JP3014267B2 - Steel pipe sheet pile wall construction method and steel pipe sheet pile - Google Patents
Steel pipe sheet pile wall construction method and steel pipe sheet pileInfo
- Publication number
- JP3014267B2 JP3014267B2 JP6066425A JP6642594A JP3014267B2 JP 3014267 B2 JP3014267 B2 JP 3014267B2 JP 6066425 A JP6066425 A JP 6066425A JP 6642594 A JP6642594 A JP 6642594A JP 3014267 B2 JP3014267 B2 JP 3014267B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- sheet pile
- pipe sheet
- connecting portion
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、土木分野で用いる鋼管
矢板壁構築工法および鋼管矢板に係り、特に、土留め構
造に適した鋼管矢板壁構築工法および鋼管矢板に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel sheet pile construction method and a steel sheet pile used in the field of civil engineering, and more particularly to a steel sheet pile construction method and a steel sheet pile suitable for an earth retaining structure.
【0002】[0002]
【従来の技術】土留め工事は、周知のように、掘削の際
の地盤の変形や沈下を極力抑えるための工事であるが、
近年、地下空間有効利用の要請等に伴い、さまざまな現
場諸条件に対応した土留め壁の構築工法を開発すること
が必要になってきた。2. Description of the Related Art As is well known, earth retaining works are works for minimizing deformation and settlement of the ground during excavation.
In recent years, with the demand for effective utilization of underground space, etc., it has become necessary to develop a construction method of a retaining wall corresponding to various site conditions.
【0003】土留め壁をその壁体材料に着目して分類す
ると、打設矢板壁、地下連続壁、柱列式地下連続壁、安
定液固化壁、プレハブ鋼製壁等に大別され、矢板壁のう
ち、鋼管矢板壁は、軟弱地盤等における大規模掘削に適
した土留め壁で、最近では、湾岸部での工事に用いられ
ることが多い。[0003] Retaining walls are roughly classified into cast sheet walls, underground continuous walls, column-type underground continuous walls, stable liquid-solidified walls, prefabricated steel walls, and the like. Among the walls, the steel pipe sheet pile wall is a retaining wall suitable for large-scale excavation in soft ground or the like, and is often used recently for construction in a bay area.
【0004】鋼管矢板壁を構築するには、鋼管矢板の鉛
直度を確認しながら、ディーゼルハンマー、バイプロハ
ンマーあるいはドロップハンマー等で鋼管矢板を打ち込
むのが一般的であるが、近年の振動あるいは騒音規制を
クリアすべく、ディーゼルハンマーに防音カバーを取り
付けたり、ウオータージェットを併用して低振動化、低
騒音化を図っている。In order to construct a steel sheet pile wall, it is common to drive the steel sheet pile with a diesel hammer, bipro hammer or drop hammer while checking the verticality of the steel pipe sheet pile. In order to clear the noise, a soundproof cover is attached to the diesel hammer, and the use of a water jet is used to reduce vibration and noise.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、市街地
に近いところでは振動あるいは騒音規制がきわめて厳格
なため、打込工法で施工すること自体がほとんど不可能
であるのが現状である。However, at present, it is almost impossible to construct by a driving method because vibration or noise regulation is very strict near a city area.
【0006】一方、上述の騒音の問題を回避するため
に、予め掘削した孔内に鋼管矢板を建て込む工法が考え
られるが、その場合には、鋼管矢板同士の連結部分にお
いて止水性が低下してしまうという別の問題を生じる。On the other hand, in order to avoid the above-mentioned problem of noise, a method of erection of a steel pipe sheet pile in a hole excavated in advance is conceivable. In this case, however, the water stoppage at the joint between the steel pipe sheet piles is reduced. This creates another problem.
【0007】本発明は、上述した事情を考慮してなされ
たもので、静粛性および止水性の両方を具備した鋼管矢
板壁構築工法および鋼管矢板を提供することを目的とす
る。The present invention has been made in consideration of the above circumstances, and has as its object to provide a steel pipe sheet pile wall construction method and a steel pipe sheet pile having both quietness and waterproofness.
【0008】[0008]
【課題を解決するための手段】上記目的を達成するた
め、本発明の鋼管矢板壁構築工法は請求項1に記載した
ように、鋼管矢板に互いに反対側となるように設けられ
た2つの連結部のうち、一方の連結部内部に所定の置換
体を取り付ける一方、前記鋼管矢板を建て込むための孔
を地盤内に掘削する工程と、当該掘削工程と同時に、先
行鋼管矢板の周囲に打設された硬化材を削り取るととも
に当該先行鋼管矢板の一方の連結部内部の置換体を除去
して当該連結部の内部を露出させる工程と、前記先行鋼
管矢板の一方の連結部に前記鋼管矢板の他方の連結部を
嵌め込みながら前記鋼管矢板を前記孔内に建て込む工程
と、前記先行鋼管矢板の一方の連結部と前記鋼管矢板の
他方の連結部との間の空間および前記鋼管矢板の周囲に
所定の硬化材を注入する工程とを含むものである。In order to achieve the above object, a steel pipe sheet pile wall construction method according to the present invention, as described in claim 1, comprises two connecting members provided on a steel pipe sheet pile at opposite sides. A predetermined replacement body is mounted inside one of the connecting portions, and a step of excavating a hole for embedding the steel pipe sheet pile in the ground, and simultaneously driving the excavation step around the preceding steel pipe sheet pile. Removing the hardened material and removing the substitute inside one of the connecting portions of the preceding steel pipe sheet pile to expose the inside of the connecting portion; and the other of the steel pipe sheet piles at one of the connecting portions of the preceding steel pipe sheet pile. Setting the steel sheet pile into the hole while fitting the connection part of the steel pipe sheet pile, and forming a predetermined space around the space between the one connection part of the preceding steel pipe sheet pile and the other connection part of the steel pipe sheet pile and around the steel pipe sheet pile. Inject hardening material It is intended to include and that step.
【0009】また、本発明の鋼管矢板は請求項2に記載
したように、互いに反対側となるように一方の連結部及
び他方の連結部が設けられた鋼管矢板であって、該一方
の連結部と次に建て込まれる鋼管矢板の他方の連結部と
を相互に連結可能に構成した鋼管矢板において、発泡ス
チロール等で形成された所定の置換体を前記一方の連結
部内部に取付け、前記置換体の周囲に注入された硬化材
が前記一方の連結部内部に実質的に浸入しないようにす
るとともに、掘削と同時に前記置換体を除去して前記一
方の連結部の内部を露出させた状態で該一方の連結部の
内部に前記他方の連結部を嵌め込み、かかる状態で前記
一方の連結部と前記他方の連結部との間の空間に硬化材
を注入するように構成したものである。Further, the steel pipe sheet pile of the present invention is a steel pipe sheet pile provided with one connecting portion and the other connecting portion so as to be opposite to each other. And a connecting part of the steel pipe sheet pile to be built next is connected to the other connecting part of the steel pipe sheet pile, and a predetermined replacement formed of styrene foam or the like is attached to the inside of the one connecting part, and the replacement While preventing the hardened material injected around the perimeter from substantially entering the inside of the one connection portion, removing the replacement body at the same time as excavation to expose the inside of the one connection portion, The other connecting portion is fitted into one of the connecting portions, and in such a state, a hardening material is injected into a space between the one connecting portion and the other connecting portion.
【0010】また、本発明の鋼管矢板は請求項3に記載
したように、互いに反対側となるように一方の連結部及
び他方の連結部が設けられた鋼管矢板であって、該一方
の連結部と次に建て込まれる鋼管矢板の他方の連結部と
を相互に連結可能に構成した鋼管矢板において、所定の
シートを前記一方の連結部を取り囲むようにして取付
け、前記シートの内側に安定液よりも比重の軽い材料で
形成された充填材を充填して前記シートの周囲に注入さ
れた硬化材が前記一方の連結部内部に実質的に浸入しな
いようにするとともに、前記シートを破って前記充填材
を崩落させ前記一方の連結部の内部を露出させた状態で
該一方の連結部の内部に前記他方の連結部を嵌め込み、
かかる状態で前記一方の連結部と前記他方の連結部との
間の空間に硬化材を注入するように構成したものであ
る。The steel pipe sheet pile according to the present invention is a steel pipe sheet pile provided with one connecting portion and the other connecting portion so as to be opposite to each other. In a steel pipe sheet pile constructed so that the part and the other connection part of the steel pipe sheet pile to be built next can be connected to each other, a predetermined sheet is attached so as to surround the one connection part, and a stable liquid is provided inside the sheet. Material with a lower specific gravity than
Filling the formed filler to prevent the hardened material injected around the sheet from substantially penetrating into the inside of the one connecting portion, breaking the sheet to collapse the filler, The other connecting portion is fitted inside the one connecting portion in a state where the inside of the connecting portion is exposed,
In such a state, a curing material is injected into a space between the one connecting portion and the other connecting portion.
【0011】[0011]
【0012】[0012]
【0013】[0013]
【0014】[0014]
【0015】[0015]
【0016】[0016]
【0017】[0017]
【0018】[0018]
【0019】[0019]
【0020】[0020]
【0021】[0021]
【0022】[0022]
【0023】[0023]
【作用】本発明の鋼管矢板壁構築工法および鋼管矢板に
おいては、まず、これから建て込む鋼管矢板の一方の連
結部に所定の置換体を取り付ける。In the steel sheet pile wall construction method and the steel sheet pile according to the present invention, first, a predetermined replacement is attached to one connecting portion of the steel sheet pile to be built.
【0024】一方、かかる取付工程とは別に、置換体を
取り付けた鋼管矢板を建て込むための孔を掘削する。孔
壁の崩壊が予想される場合には、ベントナイト安定液な
どの非硬化型の安定液を孔内に注入しながら掘削を行
う。On the other hand, apart from the mounting step, a hole for erection of a steel pipe sheet pile to which the replacement is mounted is excavated. When collapse of the hole wall is expected, excavation is performed while injecting a non-hardening type stabilizing solution such as a bentonite stabilizing solution into the hole.
