JP3981690B2 - 統括風力発電システム - Google Patents
統括風力発電システム Download PDFInfo
- Publication number
- JP3981690B2 JP3981690B2 JP2005090819A JP2005090819A JP3981690B2 JP 3981690 B2 JP3981690 B2 JP 3981690B2 JP 2005090819 A JP2005090819 A JP 2005090819A JP 2005090819 A JP2005090819 A JP 2005090819A JP 3981690 B2 JP3981690 B2 JP 3981690B2
- Authority
- JP
- Japan
- Prior art keywords
- power
- wind
- power generation
- wind farm
- wind power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010248 power generation Methods 0.000 title claims description 128
- 238000007599 discharging Methods 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 11
- 238000004891 communication Methods 0.000 claims description 9
- 230000005611 electricity Effects 0.000 claims description 4
- 230000007812 deficiency Effects 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 description 26
- 238000010586 diagram Methods 0.000 description 12
- 238000012545 processing Methods 0.000 description 5
- 230000001965 increasing effect Effects 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 230000003416 augmentation Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000005094 computer simulation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000006735 deficit Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000009313 farming Methods 0.000 description 1
- 238000007429 general method Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Control Of Eletrric Generators (AREA)
- Wind Motors (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
電力取引所で扱われる電力と料金を、過去の実績、風況条件、気象条件、経済活動などに基づいて数週間先まで独自予測した発電計画を格納するDBである。以下に述べるその他のDBの基礎情報として独自に予測した発電計画が使用される。
当日、翌日、翌々日の売電電力量と料金単価を予測するDBであり、この予測値を風力発電の所有者に提供することで風力発電電力の確保に用いる。
売電電力予測値に対する実際に集めた余剰電力、料金単価及び売電金額などの実績を格納するDBである。格納された情報は、売電の精算に用いられる他、発電計画DBの基礎情報として使用されると共に、後述する風力発電量の算出にも用いられる。
電力取引所で確定した売電電力を達成させるために、電力受渡し時に調整した指令値を格納するDBである。
風力発電の場所、種別、制御方式、定格出力、系統連系の接続情報などを格納するDBであり、系統連系時の逆潮流に関する情報として利用される。
図9は、本発明の実施形態に係る統括風力制御部11の処理において、第2種ウィンドファームの蓄電池13に系統側の電力が流れない制御の流れを示すフローチャート図である。
図10は、本発明の実施形態に係る統括風力制御部11の処理において、第2種ウィンドファーム19の蓄電池13にウィンドファーム間の電力が流れる制御の流れを示すフローチャート図である。
図12は、本発明の実施形態に係る統括風力制御部11の処理において、蓄電池13有り、無しのウィンドファーム、及び蓄電システムを用いて出力調整を行う増強型制御の流れを示すフローチャート図である。
Claims (8)
- 電力取引所の商品となる所定時間毎の電力を供給するために、複数の風力発電装置が設置されているウィンドファームの発電量などの情報を、通信ネットワークを介して取得し、取得した情報に基づいて風力発電装置の発電量を統括して電力ネットワークに供給する統括風力発電システムにおいて、
過去の気象、風況、季節、時刻のいずれかもしくは複数の条件におけるウィンドファームの各風力発電装置の条件と発電量を取得する発電量取得手段と
現在の各ウィンドファームと各風力発電装置の条件と発電量を記憶する発電量記憶手段と、
発電量記憶手段で記憶した過去の発電実績と数値解析結果に応じて所定時間毎の供給可能な電力を予測する供給量予測手段と、
供給量予測手段で得られた供給量予測値に基づき電力取引所に提示されている所定時間毎の需要量に入札し、電力取引所で約定された約定電力量と約定金額を取得する入札手段と、
ウィンドファームの風力発電装置で発電した電力を充電し、不足時に放電する蓄電池の充放電を制御する充放電制御手段と、
入札手段で約定した電力量を供給するために発電量取得手段から複数のウィンドファームの発電量を取得して総計し、余剰又は不足分を充放電制御手段により蓄電池に充放電させる風力発電統括手段と、
を備え、
風力発電統括手段は、
送電系統と配電系統とを制御する給電指令装置と、ウィンドファームを送電系統に接続する連系用変電所と、にウィンドファームの発電量と充放電制御手段の充放電量とのうち少なくとも1つの情報を送信することを特徴とする統括風力発電システム。 - 請求項1に記載の統括風力発電システムにおいて、
風力発電統括手段により制御されるウィンドファームは、
