CN205400075U - Concrete conveying pipe shock attenuation bracket - Google Patents
Concrete conveying pipe shock attenuation bracket Download PDFInfo
- Publication number
- CN205400075U CN205400075U CN201620146415.4U CN201620146415U CN205400075U CN 205400075 U CN205400075 U CN 205400075U CN 201620146415 U CN201620146415 U CN 201620146415U CN 205400075 U CN205400075 U CN 205400075U
- Authority
- CN
- China
- Prior art keywords
- support body
- cushion
- supporting legs
- frame
- roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to a concrete conveying pipe shock attenuation bracket, including the support body, in four bights of support body are connected with the one end of supporting legs respectively, all connect the shock pad in the other end of each supporting legs, a pair of spherical bearing's of having bearing frame is installed on the support body, still connects the roller between a pair of bearing frame, at least, a support body side surface still rigid coupling side keep off the frame. Utilize support body and supporting legs can be effectual to become the rolling friction between conveyer pipe and the roller with the sliding friction between horizontal movement pipe and the framework of steel reinforcement, the supporting legs arrange the direct contact who has avoided with the framework of steel reinforcement, the production of the frictional force that has significantly reduced can effectual protection reinforcing bar through setting up the shock pad, the template finished product, assurance concrete pouring quality. The side keep off arranging of frame be convenient for the workman can direct portable removal, satisfy the construction under the different occasions, make the utility model discloses a mobility improves greatly, and arranging of soft foam -rubber cushion has anti -skidding function, increases the frictional force that workman's palm was affectedly bashful.
Description
Technical field
This utility model relates to the realm of building construction, particularly relates to a kind of pump concrete horizontal conveying pipe shock-absorbing bracket.
Background technology
At present, existing high-rise casting concrete all adopts ground transport pump concrete, when pump concrete, the horizontal pump line being laid on floor is produced huge impulsive force accompanied by intense vibration, can produce floor steel bar to destroy and the stability of falsework is produced impact.Existing method is to adopt pad set sleeper and waste and old take turns, although its energy absorption portion impact load, but still directly contact with flooring, reinforcing bar generation still can be destroyed by unabsorbed impulsive force, and conveying pipe severe friction vibration simultaneously can make the framework of steel reinforcement finished product that banded is good loosen, deform, shift.Although additionally also having serpent steel pipe support to be separated with reinforcing bar by pump line, but load cannot be inhaled, still the stability of stencil support can be produced considerable damage.
Utility model content
The applicant is for above-mentioned existing issue, carry out Improvement, a kind of concrete delivery pipe shock-absorbing bracket is provided, it is completely isolated with reinforcing bar that it not only achieves pump line, absorbed the shock loading of pump line by the rotational of roller simultaneously, and it is portable that the layout of side divider can be easy to workman, prevent pump line lateral displacement simultaneously, improve working security.
The technical scheme that this utility model adopts is as follows:
A kind of concrete delivery pipe shock-absorbing bracket, including support body, is connected with one end of a spike respectively in four corners of described support body, and the other end in each spike is all connected with cushion;A pair bearing block with spherical bearing is arranged on support body, is also connected with roller between pair of bearing;At least at support body one side surface also affixed lateral blocked frame.
Its further technical scheme is in that:
Described lateral blocked frame includes the first horizontal support body, and the lower surface at the first horizontal support body is coated with soft foam-rubber cushion;It is connected with one end of longitudinal support body respectively at the two ends of the described first horizontal support body, the other end in each longitudinal support body connects the second horizontal support body respectively, upper surface at the described second horizontal support body connects cushion, cushion under the lower surface of the described second horizontal support body connects;
Described support body is enclosed by many square steel tubes and forms rectangle frame support body;
The length of described roller is 6~8cm.
The beneficial effects of the utility model are as follows:
Utilize support body and a spike that the sliding friction between horizontal conveying pipe and framework of steel reinforcement can effectively become the rolling friction between conveying pipe and roller; the layout of spike avoids and directly the contacting of framework of steel reinforcement; greatly reduce the generation of frictional force; supporting underfooting, the vibration that cushion can effectively cushion when pump concrete and reduction conveying pipe produces is set; owing to a spike does not directly contact with framework of steel reinforcement; reinforcing bar, template finished product can be effectively protected, it is ensured that concrete pouring quality by arranging cushion.The layout of lateral blocked frame is easy to workman can direct portable movement, meet the construction under different occasion, mobility of the present utility model is made to be greatly improved, and the layout of soft foam-rubber cushion has antiskid function, increase the frictional force that workman's palm is affectedly bashful, the layout of upper cushion and lower cushion makes the connective stability of lateral blocked frame good, it is ensured that lateral blocked frame is not affected by external force when construction, increases its service life.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the Fig. 2 structure for amplifying schematic diagram at A place.