【0025】掘削工程においては、掘削と同時に、先行
して建て込まれた隣接する鋼管矢板の置換体を除去し
て、当該先行鋼管矢板の一方の連結部の内部を露出させ
ておく。In the excavation step, at the same time as the excavation, the replacement of the adjacent steel pipe sheet pile previously built is removed to expose the inside of one connecting portion of the preceding steel pipe sheet pile.
【0026】次に、先行鋼管矢板の一方の連結部にこれ
から建て込もうとする鋼管矢板の他方の連結部を嵌め込
みながら、この鋼管矢板を孔内に建て込む。Next, while fitting the other connecting portion of the steel pipe sheet pile to be Komimo built now to one connection portion of the preceding steel sheet piles, Tatekomu the steel pipe sheet pile into the hole.
【0027】次に、2つの鋼管矢板の連結部の間に形成
された空間および鋼管矢板の周囲に所定の硬化材を注入
する。Next, a predetermined hardening material is injected into a space formed between the connecting portions of the two steel pipe sheet piles and around the steel pipe sheet piles.
【0028】ここで、2つの鋼管矢板の連結部の間に形
成された空間に注入された硬化材は、当該空間に隅々ま
でゆきわたり、硬化後にあっては、地下水等を遮水する
止水壁としての機能を発揮する。Here, the hardening material injected into the space formed between the connecting portions of the two steel pipe sheet piles spreads all over the space, and after hardening, the hardening material blocks the underground water and the like. It functions as a water wall.
【0029】また、後で建て込んだ方の鋼管矢板の周囲
に注入された硬化材は、硬化後にあっては、その鋼管矢
板を周囲の地盤にしっかりと固着する。Further, the hardened material injected around the steel pipe sheet pile which is later built in firmly fixes the steel pipe sheet pile to the surrounding ground after hardening.
【0030】一方、後で建て込んだ方の鋼管矢板の一方
の連結部内部には置換体を取り付けてあるため、その置
換体の容積分だけは硬化材に置換されることはない。[0030] On the other hand, one of the steel pipe sheet pile of people that built up later
Since the replacement is attached inside the connecting portion, only the volume of the replacement is not replaced by the hardening material.
【0031】そのため、硬化材が硬化してから置換体を
除去すれば、次に建て込む鋼管矢板の他方の連結部を嵌
め込むための中空空間が一方の連結部内部に現れる。Therefore, if the substitute is removed after the hardening material has hardened, a hollow space for fitting the other connecting portion of the steel pipe sheet pile to be built next appears inside one connecting portion.
【0032】また、本発明の鋼管矢板においては、ま
ず、これから建て込む鋼管矢板の一方の連結部を取り囲
むようにして所定のシートをその鋼管矢板に取り付け
る。ここで、シートの内側には安定液よりも比重の軽い
材料で形成された充填材を充填しておく。 In the steel sheet pile according to the present invention, first, a predetermined sheet is attached to the steel sheet pile so as to surround one connecting portion of the steel sheet pile to be built. Here, the specific gravity is lighter than the stable liquid inside the sheet
The filler formed of the material is filled in advance.
【0033】一方、かかる取付けとは別に、シートを取
り付けた鋼管矢板を建て込むための孔を掘削する。孔壁
の崩壊が予想される場合には、ベントナイト安定液など
の非硬化型の安定液を孔内に注入しながら掘削を行う。On the other hand, apart from such attachment, a hole for erection of a steel pipe sheet pile to which a sheet is attached is excavated. When collapse of the hole wall is expected, excavation is performed while injecting a non-hardening type stabilizing solution such as a bentonite stabilizing solution into the hole.
【0034】掘削工程においては、掘削と同時に、先行
して建て込まれた隣接する鋼管矢板のシートを破り取っ
てシート内側の充填材を崩落させ、隣接する鋼管矢板の
一方の連結部の内部を露出させておく。In the excavation step, at the same time as the excavation, the sheet of the adjacent steel pipe sheet pile previously built is torn off, the filler inside the sheet collapses, and the adjacent steel pipe sheet pile is collapsed.
The inside of one connecting portion is exposed.
【0035】次に、隣接する鋼管矢板の一方の連結部に
これから建て込もうとする鋼管矢板の他方の連結部を嵌
め込みながら、この鋼管矢板を孔内に建て込む。Next, while fitting the other connecting portion of the steel pipe sheet pile to be Komimo built now to one junction of the adjacent steel sheet pile, Tatekomu the steel pipe sheet pile into the hole.
【0036】[0036]
【0037】次に、2つの鋼管矢板の連結部の間に形成
された空間および鋼管矢板の周囲に所定の硬化材を注入
し、硬化材を硬化させる。Next, a predetermined hardening material is injected into a space formed between the connecting portions of the two steel pipe sheet piles and around the steel pipe sheet piles, and the hardened material is hardened.
【0038】ここで、2つの鋼管矢板の連結部の間に形
成された空間に注入された硬化材は、当該空間に隅々ま
でゆきわたり、硬化後にあっては、地下水等を遮水する
止水壁としての機能を発揮する。Here, the hardening material injected into the space formed between the connecting portions of the two steel pipe sheet piles spreads all over the space, and after hardening, the hardening material blocks the underground water and the like. It functions as a water wall.
【0039】また、後で建て込んだ方の鋼管矢板の周囲
に注入された硬化材は、硬化後にあっては、その鋼管矢
板を周囲の地盤にしっかりと固着する。Further, the hardened material injected around the steel pipe sheet pile that has been built later firmly fixes the steel pipe sheet pile to the surrounding ground after hardening.
【0040】一方、後で建て込んだ方の鋼管矢板の一方
の連結部の周囲にはシートを取り付けたうえでその内側
に充填材を充填してあるため、シートの内側については
硬化材が注入されることはない。[0040] On the other hand, one of the steel pipe sheet pile of people that built up later
Since a sheet is attached to the periphery of the connecting portion and a filler is filled inside the sheet, no hardening material is injected into the inside of the sheet.
【0041】そのため、硬化材が硬化してからシートを
破って内側の充填材を崩落させれば、次に建て込む鋼管
矢板の他方の連結部を嵌め込むための中空空間が一方の
連結部内部に現れる。[0041] Therefore, if the collapse of the inner filler beating sheets from the curing material is cured and then Tatekomu other hollow space for fitting the connecting portion of the steel pipe sheet pile is one <br / > Appears inside the connection.
【0042】[0042]
【実施例】以下、本発明の鋼管矢板壁構築工法および鋼
管矢板の実施例について、添付図面を参照して説明す
る。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exploded perspective view showing a construction method of a steel sheet pile wall construction method according to the present invention.
【0043】(第1実施例)図1は、本実施例の鋼管矢
板壁構築工法の手順をフローチャートで示したものであ
る。(First Embodiment) FIG. 1 is a flowchart showing a procedure of a steel pipe sheet pile wall construction method according to this embodiment.
【0044】かかる工法に用いる鋼管矢板1は、図2
(a) に示すように、外径が例えば1.5m、長さが50m 程度
の鋼管本体2に連結部3および連結部4を設けてあり、
それぞれ、鋼管本体2の長手軸線に沿った長尺部材であ
る。The steel sheet pile 1 used in this method is shown in FIG.
As shown in (a), a connecting portion 3 and a connecting portion 4 are provided on a steel pipe main body 2 having an outer diameter of, for example, 1.5 m and a length of about 50 m,
Each is a long member along the longitudinal axis of the steel pipe main body 2.
【0045】他方の連結部としての連結部3および一方
の連結部としての連結部4は、鋼管本体2の長手軸線を
挟んで互いに反対側に設けてあり、連結部3は、一対の
アングル5を先端を外方に向けて並設してあり、連結部
4は、一対のアングル6を先端を向かい合わせにして並
設してある。 The connecting portion 3 as the other connecting portion and one
The connecting portion 4 of the coupling portion, is provided with on opposite sides of the longitudinal axis of the steel pipe body 2, the connecting portion 3, Yes and juxtaposed towards the pair of angle 5 tip outwardly, The connecting portion 4 is arranged side by side with a pair of angles 6 facing each other.
【0046】かかる鋼管矢板1は、一方の鋼管矢板1の
連結部4のアングル6に、それに隣接する鋼管矢板1の
連結部3のアングル5を係止することにより、隣接する
鋼管矢板1を相互に連結できるようになっている。The steel sheet pile 1 is connected to the angle 6 of the connecting part 4 of one steel sheet pile 1 by the angle 5 of the connecting part 3 of the steel sheet pile 1 adjacent thereto, so that the adjacent steel pipe sheet piles 1 are mutually connected. It can be connected to.
【0047】図2(b) は、鋼管矢板1と同様の構造を持
つ鋼管矢板1a 、1b を互いに連結させた様子を示した
ものである。FIG. 2 (b) shows a state in which steel pipe sheet piles 1a and 1b having the same structure as the steel pipe sheet pile 1 are connected to each other.
【0048】次に、図1のフローチャートを参照しなが
ら、本実施例の鋼管矢板壁構築工法の手順を説明する。Next, the procedure of the steel pipe sheet pile wall construction method of this embodiment will be described with reference to the flowchart of FIG.
【0049】なお、本実施例では、説明の便宜上、鋼管
矢板1b 、1c ・・を、既に建て込んだ鋼管矢板1a に
順次隣接させて建て込んでいくものとし、鋼管矢板1a
、1b 、1c ・・・は、図2で説明した鋼管矢板1と
同じ構造のものであって、鋼管矢板1と同一の部分につ
いては鋼管矢板1の各部の符号にa, b, c ・・・を付し
て表現することとする。In this embodiment, for the convenience of explanation, the steel pipe sheet piles 1b, 1c,... Are assumed to be built sequentially adjacent to the already built steel pipe sheet piles 1a.