複数の風力発電装置を有する第1種ウィンドファームと、
ウィンドファーム内に蓄電池を有する第2種ウィンドファームと、
を含み、
電力ネットワークを介した充放電が制限されている場合、充放電制御手段は、第2種ウィンドファームに対して風力発電装置の電力をウィンドファーム内の蓄電池に充電させることを特徴とする統括風力発電システム。 - 請求項2に記載の統括風力発電システムにおいて、
電力ネットワークを介して他のウィンドファームで発電した電力による充電が可能な場合、充放電制御手段は、第1種ウィンドファームの風力発電装置で発電した電力相当分を電力ネットワークに放電させ、電力ネットワークから電力相当分を第2種ウィンドファームの蓄電池に充電させることを特徴とする統括風力発電システム。 - 請求項2に記載の統括風力発電システムにおいて、
電力ネットワークに接続される蓄電池を有する蓄電設備に充電が可能な場合、
充放電制御手段は、少なくとも第1種ウィンドファームの風力発電装置が発電した電力相当分を電力ネットワークへ供給させ、供給された電力相当分を蓄電設備に充電させることを特徴とする統括風力発電システム。 - 請求項2項に記載の統括風力発電システムにおいて、
充放電制御手段は、電力取引所の商品となる所定時間毎の電力以上となる場合、第2種ウィンドファームの蓄電池と電力ネットワークに接続された蓄電設備に充電させることを特徴とする統括風力発電システム。 - 請求項2項に記載の統括風力発電システムにおいて、
風力発電統括手段は、
余剰又は不足分を蓄電池の充放電により制御する充放電制御手段と、
各ウィンドファーム内に複数設置されている風力発電装置の少なくとも1つを、停止又は始動させるウィンドファーム出力制御手段と、
を有することを特徴とする統括風力発電システム。 - 請求項1項に記載の統括風力発電システムにおいて、
入札手段は、取得した約定電力量と、予め記憶されている風力発電装置の系統連系情報と、を電力ネットワークを管理する給電指令装置に送信することを特徴とする統括風力発電システム。 - 請求項1項に記載の統括風力発電システムにおいて、
風力発電統括手段は、風力発電装置の発電量を監視するとともに、給電指令装置に発電量を送信することを特徴とする統括風力発電システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005090819A JP3981690B2 (ja) | 2005-03-28 | 2005-03-28 | 統括風力発電システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005090819A JP3981690B2 (ja) | 2005-03-28 | 2005-03-28 | 統括風力発電システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006280020A JP2006280020A (ja) | 2006-10-12 |
JP3981690B2 true JP3981690B2 (ja) | 2007-09-26 |
Family
ID=37214170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005090819A Expired - Fee Related JP3981690B2 (ja) | 2005-03-28 | 2005-03-28 | 統括風力発電システム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3981690B2 (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010073310A1 (ja) | 2008-12-22 | 2010-07-01 | 日本風力開発株式会社 | 蓄電池併設型自然エネルギー発電システムの電力管理制御システム |
KR101844044B1 (ko) | 2017-09-19 | 2018-03-30 | (주)지비엠아이엔씨 | 기상 예측 모델을 이용한 풍력발전 시스템 및 방법 |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4551921B2 (ja) | 2007-09-27 | 2010-09-29 | 株式会社日立エンジニアリング・アンド・サービス | 蓄電システム併設型風力発電システム |
JP5270963B2 (ja) * | 2008-05-29 | 2013-08-21 | 株式会社日立製作所 | 風力発電設備遠隔監視装置、風力発電遠隔管理方法及び風力発電遠隔管理プログラム |
JP4808754B2 (ja) * | 2008-08-28 | 2011-11-02 | 三菱電機株式会社 | 自然エネルギー発電制御システム |
KR101168971B1 (ko) * | 2009-03-20 | 2012-07-27 | 가부시키가이샤 히다치 엔지니어링 앤드 서비스 | 축전시스템 병설형 풍력발전시스템 |
WO2011129003A1 (ja) * | 2010-04-15 | 2011-10-20 | 日本風力開発株式会社 | 蓄電池併設型自然エネルギー発電システムに用いる電力管理制御システム |
JP2011229205A (ja) * | 2010-04-15 | 2011-11-10 | Japan Wind Development Co Ltd | 蓄電池併設型自然エネルギー発電システムに用いる電力管理制御システム |
GB2480684A (en) | 2010-05-28 | 2011-11-30 | Artemis Intelligent Power Ltd | A method and apparatus for operating a renewable energy extraction device |
GB2480683B (en) * | 2010-05-28 | 2014-09-10 | Artemis Intelligent Power Ltd | Method and apparatus for extracting energy from a fluctuating energy flow from a renewable energy source |
JP5501183B2 (ja) * | 2010-09-30 | 2014-05-21 | 株式会社日立パワーソリューションズ | 蓄電装置を備えた自然エネルギー利用発電所 |
KR101155539B1 (ko) * | 2010-12-15 | 2012-06-19 | 가부시키가이샤 히다치 엔지니어링 앤드 서비스 | 재생 가능 에너지 이용 발전시스템의 제어방법 |
