CN108035356B - Automatic positioning device for building concrete pouring - Google Patents
Automatic positioning device for building concrete pouring Download PDFInfo
- Publication number
- CN108035356B CN108035356B CN201711389875.5A CN201711389875A CN108035356B CN 108035356 B CN108035356 B CN 108035356B CN 201711389875 A CN201711389875 A CN 201711389875A CN 108035356 B CN108035356 B CN 108035356B
- Authority
- CN
- China
- Prior art keywords
- positioning base
- reinforcing
- plate
- groove
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/12—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16F—SPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
- F16F15/00—Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
- F16F15/02—Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/40—Miscellaneous comprising stabilising elements
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Acoustics & Sound (AREA)
- Aviation & Aerospace Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention relates to the field of building pouring, in particular to an automatic positioning device for building concrete pouring, which comprises a positioning base, a positioning base and a connecting shaft, wherein the positioning base is arranged at the upper end of the positioning base, traction handles are arranged at the two ends of the positioning base along the length direction, the positioning base is convenient to move, an anti-skidding limiting bulge is arranged at the lower end of the positioning base, the cross section of the positioning base is in a trapezoid shape, the device not only can slow down the acting force of a ground pump, but also can enable the device to be harder and firmer to lay through a reinforcing and stabilizing body, so that the manual pulling and positioning during pouring can be avoided, more accurate fixed-point pouring can be carried out, the pouring quality is improved, the manual investment can be reduced, the cost investment is reduced, and the occurrence frequency of accidents can be reduced, the pouring safety is improved.
Description
Technical Field
The invention relates to the technical field of building pouring, in particular to an automatic positioning device for building concrete pouring.
Background
Foundation and foundation engineering in the building industry often relate to bored concrete pile construction and raft construction, and most pile foundation concreting is concrete construction under water, and pile concrete placement quality and the pouring quality of raft directly influence pile foundation bearing capacity and structural safety, therefore concrete placement and raft pouring often are as the focus in process control. Generally, the pouring operation platform is erected randomly in the pile concrete pouring process and the raft pouring process, and the safety of operators in the pouring process cannot be guaranteed. And the pipe of concrete placement usefulness is fixed also does not have fixed form, often cause to consolidate not in place and cause the pipe to drop, pile body quality can not be guaranteed, and when the area of pouring is too big, when the area of pouring of muddy earth air pump can't satisfy and pour the use, just must use the concrete pump to pour, but when using the land pump to pour, hardly accomplish accurate control discharging pump pipe, can't carry out accurate pouring, and because the power of land pump is too big, often when pouring, still can use the manpower to come to control discharging pump pipe, but the effect is unsatisfactory, and sometimes still can threaten workman's life safety.
Disclosure of Invention
The invention aims to provide an automatic positioning device for building concrete pouring, which has the characteristics of accurate pouring, safe pouring and the like.