, 1b, 1c... Have the same structure as the steel pipe sheet pile 1 described in FIG. 2, and the same portions as the steel pipe sheet pile 1 are denoted by a, b, c,.・ It is to be expressed by adding.
【0050】図1でわかるように、本実施例の鋼管矢板
構築工法においては、まず、これから建て込もうとする
鋼管矢板1b の一方の連結部としての連結部4b を取り
囲むようにして堰体71b を鋼管矢板1b に取り付ける
(ステップ101)。As can be seen from FIG. 1, in the steel pipe sheet pile construction method of the present embodiment, first, a dam body 71b is formed so as to surround a connecting part 4b as one connecting part of a steel pipe sheet pile 1b to be built. Is attached to the steel sheet pile 1b (step 101).
【0051】図3は、鋼管矢板1b に堰体71b を取り
付けた様子を示したものである。FIG. 3 shows a state in which a dam body 71b is attached to a steel pipe sheet pile 1b.
【0052】同図でわかるように、堰体71b の内側に
は長手方向の中空空間が形成されている。As can be seen from the figure, a longitudinal hollow space is formed inside the weir 71b.
【0053】堰体71b は、後の工程で周囲に硬化材を
注入したときにその硬化材の圧力で変形しないように、
その材質や形状を適宜選択し、例えば、FRP等のプラ
スチック材料を湾曲状に一体成形しあるいは金属の薄板
を曲げ加工して形成するのがよい。The weir body 71b is designed to prevent deformation due to the pressure of the hardening material when the hardening material is injected into the surroundings in a later step.
The material and shape are appropriately selected, and for example, a plastic material such as FRP may be integrally formed in a curved shape or formed by bending a thin metal plate.
【0054】また、堰体71b と鋼管矢板本体2b との
取付部分は、溶接材料や接着剤等を用いてシール構造と
し、後の工程で周囲に硬化材を注入したとき、硬化材が
内部に浸入しないようにしておくのがよい。The mounting portion between the dam body 71b and the steel pipe sheet pile main body 2b has a seal structure using a welding material, an adhesive, or the like. It is better to keep out.
【0055】一方、上述した堰体の取付工程とは別に、
堰体71b を取り付けた鋼管矢板1b を建て込むための
孔21b を掘削する(図1、ステップ102)。On the other hand, apart from the weir mounting process described above,
A hole 21b for excavating the steel pipe sheet pile 1b to which the weir 71b is attached is excavated (FIG. 1, step 102).
【0056】図4は、孔21b の掘削ラインを破線で示
したものである。FIG. 4 shows the digging line of the hole 21b by a broken line.
【0057】掘削は、例えばアースドリルを用いて行
い、ケリーバーの先端に取り付けたドリリングバケット
を回転させて削孔する。なお、掘削にあたっては、孔壁
の崩壊を防止するため、非硬化型の安定液としてのベン
トナイト安定液、ポリマー安定液等を孔内に注入しなが
ら行うのがよい。Drilling is performed using, for example, an earth drill, and a drilling bucket attached to the tip of the kelly bar is rotated to drill holes. In order to prevent collapse of the hole wall, excavation is preferably performed while pouring a bentonite stabilizing solution, a polymer stabilizing solution, or the like as a non-curable stabilizing solution into the hole.
【0058】また、孔21b の掘削ライン(破線)が、
先行して建て込まれた鋼管矢板1aの周囲に注入された
硬化材23a に及んでいることからわかるように、本工
程では、地盤を掘削すると同時に、硬化材23a の一部
も削り取る。The excavation line (broken line) for the hole 21b is
As can be seen from the fact that it extends to the hardened material 23a injected around the steel pipe sheet pile 1a built in advance, in this step, at the same time as the ground is excavated, a part of the hardened material 23a is also cut off.
【0059】同様に、孔21b の掘削ラインが、鋼管矢
板1a の堰体71a に及んでいることからわかるよう
に、本工程では、地盤を掘削すると同時にドリリングバ
ケット等で堰体71a を破って、鋼管矢板1a の連結部
4a の内部を露出させる(図1、ステップ103)。Similarly, as can be seen from the fact that the excavation line of the hole 21b extends to the weir 71a of the steel pipe sheet pile 1a, in this step, at the same time as the ground is excavated, the weir 71a is broken by a drilling bucket or the like. The inside of the connecting portion 4a of the steel sheet pile 1a is exposed (FIG. 1, step 103).
【0060】図5は、掘削工程後、孔21b が形成され
た様子を示したものである。FIG. 5 shows a state in which a hole 21b has been formed after the excavation step.
【0061】同図でわかるように、堰体71a が破られ
て連結部4a の内部がベントナイト安定液31b に露出
していることがわかる。As can be seen from the figure, it can be seen that the dam body 71a is broken and the inside of the connecting portion 4a is exposed to the bentonite stabilizing solution 31b.
【0062】次に、隣接する鋼管矢板1a の一方の連結
部である連結部4a にこれから建て込もうとする鋼管矢
板1b の他方の連結部である連結部3b を嵌め込みなが
ら、鋼管矢板1b を孔21b 内に建て込む(図1、ステ
ップ104)。Next, one of the adjacent steel pipe sheet piles 1a is connected.
The steel pipe sheet pile 1b is built into the hole 21b while the connecting part 3b, which is the other connecting part of the steel pipe sheet pile 1b to be built, is fitted into the connecting part 4a (FIG. 1, step 104).
【0063】図6は、鋼管矢板1b の建込を終了した時
点での様子を示したものである。FIG. 6 shows a state at the time when the construction of the steel pipe sheet pile 1b has been completed.
【0064】次に、鋼管矢板1a の連結部4a と鋼管矢
板1b の連結部3b との間に形成された空間および鋼管
矢板1b の周囲にベントナイトモルタル23b を注入
し、ベントナイト安定液31b をベントナイトモルタル
23b で置換する(ステップ106)。Next, bentonite mortar 23b is injected into the space formed between the connecting portion 4a of the steel pipe sheet pile 1a and the connecting portion 3b of the steel pipe sheet pile 1b and around the steel pipe sheet pile 1b, and the bentonite stabilizing solution 31b is poured into the bentonite mortar. 23b (step 106).
【0065】図7は、ベントナイト安定液31b をベン
トナイトモルタル23b に置換した後の状態を示したも
のである。なお、同図中、41、42および43は、ベ
ントナイトモルタルを注入するための配管位置を示した
ものである。FIG. 7 shows a state after the bentonite stabilizing solution 31b has been replaced with bentonite mortar 23b. In the figure, reference numerals 41, 42, and 43 indicate piping positions for injecting bentonite mortar.
【0066】かかる配管位置でわかるように、鋼管矢板
1b がモルタルの注入圧力によって傾かないように留意
する。As can be seen from the piping position, care should be taken that the steel pipe sheet pile 1b does not tilt due to the mortar injection pressure.
【0067】2つの鋼管矢板1a および1b の連結部の
間に形成された空間に注入されたベントナイトモルタル
23b は、それらの空間に隅々までゆきわたり、硬化後
にあっては、地下水等を遮水する止水壁としての機能を
発揮する。The bentonite mortar 23b injected into the space formed between the connecting portions of the two steel sheet piles 1a and 1b spreads all over the space, and after hardening, impermeable to groundwater and the like. It functions as a waterproof wall.
【0068】また、後で建て込んだ方の鋼管矢板1b の
周囲に注入されたベントナイトモルタル23b は、硬化
後にあっては、鋼管矢板1b を周囲の地盤にしっかりと
固着する。Further, the bentonite mortar 23b injected around the steel pipe sheet pile 1b which is later built in firmly fixes the steel pipe sheet pile 1b to the surrounding ground after hardening.
【0069】一方、鋼管矢板1b の連結部4b の周囲に
は堰体71b を取り付けてあるため、注入したベントナ
イトモルタル23b は連結部4b 内に浸入せず、したが
って、ベントナイトモルタル23b が硬化したとき、連
結部4b 内部には、次に建て込む鋼管矢板1c の他方の
連結部としての連結部3c を嵌め込むための中空空間が
形成される。On the other hand, since the dam body 71b is attached around the connecting portion 4b of the steel pipe sheet pile 1b, the injected bentonite mortar 23b does not enter into the connecting portion 4b, and therefore, when the bentonite mortar 23b is hardened. Inside the connecting part 4b, the other side of the steel pipe sheet pile 1c to be built next
A hollow space is formed for fitting the connecting portion 3c as the connecting portion.
【0070】これで、鋼管矢板1b に関する一連の工程
は終了するが、引き続き鋼管矢板1c の建込等を行う場
合には、ステップ101と同様、鋼管矢板1c の一方の
連結部である連結部4c を取り囲むようにして堰体71
c を鋼管矢板1c に取付け、ステップ102と同様、鋼
管矢板1c を建て込むための孔21c を掘削する。そし
て、ステップ103と同様、地盤を掘削すると同時にド
リリングバケット等で堰体71b を破って、鋼管矢板1
b の連結部4b の内部を露出させる。Thus, a series of processes for the steel pipe sheet pile 1b is completed. However, when the steel pipe sheet pile 1c is to be erected continuously, as in step 101, one of the steel pipe sheet piles 1c is formed .
Weir body 71 surrounds connecting portion 4c which is a connecting portion.
c is attached to the steel pipe sheet pile 1c, and a hole 21c for excavating the steel pipe sheet pile 1c is excavated as in step 102. Then, as in step 103, the ground is excavated, and at the same time, the dam body 71b is broken with a drilling bucket or the like, and the steel pipe sheet pile 1
The inside of the connecting portion 4b of b is exposed.
【0071】以下、詳細な説明は省略するが、上述した
と同様、ステップ104乃至105の工程を順次繰り返
し行えばよい。Hereinafter, although detailed description is omitted, the steps 104 to 105 may be sequentially repeated as described above.