KR101277904B1 (ko) * | 2011-10-31 | 2013-06-21 | 주식회사 포스코아이씨티 | 전력 관리 시스템 및 관리 방법 |
KR101333995B1 (ko) | 2011-11-09 | 2013-11-27 | 주식회사 포스코아이씨티 | 전력 관리 시스템 및 관리 방법 |
CN103249946A (zh) * | 2011-12-06 | 2013-08-14 | 三菱重工业株式会社 | 发电系统 |
CN102570505B (zh) * | 2012-02-01 | 2014-08-06 | 中国电力科学研究院 | 用于风电“部分削峰填谷”的电池储能系统控制方法 |
JP2013192401A (ja) * | 2012-03-14 | 2013-09-26 | Toshiba Corp | 電力需給制御装置 |
KR101390104B1 (ko) | 2012-12-31 | 2014-04-28 | 주식회사 포스코아이씨티 | 전력 관리 시스템 |
JP2016021084A (ja) * | 2014-07-11 | 2016-02-04 | 株式会社東芝 | 電気料金メニュー選択装置、電気料金メニュー選択方法、及び、電気料金メニュー選択プログラム |
JP6554785B2 (ja) * | 2014-11-27 | 2019-08-07 | 住友電気工業株式会社 | 電力管理装置、電力システム、需要家装置、電力管理方法および電力管理プログラム |
JP6915233B2 (ja) * | 2016-05-27 | 2021-08-04 | 住友電気工業株式会社 | 電力管理装置、電力システム、需要家装置、電力管理方法および電力管理プログラム |
DE102016124840A1 (de) | 2016-12-19 | 2018-06-21 | Wobben Properties Gmbh | Verfahren zum Steuern eines Netzwiederaufbaus |
JP6670867B2 (ja) * | 2018-02-15 | 2020-03-25 | 株式会社日立パワーソリューションズ | 蓄電池併設再生可能エネルギー発電機システム |
JP2020150726A (ja) * | 2019-03-14 | 2020-09-17 | 株式会社Ihi | 電力需給管理装置、電力需給管理システム、及び電力需給管理方法 |
EP3736440A1 (en) * | 2019-05-10 | 2020-11-11 | Siemens Gamesa Renewable Energy A/S | A method for computer-implemented analysis of a wind farm comprising a number of wind turbines |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001184433A (ja) * | 1999-12-24 | 2001-07-06 | Sumitomo Corp | 電力入札システム及び電力入札方法 |
JP4559577B2 (ja) * | 2000-02-22 | 2010-10-06 | 沖縄電力株式会社 | 風力発電装置の複数台運転における出力制御方法 |
JP2002262458A (ja) * | 2001-03-02 | 2002-09-13 | Toshiba Eng Co Ltd | 気象予測情報を利用した電力供給システム |
JP3740099B2 (ja) * | 2002-08-06 | 2006-01-25 | 三菱重工業株式会社 | 電力ネットワーク管理システムおよび電力ネットワーク管理方法 |
JP4102278B2 (ja) * | 2003-03-19 | 2008-06-18 | 三菱電機株式会社 | 風力発電システム |
JP2004289896A (ja) * | 2003-03-19 | 2004-10-14 | Mitsubishi Electric Corp | 風力発電システム |
-
2005
- 2005-03-28 JP JP2005090819A patent/JP3981690B2/ja not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010073310A1 (ja) | 2008-12-22 | 2010-07-01 | 日本風力開発株式会社 | 蓄電池併設型自然エネルギー発電システムの電力管理制御システム |
KR101844044B1 (ko) | 2017-09-19 | 2018-03-30 | (주)지비엠아이엔씨 | 기상 예측 모델을 이용한 풍력발전 시스템 및 방법 |
Also Published As
Publication number | Publication date |
---|---|
JP2006280020A (ja) | 2006-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3981690B2 (ja) | 統括風力発電システム | |
US12039558B2 (en) | Distributed energy control | |
Tajeddini et al. | Risk averse optimal operation of a virtual power plant using two stage stochastic programming | |
Awad et al. | Impact of energy storage systems on electricity market equilibrium | |
Smith et al. | A mighty wind | |
Azizivahed et al. | Risk-oriented multi-area economic dispatch solution with high penetration of wind power generation and compressed air energy storage system | |
Kamrani et al. | A two-stage flexibility-oriented stochastic energy management strategy for multi-microgrids considering interaction with gas grid | |
JP2006280154A (ja) | 分散電源制御システム | |