In order to achieve the purpose, the invention provides the following technical scheme: an automatic positioning device for building concrete pouring comprises a positioning base, a positioning base and a connecting shaft, wherein the positioning base is arranged at the upper end of the positioning base, traction handles are arranged at two ends of the positioning base along the length direction, the positioning base is convenient to move, an anti-skidding limiting bulge is arranged at the lower end of the positioning base, the cross section of the positioning base is trapezoidal, a clamping groove is formed in the middle of the upper end of the positioning base, and the clamping groove is an arc-shaped clamping groove;
the upper end of the positioning base is provided with a hinging block, the hinging block is arranged close to one end of the clamping groove, the upper end of the hinging block is hinged with one end of a limiting plate, the vertical section of the limiting plate is arc-shaped, the other end of the limiting plate is provided with a connecting hole, one end of the inside of the positioning base is provided with a connecting cavity, a limiting block is arranged inside the connecting cavity, the upper end of the limiting block is connected with one end of a connecting rod, the other end of the connecting rod sequentially penetrates through the connecting cavity and the positioning base and is positioned above the positioning base, the other end of the connecting rod is close to the other end of the clamping groove, and the other end of;
the positioning base is characterized in that a reinforcing plate group is transversely arranged in the positioning base and comprises an upper reinforcing plate and a lower reinforcing plate, inserting positioning holes are formed in the upper reinforcing plate and the lower reinforcing plate, the lower end of a clamping groove is fixedly connected with one end of a damping column, the other end of the damping column penetrates through the inserting positioning holes and is connected with the inner bottom end of the positioning base, an upper buffering bulge is arranged at the lower end of the upper reinforcing plate, a lower buffering bulge is arranged at the upper end of the lower reinforcing plate, and the upper buffering bulge and the lower buffering bulge are vertically corresponding to each other in the vertical direction;
an inserting groove is vertically formed in the middle inside the positioning base, one end of the inserting groove sequentially penetrates through the positioning base and extends to the bottom inside the clamping groove, the other end of the inserting groove is connected with the middle of the bottom inside the positioning base, a first threaded hole is formed in the middle of the inserting groove, the limiting plate and the clamping groove are matched to form the clamping groove, a lantern ring is clamped inside the clamping groove and is sleeved outside the pump pipe, a connecting plate is fixedly arranged on the lower side of the lantern ring, the connecting plate is arc-shaped, the lower side of the connecting plate is connected with a mounting plate, a second threaded hole is formed in the middle of the mounting plate, the mounting plate is inserted into the inserting groove, and the connecting plate is embedded inside the clamping groove;
the positioning base is provided with a first threaded hole, a second threaded hole, a third threaded hole, a connecting groove, a threaded protrusion, a rotating handle and a positioning base, wherein the first threaded hole, the second threaded hole and the third threaded hole are arranged on the inner side of the positioning base;
the utility model discloses a concrete reinforcing structure, including a positioning base, a first strengthening rib group, a second strengthening rib group, a baffle, a first cavity, a second cavity, a third cavity, a first strengthening rib group, a second cavity, a third cavity, a baffle, a second cavity, a concrete reinforcing structure and a concrete reinforcing structure.
Preferably, the other end surface of connecting rod is equipped with the screw thread, and the other end screw-thread fit of connecting rod has cup jointed the nut, and the connecting rod is two, and two connecting rods set up on the location base along length direction.
Preferably, the number of the shock absorption columns is at least five, and the shock absorption columns are distributed at equal intervals.
Preferably, the number of the mounting plates and the number of the inserting grooves are five, and the mounting plates and the inserting grooves are distributed at the lower end of the clamping groove at equal intervals.
Preferably, the inside of the inboard of limiting plate and joint recess all is equipped with the buffering protection pad, and the buffering protection pad is two opposite arc buffering protection pads of opening.
Preferably, the number of the first reinforcing rib group and the second reinforcing rib group is at least two, and the number of the reinforcing ribs in each group is at least three.
Preferably, the mounting plate, the connecting plate and the lantern ring are of an integrally formed structure.
Preferably, the number of the first threaded holes in each inserting groove, the number of the second threaded holes in each mounting plate and the number of the third threaded holes in each positioning base are three, and the first threaded holes, the second threaded holes and the third threaded holes are distributed in a triangular mode.
Compared with the prior art, the invention has the beneficial effects that: through the mutual matching action of the added positioning base, the positioning base and the limiting plate, the discharging pump pipe can be reinforced when the ground pump is used, the discharging pump pipe is prevented from displacing, so that accurate positioning pouring is carried out, and when pouring is carried out, the acting force of the pouring positioning device is very large due to the large power ratio of the ground pump, so that the damage or deviation of the pouring positioning device is easily caused, the acting force of the ground pump can be reduced through the device, the device can be harder and more firm to lay through the arranged reinforcing stabilizing body, so that manual pulling positioning can be avoided during pouring, more accurate fixed-point pouring can be carried out, the pouring quality is improved, the manual investment can be reduced, and the cost investment is reduced, and further, the accident frequency can be reduced, and the pouring safety is improved.