【0072】かくして、図1のステップ101乃至ステ
ップ105を必要なだけ繰り返して複数の鋼管矢板を建
て込むことにより、所望の長さ、例えば数100m にわた
る鋼管矢板壁を構築することができる。Thus, by repeating steps 101 to 105 of FIG. 1 as necessary, a plurality of steel pipe sheet piles are built, whereby a steel pipe sheet pile wall having a desired length, for example, several hundred meters can be constructed.
【0073】鋼管矢板壁構築後は、腹起こし、切り梁等
を適宜設けながら鋼管矢板壁で囲まれた領域を掘削し、
所定の構造物を構築する。構造物を構築した後は、埋め
戻し等の作業を経て、必要ならば、構築した鋼管矢板壁
を撤去する。After the construction of the steel sheet pile wall, the area surrounded by the steel sheet pile wall is excavated while providing a belly, cutting beams and the like as appropriate.
Build a given structure. After constructing the structure, the work such as backfilling is performed, and if necessary, the constructed steel sheet pile wall is removed.
【0074】従来の鋼管矢板壁工法は、打込工法で行う
と騒音や振動がひどく、建込工法で行うと止水性が低下
するというように一長一短があったが、本実施例の鋼管
矢板壁およびその構築工法では、上述したように、所定
の堰体を予め鋼管矢板の一方の連結部に取付けておくこ
とによって連結部内にモルタルが浸入するのを防止し、
モルタルが硬化した後に堰体を破って次の鋼管矢板の他
方の連結部を嵌合させるようにしたので、連結部近傍に
モルタル等が固着して連結部同士の嵌合が妨げられるこ
とがなくなり、連結部同士をスムーズに嵌合させて次の
鋼管矢板を容易に建て込むことができる。The conventional steel pipe sheet pile wall method has advantages and disadvantages in that the noise and vibration are severe when performed by the driving method and the water stoppage is reduced when the method is performed by the built-in method. And, in the construction method, as described above, a predetermined dam body is attached to one of the connecting portions of the steel pipe sheet pile in advance to prevent mortar from entering the connecting portion,
Mortar beating Sekitai after hardening the other of the following steel pipe sheet pile
Since the two connecting portions are fitted, the mortar or the like does not adhere to the vicinity of the connecting portion, so that the fitting of the connecting portions is not hindered. Can be easily built.
【0075】このように、建込の際にほとんど摩擦や抵
抗がないため、騒音や振動は発生しなくなり、きわめて
静粛性の高い工法となる。As described above, since there is almost no friction or resistance at the time of building, no noise or vibration is generated, and the construction method is extremely quiet.
【0076】また、次の鋼管矢板を建て込んだ後、先行
した鋼管矢板の一方の連結部と次の鋼管矢板の他方の連
結部との間に生じた空隙にモルタルを充填するようにし
たので、連結部における止水性を格段に向上させること
ができる。[0076] After that built up the following steel sheet pile, prior to filling the mortar into the gap occurring between one of the connecting portion and the other connecting <br/> formation of the next steel sheet pile of steel sheet pile As a result, it is possible to remarkably improve the water stoppage at the connecting portion.
【0077】静粛性および止水性に優れた土留め工法と
して地中連続壁工法がよく知られているが、後で撤去が
必要な場合には、本実施例の鋼管矢板壁工法が最適な工
法となる。The underground continuous wall method is well known as an earth retaining method excellent in silence and water stoppage. However, when it is necessary to remove the underground wall method later, the steel pipe sheet pile wall method of this embodiment is the most suitable method. Becomes
【0078】本実施例では、硬化材としてベントナイト
モルタルを用いたが、所定の強度と止水性をもつ材料、
例えば、通常のモルタルあるいはコンクリートでもよ
い。In this embodiment, bentonite mortar is used as a hardening material.
For example, ordinary mortar or concrete may be used.
【0079】また、本実施例では、鋼管矢板の連結部を
図2に示すような形状としたが、連結した状態で内部に
モルタルを充填できる空間が形成されるのであれば、ど
んな形状の連結部でもよい。Further, in this embodiment, the connecting portion of the steel pipe sheet pile is formed as shown in FIG. 2. However, as long as a space in which mortar can be filled is formed in the connected portion, any shape of connecting portion can be used. Department.
【0080】また、本実施例では、堰体と鋼管矢板との
取付け部分をシール構造としたが、硬化材の浸入を完全
に防止せねばならないものではなく、例えばセメントや
骨材部分だけを遮断すれば足りる。したがって、多少の
水分が内部に浸入してもよい。Further, in this embodiment, the mounting portion between the weir and the steel pipe sheet pile has a seal structure. However, it is not necessary to completely prevent the infiltration of the hardening material. For example, only the cement or the aggregate portion is blocked. I suffice. Therefore, some water may enter the interior.
【0081】また、本実施例では、堰体を鋼管矢板に取
り付ける場所についてはなんら言及しなかったが、かか
る取付けを予め工場で行っておき、堰体を取り付けた鋼
管矢板を現場に搬入するようにしてもよいことは言うま
でもない。In this embodiment, the place where the dam is attached to the steel pipe sheet pile is not mentioned at all. However, such attachment is performed in advance in a factory, and the steel pipe sheet pile with the dam is attached to the site. Needless to say, this may be done.
【0082】(第2実施例)次に、第2実施例について
説明するが、第1実施例と実質的に同一の部品等につい
ては同一の符号を付してその説明を省略する。(Second Embodiment) Next, a second embodiment will be described. Components substantially the same as those of the first embodiment are denoted by the same reference numerals and description thereof is omitted.
【0083】図8は、第2実施例の鋼管矢板壁構築工法
の手順をフローチャートで示したものである。FIG. 8 is a flowchart showing a procedure of a steel pipe sheet pile wall construction method according to the second embodiment.
【0084】同図でわかるように、本実施例の鋼管矢板
壁構築工法においては、まず、これから建て込もうとす
る鋼管矢板1b の一方の連結部である連結部4b に置換
体51b を取り付ける(ステップ111)。As can be seen from the figure, in the steel pipe sheet pile wall construction method of this embodiment, first, the replacement body 51b is attached to the connecting part 4b, which is one connecting part of the steel pipe sheet pile 1b to be built from now on ( Step 111).
【0085】図9は、鋼管矢板1b に置換体51b を取
り付けた様子を示したものである。FIG. 9 shows a state in which a substitute 51b is attached to a steel pipe sheet pile 1b.
【0086】同図でわかるように、置換体51b は、後
の工程で周囲に硬化材を注入したときにその硬化材の圧
力で破損しないように、かつ、掘削工程の際に所定の掘
削駆動力で連結部から除去できるようにその材質を適宜
選択し、例えば、発泡スチロールの中実体で形成するの
がよい。As can be seen from the figure, the replacement body 51b is designed not to be damaged by the pressure of the hardened material when the hardened material is injected into the surroundings in a later step, and to have a predetermined excavation drive during the excavation step. The material is appropriately selected so that the material can be removed from the connecting portion by force, and for example, the material is preferably formed of a solid body of Styrofoam.
【0087】一方、上述した置換体の取付工程とは別
に、置換体51b を取り付けた鋼管矢板1b を建て込む
ための孔21b を掘削する(図8、ステップ112)。On the other hand, apart from the above-described replacement body mounting step, a hole 21b for excavating the steel pipe sheet pile 1b to which the replacement body 51b is mounted is excavated (FIG. 8, step 112).
【0088】図10は、孔21b の掘削ラインを破線で
示したものである。FIG. 10 shows a digging line of the hole 21b by a broken line.
【0089】掘削方法については、ほぼ第1実施例と同
様であるので、詳細な説明は省略するが、孔21b の掘
削ラインが、鋼管矢板1a の置換体51a に及んでいる
ことからわかるように、本工程では、地盤を掘削すると
同時にドリリングバケット等で置換体51a を除去し
て、鋼管矢板1a の連結部4a の内部を露出させる(図
8、ステップ113)。Since the excavation method is substantially the same as that of the first embodiment, a detailed description thereof will be omitted. However, as can be seen from the fact that the excavation line of the hole 21b extends to the replacement body 51a of the steel pipe sheet pile 1a. In this process, the excavation of the ground and at the same time, the replacement 51a is removed with a drilling bucket or the like to expose the inside of the connecting portion 4a of the steel pipe sheet pile 1a (FIG. 8, step 113).
【0090】置換体51a として例えば発泡スチロール
等を用いた場合、ドリリングバケットの切削面が置換体
51a に作用すると、置換体51a は、粉々になってベ
ントナイト安定液中を浮き上がり、連結部4a から容易
に除去される。When styrofoam or the like is used as the replacement body 51a, for example, when the cutting surface of the drilling bucket acts on the replacement body 51a, the replacement body 51a is broken up and rises in the bentonite stable liquid, and easily from the connecting portion 4a. Removed.
【0091】図11は、掘削工程後、孔21b が形成さ
れた様子を示したものである。FIG. 11 shows a state in which a hole 21b has been formed after the excavation step.
【0092】次に、図12に示すように、隣接する鋼管
矢板1a の連結部4a にこれから建て込もうとする鋼管
矢板1b の他方の連結部である連結部3b を嵌め込みな
がら、鋼管矢板1b を孔21b 内に建て込み(図8、ス
テップ114)、次いで、図13に示すように、鋼管矢
板1a の連結部4a と鋼管矢板1b の連結部3b との間
に形成された空間および鋼管矢板1b の周囲にベントナ
イトモルタル23b を注入し、ベントナイト安定液31
b をベントナイトモルタル23b で置換する(図8、ス
テップ115)。Next, as shown in FIG. 12, the steel pipe sheet pile 1b is inserted into the connection part 4a of the adjacent steel pipe sheet pile 1a while the connection part 3b, which is the other connection part of the steel pipe sheet pile 1b to be built , is fitted. It is built in the hole 21b (FIG. 8, step 114), and then, as shown in FIG. 13, the space formed between the connecting part 4a of the steel pipe sheet pile 1a and the connecting part 3b of the steel pipe sheet pile 1b and the steel pipe sheet pile 1b. Of bentonite mortar 23b around the periphery of
b is replaced with bentonite mortar 23b (FIG. 8, step 115).
