0006]
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to provide a report generation method in a facility remote monitoring system that can more suitably generate reports such as daily reports based on facility operation data. Is to provide.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, the report generation method in the facility remote monitoring system according to the present invention collects the operation data of the remote monitoring device installed in the center and the facility installed in the remote location of the center. In addition, the facility operation data collection device includes a facility operation data collection device that generates a report by transmitting the collected operation data to the remote monitoring device, and the facility operation data collection device includes the collected operation data. An operation data transmission step for extracting only operation data collected at a preset inspection time from the data and transmitting it to the remote monitoring device; and when the equipment is not operated at a preset inspection time Detects the period during which the equipment is in operation, and is closest to the preset inspection time during the detected period An inspection time setting step for setting a central point as an inspection time, and when the inspection time is set by the inspection time setting step, the operation data transmission step is an operation at the set inspection time. Only data is transmitted to the remote monitoring device .
[0008]
The report generation method in the facility remote monitoring system according to the present invention includes a remote monitoring device installed in a center, and collects operation data of the facility installed in a remote place of the center and the collected operation data In a report generation method in a facility remote monitoring system having a facility operation data collection device that generates a report by transmitting to a remote monitoring device, the facility operation data collection device performs a pre-set inspection from the collected operation data An operation data transmission step of extracting only the operation data of the equipment collected at the time and transmitting it to the remote monitoring device, and when the equipment is not operated at a preset inspection time, a preset search target during operation The period during which the equipment is in operation is detected and the central point within the detected period is checked at the inspection time. And includes a check time setting step of setting, the operation data transmission step, when the inspection time by the inspection time setting step is set, the remote monitoring only operation data in the set inspection time To be sent to the device.
[0009]
The facility remote monitoring system according to the present invention collects operation data of a remote monitoring device installed at a center and facilities installed at a remote location of the center and transmits the collected operation data to the remote monitoring device. In the equipment remote monitoring system having the equipment operation data collection device that generates the report by the above, the equipment operation data collection device only collects the operation data of the equipment collected at the preset inspection time from the collected operation data. The operation data transmitting means for extracting and transmitting to the remote monitoring device, and when the equipment is not operating at a preset inspection time, the period during which the equipment is operating is detected, and the preset period of the detected period is set in advance. Inspection time setting means for setting the central point in the period closest to the inspection time as the inspection time, and the operation data transmission Means, if the check time is set by the inspection time setting means is for transmitting only the operation data at the set inspection time to the remote monitoring device.
[0010]
The facility remote monitoring system according to the present invention collects operation data of a remote monitoring device installed in a center and facilities installed in a remote area of the center and sends the collected operation data to the remote monitoring device. An equipment operation data collection device that generates a report by transmitting the equipment operation data collection device, wherein the equipment operation data collection device is configured to collect the equipment operation data collected at a preset inspection time from the collected operation data. The operation data transmitting means for extracting only the operation data and transmitting it to the remote monitoring device, and when the facility is not operated at the preset inspection time, the period during which the facility is operating in the preset during-operation search target period detects includes a check time setting means for setting a central point within the detected period as a check time, wherein the operation Over data transmission unit, when inspection time is set by the inspection time setting means is for transmitting only the operation data at the set inspection time to the remote monitoring device.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings. In addition, since the whole structure of the equipment remote monitoring system in this Embodiment may be the same as the past, it will use FIG. 3 as it is. In the present embodiment, the contents of the daily report generation process in the remote monitoring device 11 according to the difference in the functional configuration of the facility operation data collection device 4, the number of communication with the facility operation data collection device 4, and the configuration of the operation data sent thereto. Is different.