Drawings
FIG. 1 is a side view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic structural view of the reinforcing stabilizer of the present invention;
FIG. 4 is a schematic view of the connection of the mounting plate and the insertion groove of the present invention;
FIG. 5 is a schematic view of the connection of the mounting plate and the connecting plate of the present invention;
FIG. 6 is a schematic view of a connecting rod of the present invention;
FIG. 7 is a schematic view of the connection of the shock absorbing post and the reinforcing plate set of the present invention.
In the figure: the device comprises a positioning base 1, a positioning base 2, a limiting plate 3, a traction handle 4, a connecting shaft 5, a partition plate 6, a first reinforcing rib group 7, a second reinforcing rib group 8, a buffering protection pad 9, a mounting plate 10, a connecting groove 11, an inserting groove 12, a connecting rod 13, a limiting block 131, a connecting plate 14, a pump pipe 15, a lantern ring 16, a shock absorption column 17 and a reinforcing plate group 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: the utility model provides a building concrete placement uses automatic positioning device, includes location base 1, location base 2 and connecting axle 5, and location base 2 sets up in the upper end of location base 1, and location base 1 all is equipped with along length direction's both ends and pulls handle 4, and the convenience removes location base 1, and the lower extreme of location base 1 is equipped with anti-skidding spacing arch, and the cross-section of location base 2 is trapezoidal form, and the upper end middle part of location base 2 is equipped with the joint recess, and the joint recess is arc joint groove.
The upper end of the positioning base 2 is provided with a hinging block, the hinging block is arranged close to one end of the clamping groove, the upper end of the hinging block is hinged with one end of the limiting plate 3, the vertical section of the limiting plate 3 is arc-shaped, the other end of the limiting plate 3 is provided with a connecting hole, one end of the interior of the positioning base 2 is provided with a connecting cavity, the interior of the connecting cavity is provided with a limiting block 131, the upper end of the limiting block 131 is connected with one end of a connecting rod 13, the other end of the connecting rod 13 sequentially penetrates through the connecting cavity and the positioning base 2 and is positioned above the positioning base 2, the other end of the connecting rod 13 is close to the other end of the clamping groove, the other end of the connecting rod 13 is connected with the other end of the limiting plate 3 through the penetrating connecting hole, the surface of the other end of the connecting rod 13 is provided, the inboard of limiting plate 3 and the inside of joint recess all are equipped with buffering protection pad 9, and buffering protection pad 9 is two opposite arc buffering protection pads of opening.
The inside of location base 2 transversely is equipped with reinforcing plate group 18, and reinforcing plate group 18 includes reinforcing plate and lower reinforcing plate, go up the reinforcing plate and all seted up the grafting locating hole on the reinforcing plate down, the lower extreme of joint recess and the one end fixed connection of shock attenuation post 17, the other end of shock attenuation post 17 runs through the grafting locating hole and is connected with the inside bottom of location base 2, the lower extreme of going up the reinforcing plate is equipped with the buffering arch, the upper end of lower reinforcing plate is equipped with down the buffering arch, and go up the buffering arch and the protruding one-to-one vertical correspondence in vertical direction of buffering down, shock attenuation post 17 is five at least, and the equidistance distributes between the shock attenuation post 17.
An inserting groove 12 is vertically arranged at the middle end inside the positioning base 1, one end of the inserting groove 12 sequentially penetrates through the positioning base 1 and the positioning base 2 and extends to the bottom end inside the clamping groove, the other end of the inserting groove 12 is connected with the middle part of the bottom end inside the positioning base 1, a first threaded hole is arranged in the middle of the inserting groove 12, a clamping groove is formed by matching the limiting plate 3 and the clamping groove, a lantern ring 16 is clamped inside the clamping groove, the lantern ring 16 is sleeved outside the pump pipe 15, a connecting plate 14 is fixedly arranged on the lower side of the lantern ring 16, the connecting plate 14 is arc-shaped, a mounting plate 10 is connected to the lower side of the connecting plate 14, the mounting plate 10, the connecting plate 14 and the lantern ring 16 are of an integrally formed structure, a second threaded hole is arranged in the middle of the mounting plate 10, the mounting plate 10 is inserted inside the inserting groove 12, the connecting plate 14, and the mounting plate 10 and the insertion groove 12 are equally spaced at the lower end of the clamping groove.
