EP1675797B1 - Rotor spinning machine - Google Patents
Rotor spinning machine Download PDFInfo
- Publication number
- EP1675797B1 EP1675797B1 EP04765325A EP04765325A EP1675797B1 EP 1675797 B1 EP1675797 B1 EP 1675797B1 EP 04765325 A EP04765325 A EP 04765325A EP 04765325 A EP04765325 A EP 04765325A EP 1675797 B1 EP1675797 B1 EP 1675797B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- sleeve
- bobbin
- rotor spinning
- service
- spinning machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000007383 open-end spinning Methods 0.000 title claims abstract description 21
- 238000004804 winding Methods 0.000 description 10
- 238000009987 spinning Methods 0.000 description 5
- 235000013351 cheese Nutrition 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/06—Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
- B65H67/068—Supplying or transporting empty cores
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/31—Textiles threads or artificial strands of filaments
Definitions
- the invention relates to a rotor spinning machine according to the preamble of claim 1.
- service units are used, which are movable on guide rails on the longitudinal sides of the rotor spinning machine.
- the tasks of the service facilities include piecing after a yarn breakage and the supply of the spinning stations of the rotor spinning machine with sleeves.
- several service units are used on a rotor spinning machine, for example, two service units on each machine longitudinal side.
- the DE 42 17 575 A shows a winding machine with a number of juxtaposed winding units. At least one package changing device can move along the winding units. At one end of the winder, a tube feeding device is arranged. A conveying device for feeding the sleeves from the tube feeding device is arranged parallel to the path of the package changing device. A sleeve holding device for receiving the sleeves brought up by the conveyor is provided on the package changing device. The trained as a sleeve storage sleeve holding device represents additional construction costs on the bobbin changing device. If a winding unit has been shut down due to a full package, the package changing device is moved to a position in front of this winding unit. The full package is replaced with an empty tube.
- the new sleeve is for this purpose taken from the entrained from the Auflaufspulencic arthritis Skeve memory.
- the ceremoniesspulencic arthritis waits at the winding unit until a brought up by the conveyor sleeve has refilled their memory. Subsequently, the flow bobbin changing device moves to a further winding station, which requests a change of bobbins.
- the DE 199 05 856 A1 describes a rotor spinning machine having between its end frames a plurality of jobs, which are arranged on both sides of the machine. These jobs each have a spinning device and a downstream winding device and are supplied during operation by several service units.
- a service unit For a bobbin change at a workplace, a service unit is requested and positioned at the workplace. From the sleeve magazine a sleeve is requested, which is transported by means of a conveyor belt to the workplace. The service unit has a device with which the delivered sleeve can be removed from the conveyor belt. Subsequently, the sleeve is positioned in the winding position in the operating position.
- the service unit operating farther away from the sleeve magazine first requests a sleeve and, before the sleeve has arrived at this first service unit, the second service unit positioned closer to the sleeve magazine also requests a sleeve, it may happen that the for the first service unit certain sleeve from the second service unit is removed from the conveyor belt. This results in delays that can lead to undesirably long downtimes of jobs.
- the control device of the rotor spinning machine is designed such that it suppresses a later sleeve request of the second service unit in the case of an existing sleeve requirement of the first service unit positioned downstream with respect to the transport direction of the feeder until the first request for the sleeve is satisfied.
- unwanted removal of sleeves from the conveyor belt by the second requesting a sleeve service unit can be avoided.
- the first requesting a sleeve service aggregate is not by a too long service stop on one Job to quickly meet any existing requirements of other jobs quickly.
- the control device is a central machine control device in order to keep the cost of the control as low as possible.
- rotor spinning machine 1 has between its end frames 2 and 3 a plurality of jobs 4, which are arranged on both sides of the machine.
- the workstations 4, each comprising a spinning device and a winding device, are supplied by four service units 5, 5A, 5B, 5C.
- the service units 5, 5A, 5B, 5C are on a rail structure 6 along the Machine sides movable. If a thread break has occurred at one of the work stations 4 or a bobbin change is to take place, one of the service units 5, 5A, 5B, 5C becomes automatically active.