【0093】ここで、2つの鋼管矢板1a および1b の
連結部の間に形成された空間に注入されたベントナイト
モルタル23b は、その空間に隅々までゆきわたり、硬
化後にあっては、地下水等を遮水する止水壁としての機
能を発揮する。Here, the bentonite mortar 23b injected into the space formed between the connecting portions of the two steel pipe sheet piles 1a and 1b spreads all over the space, and after hardening, drains groundwater and the like. Exhibits the function as a water blocking wall that blocks water.
【0094】また、鋼管矢板1b の周囲に注入されたベ
ントナイトモルタル23b は、硬化後にあっては、鋼管
矢板1b を周囲の地盤にしっかりと固着する。The bentonite mortar 23b injected around the steel pipe sheet pile 1b firmly fixes the steel pipe sheet pile 1b to the surrounding ground after hardening.
【0095】一方、鋼管矢板1b の連結部4b 内部には
置換体51b を取り付けてあるため、その置換体51b
の容積分だけはベントナイトモルタル23b に置換され
ることはない。On the other hand, since the replacement 51b is mounted inside the connecting portion 4b of the steel pipe sheet pile 1b, the replacement 51b is attached.
Is not replaced by the bentonite mortar 23b.
【0096】そのため、ベントナイトモルタル23b が
硬化してから掘削時にこれを除去すれば、次に建て込む
鋼管矢板1c の連結部3c を嵌め込むための中空空間が
連結部4b 内部に現れる。Therefore, if the bentonite mortar 23b is hardened and then removed during excavation, a hollow space for fitting the connecting portion 3c of the steel pipe sheet pile 1c to be built next appears inside the connecting portion 4b.
【0097】以下、詳細な説明は省略するが、図8のス
テップ111乃至ステップ115を必要なだけ繰り返し
て複数の鋼管矢板を建て込むことにより、所望の長さ、
例えば数100m にわたる鋼管矢板壁を構築することがで
きる。Hereinafter, although detailed description is omitted, steps 111 to 115 of FIG. 8 are repeated as necessary to build a plurality of steel pipe sheet piles to obtain a desired length,
For example, a steel sheet pile wall spanning several hundred meters can be constructed.
【0098】第2実施例に関するその他の作用および効
果については、第1実施例とほぼ同様であるので詳細な
説明は省略する。The other operations and effects of the second embodiment are almost the same as those of the first embodiment, and therefore, detailed description is omitted.
【0099】なお、第1実施例と同様、硬化材として通
常のモルタルあるいはコンクリートを用いてもよいし、
鋼管矢板の連結部は、連結した状態で内部にモルタルを
充填できる空間が形成されるのであればどんな形状の連
結部でもよい。さらに、置換体の取付けを予め工場で行
っておき、これを現場に搬入するようにしてもよいこと
は言うまでもない。As in the first embodiment, ordinary mortar or concrete may be used as the hardening material.
The connection portion of the steel pipe sheet pile may be any shape as long as a space in which the mortar can be filled in the connected state is formed. Further, it goes without saying that the replacement body may be mounted in advance at a factory, and may be carried to the site.
【0100】(第3実施例)次に、第3実施例について
説明する。なお、第1あるいは第2実施例と実質的に同
一の部品等については、同一の符号を付してその説明を
省略する。(Third Embodiment) Next, a third embodiment will be described. In addition, the same reference numerals are given to components and the like that are substantially the same as those in the first or second embodiment, and description thereof is omitted.
【0101】図14は、第3実施例に係る鋼管矢板を示
したものである。FIG. 14 shows a steel pipe sheet pile according to the third embodiment.
【0102】同図でわかるように、第3実施例に係る鋼
管矢板は、鋼管矢板1の一方の連結部である連結部4を
取り囲むようにしてシート11を取り付けてある。As can be seen from the figure, the steel sheet pile according to the third embodiment has the sheet 11 attached so as to surround the connecting portion 4 which is one connecting portion of the steel pipe sheet pile 1.
【0103】シート11には、これを補強するローブ1
2を両縁に設けてあり、ロープ12の手前に押さえ板1
3をあてて鋲14をアングル6に打ち込むことにより、
シート11を鋼管矢板1に固定してある。この状態で
は、シート11の内側に長手方向の中空空間が形成され
ている。The sheet 11 has a lobe 1 for reinforcing it.
2 are provided on both sides, and the holding plate 1
By hitting 3 and driving the stud 14 into the angle 6,
The sheet 11 is fixed to the steel sheet pile 1. In this state, a longitudinal hollow space is formed inside the sheet 11.
【0104】次に、本実施例の鋼管矢板を用いて鋼管矢
板壁を構築する手順を説明する。Next, a procedure for constructing a steel sheet pile wall using the steel sheet pile of the present embodiment will be described.
【0105】なお、本実施例では、説明の便宜上、シー
ト11a 、11b 、11c ・・・を各々鋼管矢板1a 、
1b 、1c ・・に取付け、既に建て込みが終わった鋼管
矢板1a に隣接させて鋼管矢板1b 、1c ・・・を順次
建て込んでいくものとし、鋼管矢板1およびシート11
並びにこれらに関連する部分と同一の部分については、
図14で説明した各部の符号にa, b, c ・・・を付して
表現することとする。In this embodiment, for convenience of explanation, the sheets 11a, 11b, 11c...
, 1b, 1c,... And the steel pipe sheet piles 1b, 1c...
And the same parts as those related to
It is assumed that reference numerals a, b, c,...
【0106】本実施例の鋼管矢板を用いて鋼管矢板壁を
構築するには、まず、シート11bを取り付けた鋼管矢
板1b を建て込むための孔21b を掘削する。In order to construct a steel sheet pile wall using the steel sheet pile of this embodiment, first, a hole 21b for excavating the steel sheet pile 1b to which the sheet 11b is attached is excavated.
【0107】図15は、孔21b の掘削ラインを破線で
示したものである。FIG. 15 shows the digging line of the hole 21b by a broken line.
【0108】掘削については、第1あるいは第2実施例
と同様、例えばアースドリルを用いて行い、ケリーバー
の先端に取り付けたドリリングバケットを回転させて削
孔する。なお、掘削にあたっては、孔壁の崩壊を防止す
るため、非硬化型の安定液としてのベントナイト安定
液、ポリマー安定液等を孔内に注入しながら行うのがよ
い。[0108] Excavation is performed using, for example, an earth drill, as in the first or second embodiment, and drilling is performed by rotating a drilling bucket attached to the tip of the kelly bar. In order to prevent collapse of the hole wall, excavation is preferably performed while pouring a bentonite stabilizing solution, a polymer stabilizing solution, or the like as a non-curable stabilizing solution into the hole.
【0109】また、孔21b の掘削ライン(破線)が、
先行して建て込まれた鋼管矢板1aの周囲に充填された
硬化材23a に及んでいることからわかるように、掘削
時に硬化材23a の一部も削り取る。The excavation line (broken line) for the hole 21b is
As can be seen from the fact that it extends to the hardened material 23a filled around the steel pipe sheet pile 1a built in advance, a part of the hardened material 23a is also cut off during excavation.
【0110】同様に、孔21b の掘削ラインが、鋼管矢
板1a のシート11aおよびシート11a の内部空間に
充填してあった充填材22a に及んでいることからわか
るように、地盤の掘削時にドリリングバケット等でシー
ト11a を破り取ってシート11a 内側の充填材22a
を崩落させ、鋼管矢板1a の連結部4a の内部を露出さ
せる。Similarly, as can be seen from the fact that the excavation line of the hole 21b extends to the sheet 11a of the steel pipe sheet pile 1a and the filler 22a which has been filled in the internal space of the sheet 11a, the drilling bucket is formed when the ground is excavated. The sheet 11a is torn off by using the filler 22a inside the sheet 11a.
And the inside of the connecting portion 4a of the steel pipe sheet pile 1a is exposed.
【0111】図16は、掘削後、孔21b が形成された
様子を示したものである。FIG. 16 shows a state in which a hole 21b has been formed after excavation.
【0112】同図でわかるように、シート11a が破ら
れて内部の充填材22a が崩落し、連結部4a の内部が
ベントナイト安定液31bに露出していることがわか
る。As can be seen from the figure, it can be seen that the sheet 11a has been torn and the internal filler 22a has collapsed, and the interior of the connecting portion 4a has been exposed to the bentonite stabilizer 31b.
【0113】次に、隣接する鋼管矢板1a の一方の連結
部である連結部4a にこれから建て込もうとする鋼管矢
板1b の他方の連結部である連結部3b を嵌め込みなが
ら、鋼管矢板1b を孔21b 内に建て込む。Next, one of the adjacent steel pipe sheet piles 1a is connected.
The steel pipe sheet pile 1b is built into the hole 21b while the connecting part 3b, which is the other connecting part of the steel pipe sheet pile 1b to be built, is fitted into the connecting part 4a.
【0114】図17は、鋼管矢板1b の建込を終了した
時点での様子を示したものである。FIG. 17 shows a state at the time when the construction of the steel pipe sheet pile 1b has been completed.
【0115】次に、鋼管矢板1b に取り付けたシート1
1b の内側に充填材22b を充填する。Next, the sheet 1 attached to the steel pipe sheet pile 1b
1b is filled with a filler 22b.
【0116】充填材22b には、ベントナイト溶液の比
重(通常、1.0 乃至1.3 の範囲)よりも比重が大きな材
料、例えば砕石、高炉スラグ(比重2.5 程度)あるい
は、もっと比重の大きな材料として、電炉スラグ(比重
3.5 )やコンクリートの重量骨材として知られる鉄、磁
鉄鉱、砂鉄、褐鉄鉱等(比重2.4 乃至8 )を用いるのが
好ましい。The filler 22b is made of a material having a specific gravity higher than the specific gravity of the bentonite solution (usually in the range of 1.0 to 1.3), for example, crushed stone, blast furnace slag (specific gravity of about 2.5), or electric furnace slag as a material having a higher specific gravity. (specific gravity
It is preferable to use iron, magnetite, iron sand, limonite, etc. (specific gravity 2.4 to 8) which are known as heavy aggregates of 3.5) and concrete.
【0117】図18は、充填材の充填を終了した時点で
の様子を示したものである。FIG. 18 shows a state at the time when the filling of the filler is completed.
【0118】次に、鋼管矢板1a の連結部4a と鋼管矢
板1b の連結部3b との間に形成された空間および鋼管
矢板1b の周囲にベントナイトモルタル23b を注入
し、ベントナイト安定液31b をベントナイトモルタル
23b で置換する。Next, bentonite mortar 23b is injected into the space formed between the connecting portion 4a of the steel pipe sheet pile 1a and the connecting portion 3b of the steel pipe sheet pile 1b and around the steel pipe sheet pile 1b. Replace with 23b.
【0119】図19は、ベントナイト安定液31b をベ
ントナイトモルタル23b に置換した後の状態を示した
ものである。なお、同図中、41、42および43は、
ベントナイトモルタルを注入するための配管位置を示し
たものである。FIG. 19 shows a state after the bentonite stabilizing solution 31b has been replaced with bentonite mortar 23b. In the figure, 41, 42 and 43 are:
It is a figure which shows the piping position for injecting bentonite mortar.
【0120】かかる配管位置でわかるように、鋼管矢板
1b がモルタルの注入圧力によって傾かないように留意
する。As can be seen from the piping position, care should be taken so that the steel pipe sheet pile 1b does not tilt due to the mortar injection pressure.
【0121】これで、鋼管矢板1b に関する一連の工程
は終了するが、引き続き鋼管矢板1c の建込等を行う場
合には、上述したと同様、鋼管矢板1c の一方の連結部
である連結部4c を取り囲むようにしてシート11c を
鋼管矢板1c に取付け、鋼管矢板1c を建て込むための
孔21c を掘削する。次いで、地盤を掘削すると同時に
ドリリングバケット等でシート11b を破り取ってシー
ト11b 内側の充填材22b を崩落させ、鋼管矢板1b
の連結部4b の内部を露出させる。Thus, a series of processes for the steel pipe sheet pile 1b is completed. However, when the steel pipe sheet pile 1c is to be erected continuously, one of the connecting portions of the steel pipe sheet pile 1c is similar to the above.
The sheet 11c is mounted on the steel sheet pile 1c so as to surround the connecting portion 4c, and a hole 21c for excavating the steel sheet pile 1c is excavated. Next, at the same time as excavating the ground, the sheet 11b is torn off with a drilling bucket or the like to collapse the filler 22b inside the sheet 11b, and the steel pipe sheet pile 1b
The inside of the connecting portion 4b is exposed.
【0122】図20は、孔21c の掘削後の状態を示し
たものである。FIG. 20 shows a state after excavation of the hole 21c.
【0123】かくして、今まで述べた手順を必要なだけ
繰り返して複数の鋼管矢板を建て込むことにより、所望
の長さ、例えば数100m にわたる鋼管矢板壁を構築する
ことができる。Thus, by repeating the above-described procedure as many times as necessary to build a plurality of steel pipe sheet piles, it is possible to construct a steel pipe sheet pile wall having a desired length, for example, several hundred meters.
【0124】鋼管矢板壁構築後は、腹起こし、切り梁等
を適宜設けながら鋼管矢板壁で囲まれた領域を掘削し、
所定の構造物を構築する。構造物を構築した後は、埋め
戻し等の作業を経て、必要ならば、構築した鋼管矢板壁
を撤去する。After constructing the steel sheet pile wall, the area surrounded by the steel sheet pile wall was excavated while appropriately providing uprights, cutting beams, and the like.
Build a given structure. After constructing the structure, the work such as backfilling is performed, and if necessary, the constructed steel sheet pile wall is removed.
【0125】従来の鋼管矢板を用いて鋼管矢板壁を構築
する場合には、打込工法で行うと騒音や振動がひどく、
建込工法で行うと止水性が低下するというように一長一
短があったが、本実施例の鋼管矢板を用いて構築を行う
と、上述したように、鋼管矢板の一方の連結部に取付け
たシートの内部に充填材を充填しておくことによって、
連結部内にモルタルが浸入するのを防止し、モルタルが
硬化した後にその充填材を取り除いて中空の空間を形成
し、その中に次の鋼管矢板の他方の連結部を嵌合させる
ようにしたので、連結部近傍にモルタル等が固着して連
結部同士の嵌合が妨げられることがなくなり、連結部同
士をスムーズに嵌合させて次の鋼管矢板を容易に建て込
むことができる。In the case of constructing a steel sheet pile wall using a conventional steel sheet pile, noise and vibration are severe when driven by the driving method.
Although there were advantages and disadvantages such as lowering the water stoppage when performed by the construction method, when the construction was performed using the steel pipe sheet pile of this embodiment, as described above, the sheet attached to one connecting portion of the steel pipe sheet pile By filling the inside of the filler with
Since the mortar was prevented from infiltrating into the connection portion, and after the mortar was hardened, the filler was removed to form a hollow space, into which the other connection portion of the next steel sheet pile was fitted. In addition, the mortar or the like does not adhere to the vicinity of the connecting portion to prevent the fitting of the connecting portions from being hindered, and the connecting portions can be smoothly fitted to each other to easily install the next steel pipe sheet pile.
【0126】このように、建込の際にほとんど摩擦や抵
抗がないため、騒音や振動は発生しなくなり、きわめて
静粛性が高くなる。As described above, since there is almost no friction or resistance at the time of building, no noise or vibration is generated, and the quietness is extremely enhanced.
【0127】また、次の鋼管矢板を建て込んだ後、先行
した鋼管矢板の一方の連結部と次の鋼管矢板の他方の連
結部との間に生じた空隙にモルタルを充填するようにし
たので、連結部における止水性を格段に向上させること
ができる。[0127] After that built up the following steel sheet pile, prior to filling the mortar into the gap occurring between one of the connecting portion and the other connecting <br/> formation of the next steel sheet pile of steel sheet pile As a result, it is possible to remarkably improve the water stoppage at the connecting portion.
【0128】静粛性および止水性に優れた土留め工法と
して地中連続壁工法がよく知られているが、後で撤去が
必要な場合には、本実施例の鋼管矢板壁工法が最適な工
法となる。The underground continuous wall method is well known as an earth retaining method excellent in quietness and water stoppage. However, if it is necessary to remove the underground wall method later, the steel pipe sheet pile wall method of this embodiment is most suitable. Becomes
【0129】また、充填材として、孔内に注入する安定
液の比重よりも大きな充填材を選んだので、シート内側
に充填する際に安定液内にスムーズに沈み、途中で詰ま
ることなく、シート内側に充填することができる。Further, since a filler having a specific gravity larger than the specific gravity of the stabilizing liquid to be injected into the holes was selected as the filling material, the filler smoothly sinks into the stabilizing liquid when filling the inside of the sheet, and does not clog in the middle of the sheet. Can be filled inside.
【0130】また、本実施例では、硬化材としてベント
ナイトモルタルを用いたが、所定の強度と止水性をもつ
材料、例えば、通常のモルタルあるいはコンクリートで
もよい。Further, in this embodiment, bentonite mortar is used as a hardening material, but a material having a predetermined strength and water-blocking property, for example, ordinary mortar or concrete may be used.
【0131】また、本実施例では、鋼管矢板の連結部を
図2に示すような形状としたが、連結した状態で内部に
モルタルを充填できる空間が形成されるのであれば、ど
んな形状の連結部でもよい。Further, in this embodiment, the connecting portion of the steel pipe sheet pile is formed as shown in FIG. 2. However, as long as a space in which mortar can be filled is formed in the connected state, any shape of connecting portion can be used. Department.
【0132】また、本実施例では、シートを取り付ける
場所について特に言及しなかったが、予め工場等で取り
付けたものを現場に搬入してこれを建て込むようにして
もよい。In this embodiment, the place where the sheet is to be attached is not particularly described. However, a sheet attached in advance in a factory or the like may be carried into the site and built.
【0133】また、本実施例では、鋼管矢板の建込が終
了してからそのシート内に充填材を充填するようにした
が、工場でシートを取り付ける際、同時にそのシート内
に充填材を充填しておき、これを現場に搬入して建て込
んでもよい。In this embodiment, the sheet is filled with the filler after the steel pipe sheet pile has been installed. However, when the sheet is attached at the factory, the sheet is simultaneously filled with the filler. In advance, this may be carried into the site and built.
【0134】かかる場合には、充填材の比重はベントナ
イト安定液に対して重くする必要はなく、むしろ、建て
込んだ後の回収・再利用あるいは運搬時の取扱い等を考
慮して、発泡スチロール等の比較的軽い材料を粒状ある
いは団子状に形成し、これらをシート内に詰め込むよう
にしてもよい。In such a case, the specific gravity of the filler does not need to be heavier than that of the bentonite stabilizing solution. Rather, in consideration of recovery and reuse after building or handling during transportation, etc. A relatively light material may be formed in a granular or dumpling shape, and these may be packed in a sheet.
【0135】[0135]
【発明の効果】以上述べたように、本発明の鋼管矢板壁
構築工法は、鋼管矢板に互いに反対側となるように設け
られた2つの連結部のうち、一方の連結部内部に所定の
置換体を取り付ける一方、前記鋼管矢板を建て込むため
の孔を地盤内に掘削する工程と、当該掘削工程と同時
に、先行鋼管矢板の周囲に打設された硬化材を削り取る
とともに当該先行鋼管矢板の一方の連結部内部の置換体
を除去して当該連結部の内部を露出させる工程と、前記
先行鋼管矢板の一方の連結部に前記鋼管矢板の他方の連
結部を嵌め込みながら前記鋼管矢板を前記孔内に建て込
む工程と、前記先行鋼管矢板の一方の連結部と前記鋼管
矢板の他方の連結部との間の空間および前記鋼管矢板の
周囲に所定の硬化材を注入する工程とを含むので、無騒
音無振動でなおかつ止水性の高い土留め壁を構築するこ
とができる。As described above, according to the steel pipe sheet pile wall construction method of the present invention, a predetermined replacement is provided inside one of the two connection parts provided on the steel pipe sheet pile on opposite sides. A step of excavating a hole for embedding the steel pipe sheet pile in the ground while attaching the body, and simultaneously with the excavation step, shaving off a hardened material poured around the preceding steel pipe sheet pile and one of the preceding steel pipe sheet piles; Removing the substituted body inside the connecting portion to expose the inside of the connecting portion; and inserting the other connecting portion of the steel pipe sheet pile into one connecting portion of the preceding steel pipe sheet pile and inserting the steel pipe sheet pile in the hole. And a step of injecting a predetermined hardening material into a space between one connecting portion of the preceding steel pipe sheet pile and the other connecting portion of the steel pipe sheet pile and around the steel pipe sheet pile. Noise-free and vibration-free It is possible to construct a highly aqueous earth retaining wall.
【0136】また、本発明の鋼管矢板は、互いに反対側
となるように一方の連結部及び他方の連結部が設けられ
た鋼管矢板であって、該一方の連結部と次に建て込まれ
る鋼管矢板の他方の連結部とを相互に連結可能に構成し
た鋼管矢板において、発泡スチロール等で形成された所
定の置換体を前記一方の連結部内部に取付け、前記置換
体の周囲に注入された硬化材が前記一方の連結部内部に
実質的に浸入しないようにするとともに、掘削と同時に
前記置換体を除去して前記一方の連結部の内部を露出さ
せた状態で該一方の連結部の内部に前記他方の連結部を
嵌め込み、かかる状態で前記一方の連結部と前記他方の
連結部との間の空間に硬化材を注入するように構成した
ので、先行鋼管矢板との関係では、連結部内に硬化材を
充填して止水性を確保することができる一方、後で建て
込む鋼管矢板との関係では、連結部内部に所定の中空空
間を形成して建込作業性を確保することが可能となる。Further, the steel pipe sheet pile of the present invention is a steel pipe sheet pile provided with one connecting portion and the other connecting portion so as to be opposite to each other. In a steel pipe sheet pile configured to be mutually connectable with the other connection part of the sheet pile, a predetermined replacement body made of styrene foam or the like is attached inside the one connection part, and a hardened material injected around the replacement body To prevent substantially infiltration into the inside of the one connection part, and removing the replacement body at the same time as excavation to expose the inside of the one connection part so as to expose the inside of the one connection part. The other connecting portion is fitted inside, and in such a state, the hardening material is injected into the space between the one connecting portion and the other connecting portion, so that in relation to the preceding steel pipe sheet pile, Filling the connection part with hardener and stopping water While it is possible to secure, in the later Tatekomu relationship between steel sheet pile, it is possible to secure the Kenkomi workability inner connecting portion to form a predetermined cavity.
【0137】また、本発明の鋼管矢板は、互いに反対側
となるように一方の連結部及び他方の連結部が設けられ
た鋼管矢板であって、該一方の連結部と次に建て込まれ
る鋼管矢板の他方の連結部とを相互に連結可能に構成し
た鋼管矢板において、所定のシートを前記一方の連結部
を取り囲むようにして取付け、前記シートの内側に安定
液よりも比重の軽い材料で形成された充填材を充填して
前記シートの周囲に注入された硬化材が前記一方の連結
部内部に実質的に浸入しないようにするとともに、前記
シートを破って前記充填材を崩落させ前記一方の連結部
の内部を露出させた状態で該一方の連結部の内部に前記
他方の連結部を嵌め込み、かかる状態で前記一方の連結
部と前記他方の連結部との間の空間に硬化材を注入する
ように構成したので、先行鋼管矢板との関係では、連結
部内に硬化材を充填して止水性を確保することができる
一方、後で建て込む鋼管矢板との関係では、連結部内部
に所定の中空空間を形成して建込作業性を確保すること
が可能となる。A steel pipe sheet pile according to the present invention is a steel pipe sheet pile provided with one connecting portion and the other connecting portion so as to be opposite to each other. In a steel pipe sheet pile configured to be mutually connectable with the other connection part of the sheet pile, a predetermined sheet is attached so as to surround the one connection part and is stable inside the sheet.
Thereby to cure material injected around <br/> the sheet is filled with a filler that is formed with a light specific gravity material is not substantially intrude inside connecting portion of the one than the liquid, the The other connecting portion is fitted inside the one connecting portion in a state where the filler is broken by breaking a sheet to expose the inside of the one connecting portion, and in this state, the one connecting portion and the other are fitted. As the hardening material is injected into the space between the connecting parts, the hardening material can be filled in the connecting parts to secure the water stoppage in relation to the preceding steel pipe sheet pile, while In relation to the steel pipe sheet pile to be inserted, a predetermined hollow space can be formed inside the connecting portion, and it becomes possible to secure the erection workability.
【0138】[0138]
【0139】[0139]
【0140】[0140]
【図1】第1実施例に係る鋼管矢板壁構築工法の手順を
示したフローチャート。FIG. 1 is a flowchart showing a procedure of a steel pipe sheet pile wall construction method according to a first embodiment.
【図2】(a)は、本実施例に係る鋼管矢板壁構築工法に
用いる鋼管矢板の横断面図、(b)は、2つの鋼管矢板を
連結させた状態を示した図。2A is a cross-sectional view of a steel pipe sheet pile used in the steel sheet pile wall construction method according to the present embodiment, and FIG. 2B is a view showing a state in which two steel pipe sheet piles are connected.
【図3】鋼管矢板の連結部に堰体を取り付けた様子を示
した図。FIG. 3 is a view showing a state where a weir body is attached to a connecting portion of a steel pipe sheet pile.
【図4】鋼管矢板を建て込むための孔を掘削するライン
を示した図。FIG. 4 is a diagram showing a line for excavating a hole for installing a steel pipe sheet pile.
【図5】鋼管矢板用の孔の掘削を完了した状態を示した
図。FIG. 5 is a view showing a state in which excavation of a hole for a steel pipe sheet pile has been completed.
【図6】掘削した孔内に鋼管矢板を建て込んだ様子を示
した図。FIG. 6 is a view showing a state in which a steel pipe sheet pile is erected in a hole excavated.
【図7】2つの鋼管矢板の連結部と連結部の間に生じた
空間および鋼管矢板の周囲にベントナイトモルタルを注
入した様子を示した図。FIG. 7 is a diagram showing a state in which bentonite mortar is injected into a space formed between a connecting portion between two steel pipe sheet piles and the connecting section and around the steel pipe sheet pile.
【図8】第2実施例に係る鋼管矢板壁構築工法の手順を
示したフローチャート。FIG. 8 is a flowchart illustrating a procedure of a steel pipe sheet pile wall construction method according to a second embodiment.
【図9】鋼管矢板の連結部に置換体を取り付けた様子を
示した図。FIG. 9 is a view showing a state in which a replacement body is attached to a connecting portion of a steel pipe sheet pile.
【図10】鋼管矢板を建て込むための孔を掘削するライ
ンを示した図。FIG. 10 is a diagram showing a line for excavating a hole for installing a steel pipe sheet pile.
【図11】鋼管矢板用の孔の掘削を完了した状態を示し
た図。FIG. 11 is a view showing a state in which excavation of a hole for a steel pipe sheet pile has been completed.
【図12】掘削した孔内に鋼管矢板を建て込んだ様子を
示した図。FIG. 12 is a view showing a state in which a steel pipe sheet pile is erected in an excavated hole.
【図13】2つの鋼管矢板の連結部と連結部の間に生じ
た空間および鋼管矢板の周囲にベントナイトモルタルを
注入した様子を示した図。FIG. 13 is a diagram showing a state in which bentonite mortar is injected into a space formed between a connecting portion between two steel pipe sheet piles and a surrounding portion of the steel pipe sheet pile.
【図14】鋼管矢板の連結部にシートを取り付けた様子
を示した図。FIG. 14 is a diagram showing a state in which a sheet is attached to a connecting portion of a steel pipe sheet pile.
【図15】鋼管矢板を建て込むための孔を掘削するライ
ンを示した図。FIG. 15 is a diagram showing a line for excavating a hole for installing a steel pipe sheet pile.
【図16】鋼管矢板用の孔の掘削を完了した状態を示し
た図。FIG. 16 is a diagram showing a state in which excavation of a hole for a steel pipe sheet pile has been completed.
【図17】掘削した孔内に鋼管矢板を建て込んだ様子を
示した図。FIG. 17 is a view showing a state in which a steel pipe sheet pile is erected in the excavated hole.
【図18】建て込んだ鋼管矢板のシートの内側に充填材
を充填した様子を示した図。FIG. 18 is a diagram showing a state in which a filler is filled inside the sheet of the piled steel pipe sheet pile.
【図19】2つの鋼管矢板の連結部と連結部の間に生じ
た空間および鋼管矢板の周囲にベントナイトモルタルを
注入した様子を示した図。FIG. 19 is a view showing a state in which bentonite mortar is injected into a space formed between a connecting portion of two steel pipe sheet piles and around the steel pipe sheet pile.
【図20】さらに別の孔を掘削した様子を示した図。FIG. 20 is a diagram showing a state where another hole is excavated.
