[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP2007246259A - Method of delivering cassette in stacker crane - Google Patents

Method of delivering cassette in stacker crane Download PDF

Info

Publication number
JP2007246259A
JP2007246259A JP2006074935A JP2006074935A JP2007246259A JP 2007246259 A JP2007246259 A JP 2007246259A JP 2006074935 A JP2006074935 A JP 2006074935A JP 2006074935 A JP2006074935 A JP 2006074935A JP 2007246259 A JP2007246259 A JP 2007246259A
Authority
JP
Japan
Prior art keywords
cassette
stacker crane
conveyor
cassettes
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006074935A
Other languages
Japanese (ja)
Inventor
Yoshihiro Kotaba
善宏 甲把
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Plant Technologies Ltd
Original Assignee
Hitachi Plant Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Plant Technologies Ltd filed Critical Hitachi Plant Technologies Ltd
Priority to JP2006074935A priority Critical patent/JP2007246259A/en
Publication of JP2007246259A publication Critical patent/JP2007246259A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)
  • Container, Conveyance, Adherence, Positioning, Of Wafer (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method of delivering cassettes in stacker cranes capable of continuously performing the delivery and conveyance of the cassettes by storing the cassettes adjacent to a transfer machine and performing the operations of main stacker cranes by a second auxiliary stacker crane even if the first main stacker crane fails and derailed. <P>SOLUTION: A conveyor C disposed between the transfer machine B and a storage shelf S adjacently to the transfer machine B comprises a plurality of cassette storage zones 13, 14, 15. While the cassettes are stored by the conveyor C, the auxiliary stacker crane 2 delivers the cassettes if the specific main stacker crane 1 fails. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、スタッカクレーンにおけるカセットの受け渡し方法に関し、特に、同一レーンの走行レール上に主副2台のスタッカクレーンが走行する場合に、カセット受渡用の主スタッカクレーンが故障しても他方の稼働中の副スタッカクレーンにて継続してカセットの受け渡し作業を行えるようにしたスタッカクレーンにおけるカセットの受け渡し方法に関するものである。   The present invention relates to a cassette delivery method in a stacker crane, and in particular, when two main and secondary stacker cranes travel on a traveling rail in the same lane, the other operation even if the cassette delivery main stacker crane breaks down. The present invention relates to a cassette delivery method in a stacker crane that allows a cassette delivery operation to be continuously performed by a sub stacker crane.

従来、液晶、有機EL、半導体等の精密電子部品等の製造工場や自動倉庫などにおいて、天井走行台車にて搬送されてきたガラス薄板などの部品等を収納した定形のカセット、その他の荷(以下、「カセット」という。)をテレスコ式移載機によりカセット受渡口を経てスタッカクレーンにより保管棚へ搬送し、指定された保管棚へ一時保管するようにしている。
また、前記製造工場や自動倉庫などでは、搬送荷であるカセットの搬送効率を向上させるため、同一走行ラインに主副2台のスタッカクレーンを配置し、1台目の主スタッカクレーンを天井走行台車よりカセット受渡口へ供給されるカセットを所定の保管棚へ搬送する受け取り用として、2台目を主として保管棚の所定の棚から他の棚への搬送用の副スタッカクレーンとしてそれぞれ稼働し、これら作業工程の異なる主副2台のスタッカクレーンを、それぞれその作業目的に応じて走行範囲などを制御するようにして、カセットの受け取り及び搬送効率を向上させるようにしている。
このように、それぞれ異なる作業をする主副2台のスタッカクレーンを用いることで、天井走行台車よりカセット受渡口を経て保管棚へ一時保管する作業時間と、保管棚の所定の棚から他の棚へ搬送する作業時間が異なるような場合でも、また同一レーンの走行レール上に2台のスタッカクレーンを配置しても何ら支障なく作業を行うことができるという利点がある。
Conventional cassettes and other packages (hereinafter referred to as glass plates, etc.) that have been transported by overhead carts in manufacturing factories and automated warehouses for precision electronic components such as liquid crystal, organic EL, and semiconductors. , "Cassette") is transported to a storage shelf by a stacker crane through a cassette delivery port by a telescopic transfer machine, and temporarily stored in a designated storage shelf.
In addition, in the manufacturing factory or automatic warehouse, two main and sub stacker cranes are arranged on the same travel line in order to improve the transport efficiency of cassettes as transport loads, and the first main stacker crane is used as an overhead traveling cart. For receiving the cassette supplied to the cassette delivery port to the predetermined storage shelf, the second unit is mainly operated as a secondary stacker crane for transporting from the predetermined shelf of the storage shelf to another shelf. The two main and sub stacker cranes having different work processes control the traveling range according to the work purpose, thereby improving the cassette receiving and conveying efficiency.
In this way, by using two main and sub stacker cranes that perform different operations, the work time for temporary storage from the overhead traveling carriage to the storage shelf via the cassette delivery port, and the predetermined shelf of the storage shelf to another shelf There is an advantage that the work can be performed without any trouble even if the work time to be transported to the vehicle is different or two stacker cranes are arranged on the traveling rail of the same lane.