[0012]
FIG. 1 is a block configuration diagram of an equipment operation data collection device 4 in the present embodiment. The equipment operation data collection device 4 in the present embodiment includes a data collection unit 41, a data holding unit 42, a data management unit 43, and a data transmission unit 44. The data collection unit 41 collects operation data such as temperature and pressure detected by the sensor 2 attached to the facility 1 via the AD converter 3 and accumulates it in the data holding unit 42. The data management unit 43 causes the data transmission unit 44 to transmit the operation data accumulated in the data holding unit 42. In the present embodiment, however, only the operation data at a preset inspection time is transmitted to the center 10. This is one of the features. Further, when the equipment is not operated at a preset inspection time, the equipment operation time specified according to a predetermined rule is set as the inspection time, and only the operation data at the set inspection time is sent to the center 10. Another feature is that it is transmitted.
[0013]
As described above, in the present embodiment, it is necessary to set the inspection time in advance before the remote monitoring device 11 generates a daily report. In the conventional daily report generation processing, all the operation data collected by the facility operation data collection device 4 is transmitted to the center 10, and the center 10 obtains an average value based on the transmitted time-series operation data. However, as data for knowing the operation state of the facility 1, the operation data measured at a certain point in time or the transition of the operation data is handled as the facility daily report. That is, from the viewpoint of monitoring the operating state of the facility 1, the average value of the actually measured values that changes from moment to moment is actually not meaningful. Therefore, instead of transmitting all the collected operation data to the center 10 and extracting the operation data to be included in the daily report at the center 10, in this embodiment, the operation data necessary for generating the daily report is extracted at the local 20 I tried to make it. In other words, the amount of data transmission is reduced by transmitting only the operation data included in the daily report to the center 10. Thereby, when data transmission is performed via the public network 6, the communication cost can be reduced. In addition, since only the minimum necessary operation data to be posted in the daily report is sent to the center 10, the amount of data accumulated until the daily report is generated can be greatly reduced. Since it is not necessary to extract the operation data used for daily report generation from the operation data thus obtained, the daily report can be generated by simpler processing.
[0014]
As described above, in the present embodiment, the operation data to be transmitted to the center 10 is specified by specifying the operation data collection time. The time at which the operation data to be transmitted is collected is referred to as the inspection time. Yes. The number of inspection times set in the inspection time and the data collection period (“1 day” in the case of daily reports) can be arbitrarily set according to the type, specifications, characteristics, operation, etc. of the equipment 1 to be monitored. Furthermore, it may be set with reference to the processing capacity in the center 10, the number of facilities 1 in the entire system, etc., but basically it is desirable to set inspection times once to four times a day. In the present embodiment, the data management unit 43 performs the inspection time setting process and holds the set contents therein.
[0015]
Next, the flow of processing in the present embodiment, which is performed from the collection of operation data until the daily report is sent to the PC 8, will be described.
[0016]
In the local 20, the data collection unit 41 of the facility operation data collection device 4 collects the operation data detected by the sensor 2 and stores it inside. In the present embodiment, since the inspection time is specified in advance, the operation data at the minimum inspection time may be accumulated in the data holding unit 42. The operation data collected at the inspection time is transmitted to the center 10. However, when a plurality of inspection times are set, taking into consideration communication efficiency and cost, one day after the operation data collection at the last inspection time of the day. It is desirable to transmit the operation data for the minute. The processing in the equipment operation data collection device 4 can be automatically executed by setting the inspection time in advance.
[0017]
The remote monitoring device 11 once holds the operation data transmitted from the facility operation data collecting device 4 inside, but since only the operation data at the inspection time is sent from each local 20, the data storage amount is conventional. It is greatly reduced compared to. A daily report is generated based on the operation data without any special data processing or editing, and this is electronically transmitted to the PC 8 installed in the same local 20 as the equipment 1 via the modem 13, the public line network 6, and the modem 7. Send using e-mail.
[0018]