CN110097228A (zh) | 一种政府监管下基于谱风险的虚拟电厂调度模型构建方法 | |
Marzband | Experimental validation of optimal real-time energy management system for microgrids | |
CN114117326B (zh) | 基于系统安全运行约束的微电网市场双阶段交易优化机制 | |
Abedi et al. | Hierarchical stochastic frequency constrained micro-market model for isolated microgrids | |
Steber | Integration of decentralized battery energy storage systems into the german electrical power system | |
Azimi et al. | Aggregate Impact Analysis of Demand Response Programs, Electric Vehicles, and Combined Heat and Power Units on Integrated Management of Industrial Virtual Power Plant | |
Narimani et al. | Financially optimized scheduling of electric energy storage in presence of renewable energy resources | |
Scharff et al. | Distributed Balancing of Wind Power Forecast Deviations by Intraday Trading and Internal Ex-ante Self-Balancing--A Modelling Approach | |
Ghanuni et al. | An Information Gap Decision Theory Approach for Optimal Bidding of a Virtual Power Plant under System Uncertainties. | |
Tianbo | Research on New Energy Auxiliary Trading Mechanism Based on Capacity Trading Right | |
Kioumarsi et al. | Optimal energy management for electric vehicle charging parking lots with considering renewable energy resources and accurate battery characteristic modeling | |
Wang et al. | Bi-level scheduling optimization model and solving algorithm for virtual power plants considering externalities | |
Kamrani | Kamrani, Farshid; Fattaheian-Dehkordi, Sajjad; Gholami, Mohammad; Abbaspour, Ali; Fotuhi-Firuzabad, Mahmud; Lehtonen, Matti A Two-Stage Flexibility-Oriented Stochastic Energy Management Strategy for Multi-Microgrids Considering Interaction With Gas Grid | |
Hukkinen | Business Case Analysis of a Battery Energy Storage System Co-Located with a Wind Park | |
Liu | Optimization of Energy Storage Scheduling in Electricity Markets | |
Zhou | Sub-optimum day-ahead power dispatch for a mixed generation system considering emission and energy storage for semi-liberalized power market | |
Priya | Optimization of battery storage system for enhancing the reliability of power supply for rural microgrid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070222 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070306 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070426 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070619 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070702 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100706 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100706 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110706 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120706 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130706 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130706 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140706 Year of fee payment: 7 |
|
LAPS | Cancellation because of no payment of annual fees |