- the rotor spinning machine 1 further comprises a arranged between the workstations 4 cross-bobbin transport device 7 for conveying off finished cross-wound bobbins and a sleeve delivery device 8.
- the sleeve delivery device 8 comprises a machine end side arranged central sleeve magazine 9, a sleeve distribution device 10 and two each of the jobs 4 a machine longitudinal side with sleeves supplying machine-length sleeve conveyor belts 11, 12.
- the service unit 5 moves to the requesting workstation 4 and positions itself there.
- the service unit 5 requests a sleeve from the sleeve supply device via the control device 14.
- the sleeve is placed on the conveyor belt 11.
- the sleeve is in the Fig. 1 with the Reference numeral 17 denotes.
- the sleeve is moved in the direction of arrow from the conveyor belt in the direction of the service unit 5.
Landscapes
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
Description
Die Erfindung betrifft eine Rotorspinnmaschine gemäß dem Oberbegriff des Anspruchs 1.The invention relates to a rotor spinning machine according to the preamble of claim 1.
An Rotorspinnmaschinen werden Service-Aggregate eingesetzt, die an Führungsschienen an den Längsseiten der Rotorspinnmaschine verfahrbar sind. Zu den Aufgaben der Serviceeinrichtungen gehört das Anspinnen nach einem Fadenbruch und die Versorgung der Spinnstellen der Rotorspinnmaschine mit Hülsen. Um die Stillstandszeiten der Spinnstellen bei Fadenbruch oder Hülsenwechsel möglichst kurz zu halten, werden an einer Rotorspinnmaschine mehrere Service-Aggregate eingesetzt, beispielsweise zwei Service-Aggregate an jeder Maschinenlängsseite.At rotor spinning machines service units are used, which are movable on guide rails on the longitudinal sides of the rotor spinning machine. Among the tasks of the service facilities include piecing after a yarn breakage and the supply of the spinning stations of the rotor spinning machine with sleeves. In order to keep the downtime of the spinning stations as short as possible during yarn break or sleeve change, several service units are used on a rotor spinning machine, for example, two service units on each machine longitudinal side.
Die
Die
Wenn das weiter vom Hülsenmagazin entfernt arbeitende Service-Aggregat als erstes eine Hülse anfordert und, bevor die Hülse bei diesem ersten Service-Aggregat angelangt ist, das zweite näher zum Hülsenmagazin positionierte Service-Aggregat ebenfalls eine Hülse anfordert, kann es vorkommen, dass die für das erste Service-Aggregat bestimmte Hülse vom zweiten Service-Aggregat dem Transportband entnommen wird. Dadurch entstehen Verzögerungen, die zu unerwünscht langen Stillständen von Arbeitsstellen führen können.If the service unit operating farther away from the sleeve magazine first requests a sleeve and, before the sleeve has arrived at this first service unit, the second service unit positioned closer to the sleeve magazine also requests a sleeve, it may happen that the for the first service unit certain sleeve from the second service unit is removed from the conveyor belt. This results in delays that can lead to undesirably long downtimes of jobs.
Es ist Aufgabe der Erfindung derartige unerwünschte Entnahmen der Hülsen vom Transportband zu vermeiden.It is an object of the invention to avoid such unwanted removal of the sleeves from the conveyor belt.
Diese Aufgabe wird erfindungsgemäß durch eine Rotorspinnmaschine mit den Merkmalen des Anspruchs 1 gelöst.This object is achieved by a rotor spinning machine with the features of claim 1.
Vorteilhafte Ausgestaltungen der Erfindung sind Gegenstand der Unteransprüche.Advantageous embodiments of the invention are the subject of the dependent claims.