The two side surfaces of the positioning base 1 are provided with third threaded holes, and the inside of the positioning base 1 is transversely provided with a connecting groove 11, and the inner wall of the connecting groove 11 is provided with a thread groove, one end of the connecting groove 11 is connected with one side of the inserting groove 12, the connecting groove 11, the first threaded hole, the second threaded hole and the third threaded hole are all positioned at the same horizontal height, the outer side of the connecting shaft 5 is provided with a threaded bulge, one end of the connecting shaft 5 is positioned in the connecting groove 11 by sequentially penetrating the third threaded hole, the first threaded hole and the second threaded hole, the other end of the connecting shaft 5 is provided with a rotating handle, the rotary handle is positioned at the outer side of the positioning base 1, three first threaded holes are arranged on each insertion groove 12, three second threaded holes are arranged on each mounting plate 10 and three third threaded holes are arranged on the positioning base, and the triangular distribution is formed among the first threaded holes, among the second threaded holes and among the third threaded holes.
The inside both ends of location base 1 and location base 2 are the reinforcement stabilizer, and the inside of reinforcement stabilizer all is equipped with two baffles 6, first strengthening rib group 7 and second strengthening rib group 8, the reinforcement stabilizer is equipped with first cavity through baffle 6 branch, second cavity and third cavity, the one end of first strengthening rib group 7 and the one side fixed connection who consolidates the internal upper end of stabilizer, and the other end of first strengthening rib group 7 runs through baffle 6 and is connected with the internal bottom middle part of reinforcement stabilizer, the one end of second strengthening rib group 8 and the outside middle part fixed connection of baffle 6, and the other end of second strengthening rib group 8 is connected with the one end of the internal bottom side of reinforcement stabilizer, first cavity, the inside of second cavity and third cavity all is filled with the concrete. The number of the first reinforcing rib group 7 and the second reinforcing rib group 8 is at least two, and the number of the reinforcing ribs in each group is at least three.
The working principle is as follows: when using the land pump to pour, at first cup joint the lantern ring 16 in the outside of pump line 15, then peg graft the inside at inserting groove 12 to mounting panel 10, the inside of connecting plate 14 joint at the joint recess, pass through the cooperation of nut and connecting rod 13 this moment, tightly fix limiting plate 3 on location base 2, lantern ring 16 can be by fine confinement at limiting plate 3 and the cooperation of joint recess and be formed with the joint inslot portion this moment.
Connect location base 1, mounting panel 10 and inserting groove 12 through connecting axle 5, then can further fix a position pump line 15 like this, prevent that pump line 15 from the deviation appearing at the in-process of pouring to carry out accurate work of pouring.
When pouring is started, because the power generated by the ground pump is discontinuous continuity when the ground pump works, the positioning device is easily damaged or is enabled to be displaced, firstly, the impact force of the ground pump is relieved through the shock absorption column 17, and the reinforcing plate group 18 is fixedly arranged in the positioning base 2, so that the shock absorption column 17 can be fixed and cannot deviate when being relieved, and the impact force can be further relieved through the matching of the upper buffering bulge and the lower buffering bulge.
Through reinforcing the stability body then can guarantee whole positioner's stability, prevent that positioner from damaging, because whole positioner's weight is too big, unchangeable removal, thereby be provided with and pull handle 4, the tower crane removes positioner through pulling handle 4 just can be fine, and in general pouring work progress, positioner generally all places on the reinforcing bar that the ligature is good, be equipped with anti-skidding spacing arch through the lower extreme at positioning base 1 like this, through the contact of anti-skidding spacing arch and reinforcing bar, can increase positioning base 1's anti-skidding ability, thereby further stable positioner, place positioner when pouring, take place the displacement.
