DE1434466A1 - Method for erecting tall concrete structures, e.g. of high-rise residential buildings - Google Patents
Method for erecting tall concrete structures, e.g. of high-rise residential buildingsInfo
- Publication number
- DE1434466A1 DE1434466A1 DE19621434466 DE1434466A DE1434466A1 DE 1434466 A1 DE1434466 A1 DE 1434466A1 DE 19621434466 DE19621434466 DE 19621434466 DE 1434466 A DE1434466 A DE 1434466A DE 1434466 A1 DE1434466 A1 DE 1434466A1
- Authority
- DE
- Germany
- Prior art keywords
- formwork
- ceilings
- building
- already
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B1/3516—Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by erecting a vertical structure and then adding the floors from top to bottom
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/38—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
Verfahren zum Errichten von "hohen Betonbauten, z.B. von WohnhochhäusernMethod for erecting "high concrete structures, e.g. high-rise apartment buildings
Es ist bekannt, die Außenwände von Wohnhochhäusern mittels einer Gleit- oder Kletterschalung in einem Zuge von unten bis oben herzustellen und anschließend die Decken in Gestalt von Betonzwischendecken einzuziehen. Dabei ist vorgeschlagen worden, die Decken alle mit derselben Deckenschalung herzustellen, und zwar in der Weise, daß mit dieser Schalung zunächst die oberste Decke gegossen wird und anschließend von dieser obersten Decke aus die Deckenschalung stufenweise absinkt und zum Betonieren der zweitobersten und weiter unten liegenden Decken abgesenkt wird. Die Decken werden also, mit der obersten beginnend, von oben nach unten zeitlich nacheinander unter Verwendung der gleichen heb- und absenkbar aufgehängten Schalung gefertigt, wobei die Decken natürlich in den durch Gleitschalung erstellten Außenwänden verankert werden müssen.It is known that the outer walls of high-rise apartment buildings by means of sliding or climbing formwork in one go from the bottom to manufacture above and then pull in the ceilings in the form of concrete false ceilings. It has been suggested that to produce the ceilings all with the same ceiling formwork, in such a way that with this formwork first the top one Ceiling is poured and then the ceiling formwork gradually descends from this uppermost ceiling and is then poured into concrete the second from the top and lower ceilings is lowered. So, starting with the top one, the ceilings are made of Manufactured from top to bottom one after the other using the same raised and lowered formwork, whereby the ceilings must of course be anchored in the outer walls created by sliding formwork.
909804/0351909804/0351
U34466U34466
Pur Bauwerke normaler Höhe reicht die Festigkeit der zunächst v';:;i ohne Zwischendecken aufgeführten tragenden Seitenwände aus,"' doch können, auf diese Weise weder die heute üblichen bis au zwanzig Stockwerke umfassenden Hochhäuser noch die ebenfalls Zwischendecken zur Aufnahme der Schamotte-Innenauskleidung aufweisenden sehr hohen Kamine errichtet werden. -For buildings of normal height, the strength of the initially v 'is sufficient; :; i without intermediate ceilings, load-bearing side walls, "'but neither the high-rise buildings that are common today, with up to twenty storeys, nor the very high chimneys, which also have intermediate ceilings to accommodate the fireclay interior lining, can be built in this way.
Erfindungsgemäß wird allen Anforderungen, die an Hochhaus er. mit Zwischendecken vom Pestigkeits- und lertigungsStandpunkt aus zu stellen, sind, dadurch,genügty daß das später eine große Anzahlr z.B. zwanzig und mehr Stockwerke umfassende Bauwerk in zwei oder mehr, jeweils später eine größere Anzahl von . Zwischendecken enthaltende Bauabschnitte aufgeteilt wird und nach Errichten des ersten und jedes folgenden Bauabschnittes mittels einer jedem Bauabschnitt zugeordneten Deckenschalung zunächst die oberste Decke des Bauabschnitts als Aussteifungsdecke und anschließend,, wie an sich bekannt, durch Absenken der geweiligen Deckenschalung die darunter befindliehen Zwischendecken des zugehörigen Bauabschnitts hergestellt werden. Durch das beschriebene Einziehen von Zwischendecken nach dem Grleitbau jedes Abschnittes der Umfassungswände, wird nichtnut-, eine wesentliche Erhöhung der Steifigkeit des G-leitbaus während seiner Erstellung bzw. eine entsprechende Einsparung von Bewehrungsmaterial erreicht, sondern es wird auch ermöglicht, gleich nach dem Einziehen der obersten Decke des ersten According to the invention, all the requirements that are placed on high-rise buildings are met. to provide with false ceilings from Pestigkeits- and lertigungsStandpunkt from, are characterized, that the genügty later, a large number r such as twenty or more floors comprehensive structure into two or more, in each case later by a greater number. Construction sections containing false ceilings is divided and after the first and each subsequent construction section has been erected by means of a ceiling formwork assigned to each construction section, first the uppermost ceiling of the construction section is produced as a stiffening ceiling and then, as is known per se, the intermediate ceilings of the associated construction section located underneath are produced by lowering the respective ceiling formwork will. By drawing in false ceilings after the sliding structure of each section of the enclosing walls, a substantial increase in the rigidity of the sliding structure is achieved during its construction and a corresponding saving in reinforcement material is achieved, but it is also made possible immediately after the insertion of the top ceiling of the first
: ■■-.■ :: ; :■■"■■ — 3 -: ■■ -. ■ :: ; : ■■ "■■ - 3 -
909804/035 1909804/035 1
bzw. weiteren Bauabschnitts die Zwischendecken im hinsichtlich seiner Außenwand fertigen Bauabschnitt durch Ablassen der Deckenschalung von der obersten Yersteifungsdecke in Richtung von oben nach unten nacheinander zu erstellen. Es ergibt sich ein erheblicher Zeitgewinn, weil gleichzeitig in mehreren Bauabschnitten Decken mit dieser Schalungsabsenkmethode erstellt« werden können-ror further construction phase, the false ceilings in terms of its outer wall finished construction section by draining the Create slab formwork from the top reinforcement slab one after the other in the direction from top to bottom. It surrenders a considerable gain in time because ceilings are being created in several construction phases at the same time using this formwork lowering method « can be-r
Weitere Einzelheiten der Erfindung ergeben sich aus einem in der Zeichnung schematisch dargestellten Ausführungsbeispiel.Further details of the invention emerge from an exemplary embodiment shown schematically in the drawing.
Es zeigenShow it
Pig. 1 ein hohes Bauwerk in Ansicht, teilweise im Schnitt, mit mehreren Bauabschnitten, bei denen eine unterschiedliche Anzahl von Zwischendecken entsprechend dem verschiedenen Baufortschritt eingebracht sind.Pig. 1 a high building in view, partly in section, with several construction phases in which a different number of false ceilings accordingly the different construction progress.
909804 /0351909804/0351
PA 9/460/128PA 9/460/128
A-·'' ■ 143«66 A- · '' ■ 143 «66
Fig» 2 <§ine zerlegbare Deckenschalung in Draufsicht und-Fig »2 <§ a dismountable ceiling formwork in plan view and
'Fig,, 3 einen teilweisen Höhenschnitt des Gebäudes mit einer "; Deckenschalung« ♦ ■ '',, Figure 3 is a partial vertical section of the building with a "; slabs" ♦ ■'