According to the present embodiment, the operation data used for creating the daily report is specified and transmitted in the facility operation data collection device 4 by setting the inspection time in advance as described above, and thus transmitted to the center 10. The amount of data can be reduced. Thereby, it is possible to reduce the communication cost via the public line network 6. Further, the daily report generation process in the center 10 can reduce the storage amount of the operation data, and it is not necessary to extract the operation data used for generating the daily report from the operation data sent to the daily report generation process. Can be done efficiently.
[0019]
By the way, in the said description, it demonstrated on the assumption that the installation 1 was driving | operating at the inspection time. However, the equipment 1 may stop at the inspection time for some reason. If it is not in operation, since the operation data collected at that time is not valid, the daily report based on this operation data has no meaning.
[0020]
Therefore, in this embodiment, in such a case, processing is performed as follows.
[0021]
That is, the data management unit 43 constantly monitors the operation status of whether or not the facility 1 is in operation by monitoring power supply to the facility 1 or power consumption. FIG. 2 is a diagram showing the operation status of the equipment. As shown in FIG. 2A, when the equipment 1 is in operation at the preset inspection time T, the operation data at that time may be transmitted to the center 10 as described above. Here, as illustrated in FIG. 2B, the following processing is performed in consideration of the case where the facility 1 is not in operation at the inspection time T. First, when the inspection time T is set, a period called a search target period during operation is also set accordingly. In the present embodiment, a total of 20 minutes before and after the inspection time is set as the in-operation search target period. The search target period during operation may be set to an appropriate period depending on the operation characteristics of the equipment 1 to be monitored, the type of report to be generated (daily report in this example), and the like.
[0022]
When the equipment 1 is not in operation at the inspection time T, the data management unit 43 detects the time of operation during the in-operation search target period, and sets a certain time point during the operation as the inspection time. . As shown in FIG. 2B, when there is a period during operation, the central point in the period during operation is set as the inspection time T ′. In addition, when there are a plurality of operating periods such as ta and tb in FIG. 2B, the one closer to the inspection time T is adopted. As described above, when the facility 1 is not operated at the preset inspection time T, the inspection time is changed from T to T ′ according to the predetermined rule as described above.
[0023]
In the above description, it has been described that the operation data at the inspection time should be collected and held at the minimum on the assumption that the facility 1 is in operation at the inspection time. However, as illustrated in FIG. In addition, in order to transmit the operation data at the time T ′ past the inspection time T to the center 10, it is necessary to collect the operation data periodically at least during the search target period.
[0024]
According to the present embodiment, the inspection time can be set in advance on the local side, and the inspection time set in advance considering the stop of the facility 1 can be changed.
[0025]
In the present embodiment, the case of generating a daily report has been described as an example. However, the report to be generated is not limited to the daily report, and may be a weekly report, a monthly report, or a different type of report. Further, each local 20 collects operation data and transmits it to the center 10 in order to generate a report. However, the method described above can be applied to the case where the center 10 collects operation data for other purposes. It is possible to achieve the effect of reducing the amount of data communication and the like as described above.
[0026]
【The invention's effect】
According to the present invention, since the operation data used for generating the report is specified and transmitted on the facility operation data collection device side by setting the inspection time in advance, the amount of data to be transmitted to the remote monitoring device is reduced. Can be reduced. Thereby, when transmitting data via a public line, it is possible to reduce the communication cost.
[0027]
In addition, the daily report generation process at the center can reduce the amount of operation data stored, and the facility operation data collection device sends only the operation data necessary for report generation. Therefore, it is not necessary to extract corresponding operation data from the operation data, and daily report generation processing can be performed efficiently.
[Brief description of the drawings]
FIG. 1 is a block configuration diagram of an equipment operation data collection device in the present embodiment.
FIG. 2 is a diagram used for explaining a method for setting an inspection time in the present embodiment.
FIG. 3 is a general general configuration diagram of an equipment remote monitoring system.
[Explanation of symbols]
1 equipment, 2 sensors, 3 AD converter, 4 data collection device with remote monitoring function (facility operation data collection device), 5, 7, 12, 13 modem, 6 public line network, 8 PC, 10 center, 11 remote monitoring device , 41 Data collection unit, 42 Data holding unit, 43 Data management unit, 44 Data transmission unit.