Through the mutual matching action of the added positioning base 1, the positioning base 2 and the limiting plate 3, the discharging pump pipe can be reinforced when the ground pump is used, the discharging pump pipe is prevented from displacement, accurate positioning pouring is carried out, and in the pouring process, the power ratio of the ground pump is larger, so that the acting force of the pouring positioning device is large, the damage or deviation of the pouring positioning device is easily caused, the acting force of the ground pump can be reduced through the device, the device can be harder and firmer to lay, the manual pulling positioning during the pouring process can be avoided, more accurate fixed-point pouring can be carried out, the pouring quality is improved, the manual investment can be reduced, and the cost investment is reduced, and further, the accident frequency can be reduced, and the pouring safety is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a building concrete placement uses automatic positioning device, includes location base (1), location base (2) and connecting axle (5), and location base (2) set up the upper end at location base (1), its characterized in that: the traction handles (4) are arranged at two ends of the positioning base (1) along the length direction, so that the positioning base (1) can be conveniently moved, the lower end of the positioning base (1) is provided with an anti-skidding limiting bulge, the cross section of the positioning base (2) is trapezoidal, the middle part of the upper end of the positioning base (2) is provided with a clamping groove, and the clamping groove is an arc-shaped clamping groove;
the upper end of the positioning base (2) is provided with a hinged block, the hinged block is arranged close to one end of the clamping groove, the upper end of the hinged block is hinged with one end of the limiting plate (3), the vertical section of the limiting plate (3) is arc-shaped, a connecting hole is formed in the other end of the limiting plate (3), one end of the interior of the positioning base (2) is provided with a connecting cavity, a limiting block (131) is arranged in the connecting cavity, the upper end of the limiting block (131) is connected with one end of a connecting rod (13), the other end of the connecting rod (13) sequentially penetrates through the connecting cavity and the positioning base (2) and is located above the positioning base (2), the other end of the connecting rod (13) is close to the other end of the clamping groove, and the other end of the connecting rod (13) is;
the positioning base is characterized in that a reinforcing plate group (18) is transversely arranged inside the positioning base (2), the reinforcing plate group (18) comprises an upper reinforcing plate and a lower reinforcing plate, inserting positioning holes are formed in the upper reinforcing plate and the lower reinforcing plate, the lower end of a clamping groove is fixedly connected with one end of a damping column (17), the other end of the damping column (17) penetrates through the inserting positioning holes and is connected with the inner bottom end of the positioning base (2), an upper buffering bulge is arranged at the lower end of the upper reinforcing plate, a lower buffering bulge is arranged at the upper end of the lower reinforcing plate, and the upper buffering bulge and the lower buffering bulge are vertically corresponding to each other in the vertical direction;
an inserting groove (12) is vertically arranged at the middle end inside the positioning base (1), one end of the inserting groove (12) sequentially penetrates through the positioning base (1) and the positioning base (2) and extends to the bottom end inside the clamping groove, the other end of the inserting groove (12) is connected with the middle portion of the bottom end inside the positioning base (1), a first threaded hole is formed in the middle of the inserting groove (12), the limiting plate (3) is matched with the clamping groove to form the clamping groove, a lantern ring (16) is clamped inside the clamping groove, the lantern ring (16) is sleeved on the outer side of the pump pipe (15), a connecting plate (14) is fixedly arranged on the lower side of the lantern ring (16), the connecting plate (14) is arc-shaped, the mounting plate (10) is connected to the lower side of the connecting plate (14), a second threaded hole is formed in the middle of the mounting plate (10), and the mounting plate (10) is inserted into the inserting groove, the connecting plate (14) is embedded in the clamping groove;