Erfindungsgemäß ist die Steuereinrichtung der Rotorspinnmaschine so ausgebildet, dass sie bei einer vorliegenden Hülsenanforderung des bezüglich der Transportrichtung der Zuführeinrichtung stromab positionierten ersten Service-Aggregates eine spätere Hülsenanforderung des zweiten Service-Aggregates unterdrückt, bis die zuerst vorliegende Hülsenanforderung erfüllt ist. Dadurch werden unerwünschte Entnahmen von Hülsen vom Transportband durch das als zweites eine Hülse anfordernde Service-Aggregat vermieden. Das als erstes eine Hülse anfordernde Service-Aggregat wird nicht durch einen zu langen Service-Stopp an einer Arbeitsstelle daran gehindert, gegebenenfalls vorliegende Anforderungen weiterer Arbeitsstellen zügig zu erfüllen.According to the invention, the control device of the rotor spinning machine is designed such that it suppresses a later sleeve request of the second service unit in the case of an existing sleeve requirement of the first service unit positioned downstream with respect to the transport direction of the feeder until the first request for the sleeve is satisfied. As a result, unwanted removal of sleeves from the conveyor belt by the second requesting a sleeve service unit can be avoided. The first requesting a sleeve service aggregate is not by a too long service stop on one Job to quickly meet any existing requirements of other jobs quickly.
Mit einer Rotorspinnmaschine gemäß Anspruch 2 oder 3 wird die Zeit, in der die spätere Hülsenanforderung des zweiten Service-Aggregates unterdrückt wird, möglichst kurz gehalten. Zweckmäßig ist die Steuereinrichtung eine zentrale Maschinensteuereinrichtung, um den Aufwand für die Steuerung möglichst gering zu halten.With a rotor spinning machine according to
Mit der erfindungsgemäßen Rotorspinnmaschine werden unerwünschte Entnahmen von Hülsen vom Transportband verhindert. Durch das Vermeiden unnötiger Stillstandszeiten wird die Produktivität der Maschine verbessert.With the rotor spinning machine according to the invention unwanted removal of sleeves are prevented by the conveyor belt. Avoiding unnecessary downtime improves machine productivity.
Weitere Einzelheiten der Erfindung sind den Figuren zu entnehmen.Further details of the invention are shown in the figures.
Es zeigen:
- Fig. 1
- eine Rotorspinnmaschine mit Service-Aggregaten.
- Fig. 2
- eine vereinfachte Prinzipdarstellung der Steuerung der Service-Aggregate.
- Fig. 1
- a rotor spinning machine with service units.
- Fig. 2
- a simplified schematic representation of the control of the service units.
Die in
Die Service- Aggregate 5, 5A, 5B, 5C sind über die Leitungen 13 (
Wenn während des Spinnbetriebes an einer der Arbeitsstellen 4 eine Kreuzspule den vorgesehenen Durchmesser erreicht hat, soll diese schnellstmöglich gegen eine neue Hülse ausgetauscht werden. Das Auswechseln der vollen Kreuzspule gegen eine Hülse wird im Ausführungsbeispiel durch das Service-Aggregat 5 ausgeführt. Das Service-Aggregat 5 fährt zu der anfordernden Arbeitsstelle 4 und positioniert sich dort. Das Service-Aggregat 5 fordert über die Steuereinrichtung 14 eine Hülse von der Hülsenliefereinrichtung an. Die Hülse wird auf das Transportband 11 gesetzt. Die Hülse ist in der
Nachdem die Hülsenanforderung des Service-Aggregates 5A nicht mehr unterdrückt ist, wird auf dem Transportband 11 eine Hülse zum Service-Aggregat 5A transportiert.After the sleeve requirement of the
Das Service-Aggregat 5 kann ohne unnötige Verzögerung die Arbeitsstelle 4 wieder in Betrieb setzen und nachfolgende Anforderungen von Arbeitsstellen ohne Verzug abarbeiten.The
Die Erfindung ist nicht auf das dargestellte Ausführungsbeispiel beschränkt. Im Rahmen der Erfindung sind weitere Ausbildungen der Rotorspinnmaschine möglich.The invention is not limited to the illustrated embodiment. In the context of the invention, further embodiments of the rotor spinning machine are possible.
Claims (4)
- Rotor spinning machine comprising a plurality of working stations and a bobbin supplying device extending along the machine, wherein at least two service units supplying the working stations with bobbins are supplied by the supply device and wherein the rotor spinning machine comprises a control device for controlling the service units,
characterised in that
the control device (14) is configured in such a way that it suppresses a subsequent bobbin request from the second service unit (5A) in the event of an existing bobbin request from the first service unit (5) positioned downstream in relation to the transporting direction of the supply device, until the initially existing bobbin request has been fulfilled. - Rotor spinning machine according to claim 1, characterised in that the control device (14) is configured in such a way that an existing first bobbin request is considered fulfilled when the first service unit (5) requesting the bobbin has received a bobbin (17).