Claims (4)

センタに設置された遠隔監視装置と、前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置とを有する設備遠隔監視システムにおけるレポート生成方法において、
前記設備運転データ収集装置は
収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信ステップと、
予め設定された点検時刻に設備が運転されていないときには、設備運転中の期間を検出し、その検出した期間のうち予め設定された点検時刻に最も近い期間における中央点を点検時刻として設定する点検時刻設定ステップと、
を含み、
前記運転データ送信ステップは、前記点検時刻設定ステップにより点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信することを特徴とする設備遠隔監視システムにおけるレポート生成方法。
Collecting operation data of the remote monitoring device installed in the center and the operation data of the facility installed in the remote place of the center and generating the report by transmitting the collected operation data to the remote monitoring device In a report generation method in a facility remote monitoring system having a device,
The facility operation data collection device is :
An operation data transmission step of extracting only the operation data of the equipment collected at a preset inspection time from the collected operation data and transmitting it to the remote monitoring device ;
When the equipment is not operating at the preset inspection time, the period during which the equipment is operating is detected, and the center point in the period closest to the preset inspection time among the detected periods is set as the inspection time A time setting step;
Including
In the operation data transmission step, when the inspection time is set in the inspection time setting step, only the operation data at the set inspection time is transmitted to the remote monitoring device. Report generation method.
センタに設置された遠隔監視装置と、前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置とを有する設備遠隔監視システムにおけるレポート生成方法において、
前記設備運転データ収集装置は
収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信ステップと、
予め設定された点検時刻に設備が運転されていないときには、予め設定された運転中検索対象期間において設備運転中の期間を検出し、その検出した期間内における中央点を点検時刻として設定する点検時刻設定ステップと、
を含み、
前記運転データ送信ステップは、前記点検時刻設定ステップにより点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信することを特徴とする設備遠隔監視システムにおけるレポート生成方法。
Collecting operation data of the remote monitoring device installed in the center and the operation data of the facility installed in the remote place of the center and generating the report by transmitting the collected operation data to the remote monitoring device In a report generation method in a facility remote monitoring system having a device,
The facility operation data collection device is :
An operation data transmission step of extracting only the operation data of the equipment collected at a preset inspection time from the collected operation data and transmitting it to the remote monitoring device;
When the equipment is not operating at a preset inspection time, an inspection time during which the equipment is operating in a preset in-operation search period is detected, and the center point within the detected period is set as the inspection time Configuration steps ;
Including
The operation data transmission step, when the inspection time by the inspection time setting step is set, equipment remote you and transmits only the operation data at the set inspection time to the remote monitoring device Report generation method in the monitoring system.
センタに設置された遠隔監視装置と、
前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置と、
を有する設備遠隔監視システムにおいて、
前記設備運転データ収集装置は
収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信手段と、
予め設定された点検時刻に設備が運転されていないときには、設備運転中の期間を検出し、その検出した期間のうち予め設定された点検時刻に最も近い期間における中央点を点検時刻として設定する点検時刻設定手段と、
を有し、
前記運転データ送信手段は、前記点検時刻設定手段により点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信することを特徴とする設備遠隔監視システム。
A remote monitoring device installed in the center;
A facility operation data collection device that collects operation data of facilities installed in a remote location of the center and generates a report by transmitting the collected operation data to the remote monitoring device;
In the equipment remote monitoring system having
The facility operation data collection device is :
Operation data transmission means for extracting only the operation data of the equipment collected at the preset inspection time from the collected operation data and transmitting it to the remote monitoring device ;
When the equipment is not operating at the preset inspection time, the period during which the equipment is operating is detected, and the center point in the period closest to the preset inspection time among the detected periods is set as the inspection time Time setting means;
Have
When the inspection time is set by the inspection time setting means, the operation data transmitting means transmits only the operation data at the set inspection time to the remote monitoring device. .
センタに設置された遠隔監視装置と、
前記センタの遠隔地に設置された設備の運転データを収集すると共にその収集した運転データを前記遠隔監視装置へ送信することによってレポートを生成させる設備運転データ収集装置と、
を有する設備遠隔監視システムにおいて、
前記設備運転データ収集装置は、
収集した運転データの中から予め設定された点検時刻に収集された設備の運転データのみを抽出して前記遠隔監視装置へ送信する運転データ送信手段と、
予め設定された点検時刻に設備が運転されていないときには、予め設定された運転中検索対象期間において設備運転中の期間を検出し、その検出した期間内における中央点を点検時刻として設定する点検時刻設定手段と、
を有し、
前記運転データ送信手段は、前記点検時刻設定手段により点検時刻が設定された場合には、その設定された点検時刻における運転データのみを前記遠隔監視装置へ送信することを特徴とする設備遠隔監視システム。
A remote monitoring device installed in the center;
A facility operation data collection device that collects operation data of facilities installed in a remote location of the center and generates a report by transmitting the collected operation data to the remote monitoring device;
In the equipment remote monitoring system having
The facility operation data collection device is:
Operation data transmission means for extracting only the operation data of the equipment collected at the preset inspection time from the collected operation data and transmitting it to the remote monitoring device;
When the equipment is not operating at a preset inspection time, an inspection time during which the equipment is operating is detected in a preset in-service search target period, and the center point within the detected period is set as the inspection time. Setting means ;
Have
The operation data transmission unit, when inspection time is set by the inspection time setting means, equipment remote you and transmits only the operation data at the set inspection time to the remote monitoring device Monitoring system.
JP2003102387A 2003-04-07 2003-04-07 Equipment remote monitoring system and report generation method in equipment remote monitoring system Expired - Fee Related JP4272461B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003102387A JP4272461B2 (en) 2003-04-07 2003-04-07 Equipment remote monitoring system and report generation method in equipment remote monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003102387A JP4272461B2 (en) 2003-04-07 2003-04-07 Equipment remote monitoring system and report generation method in equipment remote monitoring system