the two side faces of the positioning base (1) are provided with third threaded holes, the inside of the positioning base (1) is transversely provided with a connecting groove (11), the inner wall of the connecting groove (11) is provided with a threaded groove, one end of the connecting groove (11) is connected with one side of an insertion groove (12), the connecting groove (11), the first threaded hole, the second threaded hole and the third threaded hole are all located at the same horizontal height, the outer side of the connecting shaft (5) is provided with a threaded bulge, one end of the connecting shaft (5) is inserted into the third threaded hole, the first threaded hole and the second threaded hole in sequence and located inside the connecting groove (11), the other end of the connecting shaft (5) is provided with a rotating handle, and the rotating handle is located on the outer side of the positioning base (1);
the two ends of the interior of each of the positioning base (1) and the positioning base (2) are reinforcing and stabilizing bodies, two partition plates (6), a first reinforcing rib group (7) and a second reinforcing rib group (8) are arranged in each reinforcing and stabilizing body, each reinforcing and stabilizing body is provided with a first cavity, a second cavity and a third cavity through the partition plates (6), one end of each first reinforcing rib group (7) is fixedly connected with one side of the upper end of the interior of each reinforcing and stabilizing body, the other end of each first reinforcing rib group (7) penetrates through the partition plates (6) to be connected with the middle of the bottom end of the interior of each reinforcing and stabilizing body, one end of each second reinforcing rib group (8) is fixedly connected with the middle of the outer side of each partition plate (6), the other end of each second reinforcing rib group (8) is connected with one end of the bottom side of the interior of each reinforcing and stabilizing body, and concrete is filled in each of the first cavity;
the surface of the other end of each connecting rod (13) is provided with threads, the other end of each connecting rod (13) is sleeved with a nut in a threaded matching mode, the number of the connecting rods (13) is two, and the two connecting rods (13) are arranged on the positioning base (2) along the length direction;
the number of the damping columns (17) is at least five, and the damping columns (17) are distributed at equal intervals;
the number of the mounting plates (10) and the number of the inserting grooves (12) are five, and the mounting plates (10) and the inserting grooves (12) are distributed at the lower end of the clamping groove at equal intervals;
the mounting plate (10), the connecting plate (14) and the lantern ring (16) are of an integrally formed structure.
2. The automatic positioning device for concrete pouring of buildings according to claim 1, characterized in that: the inner side of the limiting plate (3) and the inner part of the clamping groove are both provided with buffering protection pads (9), and the buffering protection pads (9) are two arc-shaped buffering protection pads with opposite openings.
3. The automatic positioning device for concrete pouring of buildings according to claim 1, characterized in that: the number of the first reinforcing rib group (7) and the second reinforcing rib group (8) is at least two, and the number of the reinforcing ribs in each group is at least three.
4. The automatic positioning device for concrete pouring of buildings according to claim 1, characterized in that: the number of the first threaded holes in each inserting groove (12), the number of the second threaded holes in each mounting plate (10) and the number of the third threaded holes in each positioning base (1) are three, and the first threaded holes, the second threaded holes and the third threaded holes are distributed in a triangular mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711389875.5A CN108035356B (en) | 2016-10-31 | 2016-10-31 | Automatic positioning device for building concrete pouring |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610927901.4A CN106320343B (en) | 2016-10-31 | 2016-10-31 | A kind of building concrete, which pours, uses automatic positioning equipment |
CN201711389875.5A CN108035356B (en) | 2016-10-31 | 2016-10-31 | Automatic positioning device for building concrete pouring |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610927901.4A Division CN106320343B (en) | 2016-10-31 | 2016-10-31 | A kind of building concrete, which pours, uses automatic positioning equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108035356A CN108035356A (en) | 2018-05-15 |
CN108035356B true CN108035356B (en) | 2020-10-30 |
Family
ID=57818097
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711389838.4A Expired - Fee Related CN108105477B (en) | 2016-10-31 | 2016-10-31 | Automatic positioning device for building concrete pouring |
CN201711389874.0A Expired - Fee Related CN108035355B (en) | 2016-10-31 | 2016-10-31 | Automatic positioning device for building concrete pouring |
CN201610927901.4A Active CN106320343B (en) | 2016-10-31 | 2016-10-31 | A kind of building concrete, which pours, uses automatic positioning equipment |
CN201711389875.5A Expired - Fee Related CN108035356B (en) | 2016-10-31 | 2016-10-31 | Automatic positioning device for building concrete pouring |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711389838.4A Expired - Fee Related CN108105477B (en) | 2016-10-31 | 2016-10-31 | Automatic positioning device for building concrete pouring |
CN201711389874.0A Expired - Fee Related CN108035355B (en) | 2016-10-31 | 2016-10-31 | Automatic positioning device for building concrete pouring |
CN201610927901.4A Active CN106320343B (en) | 2016-10-31 | 2016-10-31 | A kind of building concrete, which pours, uses automatic positioning equipment |
Country Status (1)
Country | Link |
---|---|
CN (4) | CN108105477B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108105477B (en) * | 2016-10-31 | 2020-06-05 | 南京溧水高新创业投资管理有限公司 | Automatic positioning device for building concrete pouring |
CN112922343B (en) * | 2021-01-18 | 2022-08-12 | 武汉思力博轨道装备有限公司 | High-efficiency concrete pouring equipment |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004068531A (en) * | 2002-08-09 | 2004-03-04 | Kitagawa Iron Works Co Ltd | Underwater concreting device |
CN203626256U (en) * | 2013-12-24 | 2014-06-04 | 王维孝 | Shock absorption bracket of concrete delivery pipeline |
CN204042204U (en) * | 2014-03-30 | 2014-12-24 | 青岛一建集团有限公司 | A kind of pump line shock bracket |
CN204201297U (en) * | 2014-10-08 | 2015-03-11 | 广西建工集团第三建筑工程有限责任公司 | A kind of disappear rolling bearing device built on stilts for the horizontal pump line of ground pump |
CN204531451U (en) * | 2015-03-23 | 2015-08-05 | 中机环建集团有限公司 | Pumping of concrete horizontal conveying pipe roller bearing shock bracket |
CN204590632U (en) * | 2015-04-30 | 2015-08-26 | 张洁 | Pump concrete carrier pipe shock bracket is dragged in a kind of building site |
CN204828953U (en) * | 2015-06-17 | 2015-12-02 | 江苏弘盛建设工程集团有限公司 | Special buffering split heads of concrete conveying pipe |
CN205400075U (en) * | 2016-02-26 | 2016-07-27 | 江苏南通二建集团有限公司无锡分公司 | Concrete conveying pipe shock attenuation bracket |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61266727A (en) * | 1985-05-21 | 1986-11-26 | Taisei Corp | Method and apparatus for placement of underwater concrete |
JP2004068521A (en) * | 2002-08-09 | 2004-03-04 | Tomoe Corp | Brace frame with damper |
CN202323956U (en) * | 2011-10-26 | 2012-07-11 | 中冶集团武汉勘察研究院有限公司 | Underwater concrete pouring elevation control device |
CN103015427B (en) * | 2012-12-28 | 2015-07-01 | 中铁二十四局集团有限公司 | Hole pile underwater concrete pouring positioning device and positioning device thereof |
CN203420473U (en) * | 2013-05-21 | 2014-02-05 | 湖南鑫隆模塑科技开发有限公司 | Fast-clamping concrete pouring device |
CN108105477B (en) * | 2016-10-31 | 2020-06-05 | 南京溧水高新创业投资管理有限公司 | Automatic positioning device for building concrete pouring |
-
2016
- 2016-10-31 CN CN201711389838.4A patent/CN108105477B/en not_active Expired - Fee Related
- 2016-10-31 CN CN201711389874.0A patent/CN108035355B/en not_active Expired - Fee Related