In Fig* 1 seien zunächst in bekannter Weise die Betonwände 1, ■ 11 des im übrigen nur schematisch dargestellten Bauwerkes bis über die Höhs des ersten Bauabschnittes I mit Hilfe.einer bekannten Gleit- oder Kletterschalung hochgeführt. Gleichzeitig wurde auf dem Baugrund des Gebäudes die in Fig. 2 und 3 dargestellte zerlegbare Deckenschalung 5 aus den längs- und Querträgern■6 einschließlich ihrer Diagonalversteifungen 7 zusammengebaut» Diese Deckenschalung 5. kann nun mittels geeigneter nicht dargestellter Hebevorrichtungen 9 die .'beispielsweise--auf'der Ar-./ beltsbühne der Gleit- oder Kletterschalung aufgelagert sind ■ oder mit Hilfe eines Baukrans bis -zur Höhe' "der zum Bauabschnitt I gehörigen obersten Zwischendecke 211 angehoben werden. IFachdem sie dort durch die in entsprechende Aussparungen der bereits erstellten Betonwände 1,V passende Terrsgelungsglieder 8 ..; aufgelagert wurde 9 kann der für die Betonsv/ischendeeke Zt 1. erforderliche Baustoff eingebracht 'werden. Während nun der Beton diese Zwischendecke 211 abbindets können bereits die nachfolgenden ■Wände-2, 2! des darüb erliegend en Bauabschnittes IX. durch .entsprechendes Fortsetzen des Gleit- oder Klet'terschalsi^e-rfahrenshergestellt werden« ·In Fig. 1, the concrete walls 1, 1 1 of the structure, which is otherwise only shown schematically, are first raised above the height of the first construction section I with the aid of a known sliding or climbing formwork. At the same time the building has been illustrated in Fig. 2 and 3 dismountable slabs assembled 5 from the longitudinal and transverse beams ■ 6 including its diagonal stiffeners 7 on the lot "These slabs 5. may now by means of suitable non-illustrated lifting devices 9, the .'beispielsweise-- auf'der Ar-./ Beltsbühne the sliding or climbing formwork are supported ■ or with the help of a construction crane to -to the height '"of the uppermost intermediate ceiling 211 belonging to construction section I 1, V matching Terrsgelungsglieder 8 ..; was overlaid 9 of the Betonsv / ischendeeke currently first required building material 'can be introduced during the concrete these false ceiling 211 now abbindet s may already have the following ■ walls-2, 2 of darüb.! Subsequent construction phase IX. can be produced by corresponding continuation of the sliding or climbing scarf process "
■'..-. ' ■■■ - ;■'■.■■ . . -.6 -■ '..-. '■■■ -; ■' ■. ■■. . -.6 -
...-■■' .--tAD'.ORIGINAL' ...;-...- ■■ ' .-- tAD ' .ORIGINAL '...; -
■ ; : 909804/035 1 '■; : 909804/035 1 '
PA 9/460/128 " -JS- /PA 9/460/128 " -JS- /
. !fach Abbinden des Beton der Zwischendecke 211 bzv/. Z12 köwien, wie axis den Figuren 1 und 3 ersichtlich ist, auf dieser Hebevorrichtungen 9, 9f aufgestellt und dann die Deckenschalung S1 mit Hilfe von durch Aussparungen 10, 10' in der Zwischendecke Z11 bzw. Z12 hindurchgehende Tragseile oder Ketten 11, 11! an den Ösen 13 aufgehängt werden. Nach Herausziehen der Riegel 8 aus den Aussparungen in den bereits erstellton Betonbauwerkswänden 1, 1' kann die Schalung 5* nun auf die Höhe der nächsten Zwischendecke Z12vabgesenkt und dort suai Gießen dieser Geschoßdecke verankert werden.. ! fold setting of the concrete of the false ceiling 211 or v /. Z12 köwien, as can be seen in FIGS. 1 and 3, is set up on these lifting devices 9, 9 f and then the ceiling formwork S 1 with the aid of supporting cables or chains 11, 11 passing through recesses 10, 10 'in the intermediate ceiling Z11 or Z12 ! can be hung on the eyelets 13. After pulling the bolt 8 out of the recesses in the already created concrete building walls 1, 1 ', the formwork 5 * can now be lowered to the level of the next intermediate ceiling Z12v and anchored there by pouring this floor ceiling.
Wie in Fig. 3 dargestellt, trägt die zerlegbare Deckenschalung noch Hängegerüste 12, 12' um von da aus die Riegel 8 sowie die Schaltafeln vom fertigen Deckenbeton lösen au können. Diese Hängebühnen 12, 12' v/erden dabei am besten nach Anheben der Deckenschalung 5-j um eine etwa der Hängebühnen 12, 12' entsprechende Höhe vom Grund aus angebracht, weil sie so vö.ro festen Boden aus montierbar sind und bereits zum Verriegeln und Entriegeln der Deckenschalung 5-j vor und nach 'dem Oießen der ( obersten Zwischendecke Z11 verfügbar sind. Unabhängig von dem weiteren Hochführen der Bauwerkswände 2, 2* im Bauabschnitt II und der daran anschließenden Bauwerkswände für die weiteren Bauabschnitte können nun schon die Zwischendecken 212 bis Z14 im Bauabschnitt I ausgeführt werden. Sofort nachdem die Bauwerkswände 2, 21 im Bauabschnitt II fertiggestellt sind, kann ■ mit Hilfe einer weiteren Deckenschalung 5p mi* &em EinbringenAs shown in Fig. 3 , the dismountable ceiling formwork also carries hanging scaffolding 12, 12 'to be able to detach the bolts 8 and the formwork panels from the finished concrete ceiling from there. These suspended platforms 12, 12 'are best attached from the ground after lifting the ceiling formwork 5-j by a height corresponding approximately to that of the suspended platforms 12, 12', because they can be mounted from a solid ground and are already locked and unlocking the ceiling formwork 5-j before and after the pouring of the (uppermost intermediate ceiling Z11 are available. Independent of the further raising of the building walls 2, 2 * in construction section II and the adjoining building walls for the further construction sections, the intermediate ceilings 212 to Z14 in construction section I. Immediately after the building walls 2, 2 1 have been completed in construction section II, ■ 5p m i * & em can be brought in with the help of further slab formwork