- Rotor spinning machine according to claim 1, characterised in that the control device (14) is configured in such a way that an existing first bobbin request is considered fulfilled when the first requested bobbin (17) has passed the second service unit (5A).
- Rotor spinning machine according to any one of claims 1 to 3, characterised in that the control device (14) is a central machine control device.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10348706A DE10348706A1 (en) | 2003-10-16 | 2003-10-16 | Rotor spinning machine |
PCT/EP2004/010429 WO2005037700A1 (en) | 2003-10-16 | 2004-09-17 | Rotor spinning machine |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1675797A1 EP1675797A1 (en) | 2006-07-05 |
EP1675797B1 true EP1675797B1 (en) | 2010-06-30 |
Family
ID=34428485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04765325A Expired - Lifetime EP1675797B1 (en) | 2003-10-16 | 2004-09-17 | Rotor spinning machine |
Country Status (5)
Country | Link |
---|---|
US (1) | US7412818B2 (en) |
EP (1) | EP1675797B1 (en) |
CN (1) | CN100387502C (en) |
DE (2) | DE10348706A1 (en) |
WO (1) | WO2005037700A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3279123A1 (en) * | 2016-08-05 | 2018-02-07 | Rieter CZ s.r.o. | Method and device for supplying empty tubes to attending devices of a textile machine |
DE102019132062A1 (en) * | 2019-11-27 | 2021-05-27 | Saurer Spinning Solutions Gmbh & Co. Kg | Supply of a large number of workplaces of a textile machine producing cross-wound bobbins with cross-wound bobbin tubes |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012109669A1 (en) * | 2012-10-11 | 2014-05-15 | Rieter Ingolstadt Gmbh | Textile machine, in particular spinning machine or winder, with a control and communication system |
DE102014119380A1 (en) * | 2014-12-22 | 2016-06-23 | Rieter Ingolstadt Gmbh | Rotor spinning machine with a variety of jobs and a suction device |
CN107526631B (en) * | 2017-09-01 | 2021-01-08 | 百度在线网络技术(北京)有限公司 | Task monitoring method, device, equipment and medium |
DE102017129700A1 (en) * | 2017-12-13 | 2019-06-13 | Saurer Spinning Solutions Gmbh & Co. Kg | Method for operating a service aggregate |
DE102018121982A1 (en) * | 2018-09-10 | 2020-03-12 | Maschinenfabrik Rieter Ag | Method for feeding a sleeve to one side of a double-sided textile machine and device for feeding a sleeve to one side of a double-sided textile machine |
DE102018128394A1 (en) * | 2018-11-13 | 2020-05-14 | Maschinenfabrik Rieter Ag | Method and device for feeding sleeves to the winding units of a textile machine and textile machine |
DE102018133192A1 (en) * | 2018-12-20 | 2020-06-25 | Saurer Spinning Solutions Gmbh & Co. Kg | Compound system with at least two feed units and at least one winding machine |
DE102019110295A1 (en) * | 2019-04-18 | 2020-10-22 | Saurer Spinning Solutions Gmbh & Co. Kg | Textile machine producing cross-wound bobbins |
CN110817595A (en) * | 2019-11-08 | 2020-02-21 | 广东科达洁能股份有限公司 | Automatic spinning cake receiving and sorting system and method |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2816418C2 (en) * | 1978-04-15 | 1985-03-28 | Fritz 7347 Bad Überkingen Stahlecker | Open-end spinning machine with a bobbin changing device |
DE3340497A1 (en) * | 1983-11-09 | 1985-05-15 | W. Schlafhorst & Co, 4050 Mönchengladbach | REEL MAKING MACHINE |
DE3601832C2 (en) * | 1986-01-22 | 1995-04-06 | Zinser Textilmaschinen Gmbh | Transport system for roving bobbins on spinning machines |
DE3602961A1 (en) * | 1986-01-31 | 1987-08-13 | Schubert & Salzer Maschinen | METHOD AND DEVICE FOR MAINTAINING THE WORKSTATIONS OF SPINNING OR TWINING MACHINES BY MEANS OF MORE AT THE WORKSTATIONS ALONG MOBILE MAINTENANCE DEVICES |
US4821504A (en) * | 1987-06-25 | 1989-04-18 | Howa Machinery, Ltd. | System for controlling displacement of carriage working machines |
CS268301B1 (en) * | 1987-09-02 | 1990-03-14 | Burysek Frantisek | Handling equipment for cores especially with spindle-less textile machine |
DE3908462A1 (en) * | 1988-08-11 | 1990-02-15 | Fritz Stahlecker | Spinning machine with bobbin changers |
JPH02139431A (en) * | 1988-11-10 | 1990-05-29 | Murao & Co Ltd | Bobbin-feeding system for spinning frame |
DE3906718A1 (en) * | 1989-03-03 | 1990-09-06 | Palitex Project Co Gmbh | TRANSPORT AND HANDLING SYSTEM FOR DIVERSE TEXTILE MACHINES, ESPECIALLY TWISTING MACHINES |
US5237807A (en) * | 1989-10-02 | 1993-08-24 | Toray Engineering Co., Ltd. | Spinning machine |
US5273224A (en) | 1991-05-28 | 1993-12-28 | Murata Kikai Kabushiki Kaisha | Doffing method and paper tube supply system for an automatic winder |
CZ283034B6 (en) * | 1994-08-24 | 1997-12-17 | Maschinenfabrik Rieter Ag | Process and apparatus for supplying winding devices of textile machine with empty tubes |
DE19512891A1 (en) * | 1995-04-06 | 1996-10-10 | Schlafhorst & Co W | Multi-station textile cone winder promptly supplying tubes by belt from central magazine |
DE19905856B4 (en) * | 1999-02-12 | 2010-11-25 | Oerlikon Textile Gmbh & Co. Kg | Sleeve delivery device for a cross-wound textile machine |
-
2003
- 2003-10-16 DE DE10348706A patent/DE10348706A1/en not_active Withdrawn
-
2004
- 2004-09-17 EP EP04765325A patent/EP1675797B1/en not_active Expired - Lifetime
- 2004-09-17 CN CNB2004800292095A patent/CN100387502C/en not_active Expired - Lifetime
- 2004-09-17 DE DE502004011343T patent/DE502004011343D1/en not_active Expired - Lifetime
- 2004-09-17 WO PCT/EP2004/010429 patent/WO2005037700A1/en active Application Filing
- 2004-09-17 US US10/575,494 patent/US7412818B2/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3279123A1 (en) * | 2016-08-05 | 2018-02-07 | Rieter CZ s.r.o. | Method and device for supplying empty tubes to attending devices of a textile machine |
CZ307257B6 (en) * | 2016-08-05 | 2018-05-02 | Rieter Cz S.R.O. | A method and a device for supplying empty tubes by the service device of a textile machine |
DE102019132062A1 (en) * | 2019-11-27 | 2021-05-27 | Saurer Spinning Solutions Gmbh & Co. Kg | Supply of a large number of workplaces of a textile machine producing cross-wound bobbins with cross-wound bobbin tubes |
EP3828112A1 (en) | 2019-11-27 | 2021-06-02 | Saurer Spinning Solutions GmbH & Co. KG | Supplying tubes to a plurality of work stations of a textile machine for creating cross-wound spools |
Also Published As
Publication number | Publication date |
---|---|
CN1863722A (en) | 2006-11-15 |
DE502004011343D1 (en) | 2010-08-12 |
US20070137167A1 (en) | 2007-06-21 |
WO2005037700A1 (en) | 2005-04-28 |
DE10348706A1 (en) | 2005-05-12 |
US7412818B2 (en) | 2008-08-19 |
CN100387502C (en) | 2008-05-14 |
EP1675797A1 (en) | 2006-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3498896B1 (en) | Method for operating a service unit | |
EP0296547B1 (en) | Method and apparatus for automatically joining a staple fibre sliver | |
DE102014220875B4 (en) | Winding machine for spun yarn | |
EP1675797B1 (en) | Rotor spinning machine | |
DE102007056561A1 (en) | Textile machine cross-winding thread onto spools, employs data transmission system to change workstation spinning- and spinning-on parameters during spool replacement | |
EP3372713B1 (en) | Spinning machine | |
EP2987757A1 (en) | Paraffin device for a textile machine for the production of cross-wound spools | |
DE102014107508A1 (en) | Method for disposing of bobbins on a textile machine and textile machine | |
DE19905856B4 (en) | Sleeve delivery device for a cross-wound textile machine | |
EP3885298B1 (en) | Textile machine producing cross-wound bobbins and method for operating a textile machine for creating cross-wound bobbins | |