- 2016-10-31 CN CN201610927901.4A patent/CN106320343B/en active Active
- 2016-10-31 CN CN201711389875.5A patent/CN108035356B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004068531A (en) * | 2002-08-09 | 2004-03-04 | Kitagawa Iron Works Co Ltd | Underwater concreting device |
CN203626256U (en) * | 2013-12-24 | 2014-06-04 | 王维孝 | Shock absorption bracket of concrete delivery pipeline |
CN204042204U (en) * | 2014-03-30 | 2014-12-24 | 青岛一建集团有限公司 | A kind of pump line shock bracket |
CN204201297U (en) * | 2014-10-08 | 2015-03-11 | 广西建工集团第三建筑工程有限责任公司 | A kind of disappear rolling bearing device built on stilts for the horizontal pump line of ground pump |
CN204531451U (en) * | 2015-03-23 | 2015-08-05 | 中机环建集团有限公司 | Pumping of concrete horizontal conveying pipe roller bearing shock bracket |
CN204590632U (en) * | 2015-04-30 | 2015-08-26 | 张洁 | Pump concrete carrier pipe shock bracket is dragged in a kind of building site |
CN204828953U (en) * | 2015-06-17 | 2015-12-02 | 江苏弘盛建设工程集团有限公司 | Special buffering split heads of concrete conveying pipe |
CN205400075U (en) * | 2016-02-26 | 2016-07-27 | 江苏南通二建集团有限公司无锡分公司 | Concrete conveying pipe shock attenuation bracket |
Also Published As
Publication number | Publication date |
---|---|
CN108035355B (en) | 2020-10-30 |
CN108105477A (en) | 2018-06-01 |
CN108035355A (en) | 2018-05-15 |
CN106320343A (en) | 2017-01-11 |
CN106320343B (en) | 2018-05-22 |
CN108035356A (en) | 2018-05-15 |
CN108105477B (en) | 2020-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108105477B (en) | Automatic positioning device for building concrete pouring | |
CN113756320B (en) | Method for hoisting low-clearance and ultra-long reinforcement cage section by section into holes under high-voltage line | |
CN113737776B (en) | Ultra-long steel pipe pile under condition of marine-facies deep mucky soil and construction method thereof | |
CN107013046B (en) | A kind of antidote of big section steel pipe concrete combination column | |
CN109024236A (en) | Steel trestle and construction method thereof | |
CN114892698B (en) | Assembled template for asymmetric double-inclined-pile cast-in-situ bearing platform and construction method | |
CN113431036B (en) | Prefabricated Z-shaped assembled type retaining wall for giant dry-operation bored pile | |
CN213682119U (en) | Foundation pile pours and uses steel reinforcement cage fixing device | |
CN213626791U (en) | Reinforcing structure of floor support steel beam | |
CN211774613U (en) | Large-scale steel construction built-in fitting | |
CN207512968U (en) | A kind of splicing node of steel plate combined shear wall | |
CN113802578B (en) | Quickly-installed rectangular pile hole assembled type protection wall and installation method thereof | |
CN218643108U (en) | Pipeline embedding and supporting device | |
CN221072601U (en) | Building pile with adjustable height | |
CN205000361U (en) | Multi -functional underground continuous wall core section of thick bamboo of combination among reverse construction method | |
CN217394149U (en) | Auxiliary device for controlling welding perpendicularity of lattice column | |
CN219862767U (en) | Support platform device of filling pile hole opening installation machine | |
CN215405627U (en) | Support system for beam | |
CN220746912U (en) | Pile foundation reinforcement cage installation auxiliary derrick | |
CN215760385U (en) | Scaffold wall connecting piece and scaffold wall connecting structure | |
CN218813689U (en) | Anchor cable steel waist rail connection structure | |
CN219280499U (en) | Quick construction structure of river course steel landing stage | |
CN220228058U (en) | Steel plate grating for assembled artificial tunneling jacking pipe construction | |
CN219808585U (en) | Steel structure upright post | |
CN213390000U (en) | Trash rack structure convenient to installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200929 Address after: 236000 118 households in houtianzi village, Baimiao village, Yingquan District, Fuyang City, Anhui Province Applicant after: Anhui xingqianli Intellectual Property Service Co.,Ltd. Address before: 264000 Zhifu City, Shandong Province, the extension of the road through the District of Yantai, No. 121 Applicant before: Chen Jian |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201030 Termination date: 20211031 |