BAD ORIGfNAL 909804/0351-BATH ORIGfNAL 909804 / 0351-
PA 9/460/128 * ~ 1434406PA 9/460/128 * ~ 1434406
der zugehörigen Zwischendecken Z21 bis Z24 begonnen werden. Dadurch wird die erforderliche Arbeitszeit verkürzt und weiterhin erhält der Bauabschnitt II auch schon die erforderliche Quersteifigkeit. Dieses Verfahren-wird nun so oft wiederholt, als das zu errichtende Bauwerk Bauabschnitte I bis IV aufweist. Bei höhten Gebäuden ist es also ohne weiteres möglich, zunächst im untersten bereits erstellten Bauwerksabschnitt I die Zwischendecken 212 bis Z 1.4 mit der vorgenannten Deckenschalung 5^ einzufügen und gleichzeitig in dem darüber liegenden Bauabschnitt II die senkrechten Bauwerkswände 2, 2f hoehzufuhren und dann mit ' einer aweiten Deckenschalung 52 ä.le Zwischendecken Z21 bis 224 einzubringen«. Dieses ist im einzelnen in Fig. 3 dargestellt, in der bereits die senkrechten tragenden Wände 1, 1 'f bis 3, 3" für die drei Bauabschnitte I bis III fertiggestellt sind und mit den tragenden Wänden 4? 4' des Bauabschnitts IV begonnen wurde. Dabei sind im Bauabschnitt I bereits die Zwischendecken Z11 bis Z13 fertiggestellt und eine Deckenschalung 5« ist gerade zum G-ießen der letzten Zwischendecke ZH des Bauabschnitts ί in entsprechender Höhe angebracht. Mit den Declcenschalungen 5o und 5-z werden weiterhin gleichseitig in den Bauabschnitten II und III die Zwischendecken Z23 bzw= Z32 gegossen, y/ährenddie noch fehlenden Zviischendecken Z 24, Z33 und 234 durch Strichelungen angedeutet sind. Wenn auf einer Baustelle gleichzeitig mehrere gleichartige ß-ebäude zu errichten sind, kann das ganze Verfahren dadurch noch.preisgünstiger und zeitsparender gemacht werden, daß nach Beenden der senkrechten Wände eines Bauwerkes bereitsof the associated false ceilings Z21 to Z24. As a result, the required working time is shortened and construction phase II also receives the required transverse rigidity. This process is repeated as often as the structure to be constructed has construction sections I to IV. In the case of elevated buildings, it is therefore easily possible to first insert the intermediate ceilings 212 to Z 1.4 with the aforementioned ceiling formwork 5 ^ in the lowest building section I, which has already been created, and at the same time to raise the vertical building walls 2, 2 f in the building section II above and then with ' a wide ceiling formwork 5 2 a.le intermediate ceilings Z21 to 224 «. This is shown in detail in Fig. 3, in which the vertical load-bearing walls 1, 1 ' f to 3, 3 "for the three construction sections I to III have already been completed and the load-bearing walls 4 - 4' of construction section IV have started . the intermediate ceilings are in Phase I already completed Z11 to Z13 and slabs 5 "is just to the G-ow of the last intermediate ceiling ZH of the section ί mounted in a corresponding amount. with the Declcenschalungen 5o and z 5-still equal to each other in the phases II and III the intermediate ceilings Z23 or Z32 cast, while the missing intermediate ceilings Z 24, Z33 and 234 are indicated by dotted lines and be made more time-saving that after finishing the vertical walls of a building already
. BAD ORIGINAL. BATH ORIGINAL
9098 04/03 519098 04/03 51
PA 9/460/128 ->ar-PA 9/460/128 -> ar-
init dem Hochführen der senkrechten V/ände eines zweiten Bauwerkes begonnen wird, während im ersten Bauwerk noch die fehlenden Zwischendecken nacheinander mittels der Deckenschalungen 5^ usv/, eingefügt werden. Dabei können die jeweils in den unteren Abschnitten des ersten Bauv/erkea frei$wsrden&en "Deckensehalungen 5-., 5p usw. sofort beim zweiten Bauwerk wieder eingesetzt werden.initiate the raising of the vertical walls of a second building is started, while in the first building still the missing false ceilings one after the other by means of the ceiling formwork 5 ^ usv /, can be inserted. In each case in the lower Sections of the first Bauv / Erkea free $ wsrden & en "ceiling formwork 5-., 5p etc. can be used again immediately on the second structure.