EP3670409B1 (en) | Textile machine which produces cross-wound bobbins, with a cross-wound bobbin transport device | |
DE2410408A1 (en) | DEVICE FOR REPLACING SPOOLS ON YARN STRETCH OR. TWISTING MACHINES | |
EP3321222B1 (en) | Workstation of a textile machine manufacturing cross-wound packages with a mechanical accumulator arranged in the area of the thread traversing triangle | |
DE4233819C2 (en) | Method for operating an automatic winding machine when changing lots | |
DE102019110294A1 (en) | Tube storage and transport device for a textile machine producing cheese | |
EP3620415A1 (en) | Method for feeding a sleeve to a side of a two-sided textile machine and device for feeding a sleeve to a side of a two-sided textile machine | |
DE4116555C2 (en) | Conveyor device for yarn delivery bobbins in a duplicating device | |
EP4021835B1 (en) | Tube supply device for a textile machine that produces cross-wound packages | |
DE102004012254B4 (en) | Method and device for providing empty tubes | |
EP3999461B1 (en) | Core magazine for a textile machine which produces cross-wound bobbins | |
DE102018132459A1 (en) | Textile machine producing cross-wound bobbins with a cross-wound bobbin transport device | |
EP3828112B1 (en) | Supplying tubes to a plurality of work stations of a textile machine for creating cross-wound spools | |
EP4034487B1 (en) | Method for operating a textile machine producing cross-wound packages, and a textile machine producing cross-wound packages | |
DE102019110295A1 (en) | Textile machine producing cross-wound bobbins | |
WO2021013665A1 (en) | Core magazine for a textile machine which produces cross-wound bobbins |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20060516 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): CZ DE IT |
|
DAX | Request for extension of the european patent (deleted) | ||
RBV | Designated contracting states (corrected) |
Designated state(s): CZ DE IT |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: OERLIKON TEXTILE GMBH & CO. KG |
|
17Q | First examination report despatched |
Effective date: 20071017 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: OERLIKON TEXTILE GMBH & CO. KG |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): CZ DE IT |
|
REF | Corresponds to: |
Ref document number: 502004011343 Country of ref document: DE Date of ref document: 20100812 Kind code of ref document: P |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20110331 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502004011343 Country of ref document: DE Effective date: 20110330 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CZ Payment date: 20110825 Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502004011343 Country of ref document: DE Owner name: SAURER GERMANY GMBH & CO. KG, DE Free format text: FORMER OWNER: OERLIKON TEXTILE GMBH & CO. KG, 42897 REMSCHEID, DE Effective date: 20130918 Ref country code: DE Ref legal event code: R081 Ref document number: 502004011343 Country of ref document: DE Owner name: SAURER SPINNING SOLUTIONS GMBH & CO. KG, DE Free format text: FORMER OWNER: OERLIKON TEXTILE GMBH & CO. KG, 42897 REMSCHEID, DE Effective date: 20130918 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130917 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502004011343 Country of ref document: DE Owner name: SAURER SPINNING SOLUTIONS GMBH & CO. KG, DE Free format text: FORMER OWNER: SAURER GERMANY GMBH & CO. KG, 42897 REMSCHEID, DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20191002 Year of fee payment: 16 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20190930 Year of fee payment: 16 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502004011343 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210401 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200917 |