Publications (2)

Publication Number Publication Date
JP2004310390A JP2004310390A (en) 2004-11-04
JP4272461B2 true JP4272461B2 (en) 2009-06-03

Family

ID=33465829

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003102387A Expired - Fee Related JP4272461B2 (en) 2003-04-07 2003-04-07 Equipment remote monitoring system and report generation method in equipment remote monitoring system

Country Status (1)

Country Link
JP (1) JP4272461B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472819A (en) * 2013-09-12 2013-12-25 中国农业大学 Remote monitoring system for autocrane operation reliability tests

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5230494B2 (en) * 2009-03-16 2013-07-10 三菱電機株式会社 Data collection system
JP2012022634A (en) * 2010-07-16 2012-02-02 Toshiba Corp Power equipment monitoring control system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472819A (en) * 2013-09-12 2013-12-25 中国农业大学 Remote monitoring system for autocrane operation reliability tests

Also Published As

Publication number Publication date
JP2004310390A (en) 2004-11-04

Similar Documents

Publication Publication Date Title
CN101393049B (en) Vibration monitoring and failure diagnosis method for wind generating set
CN108444727B (en) Vehicle remote monitoring method, monitoring device and monitoring system
CN103163841B (en) Automation equipment long distance control system and method
KR20100113686A (en) Demand-based real time energy monitoring and management system
KR101778460B1 (en) Online integrated monitoring method for neuclear power plant in remote area, and online integrated monitoring system
CN102804211B (en) Messaging device, information processing system, information processing method and message handling program
CN103245912A (en) Analytical and diagnostic method for running states of wind turbines
CN109409536B (en) Method and system for processing asset information of communication unit by acquisition system master station
JP4206953B2 (en) Air conditioner performance deterioration evaluation method, air conditioner performance deterioration evaluation system, and air conditioner information collection apparatus
CN116668482A (en) Intelligent building two-bus monitoring system and method based on artificial intelligence
KR102438442B1 (en) System Having a Function of Managing Power Demand
CN109544724A (en) A kind of intelligent blower cruising inspection system and its working method
CN102758727B (en) Wind turbine state monitoring and error diagnosis system and method integrated into control system
CN207319050U (en) A kind of Centralized Monitoring operational system of photovoltaic power station
CN110855756A (en) Meter reading management system and method based on Internet of things
JP4272461B2 (en) Equipment remote monitoring system and report generation method in equipment remote monitoring system
KR102438439B1 (en) Server, Communicating Device and System Having a Function of Managing Power Demand and Method of Managing Power Usage Thereof
CN113375645A (en) Water regime forecasting system
CN112928822A (en) Intelligent gateway of Internet of things of intelligent electric power Internet of things system
EP3505902A1 (en) Online diagnostic/prognostic system for rotation device
CN105021054A (en) Intelligent electric furnace combining internet-of-things technology and mobile management application
WO2012137304A1 (en) Remote monitor/control method and system therefor
RU98290U1 (en) WIRELESS ARTIFICIAL MONITORING SYSTEM
CN105023421A (en) Ammeter monitoring method, device and system
JP6399853B2 (en) Facility integrated management system and facility integrated management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080821

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080902

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081104

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081209

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090224

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090227

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120306

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4272461

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120306

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130306

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140306

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees