CN217840841U - High-altitude movable ladder-hanging type auxiliary construction system - Google Patents
High-altitude movable ladder-hanging type auxiliary construction system Download PDFInfo
- Publication number
- CN217840841U CN217840841U CN202221259040.4U CN202221259040U CN217840841U CN 217840841 U CN217840841 U CN 217840841U CN 202221259040 U CN202221259040 U CN 202221259040U CN 217840841 U CN217840841 U CN 217840841U
- Authority
- CN
- China
- Prior art keywords
- ladder
- upright post
- hanging
- pedal
- construction system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 230000000712 assembly Effects 0.000 claims abstract description 8
- 238000000429 assembly Methods 0.000 claims abstract description 8
- 230000001681 protective effect Effects 0.000 claims abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 238000005096 rolling process Methods 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 238000004873 anchoring Methods 0.000 claims 1
- 239000002023 wood Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 description 9
- 238000005034 decoration Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to the technical field of building auxiliary construction facilities, which discloses a high-altitude movable hanging ladder type auxiliary construction system, solving the technical problem of how to set auxiliary construction facilities between each layer of sidewalk above the stage of the present theater, comprising a plurality of groups of hanging ladder units, pedal assemblies erected between the hanging ladder units and protective pieces arranged around the pedal assemblies; the ladder hanging unit comprises a left upright post, a right upright post, a ladder hanging part and pulleys, the ladder hanging part is fixed between the left upright post and the right upright post, the pulleys are arranged in plurality and are respectively installed at the top end and the bottom end of the left upright post and the right upright post, and a pedal installing port is formed in the ladder hanging part; the pedal assembly comprises a plurality of pedals, and two ends of each pedal are respectively arranged on pedal mounting openings in different ladder hanging units; the protection parts are fixed on the left upright post and the right upright post. According to the technical scheme, the utility model discloses utilize movable to hang ladder structural system to reach the purpose of being convenient for construction between the packway.
Description
Technical Field
The utility model relates to a construction facilities technical field is assisted in the building, and more specifically says that it relates to a portable ladder formula of hanging of high altitude is supplementary construction system.
Background
The construction auxiliary facility means a device for assisting construction of a building, such as: scaffolding, hanging ladders, and the like. In the construction field, the scenes of using scaffolds and hanging ladders are particularly numerous.
In actual construction engineering, if public outfit projects for theater construction are carried out, 4 horseway beam steel structures are arranged above a common theater stage and serve as overhauling and equipment installation devices, electromechanical installation equipment is hoisted below the horseway steel structures, the interval between every two layers of horseway is larger than or equal to 4 meters, the width of each layer of horseway only meets pedestrians, and scaffolds cannot be erected according to conventional methods for construction.
Therefore, how to arrange auxiliary construction facilities between each layer of the pavement is convenient for operators to install electromechanical equipment, and becomes a technical problem to be solved in the field.
SUMMERY OF THE UTILITY MODEL
How to set up the technical problem of supplementary construction facility between every layer of packway to the theatre stage sky that proposes in the background art, the utility model discloses utilize movable to hang ladder structural system to reach the purpose of being convenient for construction between packway.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a high-altitude movable ladder hanging type auxiliary construction system comprises a plurality of sets of ladder hanging units, pedal assemblies erected among the ladder hanging units and protection pieces arranged around the pedal assemblies;
the ladder hanging unit comprises a left upright post, a right upright post, a ladder hanging part and pulleys, the ladder hanging part is fixed between the left upright post and the right upright post, the pulleys are provided with a plurality of pulleys and are respectively installed at the top end and the bottom end of the left upright post and the right upright post, and a pedal installing port is formed in the ladder hanging part;
the pedal assembly comprises a plurality of pedals, and two ends of each pedal are respectively arranged on pedal mounting openings in different ladder hanging units;
the protection parts are fixed on the left upright post and the right upright post.
Through the technical scheme, the two sides of the sliding operation platform of the horse way are welded into a ladder shape by using phi 32 seamless steel pipes, the upper part and the lower part of each ladder are respectively provided with a detachable pulley which can be respectively propped and pressed on the upper horse way beam and the lower horse way beam, the pedals are erected in the middle of the ladders at the height convenient for construction, and the protection parts are hung at intervals by a stair.
The working principle is as follows: the hanging ladder units are transversely arranged, pedals with different heights can be erected between the adjacent hanging ladders, the pedals are used for construction, and protection pieces are arranged around the pedals for construction safety protection.
The utility model discloses further set up to: the left upright post and the right upright post are configured to be seamless steel tubes, and the ladder hanging part is formed by welding the seamless steel tubes.