ところが、2台目の副スタッカクレーンは作業目的に応じてその走行範囲を設定しているので、特に2台目の副スタッカクレーンは、1台目の主スタッカクレーンの如くカセット受渡口までは走行しないようになっている。このため、1台目の主スタッカクレーンが故障し、その修理のため走行レール上より離脱しても直ちにこの2台目の副スタッカクレーンを主スタッカクレーンとして採用することはできない。
このため、2台目の副スタッカクレーンを主スタッカクレーンと同等の作業を行うようにするためには、副スタッカクレーンの制御プログラムを組み替える必要があり、この制御プログラムの組み替えに手数を要するとともに、制御プログラムの組み替えるための時間を要して副スタッカクレーンを主スタッカクレーンとして使用するまでには時間がかかるという問題があった。
However, since the second secondary stacker crane has its travel range set according to the work purpose, the second secondary stacker crane travels as far as the cassette delivery port like the first main stacker crane. It is supposed not to. For this reason, even if the first main stacker crane breaks down and is removed from the traveling rail for repair, the second sub stacker crane cannot be immediately adopted as the main stacker crane.
For this reason, in order to perform the same work as the main stacker crane for the second secondary stacker crane, it is necessary to rearrange the control program for the secondary stacker crane. There is a problem in that it takes time to rearrange the control program and it takes time to use the auxiliary stacker crane as the main stacker crane.

本発明は、スタッカクレーンにおけるカセットの受け渡しの有する問題点に鑑み、天井走行台車よりカセットを移載機にてカセット受渡口へ受け取る場合、移載機に隣接して複数のカセットを貯留できるようにしたコンベアを配設することで、1台目の主スタッカクレーンが故障して離脱しても2台目の副スタッカクレーンをそのまま主スタッカクレーンの作業を受け持つようにし、カセットの受け渡し、搬送作業を継続できるようにしたスタッカクレーンにおけるカセットの受け渡し方法を提供することを目的とする。   In view of the problems of cassette transfer in a stacker crane, the present invention allows a plurality of cassettes to be stored adjacent to the transfer machine when receiving the cassette from the overhead traveling carriage to the cassette transfer port by the transfer machine. If the first main stacker crane breaks down and leaves, the second sub stacker crane will be in charge of the main stacker crane, and the cassette will be delivered and transported. It is an object of the present invention to provide a cassette delivery method in a stacker crane that can be continued.

上記目的を達成するため、本発明のスタッカクレーンにおけるカセットの受け渡し方法は、移載機と保管棚との間に配設し、かつ該移載機に隣接して配設するコンベアに、複数のカセット貯留ゾーンを備えて、該コンベアにて複数のカセットを貯留しながら順次、特定の主スタッカクレーン故障時に副スタッカクレーンにてカセットの受け渡しを行えるようにしたことを特徴とする。   In order to achieve the above object, a cassette delivery method in a stacker crane according to the present invention includes a plurality of conveyors disposed between a transfer machine and a storage shelf and disposed adjacent to the transfer machine. A cassette storage zone is provided, and a plurality of cassettes are stored in the conveyor, and the cassettes can be transferred in the sub stacker crane in the event of a specific main stacker crane failure.