1 鋼管矢板3 連結部(他方の連結部) 4 連結部(一方の連結部) 11 シート 22 充填材 23 ベントナイトモルタル(硬化材) 31 ベントナイト溶液(非硬化型の安定液) 51 置換体 71 堰体 101 堰体取付工程 102 掘削工程 103 露出工程 104 建込工程 105 硬化材注入工程 111 置換体取付工程 112 掘削工程 113 置換体除去工程 114 建込工程 115 硬化材注入工程DESCRIPTION OF SYMBOLS 1 Steel pipe sheet pile 3 Connection part (the other connection part) 4 Connection part (one connection part) 11 Sheet 22 Filler 23 Bentonite mortar (hardening material) 31 Bentonite solution (non-hardening type stable liquid) 51 Substituent body 71 dam body 101 Weir Body Mounting Step 102 Drilling Step 103 Exposure Step 104 Building Step 105 Hardening Material Injection Step 111 Replacement Body Mounting Step 112 Drilling Step 113 Replacement Body Removing Step 114 Building Step 115 Hardening Material Injection Step
フロントページの続き (72)発明者 北村 仁 大阪市中央区北浜東4―33 株式会社大 林組 大阪本店内 (72)発明者 長尾 均 大阪市中央区北浜東4―33 株式会社大 林組 大阪本店内 (72)発明者 池田 恭二 大阪市中央区北浜東4―33 株式会社大 林組 大阪本店内 (72)発明者 谷垣 三雄 大阪市北区梅田2―2―25 五洋建設株 式会社 大阪支店内 (72)発明者 木本 和博 大阪市北区梅田2―2―25 五洋建設株 式会社 大阪支店内 (56)参考文献 特開 昭54−48911(JP,A) 特開 平5−156625(JP,A) 特公 昭56−14810(JP,B2) (58)調査した分野(Int.Cl.7,DB名) F02D 5/02 - 5/20 Continued on the front page (72) Inventor Jin Kitamura 4-33 Kitahama Higashi, Chuo-ku, Osaka City Inside the Obayashi Corporation Osaka Main Store (72) Inventor Hitoshi Nagao 4-33 Kitahama Higashi, Chuo-ku, Osaka City Obayashi Corporation Osaka Inside the main store (72) Inventor Kyoji Ikeda 4-33 Kitahamahigashi, Chuo-ku, Osaka City Obayashi Corporation Osaka Main store (72) Inventor Mitsuo Tanagaki 2-2-25 Umeda, Kita-ku, Osaka Goyo Construction Co., Ltd. Osaka Inside the branch (72) Inventor Kazuhiro Kimoto 2-2-25 Umeda, Kita-ku, Osaka-shi Goyo Construction Co., Ltd. Osaka branch (56) References JP-A-54-48911 (JP, A) 156625 (JP, A) JP 56-14810 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) F02D 5/02-5/20
Claims (3)
けられた2つの連結部のうち、一方の連結部内部に所定
の置換体を取り付ける一方、前記鋼管矢板を建て込むた
めの孔を地盤内に掘削する工程と、 当該掘削工程と同時に、先行鋼管矢板の周囲に打設され
た硬化材を削り取るとともに当該先行鋼管矢板の一方の
連結部内部の置換体を除去して当該連結部の内部を露出
させる工程と、 前記先行鋼管矢板の一方の連結部に前記鋼管矢板の他方
の連結部を嵌め込みながら前記鋼管矢板を前記孔内に建
て込む工程と、 前記先行鋼管矢板の一方の連結部と前記鋼管矢板の他方
の連結部との間の空間および前記鋼管矢板の周囲に所定
の硬化材を注入する工程とを含むことを特徴とする鋼管
矢板壁構築工法。1. A predetermined replacement is mounted inside one of two connecting portions provided on a steel pipe sheet pile so as to be opposite to each other, and a hole for embedding the steel pipe sheet pile is formed in the ground. And, simultaneously with the excavation step, shaving off the hardened material cast around the preceding steel pipe sheet pile and removing the substitute inside one of the connection parts of the preceding steel pipe sheet pile to remove the inside of the connection part. Exposing the steel pipe sheet pile into the hole while fitting the other connection part of the steel pipe sheet pile into one connection part of the preceding steel pipe sheet pile, and one connecting part of the preceding steel pipe sheet pile. Injecting a predetermined hardening material into a space between the steel pipe sheet pile and the other connecting portion and around the steel pipe sheet pile.
及び他方の連結部が設けられた鋼管矢板であって、該一
方の連結部と次に建て込まれる鋼管矢板の他方の連結部
とを相互に連結可能に構成した鋼管矢板において、 発泡スチロール等で形成された所定の置換体を前記一方
の連結部内部に取付け、前記置換体の周囲に注入された
硬化材が前記一方の連結部内部に実質的に浸入しないよ
うにするとともに、掘削と同時に前記置換体を除去して
前記一方の連結部の内部を露出させた状態で該一方の連
結部の内部に前記他方の連結部を嵌め込み、かかる状態
で前記一方の連結部と前記他方の連結部との間の空間に
硬化材を注入するように構成したことを特徴とする鋼管
矢板。2. A steel pipe sheet pile provided with one connecting portion and the other connecting portion so as to be opposite to each other, wherein the one connecting portion and the other connecting portion of a steel pipe sheet pile to be erected next. In a steel pipe sheet pile configured to be connectable to each other, a predetermined replacement formed of styrene foam or the like is attached to the inside of the one connection portion, and a hardened material injected around the replacement is filled in the one connection portion. While substantially preventing intrusion into the, the other connecting portion is fitted inside the one connecting portion in a state where the replacement body is removed at the same time as excavation and the inside of the one connecting portion is exposed, A steel pipe sheet pile characterized in that a hardening material is injected into a space between the one connecting portion and the other connecting portion in such a state.
及び他方の連結部が設けられた鋼管矢板であって、該一
方の連結部と次に建て込まれる鋼管矢板の他方の連結部
とを相互に連結可能に構成した鋼管矢板において、 所定のシートを前記一方の連結部を取り囲むようにして
取付け、前記シートの内側に安定液よりも比重の軽い材
料で形成された充填材を充填して前記シートの周囲に注
入された硬化材が前記一方の連結部内部に実質的に浸入
しないようにするとともに、前記シートを破って前記充
填材を崩落させ前記一方の連結部の内部を露出させた状
態で該一方の連結部の内部に前記他方の連結部を嵌め込
み、かかる状態で前記一方の連結部と前記他方の連結部
との間の空間に硬化材を注入するように構成したことを
特徴とする鋼管矢板。3. A steel pipe sheet pile provided with one connecting portion and the other connecting portion so as to be opposite to each other, wherein said one connecting portion and the other connecting portion of a steel pipe sheet pile to be erected next. A predetermined sheet is attached so as to surround the one connecting portion, and a material having a specific gravity smaller than that of the stable liquid is provided inside the sheet.
The hardening material injected around the sheet is filled with a filler formed of a filler so that the hardening material does not substantially enter the inside of the one connecting portion, and the sheet is broken to break the filler. The other connecting portion is fitted into the one connecting portion in a state where the inside of the one connecting portion is exposed, and in such a state, the space is hardened in a space between the one connecting portion and the other connecting portion. A steel pipe sheet pile characterized by injecting a material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6066425A JP3014267B2 (en) | 1994-03-11 | 1994-03-11 | Steel pipe sheet pile wall construction method and steel pipe sheet pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6066425A JP3014267B2 (en) | 1994-03-11 | 1994-03-11 | Steel pipe sheet pile wall construction method and steel pipe sheet pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH07252829A JPH07252829A (en) | 1995-10-03 |
JP3014267B2 true JP3014267B2 (en) | 2000-02-28 |
Family
ID=13315427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6066425A Expired - Fee Related JP3014267B2 (en) | 1994-03-11 | 1994-03-11 | Steel pipe sheet pile wall construction method and steel pipe sheet pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3014267B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5167190B2 (en) * | 2009-04-14 | 2013-03-21 | 吉田エンジニアリング有限会社 | High specific gravity stable liquid and excavation method |
CN106320324B (en) * | 2016-09-20 | 2019-05-24 | 俞晓东 | Structure improved pile protection hoop |
-
1994
- 1994-03-11 JP JP6066425A patent/JP3014267B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH07252829A (en) | 1995-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101696916B1 (en) | Construction method of permanent wall with retaining wall combined PHC pile and steel pipe | |
US20060179730A1 (en) | Wall structural member and method for constructing a wall structure | |
JP2576932B2 (en) | Construction method of independent mountain retaining wall | |
KR100346622B1 (en) | Underground construction method using permanent structural members as temporary struts | |
JP2007211408A (en) | Seismic strengthening construction method for existing concrete bridge pier | |
KR100376589B1 (en) | Underground construction method using permanent reinforced concrete girders as temporary struts | |
JP4440497B2 (en) | Construction method of underground continuous wall and construction method of underground structure | |
JP3014267B2 (en) | Steel pipe sheet pile wall construction method and steel pipe sheet pile | |
JP4485006B2 (en) | Construction method for underground structures | |
KR101935900B1 (en) | Tunnel invert | |
KR102082495B1 (en) | Low part cast in place pile construction method | |
JP2012031678A (en) | Foundation for structure and method for constructing the same | |
JP2935634B2 (en) | Steel pipe sheet pile wall construction method | |
JP2935632B2 (en) | Steel pipe sheet pile wall construction method | |
KR100327547B1 (en) | Composite retaining wall construction method | |
JP2576945B2 (en) | Construction method of manhole combined sinking pit and cutting edge to promote sinking | |
JP2874906B2 (en) | Shaft construction method | |
JP3168197B2 (en) | Caisson anchor structure and construction method | |
KR102554659B1 (en) | A Construction method of retaining wall using foundations of existing structure | |
JP2000355941A (en) | Building and its construction method | |
JP3030622B2 (en) | How to build a tunnel | |
JP2006219947A (en) | Ground excavation method | |
JP3089591B2 (en) | Circular underground diaphragm wall | |
JPH07252827A (en) | Steel pipe sheet pile wall and construction method thereof | |
KR20220140660A (en) | Installing method of steel shear material inside of steel pile underwater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 19990426 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19991109 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071217 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081217 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091217 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091217 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101217 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101217 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111217 Year of fee payment: 12 |
|
LAPS | Cancellation because of no payment of annual fees |