Wherein: 1, support body;2, lateral blocked frame;21, the first horizontal support body;22, longitudinal support body;23, the second horizontal support body;3, bearing block;4, locking nut;5, roller;6, cushion;7, reinforcement;8, soft foam-rubber cushion;9, upper cushion;10, lower cushion;11, spike is propped up.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described.
As shown in Figure 1 and Figure 2, a kind of concrete delivery pipe shock-absorbing bracket includes support body 1, and support body 1 is enclosed by many square steel tubes and forms rectangle frame support body.Being connected with one end of a spike 11 respectively in four corners of support body 1, the other end in each spike 11 is all connected with cushion 6;A pair bearing block 3 with spherical bearing is arranged on support body 1, is also connected with roller 5 between pair of bearing 3, and the length of roller 5 is 6~8cm.At least at support body 1 one side surface also affixed lateral blocked frame 2.As shown in Figure 2 and Figure 3, lateral blocked frame 2 includes the first horizontal support body 21, the lower surface of the described first horizontal support body 21 is coated with soft foam-rubber cushion 8, it is connected with one end of longitudinal support body 22 respectively at the two ends of the first horizontal support body 21, the other end in each longitudinal support body 22 connects the second horizontal support body 23 respectively, upper surface at the second horizontal support body 23 connects cushion 9, cushion 10 under the lower surface of the second horizontal support body 23 connects.The length of the above-mentioned first horizontal support body 21 and longitudinal support body 22 is 15 ± 1cm, above-mentioned second horizontal support body 23 is fixed on a square steel tube of rectangle frame support body by locking nut 4, also setting up reinforcement 7 in the junction of each spike 11 with support body 1 corner, the layout of reinforcement 7 improves the intensity of structure.
Utilize support body 1 and a spike 11 that the sliding friction between horizontal conveying pipe and framework of steel reinforcement can effectively become the rolling friction between conveying pipe and roller 5; the layout utilizing a spike 11 avoids and contacts with the direct of framework of steel reinforcement; greatly reduce the generation of frictional force; cushion 6 is set for 11 times at a spike and effectively can cushion and reduce the vibration that conveying pipe produces when pump concrete; owing to a spike 11 does not directly contact with framework of steel reinforcement; reinforcing bar, template finished product can be effectively protected, it is ensured that concrete pouring quality by arranging cushion 6.The layout of lateral blocked frame 2 is easy to workman can direct portable movement, meet the construction under different occasion, mobility of the present utility model is made to be greatly improved, and the layout of soft foam-rubber cushion 8 has antiskid function, increase the frictional force that workman's palm is affectedly bashful, upper cushion 9 and the layout of lower cushion 10 make the connective stability of lateral blocked frame 2 good, it is ensured that lateral blocked frame 2 is not affected by external force when construction, increases its service life.
Above description is to explanation of the present utility model, is not the restriction to utility model, and this utility model limited range is referring to claim, and when without prejudice to basic structure of the present utility model, this utility model can do any type of amendment.
Claims (4)
1. a concrete delivery pipe shock-absorbing bracket, it is characterized in that: include support body (1), being connected with one end of a spike (11) respectively in four corners of described support body (1), the other end in each spike (11) is all connected with cushion (6);A pair bearing block with spherical bearing (3) is arranged on support body (1), is also connected with roller (5) between pair of bearing (3);At least in support body (1) side surface also affixed lateral blocked frame (2).
2. a kind of concrete delivery pipe shock-absorbing bracket as claimed in claim 1, it is characterized in that: described lateral blocked frame (2) includes the first horizontal support body (21), the lower surface the first horizontal support body (21) is coated with soft foam-rubber cushion (8);It is connected with one end of longitudinal support body (22) respectively at the two ends of the described first horizontal support body (21), the other end in each longitudinal support body (22) connects the second horizontal support body (23) respectively, upper surface the described second horizontal support body (23) connects upper cushion (9), cushion (10) under the lower surface of the described second horizontal support body (23) connects.
3. a kind of concrete delivery pipe shock-absorbing bracket as claimed in claim 1, it is characterised in that: described support body (1) is enclosed by many square steel tubes and forms rectangle frame support body.
4. a kind of concrete delivery pipe shock-absorbing bracket as claimed in claim 1, it is characterised in that: the length of described roller (5) is 6~8cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620146415.4U CN205400075U (en) | 2016-02-26 | 2016-02-26 | Concrete conveying pipe shock attenuation bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620146415.4U CN205400075U (en) | 2016-02-26 | 2016-02-26 | Concrete conveying pipe shock attenuation bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205400075U true CN205400075U (en) | 2016-07-27 |
Family
ID=56424285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620146415.4U Expired - Fee Related CN205400075U (en) | 2016-02-26 | 2016-02-26 | Concrete conveying pipe shock attenuation bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205400075U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035355A (en) * | 2016-10-31 | 2018-05-15 | 陈键 | A kind of building concrete, which pours, uses automatic positioning equipment |
CN109737256A (en) * | 2018-12-24 | 2019-05-10 | 上海二十冶建设有限公司 | Concreting conduit ball-type steering knuckle device |
CN115434503A (en) * | 2022-09-16 | 2022-12-06 | 江苏速捷模架科技有限公司 | Component moving device and process for coil buckle frame |
-
2016
- 2016-02-26 CN CN201620146415.4U patent/CN205400075U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035355A (en) * | 2016-10-31 | 2018-05-15 | 陈键 | A kind of building concrete, which pours, uses automatic positioning equipment |
CN108035356A (en) * | 2016-10-31 | 2018-05-15 | 陈键 | A kind of building concrete, which pours, uses automatic positioning equipment |
CN108105477A (en) * | 2016-10-31 | 2018-06-01 | 陈键 | A kind of building concrete, which pours, uses automatic positioning equipment |
CN108035356B (en) * | 2016-10-31 | 2020-10-30 | 安徽省行千里知识产权服务有限公司 | Automatic positioning device for building concrete pouring |
CN108035355B (en) * | 2016-10-31 | 2020-10-30 | 安徽省行千里知识产权服务有限公司 | Automatic positioning device for building concrete pouring |
CN109737256A (en) * | 2018-12-24 | 2019-05-10 | 上海二十冶建设有限公司 | Concreting conduit ball-type steering knuckle device |
CN115434503A (en) * | 2022-09-16 | 2022-12-06 | 江苏速捷模架科技有限公司 | Component moving device and process for coil buckle frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203452012U (en) | Mobile hanging basket for guard bar outer side construction | |
CN205400075U (en) | Concrete conveying pipe shock attenuation bracket | |
CN203269274U (en) | Slope section rail type conveying device | |
CN205600697U (en) | Civil construction pipe fitting placement frame | |
CN203623675U (en) | Penstock transportation trolley in hole | |
CN213505574U (en) | Reinforcing bar hoist device for building | |
CN203998024U (en) | Stone plate planer-type automatic loading and unloading device | |
CN206375271U (en) | A kind of steel tube conveying roller bed | |
CN203306558U (en) | Transportation track and solar cell transportation device with same | |
CN205971584U (en) | Industrial area pipe fitting transport vechicle for ground is executed to building | |
CN211254150U (en) | Translation turnover type shield segment conveying device | |
CN205708871U (en) | A kind of damping device of pump line transport | |
CN204418646U (en) | A kind of detachable steel pipe extension device | |
CN204916856U (en) | Large -scale pipe fitting conveyer | |
CN210882247U (en) | Hydraulic engineering machinery conveyer | |
CN206385463U (en) | A kind of anchor ear construction auxiliary hanging basket instrument | |
CN211110746U (en) | Slope moving platform hoisting device | |
CN108035529A (en) | A kind of construction high-lift operation hanging cradle | |
CN206858045U (en) | A kind of jack supporting piece of convenient regulation | |
CN207419526U (en) | A kind of underpass falsework | |
CN207278296U (en) | A kind of multi-functional transporting device for coal tunnel | |
CN220645233U (en) | Concrete pouring lifting trolley device | |
CN206928684U (en) | Sizing safeguard structure for concrete conveyance reserved opening | |
CN207749425U (en) | A kind of road and bridge engineering high standard constructing device | |
CN204531451U (en) | Pumping of concrete horizontal conveying pipe roller bearing shock bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160727 |