この場合において、同一レーンの走行レールに配置されるスタッカクレーンの台数に応じてコンベアの機長を設定することができる。   In this case, the length of the conveyor can be set according to the number of stacker cranes arranged on the traveling rail in the same lane.

また、コンベアに、カセットを貯留するカセット貯留ゾーンを備えるようにすることができる。   Moreover, the conveyor can be provided with a cassette storage zone for storing cassettes.

また、コンベアに、カセットをカセット貯留ゾーンを経て隣接するカセット貯留ゾーンへ順次移動するための移動台車を備えることができる。   Further, the conveyor can be provided with a moving carriage for sequentially moving the cassettes through the cassette storage zone to the adjacent cassette storage zone.

本発明のスタッカクレーンにおけるカセットの受け渡し方法によれば、移載機と保管棚との間に配設し、かつ該移載機に隣接して配設するコンベアに、複数のカセット貯留ゾーンを備えて、該コンベアにて複数のカセットを貯留しながら順次、特定の主スタッカクレーン故障時に副スタッカクレーンにてカセットの受け渡しを行えるようにすることにより、1台目の主スタッカクレーンが故障しても、2台目の副スタッカクレーンをそのカセット貯留ゾーンまで移動するようにその作業範囲を拡大することで、そのままカセットの搬送作業を継続して行うことができる。   According to the cassette delivery method in the stacker crane of the present invention, the conveyor disposed between the transfer machine and the storage shelf and disposed adjacent to the transfer machine includes a plurality of cassette storage zones. Thus, even if the first main stacker crane fails, the sub stacker crane can transfer the cassettes in succession while storing a plurality of cassettes on the conveyor. By expanding the work range so that the second auxiliary stacker crane is moved to the cassette storage zone, it is possible to continue carrying the cassette as it is.

また、同一レーンの走行レールに配置されるスタッカクレーンの台数に応じてコンベアの機長を設定することにより、同一走行レール上に複数台のスタッカクレーンを配設してカセットの搬送効率を簡易に向上させることができる。   Also, by setting the length of the conveyor according to the number of stacker cranes placed on the traveling rail of the same lane, multiple stacker cranes can be installed on the same traveling rail to easily improve cassette transport efficiency. Can be made.

また、コンベアに、カセットを貯留するカセット貯留ゾーンを備えるようにすることにより、カセットの搬入速度とスタッカクレーンによる払出速度とが異なる場合でも、該コンベアにてカセットを一時的に貯留することができる。   Further, by providing the conveyor with a cassette storage zone for storing cassettes, the cassette can be temporarily stored in the conveyor even if the cassette loading speed and the payout speed by the stacker crane are different. .

また、コンベアに、カセットをカセット貯留ゾーンを経て隣接するカセット貯留ゾーンへ順次移動するための移動台車を備えるようにすることにより、カセットの移動が円滑に、スムースに行うことができる。   Further, by providing the conveyor with a moving carriage for sequentially moving the cassettes through the cassette storage zone to the adjacent cassette storage zone, the cassette can be moved smoothly and smoothly.

以下、本発明のスタッカクレーンにおけるカセットの受け渡し方法の実施の形態を、図面に基づいて説明する。   Hereinafter, an embodiment of a cassette delivery method in a stacker crane of the present invention will be described with reference to the drawings.

図1〜図5に、本発明のスタッカクレーンにおけるカセットの受け渡し方法の一実施例を示す。
液晶、有機EL、半導体等の精密電子部品等の製造工場において、部品等の所要数を予めカセットKに収納して、製造工場の天井に予め設定する搬送工程の走行レールRに沿って走行するようにした天井走行台車Dにより搬送し、搬送工程に沿って配設した所定の受渡位置Aで、該カセットKを移載するように移載機B、これは特に限定されるものではないが、例えば、テレスコ式移載機を配設して天井走行台車側により移載機側へ移載するようにするとともに、この移載機Bに隣接して複数のカセットを貯留でき、かつ複数のカセット受渡口を備えたコンベアCを配設する。
したがって、このカセット貯留式のコンベアCは、図1〜図2に示すように、移載機Bと隣接し、かつ保管棚Sの上方で、保管棚Sと平行するように配設される。
1 to 5 show an embodiment of a cassette delivery method in the stacker crane of the present invention.
In a manufacturing factory for precision electronic components such as liquid crystal, organic EL, and semiconductors, the required number of parts and the like is stored in a cassette K in advance and travels along a traveling rail R in a transport process that is preset on the ceiling of the manufacturing factory. The transfer machine B is configured to transfer the cassette K at a predetermined delivery position A that is transported by the overhead traveling carriage D and arranged along the transport process, although this is not particularly limited. For example, a telescopic transfer machine is disposed so that the overhead traveling carriage side transfers to the transfer machine side, and a plurality of cassettes can be stored adjacent to the transfer machine B, and a plurality of cassettes can be stored. A conveyor C having a cassette delivery port is disposed.
Accordingly, the cassette storage type conveyor C is disposed adjacent to the transfer machine B and above the storage shelf S so as to be parallel to the storage shelf S, as shown in FIGS.

また、この製造工場内には、天井走行台車Dにより搬入される複数のカセットKを一時的に保管できるよう保管棚Sが配設されるとともに、この保管棚Sに沿って敷設される走行レールR1に導かれて走行するように主副2台のスタッカクレーン1、2を備える。この主副2台のスタッカクレーン1、2は、同一レーンの走行レールR1上を走行するようにする。   In addition, a storage shelf S is disposed in the manufacturing factory so that a plurality of cassettes K carried by the overhead traveling carriage D can be temporarily stored, and a traveling rail laid along the storage shelf S. Two main and sub stacker cranes 1, 2 are provided so as to be guided by R1. The two main and sub stacker cranes 1 and 2 travel on the traveling rail R1 in the same lane.

テレスコ式移載機Bは、複数段の伸縮する移載用アームB1を備え、かつ天井走行台車Dの搬送路に沿うカセットの受け渡しを行う所定の受渡位置Aに配設し、この移載機Bの移載用アームB1を天井走行台車側とこの反対側のコンベア側の双方へ選択的に伸縮するようにし、これにより、カセットKを天井走行台車側よりコンベア側へ移載するようにする。   The telescopic transfer machine B includes a plurality of stages of transfer arms B1 that extend and contract, and is disposed at a predetermined delivery position A that delivers a cassette along the conveyance path of the overhead traveling carriage D. The transfer arm B1 of B is selectively expanded and contracted to both the overhead traveling carriage side and the opposite conveyor side, so that the cassette K is transferred from the overhead traveling carriage side to the conveyor side. .

テレスコ式移載機Bと隣接して配設するコンベアCは、カセットの受け渡しと貯留を行うことができるようにした複数のカセット貯留ゾーン13、14、15を備えるようにする。
この貯留機能を備えたコンベアCは、保管棚Sの上方に配設され、主副2つのスタッカクレーン1、2の専用のカセット受渡口と複数のカセットを貯留できるカセット貯留ゾーンとで構成する。
The conveyor C disposed adjacent to the telescopic transfer machine B includes a plurality of cassette storage zones 13, 14, and 15 that can perform delivery and storage of cassettes.
The conveyor C having the storage function is arranged above the storage shelf S, and includes a dedicated cassette delivery port for the main and sub two stacker cranes 1 and 2 and a cassette storage zone in which a plurality of cassettes can be stored.

また、このコンベアCには、図3〜図4に示すように、各カセット貯留ゾーン13、14、15にて1つのカセットをそれぞれ支持できるようカセット支持ロッドa、b、c、dを左右に対向して4本を樹立し、この4本1組としたカセット支持ロッドa、b、c、dの先端にてカセット底部の4角部を支持するようにする。
そして、テレスコ式移載機Bより移載された先端のカセット貯留ゾーン13より、カセット貯留ゾーン14を経て後端のカセット貯留ゾーン15まで、順次カセットを移動させるための移動台車16を、コンベア全長に亘って移動するようにして構成する。
As shown in FIGS. 3 to 4, the conveyor C has cassette support rods a, b, c, d on the left and right so that one cassette can be supported in each cassette storage zone 13, 14, 15. Four pieces are established facing each other, and the four corners at the bottom of the cassette are supported by the tips of the cassette support rods a, b, c, and d that form a set of four.
A moving carriage 16 for sequentially moving the cassette from the cassette storage zone 13 at the front end transferred from the telescopic transfer machine B to the cassette storage zone 15 at the rear end through the cassette storage zone 14 is provided on the entire length of the conveyor. It is constructed so as to move over the range.

なお、1台目の主スタッカクレーン1は、各カセット貯留ゾーンより保管棚Sの所定位置まで走行できるよう制御し、また2台目の副スタッカクレーン2は、カセット貯留ゾーン15より保管棚Sの所定位置まで及び保管棚Sから保管棚S間を走行できるようそれぞれ制御するようにして、主副2台のスタッカクレーン1、2が同一レーンの走行レールR1上を走行しても互いに衝突しないようにする。   The first main stacker crane 1 is controlled so as to be able to travel from each cassette storage zone to a predetermined position of the storage shelf S, and the second auxiliary stacker crane 2 is connected to the storage shelf S from the cassette storage zone 15. Control is performed so that the vehicle can travel to a predetermined position and between the storage shelves S, so that the two main and sub stacker cranes 1 and 2 do not collide with each other even when traveling on the traveling rail R1 in the same lane. To.

次に、本発明のスタッカクレーンにおけるカセットの受け渡し方法の作用について説明する。
天井走行台車Dにより搬送されてきたカセットKは、保管棚Sへの受渡位置Aで停止した天井走行台車側へテレスコ式移載機Bの移載用アームB1を伸張させて該移載用アーム側に移載した後、該移載用アームを反対側のコンベア側へ伸張させる。これにより、カセットは天井走行台車側よりコンベア側へ移動する。次にこの移載用アームB1をコンベアCの先端位置のカセット貯留ゾーン13で少し降下させることでカセットは移載用アームB1から最初のカセット貯留ゾーン13に移載される。この場合、カセットの底部4角は樹立するカセット支持ロッドa、b、c、dの先端にて支持される。
Next, the operation of the cassette delivery method in the stacker crane of the present invention will be described.
The cassette K transported by the overhead traveling carriage D extends the transfer arm B1 of the telescopic transfer machine B to the overhead traveling carriage side stopped at the delivery position A to the storage shelf S, and the transfer arm. After transferring to the side, the transfer arm is extended to the opposite conveyor side. Thereby, the cassette moves from the overhead traveling carriage side to the conveyor side. Next, the transfer arm B1 is slightly lowered in the cassette storage zone 13 at the front end position of the conveyor C, whereby the cassette is transferred from the transfer arm B1 to the first cassette storage zone 13. In this case, the bottom four corners of the cassette are supported by the tips of the cassette support rods a, b, c and d that are established.

このコンベアCの最初のカセット貯留ゾーン13にあるカセットを隣接するカセット貯留ゾーン14に移動するには、受け台16aを降下させた状態で移動台車16をコンベアCに沿って最初のカセット貯留ゾーン13位置まで移動させる。その後、カセット貯留ゾーン13の所定位置で停止している移動台車16の受け台16aを少し持ち上げるようにすると、カセットはカセット支持ロッド上方に持ち上げられて受け台16a側にて支持されるようになる。
この状態で移動台車16をカセット貯留ゾーン14まで移動させ、定位置で停止させた後、受け台16aを定位置まで降下させ、移動台車16を所定の位置に移動し、1台目の主スタッカクレーン1にて受け取られるのを待つ。
また、この場合、第2、第3のカセット貯留ゾーン14、15にカセットがない場合には、これら空の第2、第3のカセット貯留ゾーン14、15までカセットを搬送することができる。これにより、天井走行台車Dによるカセットの搬入速度が、1台目の主スタッカクレーン1によるカセット貯留ゾーン13よりカセットを受け取る速度が遅い場合でも、この順次搬入されるカセットをカセット貯留ゾーン14、15にて貯留できる。
In order to move the cassette in the first cassette storage zone 13 of the conveyor C to the adjacent cassette storage zone 14, the movable carriage 16 is moved along the conveyor C with the receiving table 16a lowered. Move to position. Thereafter, when the cradle 16a of the moving carriage 16 stopped at a predetermined position in the cassette storage zone 13 is slightly lifted, the cassette is lifted above the cassette support rod and supported on the cradle 16a side. .
In this state, the movable carriage 16 is moved to the cassette storage zone 14 and stopped at a fixed position. Then, the receiving carriage 16a is lowered to the fixed position, the movable carriage 16 is moved to a predetermined position, and the first main stacker is moved. Wait for the crane 1 to receive it.
In this case, if there is no cassette in the second and third cassette storage zones 14 and 15, the cassette can be transported to these empty second and third cassette storage zones 14 and 15. As a result, even if the cassette loading speed by the overhead traveling carriage D is lower than the cassette receiving zone 13 by the first main stacker crane 1, the cassettes to be sequentially loaded are cassette storage zones 14, 15 Can be stored.