5 Patentansprüche
Z Vieuren5 claims
Z Vieuren
»AD ORIGINAL“AD ORIGINAL
909804/035 1909804/035 1
Claims (1)
zugeordneten Deckenschalung zunächst· die oberste Decke des Bauabschnitts als Äussteifungsdecfce und anschließend durch an sich bekanntes Absenken der jeweiligen Deckenschalung
die darunter befindlichen Zwischendecken des zugehörigen
Bauabschnitts hergestellt werden.1./Method of erecting high ceilings with false ceilings. Concrete buildings, e.g. high-rise residential buildings, with sliding or climbing formwork that moves from bottom to top and can be anchored in the concrete wall that has already been created, and the ceiling formwork is then lowered one after the other by means of an assembled in steps and can be anchored in the concrete wall that has already been created Can be produced from top to bottom are characterized by such a division of the building to be built into two or more building sections (I to III), each later containing a larger number of false ceilings
assigned slab formwork first of all · the topmost slab of the construction section as a reinforcement decfce and then by lowering the respective slab formwork, which is known per se
the underlying false ceilings of the associated
Construction phase.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DES0079767 | 1962-06-04 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1434466A1 true DE1434466A1 (en) | 1969-01-23 |
Family
ID=7508423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19621434466 Pending DE1434466A1 (en) | 1962-06-04 | 1962-06-04 | Method for erecting tall concrete structures, e.g. of high-rise residential buildings |
Country Status (2)
Country | Link |
---|---|
DE (1) | DE1434466A1 (en) |
GB (1) | GB988114A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995006171A1 (en) * | 1993-08-27 | 1995-03-02 | Franklin James W | Concrete building frame construction apparatus |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1367645A (en) * | 1970-11-27 | 1974-09-18 | Rice E K | Demountable plural level building structure |
NL189927C (en) * | 1990-01-19 | 1993-09-01 | Cornelis Spee | METHOD FOR BUILDING A MULTI-STOREY BUILDING |
GB9723091D0 (en) * | 1997-10-31 | 1998-01-07 | Leighton Contractors Asia Limi | A method of constructing a building |
-
1962
- 1962-06-04 DE DE19621434466 patent/DE1434466A1/en active Pending
-
1963
- 1963-06-04 GB GB2214663A patent/GB988114A/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995006171A1 (en) * | 1993-08-27 | 1995-03-02 | Franklin James W | Concrete building frame construction apparatus |
GB2295416A (en) * | 1993-08-27 | 1996-05-29 | James Wesley Franklin | Concrete building frame construction apparatus |
Also Published As
Publication number | Publication date |
---|---|
GB988114A (en) | 1965-04-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102019107165A1 (en) | Method for retrofitting a building with an elevator system, component set for carrying out the method, elevator system and prefabricated shaft for the elevator system | |
DE1283484B (en) | Procedure for building high-rise buildings and formwork to carry out the procedure | |
DE1138208B (en) | Method and device for setting up multi-storey buildings with a basement | |
DE1284076B (en) | Method of erecting a building | |
DE102017114090B4 (en) | Method of constructing a building | |
DE371180C (en) | Process for the manufacture of reinforced concrete structures | |
DE1434466A1 (en) | Method for erecting tall concrete structures, e.g. of high-rise residential buildings | |
AT410343B (en) | METHOD FOR PRODUCING A TOWER-LIKE CONSTRUCTION | |
DE1684430C3 (en) | Method for building high-rise buildings or the like. and device for carrying out the method | |
DE3703487A1 (en) | Concrete wall erection method - transfers bottom shuttering panels to top as wall is raised | |
DE3036539A1 (en) | Prefabricated brick wall element for the full assembly of houses | |
DE2213924A1 (en) | Method and device for the production of multi-storey buildings with a reinforced concrete skeleton | |
DE1534972A1 (en) | Procedure for the lateral guidance of ceilings when lifting them during the erection of a building | |
DE2208911C3 (en) | Device for distributing concrete in the course of erecting buildings | |
DE1128114B (en) | Process for erecting buildings with the help of assembly supports | |
DE1534890B1 (en) | Procedure for erecting multi-storey buildings | |
DE1182411B (en) | Method and device for erecting multi-storey buildings with basements | |
CH633364A5 (en) | Method and climbing equipment for producing horizontal reinforcement rings on cooling tower shells made from reinforced concrete | |
DE1042871B (en) | Building in which the supports are first erected and then the ceiling panels are made on the ground and pulled up into their final position | |
DE889064C (en) | Construction with prefabricated panels | |
DE219501C (en) | ||
AT337420B (en) | WALL COVERING | |
AT235528B (en) | Method and device for creating a multi-storey building | |
DE1534890C (en) | Procedure for erecting multi-storey buildings | |
DE1277544B (en) | Method of erecting multi-storey buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
SH | Request for examination between 03.10.1968 and 22.04.1971 |