Through the technical scheme, the seamless steel pipe is welded, the seamless steel pipe is easy to obtain in a building place, the welding processing procedure is simple and convenient, and the construction efficiency is high.
The utility model discloses further set up to: the seamless steel pipe is set to be a seamless steel pipe with the diameter of phi 32.
By adopting the technical scheme, the seamless steel pipe with the diameter of phi 32 is adopted to meet the requirement of site construction strength.
The utility model discloses further set up to: the pulley is provided with a roller structure with a rolling bearing.
Through the technical scheme, the rolling installation effect is realized.
The utility model discloses further set up to: the pedal is set to be a wooden plate.
Through above-mentioned technical scheme, the wooden board can adopt the template of job site to set up, and is simple convenient.
The utility model discloses further set up to: the surface of the pedal forms a construction channel for workers to walk.
Through the technical scheme, the construction channel is convenient for construction operators to stand and place construction tools and equipment for construction work and the like.
The utility model discloses further set up to: the guard is provided as a guard rail or protective net.
Through the technical scheme, safety protection is carried out on high-altitude construction of constructors through the protective rail or the protective net.
The utility model discloses further set up to: the shield is mounted by means of an anchor.
Through above-mentioned technical scheme, the anchor installation is firm convenient.
To sum up, the utility model discloses following beneficial effect has:
(1) Auxiliary construction facilities can be arranged among the streets on each layer above the theatre stage;
(2) The construction height can be flexibly adjusted;
(3) The flexible sliding adjustment of the construction position can be realized.
Drawings
FIG. 1 is a schematic elevation view of an auxiliary construction system;
fig. 2 is a schematic side view of the hanging ladder unit, which is rotated 90 degrees when the hanging ladder unit is installed;
fig. 3 is a schematic view showing a guard mounting position structure.
Reference numerals: 1. a ladder hanging unit; 1-1, a left upright post; 1-2, a right upright post; 1-3, hanging a ladder part; 1-31, a pedal mounting port; 1-4, a pulley; 2. a pedal assembly; 2-1, a pedal; 2-2, constructing a channel; 3. a guard.
Detailed Description
The present invention will be described in further detail with reference to the following examples and drawings, but the embodiments of the present invention are not limited thereto.
An overhead movable ladder-hanging type auxiliary construction system can be seen from fig. 1 to 3, and comprises a plurality of groups of ladder-hanging units 1, pedal assemblies 2 erected among the ladder-hanging units 1, and protection pieces 3 arranged around the pedal assemblies 2. Hang ladder unit 1 and have gliding effect, between the adjacent ladder unit 1 of hanging of footboard subassembly 2 installation, form the operation area of standing that supplies to execute the staff to can carry out the construction operation between every layer of packway on the theatre stage. Meanwhile, the protection piece 3 is arranged to protect the safety of the operator in the high-altitude operation.
In particular, as shown in fig. 2, in order to achieve the hanging function and the sliding function of the hanging ladder unit 1. The structure of the ladder hanging unit 1 comprises a left upright post 1-1, a right upright post 1-2, a ladder hanging part 1-3 and a pulley 1-4. The ladder hanging part 1-3 is fixed between the left upright post 1-1 and the right upright post 1-2, a plurality of pulleys 1-4 are arranged and respectively installed at the top end and the bottom end of the left upright post 1-1 and the right upright post 1-2, the ladder hanging part 1-3 is internally provided with a pedal installation port 1-31, and the pedal installation port 1-31 is used for installing the pedal assembly 2 as the name implies.
Wherein, the left upright post 1-1 and the right upright post 1-2 are configured to be seamless steel pipes, and the ladder hanging part 1-3 is formed by welding the seamless steel pipes. And the seamless steel pipe in this embodiment is set to be a seamless steel pipe with a diameter of Φ 32. The pulleys 1 to 4 in this embodiment are provided as a roller structure with rolling bearings.
Specifically, referring to fig. 1, in order to realize the installation of the pedal assembly 2 at different heights, the pedal assembly 2 is provided to include a plurality of pedals 2-1, and two ends of each pedal 2-1 are respectively installed on pedal installation openings 1-31 inside different ladder hanging units 1. Therefore, during actual construction operation, the pedals 2-1 can be installed in the pedal installing openings 1-31 with different heights according to the required operation height. In the embodiment, the footplate 2-1 is configured as a wooden board, and the surface of the footplate 2-1 forms a construction channel 2-2 for the construction worker to walk.