そして、通常は1台目の主スタッカクレーン1にて、各カセット貯留ゾーンにあるカセットを受け取り、保管棚との指定された棚まで搬送して該棚に移載するようにしている。
また、2台目の副スタッカクレーン2にては保管棚とから保管棚と間の移動を行うようにしている。
Normally, the first main stacker crane 1 receives the cassettes in each cassette storage zone, transports them to the designated shelf as the storage shelf, and transfers them to the shelf.
Further, the second auxiliary stacker crane 2 is moved from the storage shelf to the storage shelf.

スタッカクレーンの稼働中に、1台目の主スタッカクレーン1が故障すると、該主スタッカクレーン1にてカセットをカセット貯留ゾーンより受け取られなくなる。
このような場合には、1台目の主スタッカクレーン1を走行レールより離脱させて故障の修理を行うようにするとともに、2台目の副スタッカクレーン2をカセット貯留ゾーン15まで移動するように制御して、このカセット貯留ゾーン15を用いて2台目の副スタッカクレーン2にてカセットの受け渡しを行うようにする。
これは、コンベアCに沿って移動台車16により搬送されるカセットを、カセット貯留ゾーン13よりカセット貯留ゾーン14を経て、或いはカセット貯留ゾーン13より直接カセット貯留ゾーン15へ移動することで行うことができる。
2台目の副スタッカクレーン2をカセットの受渡用として使用する際も、コンベアCの移動台車16をコンベアCに沿って移動されて最初のカセット貯留ゾーン13から、第2カセット貯留ゾーン14へカセットを移動させるが、この場合もタクト送りで移動させるようにして各カセット貯留ゾーン13、14さらには後端部に配設されるカセット貯留ゾーン15でカセットの貯留を行うようにする。
If the first main stacker crane 1 fails during operation of the stacker crane, the main stacker crane 1 cannot receive the cassette from the cassette storage zone.
In such a case, the first main stacker crane 1 is detached from the traveling rail to repair the failure, and the second sub stacker crane 2 is moved to the cassette storage zone 15. The cassette storage zone 15 is used to transfer the cassette by the second auxiliary stacker crane 2.
This can be done by moving the cassette conveyed by the moving carriage 16 along the conveyor C from the cassette storage zone 13 via the cassette storage zone 14 or directly from the cassette storage zone 13 to the cassette storage zone 15. .
When the second secondary stacker crane 2 is used for delivery of cassettes, the moving carriage 16 of the conveyor C is moved along the conveyor C, and the cassette is moved from the first cassette storage zone 13 to the second cassette storage zone 14. In this case as well, the cassettes are moved by tact feeding so that the cassettes are stored in the cassette storage zones 13 and 14 and further in the cassette storage zone 15 disposed at the rear end.

また、1台目の主スタッカクレーン1が復帰したら、該スタッカクレーン1によるカセットの受け取りを再び行うように稼働し、また他方の副スタッカクレーン2は元の棚から棚への移載用として稼働するようにする。   When the first main stacker crane 1 is restored, the stacker crane 1 is operated so as to receive the cassette again, and the other auxiliary stacker crane 2 is operated for transfer from the original shelf to the shelf. To do.

したがって、本実施例によれば、移載機Bに隣接して配設するコンベアCに、複数のカセットをカセット貯留ゾーンにて貯留できるので、主スタッカクレーン1によるカセットの払出が円滑に行える。また、1台目の主スタッカクレーン1が故障して離脱しても2台目の副スタッカクレーン2の作業範囲を拡大するだけで、そのまま1台目の主スタッカクレーン1の作業を受け持つようにすることができるので、カセットの受け渡し、搬送作業を継続して行うことができるようになる。   Therefore, according to the present embodiment, since a plurality of cassettes can be stored in the cassette storage zone on the conveyor C arranged adjacent to the transfer machine B, the cassette can be smoothly paid out by the main stacker crane 1. Further, even if the first main stacker crane 1 breaks down and leaves, the work of the first main stacker crane 1 can be handled as it is simply by expanding the work range of the second sub stacker crane 2. As a result, the cassette can be transferred and transported continuously.

以上、本発明のスタッカクレーンにおけるカセットの受け渡し方法について、実施例に基づいて説明したが、本発明は上記実施例に記載した構成に限定されるものではなく、その趣旨を逸脱しない範囲において適宜その構成を変更することができるものである。   As mentioned above, although the delivery method of the cassette in the stacker crane of the present invention was explained based on an example, the present invention is not limited to the composition described in the above-mentioned example, and suitably in the range which does not deviate from the meaning. The configuration can be changed.

本発明のスタッカクレーンにおけるカセットの受け渡し方法は、コンベアに、複数のカセットを貯留できるゾーンを備えることで、1台目の主スタッカクレーンが故障して離脱しても2台目の副スタッカクレーンの作業範囲を拡大することで、そのまま1台目の主スタッカクレーンの作業を受け持つという特性を有していることから、液晶などの製造工場や自動倉庫内におけるスタッカクレーンによるカセットの受け渡しの用途に好適に用いることができるほか、例えば、搬送物を順次搬送するようにした搬送装置、仕分装置の用途にも用いることができる。   The cassette delivery method in the stacker crane of the present invention includes a zone in which a plurality of cassettes can be stored in the conveyor, so that even if the first main stacker crane fails and leaves, the second sub stacker crane By extending the work range, it has the property of directly handling the work of the first main stacker crane, so it is suitable for the delivery of cassettes by stacker cranes in liquid crystal manufacturing factories and automated warehouses. For example, it can also be used for applications such as a transport device and a sorting device that sequentially transports transported items.

本発明のスタッカクレーンにおけるカセットの受け渡し方法の一実施例を示す平面図である。It is a top view which shows one Example of the delivery method of the cassette in the stacker crane of this invention. 同正面図である。It is the same front view. コンベアの正面図である。It is a front view of a conveyor. コンベアの平面図である。It is a top view of a conveyor. コンベアの側面縦断面図である。It is a side surface longitudinal cross-sectional view of a conveyor.

符号の説明Explanation of symbols

A 受渡位置
B 移載機
B1 移載用アーム
C コンベア
D 天井走行台車
S 保管棚
R1 走行レール
1 1台目の主スタッカクレーン
2 2台目の副スタッカクレーン
13、14、15 カセット貯留ゾーン
16 移動台車
16a 受け台
a、b、c、d カセット支持ロッド
A Delivery position B Transfer machine B1 Transfer arm C Conveyor D Overhead traveling carriage S Storage rack R1 Traveling rail 1 First main stacker crane 2 Second secondary stacker crane 13, 14, 15 Cassette storage zone 16 Movement Cart 16a cradle a, b, c, d Cassette support rod

Claims (4)

移載機と保管棚との間に配設し、かつ該移載機に隣接して配設するコンベアに、複数のカセット貯留ゾーンを備えて、該コンベアにて複数のカセットを貯留しながら順次、特定の主スタッカクレーン故障時に副スタッカクレーンにてカセットの受け渡しを行えるようにしたことを特徴とするスタッカクレーンにおけるカセットの受け渡し方法。   A conveyor disposed between the transfer machine and the storage shelf and disposed adjacent to the transfer machine is provided with a plurality of cassette storage zones and sequentially stores a plurality of cassettes on the conveyor. A cassette delivery method in a stacker crane, characterized in that a cassette can be delivered by a secondary stacker crane when a specific main stacker crane fails. 同一レーンの走行レールに配置されるスタッカクレーンの台数に応じてコンベアの機長を設定したことを特徴とする請求項1記載のスタッカクレーンにおけるカセットの受け渡し方法。   2. The cassette delivery method for a stacker crane according to claim 1, wherein the length of the conveyor is set according to the number of stacker cranes arranged on the traveling rail of the same lane. コンベアに、カセットを貯留するカセット貯留ゾーンを備えるようにしたことを特徴とする請求項1又は2記載のスタッカクレーンにおけるカセットの受け渡し方法。   The cassette delivery method for a stacker crane according to claim 1 or 2, wherein the conveyor is provided with a cassette storage zone for storing cassettes. コンベアに、カセットをカセット貯留ゾーンを経て隣接するカセット貯留ゾーンへ順次移動するための移動台車を備えたことを特徴とする請求項1、2又は3記載のスタッカクレーンにおけるカセットの受け渡し方法。   4. A cassette delivery method in a stacker crane according to claim 1, wherein the conveyor is provided with a moving carriage for sequentially moving cassettes to adjacent cassette storage zones via the cassette storage zone.
JP2006074935A 2006-03-17 2006-03-17 Method of delivering cassette in stacker crane Pending JP2007246259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006074935A JP2007246259A (en) 2006-03-17 2006-03-17 Method of delivering cassette in stacker crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006074935A JP2007246259A (en) 2006-03-17 2006-03-17 Method of delivering cassette in stacker crane

Publications (1)

Publication Number Publication Date
JP2007246259A true JP2007246259A (en) 2007-09-27

Family

ID=38590951

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006074935A Pending JP2007246259A (en) 2006-03-17 2006-03-17 Method of delivering cassette in stacker crane

Country Status (1)

Country Link
JP (1) JP2007246259A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010215359A (en) * 2009-03-17 2010-09-30 Murata Machinery Ltd Ceiling conveyance system and method for temporarily storing article
CN109415164A (en) * 2016-06-28 2019-03-01 伯曼集团股份公司 Storage and extraction system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010215359A (en) * 2009-03-17 2010-09-30 Murata Machinery Ltd Ceiling conveyance system and method for temporarily storing article
CN109415164A (en) * 2016-06-28 2019-03-01 伯曼集团股份公司 Storage and extraction system
US11505407B2 (en) 2016-06-28 2022-11-22 Beumer Group A/S Storage and retrieval system

Similar Documents

Publication Publication Date Title
CN107667061B (en) Method and storage system for storing piece goods in a rack
JP2016052947A5 (en)
JP2016052947A (en) Article conveyance facility
EP3275810B1 (en) Conveyor carriage for sheet-like elements, apparatus and method for the management of a warehouse of sheet-like elements comprising said carriage
JP5930406B2 (en) Picking equipment
JP4036097B2 (en) Processing and storage facilities
US20240051745A1 (en) Article Storage Facility
JP2007186319A (en) Conveying system
WO2018193710A1 (en) Buffer device
JP2007246259A (en) Method of delivering cassette in stacker crane
JP2010241547A (en) Traveling vehicle system
JP2009220986A (en) Load storing method for automatic warehouse
JP2018154479A (en) Multi-tier automatic warehouse
JP7499461B2 (en) Substrate supply device, substrate supply method, substrate storage device, substrate recovery method, and lifting device
JP2008013288A (en) Transfer machine
JP5130789B2 (en) Board processing system
JP2005272053A (en) Commodity storage facility
JP5105180B2 (en) Goods storage equipment
JP2002302211A (en) Storage and conveyance facility
JP5943309B2 (en) Goods transport equipment
JP6135402B2 (en) Transport device and transport equipment
JP4521663B2 (en) Goods storage equipment
JP7459754B2 (en) Picking System
JP7200810B2 (en) Goods storage facility
WO2022138049A1 (en) Article storage facility