Specifically, referring to fig. 3, the protection member 3 is fixed to the left and right columns 1-1 and 1-2. In actual construction work, the protection shield 3 is generally provided as a protection rail or a protection net in order to perform a protection function. In this embodiment the shield 3 is mounted by means of an anchor.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (8)
1. The utility model provides a portable supplementary construction system of ladder formula of hanging in high altitude which characterized in that: the ladder comprises a plurality of groups of ladder hanging units (1), pedal assemblies (2) erected among the ladder hanging units (1) and protective pieces (3) arranged around the pedal assemblies (2);
the ladder hanging unit (1) comprises a left upright post (1-1), a right upright post (1-2), ladder hanging parts (1-3) and pulleys (1-4), wherein the ladder hanging parts (1-3) are fixed between the left upright post (1-1) and the right upright post (1-2), a plurality of pulleys (1-4) are arranged and respectively mounted at the top end and the bottom end of the left upright post (1-1) and the right upright post (1-2), and pedal mounting openings (1-31) are formed in the ladder hanging parts (1-3);
the pedal assembly (2) comprises a plurality of pedals (2-1), and two ends of each pedal (2-1) are respectively arranged on pedal mounting openings (1-31) at different heights in the ladder hanging unit (1);
the protection piece (3) is fixed on the left upright post (1-1) and the right upright post (1-2).
2. The high-altitude movable ladder-hanging type auxiliary construction system as claimed in claim 1, wherein: the left upright post (1-1) and the right upright post (1-2) are configured to be seamless steel tubes, and the ladder hanging part (1-3) is formed by welding the seamless steel tubes.
3. The high-altitude movable ladder-hanging type auxiliary construction system as claimed in claim 2, wherein: the seamless steel pipe is set to be a seamless steel pipe with the diameter of phi 32.
4. The high-altitude movable ladder-hanging type auxiliary construction system as claimed in claim 1, wherein: the pulleys (1-4) are arranged into a roller structure with rolling bearings.
5. The high-altitude movable ladder-hanging type auxiliary construction system as claimed in claim 1, wherein: the pedal (2-1) is set to be a wood board.
6. The high-altitude movable ladder-hanging type auxiliary construction system as claimed in claim 5, wherein: the surface of the pedal (2-1) forms a construction channel (2-2) for workers to walk.
7. The high-altitude movable ladder-hanging type auxiliary construction system as claimed in claim 1, wherein: the protection piece (3) is arranged as a protection railing or a protection net.
8. The high-altitude movable ladder-hanging type auxiliary construction system as claimed in claim 7, wherein: the protection element (3) is mounted by means of anchoring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221259040.4U CN217840841U (en) | 2022-05-23 | 2022-05-23 | High-altitude movable ladder-hanging type auxiliary construction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221259040.4U CN217840841U (en) | 2022-05-23 | 2022-05-23 | High-altitude movable ladder-hanging type auxiliary construction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217840841U true CN217840841U (en) | 2022-11-18 |
Family
ID=84019739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221259040.4U Active CN217840841U (en) | 2022-05-23 | 2022-05-23 | High-altitude movable ladder-hanging type auxiliary construction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217840841U (en) |
-
2022
- 2022-05-23 CN CN202221259040.4U patent/CN217840841U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8919727B2 (en) | Elevated floor and ceiling slab formwork system | |
KR100777937B1 (en) | Construcion safety working cage with scaffold | |
CN207332279U (en) | A kind of portable electromechanical mounting platform | |
CN110805289A (en) | Plug-in type discharging platform and construction method | |
CN217840841U (en) | High-altitude movable ladder-hanging type auxiliary construction system | |
CN207829435U (en) | A kind of installation of ceiling platform | |
CN113896124A (en) | Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform, installation process and climbing method thereof | |
CN213268816U (en) | Assembled shaped steel horizontal protection platform of encorbelmenting | |
JP2016204983A (en) | Temporary staircase scaffold | |
AU2014224104A1 (en) | Construction Site Safety Screen System | |
JP3950800B2 (en) | Suspension scaffold | |
CN107227839B (en) | Integrated support construction safety platform and installation method | |
CN106836851A (en) | Deep basal pit hanging-type construction stair and its construction method | |
CN207079889U (en) | A kind of working assembling type mobile construction platform of ceiling | |
CN216662305U (en) | Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform | |
KR100901016B1 (en) | Safety bracket to external wall scaffolding for a structure | |
CN215670884U (en) | Assembly type building staircase operation platform | |
CN215564748U (en) | Pavement for roof structure of swimming pool | |
CN211775606U (en) | Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway | |
CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
CN210002827U (en) | Climbing frame gap bridge of connection tower cranes | |
CN217975316U (en) | Assembled aerial working sidewalk based on steel structure steel beam surface support | |
CN218758596U (en) | Finalized temporary bearing operation platform | |
CN213710261U (en) | Scaffold with safety protection structure for building construction | |
CN221031305U (en) | Overhanging operation platform device |